DAFTAR ISI

NOMOR NAMA GAMBAR SKALA NOMOR NAMA GAMBAR SKALA NOMOR NAMA GAMBAR SKALA
GAMBAR ARSITEKTUR GAMBAR STRUKTUR GAMBAR ELEKTRIKAL
ARS - 01 SITEPLAN PENGEMBANGAN 1 : 1.000 STR - 01 - - EL - 01 - -
ARS - 02 SKETSA KELAS LANTAI 1 1 : 200
ARS - 03 SKETSA KELAS LANTAI 2 1 : 200
ARS - 04 SKETSA KELAS LANTAI 3 1 : 200
ARS - 05 SKETSA KANTOR & LAB 1 : 200
ARS - 06 SKETSA MINI SOCCER 1 : 250
ARS - 07 SKETSA GUEST HOUSE 1 : 150
ARS - 08 SKETSA MASJID LANTAI 1 1 : 150
ARS - 09 SKETSA MASJID LANTAI 2 1 : 150

GAMBAR MEKANIKAL
- - -

LAMPIRAN
LPR - 01 - -
CATATAN
NO REVISI TANGGAL PARAF
1 Kelas & Tribun 26/10/22
2
3
4
18.0
0
5
15.0
0
3. 00 6

6. 00
7

3. 80
10.0
0
8
ENTRANCE 9

5. 00
10

8. 50
0
20.0

0
22.0

7.0
CO OD
0

0
UR

8.0
12.0

NOTASI

FO
0

7. 50
15.5 24.0
0 0
5. 70

Luas Bangunan
7.0

0
0

7.0
Kelas = 2.616 m²

0
12.0
0
14.0
13.0
0
Kantor = 900 m²
Mini Soccer = 1.718 m²
10.0
0
Guest House = 252 m²
Masjid = 1.415 m²

AN

ER
0

CC
11.5

36.0

AP
0

0
Luas Total = 6.901 m²

18.0
SO

N
19.0

IN
0

IBU
TR &
NG

NI
MI
PE

0
69.0
PEKERJAAN
0
26.0

Masterplan
Ma'had Tahfizh Al-Yusro
SJID

Bogor - Jawa Barat


MA

PEMILIK PROYEK

33.0
0

27.5
0
Ma'had Tahfizh Al-Yusro

KONSULTAN PERENCANA

26.0

SITEPLAN PENGEMBANGAN
0
0
11.0

mushammim.com

0
10.0 36.0
0

DIGAMBAR PARAF
SKALA 1 : 1.000
M
RIU

Affandy Hamid, ST., M.Eng.


ATO

Bramas Prayudha
0
30.0

OR
AB
&L

0
36.0

DIPERIKSA PARAF
OR
NT
KA

DISETUJUI PARAF

25.0
0
-

NAMA GAMBAR SKALA

KE
LA Siteplan Pengembangan 1 : 1000
SB
AR
U

NO. LEMBAR JML. LEMBAR KERTAS


0
28.0

46.0
0
ARS - 01 A3

mushammim.coM
CATATAN
NO REVISI TANGGAL PARAF
2.00 1 - -
4.00 4.00 10.00 10.00 10.00 6.00 2
3
4
5
6
KM/WC 7
8
Tamu
4.00
9

Ruang Ruang Ruang KM/WC Santri 10

Ruang
Tamu
Kelas 1 Kelas 2 Kelas 3 NOTASI
Luas Bangunan Kelas
4.00

KM/WC
UP Guru
Lantai 1 = 928 m²
Lantai 2 = 928 m²
UP Lantai 3 = 760 m²

Luas Total = 2.616 m²

Lapangan Ruang

28.00
12.00

Entrance Bulutangkis Kelas 4 PEKERJAAN

Masterplan
Ma'had Tahfizh Al-Yusro
Bogor - Jawa Barat

PEMBERI TUGAS

UP
Ma'had Tahfizh Al-Yusro
4.00

Koperasi UP KM/WC
KONSULTAN PERENCANA
Guru

Ruang Ruang Ruang


mushammim.com

Kelas 5 Kelas 6 Kelas 7


4.00

Ruang DIGAMBAR PARAF


KM/WC Santri
UKS KM/WC Affandy Hamid, ST., M.Eng.
UKS Bramas Prayudha

46.00 DIPERIKSA PARAF

DISETUJUI PARAF

SKETSA KELAS LANTAI 1 -

NAMA GAMBAR SKALA

Sketsa Kelas Lantai 1 1 : 200

NO. LEMBAR JML. LEMBAR KERTAS

ARS - 02 A3

mushammim.coM
CATATAN
NO REVISI TANGGAL PARAF
2.00 1 - -
4.00 4.00 10.00 10.00 10.00 6.00 2
3
4
5
6
KM/ 7
8
WC
4.00
9

