Kode Rekening Uraian Vol Satuan Jumlah


2 1 2 7 1 Uskup 210 Biji 5,000 1,050,000
2 1 2 7 2 Paving 50 M2 70,000 3,500,000
2 1 2 7 3 Semen 75 Sak 70,000 5,250,000
2 1 2 7 4 Pasir 30 M3 200,000 6,000,000
2 1 2 7 5 Benang 10 Buah 10,000 100,000
2 1 2 7 5 Timba 10 Buah 15,000 150,000
2 1 2 7 6 Batu 10 M3 250,000 2,500,000
2 1 2 7 7 Prasasti 1 Buah 600,000 600,000
2 1 2 7 8 Papan Proyek 1 Buah 200,000 200,000
7 JUMLAH 19,350,000
2 1 2 7 1 Upah Tukang 30 HOK 150,000 4,500,000
2 1 2 7 2 Upah Pembantu Tukang 30 HOK 120,000 3,600,000
7 JUMLAH 8,100,000
2 1 2 7 1 Ketua TPK 1 Op 750,000 750,000
2 1 2 7 2 Anggota 2 Op 500,000 1,000,000
JUMLAH 1,750,000
JUMLAH TOTAL 29,200,000

PAVINGISASI DUSUN TALANG RT 01 RW 06 VOL 28 X 2 M


Kode Rekening Uraian Vol Satuan Jumlah
2 1 2 7 1 Uskup 168 Biji 5,000 840,000
2 1 2 7 2 Paving 35 M2 70,000 2,450,000
2 1 2 7 3 Semen 10 Sak 70,000 700,000
2 1 2 7 4 Pasir 12 M3 200,000 2,400,000
2 1 2 7 5 Benang 5 Buah 10,000 50,000
2 1 2 7 6 Timba 5 Buah 15,000 75,000
2 1 2 7 7 Prasasti 1 Buah 600,000 600,000
2 1 2 7 8 Papan Proyek 1 Buah 200,000 200,000
7 JUMLAH 7,315,000
2 1 2 7 1 Upah Tukang 12 HOK 150,000 1,800,000
2 1 2 7 2 Upah Pembantu Tukang 12 HOK 120,000 1,440,000
7 JUMLAH 3,240,000
2 1 2 7 1 Ketua TPK 1 Op 750,000 750,000
2 1 2 7 2 Anggota 2 Op 500,000 1,000,000
JUMLAH 1,750,000
JUMLAH TOTAL 12,305,000

PAVINGISASI DUSUN TALANG RT 02 RW 06 VOL 60 X 2,3 M


Kode Rekening Uraian Vol Satuan Jumlah
2 1 2 7 1 Uskup 360 Biji 5,000 1,800,000
2 1 2 7 2 Paving 75 M2 70,000 5,250,000
2 1 2 7 3 Semen 30 Sak 70,000 2,100,000
2 1 2 7 4 Pasir 25 M3 200,000 5,000,000
2 1 2 7 5 Benang 10 Buah 10,000 100,000
2 1 2 7 6 Timba 10 Buah 15,000 150,000
2 1 2 7 7 Prasasti 1 Buah 600,000 600,000
2 1 2 7 8 Papan Proyek 1 Buah 200,000 200,000
7 JUMLAH 15,200,000
2 1 2 7 1 Upah Tukang 30 HOK 150,000 4,500,000
2 1 2 7 2 Upah Pembantu Tukang 30 HOK 120,000 3,600,000
7 JUMLAH 8,100,000
2 1 2 7 1 Ketua TPK 1 Op 750,000 750,000
2 1 2 7 2 Anggota 2 Op 500,000 1,000,000
JUMLAH 1,750,000
JUMLAH TOTAL 25,050,000

