Rab Agelia Vena Rastika Final
Rab Agelia Vena Rastika Final
PEKERJAAN
NO SATUAN RUMUS HITUNGAN JUMLAH
( Dilengkapi Gambar Detail )
PEKERJAAN PERSIAPAN
PEKERJAAN TANAH
1 Galian Tanah Pondasi Luas trapesium x p. Pondasi
Kompetensi Keahlian DPI B ( Arsitektur ) Nama Siswa Agelia Vena Rastika NILAI
TEKNI K ARS ITE KTUR Kelas XI DPIB - A Kelas / Absen XI DPIB A / 5
SMK NEGE RI 2
SALATIGA Kode Job Sheet EBK /GJL /2022 /001
Dinilai Oleh Daryanto, M. Pd.
Waktu 4 Jam @ 45 Menit
JOB SHEET
PROGRAM STUDI KEAHLIAN : TEKNIK KONSTRUKSI DAN PROPERTI
KOMPETENSI KEAHLIAN : TEKNIK ARSITEKTUR ( DPIB )
PEKERJAAN
NO SATUAN RUMUS HITUNGAN JUMLAH
( Dilengkapi Gambar Detail )
TOTAL 176.89365
TOTAL 10,996
Kompetensi Keahlian DPI B ( Arsitektur ) Nama Siswa Agelia Vena Rastika NILAI
TEKNI K ARS ITE KTUR
Kelas XI DPIB - A Kelas / Absen XI DPIB A / 5
SMK NEGE RI 2
SALATIGA Kode Job Sheet EBK /GJL /2022 /001
Dinilai Oleh Daryanto, M. Pd.
Waktu 4 Jam @ 45 Menit
JOB SHEET
PROGRAM STUDI KEAHLIAN : TEKNIK KONSTRUKSI DAN PROPERTI
KOMPETENSI KEAHLIAN : TEKNIK ARSITEKTUR ( DPIB )
PEKERJAAN
NO SATUAN RUMUS HITUNGAN JUMLAH
( Dilengkapi Gambar Detail )
TOTAL 58.76455
PEKERJAAN PONDASI
Kompetensi Keahlian DPI B ( Arsitektur ) Nama Siswa Agelia Vena Rastika NILAI
TEKNI K ARS ITE KTUR
Kelas XI DPIB - A Kelas / Absen XI DPIB A / 5
SMK NEGE RI 2
SALATIGA Kode Job Sheet EBK /GJL /2022 /001
Dinilai Oleh Daryanto, M. Pd.
Waktu 4 Jam @ 45 Menit
JOB SHEET
PROGRAM STUDI KEAHLIAN : TEKNIK KONSTRUKSI DAN PROPERTI
KOMPETENSI KEAHLIAN : TEKNIK ARSITEKTUR ( DPIB )
PEKERJAAN
NO SATUAN RUMUS HITUNGAN JUMLAH
( Dilengkapi Gambar Detail )
TOTAL 48,783
TOTAL 21,992
Kompetensi Keahlian DPI B ( Arsitektur ) Nama Siswa Agelia Vena Rastika NILAI
TEKNI K ARS ITE KTUR
Kelas XI DPIB - A Kelas / Absen XI DPIB A / 5
SMK NEGE RI 2
SALATIGA Kode Job Sheet EBK /GJL /2022 /001
Dinilai Oleh Daryanto, M. Pd.
Waktu 4 Jam @ 45 Menit
JOB SHEET
PROGRAM STUDI KEAHLIAN : TEKNIK KONSTRUKSI DAN PROPERTI
KOMPETENSI KEAHLIAN : TEKNIK ARSITEKTUR ( DPIB )
PEKERJAAN
NO SATUAN RUMUS HITUNGAN JUMLAH
( Dilengkapi Gambar Detail )
m3 PENGECORAN 4,653
Luas tampang sloof x panjang sloof
(bxh)xp
: ( 0.15 x 0.3 ) x 103.4
kg PEMBESIAN BESI POLOS 816.86
p. sloof x jumlah besi x berat besi
: ( 517 x 1.58 )
m2 PEMASANGAN BEKISTING 62.04
p. sloof x tinggi sloof x 2
: ( 0.3 x 103.4 ) x 2
sloof 15 / 20
m3 PENGECORAN 1.1865
Luas tampang sloof x panjang sloof
(bxh)xp
: ( 0.15 x 0.2 ) x 39.55
kg PEMBESIAN BESI POLOS 98,084
p. sloof x jumlah besi x berat besi
: ( 158.2 x 0.62 )
m2 PEMASANGAN BEKISTING 15. 82
p. sloof x tinggi sloof x 2
: ( 0.2 x 39.55 ) x 2
kg BEGEL 47.9136
4.5144
Kompetensi Keahlian DPI B ( Arsitektur ) Nama Siswa Agelia Vena Rastika NILAI
TEKNI K ARS ITE KTUR
Kelas XI DPIB - A Kelas / Absen XI DPIB A / 5
SMK NEGE RI 2
SALATIGA Kode Job Sheet EBK /GJL /2022 /001
Dinilai Oleh Daryanto, M. Pd.
Waktu 4 Jam @ 45 Menit
JOB SHEET
PROGRAM STUDI KEAHLIAN : TEKNIK KONSTRUKSI DAN PROPERTI
KOMPETENSI KEAHLIAN : TEKNIK ARSITEKTUR ( DPIB )
PEKERJAAN
NO SATUAN RUMUS HITUNGAN JUMLAH
( Dilengkapi Gambar Detail )
2 Volume kolom
K1
m3 PENGECORAN 0.333
Luas tampang kolom x panjang kolom
(bxh)xp
: ( 0.15 x 0.4 ) x 5.55
kg PEMBESIAN BESI POLOS 20,646
p. kolom x jumlah besi x berat besi
: ( 33.3 X 0.62 )
m2 PEMASANGAN BEKISTING 8.88
p. kolom x tinggi kolom x 4
: ( 0.4 x 5.55 ) x 4
kg BEGEL 208.32
KP
m3 PENGECORAN 0.124875
Luas tampang kolom x panjang kolom
(bxh)xp
: ( 0.15 x 0.15 ) x 5.55
kg PEMBESIAN BESI POLOS 2,769
p. kolom x jumlah besi x berat besi
: ( 22.2 x 0.39 )
m2 PEMASANGAN BEKISTING 3.33
p. kolom x tinggi kolom x 2
: ( 0.15 X 5.55 ) x 4
kg BEGEL 39.6
Kompetensi Keahlian DPI B ( Arsitektur ) Nama Siswa Agelia Vena Rastika NILAI
TEKNI K ARS ITE KTUR
Kelas XI DPIB - A Kelas / Absen XI DPIB A / 5
SMK NEGE RI 2
SALATIGA Kode Job Sheet EBK /GJL /2022 /001
Dinilai Oleh Daryanto, M. Pd.
Waktu 4 Jam @ 45 Menit
JOB SHEET
PROGRAM STUDI KEAHLIAN : TEKNIK KONSTRUKSI DAN PROPERTI
KOMPETENSI KEAHLIAN : TEKNIK ARSITEKTUR ( DPIB )
PEKERJAAN
NO SATUAN RUMUS HITUNGAN JUMLAH
( Dilengkapi Gambar Detail )
3 Volume Ringbalok
15 / 20 m3 PENGECORAN 1.1865
Luas tampang sloof x panjang sloof
(bxh)xp
: ( 0.15 x 0.2 ) x 39.55
kg PEMBESIAN BESI POLOS 98,084
p. sloof x jumlah besi x berat besi
: ( 158.2 x 0.62 )
m2 PEMASANGAN BEKISTING 15. 82
p. sloof x tinggi sloof x 2
: ( 0.2 x 39.55 ) x 2
kg BEGEL 4.5144
4 Volume Balok
15 / 30 m3 PENGECORAN 4,653
Luas tampang sloof x panjang sloof
(bxh)xp
: ( 0.15 x 0.3 ) x 103.4
kg PEMBESIAN BESI POLOS 816.86
p. sloof x jumlah besi x berat besi
: ( 517 x 1.58 )
m2 PEMASANGAN BEKISTING 62.04
p. sloof x tinggi sloof x 2
: ( 0.3 x 103.4 ) x 2
kg BEGEL 47,913.6
Kompetensi Keahlian DPI B ( Arsitektur ) Nama Siswa Agelia Vena Rastika NILAI
TEKNI K ARS ITE KTUR
Kelas XI DPIB - A Kelas / Absen XI DPIB A / 5
SMK NEGE RI 2
SALATIGA Kode Job Sheet EBK /GJL /2022 /001
Dinilai Oleh Daryanto, M. Pd.
