Anda di halaman 1dari 10
UNIVERSITAS DIPONEGORO LABORATORIUM MEKANIKA TANAI DEPARTEMEN TEKNIK SIPIL - FAKULTAS TEKNIK SE) SEMARANG HASIL SONDIR MANUAL E 110°50'09.632" 1 | FR | Fstge% © Fuqey% | (4) | kgm. 0,00, 10.20, 82.00, 83, 0.00; 10.40, 40. 0.00, 1 t .00, 10.80 47.00 BO] OF] Fe sgl | pe | agtea | agen | 0,00, 0.00, 0.00, 0.00 020/ 0.00, 0.00. 0.00 040, 0.00) 0.00, 0.00 0.60, 0.00/ 0.00 001 0.80, 0.00) 0.00 1.00, 75.00/ 76.00, 1.20, 54.00 4020. 1.60, 12.00 {6050.00 $5.00) 70.00 75.00| 180) 15.00 70.00) 75.00 (21001500 | 2.207 10.00) 2.40/_ 12.00) 36.00 2.60) 17.00 42.00 190.00) 2.80) 6.00 50.00 90.00/ 95.00 3.00, 4.00 56.00 97.00 102.00 3.20/ 4.00 62.00, 7: 37.00/ 40.00, 40/400 68.00, 7.50 36,00/ 37.00 20.00 72.00, 1.00 2.00| 4 15.00 76.00, 133 47.00) 00) 15.00 86.00, 3:33 58,00/ 65.00) 4.20) 18.00 94.00/ 2.22 80.00/ 85.00 440) 27.00 100,00, 1.11 14.60 108.00 110.00 4.60, 25.00) 106,00, 1.20 14.80) 180.00, 182.00 4.80 32.00 | 5.00 37.00 112,00, 0.94 081 118.00) 5.20, 40.00 3 15.40/17. [176 5.60, 22.00, 142.00/ 1.82 5.80, 18.00, 6.00 15.00 150.00, 2.22 640) 27.00 660 10.00 6.80) 6.00 0, 5.00 5.00 12.00 0) 206.00| 4.00 212.00 2.50 0.25) 19.40 105.00, 108.00 0.29 19.60 | 9.60 92.00. 95.00 0.33 19.80 t 9.80, $8.00, 60.00 10.00' 77.00) 80.00 0.34) 20.00 | 0.39 LABORATORIUM MEKANIKA TANAH DEPARTEMEN TEKNIK SIPIL - FAKULTAS TEKNIK UNIVERSITAS DIPONEGORO _SEMARANG _ oe i GRAFIK SONDIR MANUA Cone Resistance (kg/em2) Friction Ratio °4) 0 50 100 «150-200 280 GS 0.00 Cone Resistance (q0)} - Total Frictions (TF) - Friction Ratio (FR) - Friction Resistance (Fs) DEPTH (meter) 20,00 L 0 150 300 «450600750 SSS Total Friction (kg/em) Friction Resistance (kg/em2) Proyek : Pada Pekerjaan Rencana Gedung IBS RSUD dr. Lukmono Hadi Lokasi_: JI. Lukmono Hadi No. 19 - Kudus, Jawa Tengah Titik = :S.1 Team : Tatang Priyatna Tanggal : 9 Juni 2022 Koordinat :S 6°49'04.882" E_110°50'09.632" DEPARTEMEN TEKNIK SIPIL - FAKULTAS TEKNIK sons aen sg SEMARANG HASIL SONDIR MANUAL Rencana Gedung IBS RSUD dr Lukmono Hadi Tah / Bin +9 Juni 2022 (0,19 - Kudus, Jawa Tengah ‘Team: Tatang Priyatna ‘Titik Koordinat :$_ 6°49°05.068" E 110*50'09.988" DEH] =) eit] BD] RD] ee pert] ] oF | or) i) [sgl [igo | tata | gem | ta) | na | gene | a | klem_| 5096 | 0.00, 0.00, 0.00, 0.00, 0.00, 10.20, 47.00) 52.00| 0.50, 310.00, 1.06 0.20/ 0.00, 0.00, 0.00 0.00 10.40, 88.00) 90.00/ 0.20, 314.00/ 040. 