FORMULIR REKAPITULASI PENILAIAN TINGKAT KOMPONEN DALAM NEGERI (TKDN)

PEKERJAAN : PEMBANGUNAN GEDUNG SEKOLAH SD NEGERI 2 PAGIMANA


KECAMATAN : PAGIMANA
TAHUN ANG. : 2022

NILAI GABUNGAN BARANG/JASA (Rp) TKDN


URAIAN PEKERJAAN TOTAL
KDN KLN BARANG/JASA GABUNGAN
RIBU (RP) % KDN
(1) (2) (3) (4) (5) (6) (7)
BARANG
I Material Langsung (Barang Baku) 476,000,000.00 - 476,000,000.00 100.00 476,000,000.00 40.00
II Peralatan (Barang Jadi) 238,000,000.00 - 238,000,000.00 100.00 238,000,000.00 20.00
A. Sub Total Barang 714,000,000.00 - 714,000,000.00 100.00 714,000,000.00 60.00
JASA
III Manajemen Proyek dan Perekayasaan 148,750,000.00 - 148,750,000.00 100.00 148,750,000.00 12.50
IV Alat Kerja/Fasilitas Kerja 327,250,000.00 - 327,250,000.00 100.00 327,250,000.00 27.50
V Konstruksi dan Fabrikasi - - - -
VI Jasa Umum - - -
B. Sub Total Jasa 476,000,000.00 - 476,000,000.00 476,000,000.00 40.00
C. Total Biaya (A+B) 1,190,000,000.00 - 1,190,000,000.00 1,190,000,000.00 100.00

Formulasi Perhitungan :
714,000,000.00 - 0
% TKDN (Gabungan Barang dan Jasa) =
1,190,000,000.00
=1=100%
476,000,000.00 - 0
1,190,000,000.00