Waktu 4 Jam @ 45 Menit
COMPETENCY STANDARDS : MENGHITUNG RAB RUMAH TINGGAL SEDERHANA COMPETENCY STANDARDS : MENGHITUNG RAB RUMAH TINGGAL SEDERHANA
BASIC COMPETENCE : ME NGHIT UNG V OLUME P E KE RJA A N K ONST RUK S I BASIC COMPETENCE : M ENGHI TUNG VOLUM E PE K ERJAA N K ONS TRUKS I
PEKERJAAN PEKERJAAN
NO SATUAN RUMUS HITUNGAN JUMLAH NO SATUAN RUMUS HITUNGAN JUMLAH
( Dilengkapi Gambar Detail ) ( Dilengkapi Gambar Detail )
PEKERJAAN PASANGAN
1 Pasangan Dinding Bata Type J2 m3 2((3(0.6 x 1.830) + (3(0.1 x 0.6))) 6,948
Pasangan Dinding 302.5425
m2 ( p x t ) - lubang kusen
: ( 74.9 x 4.55 ) - 38.2525
TOTAL 375.8925
2 Plesteran m2 2 x luas pasangan dinding 605.085
: 2 x 302.5425
TOTAL 751.785
Kompetensi Keahlian DPI B ( Arsitektur ) Nama Siswa Agelia Vena Rastika NILAI Kompetensi Keahlian DP IB ( A rsit ektur ) Nama Siswa Agelia Vena Rastika NILAI
TEKNI K ARS ITE KTUR TE KNIK ARSI TEKTUR
Kelas XI DPIB - A Kelas / Absen XI DPIB A / 5 Kelas XI DPIB - A Kelas / Absen XI DPIB A / 5
SMK NEGE RI 2 S MK NEGERI 2
SALATIGA Kode Job Sheet EBK /GJL /2022 /001 S AL ATI GA Kode Job Sheet EBK /GJL /2022 /001
Dinilai Oleh Daryanto, M. Pd. Dinilai Oleh Daryanto, M. Pd.
Waktu 4 Jam @ 45 Menit Waktu 4 Jam @ 45 Menit
COMPETENCY STANDARDS : MENGHITUNG RAB RUMAH TINGGAL SEDERHANA COMPETENCY STANDARDS : MENGHITUNG RAB RUMAH TINGGAL SEDERHANA
BASIC COMPETENCE : ME NGHIT UNG V OLUME P E KE RJA A N K ONST RUK S I BASIC COMPETENCE : M ENGHI TUNG VOLUM E PE K ERJAA N K ONS TRUKS I
PEKERJAAN PEKERJAAN
NO SATUAN RUMUS HITUNGAN JUMLAH NO SATUAN RUMUS HITUNGAN JUMLAH
( Dilengkapi Gambar Detail ) ( Dilengkapi Gambar Detail )
1 Kusen pintu / jendela m3 Luas tampang x panjang kusen 1 Daun pintu / jendela m3
PINTU PINTU
Kusen pintu P1 m3 ((0.06 x 0.12) x (2.45 x 2) + 1.6)) + ((0.05x0.12) 0.0696 Type P1 m3 (2 (2.39 x 0.75)) + (2(0.75 x 0.10) 3,735
x ((1.6 x 2) + (0.2 x 3)
Kusen pintu P2 m3 3(((0.06 x 0.12) x ((2.45 x 2) + 0,9)) + ((0.05 0.16488 Type P2 m3 3 ((2.39 x 0.75)) + (2(0.75 x 0.10) 5,976
x 0.12) x ((0.2 x 2) + (0.9 x 2)))
Kusen pintu P3 m3 2(((0.06 x 0.12) x (2.05 x 2) + 0.75))) 0.06984 Type P3 m3 2 ( 1.99 x 0.65) 2,587
Kompetensi Keahlian DPI B ( Arsitektur ) Nama Siswa Agelia Vena Rastika NILAI Kompetensi Keahlian DP IB ( A rsit ektur ) Nama Siswa Agelia Vena Rastika NILAI
TEKNI K ARS ITE KTUR Kelas XI DPIB - A Kelas / Absen XI DPIB A / 5 TE KNIK ARSI TEKTUR Kelas XI DPIB - A Kelas / Absen XI DPIB A / 5
SMK NEGE RI 2 S MK NEGERI 2
SALATIGA Kode Job Sheet EBK /GJL /2022 /001 S AL ATI GA Kode Job Sheet EBK /GJL /2022 /001
Dinilai Oleh Daryanto, M. Pd. Dinilai Oleh Daryanto, M. Pd.
Waktu 4 Jam @ 45 Menit Waktu 4 Jam @ 45 Menit
COMPETENCY STANDARDS : MENGHITUNG RAB RUMAH TINGGAL SEDERHANA COMPETENCY STANDARDS : MENGHITUNG RAB RUMAH TINGGAL SEDERHANA
BASIC COMPETENCE : ME NGHIT UNG V OLUME P E KE RJA A N K ONST RUK S I BASIC COMPETENCE : M ENGHI TUNG VOLUM E PE K ERJAA N K ONS TRUKS I
PEKERJAAN PEKERJAAN
NO SATUAN RUMUS HITUNGAN JUMLAH NO SATUAN RUMUS HITUNGAN JUMLAH
( Dilengkapi Gambar Detail ) ( Dilengkapi Gambar Detail )
Kusen pintu P4 m3 ((0.06 x 0.12) x (3.0 x 2.0) + 0.75))) 0.04868 Type P4 m3 2.94 x 0.8 2,352
Kusen pintu PL1 m3 ((0.06 x 0.12) x ((2.45 x 2.0) + 2.5)) + ((0.05 x 0.08568 Type PL1 m3 (4 (2.39 x 0.6) + (0.1 x 2.4) 5,976
0.12) x ((2.5 x 2) + (0.2 x 2.0)))
JENDELA JENDELA
Kusen jendela J1 m3 2(((0.06 x 0.12) x ((1.95 x 2.0) + (0.7 x 2.0)) 0.097908 Type J1 m3 2 ((0.6 x 1.83) + (3(0.1 x 0.6)) 2,316
((0.05 x 0.12) x ((0.2 x 2.0) + (0.7 x 2.0))))
Kompetensi Keahlian DPI B ( Arsitektur ) Nama Siswa Agelia Vena Rastika NILAI Kompetensi Keahlian DP IB ( A rsit ektur ) Nama Siswa Agelia Vena Rastika NILAI
TEKNI K ARS ITE KTUR TE KNIK ARSI TEKTUR
Kelas XI DPIB - A Kelas / Absen XI DPIB A / 5 Kelas XI DPIB - A Kelas / Absen XI DPIB A / 5
SMK NEGE RI 2 S MK NEGERI 2
SALATIGA Kode Job Sheet EBK /GJL /2022 /001 S AL ATI GA Kode Job Sheet EBK /GJL /2022 /001
Dinilai Oleh Daryanto, M. Pd. Dinilai Oleh Daryanto, M. Pd.
