Trotoar
Trotoar
Besi
D10 pjg 4,2*5*1,04 21.84
D10 lbr 2,4*11*1,04 27.456
3 D13 4,2*3*1,04 13.104
62.4
Besi per m3 62,4/0,54 115.56 kg/m3
Besi
8D16 8*9*1,58 113.76
2 D13 2*9*1,04 18.72
sengkang 1,8*8*7,2*0,39 40.44
172.92
Besi per m3 172,92/1,29 133.42 kg/m3
Besi
8D16 8*7,2*1,5*1,58 113.76
2 D13 2*7,2*1,5*1,04 18.72
sengkang 1,6*7*7,2*0,39 35.94
168.42
Besi per m3 168,42/0,86 194.93 kg/m3
Besi
8D16 8*7,2*1,5*1,58 113.76
2 D13 2*7,2*1,5*1,04 18.72
sengkang 1,2*8*7,2*0,39 26.96
159.44
Besi per m3 159,44/0,57 276.80 kg/m3
7 Pek. Sloof 15/20 beton K225 4 O 10
O 8 - 150
asumsi dihitung per 3 m, besi ditambah 1/4 L = 3,75 m
LANTAI 1 :
Beton = 3,5 m
Besi = 3,5 m + poer 60 cm + sloof 60 cm + balok 80 cm + 1 m stek = 6,5 m
Besi
16 D19 16*6,5*2,23 231.92
010-150 2,4*25*0,62 37.20
269.12
Besi per m3 269,12/1,26 177.99 kg/m3
LANTAI 2 :
Beton = 3,2 m
Besi = 3,2 m + balok 80 cm + 1 m stek = 5 m
Besi
16 D19 16*5*2,23 178.40
010-150 2,4*23*0,62 34.22
212.62
Besi per m3 212,62/1,152 147.66 kg/m3
LANTAI 3 :
Beton = 3,2 m
Besi = 3,2 m + balok 80 cm = 4 m
Besi
Besi 16*4*2,23 142.72
16 D19 2,4*23*0,62 34.22
176.94
Besi per m3 176,94/1,152 122.88 kg/m3
Besi
8 D16 8*6,5*2,23 82.16
010-150 1,2*25*0,62 18.60
100.76
Besi per m3 100,76/0,315 319.87 kg/m3
LANTAI 2 :
Beton = 3,2 m
Besi = 3,2 m + balok 80 cm + 1 m stek = 5 m
Besi
8 D16 8*5*1,58 63.20
010-150 1,2*25*0,62 18.60
81.80
Besi per m3 81,8/0,288 284.03 kg/m3
LANTAI 3 :
Beton = 3,2 m
Besi = 3,2 m + balok 80 cm = 4 m
Besi
8 D16 8*4*1,58 50.56
010-150 2,4*23*0,62 18.60
69.16
Besi per m3 69,16/0,288 240.14 kg/m3
Besi
6 D 16 6*6,5*1,58 61.62
O 8 - 150 1*25*0,396 9.90
71.52
Besi per m3 71,52/0,21 340.57 kg/m3
LANTAI 2 :
Beton = 3,2 m
Besi = 3,2 m + balok 80 cm + 1 m stek = 5 m
Besi
6 D 16 6*5*1,58 47.40
O 8 - 150 1*23*0,396 9.11
56.51
Besi per m3 56,51/0,192 294.31 kg/m3
LANTAI 3 :
Beton = 3,2 m
Besi = 3,2 m + balok 80 cm = 4 m
Besi
6 D 16 6*4*1,58 37.92
O 8 - 150 2,4*23*0,62 9.11
47.03
Besi per m3 47,03/0,192 244.94 kg/m3
LANTAI 1 :
Beton = 3,5 m
Besi = 3,5 m + poer 60 cm + sloof 60 cm + balok 80 cm + 1 m stek = 6,5 m
Besi
18 D 16 6*6,5*1,58 184.86
O 10 - 150 1*25*0,396 48.67
233.53
Besi per m3 233,53/2,75 85.00 kg/m3
LANTAI 2 :
Beton = 3,2 m
Besi = 3,2 m + balok 80 cm + 1 m stek = 5 m
Besi
18 D 16 16*5*2,23 142.20
O 10 - 150 3,14*1*23*0,62 44.78
186.98
Besi per m3 186,98/2,512 74.43 kg/m3
LANTAI 3 :
Beton = 3,2 m
Besi = 3,2 m + balok 80 cm = 4 m
Besi
18 D 16 18*4*1,58 113.76
O 10 - 150 2,4*23*0,62 44.78
158.54
Besi per m3 158,54/2,512 63.11 kg/m3
LANTAI 1 :
Beton = 3,5 m
Besi = 3,5 m + poer 60 cm + sloof 60 cm + balok 80 cm + 1 m stek = 6,5 m
Besi
12 D 16 12*6,5*1,58 123.24
O 10 - 150 3,14*0,6*25*0,62 29.20
152.44
Besi per m3 152,44/0,9891 154.12 kg/m3
LANTAI 2 :
Beton = 3,2 m
Besi = 3,2 m + balok 80 cm + 1 m stek = 5 m
Besi
12 D 16 12*5*1,58 94.80
O 10 - 150 3,14*0,6*23*0,62 26.87
121.67
Besi per m3 121,67/0,9043 134.54 kg/m3
LANTAI 3 :
Beton = 3,2 m
Besi = 3,2 m + balok 80 cm = 4 m
Besi
12 D 16 12*4*1,58 75.84
O 10 - 150 2,4*23*0,62 26.87
102.71
Besi per m3 102,71/0,90432 113.57 kg/m3
LANTAI 1 :
Beton = 3,5 m
Besi = 3,5 m + poer 60 cm + sloof 60 cm + balok 80 cm + 1 m stek = 6,5 m
Beton 3,14*0,25*0,25*3,5 0.686875 m3
Besi
9 D 16 12*6,5*1,58 92.43
O 8 - 150 3,14*0,6*25*0,62 15.31
107.74
Besi per m3 107,74/0,6868 156.85 kg/m3
LANTAI 2 :
Beton = 3,2 m
Besi = 3,2 m + balok 80 cm + 1 m stek = 5 m
Besi
9 D 16 9*5*1,58 71.10
O 8 - 150 3,14*0,5*23*0,62 22.39
93.49
Besi per m3 93,49/0,628 148.87 kg/m3
LANTAI 3 :
Beton = 3,2 m
Besi = 3,2 m + balok 80 cm = 4 m
Besi
9 D 16 9*4*1,58 56.88
O 8 - 150 3,14*0,5*23*0,62 22.39
79.27
Besi per m3 79,27/0,628 126.22 kg/m3
Besi
22 D16 22*10,8*1,58 312.84
2 D13 2*10,8*1,04 18.72
sengkang 2,2*9*7,2*0,39 55.60
387.16
Besi per m3 387,16/1,728 224.05 kg/m3
Besi
18 D16 18*9*1,58 255.96
2 D13 2*9*1,04 18.72
sengkang 1,8*9*7,2*0,39 45.49
320.17
Besi per m3 320,17/1,296 247.04 kg/m3
Besi
8 D 13 8*9*1,04 74.88
sengkang 1*9*7,2*0,39 25.27
100.15
Besi per m3 100,15/0,432 231.83 kg/m3
1 2 3 4 5 6 7 8 9 10
koefesien
Pek. P = M¹ L T M² M³ Berat Jenis Satuan Jumlah ket
