Anda di halaman 1dari 19

KABUPATEN PENAJAM PASER UTARA

KECAMATAN SEPAKU
DESA SUKARAJA

GAMBAR RENCANA
KEGIATAN
RENOVASI GEDUNG BPD DESA SUKARAJA
PEKERJAAN
RENOVASI GEDUNG BPD DESA SUKARAJA
LOKASI
KECAMATN SEPAKU 2

TAHUN ANGGARAN 2023


PEMERINTAH

KABUPATEN
KABUPATEN PENAJAM PASER UTARA

PERKEBUNAN SAWIT PROGRAM,

5 DESA SUKARAJA

PEKERJAAN,

RENOVASI GEDUNG BPD


DESA SUKARAJA

3 RENCANA REHAB KANTOR BPD


EKSISTING
KM/WC

LOKASI,

KECAMATAN SEPAKU
RENCANA REHAB KANTOR BPD

DISETUJUI OLEH,

4 DINAS PEKERJAAN UMUM DAN PENATAAN RUANG


UNIT PELAKSANAAN TEKNIS (UPT)-PU
KECAMATAN SEPAKU
RENCANA REHAB KANTOR BPD

2
1

DEDI SUTARTONO, ST
NIP. 1981 1208 2011 01 1002

MENGETAHUI,

KEPALA DESA SUKARAJA


SEPAKU DUA,

RISKI MAULANA P.A S.Sos

KETERANGAN : DIBUAT OLEH:

TIM KADER TEKNIS

1 KANTOR DESA SUKARAJA DESA SUKARAJA,

2 PUSBAN SEPAKU 2
3 RENCANA REHAB KANTOR BPD
TIM KADER SEPAKU II
I REN. LAY OUT 4 APOTIK
ARC-01 SCALA 1: 1400 GAMBAR RENCANA
5 PLN
JUDUL GAMBAR SKALA

KODE GAMBAR NO. LEMBAR JLM LEMBAR


PEMERINTAH

KABUPATEN
KABUPATEN PENAJAM PASER UTARA
RENCANA PEKERJAAN
PROGRAM,

DESA SUKARAJA

7 8 9 10

6 I
PEKERJAAN,
EKSISTING KM/WC
ATAP SPANDEK 0.3 MM

TALANG AIR
5 H

RENOVASI GEDUNG BPD


4 G
DESA SUKARAJA
3

F
LOKASI,
ATAP SPANDEK 0.3 MM

2 E

GOR SEPAKU 2 ATAP DAK Tb. 12 cm


KECAMATAN SEPAKU
1 D

A B C
JALAN DAHLIA DISETUJUI OLEH,

DINAS PEKERJAAN UMUM DAN PENATAAN RUANG


UNIT PELAKSANAAN TEKNIS (UPT)-PU
KECAMATAN SEPAKU

JALAN NEGARA

DEDI SUTARTONO, ST
NIP. 1981 1208 2011 01 1002
PUSBAN SEPAKU 2
JALAN CEMARA MENGETAHUI,

KEPALA DESA SUKARAJA


SEPAKU DUA,

KANTOR DESA SUKARAJA RISKI MAULANA P.A S.Sos

DIBUAT OLEH:

TIM KADER TEKNIS


DESA SUKARAJA,

TIM KADER SEPAKU II

GAMBAR RENCANA
I REN. SITE PLANT JUDUL GAMBAR SKALA
ARC-01 SCALA 1: 350

KODE GAMBAR NO. LEMBAR JLM LEMBAR


PEMERINTAH

7 8 9 10
KABUPATEN
KABUPATEN PENAJAM PASER UTARA

6 I PROGRAM,

DESA SUKARAJA
EKSISTING KM/WC

5 H PEKERJAAN,

RENOVASI GEDUNG BPD

MEJA DAPUR
DESA SUKARAJA

+0.80
RG. DAPUR
-0.05
LOKASI,

4 G KECAMATAN SEPAKU

DISETUJUI OLEH,
RG. ARSIP
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
±0.00
UNIT PELAKSANAAN TEKNIS (UPT)-PU
KECAMATAN SEPAKU