Waktu 4 Jam @ 45 Menit Waktu 4 Jam @ 45 Menit
JOB SHEET
PROGRAM STUDI KEAHLIAN : TEKNIK KONSTRUKSI DAN PROPERTI
KOMPETENSI KEAHLIAN : TEKNIK ARSITEKTUR ( DPIB )
Kompetensi Keahlian DPI B ( Arsitektur ) Nama Siswa Agelia Vena Rastika NILAI
TEKNI K ARS ITE KTUR
Kelas XI DPIB - A Kelas / Absen XI DPIB A / 5
SMK NEGE RI 2
SALATIGA Kode Job Sheet EBK /GJL /2022 /001
Dinilai Oleh Daryanto, M. Pd.
Waktu 4 Jam @ 45 Menit
COMPETENCY STANDARDS : MENGHITUNG RAB RUMAH TINGGAL SEDERHANA COMPETENCY STANDARDS : MENGHITUNG RAB RUMAH TINGGAL SEDERHANA
BASIC COMPETENCE : ME NGHIT UNG V OLUME P E KE RJA A N K ONST RUK S I BASIC COMPETENCE : M ENGHI TUNG VOLUM E PE K ERJAA N K ONS TRUKS I
PEKERJAAN PEKERJAAN
NO SATUAN RUMUS HITUNGAN JUMLAH NO SATUAN RUMUS HITUNGAN JUMLAH
( Dilengkapi Gambar Detail ) ( Dilengkapi Gambar Detail )
PEKERJAAN PLAFOND
1 Rangka Langit - Langit m2 Luas langit - langit 130.2 Bagian 3.1 m2 cos 30 = samping / miring 7.72661663
pxl miring = samping / cos 30
( 5.05 x 2.65 ) + ( 6.55 x 10.85 ) + ( 9.15 x 5.0 ) miring = 2.525 / 0,866
2 Pasangan List Profil Gypsum m Jumlah panjang yg dipasang 61.6 miring = 2.91570439
L = miring x panjang atap
3 Penutup Langit - Langit m2 130.2 L = 2.91570439 x 2.65
Kompetensi Keahlian DPI B ( Arsitektur ) Nama Siswa Agelia Vena Rastika NILAI Kompetensi Keahlian DP IB ( A rsit ektur ) Nama Siswa Agelia Vena Rastika NILAI
TEKNI K ARS ITE KTUR Kelas XI DPIB - A Kelas / Absen XI DPIB A / 5 TE KNIK ARSI TEKTUR Kelas XI DPIB - A Kelas / Absen XI DPIB A / 5
SMK NEGE RI 2 S MK NEGERI 2
SALATIGA Kode Job Sheet EBK /GJL /2022 /001 S AL ATI GA Kode Job Sheet EBK /GJL /2022 /001
Dinilai Oleh Daryanto, M. Pd. Dinilai Oleh Daryanto, M. Pd.
Waktu 4 Jam @ 45 Menit Waktu 4 Jam @ 45 Menit
JOB SHEET
PROGRAM STUDI KEAHLIAN : TEKNIK KONSTRUKSI DAN PROPERTI
KOMPETENSI KEAHLIAN : TEKNIK ARSITEKTUR ( DPIB )
COMPETENCY STANDARDS : MENGHITUNG RAB RUMAH TINGGAL SEDERHANA
BASIC COMPETENCE : ME NGHIT UNG V OLUME P E KE RJA A N K ONST RUK S I
Kompetensi Keahlian DPI B ( Arsitektur ) Nama Siswa Agelia Vena Rastika NILAI
TEKNI K ARS ITE KTUR
Kelas XI DPIB - A Kelas / Absen XI DPIB A / 5
SMK NEGE RI 2
SALATIGA Kode Job Sheet EBK /GJL /2022 /001
Dinilai Oleh Daryanto, M. Pd.
Waktu 4 Jam @ 45 Menit
JOB SHEET
PROGRAM STUDI KEAHLIAN : TEKNIK KONSTRUKSI DAN PROPERTI
KOMPETENSI KEAHLIAN : TEKNIK ARSITEKTUR ( DPIB )
PEKERJAAN
NO SATUAN RUMUS HITUNGAN JUMLAH
( Dilengkapi Gambar Detail )
BV
m2 0.3x0.7 0.21
Pintu PL
m2 4x(2.15x0,36) 3
5 Grendel Jendela
Type J1 buah 2 jendela x 1 grendel jendela 2
Type J2 buah 2 jendela x 1 grendel jendela 2
Type J3 buah 1 jendela x 1 grendel jendela 1
BV buah 1 jendela x 0 grendel jendela 0
Kompetensi Keahlian DPI B ( Arsitektur ) Nama Siswa Agelia Vena Rastika NILAI
TEKNI K ARS ITE KTUR
Kelas XI DPIB - A Kelas / Absen XI DPIB A / 5
SMK NEGE RI 2
SALATIGA Kode Job Sheet EBK /GJL /2022 /001
Dinilai Oleh Daryanto, M. Pd.
Waktu 4 Jam @ 45 Menit
JOB SHEET
PROGRAM STUDI KEAHLIAN : TEKNIK KONSTRUKSI DAN PROPERTI
KOMPETENSI KEAHLIAN : TEKNIK ARSITEKTUR ( DPIB )
PEKERJAAN
NO SATUAN RUMUS HITUNGAN JUMLAH
( Dilengkapi Gambar Detail )
PEKERJAAN LANTAI
Bagian 1
m3 ((5.5 x 4.3 ) - ( 2 x 1.5 )) x 0.55 113,465
Bagian 2
Bagian 3
m3 (3.5 x 3.15) x 0.55 606,375
Kompetensi Keahlian DPI B ( Arsitektur ) Nama Siswa Agelia Vena Rastika NILAI
TEKNI K ARS ITE KTUR
Kelas XI DPIB - A Kelas / Absen XI DPIB A / 5
SMK NEGE RI 2
SALATIGA Kode Job Sheet EBK /GJL /2022 /001
Dinilai Oleh Daryanto, M. Pd.
Waktu 4 Jam @ 45 Menit
JOB SHEET
PROGRAM STUDI KEAHLIAN : TEKNIK KONSTRUKSI DAN PROPERTI
KOMPETENSI KEAHLIAN : TEKNIK ARSITEKTUR ( DPIB )
PEKERJAAN
NO SATUAN RUMUS HITUNGAN JUMLAH
( Dilengkapi Gambar Detail )
Bagian 4
Bagian 5
Bagian 6
Kompetensi Keahlian DPI B ( Arsitektur ) Nama Siswa Agelia Vena Rastika NILAI
TEKNI K ARS ITE KTUR
Kelas XI DPIB - A Kelas / Absen XI DPIB A / 5
SMK NEGE RI 2
SALATIGA Kode Job Sheet EBK /GJL /2022 /001
Dinilai Oleh Daryanto, M. Pd.
Waktu 4 Jam @ 45 Menit
JOB SHEET
PROGRAM STUDI KEAHLIAN : TEKNIK KONSTRUKSI DAN PROPERTI
KOMPETENSI KEAHLIAN : TEKNIK ARSITEKTUR ( DPIB )
PEKERJAAN
NO SATUAN RUMUS HITUNGAN JUMLAH
( Dilengkapi Gambar Detail )
Bagian7
Bagian 8
Bagian 9
Kompetensi Keahlian DPI B ( Arsitektur ) Nama Siswa Agelia Vena Rastika NILAI
TEKNI K ARS ITE KTUR
Kelas XI DPIB - A Kelas / Absen XI DPIB A / 5
SMK NEGE RI 2
SALATIGA Kode Job Sheet EBK /GJL /2022 /001
Dinilai Oleh Daryanto, M. Pd.