PEKERJAAN DINDING
1 Pek.Pas. Dinding Batu Bata Ad 1pc : 4ps 35.50 3.80 134.90 118.60 16.30
2 Pek. Plesteran Dinding ad. 1pc : 4ps 237.19
3 Pek.Pas. Dinding Tebeng Layar Batu Bata Ad 1pc : 4ps 3.14 1.86 5.84 11.68 2.00
4 Pek. Plesteran Dinding Tebeng layar ad. 1pc : 4ps 11.68
PEKERJAAN KUSEN
1 Pek. Kusen Pintu dan jendela Kayu Kelas II 73.87 0.06 0.12 4.43 0.53 0.53
2 Pek. Pas. Pintu Panel Kayu Kelas II 2.10 0.90 1.89 3.78 2.00
3 Pek. Pas. Jendela Panel Kayu Kelas II + Kaca 5mm 8.93
Daun Jendela J1 0.60 0.80 0.48 2.88 6.00
Daun Jendela J2 0.60 1.12 0.67 6.05 9.00
4 Pek.Pas Kunci + Handel Tanam Pintu 1.00
5 Pek Pas. Engsel Pintu 4'' 3.00
6 Pek Pas. Engsel Jendela 3'' 30.00
7 Pek.Pas. Grendel Jendela 30.00
8 Pek.Pas. Kait Angin Jendela 30.00
9 Pek.Pas. Handel Jendela 15.00
10 Pek.Pas. Roster Tanah 12.00
PEKERJAAN LANTAI
1 Pek.Urugan Tanah biasa Bawah Lantai T.20 cm 8.82 7.88 0.20 69.50 13.90 13.90
2 Pek Urugan Pasir Bawah Lantai 5 cm 8.82 7.88 0.05 69.50 3.48 3.48
3 Pek. Cor Lantai Kerja 5 cm ad.1pc : 3ps : 5kr 8.82 7.88 0.05 69.50 3.48 3.48
4 Pek .Pas. Guiding block indicates 3.33
BELANJA JASA KONSULTASI PERENCAAN KEGIATAN PEMBANGUNAN (SUMBER DANA DAK T.A 2022)
PEMBANGUNAN RUANG LABORATORIUM KOMPUTER BESERTA PRABOTNYA (1 RUANG)
SD NEGERI 03 ABAB
1 2 3 4 5 6 7 8 9 10
koefesien
Pek. P = M¹ L T M² M³ Satuan Jumlah ket
Berat Jenis
1 2 3 4 5 6 7 8 9 10
koefesien
Pek. P = M¹ L T M² M³ Satuan Jumlah ket
Berat Jenis
PEKERJAAN CAT
1 Pek. Cat Dinding Luar Dan Dalam 248.87
2 Pek. Cat Kawai Kanduk 7.25 7.25
3 Pek. Cat Minyak 38.35
REKAPITULASI
RENCANA ANGGARAN BIAYA (RAB)
No. Uraian Pekerjaan Kode Analisa Satuan Volume Harga Satuan Jumlah (Rp.)
Pekerjaan Pekerjaan Analisa (Rp.)
A PEKERJAAN PERSIAPAN
1 Pek. Papan Nama Proyek Ls 1.00 350,000.00 350,000.00
2 Pek. Air dan alat Kerja Ls 1.00 700,000.00 700,000.00
3 Pek. Pembersihan Lokasi dan Bongkaran Ls 1.00 1,200,000.00 1,200,000.00
4 Sewa / Pembuatan Direksiket Ls 1.00 2,000,000.00 2,000,000.00
5 Pek. Pas. Bouwplank dan Mobilisasi Ls 1.00 1,400,000.00 1,400,000.00
6 Biaya K3 Ls 1.00 2,000,000.00 2,000,000.00
Total PEKERJAAN A 7,650,000.00
B PEMBANGUNAN RUANG GURU BESERTA PRABOTNYA (1 RUANG)
I PEKERJAAN PONDASI
1 Pek. Galian Tanah A.2.3.1.1 m³ 25.05 81,675.00 2,046,301.79
2 Pek. Urugan Pasir A.2.3.1.11 m³ 3.15 158,070.00 497,880.98
3 Pek.Pas.Pondasi Batu Belah Ad 1 : 4 A.3.2.1.2 m³ 4.31 1,085,807.00 4,683,899.95
4 Pek.Pas.Anstamping Batu Belah A.3.2.1.9 m³ 2.49 1,085,807.00 2,698,230.40
5 Pek.Urukan Kembali A.2.3.1.9 m³ 6.26 27,225.00 170,525.15
Sub Total 10,096,838.26
II PEKERJAAN STRUKTUR BETON
1 Pek. Kolom Praktis 12/12 ad. 1pc : 2ps : 3kr A.4.1.1.9.c m³ 0.18 5,555,066.99 1,021,687.92
2 Pek. Balok Sloof 15/20 Ad 1pc : 2ps : 3kr A.4.1.1.9.d m³ 1.43 4,827,030.34 6,878,518.23
3 Pek. Balok Tebeng Layar 11/11 Ad 1pc : 2ps : 3kr A.4.1.1.9.d m³ 0.25 5,730,294.24 1,442,200.45
4 Pek. Ring Balok 12/15 ad 1pc : 2ps : 3kr A.4.1.1.9.d m³ 0.78 5,730,294.24 4,486,820.39
5 Pek. Kolom Konstruksi 15/15 ad 1pc : 2ps : 3kr A.4.1.1.9.c m³ 0.72 5,555,066.99 3,999,648.23
6 Pek. Kolom Teras 15/15 ad 1pc : 2ps : 3kr A.4.1.1.9.c m³ 0.27 5,555,066.99 1,499,868.09
7 Pek. Pondasi Plat Setempat A.4.1.1.9.b m³ 0.29 4,583,108.31 1,319,935.19
Sub Total 20,648,678.51
III PEKERJAAN DINDING
1 Pek.Pas. Dinding Batu Bata Ad 1pc : 4ps A.4.4.1.9 M² 118.60 113,997.02 13,519,555.79
2 Pek. Plesteran Dinding ad. 1pc : 4ps A.4.4.2.4 M² 237.19 64,775.04 15,364,082.42
3 Pek.Pas. Dinding Tebeng Layar Batu Bata Ad 1pc : 4ps A.4.4.1.9 M² 11.68 113,997.02 1,331,576.33
4 Pek. Plesteran Dinding Tebeng layar ad. 1pc : 4ps A.4.4.2.4 M² 11.68 64,775.04 756,624.29
Sub Total 30,971,838.83
IV PEKERJAAN KUSEN
1 Pek. Kusen Pintu dan jendela Kayu Kelas II A.4.6.1.1 unit 0.53 6,618,480.00 3,520,131.25
2 Pek. Pas. Pintu Panel Kayu Kelas II A.4.6.1.5.a unit 3.78 665,527.50 2,515,693.95
3 Pek. Pas. Jendela Panel Kayu Kelas II + Kaca 5mm A.4.6.1.6 unit 8.93 533,956.50 4,767,163.63
4 Pek.Pas Kunci + Handel Tanam Pintu M.145 Bh 1.00 211,805.00 211,805.00
5 Pek Pas. Engsel Pintu 4'' M.146 Bh 3.00 39,953.10 119,859.30