37.00 38.00, 0.10, 2.00 0,60 100.00 102 318.00, 020 0,60 20.00, 25.00, 0.50’ 12.00, 10,80 110.00 115.00 328.00, 0.45 0.80, 1800) 19.00 14.00 11,00/ 170.00/ 17500050) 338.00, 029, 1020.00" 21.00 tea 113014800; Henan 020; 32.00 0.8 130 30001300 tE00 Tab tiogn a0 ‘ tat 17007-9000; 300 Tat 62.001 6600 vata tean 30.00 Tap s600 600 12.00 43.00" 45.00 32.00 180° 12.007 15.00 0.30 36.00 2.00, 12.00, 15.00, 030 42.00, 220/ 1300) 17.00, 040) $0.00" 2.40/13.00/ 17.00, 040| $8.00 2.60 10.00) 12.00, 020, 62.00, 2.80| 4.00, 6.00, 0.20) 66.00, 300/400) 6.00, 70.00 320/150) 17.00 7400, 133 30/700) 12.00 $400,714 3.60) 800) 13.00, 0.30 380/800, 13.00, 030) 400, 700° 10.00 0.30/ 420, 7.00, 10.00| 030 440, 10,00, 12.00) 0.20 ,00/ 10.00 0.30 4.80 7.00 10.00 0.30 5.00, 800, 10.00, 020 5.20) 8.00, 10.00. 0.20 /s40/ 7.00/10 3160 7.00/ 10.00) 580/600, 8.00 94.00, 6.25 114-80! 175.00) 15.00) 156.00 175 600/600" 8.00 620/800" 10.00 10.00) 15.00 [ f 50 |_184.00/ 192.00, | L L 200.00 = ea 206.00 3 218.00 #00. 7.00 2221 820, 10.00, 15.00) 232.00 840/800" 12.00, 0.40/ 240.00) 860/800’ 12.00' 0.40) 248.00! S80) 13.007 1600030 /254.00 9.00' 15,00, 18.00 030 9.20, 35.00, 40,00, 0.50 9.40/ 45.00, 48.00) 0:30 9.60| 62.00, 65.00" 0:30 ~9.80' 46.00) 50.00, 0.407 10.00" 45,00, $0.00/ 0.50 LABORATORIUM MEKANIKA TANAH DEPARTEMEN TEKNIK SIPIL - FAKULTAS TEKNIK UNIVERSITAS DIPONEGORO SEMARANG GRAFIK SONDIR MANUAL Cone Resistance (kg/em2) Frietion Ratio (%) 0 50 «100 «150 «200 20 GS s.00-+ — a ( -Cone Resistance (qe) 00H! Total Frictions (TF) 3.0014 C - Friction Ratio (FR) Friction Resistance (Fs) DEPTH (meter) 20.00 — — 0 150 300 450 600 750 0 SSS Total Friction (ke/em) Friction Resistance (kg/em2) Proyek : Pada Pekerjaan Rencana Gedung IBS RSUD dr. Lukmono Hadi Lok: JI. Lukmono Hadi No. 19 - Kudus, Jawa Tengah Titik =: $.2 Team : Tatang Priyatna Tanggal : 9 Suni 2022 Koordinat :S — 6°49'05.068" E_ 110°50'09.958" LABORATORIUM MEKANIKA TANAH (@Q)_ DEPARTEMEN TEKNIK SIPIL - FAKULTAS TEKNIK UNIVERSITAS DIPONEGORO ==) SEMARANG HASIL SONDIR MANUAL Rencana Gedung IBS RSUD dr. Lukmono Hadi Tek / Bin (o. 19 - Kudus, Jawa Tengah Team eet] a] FR] wi e (M) | kgjem2 | kgem2 | eglem2 | kglem_ (ees 0.00 0.00/ 0.00 0.00 0.00 10.60, 27.00 98.00 252.00 037 020 0.00, 0.00; 0.00 10,80’ 30,00' 31.00 234.00° 033 0.40 15.00/ 17.00/ 0.20) 4.00 65,00, 66.00, 256.00 0.15 060, 30.00 31.00/ 0.10) 6.00) 70,00 72.00 260.00 0.29 ago) iso, 1700, 020, 10.00, 97.00; 100.00" 031 1.00/ 12.00) 15.00’ 030) 16.00! 