Waktu 4 Jam @ 45 Menit
JOB SHEET
PROGRAM STUDI KEAHLIAN : TEKNIK KONSTRUKSI DAN PROPERTI
KOMPETENSI KEAHLIAN : TEKNIK ARSITEKTUR ( DPIB )
:
M E NG HIT
COMPETENCY STANDARDS : MENGHITUNG RAB RUMAH TINGGAL SEDERHANA
UNG
V OLUM E
BASIC COMPETENCE
P E KE RJA
AN
K ONS TRU
KSI
PEKERJAAN
NO SATUAN RUMUS HITUNGAN JUMLAH
(Dilengkapi Gambar Detail )
3 Rabat Beton
4 Pasangan Keramik m2
m2 keramik 60 x 60 121.69
T EKNI K
ARSI TEKT
UR SMK Kompetensi Keahlian DPI B ( Arsitektur ) Nama Siswa Agelia Vena Rastika NILAI
NEGE RI 2
S AL ATI GA Kelas XI DPIB - A Kelas / Absen XI DPIB A / 5
Kode Job Sheet EBK /GJL /2022 /001 Dinilai Oleh Daryanto, M. Pd.
JOB SHEET
PROGRAM STUDI KEAHLIAN : TEKNIK KONSTRUKSI DAN PROPERTI
KOMPETENSI KEAHLIAN : TEKNIK ARSITEKTUR ( DPIB )
:
M E NG HIT
COMPETENCY STANDARDS : MENGHITUNG RAB RUMAH TINGGAL SEDERHANA
UNG
V OLUM E
BASIC COMPETENCE
P E KE RJA
AN
K ONS TRU
KSI
PEKERJAAN
NO SATUAN RUMUS HITUNGAN JUMLAH
( Dilengkapi Gambar Detail )
PEKERJAAN SANITASI
T EKNI K
ARSI TEKT
UR SMK Kompetensi Keahlian DPI B ( Arsitektur ) Nama Siswa Agelia Vena Rastika NILAI
NEGE RI 2
S AL ATI GA Kelas XI DPIB - A Kelas / Absen XI DPIB A / 5
Kode Job Sheet EBK /GJL /2022 /001 Dinilai Oleh Daryanto, M. Pd.
6 Kran buah 10
7 Resapan buah 1
8 Septictank buah 1
11 Wastafel KM buah 2
12 Shower buah 2
T EKNI K
ARSI TEKT
UR SMK Kompetensi Keahlian DPI B ( Arsitektur ) Nama Siswa Agelia Vena Rastika NILAI Kompetensi Keahlian DP IB ( A rsit ektur ) Nama Siswa Agelia Vena Rastika NILAI
NEGE RI 2 TE KNIK ARSI TEKTUR
S AL ATI GA Kelas XI DPIB - A Kelas / Absen XI DPIB A / 5 Kelas XI DPIB - A Kelas / Absen XI DPIB A / 5
S MK NEGERI 2
Kode Job Sheet EBK /GJL /2022 /001 Dinilai Oleh Daryanto, M. Pd. S AL ATI GA Kode Job Sheet EBK /GJL /2022 /001
Dinilai Oleh Daryanto, M. Pd.
Waktu 4 Jam @ 45 Menit Waktu 4 Jam @ 45 Menit
JOB SHEET
PROGRAM STUDI KEAHLIAN : TEKNIK KONSTRUKSI DAN PROPERTI
KOMPETENSI KEAHLIAN : TEKNIK ARSITEKTUR ( DPIB )
PEKERJAAN
NO SATUAN RUMUS HITUNGAN JUMLAH
( Dilengkapi Gambar Detail )
PEKERJAAN PENGECATAN
PINTU
Kompetensi Keahlian DPI B ( Arsitektur ) Nama Siswa Agelia Vena Rastika NILAI
TEKNI K ARS ITE KTUR
Kelas XI DPIB - A Kelas / Absen XI DPIB A / 5
SMK NEGE RI 2
SALATIGA Kode Job Sheet EBK /GJL /2022 /001
Dinilai Oleh Daryanto, M. Pd.
Waktu 4 Jam @ 45 Menit
JOB SHEET
PROGRAM STUDI KEAHLIAN : TEKNIK KONSTRUKSI DAN PROPERTI
KOMPETENSI KEAHLIAN : TEKNIK ARSITEKTUR ( DPIB )
PEKERJAAN
NO SATUAN RUMUS HITUNGAN JUMLAH
( Dilengkapi Gambar Detail )
Kusen pintu PL1 m3 ((0.06 x 0.12) x ((2.45 x 2.0) + 2.5)) + ((0.05 x 0.08568
0.12) x ((2.5 x 2) + (0.2 x 2.0)))
JENDELA
Kompetensi Keahlian DPI B ( Arsitektur ) Nama Siswa Agelia Vena Rastika NILAI
TEKNI K ARS ITE KTUR
Kelas XI DPIB - A Kelas / Absen XI DPIB A / 5
SMK NEGE RI 2
SALATIGA Kode Job Sheet EBK /GJL /2022 /001
Dinilai Oleh Daryanto, M. Pd.
Waktu 4 Jam @ 45 Menit
JOB SHEET
PROGRAM STUDI KEAHLIAN : TEKNIK KONSTRUKSI DAN PROPERTI
KOMPETENSI KEAHLIAN : TEKNIK ARSITEKTUR ( DPIB )
PEKERJAAN
NO SATUAN RUMUS HITUNGAN JUMLAH
( Dilengkapi Gambar Detail )
Kompetensi Keahlian DPI B ( Arsitektur ) Nama Siswa Agelia Vena Rastika NILAI
TEKNI K ARS ITE KTUR Kelas XI DPIB - A Kelas / Absen XI DPIB A / 5
SMK NEGE RI 2
SALATIGA Kode Job Sheet EBK /GJL /2022 /001
Dinilai Oleh Daryanto, M. Pd.
Waktu 4 Jam @ 45 Menit
JOB SHEET
PROGRAM STUDI KEAHLIAN : TEKNIK KONSTRUKSI DAN PROPERTI
KOMPETENSI KEAHLIAN : TEKNIK ARSITEKTUR ( DPIB )
PEKERJAAN
NO SATUAN RUMUS HITUNGAN JUMLAH
( Dilengkapi Gambar Detail )
PEKERJAAN PENGECATAN
PINTU
Kompetensi Keahlian DPI B ( Arsitektur ) Nama Siswa Agelia Vena Rastika NILAI
TEKNI K ARS ITE KTUR
Kelas XI DPIB - A Kelas / Absen XI DPIB A / 5
SMK NEGE RI 2
SALATIGA Kode Job Sheet EBK /GJL /2022 /001
Dinilai Oleh Daryanto, M. Pd.
Waktu 4 Jam @ 45 Menit
JOB SHEET
PROGRAM STUDI KEAHLIAN : TEKNIK KONSTRUKSI DAN PROPERTI
KOMPETENSI KEAHLIAN : TEKNIK ARSITEKTUR ( DPIB )
JENDELA
Kompetensi Keahlian DPI B ( Arsitektur ) Nama Siswa Agelia Vena Rastika NILAI
TEKNI K ARS ITE KTUR
Kelas XI DPIB - A Kelas / Absen XI DPIB A / 5
SMK NEGE RI 2
SALATIGA Kode Job Sheet EBK /GJL /2022 /001
Dinilai Oleh Daryanto, M. Pd.
Waktu 4 Jam @ 45 Menit
JOB SHEET
PROGRAM STUDI KEAHLIAN : TEKNIK KONSTRUKSI DAN PROPERTI
KOMPETENSI KEAHLIAN : TEKNIK ARSITEKTUR ( DPIB )
PEKERJAAN
NO SATUAN RUMUS HITUNGAN JUMLAH
( Dilengkapi Gambar Detail )
Kompetensi Keahlian DPI B ( Arsitektur ) Nama Siswa Agelia Vena Rastika NILAI
TEKNI K ARS ITE KTUR Kelas XI DPIB - A Kelas / Absen XI DPIB A / 5
SMK NEGE RI 2
SALATIGA Kode Job Sheet EBK /GJL /2022 /001
Dinilai Oleh Daryanto, M. Pd.
