GAMBAR TEKNIS
LOKASI BOOSTER KENTEN LAUT
NAMA KEGIATAN
PERENCANAAN
DETAIL ENGINEERING DESIGN (DED)
SPAM REGIONAL
PALEMBANG, BAYUASIN, DAN OGAN ILIR
10 MENGETAHUI
9 PENGGUNA ANGGARAN
DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
PROVINSI SUMATERA SELATAN
MENYETUJUI
7
50m a Da D s, H
ead mpmp lp
H PoPo . 50
lps, Kap
. 50
Kap ibu
si
istr
50m aD
ead mp
H Po
2
lps,
. 50
Kap
0m
d5
Hea
lps, etir Pet
ir
. 50 P kal
Kap kal ang
ang Pen
Pen
M. Saiful Islam, ST, MT
Pembina (IV/a)
NIP. 19751127 199803 1 004
1 5
6 KONSULTAN PERENCANA
∅
∅
PT. KRIDA KARYA ADVISORY
∅
∅
∅
∅
∅
ut
∅
∅
a
te nL
n
Ke
Jl.
JUDUL GAMBAR
52
D4 736
+
23
52
D4 716
+
23 Skala Rev No. Gambar Jumlah Hal
KEY MAP
NAMA KEGIATAN
PERENCANAAN
DETAIL ENGINEERING DESIGN (DED)
SPAM REGIONAL
PALEMBANG, BAYUASIN, DAN OGAN ILIR
MENGETAHUI
10 PENGGUNA ANGGARAN
DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
PROVINSI SUMATERA SELATAN
8
Ir. Basyaruddin Akhmad, M.Sc
MENYETUJUI
KONSULTAN PERENCANA
Pompa Distribusi
Kap. 50 lps, Head 50m
Pompa Distribusi
3 PT. KRIDA KARYA ADVISORY
Penangkal Petir
2
5
4
∅
∅
6
∅
∅
∅
∅
Direktur Perusahaan
∅
7 JUDUL GAMBAR
7 6 5 4 3 2 1
21350
200 21000 200
200
200
300
A' A DETAIL ENGINEERING DESIGN - DED
NAMA KEGIATAN
2800
2800
2650
PERENCANAAN
DETAIL ENGINEERING DESIGN (DED)
SPAM REGIONAL
PALEMBANG, BAYUASIN, DAN OGAN ILIR
B'
6650
6700
MENGETAHUI
2800
2800
2800
8148
DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
PROVINSI SUMATERA SELATAN
400
1 Pc : 2 Pas 1 Pc : 2 Pas
B
400
2800
2800
2800
Ir. Basyaruddin Akhmad, M.Sc
Pembina Utama Muda (IV/c)
NIP. 19700804 199402 1 002
MENYETUJUI
400
D'
4500
PEJABAT PELAKSANA TEKNIK KEGIATAN
SARANA DAN PRASARANA AIR MINUM
2650
2800
22700
22700
5800
9800
E' C
2800
2650
4500
Pembina (IV/a)
400
NIP. 19751127 199803 1 004
F'
KONSULTAN PERENCANA
Pas 1/2 Batu Bata Pas 1/2 Batu Bata PT. KRIDA KARYA ADVISORY
1 Pc : 2 Pas 1 Pc : 2 Pas
2800
2800
2800
400
G'
5000
8152
2800
2800
2800
6700
H'
Meilani Martini, ST, M.Sc
Direktur Perusahaan
2650
2800
2800
1 : 125 KKA/RES/01 28
KEY MAP
21750
7 6 5 4 3 2 1
300 200
A' A
2800
2650
NAMA KEGIATAN
PERENCANAAN
DETAIL ENGINEERING DESIGN (DED)
B' SPAM REGIONAL
PALEMBANG, BAYUASIN, DAN OGAN ILIR
MENGETAHUI
2800
2800
8150
PENGGUNA ANGGARAN
DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
PROVINSI SUMATERA SELATAN
C'
10900
0
400
Pas 1/2 Batu Bata Pas 1/2 Batu Bata
B
2800
2800
Ir. Basyaruddin Akhmad, M.Sc
Pembina Utama Muda (IV/c)
D' NIP. 19700804 199402 1 002
4500
MENYETUJUI
2650
1
2 SARANA DAN PRASARANA AIR MINUM
3 DAN PENYEHATAN LINGKUNGAN PERMUKIMAN
4 DINAS PERUMAHAN DAN KAWASAN
Pompa Distribusi PERMUKIMAN
22700
9400
Kap. 50 lps, Head 50m
E'
22400
5800
300
6
7
8
Menuju Ke Drainase 9
Pipa Ø100 Pompa Distribusi 10
Kap. 50 lps, Head 50m
2650
11
12
4500
13
Pompa Distribusi 14
Kap. 50 lps, Head 50m M. Saiful Islam, ST, MT
F'
15
16 Pembina (IV/a)
17 NIP. 19751127 199803 1 004
1 Pc : 2 Pas 1 Pc : 2 Pas
Pas 1/2 Batu Bata Pas 1/2 Batu Bata KONSULTAN PERENCANA
2800
400
200
G' 5000
10900
8150
2800
1 : 125 KKA/RES/02 28
KEY MAP
7 6 5 4 3 2 1
NAMA KEGIATAN
PERENCANAAN
DETAIL ENGINEERING DESIGN (DED)
SPAM REGIONAL
PALEMBANG, BAYUASIN, DAN OGAN ILIR
B'
MENGETAHUI
PENGGUNA ANGGARAN
DINAS PERUMAHAN DAN KAWASAN
8150
PERMUKIMAN
PROVINSI SUMATERA SELATAN
C'
10900
Pipa Ø50
B
Ir. Basyaruddin Akhmad, M.Sc
Pembina Utama Muda (IV/c)
NIP. 19700804 199402 1 002
MENYETUJUI
D'
PEJABAT PELAKSANA TEKNIK KEGIATAN
SARANA DAN PRASARANA AIR MINUM
1 DAN PENYEHATAN LINGKUNGAN PERMUKIMAN
2 DINAS PERUMAHAN DAN KAWASAN
3 PERMUKIMAN
4 PROVINSI SUMATERA SELATAN
5
E'
22400
5800
300
6
7
8
9
Menuju Ke Drainase 10
Pipa Ø 100
11
12
13 M. Saiful Islam, ST, MT
14 Pembina (IV/a)
NIP. 19751127 199803 1 004
F'
15
16
KONSULTAN PERENCANA
17
PT. KRIDA KARYA ADVISORY
G'
10900
8150
Electro Magnetik
Flow Meter ∅300 mm
SKR
Skala 1: 125
DENAH RESERVOIR KAP. 1.500 M3
1 : 125 KKA/RES/03 28
KEY MAP
Elv. +3.470
+Elv. 3.370 List Plank Beton = 10cm
Elv. +3.250
Elv. +2.900
Elv. +0.650
DETAIL ENGINEERING DESIGN - DED
WATERSTOP
Bend All Flange 90° Dia. 200 mm
WATERSTOP WATERSTOP PERENCANAAN
Kolom 30 x 30
Pressure Gauge Pipa Header
GIP Dia. 250 mm Elv. - 1.100
DETAIL ENGINEERING DESIGN (DED)
Check Valve 200 mm
SPAM REGIONAL
Butterfly Valve 200 mm
PALEMBANG, BAYUASIN, DAN OGAN ILIR
Fleksible Joint Dia 150 mm
Reducer 125x200 mm
Pompa Distribusi
Kap. 50 lps, H=50m Pintu Air uk. 60x60cm
MENGETAHUI
Pompa lumpur
WATERSTOP Submersible 5,5 l/det WATERSTOP
PENGGUNA ANGGARAN
Elv. - 3.150 Elv. - 3.150
DINAS PERUMAHAN DAN KAWASAN
Elv. - 3.550 Elv. - 3.550
PERMUKIMAN
Elv. - 3.950 Lantai Kerja Tebal 5 cm PROVINSI SUMATERA SELATAN
Pasir Tebal 10 cm
Lantai Kerja Tebal 5 cm
Pasir Tebal 10 cm
Square Pile 25 x 25 Cm
P = 30 m
LANTAI
DENAHTANK
CLEAR 1 400 M3
KAP.
DENAHTANK
CLEAR 1 400 M3
KAP.
LANTAI CLEAR 1 400 M3
KAP.
LANTAI
DENAHTANK LANTAI
DENAHTANK
CLEAR 1 400 M3
KAP. DENAHTANK
CLEAR 1 400 M3
KAP.
LANTAI DENAHTANK
CLEAR 1 400 M3
KAP.
LANTAI DENAHTANK
CLEAR 1 400 M3
KAP.
LANTAI CLEAR 1 400 M3
KAP.
LANTAI
DENAHTANK LANTAI
DENAHTANK
CLEAR 1 400 M3
KAP. DENAHTANK
CLEAR 1 400 M3
KAP.
LANTAI DENAHTANK
CLEAR 1 400 M3
KAP.
LANTAI
DENAHTANK
CLEAR 1 400 M3
KAP.
LANTAI DENAHTANK
CLEAR 1 400 M3
KAP.
LANTAI DENAH LANTAI 1 CLEAR TANK KAP. 400 M3 LANTAI
DENAHTANK
CLEAR 1 400 M3
KAP.
MENYETUJUI
6
1 2 3 4 5 PEJABAT PELAKSANA TEKNIK KEGIATAN
SARANA DAN PRASARANA AIR MINUM
POTONGAN 1-1 DAN PENYEHATAN LINGKUNGAN PERMUKIMAN
7 DINAS PERUMAHAN DAN KAWASAN
Skala 1: 125
PERMUKIMAN
PROVINSI SUMATERA SELATAN
Elv. +3.470
Elv. +3.250
+Elv. 3.370 List Plank Beton = 10cm
M. Saiful Islam, ST, MT
Elv. +2.900
Pembina (IV/a)
Over Head Crane 2ton
NIP. 19751127 199803 1 004
Pintu Air uk. 60x60cm
Elv. +2.110
Dismantling Joint
Dia. 200 mm
KONSULTAN PERENCANA
Bend All Flange 90
Butterfly Valve Dia. 200 mm
Plat Atap, T=12 cm
Dia. 200 mm PT. KRIDA KARYA ADVISORY
Vent Ø100mm Vent Ø100mm Vent Ø100mm Vent Ø100mm Bend All Flange 90
Dia. 200 mm Elv. +1.425
Elv. +0.650
Saluran U-Ditch
Pas 1/2 Batu Bata Uk 400x400mm
Kolom 30 x 30 Kolom 30 x 30
1 Pc : 2 Pas
DENAHTANK
CLEAR 1 400 M3
KAP.
LANTAI LANTAI
DENAHTANK
CLEAR 1 400 M3
KAP. CLEAR LANTAI
DENAHTANK 1 400 M3
KAP. CLEAR LANTAI
DENAHTANK 1 400 M3
KAP. CLEAR 1 400 M3
KAP.
LANTAI
DENAHTANK DENAHTANK
CLEAR 1 400 M3
KAP.
LANTAI DENAHTANK
CLEAR 1 400 M3
KAP.
LANTAI
JUDUL GAMBAR
LANTAI
DENAHTANK
CLEAR 1 400 M3
KAP. LANTAI
DENAHTANK
CLEAR 1 400 M3
KAP. LANTAI
DENAHTANK
CLEAR 1 400 M3
KAP. LANTAI
DENAHTANK
CLEAR 1 400 M3
KAP.
