Anda di halaman 1dari 10

NATIONAL SLUMP

UPGRADING PROGRAM
( NSUP )

PROVINSI ;
SULAWESI SELATAN

L
K
KOTA ;
H J MAKASSAR

M
I KECAMATAN ;
SANGKARRANG

N KELURAHAN ;
BARRANGLOMPO

TANGGAL ; 27 DESEMBER 2021

DIBUAT OLEH ;
G FASILITATOR TEKNIK

E
O SRY WULANDARI, ST
F

DIPERIKSA ;
ASKOT INFRASTRUKTUR

M.NUR KHALIS AHMAD, S.T.

A D
DISETUJUI OLEH ;
PENGAWAS PEKERJAAN UMUM

C
RIDWAN KURNIAWAN, S.T

NAMA GAMBAR ; SKALA ;

TITIK PEMASANGAN SEPTIK KUMUNAL TITIK PEMASANGAN SKALA 1: 200


SEPTIK KUMUNAL
Skala 1 : 200

NOMOR GAMBAR ; JML. LBR ;

B - 01 222
NATIONAL SLUMP
UPGRADING PROGRAM
( NSUP )

PROVINSI ;
SULAWESI SELATAN

Dapur
&
Kamar Kloset
mandi KOTA ;
MAKASSAR

Bak Kontrol Bak Kontrol


Grey Water Black Water KECAMATAN ;
SANGKARRANG

IPAL
Manhole Manhole Manhole KELURAHAN ;
SEPTIK TANK KUMUNAL 4 M³ BARRANGLOMPO

IN
OUT TANGGAL ; 27 DESEMBER 2021

Sumur
Resapan DIBUAT OLEH ;
FASILITATOR TEKNIK

Bak Kontrol Bak Kontrol Bak Kontrol


Black Water Bak Kontrol Black Water Bak Kontrol Black Water SRY WULANDARI, ST
Bak Kontrol
Grey Water Grey Water Grey Water

DIPERIKSA ;
ASKOT INFRASTRUKTUR
Dapur Dapur Dapur
Kloset & Kloset & Kloset &
Kamar Kamar Kamar
mandi mandi mandi
M.NUR KHALIS AHMAD, S.T.

DISETUJUI OLEH ;
PENGAWAS PEKERJAAN UMUM

SKEMA PENGELOLAAN AIR LIMBAH


Skala 1 : 50
RIDWAN KURNIAWAN, S.T

NAMA GAMBAR ; SKALA ;

SKEMA PENGELOLAAN AIR 1 : 50


LIMBAH

NOMOR GAMBAR ; JML. LBR ;

B - 02 222
NATIONAL SLUMP
UPGRADING PROGRAM
( NSUP )

PROVINSI ;
SULAWESI SELATAN

KOTA ;
MAKASSAR

KECAMATAN ;
SANGKARRANG

KELURAHAN ;
BARRANGLOMPO
Manhole
Black Water
Jalan Paving Block

Pipa Kemiringan 2% TANGGAL ; 27 DESEMBER 2021


BAK INLET
Pipa Kemiringan 2%
Pipa Kemiringan 2% BAK OUTLET

DIBUAT OLEH ;
FASILITATOR TEKNIK

SRY WULANDARI, ST

DIPERIKSA ;
ASKOT INFRASTRUKTUR

SKEMA POTONGAN MEMANJANG M.NUR KHALIS AHMAD, S.T.

Skala 1 : 70
DISETUJUI OLEH ;
PENGAWAS PEKERJAAN UMUM

RIDWAN KURNIAWAN, S.T

NAMA GAMBAR ; SKALA ;

SKEMA POTONGAN 1 : 70
MEMANJANG

NOMOR GAMBAR ; JML. LBR ;

B - 03 222
NATIONAL SLUMP
UPGRADING PROGRAM
( NSUP )

PROVINSI ;
SULAWESI SELATAN

KOTA ;
MAKASSAR

KECAMATAN ;
SANGKARRANG

KELURAHAN ;
BARRANGLOMPO

PIPA PVC 4" TANGGAL ; 27 DESEMBER 2021

DIBUAT OLEH ;
FASILITATOR TEKNIK

2m

PIPA PVC 3"


1
SRY WULANDARI, ST

DIPERIKSA ;
ASKOT INFRASTRUKTUR

M.NUR KHALIS AHMAD, S.T.


