I. PRELIMINARIES Rp 5,900,000.00
JUMLAH Rp 181,796,953.88
PPN 10% Rp 18,179,695.39
JUMLAH TOTAL Rp 199,976,649.26
DIBULATKAN Rp 200,000,000.00
TERBILANG :
( Dua ratus juta rupiah )
1 Pembersihan Lokasi Awal s/d Selesai 1.00 ls Rp. 900,000.00 Rp. 900,000.00
2 Mobilisasi/Demobilisasi 1.00 ls Rp. 5,000,000.00 Rp. 5,000,000.00
II. PEKERJAAN MEUBEL Rp. 175,896,953.88
A TENAGA
Pekerja L.02 OH 0.8500 95,000.00 80,750.00
Tukang kayu L.02 OH 2.5500 120,000.00 306,000.00
Kepala tukang L.03 OH 0.2550 130,000.00 33,150.00
Mandor L.04 OH 0.0430 145,000.00 6,235.00
JUMLAH TENAGA KERJA 426,135.00
B BAHAN
multipleks 15 mm 120x240cm lbr 0.3472 240,000.00 83,328.00
JUMLAH HARGA BAHAN 83,328.00
C PERALATAN
Paku tembak F30 dos 0.2000 37,000.00 7,400.00
Paku tembak F25 dos 0.2000 35,000.00 7,000.00
JUMLAH HARGA ALAT 14,400.00
A TENAGA
Pekerja L.02 OH 0.8500 95,000.00 80,750.00
Tukang kayu L.02 OH 2.5500 120,000.00 306,000.00
Kepala tukang L.03 OH 0.2550 130,000.00 33,150.00
Mandor L.04 OH 0.0430 145,000.00 6,235.00
JUMLAH TENAGA KERJA 426,135.00
B BAHAN
multipleks 18 mm 120x240cm lbr 0.3472 285,000.00 98,952.00
JUMLAH HARGA BAHAN 98,952.00
C PERALATAN
Paku tembak F30 dos 0.2000 37,000.00 7,400.00
Paku tembak F25 dos 0.2000 35,000.00 7,000.00
JUMLAH HARGA ALAT 14,400.00
A TENAGA
Pekerja L.02 OH 0.8500 95,000.00 80,750.00
Tukang kayu L.02 OH 2.5500 120,000.00 306,000.00
Kepala tukang L.03 OH 0.2550 130,000.00 33,150.00
Mandor L.04 OH 0.0430 145,000.00 6,235.00
JUMLAH TENAGA KERJA 426,135.00
B BAHAN
HPL lbr 0.50 195,500.00 97,750.00
Lem HPL kg 0.800 56,000.00 44,800.00
JUMLAH HARGA BAHAN 142,550.00
C PERALATAN
Alat bantu ls 1.0000 24,000.00 7,500.00
JUMLAH HARGA ALAT 7,500.00
A TENAGA
Pekerja L.02 OH 0.085) 95,000.00 8,075.00
Tukang kaca L.02 OH 0.085) 120,000.00 10,200.00
Kepala tukang L.03 OH 0.008) 130,000.00 1,040.00
Mandor L.04 OH 0.004) 145,000.00 580.00
JUMLAH TENAGA KERJA 19,895.00
B BAHAN
Kaca tebal 8mm m2 1.1000 150,000.00 165,000.00
Sticker sandblast m2 1.1000 50,000.00 55,000.00
Sealant tube 0.2700 40,000.00 10,800.00
JUMLAH HARGA BAHAN 230,800.00
C PERALATAN
Alat bantu ls 1.0000 24,000.00 7,500.00
JUMLAH HARGA ALAT 7,500.00