1 : 125 KKA/RES/04 28
KEY MAP
Bend All Flange 45 Steel ∅300 mm Bend All Flange 45 Steel ∅300 mm
1800
Butterfly Valve ∅300 mm
Dismantling Joint ∅300 mm PERENCANAAN
SKR DETAIL ENGINEERING DESIGN (DED)
SPAM REGIONAL
PALEMBANG, BAYUASIN, DAN OGAN ILIR
MENGETAHUI
NP Ø 300 mm
PENGGUNA ANGGARAN
DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
Dismantling Joint ∅300 mm Electro Magnetik PROVINSI SUMATERA SELATAN
Flow Meter ∅300 mm Pipa GIP ∅300 mm
6810
Ir. Basyaruddin Akhmad, M.Sc
Pembina Utama Muda (IV/c)
DENAH DUDUKAN WATER METER NIP. 19700804 199402 1 002
Skala 1: 25 MENYETUJUI
650
650
PERMUKIMAN
PROVINSI SUMATERA SELATAN
820
225
300
M. Saiful Islam, ST, MT
Pembina (IV/a)
NIP. 19751127 199803 1 004
KONSULTAN PERENCANA
Ke Distribusi
Meilani Martini, ST, M.Sc
Direktur Perusahaan
375
375
375
375
Wiremesh Ø8 150-200 Digambar oleh : Muhammad Ade Leo Latif
Tanah Rencana Tanah Rencana
Diperiksa oleh : Suhari Astuti
275
275
275
275
JUDUL GAMBAR
150
225
225
225
Pasir 5 cm Pasir 5 cm
Lantai Kerja 5 cm Lantai Kerja 5 cm Lantai Kerja 5 cm Lantai Kerja 5 cm DETIL WATER METER
200 225 200 200 225 200 200 225 200 200 225 200
Pasir 5 cm Pasir 5 cm Pasir 5 cm Pasir 5 cm
625 625 625 625
1 : 25 KKA/RES/05 28
Skala 1: 25
KEY MAP
Elv. +3.470
+Elv. 3.370
Elv. +3.250
Elv. +2.900
Elv. +2.110
375
375
375
375
Tanah Rencana
Wiremesh Ø8 150-200 Elv. + 0.000 Elv. + 0.000 NAMA KEGIATAN
Dismantling Joint Dismantling Joint Dismantling Joint
275
275
275
275
Lantai Kerja 5 cm Lantai Kerja 5 cm
D.200 mm D.200 mm D.200 mm
PERENCANAAN
225
225
225
225
Pasir 5 cm Pasir 5 cm
Dari
Pompa Distribusi
Lantai Kerja 5 cm
Pasir 5 cm 200 225 200
Lantai Kerja 5 cm
Pasir 5 cm 200 225 200
Lantai Kerja 5 cm
Pasir 5 cm 200 225 200
Lantai Kerja 5 cm
Pasir 5 cm 200 225 200
WATERSTOP
Bend All Flange 90° Dia. 200 mm
WATERSTOP
DETAIL ENGINEERING DESIGN (DED)
625 625 625 625
SPAM REGIONAL
2502 2443 1340 Check Valve 200 mm
PALEMBANG, BAYUASIN, DAN OGAN ILIR
Butterfly Valve 200 mm
Stube Flange HDPE Dia. 300 mm
Fleksible Joint Dia 150 mm MENGETAHUI
Reducer 125x200 mm
PENGGUNA ANGGARAN
Pompa Distribusi
DINAS PERUMAHAN DAN KAWASAN
Kap. 50 lps, H=50m WATERSTOP PERMUKIMAN
PROVINSI SUMATERA SELATAN
Elv. - 3.550
Elv. - 3.950
Pasir Tebal 10 cm
MENYETUJUI
DENAHTANK
CLEAR 1 400 M3
KAP.
LANTAI CLEAR 1 400 M3
KAP.
LANTAI
DENAHTANK LANTAI
DENAHTANK
CLEAR 1 400 M3
KAP. DENAHTANK
CLEAR 1 400 M3
KAP.
LANTAI DENAHTANK
CLEAR 1 400 M3
KAP.
LANTAI
POTONGAN 3-3
Skala 1: 100
Elv. +3.470
+Elv. 3.370
Elv. +3.250 M. Saiful Islam, ST, MT
Pembina (IV/a)
Elv. +2.900
NIP. 19751127 199803 1 004
Over Head Crane 2ton
KONSULTAN PERENCANA
Elv. +2.110
PT. KRIDA KARYA ADVISORY
Elv. +1.000
Elv. + 0.000
WATERSTOP
Elv. - 3.950
JUDUL GAMBAR
Lantai Kerja Tebal 5 cm
Pasir Tebal 10 cm
Square Pile 25 x 25 Cm
P = 30 m
POTONGAN 3-3
RESERVOIR KAP. 1.500 M3
1 400 M3
1 400 M3
1 400 M3
1 400 M3
1 400 M3
KAP.
KAP.
LANTAI
DENAHTANK
KAP.
LANTAI
KAP.
DENAHTANK
LANTAI
DENAHTANK
DENAHTANK KAP.
LANTAI
LANTAI
DENAHTANK
CLEAR
CLEAR
CLEAR
CLEAR
CLEAR
D C B
Skala Rev No. Gambar Jumlah Hal
POTONGAN 3
Skala 1: 100 1 : 100 KKA/RES/06 28
KEY MAP
NAMA KEGIATAN
PERENCANAAN
DETAIL ENGINEERING DESIGN (DED)
SPAM REGIONAL
PALEMBANG, BAYUASIN, DAN OGAN ILIR
MENGETAHUI
PENGGUNA ANGGARAN
DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
PROVINSI SUMATERA SELATAN
Elv. +3.470
+Elv. 3.370
Elv. +3.250
Elv. +2.900
Elv. +2.110
MENYETUJUI
Ralling Pipa
Dia 50 mm
PEJABAT PELAKSANA TEKNIK KEGIATAN
Elv. + 0.000
1 SARANA DAN PRASARANA AIR MINUM
2 DAN PENYEHATAN LINGKUNGAN PERMUKIMAN
3 DINAS PERUMAHAN DAN KAWASAN
WATERSTOP 4 WATERSTOP PERMUKIMAN
5 PROVINSI SUMATERA SELATAN
6
7
8
9
10
11
12
13
WATERSTOP 14
15
16 M. Saiful Islam, ST, MT
17 Pembina (IV/a)
Elv. - 3.550
NIP. 19751127 199803 1 004
Elv. - 3.950
KONSULTAN PERENCANA
Lantai Kerja Tebal 5 cm
PT. KRIDA KARYA ADVISORY
Pasir Tebal 10 cm
Square Pile 25 x 25 Cm
P = 30 m
3M 004 .PAK KNAT RAELC
B C D
POTONGAN 3'
Meilani Martini, ST, M.Sc
Skala 1: 100 Direktur Perusahaan
JUDUL GAMBAR
POTONGAN 3'-3'
RESERVOIR KAP. 1.500 M3
1 : 100 KKA/RES/07 28
KEY MAP
NAMA KEGIATAN
PERENCANAAN
DETAIL ENGINEERING DESIGN (DED)
SPAM REGIONAL
PALEMBANG, BAYUASIN, DAN OGAN ILIR
22700 MENGETAHUI
9400
PENGGUNA ANGGARAN
DINAS PERUMAHAN DAN KAWASAN
Elv. +3.470 PERMUKIMAN
PROVINSI SUMATERA SELATAN
Elv. +2.900
2470
Elv. +2.110
Elv. - 3.150
550
1 400 M3
DENAHTANK KAP.
LANTAI
DENAHTANK KAP.
LANTAI
CLEAR
CLEAR
E D C B A
POTONGAN 4-4
Skala 1: 100
Meilani Martini, ST, M.Sc
Direktur Perusahaan
JUDUL GAMBAR
POTONGAN 4-4
RESERVOIR KAP. 1.500 M3
1 : 100 KKA/RES/08 28
KEY MAP
NAMA KEGIATAN
PERENCANAAN
DETAIL ENGINEERING DESIGN (DED)
SPAM REGIONAL
PALEMBANG, BAYUASIN, DAN OGAN ILIR
MENGETAHUI
PENGGUNA ANGGARAN
DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
PROVINSI SUMATERA SELATAN
22700
9400
Elv. +3.470
Ir. Basyaruddin Akhmad, M.Sc
Pembina Utama Muda (IV/c)
Elv. +2.900
NIP. 19700804 199402 1 002
2470
MENYETUJUI
Elv. +2.110
KONSULTAN PERENCANA
Pipa Suction Pipa Suction Pipa Suction
WATERSTOP Dia. 300 mm Dia. 300 mm Dia. 300 mm
PT. KRIDA KARYA ADVISORY
Elv. - 3.150
550
Elv. - 3.550
Square Pile 25 x 25 Cm
Square Pile 25 x 25 Cm P = 30 m
P = 30 m
1 400 M3
1 400 M3
1 400 M3
1 400 M3
DENAH LANTAI 1
DENAHTANK KAP.
LANTAI
DENAHTANK KAP.
LANTAI
DENAHTANK KAP.
LANTAI
DENAHTANK KAP.
LANTAI
CLEAR
CLEAR
CLEAR
CLEAR
DENAHTANK
CLEAR LANTAI
KAP.
1 400 M3 DENAHTANK
CLEAR LANTAI
KAP.
1 400 M3 DENAHTANK
CLEAR LANTAI
KAP.
1 400 M3
CLEAR TANK KAP. 400 M3
DENAHTANK
CLEAR LANTAI
KAP.
1 400 M3
DENAHTANK
CLEAR LANTAI
KAP.
1 400 M3 DENAHTANK
CLEAR LANTAI
KAP.
1 400 M3
POTONGAN 5-5
RESERVOIR KAP. 1.500 M3
1 : 100 KKA/RES/09 28
KEY MAP
NAMA KEGIATAN
PERENCANAAN
DETAIL ENGINEERING DESIGN (DED)
SPAM REGIONAL
PALEMBANG, BAYUASIN, DAN OGAN ILIR
MENGETAHUI
PENGGUNA ANGGARAN
DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
22700 PROVINSI SUMATERA SELATAN
9400
Elv. +3.470
Elv. +3.250
Elv. +2.900
Ir. Basyaruddin Akhmad, M.Sc
Pembina Utama Muda (IV/c)
2470
Elv. +2.110
NIP. 19700804 199402 1 002
MENYETUJUI
WATERSTOP
4150
Square Pile 25 x 25 Cm
P = 30 m
Square Pile 25 x 25 Cm
P = 30 m
1 400 M3
1 400 M3
1 400 M3
1 400 M3
1 400 M3
KAP.
DENAHTANK KAP.
LANTAI
LANTAI
DENAHTANK
DENAHTANK KAP.
LANTAI
DENAHTANK KAP.
LANTAI
DENAHTANK KAP.
LANTAI
CLEAR
CLEAR
CLEAR
CLEAR
CLEAR
1 400 M3
1 400 M3
1 400 M3
KAP.
LANTAI
KAP.
DENAHTANK
DENAHTANK KAP.
LANTAI
LANTAI
DENAHTANK
CLEAR
CLEAR
CLEAR
1 400 M3
1 400 M3
DENAHTANK KAP.
LANTAI
DENAHTANK KAP.