60.00" 61,00 268.007 0.17 120, 13.00, 16.00. 030° 22.00) 35.00) 36.00 270.00" 0.29 1140, 7.00) 8.00) 0.10" 2400 33.00) 35.00. 274.00" 061 400) 5.00 26.00 32.00/ 35.00 280.00, 0.94 4.00, 7.00 32.00 67.00, 70.00" 4.007 70,00, 78.00. 2.207 6.00 67 12.80/ 43.00 50.01 240) 6.00 3.00 40,00 43.00) 2.60) 5.00 1s 18.00) 24.00 2.80/00) 10.00 0.50) 29,00, 30.00 3.00/-800/ 12.007 040 20,001 27.001 .20/ 13.00) 17.00/00! 18,00 22.00 $2 ee eat — bap root za a 3.60) 13.00/ 17.00/ 0.40 18.00/ 24.00 382.00) 3.80, 12.00’ 15.00 030, 35.00 40.00 392.00 400) 12.00° 1.00 030 43.00 50.00 402.00) 4.20) 15.00/ 17.00; 0.20 47.00 52.00 | 412.00 | 440, 12.00, 16.00 0.40 38.00/ 40.00/ 416.00, 0.53 4.60/ 12.00 16.00. 0.40 38.00, 40.00/ 0.20/ 420.00, 0.53 480, 10.00, 15.00 0.50 35.00, 37.00 020 0057 $.00/ 7.00 12.00° 0:50 30.00 32.00, 020 0.67 $20, 7.00/ 10.00 030 28.00 30.00, 020. on 340. 7.00' 10.00° 030 28.00/ 30.00' 020 o7 560, 7.00 10.00° 030) 4 |48.00/ 52.00) 0.40, 0.83 580, 7.00’ 10.0 429, 1640, 40.00, 47.00, 175 600) 7.00. 10.00 429 40.00, 45.00, 125) 192.00, 4.00 30,00" ent 20/ 196.00" 4.00 47.00) 53.00! 128 10/198.00) 1.67 00 52.00 1:06 10 200.00) 1. 00 | 520.00) 1.67, 202,00| 2:00 0:80; 336,00" 1:40 6.00 | 1.10, 204. 1.677 1.50 6.00 18.00, 80.00/ 82.00. 020 6.00 1820. 75.00 77.00, 020 5.00 18.40/ 105.00/ 107.00/ 0.20, $78.00, 0.19 5.00 18.60) 40.00/47 0.70) 592.00) 1.75 5.00 18.80, 45.00, $0.00) 0.30, 602.00, 1:11 5.00) 19.00) 45.00/ $0.00; 61200, 111 6.00 [45.007 622.00 1.11 6.00) 27.00; 030, 62800, Tl 8.00) [42.007 474 1638.00) 1:19 27.00 50.00/ 60.00/ 1.00, 658.00 2:00 27.00 57.00, 65.00, 0.80, 674.00/ 1.40 34.00 - | 9.80, 37.00 | | 10.00 48.00 —t i 20/ $5.00 { 0.40 38.00 DEPTH (meter) UNIVERSITAS DIPONEGORO SEMARANG LABORATORIUM MEKANIKA TANAH DEPARTEMEN TEKNIK SIPIL - FAKULTAS TEKNIK GRAFIK SONDIR MANUAL Cone Resistance (kgjem2) 0 50 100 150-200-250 Cone Resistance (qe)| Total Frictions (TF) 0 150 300 450 600 Total Friction (kg/em) 750 Friction Ratio (2%) - Friction Ratio (FR) Friction Resistance (Fs)| 0 os 1 15 2 25 Friction Resistance (kg/em2) Proyek : Pada Pekerjaan Rencana Gedung IBS RSUD dr. Lukmono Hadi Lokasi Titik s.3 Jl. Lukmono Hadi No. 19 - Kudus, Jawa Tengah Tatang Priyatna S 6°49'05,218" E_ 110°50'10.775" Team Koordinat LABORATORIUM MEKANIKA TANAH ®)\) DEPARTEMEN TEKNIK SIPIL- FAKULTAS TEKNIK UNIVERSITAS DIPONEGORO SEMARANG. HASIL SONDIR MANUAL Pekerjaan Rencana Gedung 18S RSUD dr. Lokmono Hadi TeL/ Bla: 10 Juni 2022 Lokasi JL Lukmono Hadi No, 19- Kudu, Jawa Tengah Tem Priyatna Thm 38.6 Koordinat : _ 6°49°05382" E 110°so'10s04" [7 | |DeP] a ae] A] iF | R | fem 2% | (M)_| kgfoma | kfema | glemd | kplem | sig 1020 0440.00, 0.94 0.53 064 0.07 0.08. 