Waktu 4 Jam @ 45 Menit
RENCANA ANGGARAN BIAYA
RUMAH TINGGAL TIDAK BERTINGKAT TYPE 160
BIAYA : Rp 536.900.000,00
LOKASI : SEMARANG
II PEKERJAAN TANAH
1 A.2.3.1.1. Penggalian 1 m3 tanah biasa sedalam 1 m 176.89365 m3 Rp 77,550.00 Rp 13,718,102.56
2 A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah 58.76455 m3 Rp 18,700.00 Rp 1,098,897.09
3 A.2.3.1.11. Pengurugan 1 m3 dengan pasir urug 11 m3 Rp 328,020.00 Rp 3,606,907.92
Jumlah Sub II Rp 18,423,907.56
VI PEKERJAAN KAYU
1 A.4.6.1.1. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I 0.739068 m3 Rp 44,736,147.50 Rp 33,063,055.06
2 A.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II 28.458 m2 Rp 1,133,874.50 Rp 32,267,800.52
3 A.4.6.1.21. Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II 50.4 m' Rp 535,139.00 Rp 26,971,005.60
Jumlah Sub VI Rp 92,301,861.18
X PEKERJAAN PENGECATAN
1 A.4.7.1.10. Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) 653 m2 Rp 21,366.40 Rp 13,950,656.72
2 A.4.7.1.7. Pelaburan 1 m2 bidang kayu dengan politur 126 m2 Rp 53,166.52 Rp 6,720,301.29
3 A.4.7.1.10. Pengecatan 1 m2 plafond 130.2 m2 Rp 21,366.40 Rp 2,781,905.28
Jumlah Sub X Rp 23,452,863.29
B
C
D
E
F
B
0.012 0.835 m3
0.02 1.39 Kg
0.007 0.487 m3
C
D
E
F
PEKERJAAN TANAH
B
C
D
E
F
B
C
D
E
F
PEKERJAAN PASANGAN
B
1.2 72.5 m3
0.432 26.109 m3
C
D
E
F
B
1.2 58.5 m3
136 6,634 Kg
0.544 26.538 m3
C
D
E
F
B
70 26,312 Buah
9.68 3,638.64 Kg
0.045 16.915 m3
C
D
E
F
7 A.4.4.3.50 Kode Koefisien Volume m2
A
L.01 0.9 3.1 OH
L.02 0.45 1.53 OH
L.03 0.045 0.153 OH
L.04 0.045 0.153 OH
B
26.0 88.5 Buah
9.3 31.7 Kg
0.018 0.061 m3
1.94 6.61 Kg
C
D
E
F
B
413 1,922 Kg
681 3,169 Kg
1,021 4,751 Kg
215 1,000 ltr
C
D
E
F
B
247 579 Kg
869 2,037 Kg
999 2,341 Kg
215 504 ltr
C
D
E
F
B
0.045 3.504 m3
0.3 23.4 Kg
0.1 7.8 Ltr
C
D
E
F
B
0.045 0.503 m3
0.3 3.4 Kg
0.1 1.1 Ltr
C
D
E
F
B
10.50 1,015.74 Kg
0.150 14.511 Kg
C
D
E
F
B
10.50 284.90 Kg
0.150 4.070 Kg
C
D
E
F
B
10.50 1,015.74 Kg
0.150 14.511 Kg
C
D
E
F
B
413 462 Kg
681 761 Kg
1,021 1,141 Kg
215 240 ltr
C
D
E
F
B
7.776 4,705.141 Kg
0.023 13.917 m3
C
D
E
F
B
3.25 1,966.53 Kg
C
D
E
F
PEKERJAAN KAYU
B
1.1 0.8 m3
1.25 0.923835 kg
1 1 kg
C
D
E
F
B
0.04 1.14 m3
0.050 1.423 kg
C
D
E
F
B
0.0108 0.5443 m3
0.10 5.04 Kg
C
D
E
F
PEKERJAAN BESI & ALUMUNIUM
B
4.4 6.765 m'
4.5 6.91875 m'
0.27 0.415125 tube
C
D
E
F
B
6.177 16.6779 kg
27.08 73.116 cm
C
D
E
F
PEKERJAAN PLAFOND
B
0.364 47.393 Lbr
0.11 14.32 Kg
C
D
E
F
B
0.0154 2.0051 m3
0.2 26.0 Kg
C
D
E
F
B
1.05 64.68 m1
0.01 0.62 Kg
C
D
E
F
B
1.02 100.62 m2
0.20 19.73 Kg
C
D
E
F
B
5 181 Buah
8 290 Kg
0.032 1.160 m3
C
D
E
F
B
1.1 39.9 Buah
0.05 1.81 Kg
C
D
E
F
PEKERJAAN PENGECATAN
B
0.1 65.3 Kg
0.1 65.3 Kg
0.26 169.76 Kg
C
D
E
F
B
0.15 18.96 Ltr
0.372 47.021 Ltr
2 253 Lbr
C
D
E
F
B
0.1 13.0 Kg
0.1 13.0 Kg
0.26 33.85 Kg
C
D
E
F
Buah
1 2 Buah
0.06 0.12
C
D
E
F
B
1.20 37.14 m'
0.35 10.83 Ls
C
D
E
F
B
1.20 22.56 m'
0.35 6.58 Ls
C
D
E
F
B
1.20 94.20 m'
0.35 27.48 Ls
C
D
E
F
8 A.5.1.1.14 Kode Koefisien Volume buah
A
L.01 0.010 0.020 OH
L.02 0.100 0.200 OH
L.03 0.010 0.020 OH
L.04 0.005 0.010 OH
B
1 2 bh
C
D
E
F
10 A.5.1.1.5 Kode Koefisien Volume Unit
A
L.01 1.2 3.6 OH
L.02 0.145 0.435 OH
L.03 0.15 0.45 OH
L.04 0.1 0.3 OH
B
1 3 Buah
0.3 0.9 -
6 18 Kg
0.01 0.03 m3
C
D
E
F
B
123.00 492.00 bh
114.00 456.00 kg
0.18 0.74 m3
0.12 0.48 m3
4.85 19.40 kg
C
D
E
F
PEKERJAAN KUNCI & KACA
B
1 24 Buah
C
D
E
F
HAN DAN TENAGA KERJA
1. PEKERJAAN PERSIAPAN
233.35
Membersihkan Lapangan dan Perataan Harga satuan Jumlah Harga
Tenaga
Pekerja 90,000.00 2,100,150.00
Mandor 120,000.00 1,400,100.00
3,500,250.00
Bahan
PERALATAN
Jumlah A + B + C 3,500,250.00
Overhead & Profit (contah 10%) 10% 350,025.00
Harga Satuan Pekerjaan (D+E) 3,850,275.00
69.6
Pengukuran dan Pemasangan Bouwplank Harga Satuan Jumlah Harga
Tenaga
Pekerja 90,000.00 626,400.00
Tukang Kayu 105,000.00 730,800.00
Kepala Tukang 110,000.00 76,560.00
Mandor 120,000.00 41,760.00
1,475,520.00
Bahan
Kayu 5/7x 4m Kayu Kruing 8,518,400.00 7,114,567.68
Paku Biasa 2" - 5" 22,500.00 31,320.00
Kayu Papan 3/20 Kruing 8,518,400.00 4,150,164.48
11,296,052.16
PERALATAN
Jumlah A + B + C 12,771,572.16
Overhead & Profit (contah 10%) 10% 1,277,157.22
Harga Satuan Pekerjaan (D+E) 14,048,729.38
PEKERJAAN TANAH
176.89365
Menggali Tanah Biasa Sedalam 1 m Harga Satuan Jumlah Harga
TENAGA
Pekerja 90,000.00 11,940,321.38
Mandor 120,000.00 530,680.95
12,471,002.33
BAHAN
PERALATAN
Jumlah A + B + C 12,471,002.33
Overhead & Profit (contah 10%) 10% 1,247,100.23
Harga Satuan Pekerjaan (D+E) 13,718,102.56
58.76455
Pengurugan Kembali di hitung dari 1/3 kali
Harga Satuan Jumlah Harga
koefisien Pekerjaan galian
TENAGA
Pekerja 90,000.00 2,644,404.75
Mandor 120,000.00 352,587.30
2,996,992.05
BAHAN
PERALATAN
Jumlah A + B + C 2,996,992.05
Overhead & Profit (contah 10%) 10% 299,699.21
Harga Satuan Pekerjaan (D+E) 3,296,691.26
10.996
Urugan Pasir Harga Satuan Jumlah Harga
TENAGA
Pekerja 90,000.00 296,892.00
Mandor 120,000.00 13,195.20
BAHAN 310,087.20
Pasir Urug 225,000.00 2,968,920.00
PERALATAN
Jumlah A + B + C 3,279,007.20