LANTAI
CLEAR
CLEAR
CLEAR TANK KAP. 400 M3
DENAH LANTAI 1
CLEAR TANK KAP. 400 M3
METODE GALIAN
POTONGAN 4-4 & 5-5
RESERVOIR KAP. 1.500 M3
1 : 100 KKA/RES/10 28
KEY MAP
22700
2800
2800
300 300
Elv. +1.000
Elv. +0.550
Elv. + 0.000
DETAIL ENGINEERING DESIGN - DED
NAMA KEGIATAN
WATERSTOP
4150
WATER STOP
PERENCANAAN
DETAIL ENGINEERING DESIGN (DED)
SPAM REGIONAL
PALEMBANG, BAYUASIN, DAN OGAN ILIR
MENGETAHUI
WATER STOP WATERSTOP
PENGGUNA ANGGARAN
Elv. - 3.150 DINAS PERUMAHAN DAN KAWASAN
550
PERMUKIMAN
Elv. - 3.550
PROVINSI SUMATERA SELATAN
Lantai Kerja Tebal 5 cm
Lantai Kerja Tebal 5 cm Pasir Tebal 10 cm
Pasir Tebal 10 cm
MENYETUJUI
22700
M. Saiful Islam, ST, MT
Pembina (IV/a)
2800 2800 NIP. 19751127 199803 1 004
300 300 Elv. +1.000
KONSULTAN PERENCANA
Elv. + 0.000
WATERSTOP WATERSTOP
4150
WATERSTOP WATERSTOP
Elv. - 3.150
550
POTONGAN 7-7
Skala 1: 100 Skala Rev No. Gambar Jumlah Hal
1 : 100 KKA/RES/11 28
KEY MAP
NAMA KEGIATAN
PERENCANAAN
DETAIL ENGINEERING DESIGN (DED)
SPAM REGIONAL
PALEMBANG, BAYUASIN, DAN OGAN ILIR
MENGETAHUI
PENGGUNA ANGGARAN
DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
PROVINSI SUMATERA SELATAN
22700
2800 2800
300 300 Elv. +1.000
Ir. Basyaruddin Akhmad, M.Sc
Pembina Utama Muda (IV/c)
NIP. 19700804 199402 1 002
Elv. +0.550
Elv. + 0.000
MENYETUJUI
Elv. - 3.150
400
Elv. - 3.550
M. Saiful Islam, ST, MT
Lantai Kerja Tebal 5 cm Pembina (IV/a)
Lantai Kerja Tebal 5 cm Pasir Tebal 10 cm
NIP. 19751127 199803 1 004
Pasir Tebal 10 cm
KONSULTAN PERENCANA
Square Pile 25 x 25 Cm Square Pile 25 x 25 Cm
P = 30 m P = 30 m
PT. KRIDA KARYA ADVISORY
3M 004 .P1AIK
3M 004 .P1AIK
3M 004 .P1AIK
3M 004 .P1AIK
3M 004 .P1AIK
3M 004 .P1AIK
3M 004 .P1AIK
3M 004 .P1AIK
3M 004 .P1AIK
3M 004 .P1AIK
3M 004 .P1AIK
3M 004 .P1AIK
3M 004 .P1AIK
ATKN
NA
AT
AT
AT
ALTH
KN
NA
AT
KN
NA
AT
AT
KN
NA
AT
AT
AT
RA
ALTH
KN
NA
ALTH
KN
NA
KN
NA
AT
AT
ALTH
KN
NA
KN
NA
AT
KN
AN
EE
RA
ALTH
RA
ALTH
ALTH
KN
NAALTH
KN
NA
RA
ALTH
ALTH
KN
NA
LD
AN
AN
AN
C
EE
RA
LD
AN
C
EELD
C
EE
RA
RA
ALTH
LD
AN
C
EE
RA
LD
AN
AN
C
EELD
C
EE
RA
LD
AN
C
EELD
C
EE
RA
RA
ALTH
NAALTH
LD
AN
AN
RAAN
C
EELD
C
EELD
C
EE
RA
LD
AN
C
EELD
C
I' H' G' F' E' D' C' B' A'
JUDUL GAMBAR
METODE GALIAN
POTONGAN 6-6 & 7-7
RESERVOIR KAP. 1.500 M3
1 : 100 KKA/RES/12 28
KEY MAP
20650
7 6 5 4 3 2 1
1909 1909 1909 1909 1909 1909 1909 1909 1909 1909 1909
PERENCANAAN
1867
1867
DETAIL ENGINEERING DESIGN (DED)
SPAM REGIONAL
PALEMBANG, BAYUASIN, DAN OGAN ILIR
MENGETAHUI
1867
1867
B' PENGGUNA ANGGARAN
DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
PROVINSI SUMATERA SELATAN
TIANG PANCANG
1867
1867
4600
UK. 25 X 25 CM. P = 30 M
C' 1667 1667 1667
Ir. Basyaruddin Akhmad, M.Sc
1867
MENYETUJUI
2633
PEJABAT PELAKSANA TEKNIK KEGIATAN
1867
1867
E' C
TIANG PANCANG
1867
1867
M. Saiful Islam, ST, MT
UK. 25 X 25 CM. P = 30 M Pembina (IV/a)
NIP. 19751127 199803 1 004
KONSULTAN PERENCANA
1867
2633
1867
G'
1867
1867
Meilani Martini, ST, M.Sc
1867
1867
H' Direktur Perusahaan
1867
JUDUL GAMBAR
I' E
1 : 125 KKA/RES/13 28
KEY MAP
D10-150
DETAIL ENGINEERING DESIGN - DED
NAMA KEGIATAN
D13
PERENCANAAN
DETAIL ENGINEERING DESIGN (DED)
SPAM REGIONAL
PALEMBANG, BAYUASIN, DAN OGAN ILIR
D13-150
MENGETAHUI
PENGGUNA ANGGARAN
200
DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
PROVINSI SUMATERA SELATAN
D13-100
15
0
Ir. Basyaruddin Akhmad, M.Sc
D13-150 Pembina Utama Muda (IV/c)
D10-150 NIP. 19700804 199402 1 002
MENYETUJUI
2D13
PEJABAT PELAKSANA TEKNIK KEGIATAN
SARANA DAN PRASARANA AIR MINUM
DETIL A1 DETIL A.1 DAN PENYEHATAN LINGKUNGAN PERMUKIMAN
DINAS PERUMAHAN DAN KAWASAN
Skala 1: 5 D13-150
PERMUKIMAN
300 PROVINSI SUMATERA SELATAN
200
D13-100
300
3350
M. Saiful Islam, ST, MT
Pembina (IV/a)
NIP. 19751127 199803 1 004
200
KONSULTAN PERENCANA
03
58
400
JUDUL GAMBAR
1 : 25 KKA/RES/14 28
KEY MAP
7 6 5 4 3 2 1
A' A
NAMA KEGIATAN
B' K-2 K-2 K-2 PERENCANAAN
DETAIL ENGINEERING DESIGN (DED)
SPAM REGIONAL
PALEMBANG, BAYUASIN, DAN OGAN ILIR
MENGETAHUI
PENGGUNA ANGGARAN
C' K-2 K-2 K-2 DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
K-1 K-3 K-1 PROVINSI SUMATERA SELATAN
MENYETUJUI
400 400
300 200
400
400
200
300
TUL. UTAMA 8 - D16 TUL. UTAMA 6 - D16 TUL. UTAMA 4 - D13 4 - D13
1 : 125 KKA/RES/15 28
KEY MAP
7 6 5 4 3 2 1
A' A
NAMA KEGIATAN
PERENCANAAN
DETAIL ENGINEERING DESIGN (DED)
SPAM REGIONAL
PALEMBANG, BAYUASIN, DAN OGAN ILIR
C' K-2 K-2 K-2
MENGETAHUI
K-1 K-3 K-1 PENGGUNA ANGGARAN
B DINAS PERUMAHAN DAN KAWASAN
D13-150 PERMUKIMAN
PROVINSI SUMATERA SELATAN
D13-150
D13-150
D13-150
B- 2
D' K-2 K-2 K-2
PLAT MEZANINE
MENYETUJUI
E' K-1 K-1
22400
C
PEJABAT PELAKSANA TEKNIK KEGIATAN
SARANA DAN PRASARANA AIR MINUM
DAN PENYEHATAN LINGKUNGAN PERMUKIMAN
DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
PROVINSI SUMATERA SELATAN
I' E
Meilani Martini, ST, M.Sc
Direktur Perusahaan
DENAH BALOK KANTILEVER RUANG POMPA Digambar oleh : Muhammad Ade Leo Latif
Skala 1: 125
Diperiksa oleh : Suhari Astuti
BALOK B-1 BALOK B-2
TUL. TUL. TUL. TUL.
DIMENSI DIMENSI
LAPANGAN TUMPUAN LAPANGAN TUMPUAN JUDUL GAMBAR
300
200
D13-150
D13-150
500
400
Elv. + 0.000
Elv. - 0.150 200 DENAH BALOK KANTILEVER R. POMPA
DENAH PENULANGAN PELAT MEZAINE R. POMPA
Elv. - 0.500
TUL. ATAS 5 - D16 5 - D16 TUL. ATAS 2 - D16 3 - D16
DENAH PENULANGAN PELAT MEZANINE RUANG POMPA Skala Rev No. Gambar Jumlah Hal
Skala 1: 125
1 : 125 KKA/RES/16 28
KEY MAP
7 6 5 4 3 2 1
A' A
NAMA KEGIATAN
B'
PERENCANAAN
DETAIL ENGINEERING DESIGN (DED)
SPAM REGIONAL
PALEMBANG, BAYUASIN, DAN OGAN ILIR
MENGETAHUI
D'
Ir. Basyaruddin Akhmad, M.Sc
B-3 B-3 Pembina Utama Muda (IV/c)
NIP. 19700804 199402 1 002
MENYETUJUI
B-3 B-3
F'
H'
JUDUL GAMBAR
BALOK B-3
TUL. TUL.
DIMENSI
LAPANGAN TUMPUAN
200
DENAH BALOK ATAP RUANG POMPA
Skala 1: 125
400
TUL. PINGGANG - -
Skala Rev No. Gambar Jumlah Hal
SENGKANG Ø10 - 150 Ø10 - 150
1 : 125 KKA/RES/17 28
KEY MAP
7 6 5 4 3 2 1
A' A
BALOK 20/40 (B4) BALOK 20/40 (B4) BALOK 20/40 (B4) BALOK 20/40 (B4) BALOK 20/40 (B4) NAMA KEGIATAN
B'
PERENCANAAN
MENGETAHUI
BALOK 20/40 (B4) BALOK 20/40 (B4) BALOK 20/40 (B4) BALOK 20/40 (B4) BALOK 20/40 (B4)
PENGGUNA ANGGARAN
C' DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
BALOK 20/40 (B4) BALOK 20/40 (B4) BALOK 20/40 (B4) BALOK 20/40 (B4) BALOK 20/40 (B4)
D'
Ir. Basyaruddin Akhmad, M.Sc
Pembina Utama Muda (IV/c)
MENYETUJUI
BALOK 20/40 (B4) BALOK 20/40 (B4) BALOK 20/40 (B4) BALOK 20/40 (B4) BALOK 20/40 (B4)
F'
BALOK 20/40 (B4)
BALOK 20/40 (B4) BALOK 20/40 (B4) BALOK 20/40 (B4) BALOK 20/40 (B4) BALOK 20/40 (B4) PT. KRIDA KARYA ADVISORY
G'
BALOK 20/40 (B4)
JUDUL GAMBAR
BALOK B-3
DIMENSI
TUL.
LAPANGAN
TUL.