TPT DUSUN WATUAGUNG RT 01 RW 01 VOL 25 X 0,8


Kode Rekening Uraian Vol Satuan Jumlah
2 1 2 7 1 Batu 10 M3 250,000 2,500,000
2 1 2 7 2 Semen 35 Sak 70,000 2,450,000
2 1 2 7 3 Pasir 10 M3 200,000 2,000,000
2 1 2 7 4 Benang 5 Buah 10,000 50,000
2 1 2 7 5 Timba 10 Buah 15,000 150,000
2 1 2 7 6 Prasasti 1 Buah 600,000 600,000
2 1 2 7 7 Papan Proyek 1 Buah 200,000 200,000
7 JUMLAH 7,950,000
2 1 2 7 1 Upah Tukang 18 HOK 150,000 2,700,000
2 1 2 7 2 Upah Pembantu Tukang 18 HOK 120,000 2,160,000
7 JUMLAH 4,860,000
2 1 2 7 1 Ketua TPK 1 Op 750,000 750,000
2 1 2 7 2 Anggota 2 Op 500,000 1,000,000
JUMLAH 1,750,000
JUMLAH TOTAL 14,560,000

TPT DUSUN WATUAGUNG RT 04 RW 01 VOL 11 X 2.2


Kode Rekening Uraian Vol Satuan Jumlah
2 1 2 7 1 Batu 10 M3 250,000 2,500,000
2 1 2 7 2 Semen 42 Sak 70,000 2,940,000
2 1 2 7 3 Pasir 12 M3 200,000 2,400,000
2 1 2 7 4 Benang 5 Buah 10,000 50,000
2 1 2 7 5 Timba 10 Buah 15,000 150,000
2 1 2 7 6 Prasasti 1 Buah 600,000 600,000
2 1 2 7 7 Papan Proyek 1 Buah 200,000 200,000
7 JUMLAH 8,840,000
2 1 2 7 1 Upah Tukang 18 HOK 150,000 2,700,000
2 1 2 7 2 Upah Pembantu Tukang 18 HOK 120,000 2,160,000
7 JUMLAH 4,860,000
2 1 2 7 1 Ketua TPK 1 Op 750,000 750,000
2 1 2 7 2 Anggota 2 Op 500,000 1,000,000
JUMLAH 1,750,000
JUMLAH TOTAL 15,450,000

TPT DUSUN WATUAGUNG RT 02 RW 02 VOL 26 X 1.2


Kode Rekening Uraian Vol Satuan Jumlah
2 1 2 7 1 Batu 10 M3 250,000 2,500,000
2 1 2 7 2 Semen 45 Sak 70,000 3,150,000
2 1 2 7 3 Pasir 12 M3 200,000 2,400,000
2 1 2 7 4 Benang 5 Buah 10,000 50,000
2 1 2 7 5 Timba 10 Buah 15,000 150,000
2 1 2 7 6 Prasasti 1 Buah 600,000 600,000
2 1 2 7 7 Papan Proyek 1 Buah 200,000 200,000
7 JUMLAH 9,050,000
2 1 2 7 1 Upah Tukang 24 HOK 150,000 3,600,000
2 1 2 7 2 Upah Pembantu Tukang 24 HOK 120,000 2,880,000
7 JUMLAH 6,480,000
2 1 2 7 1 Ketua TPK 1 Op 750,000 750,000
2 1 2 7 2 Anggota 2 Op 500,000 1,000,000
JUMLAH 1,750,000
JUMLAH TOTAL 17,280,000

TPT DUSUN TALANG RT 01 RW 08 VOL 34 X 1


Kode Rekening Uraian Vol Satuan Jumlah
2 1 2 7 1 Batu 12 M3 250,000 3,000,000
2 1 2 7 2 Semen 60 Sak 70,000 4,200,000
2 1 2 7 3 Pasir 16 M3 200,000 3,200,000
2 1 2 7 4 Benang 5 Buah 10,000 50,000
2 1 2 7 5 Timba 10 Buah 15,000 150,000
2 1 2 7 6 Prasasti 1 Buah 600,000 600,000
2 1 2 7 7 Papan Proyek 1 Buah 200,000 200,000
7 JUMLAH 11,400,000
2 1 2 7 1 Upah Tukang 30 HOK 150,000 4,500,000
2 1 2 7 2 Upah Pembantu Tukang 30 HOK 120,000 3,600,000
7 JUMLAH 8,100,000
2 1 2 7 1 Ketua TPK 1 Op 750,000 750,000
2 1 2 7 2 Anggota 2 Op 500,000 1,000,000
JUMLAH 1,750,000
JUMLAH TOTAL 21,250,000

