PERHITUNGAN PEMBESIAN
Box Culvert
BOX CULVERT
d O16-340
14.0 14.0
5
a1 a2 O16-170 6 5
5
39
c O16-340
19.8
f O10-150
a2
190.0 a1 78 c
184.0
184.0
5
19.8
e O16-340
70.37
39
e
5 14.0 5
20.0
190.0
184.0 d
5
5 14.0
5 690 5
f
PEMBESIAN BOX 150 x 150 x 700
NOMOR E JARAK JMLH PANJANG BERAT TOTAL
BESI mm (cm) BESI (cm) (kg/m) PANJANG (m) BERAT (kg)
a1 16 17 83 235.60 1.580 195.55 308.97
a2 16 17 83 194.00 1.580 161.02 254.41
c 16 34 43 406.00 1.580 174.58 275.84
d 16 34 43 406.00 1.580 174.58 275.84
e 16 34 85 80.37 1.580 68.31 107.94
f 10 15 102.0 700.00 0.620 714.00 442.68
JUMLAH 1,665.67
PERHITUNGAN PEMBESIAN
Box Culvert
SAYAP
150.0
14.0
5
5
5 h 167 5
h O10-150
g O14-150
190.0 g
184.0
KUKU
i O14-150 14.0
5 5 j 480 5
5 i
44
j 6 O 10
JUMLAH 422.81
PERHITUNGAN K-250
Box Culvert
490.0
55.0 12.5
LONENG-1 25.0
LONENG-2 20.0
20.0
20.0
190.0
SAYAP SAYAP
BOX
KUKU 50.0
K-250
DIMENSI VOLUME
NO URAIAN JLH KETERANGAN
PJG LBR TEBAL m3
JUMLAH 13.66