TUMPUAN
DENAH BALOK ATAP RUANG POMPA
Skala 1: 125
200
400
TUL. PINGGANG - -
SENGKANG Ø10 - 150 Ø10 - 150 Skala Rev No. Gambar Jumlah Hal
1 : 125 KKA/RES/18 28
KEY MAP
D16-150
D16-150
D16-150
D16-150
MENGETAHUI
PENGGUNA ANGGARAN
DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
PROVINSI SUMATERA SELATAN
MENYETUJUI
KONSULTAN PERENCANA
D16-150 D16-150
D16-150 D16-150 PT. KRIDA KARYA ADVISORY
D16-150
D16-150
D16-150
D16-150
JUDUL GAMBAR
1 : 125 KKA/RES/19 28
KEY MAP
7 6 5 4 3 2 1
NAMA KEGIATAN
PERENCANAAN
DETAIL ENGINEERING DESIGN (DED)
SPAM REGIONAL
PALEMBANG, BAYUASIN, DAN OGAN ILIR
B'
MENGETAHUI
PENGGUNA ANGGARAN
DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
PROVINSI SUMATERA SELATAN
C'
MENYETUJUI
D'
PEJABAT PELAKSANA TEKNIK KEGIATAN
SARANA DAN PRASARANA AIR MINUM
Plat, t = 12 cm DAN PENYEHATAN LINGKUNGAN PERMUKIMAN
DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
PROVINSI SUMATERA SELATAN
E' C
D10-150
D10-150
G'
H'
Meilani Martini, ST, M.Sc
Direktur Perusahaan
JUDUL GAMBAR
I' E
1 : 125 KKA/RES/20 28
KEY MAP
7 6 5 4 3 2 1
A' A
D10-150
D10-150 DETAIL ENGINEERING DESIGN - DED
NAMA KEGIATAN
D10-150
D10-150
D10-150
D10-150
Plat, t = 12 cm Plat, t = 12 cm Plat, t = 12 cm Plat, t = 12 cm
PERENCANAAN
DETAIL ENGINEERING DESIGN (DED)
SPAM REGIONAL
B' PALEMBANG, BAYUASIN, DAN OGAN ILIR
Plat, t = 12 cm MENGETAHUI
PENGGUNA ANGGARAN
DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
PROVINSI SUMATERA SELATAN
Plat, t = 12 cm Plat, t = 12 cm Plat, t = 12 cm Plat, t = 12 cm
C'
D10-150 D10-150
D10-150 D10-150
B
D10-150
D10-150
D10-150
D10-150
MENYETUJUI
C
D10-150 D10-150
D10-150 D10-150
D10-150
D10-150
D10-150
D10-150
D10-150
D10-150
Plat, t = 12 cm Plat, t = 12 cm Plat, t = 12 cm Plat, t = 12 cm
M. Saiful Islam, ST, MT
F' Pembina (IV/a)
NIP. 19751127 199803 1 004
KONSULTAN PERENCANA
Plat, t = 12 cm
PT. KRIDA KARYA ADVISORY
D
G'
Plat, t = 12 cm Plat, t = 12 cm Plat, t = 12 cm Plat, t = 12 cm
D10-150 D10-150
D10-150 D10-150
H'
Plat, t = 12 cm
D10-150
D10-150
D10-150
D10-150
D10-150
D10-150
DENAH PENULANGAN PLAT ATAP BAK RESERVOIR DENAH PENULANGAN PLAT ATAP
Skala 1: 125
BAK RESERVOIR KAP. 1.500 M3
1 : 125 KKA/RES/21 28
KEY MAP
OVERHEAD CRANE 2T
CONTROL Y MENGETAHUI
PENGGUNA ANGGARAN
DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
PROVINSI SUMATERA SELATAN
CONTROL X
400
ANGKUR M19D19; L= 300MM KOLOM
PELAT STEEL, UK.400.300.12 MM
500
BALOK KONSOL
5-D16 40 400 60 Meilani Martini, ST, M.Sc
5-D16 PROFIL DILAS DIPELATE Direktur Perusahaan
50 200 50
300
300
540
240
5-D16 42 250 42
5-D16 33 33
555 82 316 102
400
DETIL BALOK KONSOL
Skala 1: 20
Skala Rev No. Gambar Jumlah Hal
1 : 20 KKA/RES/22 28
KEY MAP
1800 1600
D16-150 D16-150
D16-150 D16-150
DETAIL ENGINEERING DESIGN - DED
700
NAMA KEGIATAN
800
D16-150
D16-150
D16-150
D16-150
PERENCANAAN
DETAIL ENGINEERING DESIGN (DED)
SPAM REGIONAL
PALEMBANG, BAYUASIN, DAN OGAN ILIR
MENGETAHUI
PENGGUNA ANGGARAN
DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
PROVINSI SUMATERA SELATAN
1800 1600
D16-150 D16-150 D16-150 D16-150 Ir. Basyaruddin Akhmad, M.Sc
Pembina Utama Muda (IV/c)
NIP. 19700804 199402 1 002
MENYETUJUI
300
300
PEJABAT PELAKSANA TEKNIK KEGIATAN
SARANA DAN PRASARANA AIR MINUM
DAN PENYEHATAN LINGKUNGAN PERMUKIMAN
DINAS PERUMAHAN DAN KAWASAN
150
150
PERMUKIMAN
PROVINSI SUMATERA SELATAN
1100
800
Besi Plat =/= 3 mm Tarikan B. Beton Ø 10 mm
Kunci
1100
800
1100
POTONGAN A - A
Skala. 1 : 20
DETIL PENULANGAN
DUDUKAN POMPA & DETIL MAINHOLE
1 : 20 KKA/RES/23 28
KEY MAP
KEYPLAN
NAMA KEGIATAN
PERENCANAAN
DETAIL ENGINEERING DESIGN (DED)
SPAM REGIONAL
PALEMBANG, BAYUASIN, DAN OGAN ILIR
MENGETAHUI
PENGGUNA ANGGARAN
DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
PROVINSI SUMATERA SELATAN
Elv. +3.470
+Elv. 3.370 List Plank Beton = 10cm
Elv. +3.250
Elv. +2.900
Elv. +2.110
Ir. Basyaruddin Akhmad, M.Sc
Pembina Utama Muda (IV/c)
NIP. 19700804 199402 1 002
D16-150
WATERSTOP WATERSTOP
M. Saiful Islam, ST, MT
Elv. - 3.150 Elv. - 3.150 Pembina (IV/a)
NIP. 19751127 199803 1 004
Elv. - 3.550 Elv. - 3.550
Elv. - 3.950
KONSULTAN PERENCANA
Lantai Kerja Tebal 5 cm Lantai Kerja Tebal 5 cm
Pasir Tebal 10 cm Pasir Tebal 10 cm PT. KRIDA KARYA ADVISORY
Lantai Kerja Tebal 5 cm
Pasir Tebal 10 cm
Square Pile 25 x 25 Cm
P = 30 m
CLEAR TANK KAP. 400 M3
DENAH LANTAI 1
CLEAR TANK KAP. 400 M3
DENAHTANK
CLEAR LANTAI
KAP.
1 400 M3 DENAHTANK
CLEAR LANTAI
KAP.
1 400 M3 DENAH LANTAI 1 CLEAR TANK KAP. 400 M3 DENAHTANK
CLEAR LANTAI
KAP.
1 400 M3
3
7
4
2
1
JUDUL GAMBAR
1 : 100 KKA/RES/24 28
KEY MAP
KEYPLAN
NAMA KEGIATAN
PERENCANAAN
DETAIL ENGINEERING DESIGN (DED)
SPAM REGIONAL
PALEMBANG, BAYUASIN, DAN OGAN ILIR
MENGETAHUI
PENGGUNA ANGGARAN
DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
Elv. +3.470
Elv. +3.250
PROVINSI SUMATERA SELATAN
Elv. +2.900
2470
Elv. +2.110
Elv. +0.550
MENYETUJUI
Elv. +0.000
PEJABAT PELAKSANA TEKNIK KEGIATAN
SARANA DAN PRASARANA AIR MINUM
Tebal Dinding 40 cm
D16-150
2 LAPIS
D16-150 D16-150 DAN PENYEHATAN LINGKUNGAN PERMUKIMAN
D16-150
WATERSTOP WATERSTOP DINAS PERUMAHAN DAN KAWASAN
4150
D16-150
D16-150
PERMUKIMAN
D16-150 D16-150
PROVINSI SUMATERA SELATAN
D13-200 D13-200 D13-200 D13-200
Elv. - 3.150
550
Elv. - 3.550
M. Saiful Islam, ST, MT
Pembina (IV/a)
Lantai Kerja Tebal 5 cm NIP. 19751127 199803 1 004
Pasir Tebal 10 cm
Lantai Kerja Tebal 5 cm KONSULTAN PERENCANA
Pasir Tebal 10 cm
Square Pile 25 x 25 Cm PT. KRIDA KARYA ADVISORY
P = 30 m
Square Pile 25 x 25 Cm
P = 30 m
DENAHTANK
CLEAR 1 400 M3
KAP.
LANTAI
DENAHTANK
CLEAR LANTAI
KAP.
1 400 M3 DENAHTANK
CLEAR LANTAI
KAP.
1 400 M3 DENAHTANK
CLEAR LANTAI
KAP.
1 400 M3 DENAHTANK
CLEAR LANTAI
KAP.
1 400 M3 DENAHTANK
CLEAR LANTAI
KAP.
1 400 M3 DENAHTANK
CLEAR LANTAI
KAP.
1 400 M3 DENAHTANK
CLEAR LANTAI
KAP.
1 400 M3 DENAHTANK
CLEAR LANTAI
KAP.
1 400 M3 DENAHTANK
CLEAR LANTAI
KAP.
1 400 M3
DETIL PENULANGAN DINDING SISI DALAM R.POMPA Meilani Martini, ST, M.Sc
Skala 1: 100 Direktur Perusahaan
JUDUL GAMBAR
1 : 100 KKA/RES/25 28
KEY MAP
22700
2800
2800
DENAHTANK
CLEAR LANTAI
KAP.
1 400 M3
Elv. +1.000
Elv. +0.550
Elv. + 0.000
KEYPLAN
Elv. +0.000
NAMA KEGIATAN
PERENCANAAN
DETAIL ENGINEERING DESIGN (DED)
SPAM REGIONAL
PALEMBANG, BAYUASIN, DAN OGAN ILIR
WATERSTOP WATERSTOP
Elv. - 3.150
MENGETAHUI
Elv. - 3.550
PENGGUNA ANGGARAN
Lantai Kerja Tebal 5 cm Lantai Kerja Tebal 5 cm DINAS PERUMAHAN DAN KAWASAN
Pasir Tebal 10 cm Pasir Tebal 10 cm PERMUKIMAN
PROVINSI SUMATERA SELATAN
DENAHTANK
CLEAR LANTAI
KAP.
1 400 M3 DENAHTANK
CLEAR LANTAI
KAP.
1 400 M3 DENAHTANK
CLEAR LANTAI
KAP.
1 400 M3 DENAHTANK
CLEAR LANTAI
KAP.
1 400 M3 DENAHTANK
CLEAR LANTAI
KAP.
1 400 M3 DENAHTANK
CLEAR LANTAI
KAP.
1 400 M3 DENAHTANK
CLEAR LANTAI
KAP.
1 400 M3 DENAHTANK
CLEAR LANTAI
KAP.
1 400 M3 DENAHTANK
CLEAR LANTAI
KAP.
1 400 M3 DENAHTANK
CLEAR LANTAI
KAP.
1 400 M3 DENAHTANK
CLEAR LANTAI
KAP.
1 400 M3 DENAHTANK
CLEAR LANTAI
KAP.
1 400 M3 DENAHTANK
CLEAR LANTAI
KAP.