DRAINASE DUSUN WATUAGUNG RT 5,6 RW 1 VOL 370X 0.5 M


Kode Rekening Uraian Vol Satuan Jumlah
2 1 2 7 1 Batu 100 M3 250,000 25,000,000
2 1 2 7 2 Semen 150 Sak 70,000 10,500,000
2 1 2 7 3 Pasir 120 M3 200,000 24,000,000
2 1 2 7 4 Benang 10 Buah 10,000 100,000
2 1 2 7 5 Timba 20 Buah 15,000 300,000
2 1 2 7 6 Prasasti 1 Buah 600,000 600,000
2 1 2 7 7 Papan Proyek 1 Buah 200,000 200,000
7 JUMLAH 60,700,000
2 1 2 7 1 Upah Tukang 90 HOK 150,000 13,500,000
2 1 2 7 2 Upah Pembantu Tukang 90 HOK 120,000 10,800,000
7 JUMLAH 24,300,000
2 1 2 7 1 Ketua TPK 1 Op 750,000 750,000
2 1 2 7 2 Anggota 2 Op 500,000 1,000,000
JUMLAH 1,750,000
JUMLAH TOTAL 86,750,000

REHAB GORONG GORONG DUSUN WATUAGUNG RT 1 RW 1 VOL 9 X 1,4 M


Kode Rekening Uraian Vol Satuan Jumlah
2 1 2 7 1 Batu 10 M3 250,000 2,500,000
2 1 2 7 2 Semen 40 Sak 70,000 2,800,000
2 1 2 7 3 Pasir 10 M3 200,000 2,000,000
2 1 2 7 4 Benang 6 Buah 10,000 60,000
2 1 2 7 5 Timba 10 Buah 15,000 150,000
2 1 2 7 6 Prasasti 1 Buah 600,000 600,000
2 1 2 7 7 Papan Proyek 1 Buah 200,000 200,000
7 JUMLAH 8,310,000
2 1 2 7 1 Upah Tukang 18 HOK 150,000 2,700,000
2 1 2 7 2 Upah Pembantu Tukang 18 HOK 120,000 2,160,000
7 JUMLAH 4,860,000
2 1 2 7 1 Ketua TPK 1 Op 750,000 750,000
2 1 2 7 2 Anggota 2 Op 500,000 1,000,000
JUMLAH 1,750,000
JUMLAH TOTAL 14,920,000

PEMBANGUNAN GUDANG DESA VOL 8 X3,5 M


Kode Rekening Uraian Vol Satuan Jumlah
2 1 2 7 1 Batu Bata 6000 Pcs 700 4,200,000
Batu kali 30 M3 250,000 7,500,000
2 1 2 7 2 Semen 80 Sak 70,000 5,600,000
2 1 2 7 3 Pasir 30 M3 200,000 6,000,000
2 1 2 7 4 Benang 10 Buah 10,000 100,000
2 1 2 7 5 Timba 20 Buah 15,000 300,000
2 1 2 7 6 Besi 12 mm 30 batang 96,000 2,880,000
2 1 2 7 7 Besi 10 mm 30 batang 75,000 2,250,000
2 1 2 7 8 Besi 6 mm 30 batang 45,000 1,350,000
2 1 2 7 9 Bendrat 10 Kg 25,000 250,000
2 1 2 7 10 Paku 20 Kg 20,000 400,000
2 1 2 7 11 Seng Gallvalum 40 M2 55,000 2,200,000
2 1 2 7 12 Holow 6 x 8 mm 16 Batang 198,000 3,168,000
2 1 2 7 13 baud Dreling 1 Dus 250,000 250,000
2 1 2 7 14 triplek 9 mm 10 lembar 145,000 1,450,000
2 1 2 7 15 Kusenan Pintu 3 Unit 1,000,000 3,000,000
2 1 2 7 16 Kusenan Cendela 6 Unit 1,450,000 8,700,000
2 1 2 7 17 daun Pintu 3 Unit 2,000,000 6,000,000
2 1 2 7 18 Daun Cendela 12 Unit 800,000 9,600,000
2 1 2 7 19 Engsel 18 Unit 25,000 450,000
2 1 2 7 20 Slot 3 Unit 350,000 1,050,000
2 1 2 7 21 Kayu 30 batang 35,000 1,050,000
2 1 2 7 22 Prasasti 1 Buah 600,000 600,000
2 1 2 7 23 Papan Proyek 1 Buah 200,000 200,000
7 JUMLAH 68,548,000
2 1 2 7 1 Upah Tukang 60 HOK 150,000 9,000,000
2 1 2 7 2 Upah Pembantu Tukang 60 HOK 120,000 7,200,000
7 JUMLAH 16,200,000
2 1 2 7 1 Ketua TPK 1 Op 750,000 750,000
2 1 2 7 2 Anggota 2 Op 500,000 1,000,000
JUMLAH 1,750,000
JUMLAH TOTAL 86,498,000

