Anda di halaman 1dari 84

GRUP B

KEJURUAN
TEKNIK INFORMATIKA, DESAIN MODE DAN TEKSTIL, TEKNIK PENDINGIN,BAHASA, KESENIAN, TATA
RIAS, KESEHATAN TRADISIONAL, ROBOTIKA, HUBUNGAN INDUSTRIAL, ELEKTRONIKA, DESAIN
KOMUNIKASI VISUAL, PERHOTELAN, MULTIMEDIA, INSTALASI INFRASTRUKTUR
TELEKOMUNIKASI (VSAT, FIBER OPTIC DAN BTS)
2020
PERSPEKTIF WORKSHOP KEJURUAN
TEKNIK INFORMATIKA
KOLOM BETON
FIN. KERAMIK 40X40 CM
MOTIF BATU

TAMPAK DEPAN
01
WORKSHOP GRUP B

BALAI LATIHAN KERJA KOMUNITAS


KEMENTERIAN KETENAGAKERJAAN
REPUBLIK INDONESIA
DIREKTORAT JENDERAL PEMBINAAN PELATIHAN DAN PRODUKTIVITAS
DIREKTORAT BINA KELEMBAGAAN PELATIHAN
DAFTAR GAMBAR
PERSPEKTIF & SITE
WORKSHOP GRUP B
NO NO. GAMBAR JUDUL GAMBAR SKALA

PERSPEKTIF
1 P - 01 PERSPEKTIF TAMPAK DEPAN 01 NTS
2 P - 02 PERSPEKTIF TAMPAK BELAKANG 02 NTS
3 P - 03 PERSPEKTIF TAMPAK SAMPING KIRI 03 NTS
4 P - 04 PERSPEKTIF TAMPAK SAMPING KANAN 04 NTS
5 P - 05 PERSPEKTIF INTERIOR VIEW KORIDOR 01 NTS
6 P - 06 PERSPEKTIF INTERIOR VIEW RUANG KELAS 02 NTS
7 P - 07 PERSPEKTIF INTERIOR VIEW LORONG TOILET 03 NTS
8 P - 08 PERSPEKTIF INTERIOR VIEW RUANG TUNGGU 04 NTS

ARSITEKTUR
9 AR - 00 DENAH LUASAN TANAH 1 : 100
10 AR - 00' DENAH LUASAN TANAH 1 : 100
PERSPEKTIF WORKSHOP KEJURUAN GRUP B
PERSPEKTIF TAMPAK BELAKANG
NTS
02
PERSPEKTIF TAMPAK SAMPING KIRI
NTS
03
PERSPEKTIF TAMPAK SAMPING KANAN
NTS
04
PERSPEKTIF INTERIOR VIEW KORIDOR
NTS
01
PERSPEKTIF INTERIOR VIEW R. KELAS
NTS
02
PERSPEKTIF INTERIOR VIEW R. TUNGGU
NTS
04
PERSPEKTIF INTERIOR VIEW LORONG TOILET
NTS
03
LUAS TANAH = 238 M2

DENAH LUASAN TANAH 01

AR - 00
GUDANG
R. KELAS TEORI

KM/WC

LUAS TANAH = 238 M3


RUANG
INSTRUKTUR

R. KELAS PRAKTEK

RUANG
TUNGGU

TERAS

DENAH LUASAN TANAH 01

AR - 00'
GUDANG

R. KELAS TEORI
KM/WC

RUANG
INSTRUKTUR

R. KELAS PRAKTEK
RUANG
TUNGGU

TERAS

01
KEMENTERIAN KETENAGAKERJAAN
REPUBLIK INDONESIA
DIREKTORAT JENDERAL PEMBINAAN PELATIHAN DAN PRODUKTIVITAS
DIREKTORAT BINA KELEMBAGAAN PELATIHAN
DAFTAR GAMBAR
SRUKTUR
WORKSHOP GRUP B