RG. KETUA
±0.00 F

RG. SEKRETARIS DEDI SUTARTONO, ST


±0.00 NIP. 1981 1208 2011 01 1002

MENGETAHUI,

KEPALA DESA SUKARAJA


SEPAKU DUA,

2 E

RISKI MAULANA P.A S.Sos


TERAS DEPAN
-0.10
DIBUAT OLEH:

TIM KADER TEKNIS


1 D DESA SUKARAJA,

A B C
TIM KADER SEPAKU II

GAMBAR RENCANA
I DENAH RENC
ARC-01 SCALA 1:70 JUDUL GAMBAR SKALA

KODE GAMBAR NO. LEMBAR JLM LEMBAR


PEMERINTAH

KABUPATEN
KABUPATEN PENAJAM PASER UTARA

PROGRAM,

TOPA
. TAPDAK
+3
3.0
DESA SUKARAJA

TOPA
. NGN
I -ANGN
I
+2
3.0
PEKERJAAN,
TOPK
. USEN
+20.0
RENOVASI GEDUNG BPD
DESA SUKARAJA

LOKASI,

KECAMATAN SEPAKU

DISETUJUI OLEH,

DINAS PEKERJAAN UMUM DAN PENATAAN RUANG


LANTATIERAS UNIT PELAKSANAAN TEKNIS (UPT)-PU
0-0.5 KECAMATAN SEPAKU
PERMUKAANTANAH
0-0.5

I TAMPAK DEPAN
ARC-01 SCALA 1:45

DEDI SUTARTONO, ST
NIP. 1981 1208 2011 01 1002

MENGETAHUI,

KEPALA DESA SUKARAJA


SEPAKU DUA,

RISKI MAULANA P.A S.Sos

DIBUAT OLEH:

TIM KADER TEKNIS


DESA SUKARAJA,

TIM KADER SEPAKU II

GAMBAR RENCANA

JUDUL GAMBAR SKALA


PERMUKAANTANAH
0-0.5

I TAMPAK BELAKANG KODE GAMBAR NO. LEMBAR JLM LEMBAR


ARC-01 SCALA 1:45
PEMERINTAH

EKSS
ITN
I GKM/WC TALANGAR
IHUJAN
FN
IS
IHN
I GPLESTERAN+ACA
IN

KABUPATEN
KABUPATEN PENAJAM PASER UTARA

PROGRAM,

TOPATAPDAK
+33.0
DESA SUKARAJA

PEKERJAAN,

RENOVASI GEDUNG BPD


DESA SUKARAJA

LOKASI,

KECAMATAN SEPAKU

DISETUJUI OLEH,

DINAS PEKERJAAN UMUM DAN PENATAAN RUANG


LANTATIERAS UNIT PELAKSANAAN TEKNIS (UPT)-PU
0-0.5 KECAMATAN SEPAKU
PERMUKAANTANAH
0-0.5

I TAMPAK SAMPING KIRI


ARC-01 SCALA 1:45

DEDI SUTARTONO, ST
NIP. 1981 1208 2011 01 1002

MENGETAHUI,

KEPALA DESA SUKARAJA


FN
IS
IHN
I GPLESTERAN+ACA
IN TALANGAR
IHUJAN EKSS
ITN
I GKM/WC SEPAKU DUA,

RISKI MAULANA P.A S.Sos


TOPATAPDAK
+33.0

DIBUAT OLEH:

TIM KADER TEKNIS


DESA SUKARAJA,

TIM KADER SEPAKU II

GAMBAR RENCANA

JUDUL GAMBAR SKALA


LANTATIERAS
0-0.5
PERMUKAANTANAH
0-0.5

I TAMPAK SAMPING KANAN KODE GAMBAR NO. LEMBAR JLM LEMBAR

ARC-01 SCALA 1:45


PEMERINTAH

KABUPATEN
KABUPATEN PENAJAM PASER UTARA

PROGRAM,

120 120
DESA SUKARAJA

PEKERJAAN,

RENOVASI GEDUNG BPD


DESA SUKARAJA

LOKASI,

KECAMATAN SEPAKU

DISETUJUI OLEH,

50 DINAS PEKERJAAN UMUM DAN PENATAAN RUANG


UNIT PELAKSANAAN TEKNIS (UPT)-PU
KECAMATAN SEPAKU

DEDI SUTARTONO, ST
NIP. 1981 1208 2011 01 1002

MENGETAHUI,

KEPALA DESA SUKARAJA


SEPAKU DUA,

RUANG SEKRETARIS RUANG KETUA


+0.00 +0.00

PERMUKAAN TANAH
-0.40
RISKI MAULANA P.A S.Sos

DIBUAT OLEH:

TIM KADER TEKNIS


DESA SUKARAJA,

300 504
TIM KADER SEPAKU II

GAMBAR RENCANA

I POTONGAN A-A JUDUL GAMBAR SKALA

ARC-01 SCALA 1:80


KODE GAMBAR NO. LEMBAR JLM LEMBAR
PEMERINTAH

KABUPATEN
KABUPATEN PENAJAM PASER UTARA

PROGRAM,

DESA SUKARAJA

PEKERJAAN,

RENOVASI GEDUNG BPD


DESA SUKARAJA

LOKASI,

KECAMATAN SEPAKU

DISETUJUI OLEH,

DINAS PEKERJAAN UMUM DAN PENATAAN RUANG


50 UNIT PELAKSANAAN TEKNIS (UPT)-PU
KECAMATAN SEPAKU

TOPK
. USEN TOPK
. USEN
+20.0 +20.0

DEDI SUTARTONO, ST
NIP. 1981 1208 2011 01 1002

MENGETAHUI,

Teras Depan Ruang Sekretaris Ruang Arsip KEPALA DESA SUKARAJA


-0.05 +0.00 +0.00 SEPAKU DUA,

PERMUKAAN TANAH
-0.40

RISKI MAULANA P.A S.Sos

DIBUAT OLEH:

TIM KADER TEKNIS


DESA SUKARAJA,

165 410 200

TIM KADER SEPAKU II

GAMBAR RENCANA
I POTONGAN B-B
JUDUL GAMBAR SKALA
ARC-01 SCALA 1:80

KODE GAMBAR NO. LEMBAR JLM LEMBAR


PEMERINTAH

KABUPATEN
KABUPATEN PENAJAM PASER UTARA

PROGRAM,

DESA SUKARAJA

PEKERJAAN,

RENOVASI GEDUNG BPD


DESA SUKARAJA

LOKASI,

KECAMATAN SEPAKU

DISETUJUI OLEH,

DINAS PEKERJAAN UMUM DAN PENATAAN RUANG


UNIT PELAKSANAAN TEKNIS (UPT)-PU
KECAMATAN SEPAKU

DEDI SUTARTONO, ST
NIP. 1981 1208 2011 01 1002

MENGETAHUI,

KEPALA DESA SUKARAJA


SEPAKU DUA,

RISKI MAULANA P.A S.Sos

DIBUAT OLEH:

TIM KADER TEKNIS


DESA SUKARAJA,

TIM KADER SEPAKU II

GAMBAR RENCANA

JUDUL GAMBAR SKALA

KODE GAMBAR NO. LEMBAR JLM LEMBAR


PEMERINTAH

KABUPATEN
KABUPATEN PENAJAM PASER UTARA
7 8 9 10 7 8 9 10
PROGRAM,

DESA SUKARAJA
6 I 6 I
EKSISTING KM/WC PEKERJAAN,
EKSISTING KM/WC

RENOVASI GEDUNG BPD


5 H 5 H
DESA SUKARAJA
Gelagar Ulin 8/8

Gelagar Ulin 8/8

Gelagar Ulin 8/8


LOKASI,
I I

KECAMATAN SEPAKU
4 G 4 G
Eksisting Gelagar Ulin 8/8 Eksisting Gelagar Ulin 8/8
DISETUJUI OLEH,
Rencana Pondasi Bt. Gunung
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
UNIT PELAKSANAAN TEKNIS (UPT)-PU
KECAMATAN SEPAKU