6 Pek Pas. Engsel Jendela 3'' M.149 Bh 32.00 42,031.00 1,344,992.00
7 Pek.Pas. Grendel Jendela M.148 Bh 32.00 69,762.00 2,232,384.00
8 Pek.Pas. Kait Angin Jendela M.150 Bh 32.00 29,903.50 956,912.00
9 Pek.Pas. Handel Jendela M.151 Bh 16.00 40,903.50 654,456.00
10 Pek.Pas. Roster Tanah M.102 Bh 16.00 8,000.00 128,000.00
Sub Total 16,451,397.13
KEGIATAN : BELANJA JASA KONSULTASI PERENCAAN KEGIATAN PEMBANGUNAN (SUMBER DANA DAK T.A 2022)
PEKERJAAN : PEMBANGUNAN RUANG GURU BESERTA PRABOTNYA (1 RUANG)
LOKASI : SD NEGERI 03 ABAB
ANGGARAN : 2022
1 2 3 4 5 6 7
V PEKERJAAN LANTAI
1 Pek.Urugan Tanah biasa Bawah Lantai T.20 cm A.2.3.1.14 M³ 13.90 102,025.00 1,418,180.15
2 Pek Urugan Pasir Bawah Lantai 5 cm A.2.3.1.11 M³ 3.48 158,070.00 549,305.90
3 Pek. Cor Lantai Kerja 5 cm ad.1pc : 3ps : 5kr A.A.4.1.1.4 M³ 3.48 885,167.11 3,076,026.52
4 Pek .Pas. Guiding block indicates A.4.4.3.37 M² 3.33 180,780.10 601,997.73
5 Pek. Lantai Floor hardener A.4.4.3.21 M² 66.88 59,840.25 4,002,379.22
Sub Total 9,647,889.51
VI PEKERJAAN KUDA - KUDA & ATAP
1 Pekerjaan Rangka Atap Baja Ringan M.293 M² 108.81 264,965.80 28,832,094.55
2 Pekerjaan Atap metal A.4.5.2.39 M² 108.81 119,438.00 12,996,574.31
3 Pekerjaan Bubungan Atap metal A.4.5.2.40 M' 10.00 71,775.00 717,750.00
4 Pekerjaan Lisplank GRC M' 46.00 49,500.00 2,277,000.00
Sub Total 44,823,418.85
VII PEK. PLAFOND + RANGKA HOLLOW
1 Pas. Plafond Kalsiboard A.4.5.1.7 M² 54.21 43,915.85 2,380,871.46
2 Pas. Rangka Plafond Hollow Galvanis A.4.2.1.21 M² 54.21 155,771.00 8,445,031.30
3 Pas. List Plafond Gypsum M.191 m' 46.00 35,350.32 1,626,114.88
Sub Total 12,452,017.64
VIII PEK. INSTALASI LISTRIK
1 Pas. Instalasi Listrik A.8.4.6.1 Titik 6.00 98,224.50 589,347.00
2 Pas. Lampu 20 Watt M.320 Bh 4.00 90,000.00 360,000.00
3 Pas. Lampu 18 Watt M.319 Bh 1.00 60,000.00 60,000.00
4 Pas. Sakelar Tunggal M.330 Bh 1.00 45,000.00 45,000.00
5 Pas. Sakelar Ganda M.329 Bh 1.00 86,000.00 86,000.00
6 Pas. Stop Kontak M.317 Bh 1.00 50,000.00 50,000.00
7 Pas. Box MCB 4 A A.8.4.6.2 unit 1.00 277,750.00 277,750.00
Sub Total 1,468,097.00
IX PEKERJAAN CAT
1 Pek. Cat Dinding Luar A.4.7.1.10 M² 124.44 22,479.60 2,797,273.75
2 Pek. Cat Minyak A.4.7.1.4 M² 38.35 28,478.18 1,092,126.62
Sub Total 3,889,400.37
Total PEKERJAAN B 150,449,576.12
C BIAYA LAIN-LAIN
1 Pek. Pembersihan akhir Ls 1.00 555,000.00 555,000.00
Total PEKERJAAN C 555,000.00
D PERABOT
1 White board standing bh 1.00 1,390,000.00 1,390,000.00
PROSEN
NO ITEM PEKERJAAN JUMLAH HARGA
PEKERJAAN
I PEKERJAAN PERSIAPAN
1 Dokumentasi dan Pelaporan (termasuk Shop dan As Built Drawing) 1.00 ls 500,000.00 500,000.00
3 Pembongkaran Saluran lama dan lantai Beton (bobok) dll 1.00 ls 1,500,000.00 1,500,000.00
2,000,000.00
II PEKERJAAN LANTAI
1 Pemasangan 1 m2 lantai granite tile ukuran 60cm x 60cm 25.25 m2 384,010.30 9,696,260.08
2 Pemasangan 1 Bh Difable tile kuning 65.00 bh 33,425.78 2,172,675.78
3 Pek. Pengecatan Trotoar 6.72 m2 45,889.25 308,375.76
4 Pek. Cor Lantai 2.93 m3 885,167.11 2,594,646.09
5 Pek. Pembuatan Penutup beton bertulang saluran t=15cm 1.26 m3 4,583,108.31 5,781,591.13
20,553,548.84
TOTAL 22,553,548.84
PPN 11% 2,480,890.37
JUMLAH KESELURUHAN 25,034,439.22
DIBULATKAN 25,000,000.00
Terbilang :
DAFTAR HARGA SATUAN PEKERJAAN
TAHUN 2018 SEMESTER I
KABUPATEN PALI
DIV. NO. JENIS PEKERJAAN SATUAN HARGA (RP)
16 . Pemasangan 1 bh pintu KM/WC Aluminium warna urat kayu lengkap (kusen, kunci engsel setara bh 4,526,460.63
dekson) - frame louver
17 . Pemasangan 1 bh pintu Aluminium warna urat kayu lengkap (kusen, kunci engsel setara dekson) - ice bh 5,387,810.63
glass
II - 56
DIV. NO. JENIS PEKERJAAN SATUAN HARGA (RP)
4 . Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas III tertutup (lebar sampai 90 cm) m2 567,956.25
8. Pengecatan 1 m2 tembok lama (1 lapis cat dasar, 2 lapis cat penutup) m2 17,868.40
9. Pengecatan 1 m2 permukaan baja dengan menie besi m2 45,889.25
10 . Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 1 lapis cat m2 39,344.25
3. Pengecatan 1 m2 tembok baru untuk exterior ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