NO NO. GAMBAR JUDUL GAMBAR SKALA

STRUKTUR
01 STR - 01 DENAH RENCANA PONDASI 1 : 100

02 STR - 02 DETAIL PONDASI BATU BELAH 1 : 20

03 STR - 03 DETAIL PONDASI P1 1 : 20

04 STR - 04 DENAH RENCANA SLOOF 1 : 100

05 STR - 05 DENAH RENCANA KOLOM 1 : 100

06 STR - 06 DENAH RENCANA BALOK LINTEL 1 : 100

07 STR - 07 DENAH RENCANA BALOK 1 : 100

08 STR - 08 DENAH RENCANA SOPI-SOPI 1 : 100

09 STR - 09 DETAIL SOPI-SOPI As.1 & 5, As.3 & 4 1 : 50

10 STR - 10 DETAIL PENULANGAN SLOOF, KOLOM & BALOK 1 : 20

11 STR - 11 DETAIL PENULANGAN BALOK 1 : 20

12 STR - 12 DENAH RENCANA RANGKA ATAP 1 : 100

13 STR - 13 RANGKA ATAP R1 & R2 1 : 50

14 STR - 14 RANGKA ATAP R3 1 : 50

15 STR - 15 DETAIL RANGKA ATAP 1 : 10

16 STR - 16 DETAIL RANGKA ATAP 1 : 10


P1 P1 P1 P1 P1

P2 P2 P2 P2

P2
P2
P1 P1

P2
P2 P2
P2
P2
P1 P1

P2 P1 P1 P2

P2' P2'
P1 01
P1 P1
P2'
P1 P1
02

DENAH RENC. PONDASI 01

STR - 01
KOLOM BETON 30X30
15
BALOK SLOOF
UK. (15X25)
BALOK SLOOF S1
UK. (15X30) FINISHING KERAMIK
PASIR URUG KERAMIK
40X40 POLISH
30 PASIR URUG
P ±0,00
-0,03
FINISHING KERAMIK
20 10 5

15 10 7
PASIR URUG FINISHING KERAMIK

17
SELASAR
-0,20 -0,20
35

32

32
10 5
BALOK SLOOF S2

10 15
MT MT
-0,35 -0,35 UK. (15X25)

PENINGGIAN URUGAN TANAH


30 TANAH URUG
30
MUKA TANAH ASLI TANAH URUG

70

70

70
80

80

80
PONDASI
BATUBELAH
10

10

10
PASIR URUG

70
10 10 10 70 10
90 90

02 POT. (02)PONDASI MENERUS BATUBELAH P2'


01 POT. (01)PONDASI MENERUS BATUBELAH P2

STR - 02
30

KOLOM K1
UK. (30X30)
PASIR URUG KERAMIK
40X40 POLISH FINISHING KERAMIK
P ±0,00
SPESI

10 5
PASIR URUG
SELASAR

25
Ø12
-0,20

10

10 5
10
-0,35
BALOK SLOOF S1
UK. (15X30)

35
A Ø8-15
PENINGGIAN URUGAN TANAH
Ø12-150

10 - Ø12
Ø12-150

10 - Ø12

120
Ø8 - 15

100
30
TANAH URUG

90

90
TANAH URUG

140
125
Ø12-150
35

Ø12-150 Ø12-150
Ø12-150
10

20

10 5 20
LANTAI KERJA
1:3:5
10 35 30 35 10
PASIR URUG
100 02 DETAIL BESI KOLOM

10 35 30 35 10
01 DENAH R. PONDASI P1 100

03 POTONGAN PONDASI P1

STR - 03
( P- 0.05) ( P- 0.05) ( P- 0.05) ( P- 0.05)

S1 S1 S1 S1

( P- 0.05)
( P- 0.05)

( P- 0.05)
S1
S1

( P- 0.05)

S1

( P- 0.05)

( P- 0.05)
( P- 0.05)
( P- 0.05)
S1

S1
( P- 0.05)

( P- 0.05)
S1

( P- 0.05)
S1

( P- 0.05)

S1
S1

( P- 0.05)
( P- 0.05)

S1
S1

S1 S1 S1 S1
( P- 0.05) ( P- 0.05) ( P- 0.05) ( P- 0.05)

( P- 0.10)
( P- 0.10) S2 S2 S2 ROLLAG BATA

( P- 0.10)

DENAH RENC. SLOOF 01

STR - 04
K1 K1 K1 K1 K1

KP KP
KP
KP
K1 K1
KP KP
KP
KP
KP

K1 KP K1
KP

K1 K1 K1 K1 K1

K1 K1

DENAH RENC. KOLOM 01

STR - 05
BL BL BL BL

( P+ 2.73) ( P+ 2.73) ( P+ 2.73) ( P+ 2.73)

( P+ 2.73)
( P+ 2.73)

BL
( P+ 2.73)
( P+ 2.73)