1 400 M3
KONSULTAN PERENCANA
Elv. +1.000
PT. KRIDA KARYA ADVISORY
D13-200
D13-200 D13-200
D13-200 D13-200 D13-200
WATERSTOP WATERSTOP
Elv. - 3.150
I H G F E D C B A
DETIL PENULANGAN DINDING MELINTANG LUAR
BAK RESERVOIR KAP. 1.500 M3
DETIL PENULANGAN DINDING MELINTANG LUAR
Skala 1: 100
1 : 100 KKA/RES/26 28
KEY MAP
1
2
1
KEYPLAN
B
B DETAIL ENGINEERING DESIGN - DED
B1 P1 NAMA KEGIATAN
PERENCANAAN
DETAIL ENGINEERING DESIGN (DED)
B1 B1 SPAM REGIONAL
PALEMBANG, BAYUASIN, DAN OGAN ILIR
MENGETAHUI
PENGGUNA ANGGARAN
DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
PROVINSI SUMATERA SELATAN
B1 B1
MENYETUJUI
D B1 B1 KONSULTAN PERENCANA
KETERANGAN
2000
1750
800 800
1 : 40 KKA/RES/27 28
KEY MAP
NAMA KEGIATAN
PERENCANAAN
DETAIL ENGINEERING DESIGN (DED)
SPAM REGIONAL
PALEMBANG, BAYUASIN, DAN OGAN ILIR
MENGETAHUI
PENGGUNA ANGGARAN
DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
PROVINSI SUMATERA SELATAN
MENYETUJUI
KONSULTAN PERENCANA
JUDUL GAMBAR
1 : 20 KKA/RES/28 28
GAMBAR DESAIN TEKNIS BANGUNAN GENSET 150 KVA
KEY MAP
11100
1300 4500 4000 1300
1 2 3
DETAIL ENGINEERING DESIGN - DED
NAMA KEGIATAN
PERENCANAAN
DETAIL ENGINEERING DESIGN (DED)
1000
SPAM REGIONAL
PALEMBANG, BAYUASIN, DAN OGAN ILIR
MENGETAHUI
C PENGGUNA ANGGARAN
DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
TANGKI 5.000 LITER PROVINSI SUMATERA SELATAN
GENERATOR SET
3000
Ir. Basyaruddin Akhmad, M.Sc
PANEL LVMDP
Pembina Utama Muda (IV/c)
NIP. 19700804 199402 1 002
U-Ditch 40x40
U-Ditch 40x40
MENYETUJUI
8500
M. Saiful Islam, ST, MT
Pembina (IV/a)
NIP. 19751127 199803 1 004
TRAY 30X10
POMPA SOLAR KONSULTAN PERENCANA
3000
PT. KRIDA KARYA ADVISORY
675
A
875
875
1500
Meilani Martini, ST, M.Sc
Direktur Perusahaan
JUDUL GAMBAR
3
10650
+4.45
500
Fin. Cat Exterior
+3.95
700 700
BALOK LATEI
TANGKI 1.000 LITER DETAIL ENGINEERING DESIGN - DED
NAMA KEGIATAN
PERENCANAAN
GENERATOR SET DETAIL ENGINEERING DESIGN (DED)
Clamp Clamp TANGKI 5.000 LITER SPAM REGIONAL
PALEMBANG, BAYUASIN, DAN OGAN ILIR
MENGETAHUI
PENGGUNA ANGGARAN
Pipa PVC Dia.4" Pipa PVC Dia.4" DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
PROVINSI SUMATERA SELATAN
ELbow 90° Dia.4" +0.55 ELbow 90° Dia.4" Ir. Basyaruddin Akhmad, M.Sc
+0.40 Pembina Utama Muda (IV/c)
NIP. 19700804 199402 1 002
Muka Tanah
+0.00 +0.00 MENYETUJUI
KONSULTAN PERENCANA
500
GENERATOR SET
TANGKI 5.000 LITER Clamp Clamp
JUDUL GAMBAR
8000
+4.45
500
Fin. Cat Exterior
+3.95
NAMA KEGIATAN
PERENCANAAN
DETAIL ENGINEERING DESIGN (DED)
Tangki SPAM REGIONAL
1.000 Ltr PALEMBANG, BAYUASIN, DAN OGAN ILIR
MENGETAHUI
PENGGUNA ANGGARAN
DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
PROVINSI SUMATERA SELATAN
Tangki Genset
Genset
SKALA : 1:50
8000
+4.45 M. Saiful Islam, ST, MT
Pembina (IV/a)
NIP. 19751127 199803 1 004
500
+3.95 KONSULTAN PERENCANA
875 875
JUDUL GAMBAR
10125
DETAIL ENGINEERING DESIGN - DED
NAMA KEGIATAN
100 200 200 200 100
600 4300 3800 625 PERENCANAAN
+4.45 DETAIL ENGINEERING DESIGN (DED)
SPAM REGIONAL
+4.30 PALEMBANG, BAYUASIN, DAN OGAN ILIR
+4.15
+3.95 MENGETAHUI
PENGGUNA ANGGARAN
DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
Tray 30x10 PROVINSI SUMATERA SELATAN
GENERATOR SET
Ir. Basyaruddin Akhmad, M.Sc
Pembina Utama Muda (IV/c)
NIP. 19700804 199402 1 002
3850
MENYETUJUI
3100
PEJABAT PELAKSANA TEKNIK KEGIATAN
SARANA DAN PRASARANA AIR MINUM
TANGKI DAN PENYEHATAN LINGKUNGAN PERMUKIMAN
DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
Delatasi PROVINSI SUMATERA SELATAN
Grouting t = 12mm LVMDP
+0.55
Pelat Lantai, t=15cm
+0.40 675 Pelat Lantai, t=10cm
+0.25 +0.25 675
Muka Tanah +0.20
650 400
Muka Tanah
+0.00 +0.00
300
700
LC, t = 5cm Pasir Urug , t=5cm
Sloof 40/20 KONSULTAN PERENCANA
SQUARE PILE 25 X 25 CM PT. KRIDA KARYA ADVISORY
FINAL SET 30 M U-Ditch 40x40 cm
2400
300
300
800 800
4500 4000
8500
Meilani Martini, ST, M.Sc
Direktur Perusahaan
NAMA KEGIATAN
8000 PERENCANAAN
DETAIL ENGINEERING DESIGN (DED)
SPAM REGIONAL
100 200 200 100 PALEMBANG, BAYUASIN, DAN OGAN ILIR
800 5800 800
MENGETAHUI
150
+4.30 PENGGUNA ANGGARAN
500
DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
PROVINSI SUMATERA SELATAN
Tray 30x10
LVMDP MENYETUJUI
3100
DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
PROVINSI SUMATERA SELATAN
875 875
Pelat Lantai, t=10cm M. Saiful Islam, ST, MT
Pembina (IV/a)
+0.20 +0.25 +0.15 NIP. 19751127 199803 1 004
Muka Tanah
+0.00 +0.00 KONSULTAN PERENCANA
700
Pelat Lantai, t=15cm Pasir Urug , t=5cm Sloof 40/20
U-Ditch 40x40 cm
300
300
Pasir Urug , t=5cm
LC, t = 5cm
800 800
6000
Meilani Martini, ST, M.Sc
Direktur Perusahaan
NAMA KEGIATAN
8000 PERENCANAAN
DETAIL ENGINEERING DESIGN (DED)
SPAM REGIONAL
100 200 200 100 PALEMBANG, BAYUASIN, DAN OGAN ILIR
800 5800 800
MENGETAHUI
150
+4.30
150
PENGGUNA ANGGARAN
500
500
DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
PROVINSI SUMATERA SELATAN
200
Tray 30x10
Ir. Basyaruddin Akhmad, M.Sc
Pembina Utama Muda (IV/c)
NIP. 19700804 199402 1 002
GENERATOR SET
MENYETUJUI
Delatasi Delatasi
Grouting t = 12mm Grouting t = 12mm
875 875
Pelat Lantai, t=10cm M. Saiful Islam, ST, MT
Pembina (IV/a)
+0.20 +0.25 +0.15 NIP. 19751127 199803 1 004
Muka Tanah
+0.00 +0.00 KONSULTAN PERENCANA
700
Sloof 40/20 Sloof 40/20
SQUARE PILE 25 X 25 CM
FINAL SET 30 M U-Ditch 40x40 cm
300
300
Pasir Urug , t=5cm
LC, t = 5cm
800 800
6000
Meilani Martini, ST, M.Sc
Direktur Perusahaan
1 2 3
8500 DETAIL ENGINEERING DESIGN - DED
250
NAMA KEGIATAN
4500 4000
PERENCANAAN
D16-200
D16-100
P1 P1 P1 DETAIL ENGINEERING DESIGN (DED)
250
800
SPAM REGIONAL
PALEMBANG, BAYUASIN, DAN OGAN ILIR
C
MENGETAHUI
PENGGUNA ANGGARAN
D16-200 DINAS PERUMAHAN DAN KAWASAN
D16-100 PERMUKIMAN
PROVINSI SUMATERA SELATAN
800
3000
PERMUKIMAN
B
Galian Pondasi
Ø10-150
700
6-D16 M. Saiful Islam, ST, MT
Pembina (IV/a)
NIP. 19751127 199803 1 004
3000
KONSULTAN PERENCANA
300
P1 P1 P1
Ø16-100
A
Lc.T=5 cm
Pasir T=5 cm
8500
4500 4000
SLOOF S1 SLOOF S1
DETAIL ENGINEERING DESIGN - DED
NAMA KEGIATAN
PERENCANAAN
DETAIL ENGINEERING DESIGN (DED)
SPAM REGIONAL
3000
PALEMBANG, BAYUASIN, DAN OGAN ILIR
MENGETAHUI
PENGGUNA ANGGARAN
DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
PROVINSI SUMATERA SELATAN
SLOOF S1
SLOOF S1
SLOOF S1
6000
MENYETUJUI
KONSULTAN PERENCANA
DENAH SLOOF
SKALA : 1:50
400
JUDUL GAMBAR
8500
4500 4000
KOLOM K1 KOLOM K1 Balok Latei 15/15 Kp KOLOM K1
NAMA KEGIATAN
3000
PERENCANAAN
DETAIL ENGINEERING DESIGN (DED)
SPAM REGIONAL
1825 PALEMBANG, BAYUASIN, DAN OGAN ILIR
MENGETAHUI
PENGGUNA ANGGARAN
DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
PROVINSI SUMATERA SELATAN
6000 Kp Kp
MENYETUJUI
3000
KONSULTAN PERENCANA
DENAH KOLOM
SKALA : 1:50
300
Meilani Martini, ST, M.Sc
150 Direktur Perusahaan
JUDUL GAMBAR
DETAIL KOLOM
SKALA : 1:5
875
1000
900
BALOK B1 BALOK B1
NAMA KEGIATAN
725 LIST PLANG ATAP
PERENCANAAN
DETAIL ENGINEERING DESIGN (DED)
SPAM REGIONAL
PALEMBANG, BAYUASIN, DAN OGAN ILIR
BALOK B1
BALOK B1
BALOK B1
3000
MENGETAHUI
PENGGUNA ANGGARAN
DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
PROVINSI SUMATERA SELATAN
BALOK B1 BALOK B1
8000
6250
Ir. Basyaruddin Akhmad, M.Sc
Pembina Utama Muda (IV/c)
NIP. 19700804 199402 1 002
MENYETUJUI
BALOK B1
BALOK B1
PERMUKIMAN
PROVINSI SUMATERA SELATAN
3000
875
700 8750 700
300
JUDUL GAMBAR
10100
800 4500 4000 800 DETAIL ENGINEERING DESIGN - DED
NAMA KEGIATAN
PERENCANAAN
DETAIL ENGINEERING DESIGN (DED)
D10-150 D10-150 SPAM REGIONAL
1000
PALEMBANG, BAYUASIN, DAN OGAN ILIR
MENGETAHUI
PENGGUNA ANGGARAN
DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
PROVINSI SUMATERA SELATAN
D10-150
D10-150
3000
MENYETUJUI
D10-150
D10-150
D10-150
D10-150
PEJABAT PELAKSANA TEKNIK KEGIATAN
SARANA DAN PRASARANA AIR MINUM
DAN PENYEHATAN LINGKUNGAN PERMUKIMAN
DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
PROVINSI SUMATERA SELATAN
8000
KONSULTAN PERENCANA
3000
D10-150 D10-150
D10-150 D10-150
1000
JUDUL GAMBAR
DENAH PENULANGAN PLAT LANTAI
SKALA : 1:50