m2 24,393.60
12 . Pengecatan 1 m2 plafond (2 lapis cat penutup) m2 14,568.40
13 . Pelapisan anti bocor 1 m2 (2 lapis ) m3 58,383.60
II - 57
DIV. NO. JENIS PEKERJAAN SATUAN HARGA (RP)
II - 58
REKAPITULASI
HARGA PERKIRAAN SENDIRI (HPS)
JUMLAH HARGA
NO URAIAN PEKERJAAN
Rp.
B #REF! #REF!
JUMLAH #REF!
PPN 10% #REF!
TOTAL #REF!
DIBULATKAN #REF!
Terbilang : Tujuh Milyar Delapan Belas Juta Enam Ratus Lima Ribu Rupiah,-
DAFTAR HARGA SATUAN BAHAN DAN UPAH
TAHUN 2018 SEMESTER I
I - 60
No. JENIS BAHAN SATUAN HARGA DASAR (Rp)
4. GENTENG METAL Genteng metal uk. 2x4 (0.25mm) lbr 35,000.00
Genteng metal uk. 2x4 (0.3mm) lbr 35,000.00
1. GENTENG METAL Genteng metal berpasir 2x5 (0,45mm) lbr 59,000.00
Genteng Ounduline 2x9,5 (3 mm) lbr 176,015.00
Nok genteng metal bh 20,000.00
Nok genteng metal berpasir bh 55,000.00
-
5. GENTENG TANAH LIAT Genteng tanah liat bh 1,284.00
Nok genteng tanah liat bh 1,926.00
-
6. POLYCARBONATE Polycarbonate m2 97,156.00
I - 61
No. JENIS BAHAN SATUAN HARGA DASAR (Rp)
I - 62
No. JENIS BAHAN SATUAN HARGA DASAR (Rp)
V BAHAN CETAK
8. JENDELA UPVC Jendela kaca dan kusen UPVC (uk. 1 m x 1,2 bh 1,605,000.00
m)
Jendela kaca dan kusen UPVC (uk. 0.6 m x 1,5 bh 1,064,650.00
m)
I - 63
No. JENIS BAHAN SATUAN HARGA DASAR (Rp)
I - 65
No. JENIS BAHAN SATUAN HARGA DASAR (Rp)
-
2. BESI Menie kg 46,500.00
Cat penutup liter 68,500.00
-
3. TEMBOK Cat tembok eksterior liter 35,000.00
Cat tembok interior kg 26,000.00
Plamir dinding/kayu kg 6,000.00
Cat dasar/sealer interior kg 25,000.00
Cat dasar/sealer eksterior liter 35,000.00
Cat antibocor kg 55,640.00
-
4. THINNER Thinner liter 25,000.00
-
5. LAIN-LAIN Kuas 1" bh 5,885.00
Kuas 1 1/2" bh 12,305.00
Kuas 2" bh 14,980.00
Kuas 3" bh 26,643.00
Kuas 4" bh 38,413.00
Kual roll bh 49,113.00
Baki cat bh 17,120.00
Coating batu alam liter 77,575.00
X. BAHAN KACA
I - 66
No. JENIS BAHAN SATUAN HARGA DASAR (Rp)
I - 67
No. JENIS BAHAN SATUAN HARGA DASAR (Rp)
PVC m2 603,023.81
Pelampung 1/2" bh 205,000.00
Pelampung 3/4" bh 249,000.00
Bio tank 1,1 m3 bh 3,000,000.00
-
I - 69
No. JENIS BAHAN SATUAN HARGA DASAR (Rp)
-
XV. LAIN-LAIN
1 Pekerja OH 95,000.00
2 Tukang OH 120,000.00
3 Kepala Tukang OH 120,000.00
4 Mandor OH 120,000.00
I - 70
RENCANA ANGGARAN BIAYA
KEGIATAN : RUMAH SAKIT UMUM DAERAH KABUPATEN PALI TYPE C
PEKERJAAN : PEMB. GEDUNG - A -
LOKASI :
Besi
D13 pjg 4,2*5*1,04 21.84
D13 lbr 2,4*11*1,04 27.456
3 D13 4,2*3*1,04 13.104
62.4
Besi per m3 62,4/0,54 115.56 kg/m3
Besi
8D16 8*9*1,58 113.76
2 D13 2*9*1,04 18.72
sengkang 1,8*8*7,2*0,39 40.44
172.92
Besi per m3 172,92/1,29 133.42 kg/m3
Besi
8D16 8*7,2*1,5*1,58 113.76
2 D13 2*7,2*1,5*1,04 18.72
sengkang 1,6*7*7,2*0,39 35.94
168.42
Besi per m3 168,42/0,86 194.93 kg/m3
Besi
8D16 8*7,2*1,5*1,58 113.76
2 D13 2*7,2*1,5*1,04 18.72
sengkang 1,2*8*7,2*0,39 26.96
159.44
Besi per m3 159,44/0,57 276.80 kg/m3
7 Pek. Sloof 15/20 beton K225 4 O 10
O 8 - 150
asumsi dihitung per 3 m, besi ditambah 1/4 L = 3,75 m
LANTAI 1 :
Beton = 3,5 m
Besi = 3,5 m + poer 60 cm + sloof 60 cm + balok 80 cm + 1 m stek = 6,5 m
Besi
16 D19 16*6,5*2,23 231.92
010-150 2,4*25*0,62 37.20
269.12
Besi per m3 269,12/1,26 177.99 kg/m3
LANTAI 2 :
Beton = 3,2 m
Besi = 3,2 m + balok 80 cm + 1 m stek = 5 m
Besi
16 D19 16*5*2,23 178.40
010-150 2,4*23*0,62 34.22
212.62
Besi per m3 212,62/1,152 147.66 kg/m3
LANTAI 3 :
Beton = 3,2 m
Besi = 3,2 m + balok 80 cm = 4 m
Besi
Besi 16*4*2,23 142.72
16 D19 2,4*23*0,62 34.22
176.94
Besi per m3 176,94/1,152 122.88 kg/m3
Besi
8 D16 8*6,5*2,23 82.16
010-150 1,2*25*0,62 18.60
100.76
Besi per m3 100,76/0,315 319.87 kg/m3
LANTAI 2 :
Beton = 3,2 m
Besi = 3,2 m + balok 80 cm + 1 m stek = 5 m
Besi
8 D16 8*5*1,58 63.20
010-150 1,2*25*0,62 18.60
81.80
Besi per m3 81,8/0,288 284.03 kg/m3
LANTAI 3 :
Beton = 3,2 m
Besi = 3,2 m + balok 80 cm = 4 m
Besi
8 D16 8*4*1,58 50.56
010-150 2,4*23*0,62 18.60
69.16
Besi per m3 69,16/0,288 240.14 kg/m3
Besi
6 D 16 6*6,5*1,58 61.62
O 8 - 150 1*25*0,396 9.90
71.52
Besi per m3 71,52/0,21 340.57 kg/m3
LANTAI 2 :
Beton = 3,2 m
Besi = 3,2 m + balok 80 cm + 1 m stek = 5 m
Besi
