RENCANA ANGGARAN BIAYA

PEKERJAAN PERSIAPAN

NO DESKRIPSI PEKERJAAN KODE SATUAN VOLUME HARGA SATUAN TOTAL HARGA TOTAL HARGA

I PEKERJAAN PERSIAPAN

1 PENGUKURAN LAPANGAN, PENGATURAN LOKASI & MARKING ls 1.00 Rp10,000,000.00 Rp10,000,000.00


2 MOBILISASI ls 1.00 Rp21,630,000.00 Rp21,630,000.00
3 PEMBERSIHAN LOKASI & BUANG PUING ls 1.00 Rp17,175,000.00 Rp17,175,000.00
4 BIAYA ASURANSI KESELAMATAN KERJA DAN LAIN LAIN ls 1.00 Rp12,896,000.00 Rp12,896,000.00
5 ALAT PELINDUNG DIRI & KESELAMATAN KERJA ls 1.00 Rp7,000,000.00 Rp7,000,000.00
6 SEWA SCAFOLLDING ls 1.00 Rp28,000,000.00 Rp28,000,000.00
7 BIAYA PERANCANGAN DESIGN ls 1.00 Rp10,000,000.00 Rp10,000,000.00
8 ADMINISTRASI & GAMBAR KERJA (AS BUILT DRAWING) ls 1.00 Rp10,000,000.00 Rp10,000,000.00
Total Pekerjaan Persiapan Rp 116,701,000.00
II PEKERJAAN PEMBONGKARAN

1 PEMBONGKARAN CEILING EKSISTING ls 1.00 Rp15,000,000.00 Rp15,000,000.00


2 PEMBONGKARAN LANTAI EKSISTING ls 1.00 Rp15,000,000.00 Rp15,000,000.00
Total Pekerjaan Pembongkaran Rp 30,000,000.00
TOTAL BIAYA Rp 146,701,000.00