Overhead & Profit (contah 10%) 10% 327,900.72
Harga Satuan Pekerjaan (D+E) 3,606,907.92
PEKERJAAN PASANGAN
60.437
Pemasang Batu Kosong/Anstamping Harga Satuan Jumlah Harga
Tenaga
Pekerja 90,000.00 4,242,677.40
Tukang Batu 105,000.00 2,474,895.15
Kepala Tukang 110,000.00 259,274.73
Mandor 120,000.00 282,845.16
7,259,692.44
Bahan
Batu Belah 15/20 350,000.00 25,383,540.00
Pasir Urug 225,000.00 5,874,476.40
31,258,016.40
PERALATAN
Jumlah A + B + C 38,517,708.84
Overhead & Profit (contoh 10%) 10% 3,851,770.88
Harga Satuan Pekerjaan (D+E) 42,369,479.72
48.783
Pemasangan Pondasi Batu Belah 1SP : 5 PP Harga Satuan Jumlah Harga
TENAGA
Pekerja 90,000.00 6,585,705.00
Tukang Batu 105,000.00 3,841,661.25
Kepala Tukang 110,000.00 402,459.75
Mandor 120,000.00 439,047.00
11,268,873.00
BAHAN
Batu Belah 15/20 350,000.00 20,488,860.00
Portland Sement 1,200.00 7,961,385.60
Pasir Pasang 300,000.00 7,961,385.60
36,411,631.20
PERALATAN
Jumlah A + B + C 47,680,504.20
Overhead & Profit (contoh 10%) 10% 4,768,050.42
Harga Satuan Pekerjaan (D+E) 52,448,554.62
375.8925
Pemasangan Dinding Bata Merah Ukuran
Harga Satuan Jumlah Harga
(5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 5PP
Tenaga
Pekerja 90,000.00 10,149,097.50
Tukang Batu 105,000.00 3,946,871.25
Kepala Tukang 110,000.00 413,481.75
Mandor 120,000.00 676,606.50
15,186,057.00
Bahan
Bata Merah 5 x 11 x 22 850.00 22,365,603.75
Portland Semen 1,200.00 4,366,367.28
Pasir Pasang 300,000.00 5,074,548.75
31,806,519.78
PERALATAN
Jumlah A + B + C 46,992,576.78
Overhead & Profit (contoh 10%) 10% 4,699,257.68
Harga Satuan Pekerjaan (D+E) 51,691,834.46
3.405
Pemasangan Dinding Porselen 20x20 cm, Harga Satuan Jumlah Harga
Tenaga
Pekerja 90,000.00 275,805.00
Tukang Batu 105,000.00 160,886.25
Kepala Tukang 110,000.00 16,854.75
Mandor 120,000.00 18,387.00
471,933.00
Bahan
Keramik - -
Portland Semen 1,200.00 37,999.80
Pasir Pasang 300,000.00 18,387.00
Semen Warna 14,000.00 92,479.80
148,866.60
PERALATAN
Jumlah A + B + C 620,799.60
Overhead & Profit (contoh 10%) 10% 62,079.96
Harga Satuan Pekerjaan (D+E) 682,879.56
2.3435
Membuat Beton mutu f'c=7,4 Mpa (K100), slum
Harga Satuan Jumlah Harga
(12±2)cm, w/c = 0,87
Tenaga
Pekerja 90,000.00 348,009.75
Tukang Batu 105,000.00 67,668.56
Kepala Tukang 110,000.00 7,217.98
Mandor 120,000.00 23,341.26
446,237.55
Bahan
Portland Semen 1,200.00 694,613.40
Pasir Beton 232.14 472,759.28
Kerikil (maksimum 30 mm) 259.26 606,966.50
Air 22.00 11,084.76
1,785,423.93
PERALATAN
Jumlah A + B + C 2,231,661.48
Overhead & Profit (contoh 10%) 10% 223,166.15
Harga Satuan Pekerjaan (D+E) 2,454,827.63
77.86
Memasang Bekisting untuk Sloof Harga Satuan Jumlah Harga
Tenaga
Pekerja 90,000.00 3,643,848.00
Tukang Kayu 105,000.00 2,125,578.00
Kepala Tukang 110,000.00 222,679.60
Mandor 120,000.00 242,923.20
6,235,028.80
Bahan
Kayu Klas III (Terentang) 1,064,800.00 3,730,739.76
Paku Biasa 2" - 5" 22,500.00 525,555.00
Minyak Bekisting 39,600.00 308,325.60
4,564,620.36
PERALATAN
Jumlah A + B + C 10,799,649.16
Overhead & Profit (contoh 10%) 10% 1,079,964.92
Harga Satuan Pekerjaan (D+E) 11,879,614.08
11.175
Memasang Bekisting untuk Sloof Harga Satuan Jumlah Harga
Tenaga
Pekerja 90,000.00 522,990.00
Tukang Kayu 105,000.00 305,077.50
Kepala Tukang 110,000.00 31,960.50
Mandor 120,000.00 34,866.00
894,894.00
Bahan
Kayu Klas III (Terentang) 1,064,800.00 535,461.30
Paku Biasa 2" - 5" 22,500.00 75,431.25
Minyak Bekisting 39,600.00 44,253.00
655,145.55
PERALATAN
Jumlah A + B + C 1,550,039.55
Overhead & Profit (contoh 10%) 10% 155,003.96
Harga Satuan Pekerjaan (D+E) 1,705,043.51
96.7372
Pembesian dg Besi Polos atau Besi Ulir Sloof Harga Satuan Jumlah Harga
Tenaga
Pekerja 90,000.00 609,444.36
Tukang Besi 105,000.00 711,018.42
Kepala Tukang 110,000.00 74,487.64
Mandor 120,000.00 46,433.86
1,441,384.28
Bahan
Besi Beton (polos/ulir) 14,500.00 14,728,238.70
Kawat Beton 25,000.00 362,764.50
15,091,003.20
PERALATAN
Jumlah A + B + C 16,532,387.48
Overhead & Profit (contoh 10%) 10% 1,653,238.75
Harga Satuan Pekerjaan (D+E) 18,185,626.23
27.1335
Pembesian dg Besi Polos atau Besi Ulir Kolom Harga Satuan Jumlah Harga
Tenaga
Pekerja 90,000.00 170,941.05
Tukang Besi 105,000.00 199,431.23
Kepala Tukang 110,000.00 20,892.80
Mandor 120,000.00 13,024.08
404,289.15
Bahan
Besi Beton (polos/ulir) 14,500.00 4,131,075.38
Kawat Beton 25,000.00 101,750.63
4,232,826.00
PERALATAN
Jumlah A + B + C 4,637,115.15
Overhead & Profit (contoh 10%) 10% 463,711.52
Harga Satuan Pekerjaan (D+E) 5,100,826.67
96.7372
Pembesian dg Besi Polos atau Besi Ulir Ringbalk Harga Satuan Jumlah Harga
Tenaga
Pekerja 90,000.00 609,444.36
Tukang Besi 105,000.00 711,018.42
Kepala Tukang 110,000.00 74,487.64
Mandor 120,000.00 46,433.86
1,441,384.28
Bahan
Besi Beton (polos/ulir) 14,500.00 14,728,238.70
Kawat Beton 25,000.00 362,764.50
15,091,003.20
PERALATAN
Jumlah A + B + C 16,532,387.48
Overhead & Profit (contoh 10%) 10% 1,653,238.75
Harga Satuan Pekerjaan (D+E) 18,185,626.23
1.1175
Membuat Beton mutu f'c=26,4 MPa (K300), slum
Harga Satuan Jumlah Harga
(12±2)cm, w/c = 0,52 Ringbalk