Ø10-150 Ø10-150
5Ø10
150
500
Balok 15x30 625 100
DETAIL ENGINEERING DESIGN - DED
NAMA KEGIATAN
250 PERENCANAAN
DETAIL ENGINEERING DESIGN (DED)
SPAM REGIONAL
10150 DETAIL PENULANGAN LISPLANG
PALEMBANG, BAYUASIN, DAN OGAN ILIR
PENGGUNA ANGGARAN
DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
PROVINSI SUMATERA SELATAN
875
1000
Ø10-150
Ø10-150
DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
3000
6250
8000
KONSULTAN PERENCANA
Ø10-150
Ø10-150
JUDUL GAMBAR
1000
875
700 8750 700
DENAH PENULANGAN PLAT ATAP
Skala Rev No. Gambar Jumlah Hal
SKALA : 1:50
KEY MAP
11100
1300 4500 4000 1300
1 2 3
DETAIL ENGINEERING DESIGN - DED
NAMA KEGIATAN
1000
PERENCANAAN
DETAIL ENGINEERING DESIGN (DED)
SPAM REGIONAL
PALEMBANG, BAYUASIN, DAN OGAN ILIR
C MENGETAHUI
PENGGUNA ANGGARAN
DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
PROVINSI SUMATERA SELATAN
3000
MENYETUJUI
B1 KONSULTAN PERENCANA
B2
A
1500
JUDUL GAMBAR
4450
NAMA KEGIATAN
PERENCANAAN
D16-150
D16-150
DETAIL ENGINEERING DESIGN (DED)
1000
SPAM REGIONAL
PALEMBANG, BAYUASIN, DAN OGAN ILIR
MENGETAHUI
PENGGUNA ANGGARAN
DINAS PERUMAHAN DAN KAWASAN
2000 PERMUKIMAN
PROVINSI SUMATERA SELATAN
1000
Ir. Basyaruddin Akhmad, M.Sc
Pembina Utama Muda (IV/c)
NIP. 19700804 199402 1 002
D16-150
MENYETUJUI
D16-150
PEJABAT PELAKSANA TEKNIK KEGIATAN
SARANA DAN PRASARANA AIR MINUM
DAN PENYEHATAN LINGKUNGAN PERMUKIMAN
DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
PROVINSI SUMATERA SELATAN
2000 1225
B
1225
KONSULTAN PERENCANA
Delatasi PT. KRIDA KARYA ADVISORY
Grouting t = 12mm
2000
4450
D16-150 Mutu Beton K250 D16-150 Mutu Beton K250 D16-150 D16-150
150 300
450
500
Meilani Martini, ST, M.Sc
Direktur Perusahaan
LC, t=5 CM LC, t=5 CM Digambar oleh : Muhammad Ade Leo Latif
Pasir Urug, t=5 CM Pasir Urug, t=5 CM
Diperiksa oleh : Suhari Astuti
JUDUL GAMBAR
SQUARE PILE 25 X 25 CM
SQUARE PILE 25 X 25 CM FINAL SET 30 M
SQUARE PILE 25 X 25 CM FINAL SET 30 M
FINAL SET 30 M
DENAH PENULANGAN DAN
POTONGAN PONDASI GENSET
1000 1000
1225 2000 1225
POT. A-A POT. B-B
Skala Rev No. Gambar Jumlah Hal
KEY MAP
2 NAMA KEGIATAN
PERENCANAAN
DETAIL ENGINEERING DESIGN (DED)
SPAM REGIONAL
PALEMBANG, BAYUASIN, DAN OGAN ILIR
MENGETAHUI
D16-150
D16-150
D16-150
D16-150
D16-150
D16-150
D16-150
D16-150
2000
2400
PENGGUNA ANGGARAN
2400
MENYETUJUI
KONSULTAN PERENCANA
700
D16-150 D16-150
300
300
JUDUL GAMBAR
LC, t = 5cm LC, t = 5cm
Pasir Urug, t = 5cm Pasir Urug, t = 5cm
2400
1400 300 1400
POT. 1-1 DENAH PENULANGAN DAN
POTONGAN PONDASI TANGKI
POT. 2-2
BALOK LATEI
B
150
62
50
573
553
NAMA KEGIATAN
PERENCANAAN
DETAIL ENGINEERING DESIGN (DED)
SPAM REGIONAL
PALEMBANG, BAYUASIN, DAN OGAN ILIR
553
2000
1146
MENGETAHUI
2500
50
PENGGUNA ANGGARAN
DINAS PERUMAHAN DAN KAWASAN
A A PERMUKIMAN
PROVINSI SUMATERA SELATAN
553
450
P Ø 10 P Ø 10
50
781
SKALA : 1:25
MENYETUJUI
510
63 1500 63
450
KONSULTAN PERENCANA
KUNCI SLOT PT. KRIDA KARYA ADVISORY
ENGSEL ENGSEL
JUDUL GAMBAR
POTONGAN A-A
PINTU SPESIFIKASI KUSEN SPESIFIKASI DAUN PINTU
( Lipped Channel ) Rangka : Besi 40 x 40 x 1.2 mm
DATIL PINTU P1 P1 150 x 50 x 20 x 2.3 mm Finishing
Pengisi
: Cat Besi
: Pelat Besi 1.2 mm (Single)
DETAIL KUSEN PINTU 1 DAN
DETAIL BOVEN
SKALA : 1:5 Kunci : Slot
11100
1300 4500 4000 1300
NAMA KEGIATAN
PERENCANAAN
DETAIL ENGINEERING DESIGN (DED)
SPAM REGIONAL
PALEMBANG, BAYUASIN, DAN OGAN ILIR
1000
MENGETAHUI
PENGGUNA ANGGARAN
GENERATOR SET
2055
Ir. Basyaruddin Akhmad, M.Sc
Pembina Utama Muda (IV/c)
3000
NIP. 19700804 199402 1 002
PANEL LVMDP
MENYETUJUI
U-Ditch 40x40
PROVINSI SUMATERA SELATAN
B
POMPA SOLAR
8500
M. Saiful Islam, ST, MT
3000
Pembina (IV/a)
NIP. 19751127 199803 1 004
KONSULTAN PERENCANA
TRAY 30X10
PT. KRIDA KARYA ADVISORY
3000
TRAY 30X10 TRAY 30X10 TRAY 30X10
A
2408 3000 3000 1051 Meilani Martini, ST, M.Sc
Direktur Perusahaan
1500
Digambar oleh : Muhammad Ade Leo Latif
KABEL TRAY
DYNASET M10 DETAIL ENGINEERING DESIGN - DED
NAMA KEGIATAN
0mm PERENCANAAN
150
DETAIL ENGINEERING DESIGN (DED)
SPAM REGIONAL
PALEMBANG, BAYUASIN, DAN OGAN ILIR
MENGETAHUI
PENGGUNA ANGGARAN
DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
PROVINSI SUMATERA SELATAN
MENYETUJUI
50
m
PERMUKIMAN
m
PROVINSI SUMATERA SELATAN
DETAIL A
10600
1050 4500 4000 1050
1050
DETAIL ENGINEERING DESIGN - DED
NAMA KEGIATAN
PERENCANAAN
DETAIL ENGINEERING DESIGN (DED)
SPAM REGIONAL
PALEMBANG, BAYUASIN, DAN OGAN ILIR
MENGETAHUI
3000
PENGGUNA ANGGARAN
DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
PROVINSI SUMATERA SELATAN
MENYETUJUI
1 KE STOP KONTAK 1
2 KE STOP KONTAK
3 DENAH
KE STOP KONTAK INSTALASI PENERANGAN
4 KE LAMPU 1 2 10 2
5 CADANGAN
Skala Rev No. Gambar Jumlah Hal
6 CADANGAN
GAMBAR DESAIN TEKNIS POS JAGA
KEY MAP
NAMA KEGIATAN
PERENCANAAN
DETAIL ENGINEERING DESIGN (DED)
SPAM REGIONAL
PALEMBANG, BAYUASIN, DAN OGAN ILIR
MENGETAHUI
PENGGUNA ANGGARAN
DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
PROVINSI SUMATERA SELATAN
B
3 Ir. Basyaruddin Akhmad, M.Sc
Pembina Utama Muda (IV/c)
NIP. 19700804 199402 1 002
MENYETUJUI
A 4 WC
2 A
PERMUKIMAN
PROVINSI SUMATERA SELATAN
KONSULTAN PERENCANA
1
B
JUDUL GAMBAR
DENAH BANGUNAN
POS JAGA
NAMA KEGIATAN
PERENCANAAN
DETAIL ENGINEERING DESIGN (DED)
SPAM REGIONAL
PALEMBANG, BAYUASIN, DAN OGAN ILIR
MENGETAHUI
PENGGUNA ANGGARAN
DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
PROVINSI SUMATERA SELATAN
MENYETUJUI
KONSULTAN PERENCANA
TAMPAK 1 TAMPAK 2
SKALA : 1:50 SKALA : 1:50
JUDUL GAMBAR
TAMPAK BANGUNAN
POS JAGA
NAMA KEGIATAN
PERENCANAAN
DETAIL ENGINEERING DESIGN (DED)
SPAM REGIONAL
PALEMBANG, BAYUASIN, DAN OGAN ILIR
MENGETAHUI
PENGGUNA ANGGARAN
DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
PROVINSI SUMATERA SELATAN
MENYETUJUI
KONSULTAN PERENCANA
TAMPAK 3 TAMPAK 4
SKALA : 1:50 SKALA : 1:50
JUDUL GAMBAR
TAMPAK BANGUNAN
POS JAGA
NAMA KEGIATAN
PERENCANAAN
DETAIL ENGINEERING DESIGN (DED)
SPAM REGIONAL
PALEMBANG, BAYUASIN, DAN OGAN ILIR
MENGETAHUI
PENGGUNA ANGGARAN
DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
PROVINSI SUMATERA SELATAN
MENYETUJUI
KONSULTAN PERENCANA
± 0.00
- 0.05 - 0.05
JUDUL GAMBAR
POTONGAN A-A
BANGUNAN POS JAGA
NAMA KEGIATAN
PERENCANAAN
DETAIL ENGINEERING DESIGN (DED)
SPAM REGIONAL
PALEMBANG, BAYUASIN, DAN OGAN ILIR
MENGETAHUI
PENGGUNA ANGGARAN
DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
PROVINSI SUMATERA SELATAN
MENYETUJUI
KONSULTAN PERENCANA
JUDUL GAMBAR
POTONGAN B-B
BANGUNAN POS JAGA
NAMA KEGIATAN
PERENCANAAN
DETAIL ENGINEERING DESIGN (DED)
SPAM REGIONAL
PALEMBANG, BAYUASIN, DAN OGAN ILIR
MENGETAHUI
PENGGUNA ANGGARAN
DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
PROVINSI SUMATERA SELATAN
MENYETUJUI
KONSULTAN PERENCANA
JUDUL GAMBAR
K1 KP K1
L S
SLOOF 20/25 SLOOF 20/25
K
SLOOF 20/25
P
SLOOF 20/25
L S
SLOOF 20/25
SP O L
P L S O L
KP KP P
SLOOF 20/25 SP K S
P K
P O S S S L
SLOOF 20/25
S
K1 K1 P /
P 1 00 0 1 02 1 002
SLOOF 20/25
P P L KS K KK
S P S
P L K P K
SP K S
P K
P O S S S L
S S
P /
PO S SLOOF KOLO P 1 5112 1 0 1 00
KO S L P
SK L 1 50
P K K SO
S1 K1 KP
S S
L PO S S L P
SK L 1 20
00 L L
L
10 200
1 150
200 250 200 200 150 150
10 200
1 150
00
1 1 PO S SLOOF KOLO
L PO S SLOOF KOLO
S 150 S 150 S 200 POS
L SLOOF L KOLO L PO S S
SK L S SK L S SK L 1 50
K A
NA A K GIA AN
R N ANAAN
AIL NGIN RING IGN
A R GIONAL
AL BANG BA A IN AN OGAN ILIR
NG A I
NGG NA ANGGARAN
INA R A AN AN KA A AN
R KI AN
RO IN I A RA LA AN
I B A
I /
RING BALOK 20/25 RING BALOK 20/25 NI 00 0 02 002
N RB
I
I /
NI 5 2 0 00
KON L AN R N ANA
KRI A KAR A A I OR
RING BALOK 20/25 200 250
50
NA RING BALOK A L L
KALA 50 A
L GA BAR
R N G
KEY MAP
900
50 800 50
700
50 600 50
50
600
NAMA KEGIATAN
J2
PERENCANAAN
50
WC DETAIL ENGINEERING DESIGN (DED)
SPAM REGIONAL
453
B1 PALEMBANG, BAYUASIN, DAN OGAN ILIR
J2
500
600
P2 MENGETAHUI
PENGGUNA ANGGARAN
159
50
1900
DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
2300
PROVINSI SUMATERA SELATAN
1000
453
POS JAGA
P1
143
Ir. Basyaruddin Akhmad, M.Sc
Pembina Utama Muda (IV/c)