6 D 16 6*5*1,58 47.40
O 8 - 150 1*23*0,396 9.11
56.51
Besi per m3 56,51/0,192 294.31 kg/m3
LANTAI 3 :
Beton = 3,2 m
Besi = 3,2 m + balok 80 cm = 4 m
Besi
6 D 16 6*4*1,58 37.92
O 8 - 150 2,4*23*0,62 9.11
47.03
Besi per m3 47,03/0,192 244.94 kg/m3
LANTAI 1 :
Beton = 3,5 m
Besi = 3,5 m + poer 60 cm + sloof 60 cm + balok 80 cm + 1 m stek = 6,5 m
Besi
18 D 16 6*6,5*1,58 184.86
O 10 - 150 1*25*0,396 48.67
233.53
Besi per m3 233,53/2,75 85.00 kg/m3
LANTAI 2 :
Beton = 3,2 m
Besi = 3,2 m + balok 80 cm + 1 m stek = 5 m
Besi
18 D 16 16*5*2,23 142.20
O 10 - 150 3,14*1*23*0,62 44.78
186.98
Besi per m3 186,98/2,512 74.43 kg/m3
LANTAI 3 :
Beton = 3,2 m
Besi = 3,2 m + balok 80 cm = 4 m
Besi
18 D 16 18*4*1,58 113.76
O 10 - 150 2,4*23*0,62 44.78
158.54
Besi per m3 158,54/2,512 63.11 kg/m3
LANTAI 1 :
Beton = 3,5 m
Besi = 3,5 m + poer 60 cm + sloof 60 cm + balok 80 cm + 1 m stek = 6,5 m
Besi
12 D 16 12*6,5*1,58 123.24
O 10 - 150 3,14*0,6*25*0,62 29.20
152.44
Besi per m3 152,44/0,9891 154.12 kg/m3
LANTAI 2 :
Beton = 3,2 m
Besi = 3,2 m + balok 80 cm + 1 m stek = 5 m
Besi
12 D 16 12*5*1,58 94.80
O 10 - 150 3,14*0,6*23*0,62 26.87
121.67
Besi per m3 121,67/0,9043 134.54 kg/m3
LANTAI 3 :
Beton = 3,2 m
Besi = 3,2 m + balok 80 cm = 4 m
Besi
12 D 16 12*4*1,58 75.84
O 10 - 150 2,4*23*0,62 26.87
102.71
Besi per m3 102,71/0,90432 113.57 kg/m3
LANTAI 1 :
Beton = 3,5 m
Besi = 3,5 m + poer 60 cm + sloof 60 cm + balok 80 cm + 1 m stek = 6,5 m
Beton 3,14*0,25*0,25*3,5 0.686875 m3
Besi
9 D 16 12*6,5*1,58 92.43
O 8 - 150 3,14*0,6*25*0,62 15.31
107.74
Besi per m3 107,74/0,6868 156.85 kg/m3
LANTAI 2 :
Beton = 3,2 m
Besi = 3,2 m + balok 80 cm + 1 m stek = 5 m
Besi
9 D 16 9*5*1,58 71.10
O 8 - 150 3,14*0,5*23*0,62 22.39
93.49
Besi per m3 93,49/0,628 148.87 kg/m3
LANTAI 3 :
Beton = 3,2 m
Besi = 3,2 m + balok 80 cm = 4 m
Besi
9 D 16 9*4*1,58 56.88
O 8 - 150 3,14*0,5*23*0,62 22.39
79.27
Besi per m3 79,27/0,628 126.22 kg/m3
Besi
22 D16 22*10,8*1,58 312.84
2 D13 2*10,8*1,04 18.72
sengkang 2,2*9*7,2*0,39 55.60
387.16
Besi per m3 387,16/1,728 224.05 kg/m3
Besi
18 D16 18*9*1,58 255.96
2 D13 2*9*1,04 18.72
sengkang 1,8*9*7,2*0,39 45.49
320.17
Besi per m3 320,17/1,296 247.04 kg/m3
Besi
8 D 13 8*9*1,04 74.88
sengkang 1*9*7,2*0,39 25.27
100.15
Besi per m3 100,15/0,432 231.83 kg/m3
1. Membuat 1 m3 beton mutu F'c=9,8 Mpa (K125), slump (12±2) cm, w/c=0,78
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.650 95,000.00 156,750.00
Tukang Batu L.02 OH 0.275 120,000.00 33,000.00
Kepala Tukang L.03 OH 0.028 120,000.00 3,360.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 203,070.00
B BAHAN
Semen Portland kg 276.000 1,360.00 375,360.00
Pasir Beton kg 828.000 71.43 59,142.86
Kerikil (Maks. 30mm) kg 1012.000 259.26 262,370.37
Air Liter 215.000 71.26 15,321.33
JUMLAH TENAGA BAHAN 712,194.56
C. PERALATAN
-
JUMLAH TENAGA ALAT -
1. Membuat 1 m3 lantai kerja beton mutu F'c=7,4 Mpa (K100) slump (3-6)cm, w/c=0,87
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.200 95,000.00 114,000.00
Tukang Batu L.02 OH 0.200 120,000.00 24,000.00
Kepala Tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.060 120,000.00 7,200.00
JUMLAH TENAGA KERJA 147,600.00
B BAHAN
Semen Portland kg 230.000 1,360.00 312,800.00
Pasir Beton 0.6378571 kg 893.000 71.43 63,785.71
Kerikil (Maks. 30mm) 0.79 kg 1027.000 259.26 266,259.26
Air Liter 200.000 71.26 14,252.40
JUMLAH TENAGA BAHAN 657,097.37
C. PERALATAN
-
JUMLAH TENAGA ALAT -
3. Membuat 1 m3 beton mutu F'c=14,5 Mpa (K175), slump (12±2) cm, w/c=0,66
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.650 95,000.00 156,750.00
Tukang Batu L.02 OH 0.275 120,000.00 33,000.00
Kepala Tukang L.03 OH 0.028 120,000.00 3,360.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 203,070.00
B BAHAN
Semen Portland kg 326.000 1,360.00 443,360.00
Pasir Beton kg 760.000 71.43 54,285.71
Kerikil (Maks. 30mm) kg 1029.000 259.26 266,777.78
Air Liter 215.000 71.26 15,321.33
JUMLAH TENAGA BAHAN 779,744.82
C. PERALATAN
-
JUMLAH TENAGA ALAT -
DIV. 4.1.1 - 1
4. Membuat 1 m3 beton mutu F'c=19,3 Mpa (K225), slump (12±2) cm, w/c=0,58
