5.
3.
8.
7.
6.
2.
9.
4.
11.
10.
14.
13.
12.
18.
17.
16.
15.
19.
22.
21.
20.
25.
24.
23.
33.
32.
31.
30.
29.
28.
27.
26.
36.
35.
34.
39.
38.
37.
1
GARASI
EXIT GATE
KANTIN
ENTRANCE GATE
LOUNDY
RESERVOIR
GEDUNG INC
GEDUNG GIZI
GEDUNG GIZI
GEDUNG IPRS
GEDUNG CSSD
RUANG TRAVO
RUANG JENSED
B
GEDUNG VK, OK
WATER TRIPMEN
KAMAR JENASAH
GUDANG FARMASI
GUDANG LOGISTIK
BD
KETERANGAN
GEDUNG INSENERATOR
U
AREA PARKIR
AREA PARKIR
AREA PARKIR AREA PARKIR
35
2
ESTCODE
KORIDOR
ESTCODE ESTCODE ESTCODE ESTCODE ESTCODE ESTCODE ESTCODE ESTCODE ESTCODE ESTCODE ESTCODE ESTCODE ESTCODE ESTCODE ESTCODE
ESTCODE ESTCODE
ESTCODE
ESTCODE
ESTCODE
ESTCODE
ESTCODE ESTCODE
ESTCODE ESTCODE
CO
ESTCODE
L
6
WC
L ESTCODE
WC
ESTCODE ESTCODE
4
7
ESTCODE ESTCODE
ESTCODE
ESTCODE
ESTCODE
ESTCODE
WC
ESTCODE
ESTCODE
Ø3" Ø3"
ESTCODE
ESTCODE ESTCODE
WC
Ø2"
ESTCODE ESTCODE ESTCODE ESTCODE ESTCODE ESTCODE ESTCODE ESTCODE ESTCODE ESTCODE ESTCODE ESTCODE ESTCODE ESTCODE ESTCODE
Xref KRAMIK
Xref KRAMIK
KORIDOR
ESTCODE ESTCODE
ESTCODE ESTCODE
KORIDOR
ESTCODE ESTCODE Xref KRAMIK ESTCODE ESTCODE
ESTCODE ESTCODE Xref KRAMIK
Xref KRAMIK
Xref KRAMIK
KORIDOR
ESTCODE ESTCODE
ESTCODE ESTCODE
ESTCODE
FD
KORIDOR
36
4
4
KORIDOR
ESTCODE
ESTCODE ESTCODE
Skala. 1 : 1800
KORIDOR KORIDOR
15
300
13
ESTCODE ESTCODE
28
ESTCODE
ESTCODE ESTCODE ESTCODE
ESTCODE
ESTCODE ESTCODE ESTCODE ESTCODE ESTCODE ESTCODE ESTCODE
ESTCODE ESTCODE ESTCODE ESTCODE ESTCODE
AREA PENGOLAH LIMBA
KORIDOR
30
31
SITE PLAN
29
TERAS TERAS
- 0.20 - 0.20
ELV - 0.20
ELV - 0.20
RG. TUNGGU
RG. TUNGGU PASIEN TB-HIV
± 0.00
PASIEN TB-MDR
ELV - 0.20
ELV - 0.20
ELV - 0.20
ELV ± 0.00
Ø4"
RG. POLY TB- MDR
33
± 0.00
RG. POLY TB- HIV
ELV - 0.20
± 0.00
ELV - 0.20
TEMPAT UPACARA
± 0,00
KORIDOR RUANG
21
ESTCODE
KORIDOR
± 0.00
ESTCODE
ELV - 0.20
ESTCODE ESTCODE
22
RABAT KELILING
- 0.20
DRAINASE KELILING
23
KM/WC
24
closed
RG. RAWAT INAP WANITA .1
RG. RAWAT INAP WANITA. 2
± 0.00
ANTE ROOM
± 0.00
TERAS
TERAS
± 0.00
26
ANTE ROOM
± 0.00
LEMARI
± 0.00
32
19
RG. RAWAT INAP PRIA.2
SELASAR
± 0.00
RABAT KELILING
- 0.20
LAHAN PENGEMBANGAN
1
38
39
T. PARKIR
34
34
34
34
AREA PENGEMBANGAN
LOKASI :
CATATAN :
DRAFTMAN
DIPERIKSA :
PEKERJAAN :
SITE PLAN
TAEM LEADER
NAMA GAMBAR
AHLI PLUMBING
TAHUN ANGGARAN :
KEPALA
dr. ANTONIUS
DAN PENATAAN
KODE GAMBAR
ARL-RSUD-MMK-20
DIREKTUR RUMAH SAKIT
RUMAH SAKIT
KONSULTAN PERENCANA :
FRANGKI L.H.
MENGETAHUI/MENYETUJUI :
KEPALA BIDANG
PENATAAN RUANG
ANTONIUS PASULU,
SELAKU
SAKIT UMUM
SELAKU
2020
PASULU,Sp
DERMAWAN, ST
L.H. TACO,
DINAS PEKERJAAN
BIDANGCIPTA
SAKIT UMUM
HADI PRAYOGO, ST
PEMERINTAH KABUPATEN
PENGGUNA ANGGARAN
01
TACO, ST.,
NO. LBR
UMUM
UMUM DAERAH
SpTHT-KL,
RUANGKABUPATEN
ANGGARAN (PA)
ST., MM
MM
TAUFIK DALIMUNTHE, ST
(PA)
CIPTAKARYA
KARYA
RSUD KABUPATEN MIMIKA
KABUPATENMIMIKA
DAERAHKAB.
MIMIKA
THT-KL,M.Kes
UMUM DAERAH
M.Kes
DAERAH
KABUPATENMIMIKA
MIMIKA
21
SKALA
4
4
1:1800
KAB.MIMIKA
JML LBR
MIMIKA
PEMASANGAN INSTALASI GAS MEDIS SENTRAL