Ruang Ruang Ruang KM/WC Santri 10

Kamar
Penjaga Kelas 8 Kelas 9 Kelas 10 NOTASI
Luas Bangunan Kelas
4.00

UP Lantai 1 = 928 m²
Lantai 2 = 928 m²
DOWN Lantai 3 = 760 m²

Luas Total = 2.616 m²

Ruang
VOID Ruang

28.00
12.00

Guru Kelas 11 PEKERJAAN

Masterplan
Ma'had Tahfizh Al-Yusro
Bogor - Jawa Barat

PEMBERI TUGAS

DOWN
Ma'had Tahfizh Al-Yusro
4.00

UP KONSULTAN PERENCANA

Ruang Ruang Ruang


mushammim.com

Gudang
Kelas 12 Kelas 13 Kelas 14
4.00

DIGAMBAR PARAF
KM/WC Santri
Affandy Hamid, ST., M.Eng.
Bramas Prayudha

46.00 DIPERIKSA PARAF

DISETUJUI PARAF

SKETSA KELAS LANTAI 2 -

NAMA GAMBAR SKALA

Sketsa Kelas Lantai 2 1 : 200

NO. LEMBAR JML. LEMBAR KERTAS

ARS - 03 A3

mushammim.coM
CATATAN
NO REVISI TANGGAL PARAF
2.00 1 - -
32.00 6.00 2
3
4
5
6
7
8
9

Ruang Ruang Ruang KM/WC Santri 10

6.00
Kelas 15 Kelas 16 Kelas 17 NOTASI

2.00
Luas Bangunan Kelas

UP Lantai 1 = 928 m²
Lantai 2 = 928 m²
Lantai 3 = 760 m²

Luas Total = 2.616 m²

VOID Ruang

28.00
12.00

Kelas 18 PEKERJAAN

Masterplan
Ma'had Tahfizh Al-Yusro
Bogor - Jawa Barat

PEMBERI TUGAS
2.00

Ma'had Tahfizh Al-Yusro

UP KONSULTAN PERENCANA

Ruang Ruang Ruang


mushammim.com
6.00

Kelas 19 Kelas 20 Kelas 21 KM/WC Santri


DIGAMBAR PARAF

Affandy Hamid, ST., M.Eng.


Bramas Prayudha

40.00 DIPERIKSA PARAF

DISETUJUI PARAF

SKETSA KELAS LANTAI 3 -

NAMA GAMBAR SKALA

Sketsa Kelas Lantai 3 1 : 200

NO. LEMBAR JML. LEMBAR KERTAS

ARS - 04 A3

mushammim.coM
CATATAN
5.00 25.00 NO REVISI TANGGAL PARAF
1 - -
2
3
KM/ 4

3.00
WC 5
6
Umum 7
8

Aula Serbaguna
9
10

10.00
5.00
NOTASI

2.00
Luas Bangunan Kantor & Lab
Lantai 1 = 300 m²
Lantai 2 = 300 m²
Lantai 3 = 300 m²
UP Luas Total = 900 m²

30.00
KANTOR & LAB LANTAI 3

5.00 12.50 12.50

KM/
3.00

WC PEKERJAAN

Santri Masterplan

Lab Lab Ma'had Tahfizh Al-Yusro


Bogor - Jawa Barat

10.00
Bahasa IT PEMBERI TUGAS
5.00

Ma'had Tahfizh Al-Yusro


2.00

KONSULTAN PERENCANA

UP
mushammim.com

30.00 DIGAMBAR PARAF

KANTOR & LAB LANTAI 2


Affandy Hamid, ST., M.Eng.
Bramas Prayudha

5.00 15.00 5.00 5.00 DIPERIKSA PARAF

KM/ -
3.00

WC
Guru DISETUJUI PARAF

Kantor Ruang Ruang -

Yayasan

10.00
Mudir Tamu
5.00

NAMA GAMBAR SKALA


2.00

Sketsa Kantor & Lab 1 : 200

UP NO. LEMBAR JML. LEMBAR KERTAS

ARS - 05 A3
30.00
KANTOR & LAB LANTAI 1

mushammim.coM
CATATAN
NO REVISI TANGGAL PARAF
1 - -
2
3
4
5
20.00 6
7
8
5.00 5.00 5.00 5.00 9
10