3 3 Eksisting Gelagar Ulin 8/8

Eksisting Gelagar Ulin 8/8

Eksisting Gelagar Ulin 8/8

Eksisting Gelagar Ulin 8/8


Eksisting Pondasi Kayu Ulin
F

DEDI SUTARTONO, ST
NIP. 1981 1208 2011 01 1002

Eksisting Pondasi Kayu Ulin MENGETAHUI,

KEPALA DESA SUKARAJA


SEPAKU DUA,

2 E 2 E
Eksisting Gelagar Ulin 8/8 Eksisting Gelagar Ulin 8/8

RISKI MAULANA P.A S.Sos

DIBUAT OLEH:
1 D 1 D TIM KADER TEKNIS
DESA SUKARAJA,

A B C A B C

TIM KADER SEPAKU II

DENAH PONDASI GAMBAR RENCANA


I
I DENAH SLOOF KAYU
ARC-01 SCALA 1:80 ARC-01 SCALA 1:80 JUDUL GAMBAR SKALA

KODE GAMBAR NO. LEMBAR JLM LEMBAR


PEMERINTAH

KABUPATEN
KABUPATEN PENAJAM PASER UTARA

Keramik Halus 40 x 40 cm PROGRAM,


Cor Lantai Rabat Fc = 7,4 Mpa, t = 7 cm
Urukan Pasir t = 10 cm DESA SUKARAJA

Trasram Pas. 1/2 Bata champ 1:2 Urugan Tanah Kembali


PEKERJAAN,

Pas. camp 1/2 Bata Ringan 1:4 RENOVASI GEDUNG BPD


DESA SUKARAJA

LOKASI,
Sloof 15/20
KECAMATAN SEPAKU
± 0.00

13 10 7
DISETUJUI OLEH,
17

DINAS PEKERJAAN UMUM DAN PENATAAN RUANG


UNIT PELAKSANAAN TEKNIS (UPT)-PU
KECAMATAN SEPAKU
30

70
DEDI SUTARTONO, ST
NIP. 1981 1208 2011 01 1002
60

60

MENGETAHUI,

KEPALA DESA SUKARAJA


SEPAKU DUA,

5
RISKI MAULANA P.A S.Sos

Angkur 2 Ø 8 DIBUAT OLEH:


Pondasi Bt. Gunung Champ 1:4 P= 50 Cm TIM KADER TEKNIS
Urukan Pasir T = 5 cm DESA SUKARAJA,

Pancang Ulin 8/8


Panjang 2 Meter
30
60 DETAIL PONDASI I-I TIM KADER SEPAKU II

ARC-04
SCALA 1:15 GAMBAR RENCANA

JUDUL GAMBAR SKALA

KODE GAMBAR NO. LEMBAR JLM LEMBAR


PEMERINTAH

KABUPATEN
KABUPATEN PENAJAM PASER UTARA
7 8 9 10 7 8 9 10
PROGRAM,

6 I DESA SUKARAJA
6 I
EKSISTING KM/WC
EKSISTING KM/WC PEKERJAAN,

KP
RENOVASI GEDUNG BPD
5 KP H 5 H DESA SUKARAJA
Balok Ulin 8/8

Balok Ulin 8/8

Balok Ulin 8/8


LOKASI,

KECAMATAN SEPAKU
4 KP G 4 G
Eksisting Balok Ulin 8/8 Eksisting Balok Ulin 8/8
DISETUJUI OLEH,