PEMBANGUNAN HALTE DAN PAPAN NAMA


Kode Rekening Uraian Vol Satuan Jumlah
2 1 2 7 1 Batu Bata 1000 Pcs 700 700,000
2 1 2 7 2 Semen 10 Sak 70,000 700,000
2 1 2 7 3 Pasir 5 M3 200,000 1,000,000
2 1 2 7 4 Benang 5 Buah 10,000 50,000
2 1 2 7 5 Timba 6 Buah 15,000 90,000
2 1 2 7 6 Besi 12 mm 6 batang 96,000 576,000
2 1 2 7 7 ANGKUR 16 BUAH 40,000 640,000
2 1 2 7 8 Bendrat 1 Kg 25,000 25,000
2 1 2 7 9 Paku 2 Kg 20,000 40,000
2 1 2 7 10 Seng Gallvalum 24 M2 55,000 1,320,000
2 1 2 7 11 Holow 6 x 8 mm 16 Batang 198,000 3,168,000
2 1 2 7 12 baud Dreling 1 Dus 250,000 250,000
2 1 2 7 13 triplek 9 mm 2 lembar 145,000 290,000
2 1 2 7 14 PLAT Ezer 2 Unit 1,000,000 2,000,000
2 1 2 7 15 Kayu 10 batang 35,000 350,000
2 1 2 7 16 Prasasti 1 Buah 600,000 600,000
2 1 2 7 17 Papan Proyek 1 Buah 200,000 200,000
7 JUMLAH 11,999,000
2 1 2 7 1 Upah Tukang 24 HOK 150,000 3,600,000
2 1 2 7 2 Upah Pembantu Tukang 24 HOK 120,000 2,880,000
7 JUMLAH 6,480,000
2 1 2 7 1 Ketua TPK 1 Op 750,000 750,000
2 1 2 7 2 Anggota 2 Op 500,000 1,000,000
JUMLAH 1,750,000
JUMLAH TOTAL 20,229,000

PIPANISASI PAMSIMAS 680 m


Kode Rekening Uraian Vol Satuan Jumlah
2 1 2 7 1 Pipa PVc 1,5 Dim 155 batang 110,000 17,050,000
2 1 2 7 2 Pipa PVc 3/4 Dim 11 batang 45,000 495,000
2 1 2 7 3 Oper Lop 2 Buah 20,000 40,000
2 1 2 7 4 L bow 5 Buah 15,000 75,000
2 1 2 7 5 Knie 10 Buah 15,000 150,000
2 1 2 7 6 Lem pipa 4 Buah 90,000 360,000
2 1 2 7 7 Papan Proyek 1 Buah 200,000 200,000
7 JUMLAH 18,370,000
2 1 2 7 1 Upah Tukang 30 HOK 150,000 4,500,000
2 1 2 7 2 Upah Pembantu Tukang 30 HOK 120,000 3,600,000
7 JUMLAH 8,100,000
2 1 2 7 1 Ketua TPK 1 Op 750,000 750,000
2 1 2 7 2 Anggota 2 Op 500,000 1,000,000
JUMLAH 1,750,000
JUMLAH TOTAL 28,220,000