Tenaga
Pekerja 90,000.00 165,948.75
Tukang Batu 105,000.00 32,267.81
Kepala Tukang 110,000.00 3,441.90
Mandor 120,000.00 11,130.30
212,788.76
Bahan
Portland Semen 1,200.00 553,833.00
Pasir Beton 232.14 176,664.78
Kerikil (maksimum 30 mm) 259.26 295,806.39
Air 22.00 5,285.78
1,031,589.94
PERALATAN
Jumlah A + B + C 1,244,378.70
Overhead & Profit (contoh 10%) 10% 124,437.87
Harga Satuan Pekerjaan (D+E) 1,368,816.57
605.085
Pemasangan Acian Harga Satuan Jumlah Harga
Tenaga
Pekerja 90,000.00 10,891,530.00
Tukang batu 105,000.00 6,353,392.50
Kepala Tukang 110,000.00 665,593.50
Mandor 120,000.00 726,102.00
18,636,618.00
Bahan
Portland Semen 1,200.00 2,359,831.50
PERALATAN
Jumlah A + B + C 20,996,449.50
Overhead & Profit (contoh 10%) 10% 2,099,644.95
Harga Satuan Pekerjaan (D+E) 23,096,094.45
PEKERJAAN KAYU
0.739068
Pembuatan & Pemasangan Kosen Pintu & Jendela
Harga Satuan Jumlah Harga
Kayu klas I
Tenaga
Pekerja 90,000.00 465,612.84
Tukang Kayu 105,000.00 1,629,644.94
Kepala Tukang 110,000.00 170,724.71
Mandor 120,000.00 31,040.86
2,297,023.34
Bahan
Kayu Klas I (Jati) , Balok 34,100,000.00 27,722,440.68
Paku Biasa 2" - 5 " 22,500.00 20,786.29
Lem Kayu 23,100.00 17,072.47
27,760,299.44
PERALATAN
Jumlah A + B + C 30,057,322.78
Overhead & Profit (contoh 10%) 10% 3,005,732.28
Harga Satuan Pekerjaan (D+E) 33,063,055.06
28.458
Pembuatan & Pemasangan Daun Pintu Panel,
Harga Satuan Jumlah Harga
Kayu Klas I atau II
Tenaga
Pekerja 90,000.00 2,561,220.00
Tukang Kayu 105,000.00 8,964,270.00
Kepala Tukang 110,000.00 939,114.00
Mandor 120,000.00 170,748.00
12,635,352.00
Bahan
Kayu Klas II (Kamfer), papan 14,641,000.00 16,666,143.12
Lem Kayu 23,100.00 32,868.99
16,699,012.11
PERALATAN
Jumlah A + B + C 29,334,364.11
Overhead & Profit (contoh 10%) 10% 2,933,436.41
Harga Satuan Pekerjaan (D+E) 32,267,800.52
50.4
Pemasangan Listplank Uk. (3x20)cm Kayu klas I
Harga Satuan Jumlah Harga
atau II
Tenaga
Pekerja 90,000.00 453,600.00
Tukang Kayu 105,000.00 1,058,400.00
Kepala Tukang 110,000.00 110,880.00
Mandor 120,000.00 30,240.00
1,653,120.00
Bahan
Kayu klas I (Jati), papan 41,800,000.00 22,752,576.00
Paku Biasa 2" - 5" 22,500.00 113,400.00
22,865,976.00
PERALATAN
Jumlah A + B + C 24,519,096.00
Overhead & Profit (contoh 10%) 10% 2,451,909.60
Harga Satuan Pekerjaan (D+E) 26,971,005.60
PEKERJAAN BESI & ALUMUNIUM
1.5375
Pemasangan Pintu Kaca Rangka Allumunium Harga Satuan Jumlah Harga
Tenaga
Pekerja 90,000.00 11,761.88
Tukang Besi 105,000.00 13,722.19
Kepala Tukang 110,000.00 1,522.13
Mandor 120,000.00 922.50
27,928.69
Bahan
Pintu Allumunium 105,000.00 710,325.00
Profil Kaca 5,000.00 34,593.75
Sealant 50,000.00 20,756.25
765,675.00
PERALATAN
Jumlah A + B + C 793,603.69
Overhead & Profit (contoh 10%) 10% 79,360.37
Harga Satuan Pekerjaan (D+E) 872,964.06
2.7
Pemasangan Teralis Besi Strip (2x3) cm Harga Satuan Jumlah Harga
Tenaga
Pekerja 90,000.00 405,810.00
Tukang Las 105,000.00 473,445.00
Kepala Tukang 110,000.00 49,599.00
Mandor 120,000.00 26,892.00
955,746.00
Bahan
Besi Strip 16,000.00 266,846.40
Pengelasan 2,370.02 173,286.09
440,132.49
PERALATAN
Jumlah A + B + C 1,395,878.49
Overhead & Profit (contoh 10%) 10% 139,587.85
Harga Satuan Pekerjaan (D+E) 1,535,466.34
PEKERJAAN PLAFOND
130.2
Memasang Langit-langit Gypsu Board, Ukuran
Harga Satuan Jumlah Harga
(120x240) tebal 9 mm
Tenaga
Pekerja 90,000.00 1,171,800.00
Tukang Kayu 105,000.00 683,550.00
Kepala Tukang 110,000.00 71,610.00
Mandor 120,000.00 78,120.00
2,005,080.00
Bahan
Gypsum Board 70,400.00 3,336,453.12
Paku Sekrup 15,000.00 214,830.00
3,551,283.12
PERALATAN
Jumlah A + B + C 5,556,363.12
Overhead & Profit (contoh 10%) 10% 555,636.31
Harga Satuan Pekerjaan (D+E) 6,111,999.43
130.2
Pemasangan Rangka Langit-langit (50x1,00) m,
Harga Satuan Jumlah Harga
kayu Klas II atau III
Tenaga
Pekerja 90,000.00 1,757,700.00
Tukang Kayu 105,000.00 4,101,300.00
Kepala Tukang 110,000.00 429,660.00
Mandor 120,000.00 1,171,800.00
7,460,460.00
Bahan
Kayu Klas II (Kamfer), balok 14,641,000.00 29,356,376.28
Paku Biasa 2" - 5" 22,500.00 585,900.00
29,942,276.28
PERALATAN
Jumlah A + B + C 37,402,736.28
Overhead & Profit (contoh 10%) 10% 3,740,273.63
Harga Satuan Pekerjaan (D+E) 41,143,009.91
61.6
List Langit-Langit Kayu Profil Harga Satuan Jumlah Harga
Tenaga
Pekerja 90,000.00 277,200.00
Tukang Kayu 105,000.00 323,400.00
Kepala Tukang 110,000.00 33,880.00
Mandor 120,000.00 22,176.00
656,656.00
Bahan
List Kayu Profil 5,500.00 355,740.00
Paku 22,500.00 13,860.00
369,600.00
PERALATAN
Jumlah A + B + C 1,026,256.00
Overhead & Profit (contoh 10%) 10% 102,625.60
Harga Satuan Pekerjaan (D+E) 1,128,881.60
36.24
Pemasangan Genteng Bubung Plentong Harga Satuan Jumlah Harga
Tenaga
Pekerja 90,000.00 1,304,640.00
Tukang Kayu 105,000.00 761,040.00
Kepala Tukang 110,000.00 79,728.00
Mandor 120,000.00 8,697.60
2,154,105.60
Bahan
Genteng Bubung Plentong 5,060.00 916,872.00
Portland Semen 1,200.00 347,904.00
Pasir Pasang 300,000.00 347,904.00
1,612,680.00
PERALATAN
Jumlah A + B + C 3,766,785.60
Overhead & Profit (contoh 10%) 10% 376,678.56