DINAS PEKERJAAN UMUM DAN PENATAAN RUANG


UNIT PELAKSANAAN TEKNIS (UPT)-PU
KECAMATAN SEPAKU

3 3 Eksisting Balok Ulin 8/8

Eksisting Balok Ulin 8/8

Eksisting Balok Ulin 8/8

Eksisting Balok Ulin 8/8


F

DEDI SUTARTONO, ST
NIP. 1981 1208 2011 01 1002

MENGETAHUI,

KEPALA DESA SUKARAJA


SEPAKU DUA,

Eksisting Balok Ulin 8/8 Eksisting Balok Ulin 8/8


2 E 2 E

RISKI MAULANA P.A S.Sos


KP KP KP
Eksisting Balok Ulin 8/8 Eksisting Balok Ulin 8/8
1 D 1 D DIBUAT OLEH:

TIM KADER TEKNIS


DESA SUKARAJA,

A B C A B C

TIM KADER SEPAKU II

I DENAH KOLOM I DENAH BALOK GAMBAR RENCANA


ARC-01 SCALA 1:80 ARC-01 SCALA 1:80
JUDUL GAMBAR SKALA

KODE GAMBAR NO. LEMBAR JLM LEMBAR


PEMERINTAH

KABUPATEN
KABUPATEN PENAJAM PASER UTARA
7 8 9 10 7 8 9 10
PROGRAM,

DESA SUKARAJA
6 I 6 I
EKSISTING KM/WC
KUDA-KUDA BAJA RINGAN EKSISTING KM/WC
ATAP SPANDEK 0.3 MM JARAK 120 CM PEKERJAAN,

BUBUNGAN METAL
RENOVASI GEDUNG BPD
TALANG AIR
5 H 5 RENG BAJA RINGAN H DESA SUKARAJA
JARAK 60 CM

EKSISITING BALOK 8/8 LOKASI,

KECAMATAN SEPAKU

4 G 4 G
DISETUJUI OLEH,

DINAS PEKERJAAN UMUM DAN PENATAAN RUANG


UNIT PELAKSANAAN TEKNIS (UPT)-PU
KECAMATAN SEPAKU

3 3

F F

DEDI SUTARTONO, ST
NIP. 1981 1208 2011 01 1002

MENGETAHUI,
ATAP SPANDEK 0.3 MM ATAP SPANDEK 0.3 MM
KEPALA DESA SUKARAJA
SEPAKU DUA,

2 E 2 E

ATAP DAK Tb. 12 cm ATAP DAK Tb. 12 cm


RISKI MAULANA P.A S.Sos

DIBUAT OLEH:
1 D 1 D
TIM KADER TEKNIS
DESA SUKARAJA,

A B C A B C

TIM KADER SEPAKU II

I DENAH ATAP I DENAH RANGKA ATAP GAMBAR RENCANA


ARC-01 SCALA 1:80 ARC-01 SCALA 1:80 JUDUL GAMBAR SKALA

KODE GAMBAR NO. LEMBAR JLM LEMBAR


PEMERINTAH

KABUPATEN
KABUPATEN PENAJAM PASER UTARA

PROGRAM,
10
0
DESA SUKARAJA

200
10 PEKERJAAN,
0
RENOVASI GEDUNG BPD
DESA SUKARAJA

LOKASI,

KECAMATAN SEPAKU
56 56 100 145 100 56 56
DISETUJUI OLEH,
610
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
UNIT PELAKSANAAN TEKNIS (UPT)-PU
KECAMATAN SEPAKU
I DETAIL KUDA"
ARC-01 SCALA 1:40

DEDI SUTARTONO, ST
NIP. 1981 1208 2011 01 1002

MENGETAHUI,

KEPALA DESA SUKARAJA


SEPAKU DUA,

RISKI MAULANA P.A S.Sos

DIBUAT OLEH:

