Nomor :
JUMLAH WAKTU HARGA PENAWARAN HARGA PERKIARAAN SENDIRI (HPS) HARGA NEGOSIASI / KESEPAKATAN
NO. URAIAN PERSON (HARI) VOLUME SATUAN HARGA HARGA HARGA
(ORANG) SATUAN JUMLAH SATUAN JUMLAH SATUAN JUMLAH
1. Ahli Sipil / Arsitektur 1.00 13.00 13.00 OB Rp 530,000.00 Rp 6,890,000.00 Rp 530,000.00 Rp 6,890,000.00 Rp 530,000.00 Rp 6,890,000.00
1. Juru Gambar CAD 1.00 13.00 13.00 OB Rp 250,000.00 Rp 3,250,000.00 Rp 250,000.00 Rp 3,250,000.00 Rp 250,000.00 Rp 3,250,000.00
2. Suveyor 1.00 12.00 12.00 OB Rp 270,000.00 Rp 3,240,000.00 Rp 270,000.00 Rp 3,240,000.00 Rp 270,000.00 Rp 3,240,000.00
B.1. PELAPORAN