Harga Satuan Pekerjaan (D+E) 4,143,464.16
36.24
Pemasangan Nok Genteng Metal Harga Satuan Jumlah Harga
Tenaga
Pekerja 90,000.00 815,400.00
Tukang Kayu 105,000.00 570,780.00
Kepala Tukang 110,000.00 59,796.00
Mandor 120,000.00 56,534.40
1,502,510.40
Bahan
Nok Genteng 20,000.00 797,280.00
Paku Biasa 1/2" - 1" 22,500.00 40,770.00
838,050.00
PERALATAN
Jumlah A + B + C 2,340,560.40
Overhead & Profit (contoh 10%) 10% 234,056.04
Harga Satuan Pekerjaan (D+E) 2,574,616.44
PEKERJAAN PENGECATAN
653
Pengecat Tembok Baru (1lap.Plamir, 1lap Cat
Harga Satuan Jumlah Harga
Dasar 2 Lap.Cat Penutup)
Tenaga
Pekerja 90,000.00 1,175,265.00
Tukang Cat 105,000.00 4,319,098.88
Kepala Tukang 110,000.00 452,477.03
Mandor 120,000.00 235,053.00
6,181,893.90
Bahan
Plamir 27,500.00 1,795,543.75
Cat Dasar 12,000.00 783,510.00
Cat Penutup 2 kali 23,100.00 3,921,467.55
6,500,521.30
PERALATAN
Jumlah A + B + C 12,682,415.20
Overhead & Profit (contoh 10%) 10% 1,268,241.52
Harga Satuan Pekerjaan (D+E) 13,950,656.72
126
Pelaburan Bidang Kayu dg Politur Harga Satuan Jumlah Harga
Tenaga
Pekerja 90,000.00 455,043.60
Tukang Cat 105,000.00 796,326.30
Kepala Tukang 110,000.00 222,465.76
Mandor 120,000.00 45,504.36
1,519,340.02
Bahan
Politur 50,600.00 959,383.59
Politur Jadi 50,600.00 2,379,271.30
Ampelas 4,950.00 1,251,369.90
4,590,024.79
PERALATAN
Jumlah A + B + C 6,109,364.81
Overhead & Profit (contoh 10%) 10% 610,936.48
Harga Satuan Pekerjaan (D+E) 6,720,301.29
130.2
Pengecat Tembok Baru (1lap.Plamir, 1lap Cat
Harga Satuan Jumlah Harga
Dasar 2 Lap.Cat Penutup)
Tenaga
Pekerja 90,000.00 234,360.00
Tukang Cat 105,000.00 861,273.00
Kepala Tukang 110,000.00 90,228.60
Mandor 120,000.00 46,872.00
1,232,733.60
Bahan
Plamir 27,500.00 358,050.00
Cat Dasar 12,000.00 156,240.00
Cat Penutup 2 kali 23,100.00 781,981.20
1,296,271.20
PERALATAN
Jumlah A + B + C 2,529,004.80
Overhead & Profit (contoh 10%) 10% 252,900.48
Harga Satuan Pekerjaan (D+E) 2,781,905.28
30.95
Pemasangan Pipa PVC tipe AW Ø 3" Harga Satuan Jumlah Harga
Tenaga
Pekerja 90,000.00 225,625.50
Tukang Batu 105,000.00 438,716.25
Kepala Tukang 110,000.00 45,960.75
Mandor 120,000.00 14,856.00
725,158.50
Bahan
Pipa PVC Ø 3" 30,500.00 1,132,770.00
Perlengkapan 35% x pipa 30,500.00 330,391.25
1,463,161.25
PERALATAN
Jumlah A + B + C 2,188,319.75
Overhead & Profit (contoh 10%) 10% 218,831.98
Harga Satuan Pekerjaan (D+E) 2,407,151.73
18.8
Pemasangan Pipa PVC tipe AW Ø 4" Harga Satuan Jumlah Harga
Tenaga
Pekerja 90,000.00 60,912.00
Tukang Batu 105,000.00 118,440.00
Kepala Tukang 110,000.00 12,408.00
Mandor 120,000.00 4,512.00
196,272.00
Bahan
Pipa PVC Ø 4" 50,666.67 1,143,040.00
Perlengkapan 35% x pipa 50,666.67 333,386.67
1,476,426.67
PERALATAN
Jumlah A + B + C 1,672,698.67
Overhead & Profit (contoh 10%) 10% 167,269.87
Harga Satuan Pekerjaan (D+E) 1,839,968.53
78.5
Pemasangan Pipa PVC tipe AW Ø ¾" Harga Satuan Jumlah Harga
Tenaga
Pekerja 90,000.00 254,340.00
Tukang Batu 105,000.00 494,550.00
Kepala Tukang 110,000.00 51,810.00
Mandor 120,000.00 18,840.00
819,540.00
Bahan
Pipa PVC Ø ¾" 8,500.00 800,700.00
Perlengkapan 35% x pipa 8,500.00 233,537.50
1,034,237.50
PERALATAN
Jumlah A + B + C 1,853,777.50
Overhead & Profit (contoh 10%) 10% 185,377.75
Harga Satuan Pekerjaan (D+E) 2,039,155.25
2
Pemasangan Floor Drain Harga Satuan Jumlah Harga
Tenaga
Pekerja 90,000.00 1,800.00
Tukang Batu 105,000.00 21,000.00
Kepala Tukang 110,000.00 2,200.00
Mandor 120,000.00 1,200.00
26,200.00
Bahan
Floor Drain 41,250.00 82,500.00
PERALATAN
Jumlah A + B + C 108,700.00
Overhead & Profit (contoh 10%) 10% 10,870.00
Harga Satuan Pekerjaan (D+E) 119,570.00
3
Pemasangan Wastafel Harga Satuan Jumlah Harga
Tenaga
Pekerja 90,000.00 324,000.00
Tukang Batu 105,000.00 45,675.00
Kepala Tukang 110,000.00 49,500.00
Mandor 120,000.00 36,000.00
455,175.00
Bahan
Wastafel 495,000.00 1,485,000.00
Perlengkapan 30% Harga Wastafel 495,000.00 445,500.00
Portland Semen 1,200.00 21,600.00
Pasir Pasang 300,000.00 9,000.00
1,961,100.00
PERALATAN
Jumlah A + B + C 2,416,275.00
Overhead & Profit (contoh 10%) 10% 241,627.50
Harga Satuan Pekerjaan (D+E) 2,657,902.50
4
Pemasangan Bak Kontrol Pas.Batu Bata 60x60
Harga Satuan Jumlah Harga
tinggi 60 cm
Tenaga
Pekerja 90,000.00 1,152,000.00
Tukang Batu 105,000.00 483,000.00
Kepala Tukang 110,000.00 4,840.00
Mandor 120,000.00 7,680.00
1,647,520.00
Bahan
Batu Bata 850.00 418,200.00
Semen Portland 1,200.00 547,200.00
Pasir Pasang 300,000.00 220,800.00
Pasir Beton - -
Baja Tulangan 18,799.00 364,700.60
1,550,900.60
PERALATAN
Jumlah A + B + C 3,198,420.60
Overhead & Profit (contoh 10%) 10% 319,842.06
Harga Satuan Pekerjaan (D+E) 3,518,262.66
PEKERJAAN KUNCI & KACA
24
Pemasangan Engsel Pintu Harga Satuan Jumlah Harga
Tenaga
Pekerja 90,000.00 32,400.00
Tukang Kayu 105,000.00 378,000.00
Kepala Tukang 110,000.00 39,600.00
Mandor 120,000.00 21,600.00
471,600.00
Bahan
Engsel pintu 9,900.00 237,600.00
PERALATAN
Jumlah A + B + C 709,200.00
Overhead & Profit (contoh 10%) 10% 70,920.00
Harga Satuan Pekerjaan (D+E) 780,120.00
14,048,727.98
1,098,897.09