Anda di halaman 1dari 1

PT.

PELAYARAN NASIONAL INDONESIA ( Persero)


DAFTAR BONGKARAN & JUMLAH MUATAN
VOYAGE : 15 / 2023
KAPAL : KM. EGON
PELABUHAN : Waingapu
DI MUAT DI UNIT / KOLI
MEREK & NOMOR POLISI GOL I S I T/M3
CAR DECK JMLH JENIS

T/M 23 UNIT II MTR 23.000 M3


AMPENAN T/M 14 UNIT III KK 42.000 M3
T/M 33 UNIT IV TS 528.000 M3
T/M 0 UNIT V TB 0.000 M3
T/M 0 UNIT VI TT 0.000 M3
T/M 0 UNIT VII AB 0.000 M3
T/M 7.2 KOLY GC Barang campuran - M3

JUMLAH................. 77 593.000 M3

MUATAN LANJUTAN

T/M 0 UNIT II MTR 0.000 M3


T/M 0 UNIT III KK 0.000 M3
T/M 0 UNIT IV TS 0.000 M3
T/M 0 UNIT V TB 0.000 M3
T/M 0 UNIT VI TT - M3
T/M 0 UNIT VII AB 0.000 M3
T/M 0 UNIT GC Mesin Dinamo - M3

0 - M3

JMLH 77 UNIT KENDARAAN GRAND TOTAL 593.000 M3


MOTOR MTR = 23 UNIT M3
KEN.KELG. KK = 14 UNIT M3
TRUK SEDANG TS = 33 UNIT M3
TRUK BESAR TB = 0 UNIT M3
TRONTON TRT = 0 UNIT M3
ALAT BERAT AB = 0 AB M3
G. CARGO GC = 7.2 KOLI M3
JUMLAH = 77 UNIT
BARANG TSB. DIATAS DITERIMA OLEH : DIBUAT TGL, 7-Sep-2023
PELNI CAB. : Waingapu MUALIM-I

M.Faisal Yusuf
____________________________ NRP O 8788

Anda mungkin juga menyukai