NOTASI
Food Food Food KM/ Luas Bangunan Mini Soccer, Tribun

5.00
& Food Court
Court 1 Court 2 Court 3 WC Luas = 1.718 m²

10.00
Tempat Makan

5.00
Outdoor

PEKERJAAN
1.00

Masterplan
Ma'had Tahfizh Al-Yusro
Bogor - Jawa Barat

PEMBERI TUGAS

Ma'had Tahfizh Al-Yusro


Tribun

10.00
Penonton KONSULTAN PERENCANA

mushammim.com

2.00
Lapangan Lapangan DIGAMBAR PARAF
20.00

22.00
Mini Mini Affandy Hamid, M.Eng.
Soccer Soccer Bramas Prayudha

DIPERIKSA PARAF

Tribun

10.00
-

Penonton DISETUJUI PARAF


1.00

NAMA GAMBAR SKALA


2.50 50.00 2.50 2.50 10.00
1.50 Sketsa Mini Soccer 1 : 250
69.00
NO. LEMBAR JML. LEMBAR KERTAS

ARS - 06 A3
MINI SOCCER 50X20 m

mushammim.coM
CATATAN
NO REVISI TANGGAL PARAF
1 - -
2
3
4
5
6
7
8
9
10

NOTASI
6.00 6.00 6.00 6.00 6.00 6.00 Luas Bangunan Guest House
= 252 m²

Guest Guest Guest Guest Guest Guest


7.00

7.00
House 1 House 2 House 3 House 4 House 5 House 6
PEKERJAAN

Masterplan
Ma'had Tahfizh Al-Yusro
Bogor - Jawa Barat

PEMBERI TUGAS

36.00
Ma'had Tahfizh Al-Yusro

KONSULTAN PERENCANA

SKETSA GUEST HOUSE mushammim.com

DIGAMBAR PARAF

Affandy Hamid, ST., M.Eng.


Bramas Prayudha

DIPERIKSA PARAF

DISETUJUI PARAF

NAMA GAMBAR SKALA

Sketsa Guest House 1 : 150

NO. LEMBAR JML. LEMBAR KERTAS

ARS - 07 A3

mushammim.coM
CATATAN
3.00 5.00 10.00 5.00 3.00 NO
1 -
REVISI TANGGAL PARAF
-
2
3
4
5
6

Ruang Ruang
7

3.00
8
9

Imam Sound 10

Mihrab NOTASI
Luas Bangunan Masjid

Lantai 1 = 707,5 m²
Lantai 2 = 707,5 m²

Luas Total = 1.415 m²


18.50

Masjid
PEKERJAAN
20.00

Masterplan

27.50
Ma'had Tahfizh Al-Yusro

Lantai 1
Bogor - Jawa Barat

PEMBERI TUGAS

Ma'had Tahfizh Al-Yusro

KONSULTAN PERENCANA

mushammim.com

DIGAMBAR PARAF

Affandy Hamid, ST., M.Eng.

UP Bramas Prayudha

DIPERIKSA PARAF

-
3.00

6.00

Tempat Tempat DISETUJUI PARAF


Wudhu & WC Wudhu & WC
-

NAMA GAMBAR SKALA

6.00 17.00 6.00 Sketsa Masjid Lantai 1 1 : 150

3.00 20.00 3.00


NO. LEMBAR JML. LEMBAR KERTAS

ARS - 08 A3

SKETSA MASJID LANTAI 1


mushammim.coM
CATATAN
3.00 5.00 10.00 5.00 3.00 NO
1 -
REVISI TANGGAL PARAF
-
2
3
4
5
6

Kamar
7

3.00
8
Gudang 9

Penjaga 10

VOID
NOTASI
Luas Bangunan Masjid

Lantai 1 = 707,5 m²
Lantai 2 = 707,5 m²

Luas Total = 1.415 m²


18.50

Masjid
PEKERJAAN
20.00

Masterplan

27.50
Ma'had Tahfizh Al-Yusro

Lantai 2
Bogor - Jawa Barat

PEMBERI TUGAS

Ma'had Tahfizh Al-Yusro

KONSULTAN PERENCANA

mushammim.com

DIGAMBAR PARAF

Affandy Hamid, ST., M.Eng.

UP Bramas Prayudha

DIPERIKSA PARAF

-
3.00

6.00

Tempat Tempat DISETUJUI PARAF


Wudhu & WC Wudhu & WC
-

NAMA GAMBAR SKALA

6.00 17.00 6.00 Sketsa Masjid Lantai 2 1 : 150

3.00 20.00 3.00


NO. LEMBAR JML. LEMBAR KERTAS

ARS - 9 A3

SKETSA MASJID LANTAI 2


mushammim.coM