B - 300 6
8
21
9
12
22 13
11 2
18
1 18
23 5
23 15
7 9 7
700
8 3 15
700
6
19
5
2
19 9
150
17 2 4 Guide Frame UNP 120x55 (SS.400)
I
IV 18 3 1 Base frame UNP 120x55 (SS.400)
4 - Guide Frame Plate t.6mm (SS.400)
5 4 Gate Frame UNP 120x55 (SS.400)
6 1 Skin Plate t.8mm (SS.400)
H1
H1
B
7 - Bolt Nut 5/8"
B + 160
B + 240 8 - Side Rubber Seal (SOR.45)
9 3 Seal Plate 3x30 (SS.400)
10 2 Hanger Plate t.8 (SS.400)
IV 11 2 Hanger UNP 120x55 (SS.400)
12
A A 12 2 Screw Spindle Ø2" (ST.41)
H
H
Skin Plate Gate PL. 8 11 13 2 Bolt Nut 1"
13 14 2 Hanger Plate t.22mm
10
14 15 - Bolt Nut 3/8
II
16 1 Bottom Rubber Seal (SOR.45)
17 4 Shear Plate (ST.41)
17
18 4 Shear Plate t.10mm (SS.400)
5 19 - Anchor Ø12
20 3 Block Mechanic (BC)
B
21 1 Roda Gigi Z.26 (Iron Cast)
22 2 Roda Gigi Z.33 (Iron Cast)
B 23 4 Rail Frame L.75x75 (SS.400)
III
B - 100
Stiffener PL.8
B
B + 160
B + 240
Provinsi
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT JAWA BARAT
DIREKTORAT JENDERAL SUMBER DAYA AIR
BALAI BESAR WILAYAH SUNGAI CITARUM PEKERJAAN
SNVT PELAKSANAAN JARINGAN PEMANFAATAN AIR CITARUM REHABILITASI, PENINGKATAN DAN MODERNISASI
ALAMAT: Jalan Inspeksi Cidurian Soekarno-Hatta Sta.5600 Telp/Fax (022) 7564073 Bandung 40292
JARINGAN IRIGASI SS.
KAMONG,SS.TELAR,SS.BARUBUG,SS.TAPEN,
SI.TARUM TIMUR
Novrizal Ardian Saputra Fedian Akmaluddin Disetujui Direksi Pekerjaan Fajar Nurjaman
Iwan Ruswandi, ST
Project Manager Sub Project Leader NIP. 19730911200701 100 1 Pelaksana Teknik Fajar Nurjaman