J1
200 100
NIP. 19700804 199402 1 002
MENYETUJUI
453
DETAIL BOVEN B1 (1 Units) PEJABAT PELAKSANA TEKNIK KEGIATAN
SARANA DAN PRASARANA AIR MINUM
Skala 1:25 DAN PENYEHATAN LINGKUNGAN PERMUKIMAN
164
DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
DETAIL KUSEN P2 (1 Units) PROVINSI SUMATERA SELATAN
Skala 1:25
KONSULTAN PERENCANA
50
50
Sealant Sealant
Meilani Martini, ST, M.Sc
Kaca ES t 5mm Kaca ES t 5mm Direktur Perusahaan
1100
1200
1100
1200
JUDUL GAMBAR
50
50
NAMA KEGIATAN
PERENCANAAN
DETAIL ENGINEERING DESIGN (DED)
SPAM REGIONAL
PALEMBANG, BAYUASIN, DAN OGAN ILIR
MEJA
KERAMIK 20x20 MENGETAHUI
KONSULTAN PERENCANA
DENAH POLA LANTAI POS JAGA PT. KRIDA KARYA ADVISORY
SKALA : 1:50
JUDUL GAMBAR
NAMA KEGIATAN
PERENCANAAN
DETAIL ENGINEERING DESIGN (DED)
SPAM REGIONAL
PALEMBANG, BAYUASIN, DAN OGAN ILIR
MENGETAHUI
PENGGUNA ANGGARAN
DINAS PERUMAHAN DAN KAWASAN
A PERMUKIMAN
PROVINSI SUMATERA SELATAN
KONSULTAN PERENCANA
DENAH PLAFOND
SKALA : 1:50
JUDUL GAMBAR
NAMA KEGIATAN
PERENCANAAN
DETAIL ENGINEERING DESIGN (DED)
SPAM REGIONAL
PALEMBANG, BAYUASIN, DAN OGAN ILIR
MENGETAHUI
PENGGUNA ANGGARAN
DINAS PERUMAHAN DAN KAWASAN
JUNCTION BOX PANEL PERMUKIMAN
(PENERANGAN) PROVINSI SUMATERA SELATAN
MENYETUJUI
1
PEJABAT PELAKSANA TEKNIK KEGIATAN
POS JAGA SARANA DAN PRASARANA AIR MINUM
DAN PENYEHATAN LINGKUNGAN PERMUKIMAN
DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
PROVINSI SUMATERA SELATAN
PP/LP-R.OPERATOR
2 3
KONSULTAN PERENCANA
JUDUL GAMBAR
3
2 4 4
NAMA KEGIATAN
PERENCANAAN
DETAIL ENGINEERING DESIGN (DED)
SPAM REGIONAL
PALEMBANG, BAYUASIN, DAN OGAN ILIR
MENGETAHUI
PENGGUNA ANGGARAN
DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
PROVINSI SUMATERA SELATAN
MENYETUJUI
KONSULTAN PERENCANA
JUDUL GAMBAR
= INSTALASI AIR BERSIH (PVC 1")
NAMA KEGIATAN
PERENCANAAN
DETAIL ENGINEERING DESIGN (DED)
BALOK 15/15 SPAM REGIONAL
PALEMBANG, BAYUASIN, DAN OGAN ILIR
MENGETAHUI
BALOK 15/15
PENGGUNA ANGGARAN
DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
A PROVINSI SUMATERA SELATAN
MENYETUJUI
KONSULTAN PERENCANA
DENAH MEJA BETON PT. KRIDA KARYA ADVISORY
SKALA : 1:50
Notasi BL
JUDUL GAMBAR
NAMA KEGIATAN
PIPA GALVANIS Ø1.5"
PERENCANAAN
DETAIL ENGINEERING DESIGN (DED)
SPAM REGIONAL
PALEMBANG, BAYUASIN, DAN OGAN ILIR
MENGETAHUI
100
BRACKET Ir. Basyaruddin Akhmad, M.Sc
Pembina Utama Muda (IV/c)
NIP. 19700804 199402 1 002
400
MENYETUJUI
100
SARANA DAN PRASARANA AIR MINUM
DAN PENYEHATAN LINGKUNGAN PERMUKIMAN
JOINT CONECTION
BC 70 mm2 DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
PROVINSI SUMATERA SELATAN
100
PIPA GALVANIS Ø2.5"
300
KABEL NYA
CLAMP
1 x 70 mm2
M. Saiful Islam, ST, MT
100
Pembina (IV/a)
NIP. 19751127 199803 1 004
KONSULTAN PERENCANA
BC 70 mm2
PT. KRIDA KARYA ADVISORY
R MAX 2 Ohm
JUDUL GAMBAR
NAMA KEGIATAN
PERENCANAAN
DETAIL ENGINEERING DESIGN (DED)
SPAM REGIONAL
PALEMBANG, BAYUASIN, DAN OGAN ILIR
MENGETAHUI
PENGGUNA ANGGARAN
DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
PROVINSI SUMATERA SELATAN
MENYETUJUI
Pompa
PompaDistribusi
Distribusi
Kap. 50 lps, Head 50m Kap. 50 lps, Head 50m
∅
∅
∅
∅
∅
∅
∅
Penangkal Petir
∅
∅
∅
JUDUL GAMBAR
Elv +1.400
2
Kolom 20x20 cm
Elv +1.200
NAMA KEGIATAN
K K
o o PERENCANAAN
DETAIL ENGINEERING DESIGN (DED)
l l SPAM REGIONAL
PALEMBANG, BAYUASIN, DAN OGAN ILIR
o o
m m MENGETAHUI
20 20 PENGGUNA ANGGARAN
DINAS PERUMAHAN DAN KAWASAN
Elv +0.500 x x Plat Galvalum PERMUKIMAN
PROVINSI SUMATERA SELATAN
20 Plat Galvalum Plat Galvalum Plat Galvalum 20
1 1
Elv +0.000
Sloof 20x20 cm Sloof 20x20 cm Ir. Basyaruddin Akhmad, M.Sc
Pembina Utama Muda (IV/c)
NIP. 19700804 199402 1 002
MENYETUJUI
Urugan Tanah Pasir t 10 cm Lantai Ker a t 5 cm Urugan Tanah
PEJABAT PELAKSANA TEKNIK KEGIATAN
Pas. Batu Kali Pas. Batu Kali SARANA DAN PRASARANA AIR MINUM
DAN PENYEHATAN LINGKUNGAN PERMUKIMAN
DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
Pasir t 10 cm Pasir t 10 cm PROVINSI SUMATERA SELATAN
KONSULTAN PERENCANA
JUDUL GAMBAR
SKALA 1:30
KEY MAP
Elv +25.400
2
Elv +25.200 Kolom 20x20 cm DETAIL ENGINEERING DESIGN - DED
NAMA KEGIATAN
PERENCANAAN
DETAIL ENGINEERING DESIGN (DED)
K K K SPAM REGIONAL
PALEMBANG, BAYUASIN, DAN OGAN ILIR
o o o
l l l MENGETAHUI
o o o
Pagar BRC Ø 10mm PENGGUNA ANGGARAN
DINAS PERUMAHAN DAN KAWASAN
m m m PERMUKIMAN
PROVINSI SUMATERA SELATAN
20 20 20
x x x
Elv +23.900
20 20 20
Elv +22.260
Elv +22.160 Pasir t 10 cm
Pasir t 10 cm POTONGAN 1-1
SKALA 1:30 M. Saiful Islam, ST, MT
TAMPAK DEPAN PAGAR BRC Pembina (IV/a)
NIP. 19751127 199803 1 004
SKALA 1:30
KONSULTAN PERENCANA
Notasi S-1 PT. KRIDA KARYA ADVISORY
Gambar
Tulangan 8-D10
Sengkang Ø8-150
DETAIL SLOOF
SKALA 1:30
Meilani Martini, ST, M.Sc
Direktur Perusahaan
POTONGAN 2-2
SKALA 1:30 Dimensi 200 x 200
Tulangan 8-D10
DETAIL KOLOM
SKALA 1:30
NAMA KEGIATAN
PERENCANAAN
DETAIL ENGINEERING DESIGN (DED)
SPAM REGIONAL
PALEMBANG, BAYUASIN, DAN OGAN ILIR
10 MENGETAHUI
9 PENGGUNA ANGGARAN
DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
PROVINSI SUMATERA SELATAN
MENYETUJUI
7
50m a Da D s, H
ead mpmp lp
H PoPo . 50
lps, Kap
. 50
Kap ibu
si
istr
50m aD
ead mp
H Po
2
lps,
. 50
Kap
0m
d5
Hea
lps, etir Pet
ir
. 50 P kal
Kap kal ang
ang Pen
Pen
M. Saiful Islam, ST, MT
Pembina (IV/a)
NIP. 19751127 199803 1 004
1 5
6 KONSULTAN PERENCANA
∅
∅
PT. KRIDA KARYA ADVISORY
∅
∅
∅
∅
∅
ut
∅
∅
a
te nL
n
Ke
Jl.
JUDUL GAMBAR
52
D4 736
+
23
52
D4 716
+
23 Skala Rev No. Gambar Jumlah Hal
KEY MAP
NAMA KEGIATAN
PERENCANAAN
DETAIL ENGINEERING DESIGN (DED)
SPAM REGIONAL
PALEMBANG, BAYUASIN, DAN OGAN ILIR
MENGETAHUI
PENGGUNA ANGGARAN
DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
PROVINSI SUMATERA SELATAN
MENYETUJUI
Top Tanah Asli Top Tanah Asli PEJABAT PELAKSANA TEKNIK KEGIATAN
2% 2% SARANA DAN PRASARANA AIR MINUM
DAN PENYEHATAN LINGKUNGAN PERMUKIMAN
DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
PROVINSI SUMATERA SELATAN
JUDUL GAMBAR
NAMA KEGIATAN
MENYETUJUI
KONSULTAN PERENCANA
LANTAI KERJA, T = 5 CM
Meilani Martini, ST, M.Sc
Direktur Perusahaan
BOND BREAKER
Digambar oleh : Muhammad Ade Leo Latif
JUDUL GAMBAR
BASE COURSE, T = 20 CM
Klass B DETIL DOWEL
Skala 1 : 5 DETAIL DOWEL
NAMA KEGIATAN
PERENCANAAN
DETAIL ENGINEERING DESIGN (DED)
SPAM REGIONAL
PALEMBANG, BAYUASIN, DAN OGAN ILIR
MENGETAHUI
PENGGUNA ANGGARAN
DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
PROVINSI SUMATERA SELATAN
MENYETUJUI
DOWEL Ø25-300
PANJANG 70 CM
M. Saiful Islam, ST, MT
Pembina (IV/a)
NIP. 19751127 199803 1 004
KONSULTAN PERENCANA
RING DUDUKAN PT. KRIDA KARYA ADVISORY
DOWEL Ø 8-300
JUDUL GAMBAR
NAMA KEGIATAN
PERENCANAAN
DETAIL ENGINEERING DESIGN (DED)
SPAM REGIONAL
PALEMBANG, BAYUASIN, DAN OGAN ILIR
MENGETAHUI
MENYETUJUI
DOP PVC
S)
OLO M. Saiful Islam, ST, MT
P PAPAN BEKISTING Pembina (IV/a)
3
5- 0 m
KONSULTAN PERENCANA
2
Ø 70 0
30
PT. KRIDA KARYA ADVISORY
-
EL NG Ø8 8
W A
NG 4Ø
DOANJ RI
P
JUDUL GAMBAR
TAMPAK ISOMETRIK
Tanpa Skala
TAMPAK ISOMETRIK
NAMA KEGIATAN
PERENCANAAN
200.00 DETAIL ENGINEERING DESIGN (DED)
SPAM REGIONAL
PALEMBANG, BAYUASIN, DAN OGAN ILIR
MENGETAHUI
PENGGUNA ANGGARAN
DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
PROVINSI SUMATERA SELATAN
50.00
MENYETUJUI
500.00
M. Saiful Islam, ST, MT
Pembina (IV/a)
NIP. 19751127 199803 1 004
DATAIL PENGAMAN TIANG LAMPU KONSULTAN PERENCANA
SCALE 1 : 25
PT. KRIDA KARYA ADVISORY
60.00 DETIL
PENERANGAN JALAN UMUM
U-DIT
CH 40
X40
8 DETAIL ENGINEERING DESIGN - DED
NAMA KEGIATAN
PERENCANAAN
DETAIL ENGINEERING DESIGN (DED)
SPAM REGIONAL
PALEMBANG, BAYUASIN, DAN OGAN ILIR
U-DIT 10 MENGETAHUI
CH 9 PENGGUNA ANGGARAN
0 PERMUKIMAN
PROVINSI SUMATERA SELATAN
MENYETUJUI
7
50m a Da D s, H
ead mpmp lp
H PoPo . 50
lps, Kap
. 50
Kap ibu
si
istr
50m aD
ead mp
H Po
2
lps,
. 50
Kap
0m
d5
Hea
lps, etir Pet
ir
. 50 P kal
Kap kal ang
ang Pen
Pen
M. Saiful Islam, ST, MT
Pembina (IV/a)
NIP. 19751127 199803 1 004
1 5
6 KONSULTAN PERENCANA
∅
BOX CULVERT 40X40
∅
PT. KRIDA KARYA ADVISORY
∅
∅
∅
∅
∅
ut
∅
∅
a
te nL
n
Ke
Jl.