REHAB GORONG-GORONG DAN GRILL


Kode Rekening Uraian Vol Satuan Jumlah
2 1 2 7 1 SEMEN 10 sak 70,000 700,000
2 1 2 7 2 CORAL 2 m3 350,000 700,000
Pasir 3 M3 200,000 600,000
2 1 2 7 3 BESI 16 MM 5 batang 125,000 625,000
2 1 2 7 4 SIKU 2 Buah 145,000 290,000
Meni 2 kg 45,000 90,000
RESIBON 1 PACK 80,000 80,000
2 1 2 7 5 PAKAN LAS 4 Buah 80,000 320,000
2 1 2 7 6 Papan Proyek 1 Buah 200,000 200,000
7 JUMLAH 3,605,000
2 1 2 7 1 Upah Tukang 12 HOK 150,000 1,800,000
2 1 2 7 2 Upah Pembantu Tukang 12 HOK 120,000 1,440,000
7 JUMLAH 3,240,000
2 1 2 7 1 Ketua TPK 1 Op 750,000 750,000
2 1 2 7 2 Anggota 2 Op 500,000 1,000,000
JUMLAH 1,750,000
JUMLAH TOTAL 8,595,000
TPT DUSUN SEKAR RT 05 RW 10 VOL 20 X 2.2
Kode Rekening Uraian Vol Satuan Jumlah
2 1 2 7 1 Batu 20 M3 250,000 5,000,000
2 1 2 7 2 Semen 100 Sak 70,000 7,000,000
2 1 2 7 3 Pasir 20 M3 200,000 4,000,000
2 1 2 7 4 Benang 10 Buah 10,000 100,000
2 1 2 7 5 Timba 10 Buah 15,000 150,000
2 1 2 7 6 Prasasti 1 Buah 600,000 600,000
2 1 2 7 7 Papan Proyek 1 Buah 200,000 200,000
7 JUMLAH 17,050,000
2 1 2 7 1 Upah Tukang 48 HOK 150,000 7,200,000
2 1 2 7 2 Upah Pembantu Tukang 48 HOK 120,000 5,760,000
7 JUMLAH 12,960,000
2 1 2 7 1 Ketua TPK 1 Op 750,000 750,000
2 1 2 7 2 Anggota 2 Op 500,000 1,000,000
JUMLAH 1,750,000
JUMLAH TOTAL 31,760,000
NO Kegiatan
1 PAVINGISASI DAN TPT DUSUN WATUAGUNG RT 01 RW 01
2 PAVINGISASI DUSUN TALANG RT 01 RW 06 VOL 28 X 2 M
3 PAVINGISASI DUSUN TALANG RT 02 RW 06 VOL 60 X 2,3 M
4 TPT DUSUN WATUAGUNG RT 01 RW 01 VOL 25 X 0,8
5 TPT DUSUN WATUAGUNG RT 04 RW 01 VOL 11 X 2.2
6 TPT DUSUN WATUAGUNG RT 02 RW 02 VOL 26 X 1.2
7 TPT DUSUN TALANG RT 01 RW 08 VOL 34 X 1
8 DRAINASE DUSUN WATUAGUNG RT 5,6 RW 1 VOL 370X 0.5 M
9 REHAB GORONG GORONG DUSUN WATUAGUNG RT 1 RW 1 VOL 9 X 1,4 M
10 PEMBANGUNAN GUDANG DESA VOL 8 X3,5 M
11 PEMBANGUNAN HALTE DAN PAPAN NAMA
12 PIPANISASI PAMSIMAS 680 m
13 REHAB GORONG-GORONG DAN GRILL
14 TPT DUSUN SEKAR RT 05 RW 10 VOL 20 X 2.2
20 2.5
0.8
550000
40
22000000
Jumlah
29,200,000
12,305,000
25,050,000
14,560,000
15,450,000
17,280,000
21,250,000
86,750,000
14,920,000
86,498,000
20,229,000
28,220,000
8,595,000
31,760,000
412,067,000