TIM KADER TEKNIS


DESA SUKARAJA,

TIM KADER SEPAKU II

GAMBAR RENCANA

JUDUL GAMBAR SKALA

KODE GAMBAR NO. LEMBAR JLM LEMBAR


PEMERINTAH

KABUPATEN
KABUPATEN PENAJAM PASER UTARA

PROGRAM,

DESA SUKARAJA

PEKERJAAN,

RENOVASI GEDUNG BPD


DESA SUKARAJA

RANGKA PENGGANTUNG HOLLOW 20/40 mm RANGKA PENGGANTUNG HOLLOW 20/40 mm LOKASI,


SECRUP BAJA SECRUP BAJA
PELAFOND CALSIBOARD T 0.35 mm DIPASANG ZIG-ZAG PELAFOND CALSIBOARD T 0.35 mm DIPASANG ZIG-ZAG
RANGKA HOLLOW 40/40 mm RANGKA HOLLOW 40/40 mm KECAMATAN SEPAKU

4 DISETUJUI OLEH,

DINAS PEKERJAAN UMUM DAN PENATAAN RUANG


UNIT PELAKSANAAN TEKNIS (UPT)-PU
4 RANGKA PENGGANTUNG HOLLOW 20/40 mm KECAMATAN SEPAKU
SECRUP BAJA 5 60
5 60
4
RANGKA PENGGANTUNG HOLLOW 20/40 mm
SECRUP BAJA 5
5
A RANGKA HOLLOW 40/40 mm

RANGKA HOLLOW 40/40 mm


DEDI SUTARTONO, ST
RANGKA PENGGANTUNG HOLLOW 20/40 mm NIP. 1981 1208 2011 01 1002

MENGETAHUI,

KEPALA DESA SUKARAJA


SEPAKU DUA,

PELAFOND CALSIBOARD T 0.35mm DIPASANG ZIG-ZAG

RISKI MAULANA P.A S.Sos


PELAFOND CALSIBOARD T 0.35mm DIPASANG ZIG-ZAG
DIBUAT OLEH:
TIM KADER TEKNIS

I DETAIL PLAFOND JARAK RANGKA PELAFOND


60 60
DESA SUKARAJA,

ARC-01 SCALA 1:25 JARAK RANGKA PELAFOND DETAIL I


60 60

60 TIM KADER SEPAKU II


A
GAMBAR RENCANA

JUDUL GAMBAR SKALA

KODE GAMBAR NO. LEMBAR JLM LEMBAR


PEMERINTAH

7 8 9 10 7 8 9 10

KABUPATEN
KABUPATEN PENAJAM PASER UTARA
6 I 6 I
PROGRAM,

EKSISTING KM/WC
EKSISTING KM/WC DESA SUKARAJA

5 H 5 H
PEKERJAAN,

MEJA DAPUR
MEJA DAPUR
RG. DAPUR

+0.80
RG. DAPUR

+0.80
KERAMIK HALUS
KERAMIK HALUS 40 x 40 RENOVASI GEDUNG BPD
40 x 40 DESA SUKARAJA

4 G 4 G LOKASI,

P1
RG. ARSIP KECAMATAN SEPAKU
RG. ARSIP J1 KERAMIK HALUS
KERAMIK HALUS 40 x 40
40 x 40
P1 J1
DISETUJUI OLEH,

3 3 DINAS PEKERJAAN UMUM DAN PENATAAN RUANG


P1 UNIT PELAKSANAAN TEKNIS (UPT)-PU
RG. KETUA KECAMATAN SEPAKU
RG. KETUA KERAMIK HALUS HALUS
KERAMIK HALUS HALUS
40 X 40 F 40 X 40 F
RG. SEKRETARIS
RG. SEKRETARIS KERAMIK HALUS
KERAMIK HALUS
J1 40 x 40
40 x 40
J1