JUDUL GAMBAR
52
D4 736
+
23
52
D4 716
+
23 Skala Rev No. Gambar Jumlah Hal
KEY MAP
NAMA KEGIATAN
PERENCANAAN
DETAIL ENGINEERING DESIGN (DED)
SPAM REGIONAL
PALEMBANG, BAYUASIN, DAN OGAN ILIR
MENGETAHUI
PENGGUNA ANGGARAN
DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
PROVINSI SUMATERA SELATAN
MENYETUJUI
KONSULTAN PERENCANA
JUDUL GAMBAR
.2 NAMA KEGIATAN
m PERENCANAAN
DETAIL ENGINEERING DESIGN (DED)
SPAM REGIONAL
PALEMBANG, BAYUASIN, DAN OGAN ILIR
m
PERMUKIMAN
PROVINSI SUMATERA SELATAN
.0
(PENERANGAN)
60 PP - Genset
PANEL SDP - 1 Ir. Basyaruddin Akhmad, M.Sc
Pembina Utama Muda (IV/c)
(RESERVOIR) NIP. 19700804 199402 1 002
MENYETUJUI
A
G
AN
JA
NG
S
C
RA
PO
W
NE
DP PE
U-D M P
LV
itc L SD
h NE L
40 NE
x4 PA
0 PA
0
X1
30
AY
TR
0
X1
30
AY
TR
0
x4
40
h
0
itc
X1
U-D
30
AY
TR
M. Saiful Islam, ST, MT
1
2
50
He usi
3
m4
5
6
7
U-D
itc
h
40
x4
PP - Pos Jaga Pembina (IV/a)
NIP. 19751127 199803 1 004
8 9 0
ad
lp trib
50
10
50 is
Ø
p. a D
11
s,
a
12
Pip
Ka omp
50
KONSULTAN PERENCANA
He si
0
13
x4
s, u
P
ad
40
lp trib
14
h
itc
15
50 is
U-D
p. a D
16
Ka omp
17
i
us
trib
P
tir
ad
Pe
He
PANEL INDUK
ka
s,
ng
lp
na
50
Pe
p.
Ka
Ben
d
All
Fla
nge
45
Ste
el
∅ 300
mm
But
terf
ly
Val
ve
∅300
mm
NP
Ø
300
: 2 Bata
mm
s
Pa
Pip
a
1 Batu
GIP
Pip
a 300
∅
GIP
Dis mm
Pc
300
∅
ma
mm ntlin
But
1/2
terf g Join
ly
Val t
ve 300
∅
∅300 mm
s
a ase
Pa
mm
0
Ele
10
Flo ctro
w
Me Ma
Pip rain
300tik d
All
∅
mm Fla
nge
D
45
Ste
ke
el
∅300
Dis
ma mm
uju
ntlin
g
0
Join
x4
t Dis
en
300 ma
∅
40
mm ntlin Che
g
M
Join ck
Val
h
t
∅300 ve
itc
300
∅
mm
U-D
SKR
Butterfly Valve
Steel Dia 200 mm
: 2 Bata
s
Pa
1 Batu
: 2 Bata
Pc
s
Pa
1/2
1 Batu
s
Pa
Pc
1/2
s
Pa
Suhari Astuti
: 2 Bata
Diperiksa oleh :
s
Pa
1 Batu
Pc
1/2
s
Pa
JUDUL GAMBAR
KETERANGAN :
Butterfly Valve
Steel Dia 200 mm
.2 NAMA KEGIATAN
m PERENCANAAN
DETAIL ENGINEERING DESIGN (DED)
SPAM REGIONAL
PALEMBANG, BAYUASIN, DAN OGAN ILIR
PP - PJU MENGETAHUI
PENGGUNA ANGGARAN
DINAS PERUMAHAN DAN KAWASAN
PANEL SDP - 2
m
PERMUKIMAN
PROVINSI SUMATERA SELATAN
.0
(PENERANGAN)
60
PANEL SDP - 1 Ir. Basyaruddin Akhmad, M.Sc
Pembina Utama Muda (IV/c)
(RESERVOIR) NIP. 19700804 199402 1 002
MENYETUJUI
A
G
AN
JA
NG
S
C
RA
PO
W
NE
DP PE
U-D M P
LV
itc L SD
h NE L
40 NE
x4 PA
0 PA
0
X1
30
AY
TR
0
X1
30
AY
TR
0
x4
40
h
0
itc
X1
U-D
30
AY
TR
1
M. Saiful Islam, ST, MT
2
3
4
5 U-D
Pembina (IV/a)
6 itc
h
NIP. 19751127 199803 1 004
m
7 40
50
x4
He usi
8 9 0
ad
lp trib
50
10
50 is
Ø
p. a D
11
s,
a
12
Pip
Ka omp
pa
50
m
KONSULTAN PERENCANA
He si
0
13
x4
s, u
P
Po
ad
40
lp trib
14
el
h
itc
15
50 is
n
U-D
p. a D
Pa
16
m
Ka omp
17
50
He si
s, u
P
ad
lp trib
tir
lPe
PANEL INDUK
ka
ng
na
Pe
Ben
d
All
Fla
nge
45
Ste
el
∅ 300
mm
But
terf
ly
Val
ve
∅300
mm
NP
Ø
300
: 2 Bata
mm
s
Pa
Pip
a
1 Batu
GIP
Pip
a 300
∅
GIP
Dis mm
Pc
300
∅
ma
mm ntlin
But
1/2
terf g Join
ly
Val t
ve 300
∅
∅300 mm
s
a ase
Pa
mm
0
Ele
10
Flo ctro
w
Me Ma
Pip rain
300tik d
All
∅
mm Fla
nge
D
45
Ste
ke
el
∅300
Dis
ma mm
uju
ntlin
g
0
Join
x4
t Dis
en
300 ma
∅
40
mm ntlin Che
g
M
Join ck
Val
h
t
∅300 ve
itc
300
∅
mm
U-D
mm
SKR
Butterfly Valve
Steel Dia 200 mm
: 2 Bata
s
Pa
1 Batu
: 2 Bata
Pc
s
Pa
1/2
1 Batu
s
Pa
Pc
1/2
s
Pa
Suhari Astuti
: 2 Bata
Diperiksa oleh :
s
Pa
1 Batu
Pc
1/2
s
Pa
JUDUL GAMBAR
Butterfly Valve
Steel Dia 200 mm
KETERANGAN:
NAMA KEGIATAN
PERENCANAAN
DETAIL ENGINEERING DESIGN (DED)
SPAM REGIONAL
PALEMBANG, BAYUASIN, DAN OGAN ILIR
MENGETAHUI
PENGGUNA ANGGARAN
DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
PROVINSI SUMATERA SELATAN
MENYETUJUI
TRAFO-1
Ø
BY PLN
KONSULTAN PERENCANA
JUDUL GAMBAR
NAMA KEGIATAN
PERENCANAAN
DETAIL ENGINEERING DESIGN (DED)
SPAM REGIONAL
PALEMBANG, BAYUASIN, DAN OGAN ILIR
MENGETAHUI
PENGGUNA ANGGARAN
DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
PROVINSI SUMATERA SELATAN
MENYETUJUI
KONSULTAN PERENCANA
Φ
Φ
Meilani Martini, ST, M.Sc
Direktur Perusahaan
JUDUL GAMBAR
NAMA KEGIATAN
PERENCANAAN
DETAIL ENGINEERING DESIGN (DED)
SPAM REGIONAL
PALEMBANG, BAYUASIN, DAN OGAN ILIR
MENGETAHUI
PENGGUNA ANGGARAN
DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
PROVINSI SUMATERA SELATAN
MENYETUJUI
KONSULTAN PERENCANA
Φ JUDUL GAMBAR
SDP 2 - PENERANGAN
RESERVOIR BOOSTER
PERENCANAAN
DETAIL ENGINEERING DESIGN (DED)
SPAM REGIONAL
PALEMBANG, BAYUASIN, DAN OGAN ILIR
PENGGUNA ANGGARAN
DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
PROVINSI SUMATERA SELATAN
MENYETUJUI
KONSULTAN PERENCANA
Spare
JUDUL GAMBAR
PP-PJU
RESERVOIR BOOSTER
PERENCANAAN
DETAIL ENGINEERING DESIGN (DED)
SPAM REGIONAL
PALEMBANG, BAYUASIN, DAN OGAN ILIR
MENGETAHUI
PENGGUNA ANGGARAN
DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
PROVINSI SUMATERA SELATAN
MENYETUJUI
KONSULTAN PERENCANA
JUDUL GAMBAR
PP-RUANG JAGA
RESERVOIR BOOSTER
PERENCANAAN
DETAIL ENGINEERING DESIGN (DED)
SPAM REGIONAL
PALEMBANG, BAYUASIN, DAN OGAN ILIR
MENGETAHUI
PENGGUNA ANGGARAN
DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
PROVINSI SUMATERA SELATAN
MENYETUJUI
KONSULTAN PERENCANA
JUDUL GAMBAR
PP-R.GENSET
RESERVOIR BOOSTER
PERENCANAAN
DETAIL ENGINEERING DESIGN (DED)
SPAM REGIONAL
PALEMBANG, BAYUASIN, DAN OGAN ILIR
MENGETAHUI
PENGGUNA ANGGARAN
DINAS PERUMAHAN DAN KAWASAN
PERMUKIMAN
PROVINSI SUMATERA SELATAN
MENYETUJUI
KONSULTAN PERENCANA
JUDUL GAMBAR
PP-R. POMPA
RESERVOIR BOOSTER
25 19 22 23 19 Pipa Header
2' Loose Flange 400 mm 1 8 GIP Dia. 500 mm
MENYETUJUI
11 Wall Pipe Single Flange 17
12 Butterfly Valve
250 mm
250 mm
3
3
KAP. 1.500 M3 15 16 P1 F. Pipa ke Pos Jaga, Operasional PEJABAT PELAKSANA TEKNIK KEGIATAN
42 37 P3 dan Laboratorium SARANA DAN PRASARANA AIR MINUM
13 Dismantling Joint 250 mm 3 GIP PIPE DAN PENYEHATAN LINGKUNGAN PERMUKIMAN
Ø 300 mm DINAS PERUMAHAN DAN KAWASAN
14 Fleksible Joint 250 mm 3 PERMUKIMAN
Sambungan Las
GI PIPE Ø 34'' PROVINSI SUMATERA SELATAN
2 Loose Flange 250 mm 9 B
44
15 Reducer 250 x 150 mm 3 26
26 ke Bangunan
45
31
16 Loose Flange 150 mm 3
26 26 G. Pipa Air Bersih ke Pos Jaga
End Suction Pump - Distribusi
P1 Q = 50 lps ; H = 50 m
3 30
45 ke Pos Jaga
26
17 Loose Flange 125 mm 3 29
M
26 35 Dari Header Distribusi
19 Loose Flange 150 mm 15 A 45
3 36 KONSULTAN PERENCANA
20 Fleksible Joint 150 mm 3 30 29
PT. KRIDA KARYA ADVISORY
2 26
21 Butterfly Valve 150 mm 3 26
31
26 Loose Flange
Ke Pelayanan
300 mm 1 Duo Jet Anti-Surge 44 Ball Valve GI 3
33 80 mm 1 4'' 1
Automatic Air Valve Digambar oleh : Muhammad Ade Leo Latif
27 Blind Flange 300 mm 1 3
34 Stube Flange 300 mm 1 45 Bend Las 90° 4'' 5
Diperiksa oleh : Suhari Astuti
28 Bend Las 45° 300 mm 2 Pipa GIP Dia. 34'' mm Panjang = 24 m
28 Bend Las 45° 300 mm 2
Pipa GIP Dia. 300 mm JUDUL GAMBAR
Panjang = 12 m Pipa GIP Dia. 300 mm
(Header Distribusi) Panjang = 12 m
(Pipa Header Distribusi)