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.650 95,000.00 156,750.00
Tukang Batu L.02 OH 0.275 120,000.00 33,000.00
Kepala Tukang L.03 OH 0.028 120,000.00 3,360.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 203,070.00
B BAHAN
Semen Portland kg 371.000 1,360.00 504,560.00
Pasir Beton 0.4985714 kg 698.000 71.43 49,857.14
Kerikil (Maks. 30mm) 0.7755556 kg 1047.000 259.26 271,444.44
Air Liter 215.000 71.26 15,321.33
JUMLAH TENAGA BAHAN 841,182.92
C. PERALATAN
-
JUMLAH TENAGA ALAT -
5. Membuat 1 m3 beton mutu F'c=21,7 Mpa (K250), slump (12±2) cm, w/c=0,56
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.650 95,000.00 156,750.00
Tukang Batu L.02 OH 0.275 120,000.00 33,000.00
Kepala Tukang L.03 OH 0.028 120,000.00 3,360.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 203,070.00
B BAHAN
Semen Portland kg 384.000 1,360.00 522,240.00
Pasir Beton kg 692.000 71.43 49,428.57
Kerikil (Maks. 30mm) kg 1039.000 259.26 269,370.37
Air Liter 215.000 71.26 15,321.33
JUMLAH TENAGA BAHAN 856,360.27
C. PERALATAN
-
JUMLAH TENAGA ALAT -
6. Membuat 1 m3 beton mutu F'c=26,4 Mpa (K300), slump (12±2) cm, w/c=0,52
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.650 95,000.00 156,750.00
Tukang Batu L.02 OH 0.275 120,000.00 33,000.00
Kepala Tukang L.03 OH 0.028 120,000.00 3,360.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 203,070.00
B BAHAN
Semen Portland kg 413.000 1,360.00 561,680.00
Pasir Beton kg 681.000 71.43 48,642.86
Kerikil (Maks. 30mm) kg 1021.000 259.26 264,703.70
Air Liter 215.000 71.26 15,321.33
JUMLAH TENAGA BAHAN 890,347.89
C. PERALATAN
-
JUMLAH TENAGA ALAT -
DIV. 4.1.1 - 2
7. Membuat 1 m3 beton mutu F'c=31,2 Mpa (K350), slump (12±2) cm, w/c=0,48
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 2.100 95,000.00 199,500.00
Tukang Batu L.02 OH 0.350 120,000.00 42,000.00
Kepala Tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.105 120,000.00 12,600.00
JUMLAH TENAGA KERJA 258,300.00
B BAHAN
Semen Portland kg 448.000 1,360.00 609,280.00
Pasir Beton kg 667.000 71.43 47,642.86
Kerikil (Maks. 30mm) kg 1000.000 259.26 259,259.26
Air Liter 215.000 71.26 15,321.33
JUMLAH TENAGA BAHAN 931,503.45
C. PERALATAN
-
JUMLAH TENAGA ALAT -
DIV. 4.1.1 - 3
DIV. 4.1.1 - 4
DIV. 4.1.1 - 5
15. Pemasangan 1 m2 bekesting untuk dinding
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.660 95,000.00 62,700.00
Tukang Kayu L.02 OH 0.330 120,000.00 39,600.00
Kepala Tukang L.03 OH 0.033 120,000.00 3,960.00
Mandor L.04 OH 0.033 120,000.00 3,960.00
JUMLAH TENAGA KERJA 110,220.00
B BAHAN
Kayu m3 0.030 1,100,000.00 33,000.00
Paku 5-12 cm kg 0.400 15,000.00 6,000.00
Minyak bekesting Liter 0.200 11,449.00 2,289.80
Balok m3 0.020 2,500,000.00 50,000.00
Plywood tebal 9 mm Lbr 0.350 150,000.00 52,500.00
Dolken Kayu Ø8-10cm p.4m Batang 3.000 5,000.00 15,000.00
Penjaga jarak bekesting/spacer Batang 4.000 5,000.00 20,000.00
JUMLAH TENAGA BAHAN 178,789.80
C. PERALATAN
-
JUMLAH TENAGA ALAT -
DIV. 4.1.1 - 6
2. Membuat 1 m3 pondasi beton bertulang (150 kg besi + bekesting)
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 5.300 95,000.00 503,500.00
Tukang Batu L.02 OH 0.275 120,000.00 33,000.00
Tukang Kayu L.02 OH 1.300 120,000.00 156,000.00
Tukang Besi L.02 OH 1.050 120,000.00 126,000.00
Kepala Tukang L.03 OH 0.262 120,000.00 31,440.00
Mandor L.04 OH 0.265 120,000.00 31,800.00
JUMLAH TENAGA KERJA 881,740.00
B BAHAN
Kayu m3 0.200 1,100,000.00 220,000.00
Paku 5-12 cm kg 1.500 15,000.00 22,500.00
Minyak bekesting Liter 0.400 11,449.00 4,579.60
Besi beton polos kg 157.500 13,880.00 2,186,100.00
Kawat beton kg 2.250 25,370.00 57,082.50
Sement Portland kg 336.000 1,360.00 456,960.00
Pasir Beton m3 0.540 100,000.00 54,000.00
Kerikil m3 0.810 350,000.00 283,500.00
JUMLAH TENAGA BAHAN 3,284,722.10
C. PERALATAN
-
JUMLAH TENAGA ALAT -
D. Jumlah (A+B+C) 4,166,462.10
E. Overhead & Profit 10% X D 416,646.21
F. Harga Satuan Pekerjaan (D+E) 4,583,108.31
3. Membuat 1 m3 sloof beton bertulang (150 kg besi + bekesting)
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 5.650 95,000.00 536,750.00
Tukang Batu L.02 OH 0.275 120,000.00 33,000.00