190,,97 mm

DISETUJUI OLEH ;
PENGAWAS PEKERJAAN UMUM

2 3m PIPA PVC 3"


RIDWAN KURNIAWAN, S.T

KETERANGAN :
NAMA GAMBAR ; SKALA ;
SIMBOL NAMA
Septik Tank Kumunal 3m3
SEPTIK KUMUNAL RUAS SKALA 1: 60
Jaringan IPAL PIPA PVC 4" (A)

NO NAMA SEPTIK KUMUNAL RUAS (A) Jaringan IPAL PIPA PVC 3"
NOMOR GAMBAR ; JML. LBR ;
Skala 1 : 60 Penerima Manfaat
01 OMA (1 KK / 5 Jiwa)
Bak Kontrol
02 DG. JARRE(3 KK / 8 Jiwa) Sumur Resapan 222
NATIONAL SLUMP
UPGRADING PROGRAM
( NSUP )

PROVINSI ;
SULAWESI SELATAN

KOTA ;
MAKASSAR

KECAMATAN ;
SANGKARRANG

KELURAHAN ;
BARRANGLOMPO

BAK INLET TANGGAL ; 27 DESEMBER 2021


Inlet BAK OUTLET

DIBUAT OLEH ;
Outlet
FASILITATOR TEKNIK

FILTER
PENYARING A RUMAH BAKTERI
Ijuk
SRY WULANDARI, ST

BAK PENAMPUNG Krikil


AKHIR
Pipa PVC 3/4" DIPERIKSA ;
ASKOT INFRASTRUKTUR
RUMAH BAKTERI
Buis Beton K225

C M.NUR KHALIS AHMAD, S.T.

B DISETUJUI OLEH ;
PENGAWAS PEKERJAAN UMUM

Pipa PVC 4"


Bio Bol
RIDWAN KURNIAWAN, S.T
Pasir
Cor Beton Bertulang K225
NAMA GAMBAR ; SKALA ;
Pipa PVC 4"

POT. A - A POT. A - A 1 : 30

S k a l a 1 : 30
NOMOR GAMBAR ; JML. LBR ;

B - 07 222
NATIONAL SLUMP
UPGRADING PROGRAM
( NSUP )

Menhole
A PROVINSI ;
SULAWESI SELATAN

∅6
0
∅6
B

0
Inlet Outlet KOTA ;

130
MAKASSAR

KECAMATAN ;
SANGKARRANG

KELURAHAN ;
20 210 20
BARRANGLOMPO
TAMPAK SAMPING KANAN
Skala 1 : 30
DETAIL A
Skala 1 : 30 TANGGAL ; 27 DESEMBER 2021

DIBUAT OLEH ;
FASILITATOR TEKNIK

SRY WULANDARI, ST

DIPERIKSA ;
ASKOT INFRASTRUKTUR

M.NUR KHALIS AHMAD, S.T.

DISETUJUI OLEH ;
PENGAWAS PEKERJAAN UMUM

RIDWAN KURNIAWAN, S.T

NAMA GAMBAR ; SKALA ;

I
DETAIL A
TAMPAK DEPAN 1 : 30
&
Skala 1 : 30 TAMPAK DEPAN, TAMPAK,
1 : 30
ISOMETRI
SOMETRI
NOMOR GAMBAR ; JML. LBR ;

B - 08 222
NATIONAL SLUMP
Menhole ∅60
UPGRADING PROGRAM

20 20 60 50 60 20 20 ( NSUP )

10
PROVINSI ;
Inlet

5
SULAWESI SELATAN
Outlet

20
KOTA ;
MAKASSAR
Pipa PVC 4"
Bio Bol
130 KECAMATAN ;
SANGKARRANG

KELURAHAN ;
BARRANGLOMPO

TANGGAL ; 27 DESEMBER 2021


20

DIBUAT OLEH ;
FASILITATOR TEKNIK
15 170 15
POT. B - B
Skala 1 : 20
20 210 20
SRY WULANDARI, ST

60
Menhole ∅60 DIPERIKSA ;
10

ASKOT INFRASTRUKTUR

Pipa PVC 4"


M.NUR KHALIS AHMAD, S.T.

