2023 TERHITUNG DARI BAHAN BANGUNAN SERTA UPAH TUKANG SELAMA 8 BULAN
TOTAL KESELURUHAN 36 ITEM DI ATAS BIAYA BELI BAHAN BANGUNAN SELAMA 8 BULAN
= Rp.
13. BIAYA PASANG JENDELA DAPUR + UPH PASANG : 1 JENDELA X 800.000 = 800.000
14. BIAYA PASANG JENDELA KAMAR + UPH PASANG : 1 JENDELA X 1.200. 000
15. BIAYA PINTU KAMAR MANDI : 1 PINTU KAMAR MANDI X 250.000 =
225.000
16. BIAYA CLOSET KAMAR MANDI : 1 CLOSET JONGKOK X 215.000 =
215.000
17. BIAYA PASANG LOSTER DAN BAHAN : 8 LOSTER X 50.000 = 400.000
18. BIAYA PIPA PARALON AIR + UPH PASANG : 400.000
19. BIAYA PIPA GAS ALAM + UPH PASANG : 850.000
20. BIAYA KINGKONG : 4 SHAK KINGKONG X 145.000 =
580.000
21. BIAYA UPAH TUKANG PLAMIR BORONGAN : 1.000.000
22. BIAYA UPAH BORONGAN PLASTER : 50 METER X 60.000 = 3.000.000
23. BIAYA BIKIN MEJA DAPUR + JASA & BAHAN : 850.000
24. UPAH PASANG JENDELA DAPUR DAN KAMAR : 500.000
25. BIAYA NGOPI + GORENGAN TUKANG PAGI DAN SORE : 50.000 X 8 BULAN = 6.500.000
26. BIAYA UPAH TUKANG SELAMA 8 BULAN : 2 ORANG X 150.000 = 62.400.000
27. BIAYA UPAH KENEK SELAMA 8 BULAN : 1 ORANG X 100.000 = 20.800.000
TERHITUNG 8 BULAN = 240 HARI DI KURANG 32 HARI ( HARI LIBUR MINGGU ) = 208 HARI
TOTAL PENGERJAAN
BERIKUT TOTAL KESELURUHAN RINCIAN DI ATAS SELAMA 8 BULAN PENGERJAAN RUMAH CEK MERI
SEBESAR : Rp. 152.760.000