PJ1
DEDI SUTARTONO, ST
NIP. 1981 1208 2011 01 1002
J1 J1

2 E 2 E MENGETAHUI,

KEPALA DESA SUKARAJA


SEPAKU DUA,
TERAS DEPAN
TERAS DEPAN KERAMIK HALUS
KERAMIK KASAR
40 x 40
40 x 40

1 D 1 D
RISKI MAULANA P.A S.Sos

DIBUAT OLEH:
A B C A B C
TIM KADER TEKNIS
DESA SUKARAJA,

I DENAH KERAMIK I DENAH KUSEN


TIM KADER SEPAKU II
ARC-01 ARC-01 SCALA 1:80
SCALA 1:80
KETERANGAN JUMLAH
GAMBAR RENCANA
1. KUSEN PJ 1 = 1 BUAH JUDUL GAMBAR SKALA
2. KUSEN P1 = 3 BUAH
3. KUSEN J1 = 6 BUAH
KODE GAMBAR NO. LEMBAR JLM LEMBAR
4. KUSEN BV = 1 BUAH
PEMERINTAH

5
ENGSEL
JENDELA

DAUN JENDELA
KAYU KELAS I
KACA
BENING 5 mm KABUPATEN

130
KUSEN KAYU

5
KELAS I KABUPATEN PENAJAM PASER UTARA
ANGKUR BESI 8mm,
KACA

30
PANJANG 20 cm
BENING 5 mm PROGRAM,

5
DESA SUKARAJA

PEKERJAAN,

5
KUSEN KAYU
RENOVASI GEDUNG BPD
KELAS I 5 40 5 DESA SUKARAJA

LOKASI,

TIPE BOVEN KECAMATAN SEPAKU


5 50 5 50 5 DIMENSI ( 50 x 40 )
JUMLAH 1.00 ( BH )
DISETUJUI OLEH,
TIPE J1 MATERIAL
KUSEN KAYU KELAS I

DIMENSI ( 115 x 140 ) KACA BENING 5 mm DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
UNIT PELAKSANAAN TEKNIS (UPT)-PU
JUMLAH 5.00 ( BH )
KECAMATAN SEPAKU
KUSEN KAYU KELAS I
MATERIAL DAUN JENDELA KAYU KELAS I
BESI Ø 8 - 50 CM

KUSEN KAYU

5 10 5
AKSESORIS ENGSEL, HANDEL, DAN GRENDEL

KELAS I
KUSEN KAYU
5

KELAS I
DEDI SUTARTONO, ST
NIP. 1981 1208 2011 01 1002

PINTU PANEL 5 105 5 MENGETAHUI,

KAYU KELAS I KEPALA DESA SUKARAJA


SEPAKU DUA,
ENGSEL PINTU TIPE ANGIN-ANGIN J1
DIMENSI ( 115 x 20 )

ANGKUR BESI 8mm, JUMLAH 6.00 ( BH )

PANJANG 20 cm KUSEN KAYU KELAS I


MATERIAL
KACA BENING 5 mm
195

RISKI MAULANA P.A S.Sos

HANDEL PINTU DIBUAT OLEH:

KUSEN KAYU TIM KADER TEKNIS

5 10 5
DESA SUKARAJA,
KELAS I

5 80 5 TIM KADER SEPAKU II

ANGKUR BESI 8mm,


GAMBAR RENCANA
TIPE ANGIN-ANGIN P1
PANJANG 20 cm
TIPE P1 DIMENSI ( 90 x 20 )
DIMENSI ( 200 x 80 )
JUMLAH 3.00 ( BH ) JUDUL GAMBAR SKALA
JUMLAH 3.00 ( BH )
KUSEN KAYU KELAS I
KUSEN KAYU KELAS I MATERIAL
KACA BENING 5 mm I DETAIL KUSEN
MATERIAL DAUN PINTU KAYU KELAS I
ARC-01 SCALA 1:20
5 80 5 BESI Ø 8 - 50 CM KODE GAMBAR NO. LEMBAR JLM LEMBAR
ENGSEL, HANDEL, DAN
AKSESORIS
GRENDEL
PEMERINTAH