Tukang Kayu L.02 OH 1.560 120,000.00 187,200.00
Tukang Besi L.02 OH 1.400 120,000.00 168,000.00
Kepala Tukang L.03 OH 0.323 120,000.00 38,760.00
Mandor L.04 OH 0.283 120,000.00 33,960.00
JUMLAH TENAGA KERJA 997,670.00
B BAHAN
Kayu kelas m3 0.270 1,100,000.00 297,000.00
Paku 5-12 cm kg 2.000 15,000.00 30,000.00
Minyak bekesting Liter 0.600 11,449.00 6,869.40
Besi beton polos kg 157.500 13,880.00 2,186,100.00
Kawat beton kg 3.000 25,370.00 76,110.00
Sement Portland kg 336.000 1,360.00 456,960.00
Pasir Beton m3 0.540 100,000.00 54,000.00
Kerikil m3 0.810 350,000.00 283,500.00
JUMLAH TENAGA BAHAN 3,390,539.40
C. PERALATAN
-
JUMLAH TENAGA ALAT -
DIV. 4.1.1 - 7
20. Membuat 1 m3 kolom beton bertulang (300 kg besi + bekesting)
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 7.050 95,000.00 669,750.00
Tukang Batu L.02 OH 0.275 120,000.00 33,000.00
Tukang Kayu L.02 OH 1.650 120,000.00 198,000.00
Tukang Besi L.02 OH 2.100 120,000.00 252,000.00
Kepala Tukang L.03 OH 0.403 120,000.00 48,360.00
Mandor L.04 OH 0.353 120,000.00 42,360.00
JUMLAH TENAGA KERJA 1,243,470.00
B BAHAN
Kayu kelas m3 0.400 1,100,000.00 440,000.00
Paku 5-12 cm kg 4.000 15,000.00 60,000.00
Minyak bekesting Liter 2.000 11,449.00 22,898.00
Besi beton polos kg 315.000 13,880.00 4,372,200.00
Kawat beton kg 4.500 25,370.00 114,165.00
Sement Portland kg 336.000 1,360.00 456,960.00
Pasir Beton m3 0.540 100,000.00 54,000.00
Kerikil kg 0.810 350,000.00 283,500.00
Kayu kelas balok m3 0.150 1,100,000.00 165,000.00
Plywood 9 mm Lbr 3.500 150,000.00 525,000.00
Dolken Kayu Ø8-10cm p.4m Batang 20.000 5,000.00 100,000.00
JUMLAH TENAGA BAHAN 6,593,723.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
1. Pemasangan 1 m2 dinding bata jumbo (8x16x30) cm tebal 1/2 batu campuran 1 SP:4PP
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Upah Pasang L.01 Ls 1.000 45,000.00 45,000.00
JUMLAH TENAGA KERJA 45,000.00
B BAHAN
Bata jumbo bh 19.000 2,800.00 53,200.00
Semen Portland kg 3.134 1,360.00 4,261.90
Pasir pasang m3 0.012 100,000.00 1,171.75
JUMLAH TENAGA BAHAN 58,633.65
C. PERALATAN
-
JUMLAH TENAGA ALAT -
2. Pemasangan 1 m2 acian
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Upah Kerja LS 1.000 34,000.00 34,000.00
JUMLAH TENAGA KERJA 34,000.00
B BAHAN
Semen Portland kg 3.250 1,360.00 4,420.00
JUMLAH TENAGA BAHAN 4,420.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
DIV. 4.4.3 - 1
4. Pemasangan 1 m2 lantai keramik putih ukuran 40cm x 40cm
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.250 95,000.00 23,750.00
Tukang Batu L.02 OH 0.125 120,000.00 15,000.00
Kepala Tukang L.03 OH 0.013 120,000.00 1,560.00
Mandor L.04 OH 0.013 120,000.00 1,560.00
JUMLAH TENAGA KERJA 41,870.00
B BAHAN
Keramik 40x40 (putih) bh 6.630 11,500.00 76,245.00
Semen Portland kg 10.000 1,360.00 13,600.00
Pasir pasang kg 0.045 100,000.00 4,500.00
Semen warna kg 1.500 17,655.00 26,482.50
JUMLAH TENAGA BAHAN 120,827.50
C. PERALATAN
-
JUMLAH TENAGA ALAT -
DIV. 4.4.3 - 2
2. Pemasangan 1 m2 lantai keramik warna ukuran 40cm x 40cm
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.250 95,000.00 23,750.00
Tukang Batu L.02 OH 0.125 120,000.00 15,000.00
Kepala Tukang L.03 OH 0.013 120,000.00 1,560.00
Mandor L.04 OH 0.013 120,000.00 1,560.00
JUMLAH TENAGA KERJA 41,870.00
B BAHAN
Keramik 40x40 warna bh 6.630 7,500.00 49,725.00
Semen Portland kg 10.000 1,360.00 13,600.00
Pasir pasang kg 0.045 100,000.00 4,500.00
Semen warna kg 1.500 17,655.00 26,482.50
JUMLAH TENAGA BAHAN 94,307.50
C. PERALATAN
-
JUMLAH TENAGA ALAT -
DIV. 4.4.3 - 3
10. Pemasangan 1 m' plint Granite Tile ukuran 10 cm x 60 cm
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.090 95,000.00 8,550.00
Tukang Batu L.02 OH 0.090 120,000.00 10,800.00
Kepala Tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 24,150.00
B BAHAN
Plint granite tile bh 1.760 20,062.50 35,310.00
Semen Portland kg 1.140 1,360.00 1,550.40
Pasir pasang kg 0.003 100,000.00 300.00
Semen warna kg 0.050 17,655.00 882.75
JUMLAH TENAGA BAHAN 38,043.15
C. PERALATAN
-
JUMLAH TENAGA ALAT -
DIV. 4.4.3 - 4