( P+ 2.73)
BL BL
( P+ 2.73)

( P+ 2.73)
BL BL
BL BL BL BL
( P±0.00)
( P-0.05)
( P+ 2.73) ( P+ 2.73) ( P+ 2.73) ( P+ 2.73)

01

02 POT. 01

DENAH RENC. BALOK LINTEL 01

STR - 06
B1 20X30 B1 20X30 B1 20X30 B1 20X30
( P+ 3.50) ( P+ 3.50) ( P+ 3.50) ( P+ 3.50)

( P+ 3.50)
RB 15X15
( P+ 3.50) ( P+ 3.50)

( P+ 3.50)

( P+ 3.50)
B2 20X30

B1 20X30
02 RB 15X15
( P+ 3.50)

( P+ 3.50)
RB 15X15

( P+ 3.50)
RB 15X15
( P+ 2.73) ( P+ 2.73)

RB 15X15
( P+ 3.50)
( P+ 3.50)
B2 20X30

( P+ 3.50)
B2 20X30
( P+ 3.50)
RB 15X15
RB 15X15
( P+ 3.50)
RB 15X15
( P+ 3.50)

( P+ 3.50)
RB 15X15

( P+ 3.50)
( P+ 3.50)

B2 20X30
B2 20X30

01
B2 20X30 B2 20X30 B1 20X30 B2 20X30
( P+ 3.50) ( P+ 3.50) ( P+ 3.50) ( P+ 3.50)
( P+ 2.88)

( P+ 2.88)
B3 20X30

B3 20X30
( P±0.00) ( P±0.00)
( P-0.05)

B3 20X30
( P+ 2.88)

02 POT. 01 03 POT. 02

DENAH RENC. BALOK 01

STR - 07
( P+ 4.93)

B1 20X30 B1 20X30 B1 20X30 B1 20X30


( P+3.50 ) ( P+3.50 ) ( P+3.50 ) ( P+3.50 )

( P+3.50 )
RB 15X15
RB 15X15 ( P+ 3.50)
( P+3.50 )

( P+3.50 )
RB 15X15
( P+3.50 )
RB 15X15

BS 15X20 (BALOK SOPI-SOPI)


BS 15X20 (BALOK SOPI-SOPI)

( P+ 2.73)
RB 15X15
RB 15X15
( P+3.50 )
( P+3.50 )

( P+3.50 )
RB 15X15
RB 15X15
( P+3.50 )

B4 15X20 B4 15X20 B4 15X20 B4 15X20


( P+4.93 ) ( P+4.93 ) ( P+5.60) ( P+4.93 )

BS 15X20 BS 15X20
(MIRING) (MIRING)
01 B4 15X20 ( P±0.00)
( P-0.05)
( P+5.847 )

01 DENAH RENC. SOPI-SOPI 02 POT. 01

STR - 08
01 DETAIL SOPI-SOPI As.1 & As.5

02 DETAIL SOPI-SOPI As.3 & As.4

STR - 09
TYPE SLOOF S1 TYPE SLOOF S2 TYPE KOLOM K1 TYPE KOLOM KP

POSISI TUMPUAN LAPANGAN POSISI TUMPUAN LAPANGAN POSISI TUMPUAN POSISI TUMPUAN

DIMENSI DIMENSI DIMENSI DIMENSI


15 X 30 CM 15 X 25 CM 30 X 30 CM 15 X 15 CM

TUL . ATAS 3 Ø12 3 Ø12 TUL . ATAS 3 Ø12 3 Ø12 TUL . POKOK 10 Ø12 TUL . POKOK 4 Ø10

TUL . BAWAH 3 Ø12 3 Ø12 TUL . BAWAH 3 Ø12 3 Ø12 BEGEL Ø8 - 15 BEGEL Ø8 - 15

TUL . PINGGANG - - TUL . PINGGANG - -

Ø8 - 15 Ø8 - 20 Ø8 - 15 Ø8 - 20
03 DETAIL KOLOM K1 04 DETAIL KOLOM KP
BEGEL BEGEL

01 DETAIL SLOOF 02 DETAIL SLOOF

TYPE BALOK B2

TYPE BALOK B1 LAPANGAN

POSISI TUMPUAN LAPANGAN

DIMENSI
20 X 30 CM

TUL . ATAS 2 Ø12 2 Ø12

TUL . BAWAH 2 Ø12 2 Ø12 TUL . ATAS 2 Ø12 2 Ø12

TUL . PINGGANG - - TUL . BAWAH 2 Ø12 2 Ø12

BEGEL Ø8 - 15 Ø8 - 20 TUL . PINGGANG - -

BEGEL Ø8 - 15 Ø8 - 20

05 DETAIL BALOK B1
06 DETAIL BALOK B2

STR -10
TYPE BALOK B4 TYPE BALOK LINTEL ( BL )