DISETUJUI OLEH ;
PENGAWAS PEKERJAAN UMUM
130

RIDWAN KURNIAWAN, S.T

NAMA GAMBAR ; SKALA ;

POT. A - A 1 : 20
&
POT. B - B 1 : 20
20

POT. A - A NOMOR GAMBAR ; JML. LBR ;

Skala 1 : 20 110
222
130 B - 09
NATIONAL SLUMP

Cor Beton K225 A UPGRADING PROGRAM


( NSUP )
10 57 12 271 12 57 10

12
PROVINSI ;
SULAWESI SELATAN

47,5

47,5
35,5
10
KOTA ;
B MAKASSAR

168
SEPTIK TANK KUMUNAL 3 M³
73

53

73
BAK INLET BAK OUTLET

KECAMATAN ;
SANGKARRANG
10
35,5
47,5

47,5
KELURAHAN ;
BARRANGLOMPO
12

TANGGAL ; 27 DESEMBER 2021


295
DETAIL B
Skala 1 : 30 DIBUAT OLEH ;
FASILITATOR TEKNIK

SRY WULANDARI, ST

67 295 67
DIPERIKSA ;
ASKOT INFRASTRUKTUR
60

70
M.NUR KHALIS AHMAD, S.T.

DISETUJUI OLEH ;
PENGAWAS PEKERJAAN UMUM
130

RIDWAN KURNIAWAN, S.T

120
NAMA GAMBAR ; SKALA ;

DETAIL B 1 : 30
&
TAMPAK SAMPING KANAN 1 : 30

NOMOR GAMBAR ; JML. LBR ;

TAMPAK SAMPING KANAN


Skala 1 : 30
B - 10 222
NATIONAL SLUMP
UPGRADING PROGRAM
( NSUP )
10 57 12 275 12 57 10

PROVINSI ;

5
SULAWESI SELATAN

50

60
BAK INLET BAK OUTLET

10
KOTA ;

10
MAKASSAR

200
190
Cor Beton Bertulang K225
SEPTIK TANK KUMUNAL 3 M³
KECAMATAN ;
10 10
130
SANGKARRANG

120
KELURAHAN ;
Lantai Kerja Cor Beton K225
BARRANGLOMPO
15

TANGGAL ; 27 DESEMBER 2021


295
DIBUAT OLEH ;
POT. B - B FASILITATOR TEKNIK

Skala 1 : 20

SRY WULANDARI, ST

168
12 144 12 DIPERIKSA ;
ASKOT INFRASTRUKTUR

5
M.NUR KHALIS AHMAD, S.T.

DISETUJUI OLEH ;
PENGAWAS PEKERJAAN UMUM
165
180

SEPTIK TANK KUMUNAL 3 M³


Cor Beton Bertulang K225
10 10
RIDWAN KURNIAWAN, S.T

NAMA GAMBAR ; SKALA ;

POT. A - A 1 : 20
&
Lantai Kerja Cor Beton K225 POT. B - B 1 : 20
15

NOMOR GAMBAR ; JML. LBR ;

POT. A - A
Skala 1 : 20
B - 12 222
NATIONAL SLUMP
UPGRADING PROGRAM
( NSUP )

PROVINSI ;
SULAWESI SELATAN

Cor Beton Bertulang K225


Manhole Cor Beton Bertulang K225 KOTA ;
MAKASSAR

5 57 70 30 70 57 5

10 10
KECAMATAN ;
10
SANGKARRANG

67,5 60 40 60 67,5 KELURAHAN ;


BARRANGLOMPO
POT. B - B
Skala 1 : 20
TANGGAL ; 27 DESEMBER 2021

DIBUAT OLEH ;
FASILITATOR TEKNIK

SRY WULANDARI, ST

DIPERIKSA ;
ASKOT INFRASTRUKTUR

Cor Beton bertulang K225

168 M.NUR KHALIS AHMAD, S.T.

DISETUJUI OLEH ;
20

PENGAWAS PEKERJAAN UMUM

RIDWAN KURNIAWAN, S.T


POT. A - A
Skala 1 : 20

NAMA GAMBAR ; SKALA ;

POT. A - A 1 : 20
&
POT. B - B 1 : 20

NOMOR GAMBAR ; JML. LBR ;

B - 16 222