KABUPATEN
KABUPATEN PENAJAM PASER UTARA

5
ENGSEL JENDELA PROGRAM,

DESA SUKARAJA

DAUN JENDELA
KAYU KELAS I PEKERJAAN,
KACA BENING 5 mm

130
RENOVASI GEDUNG BPD
DESA SUKARAJA
ANGKUR BESI 8mm,
PANJANG 20 cm
LOKASI,

195
KECAMATAN SEPAKU

DISETUJUI OLEH,
5

KUSEN KAYU DINAS PEKERJAAN UMUM DAN PENATAAN RUANG


KELAS I UNIT PELAKSANAAN TEKNIS (UPT)-PU
KECAMATAN SEPAKU
TIPE PJ1
DIMENSI ( 200 x 80 ) ( 120 x 140 )
JUMLAH 1.00 ( BH )
KUSEN KAYU KELAS I
MATERIAL DAUN PINTU DAN JENDELA KAYU KELAS I
BESI Ø 8 - 50 CM
AKSESORIS ENGSEL, HANDEL, DAN GRENDEL

DEDI SUTARTONO, ST
NIP. 1981 1208 2011 01 1002

KUSEN KAYU MENGETAHUI,


KELAS I
KEPALA DESA SUKARAJA
SEPAKU DUA,
5 50 5 50 5 80 5

RISKI MAULANA P.A S.Sos

KUSEN KAYU
5 10 5

DIBUAT OLEH:
KELAS I TIM KADER TEKNIS
DESA SUKARAJA,

5 105 5 80 5
TIM KADER SEPAKU II

TIPE ANGIN-ANGIN PJ 1
DIMENSI ( 200 x 20 ) GAMBAR RENCANA
JUMLAH 1.00 ( BH )
KUSEN KAYU KELAS I
MATERIAL JUDUL GAMBAR SKALA
KACA BENING 5 mm
I DETAIL KUSEN
ARC-01 SCALA 1:25
KODE GAMBAR NO. LEMBAR JLM LEMBAR
PEMERINTAH

7 8 9 10 7 8 9 10

6 I 6 I
KABUPATEN
EKSISTING KM/WC KABUPATEN PENAJAM PASER UTARA
AIR TANDON DISTRIBUSI KE
EKSISTING KM/WC CUCI PIRING
PROGRAM,
5 H 5 H
DESA SUKARAJA
AIR CUCI PIRING DI BUANG
KE SALURAN

PEKERJAAN,

4 G 4 G RENOVASI GEDUNG BPD


DESA SUKARAJA

LOKASI,

KECAMATAN SEPAKU
3 3
DISETUJUI OLEH,

F F DINAS PEKERJAAN UMUM DAN PENATAAN RUANG


UNIT PELAKSANAAN TEKNIS (UPT)-PU
KECAMATAN SEPAKU

2 E 2 E DEDI SUTARTONO, ST
NIP. 1981 1208 2011 01 1002

MENGETAHUI,

KEPALA DESA SUKARAJA


SEPAKU DUA,

1 D 1 D

A B C A B C RISKI MAULANA P.A S.Sos

DIBUAT OLEH:

TIM KADER TEKNIS


I DENAH INSTALASI I DENAH PIPA DESA SUKARAJA,

ARC-01 ARC-01 SCALA 1:80


SCALA 1:80
KETERANGAN JUMLAH KETERANGAN

SAKLAR GANDA = 7 BUAH AIR KOTOR = 2" TIM KADER SEPAKU II

LAMPU PHLIPS = 3 BUAH AIR BERSIH = 3/4 "


SAKLAR TUNGAL = 3 BUAH GAMBAR RENCANA
STOP KONTAK = 6 BUAH
JUDUL GAMBAR
STOP KONTAK AC = 3 BUAH SKALA

BOX MCB = 1 BUAH


MCB 6 AMPER = 2 GRUP KODE GAMBAR NO. LEMBAR JLM LEMBAR