013 031 468,000.34 472.00, 024 1.29 10.60 8.00 0.42 10.80 | 150.00” 151.00, 10,00, 0.13 11.00 | 120.00 121.00) 32.00, —14.00/ 0.63 11.20) 75.00) 76.00) 15.00) 17.00 0) 1.33, 11.40) 9 10.00 "12.00/0.20/ 22.00, 2.00 11.60) 8 10.00 12.00, 0.20, 26.00/ 2.00” 11.80/ $7 47 10.00 "11.00/ 0.10 28.00" 1.00 12.00/ 95.00, 96.00 0.10’ 474.00. 0.11 10.00 11.00' 0.10, 30.00, 1.00. 12.20/ 100.00 10: 476.00 10 12.00/ 15.00, 0.30 36.00/ 2.50” 12.40 45.00 480.00, 0.44 48.00. 80.00 25.00 27.00 40.00 8012.60 45.00 0] 0.44 15.00/ 18.00 46.00/ 2.00 12.802 494.00, 2.50 10.00/ 15.00 0.50, _$6.00/ .00/ 13.00) 15.00] 15.00 20.00/ 0.50 66.00 3.313.201 27.00) 18.00 24.00 0.60 78.00, 333. 13.40) 10.00 28.00/ 33.00/0.50/ 88.00) 1.79. 13,60 13.00 13.00, 18.00, 0.50 98.00 3.85. 13.80, 20.00 3.33 510.00 520.00 530.00 $40.00 2.50 0.50, 108.00/ 3.33" 14.00 20.00 550.00) 2:30 0.50, 118.00/ 3.33" 14.20) 30.00, 370.00, 3.33 0.50, 128.00/ 2.27 14.40/ 32.00 I 1.56 0.70 142.00, 3.50 14.60) O71 0.50 152.00, 3.85 14.80! . 71 0,60, 164.00, 5.00. 15.00. 596.00, 0.50 -176.00/ 3.33 15.20, 40.00" 4 606.00, 1.25, 188.00) 3.33 16.00, 1.1 200.00 3.33 70,00 72.00, 620.00, 0.29 5.38 15.80 73.00) 76.00 ~ 626.00, 0.41 816.00 70.00, 72.00/ 0.20/ 630.00 0.29 6.00) 7.00 6. 634.00, 0.29 6.20) 7.00 0.50252. 16.40 6407. 0.50 262,00) 7.14 16.60 120.00 — 6:60 10.00 6.80, 10.00 10.00 17.00 20 266.00' 2.00 _16.80_187.00 | 190.00/ 0.30 652.00 | 0.20, 270.00, 2.00 17.00 225.007 230.00/ 0.50 662.00 0.22 274.00, 2.00 17.20. 100 2.94” 17.40) Catatan Ag ea 0.50 0 12.00/ 18.00' 0.60 310.00" 5.00.17. 12.00, 20.00. 0.80, 326.00/ 6.67 12,00, 20.00 0.80 342.00° 6.67 11.00; 17.00, 0.60 o| 5.45 12,00/ 18.00, 0.60) 366.00° 5.00 10.00 376.00, 5.00 10.0 386.00) 5.00 9.00 10.00 15.00 0.50. 396.00 5.00 9.20' 26.00/ 31.00 0.0’ 406.00. 1.92 9.40, 25.00/ 30.00, 0.50, 416.00. 2.00 9.60, 27.00/ 30.00/ 0.30) 422.00. 1.11 9.80, 27.00, 30.00, 0.30/ 428.00. 1.1L I 10.00/ 27.00/ 30.00, 0.30/ 434.00 1.11 I DEPTH (meter) LABORATORIUM MEKANIKA TANAH DEPARTEMEN TEKNIK SIPIL - FAKULTAS TEKNIK UNIVERSITAS DIPONEGORO. SEMARANG GRAFIK SONDIR MANUAL Friction Ratio (%) 306 9 2 1s ‘Cone Resistance (kg/cm2) 0 50 100-150 2002500 0.00, ———- = 1.00, 2.00 3.00 Cone Resistance (qe) 4.00 - Total Frictions (TF) Friction Ratio (FR) Friction Resistance (Fs)} 18.00) 19.00 20.09 1 a 0 150 300 450 600 «750 «20 «OS tS OS Friction Resistance (kg/em2) Proyek : Pada Pekerjaan Rencana Gedung IBS RSUD dr, Lukmono Hadi Lokasi jl. Lukmono Hadi No. 19 - Kudus, Jawa Tengah Titik 6 Team : Tatang Priyatna Tanggal : 10 Juni 2022 Koordinat :S — 6°49'05.382" E 110°50'10.504" Proyek Lokast | DEPTH wy 2 1801 0.80 1.00 120 : Pada Pekerjaan Rencana Gedung IBS RSUD dr. # Jl Lukmono Hadi No. 19 - Kudus, Jawa Tengah Team [att] A FR [DEPTH] qe [eer | kegjem2 | kg/em2 | kglem? we (Fsige)% | OM) gfe agen 000, LABORATORIUM MEKANIKA TANAH DEPARTEMEN TEKNIK SIPIL - FAKULTAS TEKNIK UNIVERSITAS DIPONEGORO SEMARANG HASIL SONDIR MANUAL 12 Juni 2022 ratang Priyatna 6°49"05.883" E_ 110°S0'10.508" ukmono Had Teh! 10 Koordinat : iF] FR 0.00 0.00, 0.00, 0.00 _0.00 Goof a28| { 00. 0.00, 0.00 0.00 0.00’ 10.40, 97.00" ‘00.007 0.30 8.00, 0.10) 2.00) 8.00 9.00, 0.10/ 7.00, 800, 0.10 8.00, 0.20) 10.00 0.20 6.00 64 10.60; 100,00" 102.00/ 0.20. 4001.25’ 1080/92.00/ 93.00 0.10” 270.00 6.00, 30.00 020,274.00 45.00, 46,00, 0.10. 276.00, 30.00 32.00 0.20 280.00 30.00" 32.00, 0.20, 284.00, 0, 20.00' 22.00' 020 288.00 700 22,00, 25.00, 030” 294.00" 20 35.00| 40.00/ 0.50 304.00 0507 314.00 00 0,324.00 6.00 0.50. 334.00/ 10.00 0.50, 344.00 12.00 0.70, 358.00 12.00 0.80, 374.00, 8.00 0.50 384.00/ 8.00 8.00 10.00 10.00 7.00 7.00 7.00 7.00 8.00 8.00 60.00, 65,00 | 75.00, 80.00 140.00/ 5.00 15.40 105.00 110.00; 148.00 15.60. 125.00 130.00 15,80 165.00 170.00 496.00' 0.30 00 $10,000.24 10.00 12.00 25.00 | 26.00, 18.40 ee 25.00.2600 18.60 T - 20.00, 21.00. 18.80 a 25,00 27.00 19.00 25.00| 27.00 19.20 | 20.00 22.00 19.40 T 1 17.00) 20.00 19.60 | 25.00/ 27.00 19.80 27.00/ 28.00 20.00 27.00 28.00 LABORATORIUM MEKANIKA TANAH DEPARTEMEN TEKNIK SIPIL - FAKULTAS TEKNIK UNIVERSITAS DIPONEGORO SEMARANG : GRAFIK SONDIR MANUAL Cone Resistance (kg/em2) Friction Ratio (%) 0 50 100 150 200 250 0 3 6 9 2 15 Cone Resistance (q0) Total Frictions (TF) “Friction Ratio (FR) jon Resistance (Fs) DEPTH (meter) 0 150 300-450 600750 0S SOS (kg/m) Friction Resistance (kg/em2) Proyek : Pada Pekerjaan Rencana Gedung IBS RSUD dr. Lukmono Hadi 1. Lukmono Hadi No. 19 - Kudus, Jawa Tengah Team ——_: Tatang Priyatna Tanggal : 12 Juni 2022 Koordinat :S 6°49'05.883" E 110°50'10.508"

Anda mungkin juga menyukai