POSISI TUMPUAN LAPANGAN POSISI TUMPUAN LAPANGAN

DIMENSI DIMENSI
15 X 20 CM 15 X 15 CM

TUL . ATAS 2 Ø12 2 Ø12 TUL . ATAS 2 Ø10 2 Ø10

TUL . BAWAH 2 Ø12 2 Ø12 TUL . BAWAH 2 Ø10 2 Ø10

TUL . PINGGANG - - TUL . PINGGANG - -

BEGEL Ø8 - 15 Ø8 - 20 BEGEL Ø8 - 15 Ø8 - 20

DETAIL BALOK B4 03 DETAIL BALOK LINTEL BL


02

TYPE BALOK BS (BALOK SOPI-SOPI)

POSISI TUMPUAN LAPANGAN TYPE BALOK RING BALOK ( RB )

POSISI TUMPUAN LAPANGAN

DIMENSI
15 X 20 CM DIMENSI
15 X 15 CM

TUL . ATAS 2 Ø12 2 Ø12

TUL . ATAS 2 Ø10 2 Ø10


TUL . BAWAH 2 Ø12 2 Ø12

TUL . BAWAH 2 Ø10 2 Ø10


TUL . PINGGANG - -

TUL . PINGGANG - -
BEGEL Ø8 - 15 Ø8 - 20

BEGEL Ø8 - 15 Ø8 - 20

04 DETAIL BALOK BS (SOPI-SOPI)


05 DETAIL RING BALOK RB

STR - 1
STR-12
STR-13
STR-14
STR-15
STR-16
KEMENTERIAN KETENAGAKERJAAN
REPUBLIK INDONESIA
DIREKTORAT JENDERAL PEMBINAAN PELATIHAN DAN PRODUKTIVITAS
DIREKTORAT BINA KELEMBAGAAN PELATIHAN
DAFTAR GAMBAR
ARSITEKTUR
WORKSHOP TEKNOLOGI INFORMASI & KOMUNIKASI
NO NO. GAMBAR JUDUL GAMBAR SKALA

ARSITEKTUR
1 AR - 01 TAMPAK ATAP 1 : 100
2 AR - 02 TAMPAK DEPAN 1 : 100
3 AR - 03 TAMPAK DEPAN PARSIAL 1 : 50
4 AR - 04 TAMPAK BELAKANG 1 : 100
5 AR - 05 TAMPAK SAMPING KIRI 1 : 100
6 AR - 06 TAMPAK SAMPING KANAN 1 : 100
7 AR - 07 DENAH 1 : 100
8 AR - 08 DETAIL DENAH 1 : 100
9 AR - 09 POTONGAN A-A & DETAIL 1 : 100, 25
10 AR - 10 DETAIL POTONGAN 1 : 20
11 AR - 11 POTONGAN B-B 1 : 100
12 AR - 12 DETAIL POTONGAN 1 : 25
13 AR - 13 POTONGAN C-C 1 : 100
14 AR - 14 RENCANA POLA LANTAI 1 : 100
15 AR - 15 DETAIL POTONGAN LANTAI 1 : 25
16 AR - 16 DENAH RENCANA PLAFOND 1 : 100
17 AR - 17 DENAH RENCANA KUSEN & TYPE KUSEN 1 : 100, 50
18 AR - 18 TYPE KUSEN 1 : 30
19 AR - 19 TYPE KUSEN 1 : 30
20 AR - 20 TYPE KUSEN 1 : 30
21 AR - 21 TYPE TERALIS PJ1 & J1 1 : 30
22 AR - 22 TYPE TERALIS J2 & J3 1 : 30
23 AR - 23 DETAIL DENAH TOILET 1 : 25
24 AR - 24 POTONGAN A-A, B-B 1 : 30
25 AR - 25 POTONGAN C-C 1 : 30
26 AR - 26 DETAIL KOLOM ENTRANCE 1 : 20
TAMPAK ATAP 01

AR - 01
KOLOM BETON
FIN. KERAMIK 40X40 CM
MOTIF BATU

01
KOLOM BETON
FIN. KERAMIK 40X40 CM
MOTIF BATU

01
KOLOM BETON
FIN. KERAMIK 40X40 CM
MOTIF BATU

01
KOLOM BETON
FIN. KERAMIK 40X40 CM
MOTIF BATU

01
KOLOM BETON
FIN. KERAMIK 40X40 CM
MOTIF BATU

01
KOLOM BETON
FIN. KERAMIK 40X40 CM
MOTIF BATU

01
KOLOM BETON
FIN. KERAMIK 40X40 CM
MOTIF BATU

01
KOLOM BETON
FIN. KERAMIK 40X40 CM
MOTIF BATU

01
KOLOM BETON
FIN. KERAMIK 40X40 CM
MOTIF BATU

01
KOLOM BETON
FIN. KERAMIK 40X40 CM
MOTIF BATU

01
KOLOM BETON
FIN. KERAMIK 40X40 CM
MOTIF BATU

01
KOLOM BETON
FIN. KERAMIK 40X40 CM
MOTIF BATU

01
KOLOM BETON
FIN. KERAMIK 40X40 CM
MOTIF BATU

01
KOLOM BETON
FIN. KERAMIK 40X40 CM
MOTIF BATU

01
KOLOM BETON
FIN. KERAMIK 40X40 CM
MOTIF BATU

01
WORKSHOP KEJURUAN
TELEKOMUNIKASI
BALAI LATIHAN KERJA
KOMUNITAS

-0,03 KOLOM BETON


FIN. KERAMIK 40X40 CM
MOTIF BATU

3 4 5
TAMPAK DEPAN PARSIAL 01
TAMPAK BELAKANG 01

AR - 04
-0,03
-0,20
-0,35 -0,35

TAMPAK SAMPING KIRI 01

AR - 05
-0,03
-0,20
-0,35 -0,35

TAMPAK SAMPING KANAN 01

AR - 06
A B

GUDANG
R. KELAS TEORI

KM/WC

RUANG
INSTRUKTUR

R. KELAS PRAKTEK
RUANG
TUNGGU

TERAS

DENAH 01

AR - 07
FLOOR SCHEDULE

CODE DESCRIPTION
1 KERAMIK POLISHED 40X40 cm
2 2 2 2 2 KERAMIK POLISHED 30X30 cm
GUDANG
3 KERAMIK UNPOLISHED 20X20 cm
1 1
4 RABAT BETON
11
2
R. KELAS TEORI KM/WC

1 WALL SCHEDULE
2
RUANG CODE DESCRIPTION
1 INSTRUKTUR
1 DINDING BATA DIPLESTER DAN ACI
1 TEBAL 2,5cm FINISH CAT
11 2 JENDELA KUSEN ALUMUNIUM + KACA

R. KELAS PRAKTEK
R. TUNGGU 2

2 2 WALL CERAMIC SCHEDULE

CODE DESCRIPTION
1 PLINT KERAMIK TINGGI 10CM
TERAS
2 KERAMIK POLISHED 30X60 cm

DETAIL DENAH 01

AR - 08
02

±0,00 -0,03
-0,20
-0,35 -0,20

01

POTONGAN A-A 01

AR - 09
DETAIL POT. A 01

AR - 10
C

CL+3.20

±0,00 TERAS
-0,20
-0,35

POTONGAN B-B 01

AR - 11
01 DETAIL POT. C 02
DETAIL POT. B

AR - 12
CL+3.20

-0,20
-0,35

POTONGAN C-C 01

AR - 13
KETERANGAN :
M2

M1
P P
M1
M2

M3
M1 M3
M4
P

P M1
P

M1
P P

M1

P P

M2
M2

M4 M4

DENAH RENC.POLA LANTAI 01

AR - 14
02 POTONGAN B-B

01 POTONGAN A-A

AR - 15
KETERANGAN :
CB
PG

PG
CB

PG LG
CB
LG

LG

LG
PG

PG
LG

LG
PG

LG
PG

DENAH RENC. PLAFOND 01

AR - 16
J2 J2 BV1

P4
J2 P3

BV2

P2
J3 J1
P2

P2
KACA 5 mm KACA 5 mm KACA 5 mm

J2 J2
P1

J2 J2

DENAH TYPE KUSEN 01

AR - 17
KACA 5 mm KACA 5 mm KACA 5 mm

ALLUMINIUM

KACA 5 mm KACA 5 mm

ALLUMINIUM

ALLUMINIUM

AR - 18
KACA 5 mm

KACA 5 mm KACA 5 mm KACA 5 mm

KACA 5 mm

AR- 19
KACA 5 mm
KACA 5 mm

AR - 20
02 TYPE TERALIS J2
01 TYPE TERALIS J1

AR - 21
KETERANGAN
A KERAMIK LANTAI UNPOLISHED UK. 20/20

B KERAMIK DINDING POLISHED UK. 30/60

C KERAMIK UK. 20/20 POLISHED DASAR BAK MANDI

D FINISHING DINDING CAT

MEJA BETON WASTAFEL T= 8CM


E FINISH KERAMIK UK. 20/20

F CLOSET JONGKOK

G WASTAFEL GANTUNG

FLOOR DRAIN
B A
H
I KRAN AIR

J CERMIN UK. 100/140


RANGKA HOLLOW 4/4 +MULTIPLEK 12

C I

G G F
E
H
J

01 DETAIL KM/WC WORKSHOP TEKNOLOGI INFORMASI

AR - 22
P+3,20

P+2,80

D D

PLESTERAN
TRASRAM

B PLESTERAN
TRASRAM
P +0,05
P ±0,00 P ±0,00
P -0,05

03 POTONGAN B
02 POTONGAN A

AR - 23
P+3,20

P+2,80

D
D

B J

I
E

G G

P +0,05
P ±0,00
P -0,05

P -0,35

SLOOF 15X30

04 POTONGAN C

AR - 24
A

BAN KOLOM T= 100 mm


B 01 LAYOUT KOLOM ENTRANCE BAN KOLOM T= 100 mm

SPESI

KOLOM K1
UK. 300X300 mm KOLOM BETON
FIN. KERAMIK 400X400mm
KOLOM BETON FIN. KERAMIK 40X40 CM
FIN. KERAMIK 40X40 CM MOTIF BATU
BAN KOLOM T= 100 mm
MOTIF BATU
05 POTONGAN B
B

A
-0,03 -0,03

-0,20

-0,35 -0,35 -0,35


SPESI

02 TAMPAK A 03 TAMPAK B
FIN. KERAMIK
400X400mm
KOLOM K1
30X30 CM

RAMP RABAT BETON

04 POTONGAN A

AR - 25
KEMENTERIAN KETENAGAKERJAAN
REPUBLIK INDONESIA
DIREKTORAT JENDERAL PEMBINAAN PELATIHAN DAN PRODUKTIVITAS
DIREKTORAT BINA KELEMBAGAAN PELATIHAN
DAFTAR GAMBAR
MEKANIKAL & ELEKTRIKAL
WORKSHOP GRUP B

NO NO. GAMBAR JUDUL GAMBAR SKALA

MEKANIKAL DAN ELEKTRIKAL


01 ME-01 RENCANA TITIK LAMPU, AC, SAKLAR DAN STOP KONTAK NTS

02 ME-02 WIRING DIAGRAM SDP NTS

03 ME-03 RENCANA TATA UDARA NTS

04 ME-04 DIAGRAM INSTALASI AIR BERSIH DAN AIR KOTOR NTS

05 ME-05 INSTALASI PLUMBING NTS

06 ME-06 DENAH & POTONGAN SEPTIC TANK & PERESAPAN 1 : 50


LP-A

01 RENCANA TITIK LAMPU, SAKLAR & STOP KONTAK

ME - 01
SDP- WORKSHOP GRUP B
JENIS KABEL

6A

20A / 10 KA, 1P
NYY 4 x 10mm2 + BC 6mm2
KE KWH PLN

JUMLAH

Max 2 Ohm

01 WIRING DIAGRAM SDP

ME - 02
01 RENCANA TATA UDARA

ME - 03
SKALA : NTS

KE SAL. DRAINASE

SEPTICTANK KAP 1,5 M3

SKALA : NTS

01 DIAGRAM INSTALASI AIR BERSIH & AIR KOTOR

ME - 04
01 INSTALASI PLUMBING

ME - 05
04 POTONGAN A 05 POTONGAN B 06 POTONGAN C

B
A

01 DENAH SEPTIC TANK 02 DENAH RESAPAN 03 PENULANGAN PENUTUP

ME-06