13. Pemasangan 1 m2 lantai lantai karpet t. 4-5 mm
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.170 95,000.00 16,150.00
Tukang Batu L.02 OH 0.170 120,000.00 20,400.00
Kepala Tukang L.03 OH 0.017 120,000.00 2,040.00
Mandor L.04 OH 0.009 120,000.00 1,080.00
JUMLAH TENAGA KERJA 39,670.00
B BAHAN
Karpet m2 1.050 93,625.00 98,306.25
Lem kg 0.350 55,190.60 19,316.71
JUMLAH TENAGA BAHAN 117,622.96
C. PERALATAN
-
JUMLAH TENAGA ALAT -
D. Jumlah (A+B+C) 157,292.96
### E. Overhead & Profit 15% X D 23,593.94
F. Harga Satuan Pekerjaan (D+E) 180,886.90
DIV. 4.4.3 - 5
16. Pemasangan 1 m2 dinding keramik putih ukuran 20cm x 25cm
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.1875 95,000.00 17,812.50
Tukang Batu L.02 OH 0.3750 120,000.00 45,000.00
Kepala Tukang L.03 OH 0.0450 120,000.00 5,400.00
Mandor L.04 OH 0.0188 120,000.00 2,256.00
JUMLAH TENAGA KERJA 70,468.50
B BAHAN
Keramik 20x25 putih bh 22.000 3,500.00 77,000.00
Semen Portland kg 9.300 1,360.00 12,648.00
Pasir pasang kg 0.018 100,000.00 1,800.00
Semen warna kg 1.940 17,655.00 34,250.70
JUMLAH TENAGA BAHAN 125,698.70
C. PERALATAN
-
JUMLAH TENAGA ALAT -
DIV. 4.4.3 - 6
19. Pemasangan 1 m2 dinding batu tempel hitam
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.700 95,000.00 66,500.00
Tukang Batu L.02 OH 0.350 120,000.00 42,000.00
Kepala Tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.035 120,000.00 4,200.00
JUMLAH TENAGA KERJA 116,900.00
B BAHAN
Batu tempel m2 1.100 139,100.00 153,010.00
Semen Portland kg 11.750 1,360.00 15,980.00
Pasir pasang kg 0.035 100,000.00 3,500.00
JUMLAH TENAGA BAHAN 172,490.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
1. 1 m2 Pengecatan bidang kayu baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.070 95,000.00 6,650.00
Tukang cat L.02 OH 0.009 120,000.00 1,080.00
Kepala tukang L.03 OH 0.006 120,000.00 720.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 8,810.00
B BAHAN
Cat menie kg 0.200 46,500.00 -
Plamir kg 0.150 9,951.00 -
Cat dasar kg 0.170 37,000.00 -
Cat penutup kg 0.260 55,500.00 14,430.00
Kuas bh 0.010 12,305.00 123.05
Pengencer kg 0.030 25,000.00 750.00
Amplas Lbr 0.200 8,881.00 1,776.20
JUMLAH TENAGA BAHAN 17,079.25
C. PERALATAN
-
JUMLAH TENAGA ALAT -
2. Pengecatan 1 m2 tembok baru untuk interior ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.020 95,000.00 1,900.00
Tukang cat L.02 OH 0.063 120,000.00 7,560.00
Kepala tukang L.03 OH 0.0063 120,000.00 756.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 10,576.00
B BAHAN
Plamir L 0.100 6,000.00 600.00
Cat dasar Kg 0.100 25,000.00 2,500.00
Cat penutup ex. Vinilex Kg 0.260 26,000.00 6,760.00
JUMLAH TENAGA BAHAN 9,860.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
DIV. 4.6.2 - 2
8. Pemasangan 1 buah kait angin
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.015 95,000.00 1,425.00
Tukang Kayu L.02 OH 0.150 120,000.00 18,000.00
Kepala Tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.0080 120,000.00 960.00
JUMLAH TENAGA KERJA 22,185.00
B BAHAN
Kait angin stainless stell bh 1.000 5,000.00 5,000.00
JUMLAH TENAGA BAHAN 5,000.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
DIV. 4.6.2 - 3
10. Pemasangan 1 buah Door handle
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.050 95,000.00 4,750.00
Tukang Kayu L.02 OH 0.500 120,000.00 60,000.00
Kepala Tukang L.03 OH 0.050 120,000.00 6,000.00
Mandor L.04 OH 0.0030 120,000.00 360.00
JUMLAH TENAGA KERJA 71,110.00
B BAHAN
Door handle bh 1.000 450,000.00 450,000.00
JUMLAH TENAGA BAHAN 450,000.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
DIV. 4.6.2 - 4
13. Pemasangan 1 m2 kaca tebal 8 mm
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.017 95,000.00 1,615.00
Tukang Kayu L.02 OH 0.170 120,000.00 20,400.00
Kepala Tukang L.03 OH 0.017 120,000.00 2,040.00
Mandor L.04 OH 0.0009 120,000.00 108.00
JUMLAH TENAGA KERJA 24,163.00
B BAHAN
Kaca tebal 8 mm m2 1.100 374,500.00 411,950.00
Sealent bh 0.070 29,960.00 2,097.20
JUMLAH TENAGA BAHAN 414,047.20
C. PERALATAN
-
JUMLAH TENAGA ALAT -
DIV. 4.6.2 - 5
5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG