Anda di halaman 1dari 34

STANDAR SATUAN HARGA

PEMERINTAH KABUPATEN JEMBER


TAHUN ANGGARAN 2021
KODE REKENING
NO JENIS PEKERJAAN SATUAN HARGA (Rp)
BELANJA
1 2 3 6 7
II.A BIDANG SUMBER DAYA AIR
ANALISIS HARGA SATUAN PEKERJAAN (AHSP) BIDANG SUMBER DAYA AIR
I. UMUM
A.1 PEKERJAAN TANAH
1 A.1.1 PEKERJAAN TANAH SECARA MANUAL DAN SEMI MEKANIS (NORMATIF)
2 T.01 AHSP PEMBERSIHAN DAN PENGUPASAN PERMUKAAN TANAH
3 T.01.A 1 M2 PEMBERSIHAN DAN STRIPING/KOSREKAN M2 7.300,20
1 M2 TEBAS TEBANG BERUPA MEMOTONG DAN MEMBERSIHKAN LOKASI DARI TANAMAN/
4 T.01.B M2 9.125,25
TUMBUHAN Ø < 15 CM
CABUT 1 TUNGGUL POHON TANAMAN KERAS Ø > 15 CM DAN MEMBUANG SISA TUNGGUL
5 T.01.C BUAH 28.005,95
KAYU DAN AKAR-AKAR NYA

T.02 AHSP UITZET TRASE SALURAN DAN PASANG PROFIL MELINTANG PENAMPANG
1 T.02.A 1 M¹ UITSET TRASE SALURAN M' 2.996,03

T.02.B PASANG 1 M' PROFIL MELINTANG GALIAN TANAH SALURAN DAN PASANG BOUWPLANK

1 T.02.B.1) PASANG 1 M' PROFIL MELINTANG GALIAN TANAH M' 135.418,70


2 T.02.B.2) PASANG 1 M' BOUWPLANK M' 292.817,70

T.03 PENGADAAN DAN PEMASANGAN PATOK


1 T.03.A PATOK KAYU (UKURAN 5/7) BUAH 26.358,52
2 T.03.B PATOK TETAP BANTU (PTB) BUAH 414.422,20
3 T.03.C PATOK TETAP UTAMA (PTU) BUAH 708.238.685,99

T.06 GALIAN TANAH BIASA


1 T.06.A CARA MANUAL
2 T.06.A.1) 1 M3 GALIAN TANAH BIASA SEDALAM ≤ 1 M M3 68.500,21
3 T.06.A.2) 1 M3 GALIAN TANAH BIASA SEDALAM > 1 M S.D. 2 M M3 82.127,25
4 T.06.A.3) 1 M3 GALIAN TANAH BIASA SEDALAM > 2 M S.D. 3 M M3 92.469,20
5 T.06.A.4) 1 M3 GALIAN TANAH BIASA > 3 M, UNTUK SETIAP PENAMBAHAN KEDALAMAN 1 M M3 9.125,25

T.06.B CARA SEMI MEKANIS


1 T.06.B.1) 1 M3 GALIAN TANAH BIASA SEDALAM ≤ 1 M M3 35.799,21
2 T.06.B.2) 1 M3 GALIAN TANAH BIASA SEDALAM > 1 M S.D. 2 M M3 40.666,01
3 T.06.B.3) 1 M3 GALIAN TANAH BIASA SEDALAM > 2 M S.D. 3 M M3 45.532,81
KEDALAMAN YANG > 3 M MENGGUNAKAN AHSP T.06.B.3) + {AHSP T.06.A.4) UNTUK SETIAP
4 T.06.B.4) M3 45.626,25
KEDALAMAN 1 M}

T.07 GALIAN TANAH BERBATU


T.07.A CARA MANUAL
1 T.07.A.1) 1 M3 GALIAN TANAH BERBATU SEDALAM ≤ 1 M M3 164.376,17
2 T.07.A.2) 1 M3 GALIAN TANAH BERBATU SEDALAM > 1 M S.D. 2 M M3 182.505,00
3 T.07.A.3) 1 M3 GALIAN TANAH BERBATU SEDALAM > 2 M S.D. 3 M M3 200.755,50

4 T.07.A.4) 1 M3 GALIAN TANAH BERBATU > 3 M, UNTUK SETIAP PENAMBAHAN KEDALAMAN 1 M M3 17.033,80

T.07.B CARA SEMI MEKANIS


1 T.07.B.1) 1 M3 GALIAN TANAH BERBATU SEDALAM ≤ 1 M M3 74.897,63
2 T.07.B.2) 1 M3 GALIAN TANAH BERBATU SEDALAM > 1 M S.D. 2 M M3 84.075,78
3 T.07.B.3) 1 M3 GALIAN TANAH BERBATU SEDALAM > 2 M S.D. 3 M M3 82.168,94
KEDALAMAN YANG > 3 M MENGGUNAKAN AHSP T.07.B.3) + {AHSP T.07.A.4) UNTUK SETIAP
4 T.07.B.4) M3 114.083,15
KEDALAMAN 1M}
5
T.08 GALIAN BATU
T.08.A CARA MANUAL
1 T.08.A.1) 1 M3 GALIAN BATU SEDALAM ≤ 1 M M3 411.001,26
2 T.08.A.2) 1 M3 GALIAN BATU SEDALAM > 1 M S.D. 2 M M3 456.262,50
3 T.08.A.3) 1 M3 GALIAN BATU SEDALAM > 2 M S.D.3 M M3 501.888,75
4 T.08.A.4) 1 M3 GALIAN BATU > 3 M UNTUK SETIAP PENAMBAHAN KEDALAMAN 1 M M3 45.626,25

STANDAR SATUAN HARGA, PEMERINTAH KABUPATEN JEMBER, TAHUN 2021 857


KODE REKENING
NO JENIS PEKERJAAN SATUAN HARGA (Rp)
BELANJA
1 2 3 6 7
T.08.B CARA SEMI MEKANIS
1 T.08.B.1) 1 M3 GALIAN BATU SEDALAM ≤ 1 M M3 166.829,06
2 T.08.B.2) 1 M3 GALIAN BATU SEDALAM > 1 M S.D. 2 M M3 191.163,06
3 T.08.B.3) 1 M3 GALIAN BATU SEDALAM > 2 M S.D. 3 M M3 205.763,46
KEDALAMAN YANG > 3 M MENGGUNAKAN AHSP T.08B.3) + {AHSP T.08A.4) UNTUK SETIAP
4 T.08.B.4) M3 289.098,17
KEDALAMAN 1M}

T.09 GALIAN TANAH CADAS ATAU TANAH KERAS


T.09.A CARA MANUAL
1 T.09.A.1) 1 M3 GALIAN TANAH CADAS ATAU TANAH KERAS SEDALAM ≤ 1 M M3 152.087,50
2 T.09.A.2) 1 M3 GALIAN TANAH CADAS ATAU TANAH KERAS SEDALAM > 1 M S.D. 2 M M3 169.364,64
3 T.09.A.3) 1 M3 GALIAN TANAH CADAS/TANAH KERAS SEDALAM > 2 M S.D 3 M M3 182.505,00
1 M3 GALIAN TANAH CADAS ATAU TANAH KERAS > 3 M UNTUK SETIAP PENAMBAHAN
4 T.09.A.4) M3 12.167,00
KEDALAMAN 1 M

T.09.B CARA SEMI MEKANIS


1 T.09.B.1) 1 M3 GALIAN TANAH CADAS ATAU TANAH KERAS SEDALAM ≤ 1 M M3 54.184,84
2 T.09.B.2) 1 M3 GALIAN TANAH CADAS ATAU TANAH KERAS SEDALAM > 1 M S.D. 2 M M3 66.351,84
3 T.09.B.3) 1 M3 GALIAN TANAH CADAS ATAU TANAH KERAS SEDALAM > 2 M S.D. 3 M M3 76.085,44
KEDALAMAN YANG > 3 M MENGGUNAKAN AHSP T.09.B.3) + {AHSP T.09.A.4) UNTUK SETIAP
4 T.09.B.4) M3 101.490,30
KEDALAMAN 1 M}

T.10 GALIAN LUMPUR


T.10.A CARA MANUAL
1 T.10.A.1) 1 M3 GALIAN LUMPUR SEDALAM ≤ 1 M M3 100.986,10
2 T.10.A.2) 1 M3 GALIAN LUMPUR SEDALAM > 1 M S.D. 2 M M3 121.670,00
3 T.10.A.3) 1 M3 GALIAN LUMPUR SEDALAM > 2 M S.D. 3 M M3 139.920,50
4 T.10.A.4) 1 M3 GALIAN LUMPUR > 3 M UNTUK SETIAP PENAMBAHAN KEDALAMAN 1 M M3 18.250,50

T.10.B CARA SEMI MEKANIS


1 T.10.B.1) 1 M3 GALIAN LUMPUR SEDALAM ≤ 1 M M3 42.526,43
2 T.10.B.2) 1 M3 GALIAN LUMPUR SEDALAM > 1 M S.D. 2 M M3 48.841,65
3 T.10.B.3) 1 M3 GALIAN LUMPUR SEDALAM > 2 M S.D. 3 M M3 55.436,90

4 T.10.B.4) 1 M3 GALIAN LUMPUR SEDALAM > 3 M UNTUK SETIAP PENAMBAHAN KEDALAMAN 1 M M3 5.986,90

T.11 GALIAN PASIR


T.11.A CARA MANUAL
1 T.11.A.1) 1 M3 GALIAN PASIR SEDALAM ≤ 1 M1 M3 80.302,20
2 T.11.A.2) 1 M3 GALIAN PASIR SEDALAM > 1 M S.D. 2 M1 M3 97.336,00
3 T.11.A.3) 1 M3 GALIAN PASIR UNTUK PONDASI BANGUNAN SEDALAM > 2 M S.D. 3 M1 M3 111.936,40

4 T.11.A.4) 1 M3 GALIAN PASIR KEDALAMAN >3 M UNTUK SETIAP PENAMBAHAN KEDALAMAN 1 M M3 12.167,00

T.11.B CARA SEMI MEKANIS


1 T.11.B.1) 1 M3 GALIAN PASIR SEDALAM ≤ 1 M1 M3 45.792,31
2 T.11.B.2) 1 M3 GALIAN PASIR SEDALAM > 1 M S.D. 2 M1 M3 53.208,20
3 T.11.B.3) 1 M3 GALIAN PASIR SEDALAM > 2 M S.D. 3 M1 M3 59.226,38
4 T.11.B.4) 1 M3 GALIAN PASIR SEDALAM > 3 M UTK SETIAP PENAMBAHAN KEDALAMAN 1 M M3 5.245,68

T.12 PERKUATAN DINDING GALIAN


1 T.12.A (K3) 1 M2 PASANGAN 2-LAPIS SESEG BAMBU, JAT < 1,0 M' M2 49.776,32
2 T.12.B (K3) 1 M2 PASANGAN PAPAN 3/20, JAT < 1,5 M' M2 124.902,35
3 T.12.C (K3) 1 M2 PASANGAN BALOK KAYU 8/12, TEBAL 8 CM, JAT 4,0 M' M2 346.262,14
4 T.12.D (K3) 1 M2 PASANGAN BALOK KAYU 8/12, TEBAL 12 CM, JAT < 6,0 M' M2 517.064,95

T.14 TIMBUNAN DAN PEMADATAN


1 T.14.A 1 M3 TIMBUNAN TANAH ATAU URUGAN TANAH KEMBALI M3 40.151,10
2 T.14.B 1 M3 PEMADATAN TANAH M3 65.276,88
3 T.14.C 1 M3 TIMBUNAN PASIR SEBAGAI BAHAN PENGISI M3 338.633,60
4 T.14.D 1 M3 PEMADATAN PASIR SEBAGAI BAHAN PENGISI M3 21.050,75

T.15 ANGKUTAN MATERIAL DAN/ATAU HASIL GALIAN

T.15.A ANGKUTAN MATERIAL DAN/ATAU HASIL GALIAN UNTUK JARAK HORIZONTAL (DATAR)

1 T.15.A.1) MENGANGKUT 1 M3 MATERIAL ATAU HASIL GALIAN DENGAN JARAK ANGKUT 5 M M3 28.534,26
2 T.15.A.2) MENGANGKUT 1 M3 MATERIAL ATAU HASIL GALIAN DENGAN JARAK ANGKUT 10 M M3 31.295,64
3 T.15.A.3) MENGANGKUT 1 M3 MATERIAL ATAU HASIL GALIAN DENGAN JARAK ANGKUT 20 M M3 36.249,73

STANDAR SATUAN HARGA, PEMERINTAH KABUPATEN JEMBER, TAHUN 2021 858


KODE REKENING
NO JENIS PEKERJAAN SATUAN HARGA (Rp)
BELANJA
1 2 3 6 7
4 T.15.A.4) MENGANGKUT 1 M3 MATERIAL ATAU HASIL GALIAN DENGAN JARAK ANGKUT 30 M M3 40.960,47
5 T.15.A.5) MENGANGKUT 1 M3 MATERIAL ATAU HASIL GALIAN DENGAN JARAK ANGKUT 50 M M3 48.554,27
6 T.15.A.6) MENGANGKUT 1 M3 MATERIAL ATAU HASIL GALIAN DNG JARAK ANGKUT 100 M M3 69.034,50
7 T.15.A.7) MENGANGKUT 1 M3 MATERIAL ATAU HASIL GALIAN DNG JARAK ANGKUT 200 M M3 109.304,63
8 T.15.A.8) MENGANGKUT 1 M3 MATERIAL ATAU HASIL GALIAN DNG JARAK ANGKUT 300 M M3 149.574,75
9 T.15.A.9) MENGANGKUT 1 M3 MATERIAL ATAU HASIL GALIAN DNG JARAK ANGKUT 400 M M3 189.844,88
10 T.15.A.10) MENGANGKUT 1 M3 MATERIAL ATAU HASIL GALIAN DNG JARAK ANGKUT 500 M M3 224.362,13
MENGANGKUT 1 M3 MATERIAL ATAU HASIL GALIAN DNG JARAK ANGKUT > 500 M UNTUK
11 T.15.A.11) M3 40.500,24
SETIAP PENAMBAHAN JARAK ANGKUT 100 M

T.15.B ANGKUTAN MATERIAL DAN/ATAU HASIL GALIAN UNTUK JARAK VERTIKAL MENURUN

1 T.15.B.1) MENURUNKAN 1 M3 MATERIAL ATAU HASIL GALIAN TANAH SAMPAI BEDA TINGGI 1 M M3 17.258,63

MENURUNKAN 1 M3 MATERIAL ATAU HASIL GALIAN TANAH SAMPAI BEDA TINGGI > 1 M S.D. 2
2 T.15.B.2) M3 24.162,08
M
MENURUNKAN 1 M3 MATERIAL ATAU HASIL GALIAN TANAH SAMPAI BEDA TINGGI > 2 M S.D. 3
3 T.15.B.3) M3 31.899,23
M
MENURUNKAN 1 M3 MATERIAL ATAU HASIL GALIAN TANAH SAMPAI BEDA TINGGI > 3 M S.D. 4
4 T.15.B.4) M3 39.864,12
M
MENURUNKAN 1 M3 MATERIAL ATAU HASIL GALIAN TANAH SAMPAI BEDA TINGGI > 4 M S.D. 5
5 T.15.B.5) M3 47.436,22
M
MENURUNKAN 1 M3 MATERIAL ATAU HASIL GALIAN TANAH SAMPAI BEDA TINGGI > 5 M S.D. 6
6 T.15.B.6) M3 54.087,87
M
MENURUNKAN 1 M3 MATERIAL ATAU HASIL GALIAN TANAH SAMPAI BEDA TINGGI > 6 M S.D. 7
7 T.15.B.7) M3 59.502,18
M
MENURUNKAN 1 M3 MATERIAL ATAU HASIL GALIAN TANAH SAMPAI BEDA TINGGI > 7 M S.D. 8
8 T.15.B.8) M3 63.665,94
M
MENURUNKAN 1 M3 MATERIAL ATAU HASIL GALIAN TANAH SAMPAI BEDA TINGGI > 8 M S.D. 9
9 T.15.B.9) M3 66.830,95
M
MENURUNKAN 1 M3 MATERIAL ATAU HASIL GALIAN TANAH SAMPAI BEDA TINGGI > 9 M S.D.
10 T.15.B.10) M3 69.516,42
10 M
MENURUNKAN 1 M3 MATERIAL ATAU HASIL GALIAN TANAH DENGAN BEDA TINGGI > 10 M
11 T.15.B.11) M3 1.732,48
UNTUK SETIAP PENAMBAHAN 1 M

T.15.C ANGKUTAN MATERIAL DAN/ATAU HASIL GALIAN UNTUK JARAK VERTIKAL NAIK
1 T.15.C.1) MENAIKKAN 1 M3 MATERIAL ATAU HASIL GALIAN TANAH SAMPAI BEDA 1 M M3 34.517,25

2 T.15.C.2) MENAIKKAN 1 M3 MATERIAL ATAU HASIL GALIAN TANAH SAMPAI BEDA > 1 M S.D. 2 M M3 50.492,79

3 T.15.C.3) MENAIKKAN 1 M3 MATERIAL ATAU HASIL GALIAN TANAH SAMPAI BEDA > 2 M S.D. 3 M M3 69.468,28

4 T.15.C.4) MENAIKKAN 1 M3 MATERIAL ATAU HASIL GALIAN TANAH SAMPAI BEDA > 3 M S.D. 4 M M3 90.895,43

5 T.15.C.5) MENAIKKAN 1 M3 MATERIAL ATAU HASIL GALIAN TANAH SAMPAI BEDA > 4 M S.D. 5 M M3 112.864,80

6 T.15.C.6) MENAIKKAN 1 M3 MATERIAL ATAU HASIL GALIAN TANAH SAMPAI BEDA > 5 M S.D. 6 M M3 134.683,40

7 T.15.C.7) MENAIKKAN 1 M3 MATERIAL ATAU HASIL GALIAN TANAH SAMPAI BEDA > 6 M S.D. 7 M M3 154.610,83

8 T.15.C.8) MENAIKKAN 1 M3 MATERIAL ATAU HASIL GALIAN TANAH SAMPAI BEDA > 7 M S.D. 8 M M3 173.128,48

9 T.15.C.9) MENAIKKAN 1 M3 MATERIAL ATAU HASIL GALIAN TANAH SAMPAI BEDA > 8 M S.D. 9 M M3 189.778,75

10 T.15.C.10) MENAIKKAN 1 M3 MATERIAL ATAU HASIL GALIAN TANAH SAMPAI BEDA > 9 M S.D. 10 M M3 206.452,83

MENAIKKAN 1 M3 MATERIAL ATAU HASIL GALIAN TANAH DENGAN BEDA TINGGI > 10 M
11 T.15.C.11) M3 5.819,00
UNTUK SETIAP PENAMBAHAN 1 M

T.15.D KONVERSI BERAT MATERIAL TANAH BIASA (LEPAS) KEPADA JENIS MATERIAL LAIN
JIKA BIAYA ANGKUTAN DIMASUKAN DALAM HSD - BAHAN (DIHITUNG TANPA OVERHEAD +
T.15.D.1)
KEUNTUNGAN)
T.15.D.1) A) UNTUK JARAK ANGKUT HORIZONTAL 100 M
1 T.15.D.1) A).1 * TANAH GAMBUT M3 39.292,36
2 T.15.D.1) A).2 * AGREGAT KASAR M3 68.761,64
3 T.15.D.1) A).3 * AGREGAT HALUS M3 71.490,27
4 T.15.D.1) A).4 * SPLIT/KORAL/KERIKIL M3 68.215,91
5 T.15.D.1) A).5 * BATU KALI M3 52.935,55
6 T.15.D.1) A).6 * BATU BELAH M3 51.298,36
STANDAR SATUAN HARGA, PEMERINTAH KABUPATEN JEMBER, TAHUN 2021 859
KODE REKENING
NO JENIS PEKERJAAN SATUAN HARGA (Rp)
BELANJA
1 2 3 6 7
7 T.15.D.1) A).7 * PASIR PASANG M3 69.853,09
8 T.15.D.1) A).8 PIPA BETON (TIDAK BERTULANG) UMUM M3 108.054,00
9 T.15.D.1) A).9 PIPA BETON (TIDAK BERTULANG) FC'= 12,5 MPA M3 117.877,09
10 T.15.D.1) A).10 PIPA BETON (BERTULANG 155 KG BESI/M3) M3 122.788,64
11 T.15.D.1) A).11 KAYU M3 43.658,18
12 T.15.D.1) A).12 PLASTIK M3 37.109,45
13 T.15.D.1) A).13 PVC M3 41.748,14
14 T.15.D.1) A).14 HDPE M3 39.292,36
15 T.15.D.1) A).15 GIP M3 349.265,45
16 T.15.D.1) A).16 DCIP M3 349.265,45
17 T.15.D.1) A).17 BAJA PROFIL M3 340.533,82
18 T.15.D.1) A).18 BESI BETON M3 297.967,09

T.15.D.1) B) UNTUK JARAK ANGKUT VERTIKAL TURUN 3 M


1 T.15.D.1) B).1 * TANAH GAMBUT M3 18.156,08
2 T.15.D.1) B).2 * AGREGAT KASAR M3 31.773,15
3 T.15.D.1) B).3 * AGREGAT HALUS M3 33.033,98
4 T.15.D.1) B).4 * SPLIT/KORAL/KERIKIL M3 31.520,98
5 T.15.D.1) B).5 * BATU KALI M3 24.460,28
6 T.15.D.1) B).6 * BATU BELAH M3 23.703,77
7 T.15.D.1) B).7 * PASIR PASANG M3 32.277,48
8 T.15.D.1) B).8 PIPA BETON (TIDAK BERTULANG) UMUM M3 49.929,23
9 T.15.D.1) B).9 PIPA BETON (TIDAK BERTULANG) FC'= 12,5 MPA M3 54.468,25
10 T.15.D.1) B).10 PIPA BETON (BERTULANG 155 KG BESI/M3) M3 56.737,76
11 T.15.D.1) B).11 KAYU M3 20.173,43
12 T.15.D.1) B).12 PLASTIK M3 17.147,41
13 T.15.D.1) B).13 PVC M3 19.290,84
14 T.15.D.1) B).14 HDPE M3 18.156,08
15 T.15.D.1) B).15 GIP M3 161.387,40
16 T.15.D.1) B).16 DCIP M3 161.387,40
17 T.15.D.1) B).17 BAJA PROFIL M3 157.352,72
18 T.15.D.1) B).18 BESI BETON M3 137.683,63

T.15.D.1) C) UNTUK JARAK ANGKUT VERTIKAL NAIK 3 M


1 T.15.D.1) C).1 * TANAH GAMBUT M3 39.539,26
2 T.15.D.1) C).2 * AGREGAT KASAR M3 69.193,70
3 T.15.D.1) C).3 * AGREGAT HALUS M3 71.939,48
4 T.15.D.1) C).4 * SPLIT/KORAL/KERIKIL M3 68.644,55
5 T.15.D.1) C).5 * BATU KALI M3 53.268,17
6 T.15.D.1) C).6 * BATU BELAH M3 51.620,70
7 T.15.D.1) C).7 * PASIR PASANG M3 70.292,01
8 T.15.D.1) C).8 PIPA BETON (TIDAK BERTULANG) UMUM M3 108.732,96
9 T.15.D.1) C).9 PIPA BETON (TIDAK BERTULANG) FC'= 12,5 MPA M3 118.617,77
10 T.15.D.1) C).10 PIPA BETON (BERTULANG 155 KG BESI/M3) M3 123.560,18
11 T.15.D.1) C).11 KAYU M3 43.932,51
12 T.15.D.1) C).12 PLASTIK M3 37.342,63
13 T.15.D.1) C).13 PVC M3 42.010,46
14 T.15.D.1) C).14 HDPE M3 39.539,26
15 T.15.D.1) C).15 GIP M3 351.460,07
16 T.15.D.1) C).16 DCIP M3 351.460,07
17 T.15.D.1) C).17 BAJA PROFIL M3 342.673,57
18 T.15.D.1) C).18 BESI BETON M3 299.839,37

JIKA BIAYA ANGKUTAN DIPISAHKAN DARI HSD KOMPONEN PEKERJAAN KONSTRUKSI - BIAYA
T.15.D.2) KONSTRUKSI DAN BIAYA ANGKUT DITULIS MASING-MASING YANG SUDAH TERMASUK
OVERHEAD + KEUNTUNGAN
T.15.D.2) A) UNTUK JARAK ANGKUT HORIZONTAL 100 M
1 T.15.D.2) A).1 * TANAH GAMBUT M3 45.186,22
2 T.15.D.2) A).2 * AGREGAT KASAR M3 79.075,88
3 T.15.D.2) A).3 * AGREGAT HALUS M3 82.213,81
4 T.15.D.2) A).4 * SPLIT/KORAL/KERIKIL M3 78.448,30
5 T.15.D.2) A).5 * BATU KALI M3 60.875,88
6 T.15.D.2) A).6 * BATU BELAH M3 58.993,12
7 T.15.D.2) A).7 * PASIR PASANG M3 80.331,05
8 T.15.D.2) A).8 PIPA BETON (TIDAK BERTULANG) UMUM M3 124.262,10
9 T.15.D.2) A).9 PIPA BETON (TIDAK BERTULANG) FC'= 12,5 MPA M3 135.558,65
10 T.15.D.2) A).10 PIPA BETON (BERTULANG 155 KG BESI/M3) M3 141.206,93
11 T.15.D.2) A).11 KAYU M3 50.206,91

STANDAR SATUAN HARGA, PEMERINTAH KABUPATEN JEMBER, TAHUN 2021 860


KODE REKENING
NO JENIS PEKERJAAN SATUAN HARGA (Rp)
BELANJA
1 2 3 6 7
12 T.15.D.2) A).12 PLASTIK M3 42.675,87
13 T.15.D.2) A).13 PVC M3 48.010,36
14 T.15.D.2) A).14 HDPE M3 45.186,22
15 T.15.D.2) A).15 GIP M3 401.655,27
16 T.15.D.2) A).16 DCIP M3 401.655,27
17 T.15.D.2) A).17 BAJA PROFIL M3 391.613,89
18 T.15.D.2) A).18 BESI BETON M3 342.662,15

T.15.D.2) B) UNTUK JARAK ANGKUT VERTIKAL TURUN 3 M


1 T.15.D.2) B).1 * TANAH GAMBUT M3 20.879,50
2 T.15.D.2) B).2 * AGREGAT KASAR M3 36.539,12
3 T.15.D.2) B).3 * AGREGAT HALUS M3 37.989,08
4 T.15.D.2) B).4 * SPLIT/KORAL/KERIKIL M3 36.249,12
5 T.15.D.2) B).5 * BATU KALI M3 28.129,32
6 T.15.D.2) B).6 * BATU BELAH M3 27.259,34
7 T.15.D.2) B).7 * PASIR PASANG M3 37.119,10
8 T.15.D.2) B).8 PIPA BETON (TIDAK BERTULANG) UMUM M3 57.418,61
9 T.15.D.2) B).9 PIPA BETON (TIDAK BERTULANG) FC'= 12,5 MPA M3 62.638,49
10 T.15.D.2) B).10 PIPA BETON (BERTULANG 155 KG BESI/M3) M3 65.248,42
11 T.15.D.2) B).11 KAYU M3 23.199,44
12 T.15.D.2) B).12 PLASTIK M3 19.719,52
13 T.15.D.2) B).13 PVC M3 22.184,46
14 T.15.D.2) B).14 HDPE M3 20.879,50
15 T.15.D.2) B).15 GIP M3 185.595,51
16 T.15.D.2) B).16 DCIP M3 185.595,51
17 T.15.D.2) B).17 BAJA PROFIL M3 180.955,63
18 T.15.D.2) B).18 BESI BETON M3 158.336,17

T.15.D.2) C) UNTUK JARAK ANGKUT VERTIKAL NAIK 3 M


1 T.15.D.2) C).1 * TANAH GAMBUT M3 45.470,15
2 T.15.D.2) C).2 * AGREGAT KASAR M3 79.572,76
3 T.15.D.2) C).3 * AGREGAT HALUS M3 82.730,41
4 T.15.D.2) C).4 * SPLIT/KORAL/KERIKIL M3 78.941,23
5 T.15.D.2) C).5 * BATU KALI M3 61.258,39
6 T.15.D.2) C).6 * BATU BELAH M3 59.363,80
7 T.15.D.2) C).7 * PASIR PASANG M3 80.835,82
8 T.15.D.2) C).8 PIPA BETON (TIDAK BERTULANG) UMUM M3 125.042,90
9 T.15.D.2) C).9 PIPA BETON (TIDAK BERTULANG) FC'= 12,5 MPA M3 136.410,44
10 T.15.D.2) C).10 PIPA BETON (BERTULANG 155 KG BESI/M3) M3 142.094,21
11 T.15.D.2) C).11 KAYU M3 50.522,39
12 T.15.D.2) C).12 PLASTIK M3 42.944,03
13 T.15.D.2) C).13 PVC M3 48.312,03
14 T.15.D.2) C).14 HDPE M3 45.470,15
15 T.15.D.2) C).15 GIP M3 404.179,08
16 T.15.D.2) C).16 DCIP M3 404.179,08
17 T.15.D.2) C).17 BAJA PROFIL M3 394.074,61
18 T.15.D.2) C).18 BESI BETON M3 344.815,28

A.1.2 PEKERJAAN TANAH SECARA MEKANIS (INFORMATIF)


AHSP PENGGALIAN TANAH DI SITU/WADUK DENGAN EXCAVATOR DI PONTON 1, HASIL
1 TM.01 M3 94.433,10
GALIAN DIANGKUT DENGAN PONTON 2

AHSP PENGGALIAN TANAH DI SUNGAI MENGGUNAKAN EXCAVATOR (DI DARAT) YANG


TM.02
DIANGKUT OLEH DUMP TRUCK

1 TM.02.A MENGGALI DENGAN EXCAVATOR DAN MATERIAL ATAU HASIL GALIAN DIMUAT KE DT M3 34.160,51

2 TM.03 AHSP ANGKUTAN MATERIAL ATAU HASIL GALIAN LINTAS PULAU M3 132.316,15

TM.04 AHSP GALI, ANGKUT MATERIAL/HASIL GALIAN DAN PEMADATAN


TM.04.A GALIAN TANAH
TM.04.A.1 GALIAN TANAH BIASA
1 TM.04.A.1.A 1 M3 GALIAN TANAH BIASA SEDALAM SD 2 M M3 28.885,90
2 TM.04.A.1.B 1 M3 GALIAN TANAH BIASA SEDALAM 2 M - 4 M M3 29.250,72
1 M3 GALIAN TANAH BIASA SEDALAM > 4 M ATAU GALIAN TANAH DI SUNGAI MENGGUNAKAN
3 TM.04.A.1.C M3 34.993,77
EXAVATOR DI DARAT

TM.04.A.2 GALIAN TANAH BERBATU


1 TM.04.A.2.A 1 M3 GALIAN TANAH BERBATU SEDALAM SD 2 M M3 85.476,08

STANDAR SATUAN HARGA, PEMERINTAH KABUPATEN JEMBER, TAHUN 2021 861


KODE REKENING
NO JENIS PEKERJAAN SATUAN HARGA (Rp)
BELANJA
1 2 3 6 7

TM.04.A.3 GALIAN BATU


1 TM.04.A.3.A 1 M3 GALIAN TANAH BATU SEDALAM SD 2 M M3 136.227,03

TM.04.A.4 GALIAN TANAH KERAS / CADAS


1 TM.04.A.4.A 1 M3 GALIAN TANAH KERAS/CADAS SEDALAM SD 2 M M3 85.476,08

TM.04.A.5 GALIAN LUMPUR


1 TM.04.A.5.A 1 M3 GALIAN LUMPUR SEDALAM SD 2 M M3 35.974,82

TM.04.A.6 GALIAN PASIR


1 TM.04.A.6.A 1 M3 GALIAN PASIR SEDALAM SD 2 M M3 33.100,08
2 TM.04.B MEMUAT MATERIAL ATAU HASIL GALIAN M3 27.337,80

TM.04.C. ANGKUTAN MATERIAL DAN/ATAU HASIL GALIAN

TM.04.C.1 MENGANGKUT 1 M3 MATERIAL ATAU HASIL GALIAN MENGGUNAKAN DUMP TRUCK

1 TM.04.C.1.A JARAK ANGKUT < 1 KM M3 30.142,56


2 TM.04.C.1.B JARAK ANGKUT > 1 KM UNTUK SETIAP PENAMBAHAN JARAK ANGKUT 100 M M3 1.193,38

TM.04.C.2 MENGANGKUT 1 M3 MATERIAL ATAU HASIL GALIAN MENGGUNAKAN PONTON


1 TM.04.C.2.A JARAK ANGKUT < 1 KM M3 12.603,08
2 TM.04.C.2.B JARAK ANGKUT > 1 KM UNTUK SETIAP PENAMBAHAN JARAK ANGKUT 1 KM M3 6.177,76
3 TM.04.C.3 MENGANGKUT 1 M3 MATERIAL ATAU HASIL GALIAN MENGGUNAKAN PERAHU M3 14.957,87

TM.04.C.4 MENGANGKUT 1 M3 MATERIAL ATAU HASIL GALIAN MENGGUNAKAN TONGKANG


1 TM.04.C.4.A JARAK ANGKUT < 10 KM M3 5.202,32
2 TM.04.C.4.B JARAK ANGKUT > 1 KM UNTUK SETIAP PENAMBAHAN JARAK ANGKUT 1 KM M3 361,27
3 TM.04.D TANAH DIHAMPAR, DIRATAKAN DAN DIRAPIHKAN M3 11.492,20
4 TM.04.E PEMADATAN TANAH DI LOKASI PEKERJAAN M3 17.860,09

A.2 PEKERJAAN PASANGAN (NORMATIF)

A.2.1 KOEFISIEN UNTUK ANALISISIS HARGA SATUAN PEKERJAAN PASANGAN (NORMATIF)

P.01 PASANGAN BATU DENGAN MORTAR JENIS PC-PP (1 M3)


P.01.A MORTAR TIPE M (SETARA CAMPURAN 1 PC:2 PP)
1 P.01.A.1) MANUAL M3 1.241.982,06
2 P.01.A.2) MENGGUNAKAN MOLEN M3 1.141.481,26

P.01.B MORTAR TIPE S (SETARA CAMPURAN 1 PC:3 PP)


1 P.01.B.1) MANUAL M3 1.171.418,52
2 P.01.B.2) MENGGUNAKAN MOLEN M3 1.070.917,72

P.01.C MORTAR TIPE N (SETARA CAMPURAN 1 PC:4 PP)


1 P.01.C.1) MANUAL M3 1.116.354,80
2 P.01.C.2) MENGGUNAKAN MOLEN M3 1.015.854,00

P.01.D MORTAR TIPE O (SETARA CAMPURAN 1 PC:5 PP)


1 P.01.D.1) MANUAL M3 1.076.549,25
2 P.01.D.2) MENGGUNAKAN MOLEN M3 976.048,45

P.01.E BONGKAR DAN PEMANFAATAN BATU BEKAS PASANGAN


1 P.01.E.1) BONGKAR 1 M3 PASANGAN BATU DAN PEMBERSIHAN BATU (MANUAL) M3 185.310,08
2 P.01.E.2) BONGKAR 1 M3 PASANGAN BATU (MANUAL) M3 159.157,87
3 P.01.E.3) BONGKAR 1 M3 PASANGAN BATU DENGAN JACK HAMMER M3 76.259,38
PEMBERSIHAN 1 M3 BONGKARAN PASANGAN BATU UNTUK PEMANFAATAN KEMBALI
4 P.01.E.4) M3 26.152,21
MATERIAL BATU
5 P.01.E.5) 1 M3 BATU DARI BEKAS BONGKARAN PASANGAN BATU **) M3 204.823,17

P.02 1 M3 PASANGAN BATA MERAH


P.02.A MORTAR TIPE M (SETARA CAMPURAN 1 PC:2 PP)
1 P.02.A.1) MANUAL M3 1.252.766,42
2 P.02.A.2) MENGGUNAKAN MOLEN M3 1.155.108,42

P.02.B MORTAR TIPE S (SETARA CAMPURAN 1 PC:3 PP)


1 P.02.B.1) MANUAL M3 1.186.354,95
2 P.02.B.2) MENGGUNAKAN MOLEN M3 1.088.696,95

STANDAR SATUAN HARGA, PEMERINTAH KABUPATEN JEMBER, TAHUN 2021 862


KODE REKENING
NO JENIS PEKERJAAN SATUAN HARGA (Rp)
BELANJA
1 2 3 6 7
P.02.C MORTAR TIPE N (SETARA CAMPURAN 1 PC:4 PP)
1 P.02.C.1) MANUAL M3 1.150.862,90
2 P.02.C.2) MENGGUNAKAN MOLEN M3 1.053.204,90

P.02.D MORTAR TIPE O (SETARA CAMPURAN 1 PC:5 PP)


1 P.02.D.1) MANUAL M3 1.132.025,39
2 P.02.D.2) MENGGUNAKAN MOLEN M3 1.034.367,39

P.02.E MORTAR CAMPURAN 1 PC:6 PP


1 P.02.E.1) MANUAL M3 1.128.554,00
2 P.02.E.2) MENGGUNAKAN MOLEN M3 1.030.896,00

P.02.F BONGKAR 1 M3 PASANGAN BATA MERAH


1 P.02.F.1) MANUAL M3 77.514,95
2 P.02.F.2) BONGKAR 1 M3 PASANGAN BATA MERAH DENGAN JACK HAMMER M3 3.736,35

P.03 1 M2 PEKERJAAN SIARAN DENGAN MORTAR JENIS PC-PP


1 P.03.A SIARAN DENGAN MORTAR TIPE M (SETARA CAMPURAN 1 PC:2 PP) M2 70.771,90
2 P.03.B SIARAN DENGAN MORTAR TIPE S (SETARA CAMPURAN 1 PC:3 PP) M2 69.778,61

P.04 1 M2 PEKERJAAN PLESTERAN DENGAN MORTAR JENIS PC-PP (1 M2)


1 P.04.A TRASRAAM TEBAL 1 CM, DNG MORTAR TIPE M (SETARA CAMPURAN 1 PC:2 PP) M2 72.721,05
2 P.04.B PLESTERAN TEBAL 1 CM, DNG MORTAR TIPE S (SETARA CAMPURAN 1 PC:3 PP) M2 70.924,08
3 P.04.C PLESTERAN TEBAL 1 CM, DNG MORTAR TIPE N (SETARA CAMPURAN 1 PC:4 PP) M2 69.143,00
4 P.04.D TRASRAAM TEBAL 1,5 CM, DNG MORTAR TIPE M (SETARA CAMPURAN 1 PC:2 PP) M2 92.550,68
5 P.04.E PLESTERAN TEBAL 1,5 CM, DNG MORTAR TIPE S (SETARA CAMPURAN 1 PC:3 PP) M2 90.979,89
6 P.04.F PLESTERAN TEBAL 1,5 CM, DNG MORTAR TIPE N (SETARA CAMPURAN 1 PC:4 PP) M2 87.093,46
7 P.04.G 1 M2 PEKERJAAN ACIAN M2 43.657,42
8 P.05 1 M3 PASANGAN BATU KOSONG* M3 474.678,60

P.06 PASANGAN BATU BRONJONG KAWAT (SNI 03-0090-1999)


P.06.A 1 M3 PASANGAN BATU BRONJONG KAWAT BENTUK I
P.06.A.1) BENTUK I, TIPE A BRONJONG KAWAT UKURAN L=2,0 M X B=1,0 M X T=1,0 M
KAWAT BRONJONG GALVANIS KAWAT ANYAMAN 3 LILITAN Ø 2,70 MM, KAWAT SISI Ø 3,40 MM
1 P.06.A.1) A) M3 1.705.634,23
DAN KAWAT PENGIKAT Ø 2,0 MM, LUBANG HEKSAGONAL 80 X 100 MM;
KAWAT BRONJONG GALVANIS KAWAT ANYAMAN 3 LILITAN Ø 3,0 MM, KAWAT SISI Ø 4,0 MM
2 P.06.A.1) B) M3 1.735.096,83
DAN KAWAT PENGIKAT Ø 2,0 MM, LUBANG HEKSAGONAL 100 X 120 MM;
KAWAT BRONJONG WIRE MESH Ø 5 MM ULIR, DAN KAWAT PENGIKAT Ø 2,0 MM, LUBANG
3 P.06.A.1) C) M3 2.948.513,46
KOTAK 100 X 100 MM;

P.06.A.2) BENTUK I, TIPE B BRONJONG KAWAT UKURAN L=3,0 M X B=1,0 M X T=1,0 M


KAWAT BRONJONG GALVANIS KAWAT ANYAMAN 3 LILITAN Ø 2,70 MM, KAWAT SISI Ø 3,40 MM
1 P.06.A.2) A) M3 3.099.260,88
DAN KAWAT PENGIKAT Ø 2,0 MM, LUBANG HEKSAGONAL 80 X 100 MM;
KAWAT BRONJONG GALVANIS KAWAT ANYAMAN 3 LILITAN Ø 3,0 MM, KAWAT SISI Ø 4,0 MM
2 P.06.A.2) B) M3 2.545.491,67
DAN KAWAT PENGIKAT Ø 2,0 MM, LUBANG HEKSAGONAL 100 X 120 MM;
KAWAT BRONJONG WIRE MESH Ø 5 MM ULIR, KAWAT PENGIKAT Ø 2,0 MM, LUBANG KOTAK
3 P.06.A.2) C) M3 4.226.484,03
100 X 100 MM;

P.06.A.3) BENTUK I, TIPE C BRONJONG KAWAT UKURAN L = 4,0 M X B = 1,0 M X T = 1,0 M


KAWAT BRONJONG GALVANIS KAWAT ANYAMAN 3 LILITAN Ø 2,70 MM, KAWAT SISI Ø 3,40 MM
1 P.06.A.3) A) M3 3.424.130,26
DAN KAWAT PENGIKAT Ø 2,0 MM, LUBANG HEKSAGONAL 80 X 100 MM;
KAWAT BRONJONG GALVANIS KAWAT ANYAMAN 3 LILITAN Ø 3,0 MM, KAWAT SISI Ø 4,0 MM
2 P.06.A.3) B) M3 3.343.587,27
DAN KAWAT PENGIKAT Ø 2,0 MM, LUBANG HEKSAGONAL 100 X 120 MM;
KAWAT BRONJONG WIRE MESH Ø 5 MM ULIR, KAWAT PENGIKAT Ø 2,0 MM, LUBANG KOTAK
3 P.06.A.3) C) M3 5.556.603,93
100 X 100 MM;

P.06.A.4) BENTUK I, TIPE D BRONJONG KAWAT UKURAN L=2,0 M X B=1,0 M X T= 0,5 M


KAWAT BRONJONG GALVANIS KAWAT ANYAMAN 3 LILITAN Ø 2,70 MM, KAWAT SISI Ø 3,40 MM
1 P.06.A.4) A) M3 1.071.475,13
DAN KAWAT PENGIKAT Ø 2,0 MM, LUBANG HEKSAGONAL 80 X 100 MM;
KAWAT BRONJONG GALVANIS KAWAT ANYAMAN 3 LILITAN Ø 3,0 MM, KAWAT SISI Ø 4,0 MM
2 P.06.A.4) B) M3 1.092.279,05
DAN KAWAT PENGIKAT Ø 2,0 MM, LUBANG HEKSAGONAL 100 X 120 MM;
KAWAT BRONJONG WIRE MESH Ø 5 MM ULIR, KAWAT PENGIKAT Ø 2,0 MM, LUBANG KOTAK
3 P.06.A.4) C) M3 1.880.289,85
100 X 100 MM;

P.06.A.5) BENTUK I, TIPE E BRONJONG KAWAT UKURAN L=3,0 M X B=1,0 M X T=0,5 M


KAWAT BRONJONG GALVANIS KAWAT ANYAMAN 3 LILITAN Ø 2,70 MM, KAWAT SISI Ø 3,40 MM
1 P.06.A.5) A) M3 1.547.033,00
DAN KAWAT PENGIKAT Ø 2,0 MM, LUBANG HEKSAGONAL 80 X 100 MM;

STANDAR SATUAN HARGA, PEMERINTAH KABUPATEN JEMBER, TAHUN 2021 863


KODE REKENING
NO JENIS PEKERJAAN SATUAN HARGA (Rp)
BELANJA
1 2 3 6 7
KAWAT BRONJONG GALVANIS KAWAT ANYAMAN 3 LILITAN Ø 3,0 MM, KAWAT SISI Ø 4,0 MM
2 P.06.A.5) B) M3 1.920.108,75
DAN KAWAT PENGIKAT Ø 2,0 MM, LUBANG HEKSAGONAL 100 X 120 MM;
KAWAT BRONJONG WIRE MESH Ø 5 MM ULIR, KAWAT PENGIKAT Ø 2,0 MM, LUBANG KOTAK
3 P.06.A.5) C) M3 3.208.738,74
100 X 100 MM;

P.06.A.6) BENTUK I, TIPE F BRONJONG KAWAT UKURAN L = 4,0 M X B = 1,0 M X T = 0,5 M


KAWAT BRONJONG GALVANIS KAWAT ANYAMAN 3 LILITAN Ø 2,70 MM, KAWAT SISI Ø 3,40 MM
1 P.06.A.6) A) M3 2.039.907,90
DAN KAWAT PENGIKAT Ø 2,0 MM, LUBANG HEKSAGONAL 80 X 100 MM;
KAWAT BRONJONG GALVANIS KAWAT ANYAMAN 3 LILITAN Ø 3,0 MM, KAWAT SISI Ø 4,0 MM
2 P.06.A.6) B) M3 2.079.118,09
DAN KAWAT PENGIKAT Ø 2,0 MM, LUBANG HEKSAGONAL 100 X 120 MM;
KAWAT BRONJONG WIRE MESH Ø 5 MM ULIR, KAWAT PENGIKAT Ø 2,0 MM, LUBANG KOTAK
3 P.06.A.6) C) M3 3.563.401,62
100 X 100 MM;

4 P.06.A.7) PASANGAN BRONJONG PABRIKASI (TENAGA KERJA UNTUK 1M3 BATU BRONJONG) M3 915.475,90

P.06.B 1 M3 PASANGAN BRONJONG KAWAT BENTUK II


P.06.B.1) BENTUK II, TIPE G BRONJONG KAWAT UKURAN L = 6,0 M X B = 2,0 M X T = 0,17 M
KAWAT BRONJONG GALVANIS KAWAT ANYAMAN 3 LILITAN Ø 2,00 MM, KAWAT SISI Ø 3,40 MM
1 P.06.B.1) A) M3 3.382.491,94
DAN KAWAT PENGIKAT Ø 2,0 MM, LUBANG HEKSAGONAL 60 X 80 MM;
KAWAT BRONJONG GALVANIS KAWAT ANYAMAN 3 LILITAN Ø 2,7 MM, KAWAT SISI Ø 4,0 MM
2 P.06.B.1) B) M3 2.963.263,49
DAN KAWAT PENGIKAT Ø 2,0 MM, LUBANG HEKSAGONAL 80 X 100 MM;

P.06.B.2) BENTUK II, TIPE H BRONJONG KAWAT UKURAN L = 6,0 M X B = 2,0 M X T = 0,23 M
KAWAT BRONJONG GALVANIS KAWAT ANYAMAN 3 LILITAN Ø 2,00 MM, KAWAT SISI Ø 3,40 MM
1 P.06.B.2) A) M3 2.962.320,66
DAN KAWAT PENGIKAT Ø 2,0 MM, LUBANG HEKSAGONAL 60 X 80 MM;
KAWAT BRONJONG GALVANIS KAWAT ANYAMAN 3 LILITAN Ø 2,7 MM, KAWAT SISI Ø 4,0 MM
2 P.06.B.2) B) M3 3.376.305,54
DAN KAWAT PENGIKAT Ø 2,0 MM, LUBANG HEKSAGONAL 80 X 100 MM;

P.06.B.3) BENTUK II, TIPE I BRONJONG KAWAT UKURAN L = 6,0 M X B = 2,0 M X T = 0,30 M
KAWAT BRONJONG GALVANIS KAWAT ANYAMAN 3 LILITAN Ø 2,00 MM, KAWAT SISI Ø 3,40 MM
1 P.06.B.3) A) M3 3.369.679,40
DAN KAWAT PENGIKAT Ø 2,0 MM, LUBANG HEKSAGONAL 60 X 80 MM;
KAWAT BRONJONG GALVANIS KAWAT ANYAMAN 3 LILITAN Ø 2,7 MM, KAWAT SISI Ø 4,0 MM
2 P.06.B.3) B) M3 4.214.766,84
DAN KAWAT PENGIKAT Ø 2,0 MM, LUBANG HEKSAGONAL 80 X 100 MM;

3 P.06.B.4) PASANGAN BRONJONG PABRIKASI (TENAGA KERJA UNTUK 1 M3 BATU BRONJONG) M3 1.718.277,79

P.07 CERUCUK DAN PEMASANGAN MODUL BRONJONG


P.07.A 1 M’ PANJANG CERUCUK KAYU ATAU DOLKEN Ø 8 - 10 CM
1 P.07.B 1 M PANJANG CERUCUK BAMBU Ø 8 CM - 10 CM M' 63.964,84
2 P.07.C 1 M PANJANG CERUCUK TIANG BETON Ø 10 CM - 15 CM M' 306.112,64

3 P.07.D 1 M3 PEMASANGAN MODUL BRONJONG KAWAT MENJADI STRUKTUR KRIB SUNGAI M3 150.256,13

P.08 1 M2 PASANGAN BATU MUKA DAN BATU CANDI


1 P.08.A 1 M2 PASANGAN BATU MUKA M2 152.331,16
2 P.08.B 1 M2 PASANGAN BATU CANDI M2 177.664,65

P.09 1 M2 PASANGAN GEOTEKSTIL


1 P.09.A 1 M2 PEMASANGAN GEOTEKSTIL, TIPE-A, TIPIS M2 110.463,83
2 P.09.B 1 M2 PEMASANGAN GEOTEKSTIL, TIPE-B, TEBAL SEDANG M2 122.018,22
3 P.09.C 1 M2 PEMASANGAN GEOTEKSTIL, TIPE-C, TEBAL M2 135.599,95
PASANGAN BAR SCREEN (SARINGAN KASAR) BANGUNAN INTAKE, PENGUKUR, DAN
4 P.10 BUAH 541.903,40
PENGATUR 1 BUAH PASANGAN BAR SCREEN/SARINGAN KASAR

5 P.11 1 BUAH PASANGAN AMBANG UKUR PADA BANGUNAN PENGUKUR DAN/ATAU PENGATUR BUAH 274.186,51

P.12 1 M2 PASANGAN LEMPENGAN RUMPUT


1 P.12.A PENANAMAN RUMPUT LEMPENGAN M2 63.633,53

P.12.B PEMBABADAN RUMPUT


P.12.B.1) SECARA MANUAL

1 P.12.B.1)A) PERHITUNGAN SECARA UMUM (JIKA TIDAK DIKETAHUI KONDISI MEDAN SECARA DETAIL) M2 1.514,26

P.12.B.1)B) PERHITUNGAN SECARA DETAIL (JIKA DIKETAHUI KONDISI MEDAN SECARA DETAIL)

1 P.12.B.1)B)(1) DAERAH DATAR SAMPAI PELANDAIAN NAIK DENGAN KEMIRINGAN 1V:10 H M2 973,36
2 P.12.B.1)B)(2) DAERAH DENGAN KEMIRINGAN 1V:10H S.D 1V:2,5H M2 1.514,26
STANDAR SATUAN HARGA, PEMERINTAH KABUPATEN JEMBER, TAHUN 2021 864
KODE REKENING
NO JENIS PEKERJAAN SATUAN HARGA (Rp)
BELANJA
1 2 3 6 7
3 P.12.B.1)B)(3) DAERAH DENGAN KEMIRINGAN 1V:2,5H S.D 1V:1H M2 2.035,86
4 P.12.B.1)B)(4) DAERAH DENGAN KEMIRINGAN 1V:1H S.D 1H:2,5V M2 3.041,75
5 P.12.B.1)B)(5) DAERAH DENGAN KEMIRINGAN 2,5V:1H SAMPAI DENGAN TEGAK M2 6.083,50

P.12.B.2) SECARA SEMI MEKANIS

1 P.12.B.2)A) PERHITUNGAN SECARA UMUM (JIKA TIDAK DIKETAHUI KONDISI MEDAN SECARA DETAIL) M2 545,71

P.12.B.2)B) PERHITUNGAN SECARA DETAIL (JIKA DIKETAHUI KONDISI MEDAN SECARA DETAIL)

1 P.12.B.2)B)(1) DAERAH DATAR SAMPAI PELANDAIAN NAIK DENGAN KEMIRINGAN 1V : 10H M2 444,68
2 P.12.B.2)B)(2) DAERAH DENGAN KEMIRINGAN 1V : 10H S.D 1V : 2,5H M2 558,99
3 P.12.B.2)B)(3) DAERAH DENGAN KEMIRINGAN 1V : 2,5H S.D 1V : 1H M2 790,00
4 P.12.B.2)B)(4) DAERAH DENGAN KEMIRINGAN 1V : 1H S.D 2,5V : 1H M2 1.217,86
5 P.12.B.2)B)(5) DAERAH DENGAN KEMIRINGAN 2,5V:1H SAMPAI DENGAN TEGAK M2 2.168,96

P.13 PEKERJAAN PANTAI


1 P.13.A PENANAMAN 1 POHON BAKAU BUAH 21.548,13
2 P.13.B MATRAS BAMBU M2 209.946,88

P.14 PASANGAN ARMOR


1 P.14.A PEMBUATAN 1 BUAH KUBUS BETON UKURAN 30 CM X 30 CM X 30 CM BUAH 48.376,14
2 P.14.B PEMBUATAN 1 BUAH KUBUS BETON UKURAN 40 CM X 40 CM X 40 CM BUAH 111.996,57
3 P.14.C PEMBUATAN 1 BUAH 3B: BLOK BETON BERGIGI BUAH 169.459,10

4 P.14.D PEMBUATAN 1 BUAH BLOK BETON BERAT 0,5 TON QUADRIPOD, TETRAPOD, DOLOS, TRIBAR BUAH 372.097,83

PEMBUATAN 1 BUAH BLOK BETON BERAT 0,75 TON QUADRIPOD, TETRAPOD, DOLOS,
5 P.14.E BUAH 556.461,81
TRIBAR
PEMBUATAN BLOK BETON BERAT 1,0 TON QUADRIPOD, TETRAPOD, DOLOS, TRIBAR DAN
6 P.14.F BUAH 746.754,78
LAIN-LAIN

7 P.14.G PEMBUATAN 1 BUAH BLOK BETON BERAT 1,5 TON QUADRIPOD, TETRAPOD, DOLOS, TRIBAR BUAH 403.299,11

8 P.14.H PEMBUATAN 1 BUAH BLOK BETON BERAT 2,0 TON QUADRIPOD, TETRAPOD, DOLOS, TRIBAR BUAH 628.354,11

9 P.14.I PEMBUATAN 1 BUAH BLOK BETON BERAT 2,5 TON QUADRIPOD, TETRAPOD, DOLOS, TRIBAR BUAH 740.881,61

10 P.14.J PEMASANGAN 1 M3 BERBAGAI JENIS ARMOR M3 414.846,71


11 P.14.K 1 M3 PASANGAN BATU 1 KG - 3 KG, VOID MAKSIMUM 15% M3 385.102,80
12 P.14.L 1 M3 PASANGAN BATU 3 KG - 5 KG, VOID MAKSIMUM 15% M3 422.188,58
13 P.14.M 1 M3 PASANGAN BATU 5 KG - 10 KG, VOID MAKSIMUM 20% M3 449.085,93
14 P.14.N 1 M3 PASANGAN BATU 10 KG - 30 KG, VOID MAKSIMUM 20% M3 460.871,70
15 P.14.O 1 M3 PASANGAN BATU 30 KG - 50 KG, VOID MAKSIMUM 25% M3 483.054,74
16 P.14.P 1 M3 PASANGAN BATU 50 KG - 100 KG, VOID MAKSIMUM 25% M3 485.411,90
17 P.14.Q 1 M3 PASANGAN BATU 100 KG - 200 KG, VOID MAKSIMUM 30% M3 492.483,36
18 P.14.R 1 M3 PASANGAN BATU 200 KG - 300 KG, VOID MAKSIMUM 30% M3 494.840,52
19 P.14.S 1 M3 PASANGAN BATU 300 KG - 400 KG, VOID MAKSIMUM 30% M3 521.737,87
20 P.14.T 1 M3 PASANGAN BATU 400 KG - 500 KG, VOID MAKSIMUM 35% M3 526.452,18
21 P.14.U 1 M3 PASANGAN BATU 200 KG - 500 KG, VOID MAKSIMUM 32% M3 517.328,77
22 P.14.V 1 M3 PASANGAN BATU 500 KG - 650 KG, VOID MAKSIMUM 35% M3 538.514,99
23 P.14.W 1 M3 PASANGAN BATU 650 KG - 800 KG, VOID MAKSIMUM 35% M3 545.586,45

P.15 STRUKTUR KRIB LAUT


1 BUAH BUIS BETON DIANGKUT < 30 M DAN DIPASANG UNTUK KONSTRUKSI PENGAMAN
1 P.15.A BUAH 24.334,00
PANTAI
PENGECORAN 1 BUAH BUIS BETON DIAMETER 1 M' DENGAN CAMPURAN BETON F'C = 7,4
2 P.15.B BUAH 1.362.773,92
MPA (K-100)
3 P.16 1 M’ PASANGAN PIPA SULING-SULING M' 427.180,27

A.3 PEKERJAAN BETON (NORMATIF)


A.3.1 KOEFISIEN UNTUK ANALISISIS HARGA SATUAN PEKERJAAN PEMBUATAN BETON
B.01 1 M³ BETON UNTUK LANTAI KERJA (BEDDING)
TIPE-1: MENGGUNAKAN CAMPURAN BETON TUMBUK FC' = 1,8 S.D 3,7 (B0: K-40 S.D. K-60)
1 B.01.A M3 1.027.089,79
ATAU SETARA 1PC : 3PB : 5KR
TIPE-2: MENGGUNAKAN CAMPURAN BETON FC' = 5,6 S.D 7,4 MPA (K-80 S.D. K-100) ATAU
2 B.01.B M3 1.034.331,79
SETARA 1PC : 2PB : 3KR
TIPE-3: MENGGUNAKAN CAMPURAN BETON FC' ~ 7,4 MPA (K-100) ATAU SETARA 1PC : 2PB :
3 B.01.C M3 1.049.865,73
3KR

STANDAR SATUAN HARGA, PEMERINTAH KABUPATEN JEMBER, TAHUN 2021 865


KODE REKENING
NO JENIS PEKERJAAN SATUAN HARGA (Rp)
BELANJA
1 2 3 6 7
B.02 1 M³ BETON MUTU, F’C = 7,4 MPA (K100), SLUMP (12±2) CM, W/C = 0,87
1 B.02.A MANUAL M3 1.218.718,42
2 B.02.B MENGGUNAKAN MOLEN M3 1.196.384,16

B.03 1 M³ BETON MUTU, F’C = 9,8 MPA (K125), SLUMP (12±2) CM, W/C = 0,78
1 B.03.A MANUAL M3 1.183.457,53
2 B.03.B MENGGUNAKAN MOLEN M3 1.161.123,26

B.04 1 M³ BETON MUTU, F’C = 12,2 MPA (K150), SLUMP (12±2) CM, W/C = 0,72
1 B.04.A MANUAL M3 1.216.062,21
2 B.04.B MENGGUNAKAN MOLEN M3 1.193.727,95

B.05 1 M³ BETON MUTU F’C=14,5 MPA (K175), SLUMP (12±2) CM, W/C = 0,66
1 B.05.A MANUAL M3 1.254.725,84
2 B.05.B MENGGUNAKAN MOLEN M3 1.232.391,00

B.06 1 M³ BETON MUTU, F’C = 16,9 MPA (K200), SLUMP (12±2) CM, W/C = 0,61
1 B.06.A MANUAL M3 1.291.523,83
2 B.06.B MENGGUNAKAN MOLEN M3 1.269.189,57

B.07 1 M³ BETON MUTU, F’C = 19,3 MPA (K225), SLUMP (12±2) CM, W/C = 0,58
1 B.07.A MANUAL M3 1.319.325,14
2 B.07.B MENGGUNAKAN MOLEN M3 1.296.990,87

B.08 1 M³ BETON MUTU, F’C = 21,7 MPA (K250) KEDAP AIR,SLUMP (12±2) CM, W/C = 0,56
1 B.08.A MANUAL M3 1.337.407,28
2 B.08.B MENGGUNAKAN MOLEN M3 1.315.073,01

B.09 1 M³ BETON MUTU, F’C = 24,0 MPA (K275) KEDAP AIR, SLUMP (12±2) CM, W/C = 0,53

1 B.09.A MANUAL M3 1.368.578,66


2 B.09.B MENGGUNAKAN MOLEN M3 1.346.244,40

1 M³ BETON MUTU, F’C = 26,4 MPA (K300) KEDAP AIR, SLUMP (12±2)CM, W/C = 0,52 (KEDAP
B.10
AIR)
1 B.10.A MANUAL M3 1.378.203,13
2 B.10.B MENGGUNAKAN MOLEN M3 1.355.868,86

1 M³ BETON MUTU, F’C = 28,8 MPA, (K325) KEDAP AIR, SLUMP (12±2) CM, W/C = 0,49 (KEDAP
B.11
AIR)
1 B.11.A MANUAL M3 1.414.805,67
2 B.11.B MENGGUNAKAN MOLEN M3 1.392.471,41

1 M³ BETON MUTU, F’C = 31,2 MPA, (K350) KEDAP AIR , SLUMP (12±2) CM, W/C = 0,48 (KEDAP
B.12
AIR)
1 B.12.A MANUAL M3 1.427.456,65
2 B.12.B MENGGUNAKAN MOLEN M3 1.405.122,38

B.13 1 M³ BETON MENGGUNAKAN READY MIXED DAN BAHAN ADITIF


1 B.13.A 1 M³ BETON MENGGUNAKAN READY MIXED DAN POMPA BETON M3 1.651.880,13
2 B.13.B 1 M³ BETON MENGGUNAKAN BAHAN ADITIF M3 109.447,80

A.3.2 PENAMBAHAN KOEFISIEN TENAGA KERJA DAN/ATAU PERALATAN


B.14 MENGANGKUT/MENAIKAN CAMPURAN BETON DENGAN JARAK > 5 M

B.14.A 1 M³ BETON DICORKAN PADA TAPAK BERJARAK < 25 M DENGAN BEDA TINGGI < 1 M

1 B.14.A.1) MANUAL M3 49.884,70

B.14.B 1 M3 BETON DICORKAN PADA TAPAK BERJARAK SETIAP TAMBAHAN JARAK 25 M


1 B.14.B.1) MANUAL M3 60.835,00
2 B.14.B.2) MENGGUNAKAN POMPA BETON M3 30.374,95

B.15 1 M3 PEMADATAN BETON PADA SAAT MENGECOR


1 B.15.A VIBRATOR M3 33.734,10
2 B.15.B MANUAL (MENGGUNAKAN PENUSUK BESI BETON) M3 60.835,00

B.16 1 M3 BETON DICORKAN PADA TAPAK SETIAP KENAIKAN 4 M (VERTIKAL)


1 B.16.A MANUAL M3 30.417,50

STANDAR SATUAN HARGA, PEMERINTAH KABUPATEN JEMBER, TAHUN 2021 866


KODE REKENING
NO JENIS PEKERJAAN SATUAN HARGA (Rp)
BELANJA
1 2 3 6 7
2 B.16.B MENGGUNAKAN POMPA BETON M3 30.374,95

A.3.3 KOEFISIEN UNTUK ANALISISA HARGA SATUAN PEKERJAAN PEMBESIAN BETON


B.17 PEMBESIAN 100 KG DENGAN BESI POLOS ATAU ULIR
1 B.17.A UNTUK PEMBESIAN PELAT KG 1.774.458,63
2 B.17.B UNTUK PEMBESIAN KOLOM, BALOK, RING BALK DAN SLOOF KG 2.057.575,98
3 B.18 PEMBESIAN 100 KG JARING KAWAT (WIREMESH) UNTUK PELAT ATAU DINDING KG 124.148,94
4 B.19 PEMBESIAN 100 KG KABEL PRESTRESSED POLOS/STRAND KG 1.871.459,69

MENGANGKUT/MENAIKKAN 100 KG TULANGAN SETIAP KENAIKAN VERTIKAL 4 M ATAU JARAK


B.20
HORIZONTAL SETIAP 25 M KE TAPAK PEMASANGAN
1 B.20.A MANUAL (KENAIKAN 4 M) KG 49.151,00
2 B.20.B MEKANIS (PENAMBAHAN JARAK HORIZONTAL 10 M S.D 25 M) KG 89.359,31
3 B.20.C MEKANIS (SETIAP PENAMBAHAN JARAK HORIZONTAL 25 M) KG 109.116,31
4 B.20.D MEKANIS (SETIAP KENAIKAN 4 M) KG 62.180,50

KOEFISIEN UNTUK ANALISISA HARGA SATUAN PEKERJAAN PEMBUATAN/PENYEDIAAN


A.3.4
BEKISTING BETON
B.21 BEKISTING LANTAI
1 B.21.A 1 M² BEKISTING LANTAI BETON EXPOSE DENGAN MULTIFLEX 18 MM (TP) M2 196.992,44

2 B.21.B 1 M² BEKISTING LANTAI BETON BIASA DENGAN MULTIFLEX 12 MM ATAU 18 MM (TP) M2 142.564,47

3 B.21.C 1 M² BEKISTING LANTAI BETON BIASA MENGGUNAKAN PAPAN KAYU 3/20 CM (TP) M2 236.874,56

4 B.21.D 1 M2 PERANCAH BEKISTING LANTAI MENGGUNAKAN KASO 5/7 CM, TINGGI 4 M**, JAT < 60 CM M2 260.871,35

1 M2 PERANCAH BEKISTING LANTAI MENGGUNAKAN DOLKEN Ø 8-10 CM, TINGGI 4 M, JAT <
5 B.21.E M2 97.431,28
80 CM
1 M2 PERANCAH BEKISTING LANTAI MENGGUNAKAN BAMBU Ø 8-10 CM, TINGGI 4 M, JAT < 80
6 B.21.F M2 159.032,58
CM

B.22 FLOORDECK
1 B.22.A 1 M2 BEKISTING LANTAI FLOORDECK TIPE PELAT (JAP < 0,6 M) M2 280.046,57
2 B.22.B 1 M2 BEKISTING LANTAI FLOORDECK TIPE PELAT (JAP < 0,8 M) M2 279.207,78
3 B.22.C 1 M2 BEKISTING LANTAI FLOORDECK TIPE BALOK T (JAP < 1,2 M) M2 263.498,25
4 B.22.D 1 M2 BEKISTING LANTAI DENGAN FLOORDECK TIPE BALOK T (JAP < 2,0 M) M2 257.026,26

B.23 BEKISTING BALOK

1 B.23.A 1M2 BEKISTING BALOK BETON EXPOSE MENGGUNAKAN MULTIFLEX 18 MM, JAT < 1,0M M2 282.889,89

1 M2 BEKISTING BALOK BETON BIASA MENGGUNAKAN MULTIFLEX 12 MM ATAU 18 MM, JAT <
2 B.23.B M2 210.302,08
1,0M
3 B.23.C 1 M2 BEKISTING BALOK BETON BIASA MENGGUNAKAN KAYU PAPAN 3/20 CM (TP) M2 297.919,55

4 B.23.D 1 M2 PERANCAH BEKISTING BALOK MENGGUNAKAN KASO 5/7, TINGGI 4 M DAN JAT < 1,0 M M2 183.008,84

1 M2 PERANCAH BEKISTING BALOK MENGGUNAKAN DOLKEN Ø 8-10 CM, TINGGI 4 M**, JAT <
5 B.23.E M2 96.977,03
1,2 M
1 M2 PERANCAH BEKISTING BALOK BETON MENGGUNAKAN BAMBOO Ø 8-10 CM, TINGGI 4
6 B.23.F M2 196.553,40
M**, JAT < 1,0 M

B.24 BEKISTING KOLOM

1 B.24.A 1 M2 BEKISTING KOLOM BETON EXPOSE MENGGUNAKAN MULTIFLEX 18 MM (TP) M2 211.086,74

2 B.24.B 1 M2 BEKISTING KOLOM BETON BIASA MENGGUNAKAN MULTIFLEX 12MM ATAU 18 MM, (TP) M2 156.929,89

3 B.24.C 1 M2 BEKISTING KOLOM BETON BIASA MENGGUNAKAN KAYU PAPAN 3/20 CM (TP) M2 274.268,84
1 M2 PERANCAH BEKISTING KOLOM BETON MENGGUNAKAN KAYU 5/7 CM, TINGGI 4 M, JAT <
4 B.24.D M2 179.172,44
1,0M
1 M2 PERANCAH BEKISTING KOLOM BETON DENGAN KAYU DOLKEN Ø 8 -10 CM, TINGGI 4 M,
5 B.24.E M2 91.156,59
JAT < 1,2 M
1 M2 PERANCAH BEKISTING KOLOM BETON DENGAN BAMBU Ø 8-10 CM, TINGGI 4 M, JAT <
6 B.24.F M2 189.424,09
1,0 M

B.25 BEKISTING DINDING


1 B.25.A 1 M2 BEKISTING DINDING BETON EXPOSE DENGAN MULTIFLEX 18 MM M2 219.982,28

2 B.25.B 1 M2 BEKISTING DINDING BETON BIASA DENGAN MULTIFLEX 12 MM ATAU 18 MM (TP) M2 150.651,84

3 B.25.C 1 M2 BEKISTING DINDING BETON BIASA MENGGUNAKAN KAYU PAPAN 3/20 CM M2 268.198,08

STANDAR SATUAN HARGA, PEMERINTAH KABUPATEN JEMBER, TAHUN 2021 867


KODE REKENING
NO JENIS PEKERJAAN SATUAN HARGA (Rp)
BELANJA
1 2 3 6 7
1 M2 PERANCAH/PENYOKONG BEKISTING DINDING BETON MENGGUNAKAN KAYU 5/7, TINGGI
4 B.25.D M2 173.101,68
MAKSIMUM 2,5 M
1 M2 PERANCAH/PENYOKONG BEKISTING DINDING BETON MENGGUNAKAN KAYU 8/12,
5 B.25.E M2 440.713,01
TINGGI MAKSIMUM 4,5 M

B.26 BEKISTING FONDASI DAN SLOOF


1 M2 BEKISTING FONDASI DAN SLOOF BETON BIASA MENGGUNAKAN MULTIFLEX 12 MM
1 B.26.A M2 182.814,96
ATAU 18 MM (TP)

2 B.26.B 1 M2 BEKISTING FONDASI DAN SLOOF BETON BIASA MENGGUNAKAN PAPAN 3/20 CM M2 169.275,15

1 M2 PERANCAH/PENYOKONG BEKISTING SLOOF DAN FONDASI BETON MENGGUNAKAN


3 B.26.C M2 43.794,93
KASO 5/7, TINGGI MAKSIMUM 2,0 M

B.27 BONGKAR BEKISTING


BONGKAR 1M2 BEKISTING SECARA BIASA (MEMBERSIHKAN DAN MEMBERESKAN PUING-
1 B.27.A M2 4.866,80
PUING)
2 B.27.B BONGKAR 1 M² BEKISTING SECARA HATI-HATI (DAN MEMBERESKAN PUING) *) M2 7.300,20

A.3.5 KOEFISIEN UNTUK AHSP PELAKSANAAN CURING


1 B.28 PELAKSANAAN CURRING BETON
2 B.28.A MENGGENANGI 100 M² PERMUKAAN BETON DENGAN AIR M2 94.118,88

3 B.28.B MENYIRAMI 100 M² PERMUKAAN BETON MENGGUNAKAN MEDIA TERPAL SELAMA 4 HARI M2 92.046,00

MENYIRAMI 100 M² PERMUKAAN BETON MENGGUNAKAN MEDIA KARUNG GONI SELAMA 4


4 B.28.C M2 238.406,50
HARI

B.28.D CURING DENGAN STEAM (UAP) -


A.3.6 PEMBONGKARAN KONSTRUKSI BETON
B.29 PEMBONGKARAN KONSTRUKSI BETON
1 B.29.A BONGKAR 1 M3 BETON SECARA KONVENSIONAL M3 538.812,95
2 B.29.B BONGKAR 1 M3 BETON DENGAN JACK HAMMER M3 191.163,06

B.30 PEMASANGAN WATERSTOP


1 B.30.A 1 M’ PASANGAN WATER STOP PVC LEBAR 150 MM M' 142.343,15
2 B.30.B 1 M’ PASANGAN WATER STOP PVC LEBAR 200 MM M' 169.757,71
3 B.30.C 1 M’ PASANGAN WATER STOP PVC LEBAR 230 MM - 320 MM M' 215.206,29
4 B.30.D 1 M’ PASANGAN WATER STOP RUBBER LEBAR 150 MM - 200 MM M' 213.530,91

A.4 PEKERJAAN PEMANCANGAN MANUAL (NORMATIF)


AHSP PEMANCANGAN SECARA MANUAL (TANPA MESIN) MENGGUNAKAN TRIPOD DAN
A.4.1
HAMMER
1 F.01 PER-M' PENETRASI TIANG PANCANG KAYU GELONDONGAN Ø 15 - 20 CM M' 82.450,69
2 F.02 PER-M' PENETRASI TIANG PANCANG KAYU ATAU DOLKEN Ø 8-10 CM M' 16.070,24
3 F.03 PER-M’ PENETRASI TIANG PANCANG BAJA PIPA Ø 30 CM ATAU KOTAK 30 X 30 CM M' 43.882,62

F.04 TIANG PANCANG BETON BERTULANG


1 F.04.A PER-M’ PENETRASI TIANG PANCANG BETON KOTAK 20 CM X 20 CM M' 73.601,84
2 F.04.B PER-M' PENETRASI TIANG PANCANG BETON KOTAK 25 X 25 CM M' 82.167,04
3 F.04.C PER-M' PENETRASI TIANG PANCANG BETON KOTAK 30 X 30 CM M' 90.732,24
4 F.04.D PER-M' PENETRASI TIANG PANCANG BETON Ø 40 ATAU KOTAK 40 X 40 CM M' 131.742,16
5 F.04.E PER-M' PENETRASI TIANG PANCANG (HOLLOW) BETON Ø 40 CM M' 119.765,60

F.05 TURAP KAYU


1 F.05.A PER M' PENETRASI UNTUK 1 M’ LEBAR TURAP (10-12,5 BUAH) DOLKEN Ø8-10 M' 128.948,06
2 F.05.B PER-M' PENETRASI UNTUK 1 M' LEBAR TURAP KAYU (10 BUAH) PAPAN (2-3)/10 CM M' 104.372,56
3 F.05.C PER-M' PENETRASI UNTUK 1 M' LEBAR TURAP (5 BUAH) KAYU PAPAN (2-3)/20 CM M' 148.315,21
4 F.05.D PER-M' PENETRASI UNTUK 1 M' LEBAR TURAP (4 BUAH) KAYU PAPAN (2-3)/25 CM M' 152.074,85

5 F.05.E PER-M' PENETRASI UNTUK 1 M' LEBAR TURAP (3,33 BUAH) KAYU PAPAN (2-3)/30 CM M' 157.777,07

6 F.05.F PER-M' PENETRASI UNTUK 1 M' LEBAR TURAP (14 BUAH) KAYU KASO 5/7 TEBAL 5 CM M' 126.198,13

7 F.05.G PER-M' PENETRASI UNTUK 1 M' LEBAR TURAP (20 BUAH) KAYU KASO 5/7 TEBAL 7 CM M' 115.505,71

8 F.05.H PER-M' PENETRASI UNTUK 1 M' LEBAR TURAP (8 BUAH) KAYU BALOK 8/12 TEBAL 8 CM M' 159.007,63

9 F.05.I PER-M' PENETRASI UNTUK 1 M' LEBAR (12,5 BUAH) TURAP KAYU BALOK 8/12 TEBAL 12 CM M' 148.315,21

STANDAR SATUAN HARGA, PEMERINTAH KABUPATEN JEMBER, TAHUN 2021 868


KODE REKENING
NO JENIS PEKERJAAN SATUAN HARGA (Rp)
BELANJA
1 2 3 6 7
F.06 TURAP BAJA
1 F.06.A PER-M' PENETRASI (1 BUAH) TURAP BAJA PROFIL LARSEN LEBAR 350 MM M' 60.716,55

2 F.06.B PER-M' PENETRASI UNTUK 1 M' LEBAR TURAP (7 BUAH) BAJA PROFIL INP-8 + UNP-8 M' 91.235,83

3 F.06.C PER-M' PENETRASI UNTUK 1 M' LEBAR TURAP (5,56 BUAH) BAJA PROFIL INP-10 + UNP-10 M' 82.698,57

F.07 TURAP BETON PRE-CAST


1 F.07.A PER-M' PENETRASI 1 BUAH TURAP BETON PRE-CAST 12 X 30 CM M' 59.734,74
2 F.07.B PER-M' PENETRASI 1 BUAH TURAP BETON PRE-CAST 15 X 40 CM M' 95.575,58
3 F.07.C PER-M' PENETRASI 1 BUAH TURAP BETON PRE-CAST 22 X 50 CM M' 119.469,48

A.4.2 AHSP PEMANCANGAN SECARA MEKANIS


TM.05 PEMANCANGAN SECARA MEKANIS
1 TM.05.1 TIANG PANCANG KAYU GELONDONGAN Ø 15 - 20 CM M' 254.756,63
2 TM.05.2.A TIANG PANCANG BETON KOTAK 20 X 20 CM M' 145.286,40
3 TM.05.2.B PER-M' PENETRASI TIANG PANCANG BAJA Ø 20 CM ATAU KOTAK 20 X 20 M' 147.087,69
4 TM.05.2.C PER-M' PENETRASI TIANG PANCANG BAJA Ø 30 CM ATAU KOTAK 30 X 30 M' 150.842,90
5 TM.05.3.A PER-M' PENETRASI TIANG PANCANG BETON Ø 20 CM /KOTAK 20 X 20 M' 191.234,66
6 TM.05.3.B PER-M' PENETRASI TIANG PANCANG BETON Ø 25 CM ATAU KOTAK 25 X 25 M' 209.593,27
7 TM.05.3.C PER-M' PENETRASI TIANG PANCANG BETON Ø 30 CM / KOTAK 30 X 30 M' 216.375,94
8 TM.05.3.D PER-M' PENETRASI PANCANG BETON Ø 40 CM ATAU KOTAK 40 X 40 M' 262.082,55
9 TM.05.3.E PER-M' PENETRASI TIANG PANCANG BETON HOLLOW Ø 40 CM M' 235.076,16

A.5 PEKERJAAN DEWATERING (NORMATIF)


A.5.1 AHSP PEKERJAAN DEWATERING (NORMATIF)
1 D.01 KISTDAM PASIR/TANAH

2 D.01.A 1 BUAH KISTDAM PASIR/TANAH DIBUNGKUS KARUNG PLASTIK BAGOR 43 CM X 65 CM BUAH 44.485,96

1 BUAH KISTDAM PASIR/TANAH DIBUNGKUS KARUNG PLASTIK/BAGOR/GONI ATAU TERPAL


3 D.01.B BUAH 63.597,88
UKURAN 45 X 120 CM
4 D.01.C 1 BUAH GEOBAG PASIR/TANAH UKURAN 145 X 240 CM BUAH 904.248,11
5 D.02 KERANGKA KAYU UNTUK 1 M3 KISTDAM PASIR/TANAH UKURAN 43 CM X 65 CM M2 366.174,48
KERANGKA BAJA PROFIL L.50.50.5 ATAU L.60.60.6 ATAU PROFIL BESI BERLUBANG UNTUK 1
6 D.03 M2 317.568,04
M3 KISTDAM PASIR/TANAH DENGAN KARUNG UKURAN 43 CM X 65 CM.
PENGOPERASIAN PER-JAM POMPA AIR DIESEL DAYA 5 KW DENGAN SUCTION HEAD MAKS. 3
7 D.04 M DAN DISCHARGE HEAD MAKS. 20 M (KAPASITAS 0,5 M3/S PADA SUCTION HEAD 1 M DAN JAM 56.820,64
DISCHARGE HEAD 10 M).
PENGOPERASIAN PER-JAM POMPA AIR DIESEL DAYA 10 KW DENGAN SUCTION HEAD
8 D.05 MAKSIMAL 3 M DAN DISCHARGE HEAD MAKSIMAL 20 M (KAPASITAS 1,0 M3/S PADA SUCTION JAM 107.525,72
HEAD 1 M DAN DISCHARGE HEAD 10 M)
PENGOPERASIAN PER-JAM POMPA AIR DIESEL DAYA 20 KW DENGAN SUCTION HEAD
9 D.06 MAKSIMAL 3 M DAN DISCHARGE HEAD MAKSIMAL 20 M (KAPASITAS 2,0 M3/S PADA SUCTION JAM 404.418,34
HEAD 1 M DAN DISCHARGE HEAD 10 M).

A.6 PEKERJAAN PINTU AIR (NORMATIF)

A.6.1 BIAYA PEMASANGAN (JIKA HARGA PINTU AIR BELUM TERMASUK HARGA PEMASANGAN)

H.01 PINTU ANGKAT


1 H.01.A PINTU ANGKAT LEBAR B=200 MM; H=250 MM; H1=500 MM DAN TR=1050 MM. BUAH 4.719.844,23

H.02 PINTU SORONG KAYU

1 H.02.A PINTU SORONG KAYU LEBAR B = 1500 MM; H = 1500 MM; H1 = 3000 MM DAN TR = 3800 MM BUAH 8.960.002,71

H.03 PINTU SORONG BAJA

1 H.03.A PINTU SORONG BAJA LEBAR B = 500 MM; H = 500 MM; H1 = 1000 MM DAN TR = 1900 MM BUAH 5.564.686,92

A.6.2 BIAYA OP UNTUK PELUMASAN PINTU AIR


AHSP PELUMASAN PINTU AIR (PELAKSANAAN PELUMASAN DILAKUKAN SETIAP 2 MINGGU
H.04
SEKALI ATAU 26 KALI/TAHUN)
1 H.04.A PINTU ANGKAT LOT 15.132,99

H.04.B PINTU SORONG KAYU DENGAN RODA GIGI


1 H.04.B.1) STANG TUNGGAL < 1 M LOT 28.369,59
2 H.04.B.2) STANG DOUBLE < 1 M LOT 43.822,39
3 H.04.B.3) STANG TUNGGAL 1 - 2 M LOT 42.752,79
STANDAR SATUAN HARGA, PEMERINTAH KABUPATEN JEMBER, TAHUN 2021 869
KODE REKENING
NO JENIS PEKERJAAN SATUAN HARGA (Rp)
BELANJA
1 2 3 6 7
4 H.04.B.4) STANG DOUBLE 1 - 2 M LOT 70.522,43
5 H.04.B.5) STANG TUNGGAL > 2 M LOT 69.302,99
6 H.04.B.6) STANG DOUBLE > 2 M LOT 110.771,19

H.04.C PINTU SORONG BAJA DENGAN RODA GIGI


1 H.04.C.1) STANG TUNGGAL < 1 M LOT 43.372,28
2 H.04.C.2) STANG DOUBLE < 1 M LOT 71.657,18
3 H.04.C.3) STANG TUNGGAL 1 - 2 M LOT 70.587,58
4 H.04.C.4) STANG DOUBLE 1 - 2 M LOT 112.740,42
5 H.04.C.5) STANG TUNGGAL > 2 M LOT 111.455,83
6 H.04.C.6) STANG DOUBLE > 2 M LOT 180.608,98

A.8 PEKERJAAN LAIN-LAIN (NORMATIF/INFORMATIF)


A.8.1 AHSP PEKERJAAN LAIN-LAIN (NORMATIF/INFORMATIF)
LA.01 PEMAGARAN DAERAH KERJA
1 LA.01.A RANGKA BAJA L.40.40.4 M2 436.166,83
2 LA.01.B RANGKA KAYU M2 570.784,91

LA.03 PEMBUATAN PAPAN NAMA PEKERJAAN


1 BUAH PAPAN NAMA PEKERJAAN MENGGUNAKAN MULTIFLEX 18 MM, FRAME BESI SIKU
1 LA.03.A BUAH 1.595.002,95
DAN TIANG KAYU 8/12
1 BUAH PAPAN NAMA PEKERJAAN MENGGUNAKAN MULTIFLEX 10 MM, FRAME ALLUMUNIUM
2 LA.03.B BUAH 621.123,25
SIKU DAN TIANG KAYU 5/7, PRINTING BANNER PLASTIK

LA.04 MOBILISASI
LA.04.A INVESTIGASI LAPANGAN SET 1.271.635,96
LA.09 1 M2 PENGANGKATAN GULMA DAN/ATAU SAMPAH APUNG
1 LA.09.A SECARA MANUAL M2 3.650,10
2 LA.09.B SECARA MEKANIS M2 827,02

LA.10 1 M3 PENGANGKATAN GULMA PADAT, KETEBALAN 25 CM


1 LA.10.A SECARA MANUAL M3 60.835,00
2 LA.10.B SECARA MEKANIS M3 23.271,69

LA.11 PEKERJAAN KAYU


LA.11.A SECARA MANUAL
1 LA.11.A.1) 1 M2 PEKERJAAN SERUTAN PAPAN ATAU BALOK KAYU (MANUAL) M2 28.905,25
2 LA.11.A.2) 1 M2 MEMBUAT PASANGAN/KONSTRUKSI KAYU DARI BAHAN BAKU PAPAN KAYU M2 323.973,69
1 M' PEMBUATAN PROFIL PADA SUDUT KAYU DENGAN ALAT SERUTAN PROFIL,
3 LA.11.A.3) M' 5.284,83
TAKIKAN/SAMBUNGAN DENGAN PAHAT DAN LAIN-LAIN.
1 M3 MEMBUAT PASANGAN/KONSTRUKSI KAYU DARI BAHAN BAKU BALOK KAYU KELAS II
4 LA.11.A.4) M3 1.581.256,61
DAN/ATAU III

LA.11.B SECARA SEMI MEKANIS


1 LA.11.B.1) 1 M2 PEKERJAAN SERUTAN PAPAN ATAU BALOK KAYU (SEMI MEKANIS) M3 15.364,00
1 M3 MEMBUAT PASANGAN/KONSTRUKSI KAYU DARI BAHAN BAKU PAPAN ATAU BALOK
2 LA.11.B.2) M3 640.644,59
KAYU (SEMI MEKANIS)

LA.12 PEKERJAAN LOGAM BESI ATAU BAJA


1 LA.12.A PEMASANGAN 1 KG BESI PROFIL SIKU, IWF, INP, UNP KG 32.348,64
2 LA.12.B PENGERJAAN 100 KG PEKERJAAN PERAKITAN KONSTRUKSI BESI/BAJA KG 132.555,33
3 LA.12.C PENGERJAAN 10 CM PENGELASAN DENGAN LAS LISTRIK CM 37.693,95

II.B BIDANG BINA MARGA


ANALISIS HARGA SATUAN PEKERJAAN (AHSP) BIDANG BINA MARGA
DIVISI 2. DRAINASE
1 2.1.(1) GALIAN UNTUK SELOKAN DRAINASE DAN SALURAN AIR M3 48.476,83
2 2.2.(1) PASANGAN BATU DENGAN MORTAR M3 1.016.269,84
3 2.3.(1) GORONG-GORONG PIPA BETON TANPA TULANGAN DIAMETER DALAM 20 CM M1 159.172,39
4 2.3.(2) GORONG-GORONG PIPA BETON TANPA TULANGAN DIAMETER DALAM 25 CM M1 219.492,82
5 2.3.(3) GORONG-GORONG PIPA BETON TANPA TULANGAN DIAMETER DALAM 30 CM M1 265.417,38
6 2.3.(4) GORONG-GORONG PIPA BETON BERTULANG, DIAMETER DALAM 40 CM M1 625.750,80
7 2.3.(5) GORONG-GORONG PIPA BETON BERTULANG, DIAMETER DALAM 60 CM M1 913.298,55
8 2.3.(6) GORONG-GORONG PIPA BETON BERTULANG, DIAMETER DALAM 80 CM M1 1.503.541,23
9 2.3.(7) GORONG-GORONG PIPA BETON BERTULANG, DIAMETER DALAM 100 CM M1 2.021.561,62
10 2.3.(8) GORONG-GORONG PIPA BETON BERTULANG, DIAMETER DALAM 120 CM M1 2.653.087,08
11 2.3.(9) GORONG-GORONG PIPA BETON BERTULANG, DIAMETER DALAM 150 CM M1 3.836.829,83
12 2.3.(10) GORONG-GORONG PIPA BAJA BERGELOMBANG TON 19.909.273,74

STANDAR SATUAN HARGA, PEMERINTAH KABUPATEN JEMBER, TAHUN 2021 870


KODE REKENING
NO JENIS PEKERJAAN SATUAN HARGA (Rp)
BELANJA
1 2 3 6 7
13 2.3.(11) GORONG-GORONG KOTAK BETON BERTULANG, UKURAN DALAM 40 CM X 40 CM M1 607.324,83
14 2.3.(12) GORONG-GORONG KOTAK BETON BERTULANG, UKURAN DALAM 50 CM X 50 CM M1 810.094,41
15 2.3.(13) GORONG-GORONG KOTAK BETON BERTULANG, UKURAN DALAM 60 CM X 60 CM M1 1.042.655,18
16 2.3.(14) GORONG-GORONG KOTAK BETON BERTULANG, UKURAN DALAM 80 CM X 80 CM M1 1.661.575,58

17 2.3.(15) GORONG-GORONG KOTAK BETON BERTULANG, UKURAN DALAM 100 CM X 100 CM M1 2.956.049,32

18 2.3.(16) GORONG-GORONG KOTAK BETON BERTULANG, UKURAN DALAM 120 CM X 120 CM M1 4.607.306,39

19 2.3.(17) GORONG-GORONG KOTAK BETON BERTULANG, UKURAN DALAM 140 CM X 140 CM M1 7.645.262,96

20 2.3.(18) GORONG-GORONG KOTAK BETON BERTULANG, UKURAN DALAM 150 CM X 150 CM M1 9.278.451,55

21 2.3.(19) GORONG-GORONG KOTAK BETON BERTULANG, UKURAN DALAM 160 CM X 160 CM M1 11.804.191,05

22 2.3.(20) GORONG-GORONG KOTAK BETON BERTULANG, UKURAN DALAM 180 CM X 180 CM M1 17.341.588,79

23 2.3.(21) GORONG-GORONG KOTAK BETON BERTULANG, UKURAN DALAM 200 CM X 200 CM M1 24.751.759,57

24 2.3.(22) SALURAN BERBENTUK U TIPE DS 1 M1 1.264.981,27


25 2.3.(23) SALURAN BERBENTUK U TIPE DS 1A (DENGAN TUTUP) M1 1.580.196,49
26 2.3.(24) SALURAN BERBENTUK U TIPE DS 2 M1 1.310.012,01
27 2.3.(25) SALURAN BERBENTUK U TIPE DS 2A (DENGAN TUTUP) M1 1.670.257,98
28 2.3.(26) SALURAN BERBENTUK U TIPE DS 3 M1 1.355.042,76
29 2.3.(27) SALURAN BERBENTUK U TIPE DS 3A (DENGAN TUTUP) M1 1.760.319,47
30 2.3.(28) SALURAN BERBENTUK U TIPE DS 4 M1 1.445.104,25
31 2.3.(29) SALURAN BERBENTUK U TIPE DS 4A (DENGAN TUTUP) M1 1.940.442,45
32 2.3.(30) SALURAN BERBENTUK U TIPE DS 5 M1 1.535.165,74
33 2.3.(31) SALURAN BERBENTUK U TIPE DS 5A (DENGAN TUTUP) M1 2.120.565,44
34 2.3.(32) SALURAN BERBENTUK U TIPE DS 6 M1 1.535.165,74
35 2.3.(33) SALURAN BERBENTUK U TIPE DS 6A (DENGAN TUTUP) M1 2.120.565,44
36 2.3.(34) PASANGAN BATU TANPA ADUKAN (AANSTAMPING) M3 1.910.712,33
37 2.4.(1) BAHAN DRAINASE POROUS ATAU PENYARING (FILTER) M3 435.893,84
PIPA BERLUBANG BANYAK (PERFORATED PIPE) UNTUK PEKERJAAN DRAINASE BAWAH
38 2.4.(2) M1 130.239,32
PERMUKAAN, DIAMETER 4 INCH
PIPA BERLUBANG BANYAK (PERFORATED PIPE) UNTUK PEKERJAAN DRAINASE BAWAH
39 2.4.(3) M1 138.153,05
PERMUKAAN, DIAMETER 5 INCH
PIPA BERLUBANG BANYAK (PERFORATED PIPE) UNTUK PEKERJAAN DRAINASE BAWAH
40 2.4.(4) M1 177.804,18
PERMUKAAN, DIAMETER 6 INCH
PIPA BERLUBANG BANYAK (PERFORATED PIPE) UNTUK PEKERJAAN DRAINASE BAWAH
41 2.4.(5) M1 220.505,41
PERMUKAAN, DIAMETER 8 INCH

DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK


1 3.1.(1) GALIAN BIASA M3 14.320,87
2 3.1.(2) GALIAN BATU LUNAK M3 32.836,53
3 3.1.(3) GALIAN BATU M3 83.262,56
4 3.1.(4) GALIAN STRUKTUR DENGAN KEDALAMAN 0 - 2 METER M3 177.320,45
5 3.1.(5) GALIAN STRUKTUR DENGAN KEDALAMAN 2 - 4 METER M3 934.312,90
6 3.1.(6) GALIAN STRUKTUR DENGAN KEDALAMAN 4 - 6 METER M3 1.149.134,35
7 3.1.(7) GALIAN PERKERASAN BERASPAL DENGAN COLD MILLING MACHINE M3 155.488,36
8 3.1.(8) GALIAN PERKERASAN BERASPAL TANPA COLD MILLING MACHINE M3 567.318,11
9 3.1.(9) GALIAN PERKERASAN BERBUTIR M3 17.738,62
10 3.1.(10). GALIAN PERKERASAN BETON M3 559.044,31
11 3.2.(1A) TIMBUNAN BIASA DARI SUMBER GALIAN M3 98.872,97
12 3.2.(1B) TIMBUNAN BIASA DARI HASIL GALIAN M3 60.829,04
13 3.2.(2A) TIMBUNAN PILIHAN DARI SUMBER GALIAN M3 127.520,89
14 3.2.(2B) TIMBUNAN PILIHAN DARI GALIAN M3 71.710,33
15 3.2.(3A) TIMBUNAN PILIHAN (DIUKUR DIATAS BAK TRUK) M3 229.512,02
16 3.2.(3B) TIMBUNAN PILIHAN (DIUKUR DENGAN ROD & PLATE) M3 273.930,74
17 3.2.(4) PENIMBUNAN KEMBALI BERBUTIR (GRANULAR BACKFILL) M3 321.270,01
18 3.3.(1) PENYIAPAN BADAN JALAN M2 16.757,71
19 3.4.(1) PEMBERSIHAN DAN PENGUPASAN LAHAN M2 15.017,56
20 3.4.(2) PEMOTONGAN POHON PILIHAN DIAMETER 15 – 30 CM BUAH 14.469,34
21 3.4.(3) PEMOTONGAN POHON PILIHAN DIAMETER > 30 – 50 CM BUAH 52.994,44
22 3.4.(4) PEMOTONGAN POHON PILIHAN DIAMETER > 50 – 75 CM BUAH 147.821,31
23 3.4.(5) PEMOTONGAN POHON PILIHAN DIAMETER > 75 CM BUAH 367.911,32
24 3.5.(1) GEOTEKSTIL FILTER UNTUK DRAINAGE BAWAH PERMUKAAN (KELAS 2) M2 108.291,82
25 3.5.(2A) GEOTEKSTIL SEPARATOR KELAS 1 M2 131.188,21
26 3.5.(2B) GEOTEKSTIL SEPARATOR KELAS 2 M2 141.558,51
STANDAR SATUAN HARGA, PEMERINTAH KABUPATEN JEMBER, TAHUN 2021 871
KODE REKENING
NO JENIS PEKERJAAN SATUAN HARGA (Rp)
BELANJA
1 2 3 6 7
27 3.5.(2C) GEOTEKSTIL SEPARATOR KELAS 3 M2 153.758,86
28 3.5.(3) GEOTEKSTIL STABILISATOR (KELAS 1) M2 173.089,90

DIVISI 4. PEKERJAAN PREVENTIF


4.1 PENGABUTAN ASPAL EMULSI (FOG SEAL)
PENGABUTAN (FOG SEAL) DENGAN ASPAL EMULSI YANG MENGIKAT LAMBAT (CSS-1H ATAU
1 4.1.(1) LITER 16.957,16
SS-1H)
PENGABUTAN (FOG SEAL) DENGAN ASPAL EMULSI YANG MENGIKAT LEBIH CEPAT (CQS-1H
2 4.1.(2) LITER 16.957,16
ATAU QS-1H)
PENGABUTAN (FOG SEAL) DENGAN ASPAL EMULSI MODIFIKASI POLYMER YANG MENGIKAT
3 4.1.(3) LITER 16.957,84
LEBIH CEPAT (PMCQS-1H ATAU PMQS-1H)

4.2 LABURAN ASPAL (BURAS)


1 4.2.(1) LABURAN ASPAL (BURAS) M2 17.954,95

1 4.4 LAPIS PENUTUP BUBUR ASPAL EMULSI (EMULSIFIED ASPHALT SLURRY SEAL)
2 4.4.(1) PENGHAMPARAN LAPIS PENUTUP BUBUR ASPAL EMULSI, TIPE 1, CSS-1H SS-1H M2 29.773,72
3 4.4.(2) PENGHAMPARAN LAPIS PENUTUP BUBUR ASPAL EMULSI, TIPE 1, CQS-1H QS-1H M2 21.911,74
4 4.4.(3) PENGHAMPARAN LAPIS PENUTUP BUBUR ASPAL EMULSI, TIPE 2, CSS-1H SS-1H M2 24.649,64
5 4.4.(4) PENGHAMPARAN LAPIS PENUTUP BUBUR ASPAL EMULSI, TIPE 2, CQS-1H QS-1H M2 24.649,64
6 4.4.(5) PENGHAMPARAN LAPIS PENUTUP BUBUR ASPAL EMULSI, TIPE 3, CSS-1H SS-1H M2 25.549,47
7 4.4.(6) PENGHAMPARAN LAPIS PENUTUP BUBUR ASPAL EMULSI, TIPE 3, CQS-1H QS-1H M2 25.904,10

4.5 LAPIS PERMUKAAN MIKRO ASPAL EMULSI MODIFIKASI POLIMER (MICRO SURFACING)

LAPIS PERMUKAAN MIKRO DENGAN ASPAL EMULSI MODIFIKASI POLYMER PMCQS-1H ATAU
1 4.5.(1) M2 8.036,73
PMCQS-1H UNTUK TIPE 1
LAPIS PERMUKAAN MIKRO PERATA DENGAN ASPAL EMULSI MODIFIKASI POLYMER PMCQS-
2 4.5.(2) TON 73.408,78
1H ATAU PMCQS-1H UNTUK TIPE 1
LAPIS PERMUKAAN MIKRO DENGAN ASPAL EMULSI MODIFIKASI POLYMER PMCQS-1H ATAU
3 4.5.(3) M2 8.654,69
PMCQS-1H UNTUK TIPE 2
LAPIS PERMUKAAN MIKRO PERATA DENGAN ASPAL EMULSI MODIFIKASI POLYMER PMCQS-
4 4.5.(4) TON 42.890,49
1H ATAU PMCQS-1H UNTUK TIPE 2

4.6 LAPIS TIPIS ASPAL PASIR


1 4.6.(1) LATASIR KELAS A (SS-A) TON 1.975.547,04
2 4.6.(2) LATASIR KELAS B (SS-B) TON 2.337.756,38

4.7 LAPIS TIPIS BETON ASPAL (LTBA) DAN STONE MATRIX ASPHALT TIPIS (SMA TIPIS)
1 4.7.(1) LAPIS TIPIS BETON ASPAL - A (LTBA-A) TON 1.697.712,24
2 4.7.(2) LAPIS TIPIS BETON ASPAL - B HALUS (LTBA-B HALUS) TON 1.531.892,59
3 4.7.(3) LAPIS TIPIS BETON ASPAL - B HALUS (LTBA-B KASAR) TON 1.351.854,64
4 4.7.(4) LAPIS TIPIS BETON ASPAL - B HALUS MODIFIKASI KASAR (LTBA-B MOD KASAR) TON 1.405.920,62
5 4.7.(5) STONE MATRIX ASPHALT TIPIS (SMA TIPIS) TON 2.235.935,59
6 4.7.(6) STONE MATRIX ASPHALT MODIFIKASI TIPIS (SMA MOD TIPIS) TON 2.267.921,42

4.8 PENAMBALAN DANGKAL PERKERASAN BETON SEMEN BERSAMBUNG TANPA TULANGAN

TAMBALAN DANGKAL DENGAN BETON SEMEN CEPAT MENGERAS UNTUK PEMBBUKAAN


1 4.8.(1) M3 572.324,28
LALU LINTAS UMUR BETON < 24 JAM

TAMBALAN DANGKAL DENGAN BETON SEMEN CEPAT MENGERAS UNTUK PEMBUKAAN LALU
2 4.8.(2) M3 420.071,97
LINTAS UMUR BETON LEBIH DARI 1 HARI DAN KURANG DARI 3 HARI

TAMBAHAN DANGKAL DENGAN BETON SEMEN CEPAT MENGERAS UNTUK PEMBUKAAN LALU
3 4.8.(3) M3 372.429,29
LINTAS UMUR BETON LEBIH DARI 3 HARI DAN KURANG DARI 7 HARI

4.9 PENAMBALAN PENUH PERKERASAN BETON SEMEN BERSAMBUNG TANPA TULANGAN

TAMBALAN PENUH DENGAN BETON SEMEN CEPAT MENGERAS UNTUK PEMBUKAAN LALU
1 4.9.(1) M3 15.285.376,58
LINTAS UMUR BETON < 24 JAM

TAMBALAN PENUH DENGAN BETON SEMEN CEPAT MENGERAS UNTUK PEMBUKAAN LALU
2 4.9.(2) M3 14.823.915,84
LINTAS UMUR BETON LEBIH DARI 1 HARI DAN KURANG DARI 3 HARI

TAMBALAN PENUH DENGAN BETON SEMEN CEPAT MENGERAS UNTUK PEMBUKAAN LALU
3 4.9.(3) M3 14.820.206,40
LINTAS UMUR BETON LEBIH DARI 3 HARI DAN KURANG DARI 7 HARI

4 4.9.(4) PEMASANGAN RUJI (DOWEL) BUAH 360.084,38


STANDAR SATUAN HARGA, PEMERINTAH KABUPATEN JEMBER, TAHUN 2021 872
KODE REKENING
NO JENIS PEKERJAAN SATUAN HARGA (Rp)
BELANJA
1 2 3 6 7
5 4.9.(5) PEMASANGAN SEALANT M1 947,63

4.10 PENAMBAHAN PENYALURAB BEBAN PADA PERKERASAN BETON SEMEN (DOWEL RETROFIT)

PENAMBAHAN DAN/ATAU PENGGANTIAN RUJI (DOWEL) PADA PERKERASAN BETON SEMEN


1 4.10.(1) BUAH 382.682,81
DENGAN EPOKSI

PENJAHITAN MELINTANG PADA PEMELIHARAAN PERKERASAN BETON SEMEN (CROSS


4.11
STITCHING
1 4.11.(1) PENJAHITAN MELINTANG TIPE 1 (TABEL PELAT BETON = 150 - 175 MM) BUAH 322.729,18

PENUTUPAN ULANG SAMBUNGAN DAN PENUTUPAN RETAK PADA PERKERASAN BETON


4.12
SEMEN (JOINT AND CRACK SEALINGS
1 4.12.(1) PENUTUPAN SAMBUNGAN MELINTANG (TERMOPLASTIK) M1 109.360,85
2 4.12.(2) PENUTUPAN SAMBUNGAN MELINTANG (TERMOSETING) M1 178.350,46
3 4.12.(3) PENUTUPAN SAMBUNGAN MELINTANG (PREFORMED) M1 838.071,10

PENSTABILAN DAN PENGEMBALIAN ELEVASI PELAT BETON DENGAN CARA INJEKSI PADA
4.13
PERKERASAN BETON SEMEN
1 4.13.(1) PENGEBORAN LUBANG BUAH 3.518,76
2 4.13.(2) MATERIAL INJEKSI BERBAHAN DASAR SEMEN KG 480.988,48
3 4.13.(3) MATERIAL INJEKSI BERBAHAN DASAR CELLULAR KG 515.960,29

DIVISI 5. PERKERASAN BERBUTIR


1 5.1.(1) LAPIS PONDASI AGREGAT KELAS A M3 392.122,78
2 5.1.(2) LAPIS PONDASI AGREGAT KELAS B M3 348.408,20
3 5.1.(3) LAPIS PONDASI AGREGAT KELAS S M3 300.516,00
4 5.1.(4) LAPIS DRAINASE M3 380.191,05
5 5.2,(1) LAPIS PERMUKAAN AGREGAT TANPA PENUTUP ASPAL M3 516.586,81
6 5.2,(2) LAPIS PONDASI AGREGAT TANPA PENUTUP ASPAL M3 352.263,57
7 5.3.(1.A) PERKERASAN BETON SEMEN (PPC) M3 1.669.884,06
8 5.3.(1.A) PERKERASAN BETON SEMEN (OPC TIPE I + FLY ASH) M3 1.715.517,29
9 5.3.(1.B) PERKERASAN BETON SEMEN FAST TRACK 8 JAM M3 3.847.696,17
10 5.3.(1.C) PERKERASAN BETON SEMEN FAST TRACK 24 JAM M3 3.326.359,97
11 5.3.(2.A) PERKERASAN BETON SEMEN DENGAN ANYAMAN TULANGAN TUNGGAL M3 2.138.715,57

12 5.3.(2.B) PERKERASAN BETON SEMEN FAST TRACK 8 JAM DENGAN ANYAMAN TULANGAN TUNGGAL M3 4.262.689,80

13 5.3.(2.C) PERKERASAN BETON SEMEN FAST TRACK 24 JAM DENGAN ANYAMAN TULANGAN TUNGGAL M3 3.807.649,29

14 5.3.(3) LAPIS PONDASI BAWAH BETON KURUS (CONCRETE VIBRATOR) M3 1.322.199,65


15 5.4.(1) STABILISASI TANAH DASAR DENGAN SEMEN TON 601.098,44
16 5.4.(2) LAPIS FONDASI TANAH SEMEN M3 645.885,22
17 5.5.(1) LAPIS FONDASI AGREGAT SEMEN KELAS A (CEMENT TREATED BASE = CTB) M3 513.675,30

18 5.5.(2) LAPIS FONDASI AGREGAT SEMEN KELAS B (CEMENT TREATED SUB-BASE = CTSB) M3 433.206,19

DIVISI 6. PERKERASAN ASPAL


1 6.1 (1) LAPIS RESAP PENGIKAT - ASPAL CAIR/EMULSI LITER 27.755,74
2 6.1 (2A) LAPIS PEREKAT - ASPAL CAIR/EMULSI LITER 27.925,48
3 6.1 (2B) LAPIS PEREKAT - ASPAL EMULSI MODIFIKASI POLIMER LITER 29.370,26
4 6.2 (1) AGREGAT PENUTUP BURTU M2 6.337,41
5 6.2 (2) AGREGAT PENUTUP BURDA M2 8.766,72
6 6.2 (3A) BAHAN ASPAL KERAS UNTUK PEKERJAAN PELABURAN LITER 16.579,01
7 6.2 (3B) BAHAN ASPAL EMULSI MODIFIKASI UNTUK PEKERJAAN PELABURAN LITER 25.447,72
8 6.2 (4A) ASPAL CAIR UNTUK PRECOATED LITER 18.356,63
9 6.2 (4B) ASPAL EMULSI UNTUK PRECOATED LITER 16.532,68
10 6.2 (4C) ASPAL EMULSI MODIFIKASI POLIMER UNTUK PRECOATED LITER 16.532,68
11 6.3 (1A) STONE MATRIX ASPHALT HALUS (SMA HALUS) TON 1.568.859,26
12 6.3 (1B) STONE MATRIX ASPHALT MODIFIKASI HALUS (SMA MOD HALUS) TON 1.600.584,85
13 6.3 (2A) STONE MATRIX ASPHALT KASAR (SMA KASAR) TON 1.554.686,18
14 6.3 (2B) STONE MATRIX ASPHALT MODIFIKASI KASAR (SMA MOD KASAR) TON 1.578.933,20
15 6.3(3) LATASTON LAPIS AUS (HRS-WC) TON 1.747.373,13
16 6.3.(4) LATASTON LAPIS FONDASI (HRS-BASE) TON 1.487.527,29
17 6.3(5A) LASTON LAPIS AUS (AC-WC) TON 1.473.900,47
18 6.3(5B) LASTON LAPIS AUS MODIFIKASI (AC-WC MOD) TON 1.498.182,74
19 6.3(6A) LASTON LAPIS ANTARA (AC-BC) TON 1.385.312,37
20 6.3(6B) LASTON LAPIS ANTARA MODIFIKASI (AC-BC MOD) TON 1.409.245,46
21 6.3(7A) LASTON LAPIS FONDASI (AC-BASE) TON 1.251.006,25

STANDAR SATUAN HARGA, PEMERINTAH KABUPATEN JEMBER, TAHUN 2021 873


KODE REKENING
NO JENIS PEKERJAAN SATUAN HARGA (Rp)
BELANJA
1 2 3 6 7
22 6.3(7B) LASTON LAPIS FONDASI MODIFIKASI (AC-BASE MOD) TON 1.275.297,01
23 6.3.(8) BAHAN ANTI PENGELUPASAN KG 122.003,50
24 6.4.(1A) LASTON HANGAT PEN.60-70, WMAC LAPIS AUS (WMAC-WC) DENGAN ZEOLIT TON 1.552.292,75
25 6.4.(1B) LASTON HANGAT PEN.60-70, WMAC LAPIS AUS (WMAC-WC) DENGAN WAX TON 1.509.252,78
26 6.4.(2A) LASTON HANGAT PEN.60-70, WMAC LAPIS ANTARA (WMAC-BC) DENGAN ZEOLIT TON 1.466.278,43
27 6.4.(2B) LASTON HANGAT PEN.60-70, WMAC LAPIS ANTARA (WMAC-BC) DENGAN WAX TON 1.419.477,43

28 6.4.(3A) LASTON HANGAT PEN.60-70, WMAC LAPIS FONDASI (WMAC-BASE) DENGAN ZEOLIT TON 1.330.520,88

29 6.4.(3B) LASTON HANGAT PEN.60-70, WMAC LAPIS FONDASI (WMAC-BASE) DENGAN WAX TON 1.287.850,84
30 6.5.(1) LASTON LAPIS AUS ASBUTON (AC-WC ASB) TON 1.441.247,18
31 6.5.(2) LASTON LAPIS ANTARA ASBUTON (AC-BC ASB) TON 1.354.419,13
32 6.6.(1) CPHMA KEMASA KANTONG TON 1.161.531,17
33 6.7.(1) LAPIS PENETRASI MACADAM M3 2.039.143,39
34 6.7.(2) LAPIS PENETRASI MACADAM ASBUTON M3 1.500.654,56

DIVISI 7. STRUKTUR
1 7.1 (1) BETON STRUKTUR, FC’50 MPA M3 2.695.859,45
2 7.1 (2) BETON STRUKTUR, FC’45 MPA M3 2.634.311,14
3 7.1 (3) BETON STRUKTUR, FC’40 MPA M3 2.563.145,31
4 7.1 (4) BETON STRUKTUR, FC’35 MPA M3 2.491.488,97
5 7.1 (5A) BETON STRUKTUR, FC’30 MPA M3 2.423.866,58
6 7.1 (5B) BETON STRUKUTR BERVOLOME BESAR, FC'30 MPA M3 2.474.285,52
7 7.1 (5C) BETON STRUKUTR MEMADAT SENDIRI, FC'30 MPA M3 2.424.342,92
8 7.1 (6A) BETON STRUKTUR, FC’25 MPA M3 2.337.124,74
9 7.1 (6B) BETON STRUKTUR BERVOLUME BESAR, FC’25 MPA M3 2.409.971,49
10 7.1 (6C) BETON STRUKTUR MEMADAT SENDIRI, FC’25 MPA M3 2.388.195,80
11 7.1 (7A) BETON STRUKUR, FC’20 MPA M3 2.502.841,96
12 7.1 (7B) BETON STRUKUT BERVOLUME BESAR, FC’20 MPA M3 2.575.688,71
13 7.1 (7C) BETON STRUKUT MEMADAT SENDIRI, FC’20 MPA M3 2.582.256,30
14 7.1 (7D) BETON STRUKUT, FC’20 MPA YANG DILAKSANAKAN DI AIR M3 5.623.726,45
15 7.1 (8) BETON , FC’15 MPA M3 2.499.766,08
16 7.1 (9) BETON SIKLOP, FC’15 MPA M3 970.136,41
17 7.1 (10) BETON, FC’10 MPA M3 2.464.135,41
18 7.2 (1A) PENYEDIAAN UNIT PRACETAK GELAGAR TIPE I BENTANG 16 METER BUAH 159.066.232,46
19 7.2 (1B) PENYEDIAAN UNIT PRACETAK GELAGAR TIPE I BENTANG 25 METER BUAH 260.323.218,43
20 7.2 (2A) PEMASANGAN UNIT PRACETAK GELAGAR TIPE I BENTANG 16 METER BUAH 7.849.413,85
21 7.2 (2B) PEMASANGAN UNIT PRACETAK GELAGAR TIPE I BENTANG 25 METER BUAH 9.893.199,39
22 7.2 (3A) PENYEDIAAN UNIT PRACETAK GELAGAR TIPE U BENTANG 16 METER BUAH 428.696.283,66
23 7.2 (4A) PEMASANGAN UNIT PRACETAK GELAGAR TIPE U BENTANG 16 METER BUAH 9.893.199,39
24 7.2.(7) BAJA PRATEGANG KG 576.128,09
25 7.2.(12A) PENYEDIAAN PANEL FULL DEPTH SLAB BUAH 1.431.612,56
26 7.2.(12B) PENMASANGAN PANEL FULL DEPTH SLAB BUAH 720.514,49
27 7.3 (1) BAJA TULANGAN POLOS-BJTP 280 KG 18.948,55
28 7.3 (2) BAJA TULANGAN SIRIP BJTS 280 KG 18.948,55
29 7.3 (3) BAJA TULANGAN SIRIP BJTS 420A KG 18.948,55
30 7.3 (4) BAJA TULANGAN SIRIP BJTS 420B KG 18.948,55
31 7.3 (5) BAJA TULANGAN SIRIP BJTS 520 KG 18.948,55
32 7.3 (6) BAJA TULANGAN SIRIP BJTS 550 KG 18.948,55
33 7.3 (7) BAJA TULANGAN SIRIP BJTS 700 KG 18.948,55
34 7.3 (8) ANYAMAN KAWAT YANG DILAS (WELDED WIRE MESH) KG 21.433,64
35 7.4 (1A) PENYEDIAAN BAJA STRUKTUR GRADE 250 (KUAT LELEH 250 MPA) KG 15.275,73
36 7.4 (1B) PENYEDIAAN BAJA STRUKTUR GRADE 345 (KUAT LELEH 345 MPA) KG 15.275,73
37 7.4 (1C) PENYEDIAAN BAJA STRUKTUR GRADE 485 (KUAT LELEH 485 MPA) KG 15.275,73

38 7.4 (1D) PENYEDIAAN BAJA STRUKTUR GRADE 690 (KUAT LELEH 690 MPA UNTUK TEBAL PELAT < 2,5) KG 15.275,73

PENYEDIAAN BAJA STRUKTUR GRADE 690 (KUAT LELEH 620 MPA UNTUK TEBAL PELAT < 2,5-
39 7.4 (1E) KG 15.275,73
4,0 INCH)
40 7.4 (2) PEMASANGAN BAJA STRUKTUR KG 3.028,68
41 7.4 (3) PENYEDIAAN STRUKTUR JEMBATAN RANGKA BAJA STANDAR …… M KG 15.275,73
42 7.4 (4) PEMASANGAN JEMBATAN RANGKA BAJA STANDAR PANJANG ….. M KG 17.834,93
43 7.4 (5A) PEMASANGAN JEMBATAN RANGKA BAJA YANG DISEDIAKAN PENGGUNA JASA KG 3.028,68
44 7.4 (5B) PENGANGKUTAN BAHAN JEMBATAN YANG DISEDIAKAN PENGGUNA JASA KG 15.275,73
45 7.5.(1) TIANG BOR SEKAN PRIMER DIAMETER 80 CM (FC' > 15 MPA) M1 1.912.629,88
46 7.5.(2) TIANG BOR SEKAN SEKUNDER DIAMETER 80 CM (FC' > 30 MPA) M1 2.825.736,15
47 7.5.(3) TIANG BOR SEKAN PRIMER DIAMETER 100 CM (FC' > 15MPA) M1 2.611.167,34
48 7.5.(4) TIANG BOR SEKAN SEKUNDER DIAMETER 100 CM (FC' > 30 MPA) M1 3.345.954,05
49 7.5.(5) TIANG BOR SEKAN PRIMER DIAMETER 120 CM (FC' > 15 MPA) M1 3.464.935,34
50 7.5.(6) TIANG BOR SEKAN SEKUNDER DIAMETER 120 CM (FC' > 30 MPA) M1 4.229.959,00

STANDAR SATUAN HARGA, PEMERINTAH KABUPATEN JEMBER, TAHUN 2021 874


KODE REKENING
NO JENIS PEKERJAAN SATUAN HARGA (Rp)
BELANJA
1 2 3 6 7
51 7.5.(7) TIANG BOR SEKAN PRIMER DIAMETER 150 CM (FC' > 15 MPA) M1 5.036.644,62
52 7.5.(8) TIANG BOR SEKAN SEKUNDER DIAMETER 150 CM (FC' > 15 MPA) M1 6.060.390,63
53 7.6 (1) FONDASI CERUCUK, PENYEDIAAN DAN PEMANCANGAN M1 59.041,80
54 7.6 (2) DINDING TURAP KAYU TANPA PENGAWETAN, PENYEDIAAN DAN PEMANCANGAN M2 135.120,50
55 7.6.(3) DINDING TURAP KAYU DENGAN PENGAWETAN, PENYEDIAAN DAN PEMANCANGAN M2 542.905,36
56 7.6.(4) DINDING TURAP BAJA, PENYEDIAAN DAN PEMANCANGAN M2 2.473.629,22
57 7.6.(5) DINDING TURAP BETON, PENYEDIAAN DAN PEMANCANGAN M2 754.539,49
58 7.6.(6) PENYEDIAAN TIANG PANCANG KAYU TANPA PENGAWETAN UKURAN…… MM M1 62.245,40
59 7.6.(7) PENYEDIAAN TIANG PANCANG KAYU DENGAN PENGAWETAN UKURAN…… MM M1 64.962,06
60 7.6 (8A) PENYEDIAAN TIANG PANCANG BAJA DIAMETER 500 MM TEBAL 10 MM M1 2.408.149,17

61 7.6.(9A) PENYEDIAAN TIANG PANCANG BAJA H BEAM UKURAN 300 MM X 300 MM X 10 MM X 15 MM M1 1.189.793,92

62 7.6.(10A) PENYEDIAAN TIANG PANCANG BETON BERTULANG PRACETAK UKURAN 350 MM X 350 MM M1 642.467,54

63 7.6.(11A) PENYEDIAAN TIANG PANCANG BETON PRATEKAN PRACETAK UKURAN 400 MM X 400 MM M1 1.012.743,17

64 7.6.(12A) PENYEDIAAN TIANG PANCANG BETON PRATEKAN PRACETAK DIAMETER 450 MM M1 714.915,10
65 7.6.(13) PEMANCANGAN TIANG PANCANG KAYU UKURAN ….. MM M1 372.867,58
66 7.6.(14A) PEMANCANGAN TIANG PANCANG BAJA DIAMETER 500 MM M1 698.747,58

67 7.6.(15A) PEMANCANGAN TIANG PANCANG BAJA H BEAM UKURAN 300 MM X 300 MM X 10 MM X 15 MM M1 698.747,58

68 7.6.(16A) PEMANCANGAN TIANG PANCANG BETON BERTULANG PRACETAK UKURAN 350 MM X 350 MM M1 698.747,58

69 7.6.(17A) PEMANCANGAN TIANG PANCANG BETON PRATEKAN PRACETAK UKURAN 400 MM X 400 MM M1 698.747,58

70 7.6.(18A) PEMANCANGAN TIANG PANCANG BETON PRATEKAN PRACETAK DIAMETER 450 MM M1 897.680,26

71 7.6.(19A) TIANG BOR BETON, DIAMETER 800 MM M1 1.117.916,03


TAMBAHAN BIAYA UNTUK NOMOR MATA PEMBAYARAN 7.6.(13)S/D 7.6.(18) BILA TIANG
72 7.6.(20) M1 95.734,06
PANCANG DIKERJAKAN DI TEMPAT YANG BERAIR
TAMBAHAN BIAYA UNTUK NOMOR MATA PEMBAYARAN 7.6.(19) BILA TIANG BOR BETON
73 7.6.(21) M1 139.462,28
DIKERJAKAN DITEMPAT YANG BERAIR
74 7.7.(1) DINDING SUMURAN SILINDER TERPASANG, DIAMETER ……………. M1 7.741.997,99
75 7.9.(1) PASANGAN BATU M3 769.524,87
76 7.10.(1) PASANGAN BATU KOSONG YANG DIISI ADUKAN M3 827.082,25
77 7.10.(2) PASANGAN BATU KOSONG M3 497.648,19
78 7.10.(3A) BRONJONG DENGAN KAWAT YANG DILAPISI GALVANIS M3 592.352,93
79 7.10.(3B) BRONJONG DENGAN KAWAT YANG DILAPISI PVC M3 906.206,23
TAMBAHAN BIAYA UNTUK ANYAMAN PENULANGAN TANAH DENGAN KAWAT YANG DILAPISI
80 7.10.(4) M2 229.308,22
PVC
81 7.11.(1A) SAMBUNGAN SIAR MUAI TIPE ASPHALTIC PLUG, FIXED M1 2.934.990,91
82 7.11.(1B) SABUNGAN SIAR MUAI TIPE ASPHALTIC PLUG, MOVABLE M1 4.388.672,70
83 7.11.(2) SAMBUNGAN SIAR MUAI TIPE SILICONE SEAL M1 746.677,84
84 7.11.(3) SAMBUNGAN SIAR MUAI TIPE STRIP SEAL M1 1.481.672,65
85 7.11.(4) SAMBUNGAN SIAR MUAI TIPE COMPRESSION SEAL M1 1.566.930,39
86 7.11.(5) SAMBUNGAN SIAR MUAI EXPANSION JOINT TIPE MODULAR, LEBAR …….. M1 223.382,66
87 7.11.(6) SAMBUNGAN SIAR MUAI EXPANSION JOINT TIPE FINGER PLATE, LEBAR …….. M1 4.434.333,46
88 7.11.(7) SAMBUNGAN SIAR MUAI EXPANSION TIPE KARET DENGAN LEBAR CELAH... CM M3 1.924.340,24
89 7.11.(8) JOINT FILLER UNTUK SAMBUNGAN KONSTRUKSI M3 3.409.545,81
90 7.11.(9) SAMBUNGAN SIAR MUAI TIPE MODULAR, LEBAR …….. M3 223.872,04
91 7.12.(1A) LANDASAN LOGAM TIPE FIXED BUAH 2.204.360,57
92 7.12.(1B) LANDASAN LOGAM TIPE MOVEABLE BUAH 2.432.481,92

93 7.12.(2) : LANDASAN ELASTOMERIK KARET ALAM BERLAPIS BAJA UKURAN 450 MM X 400 MM X 45 MM BUAH 1.307.206,92

: LANDASAN ELASTOMERIK KARET SINTETIS BERLAPIS BAJA UKURAN 450 MM X 400 MM X 45


94 7.12.(3) BUAH 1.130.124,17
MM
95 7.12.(4) LANDASAN KARET STRIP M1 311.162,69
96 7.12.(5) LANDASAN TIPE LOGAM BERONGGA (POT BEARING) BUAH 14.328.448,95
97 7.12.(6) LANDASAN TIPE LOGAM JENIS SPHERICAL BUAH 15.805.520,45
98 7.13.(1) SANDARAN (RAILING) M1 89.806,75
99 7.14.(1) PAPAN NAMA JEMBATAN M1 454.681,87
100 7.15.(1) PEMBONGKARAN PASANGAN BATU M3 391.018,80
101 7.15.(2) PEMBONGKARAN BETON M3 573.892,12
102 7.15.(3) PEMBONGKARAN BETON PRATEKAN M3 670.945,66
103 7.15.(4) PEMBONGKARAN BANGUNAN GEDUNG M2 376.554,97
104 7.15.(5) PEMBONGKARAN RANGKA BAJA M2 1.740.983,86
105 7.15.(6) PEMBONGKARAN BALOK BAJA (STEEL STINGERS) M1 608.132,83
106 7.15.(7) PEMBONGKARAN LANTAI JEMBATAN KAYU M2 138.552,06
STANDAR SATUAN HARGA, PEMERINTAH KABUPATEN JEMBER, TAHUN 2021 875
KODE REKENING
NO JENIS PEKERJAAN SATUAN HARGA (Rp)
BELANJA
1 2 3 6 7
107 7.15.(8) PEMBONGKARAN JEMBATAN KAYU M2 60.295,43
108 7.16.(1) DRECK DRAIN BUAH 146.494,48
109 7.16.(2A) PIPA DRAINASE BAJA DIAMETER 150 MM M1 231.061,35
110 7.16.(3A) PIPA DRAINASE PVC DIAMETER 150 MM M1 84.621,60
111 7.16.(4) PIPA PENYALUR PVC M1 84.621,60

DIVISI 8. REHABILITASI JEMBATAN


1 8.1 (1) CAIRAN PEREKAT (EPOKSI RESIN) KG 132.662,50
2 8.1 (2) BAHAN PENUTUP (SEALANT) KG 144.088,30
3 8.1 (3A) TABUNG PENYUNTIK, PENYEDIAAN BUAH 102.433,07
4 8.1 (3B) TABUNG PENYUNTIK, PENGGUNAN BUAH 120.136,14
5 8.2.(1) PENAMBAHAN (PATCHING) M3 3.177.802,32
6 8.2.(2) PERBAIKAN DENGAN CARA GRAUT M3 3.760.996,73
7 8.3.(1A) PENGECETAN PROTEKTIF PADA ELEMEN STRUKTUR BETON, TEBAL 200µM M2 72.968,83
8 8.3.(2A) PENGECETAN DEKORATIF PADA ELEMEN STRUKTUR BETON, TEBAL : 100 µM M2 72.968,83
PERKUATAN STRUKTUR DENGAN BAHAN FRP JENIS E- GLASS PER LAPIS PADA DAERAH
9 8.4.(1) M2 12.087.766,92
KERING
PERKUATAN STRUKTUR DENGAN BAHAN FRP JENIS E- GLASS-PER LAPIS PADA DAERAH
10 8.4.(2) M2 12.087.766,92
BASAH

11 8.4.(3) PERKUATAN STRUKTUR DENGAN BAHAN FRP LAMINASI JENIS GLASS PADA DAERAH KERING M2 12.087.766,92

PERKUATAN STRUKTUR DENGAN BAHAN FRP JENIS CARBON PER LAPIS PADA DAERAH
12 8.4.(4) M2 12.087.766,92
KERING
PERKUATAN STRUKTUR DENGAN BAHAN FRP JENIS CARBON PER LAPIS PADA DAERAH
13 8.4.(5) M2 12.087.766,92
BASAH
14 8.4.(7) PEMASANGAN PERKUATAN PELAT LANTAI DENGAN STEEL PLATE BONDING KG 1.340.637,98
15 8.4.(8) PERKUATAN EXTERNAL STRESSING JEMBATAN BETON BENTANG …… M BUAH 348.862.612,51
16 8.5.(1A) PENGGANTIAN BAUT MUTU TINGGI A325 TIPE 1 DIAMETER M25 BUAH 70.041,18
17 8.5.(2A) PENGGANTIAN BAUT MUTU TINGGI A490 TIPE 1 DIAMETER M25 BUAH 70.041,18
18 8.5.(3A) PENGGANTIAN BAUT BIASA GRADE A DIAMETER M25 BUAH 70.633,43
19 8.5.(4A) PENGGANTIAN BAUT BIASA GRADE B DIAMETER M25 BUAH 68.264,43
20 8.5.(5A) PENGGANTIAN BAUT BIASA GRADE C UNTUK ANCHOR BOLTS DIAMETER M25 BUAH 70.633,43
21 8.5.(6A) PENGENCANGAN BAUT BIASA GRADE A DIAMETER M25 BUAH 34.029,66
22 8.5.(7A) PENGENCANGAN BAUT BIASA GRADE B DIAMETER M25 BUAH 64.850,56
23 8.6.(1A) PENGELASAN SMAW PADA BAJA GRADE 30 M1 64.850,56
24 8.6.(2A) PENGELASAN SAW PADA BAJA GRADE 30 M1 64.850,56
25 8.6.(3A) PENGELASAN GMAW PADA BAJA GRADE 30 M1 64.850,56
26 8.6.(4A) PENGELASAN FCAW PADA BAJA GRADE 30 M1 64.850,56
27 8.7.(1A) PENGECATAN STRUKTUR BAJA PADA DAERAH KERING TEBAL 80 MIKRON M2 111.193,16
28 8.7.(1B) PENGECATAN STRUKTUR BAJA PADA DAERAH KERING TEBAL 240 MIKRON M2 175.896,99

29 8.7.(2A) PENGECATAN STRUKTUR BAJA PADA DAERAH BASAH/PASANG SURUT 360 MIKRON M2 175.896,99

30 8.7.(2B) PENGECATAN STRUKTUR BAJA PADA DAERAH BASAH/PASANG SURUT 500 MIKRON M2 175.896,99

PENGECATAN PADA ELEMEN SANDARAN DAN/ATAU PAGAR PENGAMAN (GRUARD RAIL) 80


31 8.7.(3A) M2 175.896,99
MIKRON
PENGECATAN PADA ELEMEN SANDARAN DAN/ATAU PAGAR PENGAMAN (GRUARD RAIL) 160
32 8.7.(3B) M2 175.896,99
MIKRON
33 8.8.(1) PERBAIKAN ELEMEN STRUKTUR BAJA DENGAN CARA PELURUSAN LS 6.464.337,84
34 8.8.(2) PENGGANTIAN ELEMEN STRUKTUR BAJA GRADE 250 (KUAT LELEH 250 MPA) KG 1.228.029,74
35 8.8.(3) PENGGANTIAN ELEMEN STRUKTUR BAJA GRADE 345 (KUAT LELEH 345 MPA) KG 1.228.029,74
36 8.8.(4) PENGGANTIAN ELEMEN STRUKTUR BAJA GRADE 485 (KUAT LELEH 485 MPA) KG 1.228.029,74
PEKUATAN DENGAN EXTERNAL STRESSING UNTUK JEMBATAN BAJA DENGAN BENTANG
37 8.9.(1) BUAH 160.698.686,11
……….M
38 8.10.(1) PENGGANTIAN LANTAI KAYU M3 20.253.240,71
39 8.10.(2) PERBAIKAN LANTAI KAYU M3 21.817.113,70
40 8.10.(3) PENGGANTIAN GELEGAR KAYU M3 19.299.167,33
41 8.10.(4) PERBAIKAN GELEGAR KAYU M3 19.250.342,64
42 8.10.(5) PENGGANTIAN BALOK KEPALA TIANG M3 19.030.631,53
43 8.10.(6) PERBAIKAN PAPAN LAJUR KENDARAAN M3 19.470.053,75
44 8.10.(7) PENGANTIAN PAPAN LAJUR KENDARAAN M3 21.721.600,43
45 8.10.(8) PERBAIKAN DAN/ATAU PENGGANTIAN KERB KAYU M3 23.759.839,57
46 8.10.(9) PERBAIKAN DAN/ATAU PENGGANTIAN SANDARAN KAYU M3 20.065.531,54
47 8.10.(10) PENGECATAN/PERLINDUNGAN GELEGAR M2 81.817,10
48 8.10.(11) PENGECATAN/PERLINDUNGAN LANTAI KAYU M2 81.817,10
49 8.10.(12) PENGECATAN/PERLINDUNGAN TIANG PANCANG KAYU M2 81.817,10
50 8.10.(13) PENGECATAN/PERLINDUNGAN BALOK KEPALA KAYU M2 81.817,10
51 8.10.(14) PENGECATAN/PERLINDUNGAN SANDARAN M1 81.817,10
STANDAR SATUAN HARGA, PEMERINTAH KABUPATEN JEMBER, TAHUN 2021 876
KODE REKENING
NO JENIS PEKERJAAN SATUAN HARGA (Rp)
BELANJA
1 2 3 6 7
52 8.11.(1) PENGGANTIAN DAN PERBAIKAN SAMBUNGAN SIAR MUAI TIPE ASPHALTIC PLUG M1 4.398.027,16
53 8.11.(2) PENGGANTIAN DAN PERBAIKAN SAMBUNGAN SIAR MUAI TIPE SILICONE SEAL M1 749.885,43
54 8.11.(3) PENGGANTIAN KARET PENGISI SAMBUNGAN SIAR MUAI TIPE STRIP SEAL M1 1.471.546,36

55 8.11.(4) PENGGANTIAN KARET PENGISI SAMBUNGAN SIAR MUAI TIPE COMPRESSION SEAL M1 1.566.930,39

56 8.11.(5) PENGGANTIAN SAMBUNGAN SIAR MUAI TIPE MODULAR, LEBAR …….. M1 225.757,37
57 8.11.(6) PENGGANTIAN SAMBUNGAN SIAR MUAI TIPE FINGER PLATE, LEBAR …….. M1 4.436.708,17
PENGGANTIAN SAMBUNGAN SIAR MUAI TIPE DOBEL SIKU DENGAN PENUTUP KARET
58 8.11.(7) M1 321.310,03
NEOPRENE
PENGGANTIAN LANDASAN ELASTOMER KARET ALAM BERLAPIS BAJA UKURUAN …. MM X
59 8.12.(2) BUAH 8.558.947,29
…… MM X ……. MM
PENGGANTIAN LANDASAN ELASTOMER SINTETIS BERLAPIS BAJA UKURAN ….. MM X ….. MM
60 8.12.(3) BUAH 8.615.803,29
X …….. MM
61 8.12.(4) PENGGANTIAN LANDASAN KARET STRIP TEBAL …. MM M1 8.849.149,79
62 8.12.(5) PENGGANTIAN LANDASAN LOGAM BERONGGA (POT BEARING) BUAH 12.420.417,29
63 8.12.(6) PENGGANTIAN LANDASAN LOGAM JENIS SPHERICAL BUAH 13.897.488,79
64 8.12.(7) PENGGANTIAN STOPPER LATERAL DAN HORISONTAL BUAH 10.357.610,54
65 8.13.(1) PERBAIKAN SANDARAN BAJA M1 335.582,84
66 8.13.(2) PENGGANTIAN SANDARAN BAJA M1 140.133,19
67 8.13.(3) PERBAIKAN TEMBOK SANDARAN BETON M1 671.110,21
68 8.13.(4) PERBAIKAN SANDARAN BETON-BAJA M1 2.971.602,55
69 8.13.(5) PENGGANTIAN SANDARAN BETON-BAJA M1 5.241.589,84
70 8.14.(1) PENGGANTIAN DECK DRAIN BUAH 155.223,02
71 8.14.(2) PENGGANTIAN PIPA PENYALUR, PIPA CUCURAN PVC DIAMTER …… MM M1 341.723,45
72 8.14.(3) PENGGANTIAN PIPA PENYALUR, PIPA CUCURAN BAJA DIAMTER …… MM M1 781.326,94

DIVISI 9. PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN


1 9.1.(1) MANDOR JAM 18.892,86
2 9.1.(2) PEKERJA BIASA JAM 15.492,14
3 9.1.(3) TUKANG KAYU, TUKANG BATU, DSB JAM 18.071,43
4 9.1.(4) A DUMP TRUCK, KAPASITAS 3 - 4 M³ JAM 384.962,50
5 9.1.(4) B DUMP TRUCK, KAPASITAS 6 - 8 M³ JAM 681.087,50
6 9.1.(5) A TRUK BAK DATAR 3 - 4 TON JAM 387.923,75
7 9.1.(5) B TRUK BAK DATAR 6 - 8 TON JAM 414.575,00
8 9.1.(6) TRUK TANGKI 3000 - 4500 LITER JAM 379.040,00
9 9.1.(7) BULLDOZER 100 - 150 PK JAM 405.691,25
10 9.1.(8) MOTOR GRADER MIN 100 PK JAM 396.807,50
11 9.1.(9) LOADER RODA KARET 1.0 - 1.6 M3 JAM 299.086,25
12 9.1.(10) LOADER RODA BERANTAI 75 - 100 PK JAM 402.730,00
13 9.1.(11) ALAT PENGGALI (EXCAVATOR) 80 - 140 PK JAM 509.335,00
14 9.1.(12) CRANE 10 - 15 TON JAM 769.925,00
15 9.1.(13) PENGGILAS RODA BESI 6 - 9 TON JAM 533.025,00
16 9.1.(14) PENGGILAS BERVIBRASI 5 - 8 TON JAM 343.505,00
17 9.1.(15) PEMADAT BERVIBRASI 1.5 - 3.0 PK JAM 118.450,00
18 9.1.(16) PENGGILAS RODA KARET 8 - 10 TON JAM 592.250,00
19 9.1.(17) KOMPRESOR 4000 - 6500 LTR/MNT JAM 236.900,00
20 9.1.(18) MESIN PENGADUK BETON (MOLEN) 0.3 - 0.6 M3 JAM 84.099,50
21 9.1.(19) POMPA AIR 70 - 100 MM JAM 74.031,25
22 9.1.(20) JACK HAMMER JAM 65.147,50
23 9.2.(1) MARKA JALAN TERMOPLASTIK M2 147.663,16
24 9.2.(2) MARKA JALAN BUKAN TERMOPLASTIK M2 40.279,42

25 9.2.(3A) RAMBU JALAN TUNGGAL DENGAN PERMUKAAN PEMANTUL ENGINEERING GRADE BUAH 1.775.952,77

26 9.2.(3B) RAMBU JALAN GANDA DENGAN PERMUKAAN PEMANTUL ENGINEERING GRADE BUAH 3.401.384,28
27 9.2.(4A) RAMBU JALAN TUNGGAL DENGAN PEMANTUL HIGH INTENSITY GRADE BUAH 1.770.420,01
28 9.2.(4B) RAMBU JALAN GANDA DENGAN PEMANTUL HIGH INTENSITY GRADE BUAH 3.393.440,17
29 9.2.(5) PATOK PENGARAH BUAH 131.591,63
30 9.2.(6A) PATOK KILOMETER BUAH 477.209,89
31 9.2.(6B) PATOK HEKTOMETER BUAH 149.035,62
32 9.2.(7) REL PENGAMAN M1 3.175.599,64
33 9.2.(8) PAKU JALAN TIDAK MEMANTUL BUAH 240.211,90
34 9.2.(9A) PAKU JALAN MEMANTUL BUJUR SANGKAR BUAH 266.086,71
35 9.2.(9B) PAKU JALAN MEMANTUL PERSEGI PANJANG BUAH 280.300,71
36 9.2.(9C) PAKU JALAN MEMANTUL BULAT BUAH 290.961,21
37 9.2(10A) KERB PRACETAK JENIS 1 (PENINGGI/MOUNTABLE) M1 127.819,80
38 9.2.(10B) KEREB PRACETAK JENIS 2 (PENGHALANG/BARRIER) M1 143.711,01
39 9.2.(10C) KEREB PRACETAK JENIS 3 (KEREB BERPARIT/GUTTER) M1 149.995,40

STANDAR SATUAN HARGA, PEMERINTAH KABUPATEN JEMBER, TAHUN 2021 877


KODE REKENING
NO JENIS PEKERJAAN SATUAN HARGA (Rp)
BELANJA
1 2 3 6 7

40 9.2.(10D) KEREB PRACETAK JENIS 4 (PENGHALANG BERPARIT / BARRIER GUTTER) T = 20 CM M1 176.073,92

41 9.2.(10E) KEREB PRACETAK JENIS 5 (PENGHALANG BERPARIT / BARRIER GUTTER) T = 30 CM M1 209.553,13

42 9.2.(10F) KEREB PRACETAK JENIS 6 (KEREB DENGAN BUKAAN) BUAH 84.346,23


43 9.2.(10G) KEREB PRACETAK JENIS 7 (KEREB PADA PELANDAIAN TROTOAR) BUAH 667.112,96
44 9.2.(10H) KEREB PRACETAK JENIS 8 (KEREB PADA PELANDAIAN TROTOAR) BUAH 667.112,96
45 9.2.(10I) KEREB PRACETAK JENIS 9 (KEREB PADA PELANDAIAN TROTOAR) BUAH 667.112,96
46 9.2.(11) KEREB YANG DIGUNAKAN KEMBALI M1 33.706,50
47 9.2.(12A) PERKERASAN BLOK BETON PADA TROTOAR DAN MEDIAN M2 233.379,70
PEMBENGKOKAN UBIN EKSISTING ATAU PERKERASAN BLOK BETON EKSISTING PADA
48 9.2.(12B) M3 16.229,52
TROTOAR ATAU MEDIAN
49 9.2.(13) BETON PEMISAH JALUR (CONCRETE BARRIER) M1 732.755,57
50 9.2.(14) UNIT LAMPU PENERANGAN JALAN LENGAN TUNGGAL, TIPE LED BUAH 9.844.123,44
51 9.2.(15) UNIT LAMPU PENERANGAN JALAN LENGAN GANDA, TIPE LED BUAH 12.699.952,94
52 9.2.(16) UNIT LAMPU PENERANGAN JALAN LENGAN TUNGGAL, TIPE MERKURI 250 WATT BUAH 8.287.098,19
53 9.2.(17) UNIT LAMPU PENERANGAN JALAN LENGAN GANDA, TIPE MERKURI 250 WATT BUAH 9.116.840,44
54 9.2.(18) UNIT LAMPU PENERANGAN JALAN LENGAN TUNGGAL, TIPE MERKURI 400 WATT BUAH 8.582.630,94
55 9.2.(19) UNIT LAMPU PENERANGAN JALAN LENGAN GANDA, TIPE MERKURI 400 WATT BUAH 9.707.905,94
56 9.2.(20) PAGAR PEMISAH PEDESTRIAN CARBON STEEL M' 716.774,48
57 9.2.(21) PAGAR PEMISAH PEDESTRIAN GALVANISED M' 716.774,48
58 9.2.(22A) STABILISASI DENGAN TANAMAN M2 37.881,52
59 9.2.(22B) STABILISASI DENGAN TANAMAN VS M2 92.019,03
60 9.2.(23) SEMAK / PERDU…………………. M2 79.149,10
61 9.2.(24) POHON JENIS ……………………. BUAH 78.260,72

DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA


1 10.1.(1) GALIAN PADA SALURAN AIR ATAU LERENG UNTUK PEMELIHARAAN M3 633.936,60
2 10.1.(2) TIMBUNAN PILIHAN PADA LERENG TEPI SALURAN UNTUK PEMELIHARAAN M3 252.319,68
3 10.1.(3) PEBAIKAN PASANGAN BATU DENGAN MORTAR M3 1.374.076,67
4 10.1.(4) PERBAIKAN LAPIS FONDASI AGREGAT KELAS A M3 839.076,16
5 10.1.(5) PERBAIKAN LAPIS FONDASI AGREGAT KELAS B M3 687.392,64
6 10.1.(6) PERBAIKAN LAPIS FONDASI AGREGAT KELAS S M3 634.837,11
7 10.1.(7) PERBAIKAN DAN PERATAAN PERMUKAAN JALANTANAH M2 14.768,49

8 10.1.(8) PERBAIKAN DAN PERATAAN PERMUKAN PERKERASAN BERBUTIR TANPA PENUTUP ASPAL M3 15.698,43

9 10.1.(9) PERBAIKAN CAMPURAN ASPAL PANAS M3 3.601.618,39


10 10.1.(10) PERBAIKAN CAMPURAN ASPAL PANAS DENGAN ASBUTON M3 3.532.324,52
11 10.1.(11) PERBAIKAN ASBUTON CAMPURAN PANAS HAMPAR DINGIN M3 2.799.918,60
12 10.1.(12) PERBAIKAN LAPIS PENETRASI MACADAM TANPA ATAU DENGAN ASBUTON LITER 2.084.388,94
13 10.1.(13) RESIDU BITUMEN UNTUK PEMELIHARAAN M3 406.875,24
14 10.1.(14) PERBAIKAN PERKERASAN BETON SEMEN M3 1.788.607,12
15 10.1.(15) PERBAIKAN LAPIS FONDASI BAWAH BETON KURUS M3 1.726.292,72
16 10.1.(16) PERBAIKAN PASANGAN BATU M2 1.268.717,81
17 10.1.(17) PENGECATAN KEREB PADA TROTOAR ATAU MEDIAN M1 46.758,60
18 10.1.(18) PERBAIKAN REL PENGAMAN BUAH 3.077.917,90
19 10.1.(19) PEMBERSIHAN PATOK BUAH 41.376,01
20 10.1.(20) PEMBERSIHAN RAMBU M1 41.376,01
21 10.1.(21) PEMBERSIHAN DRAINASE BUAH 360.086,71
22 10.1.(22) PENGENDALIAN TANAMAN M2 2.844,91

1 LAPIS PENETRASI MACADAM ( LAPEN ) ASPAL 4,5 KG/M² M2 110.978,30


2 LAPIS PENETRASI MACADAM ( LAPEN ) ASPAL 4,5 KG/M² (PED. ROLLER) M2 114.167,85
3 LAPEN MACADAM UNT. LEVELLING, ASPAL 3,0 KG/M² M2 84.113,84
4 LAPEN MACADAM UNT. LEVELLING, ASPAL 3,0 KG/M² (PED. ROLLER) M2 87.303,39
5 LAPEN MACADAM UNT. LEVELLING, ASPAL 4,0 KG/M² M2 102.023,48
6 LAPEN MACADAM UNT. LEVELLING, ASPAL 4,0 KG/M² (PED. ROLLER) M2 105.213,03
LAPEN MACADAM UNT. LEVELLING, ASPAL 3,5 KG/M² M2 93.068,66
LAPEN MACADAM UNT. LEVELLING, ASPAL 3,5 KG/M² (PED. ROLLER) M2 96.258,21

II.C BIDANG CIPTA KARYA


ANALISIS HARGA SATUAN PEKERJAAN (AHSP) BIDANG CIPTA KARYA
A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN
1 A.2.2.1.1. (K3) PEMBUATAN 1 M2 PAGAR SEMENTARA DARI KAYU TINGGI 2 METER M2 555.731,19

2 A.2.2.1.2 (K3) PEMBUATAN 1 M2 PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2 METER M2 726.400,97

3 A.2.2.1.3. PEMBUATAN 1 M2 PAGAR SEMENTARA DARI KAWAT DURI TINGGI 1,8 METER M2 271.794,81
4 A.2.2.1.4. PENGUKURAN DAN PEMASANGAN 1 M’ BOUWPLANK M' 2.348.832,51

STANDAR SATUAN HARGA, PEMERINTAH KABUPATEN JEMBER, TAHUN 2021 878


KODE REKENING
NO JENIS PEKERJAAN SATUAN HARGA (Rp)
BELANJA
1 2 3 6 7
5 A.2.2.1.5. (K3) PEMBUATAN 1 M2 KANTOR SEMENTARA LANTAI PLESTERAN M2 4.182.979,81
6 A.2.2.1.6. (K3) PEMBUATAN 1 M2 RUMAH JAGA (KONSTRUKSI KAYU ) M2 3.207.024,07
7 A.2.2.1.7. (K3) PEMBUATAN 1 M2 GUDANG SEMEN DAN PERALATAN M2 2.667.466,92
8 A.2.2.1.8. (K3) PEMBUATAN 1 M2 BEDENG PEKERJA M2 2.586.830,73
9 A.2.2.1.9. (K3) PEMBERSIHAN 1 M2 LAPANGAN DAN PERATAAN M2 17.457,00
10 A.2.2.1.10. (K3) PEMBUATAN 1 M2 STEGER/PERANCAH DARI BAMBU M2 441.203,89
11 A.2.2.1.11. PEMBUATAN 1 BUAH KOTAK ADUKAN UKURAN 40CM X50CM X25CM BUAH 403.927,51
12 A.2.2.1.12. PEMBUATAN 1 M2 JALAN SEMENTARA M2 133.860,00
13 A.2.2.1.13. PEMBONGKARAN 1 M3 BETON BERTULANG M3 232.679,06
14 A.2.2.1.14. PEMBONGKARAN 1 M3 DINDING TEMBOK BATA M3 116.339,53
15 A.2.2.1.15. PEMASANGAN 1 M2 PAGAR KAWAT JARING GALVANIS PANJANG 240 CM M2 37.087,04
16 A.2.2.1.16. PEMASANGAN 1 M2 PANEL BETON PRACETAK 5X50X240 CM M2 776.393,72

A.2.3.1 HARGA SATUAN PEKERJAAN TANAH


1 A.2.3.1.1. PENGGALIAN 1 M3 TANAH BIASA SEDALAM 1 M M3 84.640,00
2 A.2.3.1.2. PENGGALIAN 1 M3 TANAH BIASA SEDALAM 2 M M3 103.551,75
3 A.2.3.1.3. MENGGALI 1 M3 TANAH BIASA SEDALAM 3 M M3 122.728,00
4 A.2.3.1.4. MENGGALI 1 M3 TANAH KERAS SEDALAM 1 M M3 112.677,00
5 A.2.3.1.5. MENGGALI 1 M3 TANAH CADAS SEDALAM 1 M M3 170.602,50
6 A.2.3.1.6. MENGGALI 1 M3 TANAH LUMPUR SEDALAM 1 M M3 136.085,25
7 A.2.3.1.7. PENGERJAAN STRIPPING 1 M2 TANAH TEBING SETINGGI 1 METER M2 6.083,50
8 A.2.3.1.8. (K3) PEMBUANGAN 1 M3 TANAH SEJAUH 30 METER M3 37.109,35

9 A.2.3.1.9. PENGURUGAN KEMBALI 1 M3 GALIAN TANAH (1/3 GALIAN;-TANAH BIASA SEDALAM 1 M) M3 30.417,50

10 A.2.3.1.10. (K3) PEMADATAN TANAH 1 M3 TANAH ( PER 20 CM) M3 60.835,00


11 A.2.3.1.11. PENGURUGAN 1 M3 DENGAN PASIR URUG M3 187.367,20
12 A.2.3.1.12. PEMASANGAN 1 M3 LAPISAN PUDEL CAMPURAN 1KP:3PP:7TL M3 335.732,78
13 A.2.3.1.13. PEMASANGAN 1 M2 LAPISAN IJUK TEBAL 10 CM UNTUK BIDANG RESAPAN M2 306.084,00
14 A.2.3.1.14. PENGURUGAN 1 M3 SIRTU PADAT M3 227.992,10

A.3.2.2 HARGA SATUAN PEKERJAAN PONDASI


1 A.3.2.1.1. PEMASANGAN 1 M3 PONDASI BATU BELAH CAMPURAN 1SP : 3PP M3 1.028.902,47
2 A.3.2.1.2. PEMASANGAN 1 M3 PONDASI BATU BELAH CAMPURAN 1SP : 4PP M3 973.838,75
3 A.3.2.1.3. PEMASANGAN 1 M3 PONDASI BATU BELAH CAMPURAN 1SP : 5PP M3 935.661,94
4 A.3.2.1.4. PEMASANGAN 1 M3 PONDASI BATU BELAH CAMPURAN 1SP : 6PP M3 908.823,63
5 A.3.2.1.5. PEMASANGAN 1 M3 PONDASI BATU BELAH CAMPURAN 1SP : 8PP M3 872.033,94
6 A.3.2.1.6. PEMASANGAN 1 M3 PONDASI BATU BELAH CAMPURAN 1SP : 1KP : 2PP M3 1.037.192,13
7 A.3.2.1.7. PEMASANGAN 1 M3 PONDASI BATU BELAH CAMPURAN 1 SP : 3 KP : 10 PP M3 883.474,48
8 A.3.2.1.8. PEMASANGAN 1 M3 PONDASI BATU BELAH CAMPURAN ¼ SP : 1 KP : 4PP M3 849.407,11
9 A.3.2.1.9. PEMASANGAN 1 M3 BATU KOSONG (ANSTAMPING) M3 504.616,18
(K3) PEMASANGAN 1 M3 PONDASI SIKLOP, 60% BETON CAMPURAN 1SP : 2 PB : 3 KR DAN
10 A.3.2.1.10. M3 3.142.797,33
40% BATU BELAH
11 A.3.2.1.11. PEMASANGAN 1 M3 PONDASI SUMURAN, DIAMETER 100 CM M3 1.103.674,77

A.4.1.1 HARGA SATUAN PEKERJAAN BETON


1 A.4.1.1.1 MEMBUAT 1 M3 BETON MUTU F’C = 7,4 MPA (K 100) M3 1.417.272,42
2 A.4.1.1.2 MEMBUAT 1 M3 BETON MUTU F’= 9,8 MPA (K 125) M3 1.456.537,91
3 A.4.1.1.3 MEMBUAT 1 M3 BETON MUTU F’= 12,2 MPA (K 150) M3 1.486.623,86
MEMBUAT 1 M3 LANTAI KERJA BETON MUTU F’C = 7,4 MPA (K 100), SLUMP (3-6) CM, W/C =
4 A.4.1.1.4 M3 1.340.358,81
087

5 A.4.1.1.5. MEMBUAT 1 M3 BETON MUTU F’ = 14,5 MPA (K 175), SLUMP (12 ±2) CM, W/C = 0,66 M3 1.522.868,87

6 A.4.1.1.6 MEMBUAT 1 M3 BETON MUTU F’= 16,9 MPA (K 200), SLUMP (120 ± 20) MM, W/C = 0,61 M3 1.556.597,34

7 A.4.1.1.7. MEMBUAT 1 M3 BETON MUTU F’ = 19,3 MPA (K 225), SLUMP (120 ± 20) MM, W/C = 0,58 M3 1.583.425,46

8 A.4.1.1.8. MEMBUAT 1 M3 BETON MUTU F’= 21,7 MPA (K 250), SLUMP (120 ± 20) MM, W/C = 0,56 M3 1.570.296,02

9 A.4.1.1.9. MEMBUAT 1 M3 BETON MUTU F’ = 24,0 MPA (K 275), SLUMP (120 ± 20) MM, W/C = 0,53 M3 1.627.164,33

10 A.4.1.1.10. MEMBUAT 1 M3 BETON MUTU F’C = 26,4 MPA (K 300), SLUMP (120 ± 20) MM, W/C = 0,52 M3 1.635.515,28

11 A.4.1.1.11. MEMBUAT 1 M3 BETON MUTU F’C = 28,8 MPA (K 325), SLUMP (120 ± 20) MM, W/C = 0,49 M3 1.730.223,53

12 A.4.1.1.12. MEMBUAT 1 M3 BETON MUTU F’C = 31,2 MPA (K 350), SLUMP (120 ± 20) MM, W/C = 0,48 M3 1.741.417,40

13 A.4.1.1.13 MEMBUAT 1 M3 BETON KEDAP AIR DENGAN STROROX - 100 M3 1.170.135,79


14 A.4.1.1.14 PEMASANGAN 1 M’ PVC WATERSTOP LEBAR 150 MM M' 262.344,90
STANDAR SATUAN HARGA, PEMERINTAH KABUPATEN JEMBER, TAHUN 2021 879
KODE REKENING
NO JENIS PEKERJAAN SATUAN HARGA (Rp)
BELANJA
1 2 3 6 7
15 A.4.1.1.15 PEMASANGAN 1 M’ PVC WATERSTOP LEBAR 200 MM M' 339.974,21
16 A.4.1.1.16 MEMBUAT 1 M’ PVC WATERSTOP LEBAR 230 MM - 320 MM M' 374.874,99
17 A.4.1.1.17 PEMBESIAN 10 KG DENGAN BESI POLOS ATAU BESI ULIR 177.049,11
18 A.4.1.1.18 PEMASANGAN 10 KG KABEL PRESSTRESSED POLOS/STRANDS 170.727,85
19 A.4.1.1.19 PEMASANGAN 10 KG JARING KAWAT BAJA (WIREMESH) 487.905,04
20 A.4.1.1.20 (K3) PEMASANGAN 1 M2 BEKISTING UNTUK PONDASI M2 356.897,90
21 A.4.1.1.21 (K3) PEMASANGAN 1 M2 BEKISTING UNTUK SLOOF M2 387.931,80
22 A.4.1.1.22 (K3) PEMASANGAN 1 M2 BEKISTING UNTUK KOLOM M2 654.628,24
23 A.4.1.1.23 (K3) PEMASANGAN 1 M2 BEKISTING UNTUK BALOK M2 682.739,98
24 A.4.1.1.24 (K3) PEMASANGAN 1 M2 BEKISTING UNTUK LANTAI M2 773.078,24
25 A.4.1.1.25 (K3) PEMASANGAN 1 M2 BEKISTING UNTUK DINDING M2 922.025,84
26 A.4.1.1.26 (K3) PEMASANGAN 1 M2 BEKISTING UNTUK TANGGA M2 589.510,36
27 A.4.1.1.27 PEMASANGAN 1 M2 JEMBATAN UNTUK PENGECORAN BETON M2 215.442,24
28 A.4.1.1.28 MEMBUAT 1 M3 PONDASI BETON BERTULANG (150 KG BESI + BEKISTING) M3 5.702.225,38
29 A.4.1.1.29 MEMBUAT 1 M3 SLOOF BETON BERTULANG (200 KG BESI + BEKISTING) M3 7.080.723,77
30 A.4.1.1.30 MEMBUAT 1 M3 KOLOM BETON BERTULANG (300 KG BESI + BEKISTING) M3 12.513.882,67
31 A.4.1.1.31 MEMBUAT 1 M3 BALOK BETON BERTULANG (200 KG BESI + BEKISTING) M3 9.866.681,80
32 A.4.1.1.32 MEMBUAT 1 M3 KOLOM BETON BERTULANG (150 KG BESI + BEKISTING) M3 9.138.719,89
33 A.4.1.1.33 MEMBUAT 1 M3 DINDING BETON BERTULANG (150 KG BESI + BEKISTING) M3 8.262.404,02
34 A.4.1.1.34 MEMBUAT 1 M3 DINDING BETON BERTULANG (200 KG BESI + BEKISTING) M3 8.868.436,31
35 A.4.1.1.35 MEMBUAT 1 M’ KOLOM PRAKTIS BETON BERTULANG (11 X 11) CM M' 182.295,09
36 A.4.1.1.36 MEMBUAT 1 M’ RING BALOK BETON BERTULANG (10 X 15) CM M' 212.655,36

A.4.1.2 HARGA SATUAN PEKERJAAN BETON PRACETAK


(K3) PEMBUATAN 1 M2 LAHAN PRODUKSI TEBAL 8CM BETON F’C 14,5 MPA (K 175) SLUMP
1 A.4.1.2.1. M2 121.844,00
(120 ± 20) MM
(K3) PEMBUATAN 1 M2 LAHAN PRODUKSI TEBAL 10 CM BETON F’C 14,5 MPA (K 175) SLUMP
2 A.4.1.2.2. M2 152.338,06
(120 ± 20) MM
(K3) PEMBUATAN 1 M2 LAHAN PRODUKSI TEBAL 12 CM BETON F’C 14,5 MPA (K 175) SLUMP
3 A.4.1.2.3. M2 171.298,66
(120 ± 20) MM
(K3) PEMBUATAN 1 M2 LAHAN PRODUKSI TEBAL 15 CM BETON F’C 14,5 MPA (K 175) SLUMP
4 A.4.1.2.4. M2 228.498,07
(120 ± 20) MM
5 A.4.1.2.5. PEMBUATAN 1 M2 BEKISTING UNTUK PLAT BETON PRACETAK ( 5 KALI PAKAI) M2 855.571,54

6 A.4.1.2.6. PEMBUATAN 1 M2 BEKISTING UNTUK BALOK BETON PRACETAK ( 10-12 KALI PAKAI) M2 83.599,80

7 A.4.1.2.7. PEMBUATAN 1 M2 BEKISTING UNTUK KOLOM BETON PRACETAK (10-12 KALI PAKAI) M2 76.441,28

8 A.4.1.2.8. PEMASANGAN DAN MEMBUKA BEKISTING 1 BUAH KOMPONEN PLAT BETON PRACETAK BUAH 8.685,84

9 A.4.1.2.9. PEMASANGAN DAN MEMBUKA BEKISTING 1 BUAH KOMPONEN BALOK BETON PRACETAK BUAH 14.107,86

10 A.4.1.2.10. PEMASANGAN DAN MEMBUKA BEKISTING 1 BUAH KOMPONEN KOLOM BETON PRACETAK BUAH 11.396,85

11 A.4.1.2.11. PENUANGAN/MENEBAR BETON UNTUK 1 BUAH KOMPONEN PLAT PRACETAK BUAH 68.344,73
12 A.4.1.2.12. PENUANGAN/MENEBAR BETON UNTUK 1 BUAH KOMPONEN BALOK PRACETAK BUAH 70.312,96
13 A.4.1.2.13. PENUANGAN/MENEBAR BETON UNTUK 1 BUAH KOMPONEN KOLOM PRACETAK BUAH 63.200,90
14 A.4.1.2.14. EREKSI 1 BUAH KOMPONEN UNTUK PELAT PRACETAK BUAH 339.637,37
15 A.4.1.2.15. EREKSI 1 BUAH KOMPONEN UNTUK BALOK PRACETAK BUAH 317.714,01
16 A.4.1.2.16. EREKSI 1 BUAH KOMPONEN UNTUK KOLOM PRACETAK BUAH 491.206,29
17 A.4.1.2.17. MELANGSIR 1 BUAH KOMPONEN PLAT PRACETAK ( ± 20 M) BUAH 71.791,57
18 A.4.1.2.18. MELANGSIR 1 BUAH KOMPONEN BALOK PRACETAK ( ± 20 M) BUAH 71.791,57
19 A.4.1.2.19. MELANGSIR 1 BUAH KOMPONEN KOLOM PRACETAK ( ± 20 M) BUAH 71.791,57
20 A.4.1.2.20. BAHAN 1 M3 GROUTING CAMPURAN M3 7.361.667,50
21 A.4.1.2.21. BAHAN 1 M3 GROUTING TIDAK CAMPURAN M3 9.807.660,00
22 A.4.1.2.22. UPAH MELAKUKAN 1 TITIK GROUTING PADA JOIN PRACETAK TITIK 61.530,75
23 A.4.1.2.23. PEMASANGAN 1 TITIK BEKISTING JOIN PRACETAK TITIK 180.014,63
24 A.4.1.2.24. UPAH 1 TITIK JOIN DENGAN SLING TITIK 80.972,65

A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM


1 A.4.2.1.1. PEMASANGAN 1 KG BESI PROFIL 32.348,64
2 A.4.2.1.2. PEMASANGAN 1 KG RANGKA KUDA-KUDA BAJA IWF 32.348,64
3 A.4.2.1.3. PENGERJAAN 100 KG PEKERJAAN PERAKITAN 284.706,08

4 A.4.2.1.4. PEMBUATAN 1 M2 PINTU BESI PLAT BAJA TEBAL 2 MM RANGKAP, RANGKA BAJA SIKU M2 1.031.054,93

5 A.4.2.1.5. PENGERJAAN 10 CM PENGELASAN DENGAN LAS LISTRIK 424.368,82


6 A.4.2.1.6. PEMBUATAN 1 M2 RANGKA JENDELA BESI SCUARE TUBE/PIPA KOTAK (25 X 5) CM M2 424.368,82
7 A.4.2.1.7. PEMASANGAN 1 M2 PINTU ROLLING DOOR BESI M2 567.576,75
8 A.4.2.1.8. PEMASANGAN 1 M2 PINTU LIPAT (FOLDING DOOR) BAHAN PLASTIK/PVC M2 390.714,80
STANDAR SATUAN HARGA, PEMERINTAH KABUPATEN JEMBER, TAHUN 2021 880
KODE REKENING
NO JENIS PEKERJAAN SATUAN HARGA (Rp)
BELANJA
1 2 3 6 7
9 A.4.2.1.9. PEMASANGAN 1 M2 SUNSCREEN ALLUMINIUM M2 332.285,60
10 A.4.2.1.10. PEMASANGAN 1 M2 ROLLING DOOR ALLUMINIUM M2 1.231.385,50
11 A.4.2.1.11. PEMASANGAN 1 M KUSEN PINTU ALLUMINIUM M' 150.673,69
12 A.4.2.1.12. PEMASANGAN 1 M2 PINTU ALLUMINIUM STRIP LEBAR 8 CM M2 734.886,23
13 A.4.2.1.13. PEMASANGAN 1 M2 PINTU KACA RANGKA ALLUMINIUM M2 1.138.892,61
14 A.4.2.1.14. PEMASANGAN 1 M2 VENETIONS BLINDS DAN VERTICAL BLINDS M2 185.978,00
15 A.4.2.1.15. PEMASANGAN 1 M2 TERALI BESI STRIP (2 X 3) MM M2 649.351,77
16 A.4.2.1.16. PEMASANGAN 1 M2 KAWAT NYAMUK M2 127.700,06
17 A.4.2.1.17. PEMASANGAN 1 M2 JENDELA NAKO & TRALIS M2 534.756,33
18 A.4.2.1.18. PEMASANGAN 1 M’ TALANG DATAR/ JURAI SENG BJLS 28 LEBAR 90 CM M' 296.016,20

19 A.4.2.1.19 PEMASANGAN 1 M TALANG ½ LINGKARAN D-15 CM, SENG PLAT BJLS 30 LEBAR 45 CM M' 134.808,18

PEMASANGAN 1 M2 RANGKA BESI HOLLOW 1X40.40.2MM, MODUL 60 X 120 CM, DINDING


20 A.4.2.1.20. M2 232.104,50
PARTISI

21 A.4.2.1.21. PEMASANGAN 1 M2 RANGKA BESI HOLLOW 1X40.40.2MM, MODUL 60 X 60 CM, PLAFON M2 272.446,50

22 A.4.2.1.22. (K3) PEMASANGAN 1 M2 ATAP PELANA RANGKA ATAP BAJA CANAI DINGIN PROFIL C75 M2 260.127,52

23 A.4.2.1.23. (K3) PEMASANGAN 1 M2 ATAP JURAI RANGKA ATAP BAJA CANAI DINGIN PROFIL C75 M2 250.380,46

PEMASANGAN 1 M2 PASANG KUDA-KUDA BAJA RINGAN + RENG UNTUK ATAP GENTENG


24 A.4.2.1.24. M2 873.730,20
BIASA/METAL

A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING


PEMASANGAN 1 M2 DINDING BATA MERAH (5X11X22) CM TEBAL 1 BATU CAMPURAN 1 SP : 2
1 A.4.4.1.1. M2 311.648,45
PP
PEMASANGAN 1 M2 DINDING BATA MERAH (5X11X22) CM TEBAL 1 BATU CAMPURAN 1 SP : 3
2 A.4.4.1.2. M2 297.123,21
PP
PEMASANGAN 1 M2 DINDING BATA MERAH (5X11X22) CM TEBAL 1 BATU CAMPURAN 1 SP : 4
3 A.4.4.1.3. M2 287.182,51
PP
PEMASANGAN 1 M2 DINDING BATA MERAH (5X11X22) CM TEBAL 1 BATU CAMPURAN 1 SP : 5
4 A.4.4.1.4. M2 282.272,22
PP
PEMASANGAN 1 M2 DINDING BATA MERAH (5X11X22) CM TEBAL 1 BATU CAMPURAN 1 SP : 6
5 A.4.4.1.5. M2 281.078,62
PP
PEMASANGAN 1 M2 DINDING BATA MERAH (5X11X22) CM TEBAL 1 BATU CAMPURAN 1SP :
6 A.4.4.1.6 M2 275.676,22
3KP : 10PP
PEMASANGAN 1 M2 DINDING BATA MERAH (5X11X22) CM TEBAL ½ BATU CAMPURAN 1SP :
7 A.4.4.1.7 M2 150.780,46
2PP
PEMASANGAN 1 M2 DINDING BATA MERAH (5X11X22) CM TEBAL ½ BATU CAMPURAN 1SP :
8 A.4.4.1.8 M2 143.804,09
3PP
PEMASANGAN 1 M2 DINDING BATA MERAH (5X11X22) CM TEBAL ½ BATU CAMPURAN 1SP
9 A.4.4.1.9 M2 139.854,50
:4PP
PEMASANGAN 1 M2 DINDING BATA MERAH (5X11X22)CM TEBAL ½ BATU CAMPURAN 1 SP : 5
10 A.4.4.1.10 M2 137.373,46
PP
PEMASANGAN 1 M2 DINDING BATA MERAH (5X11X22)CM TEBAL ½ BATU CAMPURAN 1 SP : 6
11 A.4.4.1.11 M2 136.124,92
PP
PEMASANGAN 1 M2 DINDING BATA MERAH (5X11X22)CM TEBAL ½ BATU CAMPURAN 1SP : 8
12 A.4.4.1.12 M2 133.402,24
PP
PEMASANGAN 1 M2 DINDING BATA MERAH (5X11X22)CM TEBAL ½ BATU CAMPURAN 1SP :
13 A.4.4.1.13 M2 138.566,55
3KP :10PP
PEMASANGAN 1 M2 DINDING BATA MERAH (5X11X22)CM TEBAL ½ BATU CAMPURAN 1SM :
14 A.4.4.1.14 M2 125.498,29
1KP :1PP
PEMASANGAN 1 M2 DINDING BATA MERAH (5X11X22) CM TEBAL ½ BATU CAMPURAN 1SM :
15 A.4.4.1.15 M2 125.600,16
1KP :2PP
16 A.4.4.1.16 PEMASANGAN 1 M2 DINDING CONBLOCK HB20 CAMPURAN 1SP : 3PP M2 344.873,72
17 A.4.4.1.17 PEMASANGAN 1 M2 DINDING CONBLOCK HB20 CAMPURAN 1SP:4PP M2 345.635,60
18 A.4.4.1.18 PEMASANGAN 1 M2 DINDING CONBLOCK HB15 CAMPURAN 1SP :3PP M2 277.100,77
19 A.4.4.1.19 PEMASANGAN 1 M2 DINDING CONBLOCK HB15 CAMPURAN 1SP :4PP M2 277.438,69
20 A.4.4.1.20 PEMASANGAN 1 M2 DINDING CONBLOCK HB10 CAMPURAN 1SP :3PP M2 210.014,42
21 A.4.4.1.21 PEMASANGAN 1 M2 DINDING CONBLOCK HB10 CAMPURAN 1SP :4PP M2 210.878,64

22 A.4.4.1.22 PEMASANGAN 1 M2 DINDING TERAWANG (ROOSTER) 12X11X24 CAMPURAN 1SP :3PP M2 350.317,03

23 A.4.4.1.23 PEMASANGAN 1 M2 DINDING TERAWANG (ROOSTER) 12X11X24 CAMPURAN 1SP :4PP M2 403.619,53

24 A.4.4.1.24 PEMASANGAN 1 M2 DINDING BATA BERONGGA EKSPOSE 12X11X24 CAMPURAN 1 SP : 3 PP M2 728.688,35

STANDAR SATUAN HARGA, PEMERINTAH KABUPATEN JEMBER, TAHUN 2021 881


KODE REKENING
NO JENIS PEKERJAAN SATUAN HARGA (Rp)
BELANJA
1 2 3 6 7

25 A.4.4.1.25 PEMASANGAN 1 M2 DINDING BATA RINGAN TEBAL 7,5 CM DENGAN MORTAR SIAP PAKAI B. M2 143.274,22

26 A.4.4.1.26 PEMASANGAN 1 M2 DINDING BATA RINGAN TEBAL 10 CM DENGAN MORTAR SIAP PAKAI M2 172.090,72

A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN


1 A.4.4.2.1. PEMASANGAN 1 M2 PLESTERAN 1SP : 1PP TEBAL 15 MM. M2 84.680,52
2 A.4.4.2.2. PEMASANGAN 1 M2 PLESTERAN 1SP : 2PP TEBAL 15 MM. M2 77.047,30
3 A.4.4.2.3. PEMASANGAN 1 M2 PLESTERAN 1SP : 3PP TEBAL 15MM. M2 73.785,05
4 A.4.4.2.4. PEMASANGAN 1 M2 PLESTERAN 1SP : 4PP TEBAL 15 MM M2 71.524,93
5 A.4.4.2.5. PEMASANGAN 1 M2 PLESTERAN 1SP : 5PP TEBAL 15 MM M2 70.288,25
6 A.4.4.2.6. PEMASANGAN 1 M2 PLESTERAN 1SP : 6PP TEBAL 15 MM. M2 69.279,01
7 A.4.4.2.7. PEMASANGAN 1 M2 PLESTERAN 1SP : 7PP TEBAL 15 MM M2 68.738,85
8 A.4.4.2.8. PEMASANGAN 1 M2 PLESTERAN 1SP : 8PP TEBAL 15 MM M2 68.198,69
9 A.4.4.2.9. PEMASANGAN 1 M2 PLESTERAN 1SP : 1/2KP : 3PP TEBAL 15 MM M2 72.463,92
10 A.4.4.2.10. PEMASANGAN 1 M2 PLESTERAN 1SP : 2KP : 8PP TEBAL 15 MM M2 70.782,96
11 A.4.4.2.11. PEMASANGAN 1 M2 PLESTERAN 1SM : 1KP : 1PP TEBAL 15 MM M2 65.499,18
12 A.4.4.2.12. PEMASANGAN 1 M2 PLESTERAN 1SM : 1KP : 2PP TEBAL 15 MM M2 65.822,84
13 A.4.4.2.13. PEMASANGAN 1 M2 PLESTERAN 1SP : 1PP TEBAL 20 MM M2 103.074,78
14 A.4.4.2.14. PEMASANGAN 1 M2 PLESTERAN 1SP : 3PP TEBAL 20 MM M2 82.352,56
15 A.4.4.2.15. PEMASANGAN 1 M2 PLESTERAN 1SP : 4PP TEBAL 20 MM. M2 95.631,07
16 A.4.4.2.16. PEMASANGAN 1 M2 PLESTERAN 1SP : 5PP TEBAL 20 MM M2 94.062,72
17 A.4.4.2.17. PEMASANGAN 1 M2 PLESTERAN 1SP : 6PP TEBAL 20 MM M2 92.636,52
18 A.4.4.2.18. PEMASANGAN 1 M2 PLESTERAN 1SM : 1KP : 2PP TEBAL 20 MM M2 90.908,52
19 A.4.4.2.19. PEMASANGAN 1 M2 BERAPEN 1SP : 5PP TEBAL 15 MM M2 42.642,25
20 A.4.4.2.20. PEMASANGAN 1 M’ PLESTERAN SKONING 1SP : 3PP LEBAR 10 CM M2 69.280,27
21 A.4.4.2.21. PEMASANGAN 1 M2 PLESTERAN GRANIT 1SP : 2 GRANIT TEBAL 1CM M2 233.022,20
22 A.4.4.2.22. PEMASANGAN 1 M2 PLESTERAN TRASO 1SP : 2 TRASO TEBAL 1CM M2 197.487,20
23 A.4.4.2.23. PEMASANGAN 1 M2 PLESTERAN CIPRAT 1SP : 2PP M2 57.033,26
24 A.4.4.2.24 PEMASANGAN 1 M2 FINISHING SIAR PASANGAN BATA MERAH M2 32.978,39
25 A.4.4.2.25. PEMASANGAN 1 M2 FINISHING SIAR PASANGAN CONBLOCK EKSPOSE M2 15.705,64
26 A.4.4.2.26. PEMASANGAN 1 M2 FINISHING SIAR PASANGAN BATU KALI, CAMPURAN 1SP : 2PP. M2 68.788,15
27 A.4.4.2.27. PEMASANGAN 1 M2 ACIAN. M2 42.334,92
28 A.4.4.2.28. PEMASANGAN 1 M2 PLESTERAN DENGAN MORTAR SIAP PAKAI (MSP) M2 94.413,85
29 A.4.4.2.29. PEMASANGAN 1 M2 ACIAN DENGAN MORTAR SIAP PAKAI (MSP) M2 45.783,11
30 A.4.4.2.30 PEMASANGAN 1 M' PLESTERAN SKONING/BENANGAN 1 PC : 2 PSR M2 69.280,27
31 A.4.4.2.31. PEMASANGAN 1 M2 BENANGAN M2 17.599,93

A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING


1 A.4.4.3.1. PEMASANGAN 1 M2 LANTAI UBIN PC ABU-ABU UKURAN 40CM X40CM M2 149.841,45
2 A.4.4.3.2. PEMASANGAN 1 M2 LANTAI UBIN PC ABU-ABU UKURAN 30CM X30 CM M2 182.563,28
3 A.4.4.3.3. PEMASANGAN 1 M2 LANTAI UBIN PC ABU-ABU UKURAN 20CM X20 CM M2 175.260,48
4 A.4.4.3.4. PEMASANGAN 1 M2 LANTAI UBIN WARNA UKURAN 40CM X40 CM M2 172.169,28
5 A.4.4.3.5. PEMASANGAN 1 M2 LANTAI UBIN WARNA UKURAN 30CM X30CM M2 210.043,10
6 A.4.4.3.6. PEMASANGAN 1 M2 LANTAI UBIN WARNA UKURAN 20CM X20CM M2 206.223,31
7 A.4.4.3.7. PEMASANGAN 1 M2 LANTAI UBIN TERASO UKURAN 40CM X40CM M2 708.152,57
8 A.4.4.3.8. PEMASANGAN 1 M2 LANTAI UBIN TERASO UKURAN 30CM X30CM M2 600.208,52
9 A.4.4.3.9. PEMASANGAN 1 M2 LANTAI UBIN GRANIT UKURAN 40CM X40CM M2 547.161,25
10 A.4.4.3.10. PEMASANGAN 1 M2 LANTAI UBIN GRANIT UKURAN 30CM X30CM M2 586.148,50
11 A.4.4.3.11. PEMASANGAN 1 M2 LANTAI UBIN TERALUX MARMER UKURAN 40CM X40CM M2 1.112.594,17
12 A.4.4.3.12. PEMASANGAN 1 M2 LANTAI UBIN TERALUX UKURAN 30CM X30CM M2 930.618,87
13 A.4.4.3.13. PEMASANGAN 1 M2 LANTAI UBIN TERALUX MARMER UKURAN 60CM X60CM M2 884.355,61
14 A.4.4.3.14. PEMASANGAN 1 M2 LANTAI UBIN TERALUX MARMER UKURAN 40CM X40CM M2 1.112.594,17
15 A.4.4.3.15. PEMASANGAN 1 M2 LANTAI UBIN TERALUX MARMER UKURAN 30CM X30CM M2 930.618,87
16 A.4.4.3.16. PEMASANGAN 1 M’ PLINT UBIN PC ABU-ABU UKURAN 15CM X 20CM M' 61.230,46
17 A.4.4.3.17. PEMASANGAN 1 M’ PLINT UBIN PC ABU-ABU UKURAN 10CM X 30CM M' 48.789,93
18 A.4.4.3.18. PEMASANGAN 1 M’ PLINT UBIN PC ABU-ABU UKURAN 10CM X 40CM M' 43.056,95
19 A.4.4.3.19. PEMASANGAN 1 M’ PLINT UBIN WARNA UKURAN 10CM X 20CM M' 44.611,60
20 A.4.4.3.20. PEMASANGAN 1 M’ PLINT UBIN WARNA UKURAN 10CM X 30CM M' 50.344,58
21 A.4.4.3.21. PEMASANGAN 1 M’ PLINT UBIN WARNA UKURAN 10CM X 40CM M' 44.611,60
22 A.4.4.3.22. PEMASANGAN 1 M’ PLINT UBIN TERASO UKURAN 10CM X 30CM M' 50.344,58
23 A.4.4.3.23. PEMASANGAN 1 M’ PLINT UBIN TERASO UKURAN 10CM X 40CM M' 44.611,60
24 A.4.4.3.24. PEMASANGAN 1 M’ PLINT UBIN GRANIT UKURAN 10CM X 40CM M' 44.611,60
25 A.4.4.3.25. PEMASANGAN 1 M’ PLINT UBIN GRANIT UKURAN 10CM X 30CM M' 50.344,58
26 A.4.4.3.26. PEMASANGAN 1 M’ PLINT UBIN TERALUX KERANG UKURAN 10CM X 40CM M' 44.481,30
27 A.4.4.3.27. PEMASANGAN 1 M’ PLINT UBIN TERALUX KERANG UKURAN 10CM X 30CM M' 50.344,58
28 A.4.4.3.28. PEMASANGAN 1 M’ PLINT UBIN TERALUX MARMER UKURAN 10CM X 60CM M' 38.422,58
29 A.4.4.3.29. PEMASANGAN 1 M’ PLINT UBIN TERALUX MARMER UKURAN 10CM X 40CM M' 44.611,60

STANDAR SATUAN HARGA, PEMERINTAH KABUPATEN JEMBER, TAHUN 2021 882


KODE REKENING
NO JENIS PEKERJAAN SATUAN HARGA (Rp)
BELANJA
1 2 3 6 7
30 A.4.4.3.30. PEMASANGAN 1 M’ PLINT UBIN TERALUX MARMER UKURAN 10CM X 30CM M' 50.344,58
31 A.4.4.3.31. PEMASANGAN 1 M2 LANTAI TERASO COR DI TEMPAT, TEBAL 3CM M2 109.520,43
32 A.4.4.3.32. PEMASANGAN 1 M2 LANTAI KERAMIK ARTISTIK 10CM X 20CM M2 298.396,99
33 A.4.4.3.33. PEMASANGAN 1 M2 LANTAI KERAMIK ARTISTIK 10CM X 10CM ATAU 5CM X 20CM M2 340.654,03
34 A.4.4.3.34. PEMASANGAN 1 M2 LANTAI KERAMIK UKURAN 33CM X 33CM M2 273.481,04
35 A.4.4.3.35. PEMASANGAN 1 M2 LANTAI KERAMIK UKURAN 30CM X 30CM M2 259.899,37
36 A.4.4.3.36. PEMASANGAN 1 M2 LANTAI KERAMIK UKURAN 20CM X 20CM M2 279.449,56
37 A.4.4.3.36.A PEMASANGAN 1 M2 LANTAI KERAMIK UKURAN 40CM X 40CM M2 285.278,66
38 A.4.4.3.36.B PEMASANGAN 1 M2 LANTAI KERAMIK UKURAN 50CM X 50CM M2 280.481,37
39 A.4.4.3.36.C PEMASANGAN 1 M2 LANTAI KERAMIK UKURAN 60CM X 60CM M2 260.437,49
40 A.4.4.3.36.D PEMASANGAN 1 M2 LANTAI GRANIT UKURAN 60CM X 60CM M2 304.500,89
41 A.4.4.3.37. KERAMIK UKURAN 10CM X 33CM UNTUK VARIASI/BORDER M' 589.658,00
42 A.4.4.3.38. PEMASANGAN 1 M2 LANTAI KERAMIK MOZAIK UKURAN 30CM X 30CM M2 301.916,49
43 A.4.4.3.39. PEMASANGAN 1 M’ PLINT KERAMIK UKURAN 10CM X 20CM M' 64.175,54
44 A.4.4.3.40. PEMASANGAN 1 M’ PLINT KERAMIK UKURAN 10CM X 10CM M' 99.133,10
45 A.4.4.3.41. PEMASANGAN 1 M’ PLINT KERAMIK UKURAN 5CM X 20CM M' 62.678,59
46 A.4.4.3.42. PEMASANGAN 1 M’ PLINT INTERNAL COVE ARTISTIK 5CM X 5CM X 20CM M' 230.411,63
47 A.4.4.3.43. PEMASANGAN 1 M2 LANTAI MARMER UKURAN 100CM X 100CM M2 171.927,93
48 A.4.4.3.44. PEMASANGAN 1 M2 LANTAI KARPET M2 111.467,20
49 A.4.4.3.45. PEMASANGAN 1 M2 UNDERLAYER (PELAPIS BAWAH KARPET) M2 78.733,60
50 A.4.4.3.46. PEMASANGAN 1 M2 LANTAI PARQUET KAYU M2 429.916,00
51 A.4.4.3.47. PEMASANGAN 1 M2 LANTAI KAYU GYMFLOOR M2 524.439,10
52 A.4.4.3.48. PEMASANGAN 1 M2 DINDING PORSLEN 11CM X 11CM M2 337.427,54
53 A.4.4.3.49. PEMASANGAN 1 M2 DINDING PORSLEN 10CM X 20CM M2 330.722,18
54 A.4.4.3.50. PEMASANGAN 1 M2 DINDING PORSLEN 20CM X 20CM M2 307.275,00
55 A.4.4.3.51. PEMASANGAN 1 M2 DINDING KERAMIK ARTISTIK 10CM X 20CM M2 330.722,18
56 A.4.4.3.52. PEMASANGAN 1 M2 DINDING KERAMIK ARTISTIK 5CM X 20CM M2 342.715,24
57 A.4.4.3.53. PEMASANGAN 1 M2 DINDING KERAMIK 10CM X 20CM M2 330.722,18
58 A.4.4.3.54. PEMASANGAN 1 M2 DINDING KERAMIK 20CM X 20CM M2 308.962,91
59 A.4.4.3.54.A PEMASANGAN 1 M2 DINDING KERAMIK 20CM X 25CM M2 312.345,31
60 A.4.4.3.54.B PEMASANGAN 1 M2 DINDING KERAMIK 25CM X 40CM M2 317.468,28
61 A.4.4.3.54.C PEMASANGAN 1 M2 DINDING KERAMIK 25CM X 60CM M2 317.557,11
62 A.4.4.3.55. PEMASANGAN 1 M2 DINDING MARMER 100CM X 100CM M2 477.083,40
63 A.4.4.3.56. PEMASANGAN 1 M2 DINDING BATA PELAPIS 3CM X 7CM X 24CM M2 471.418,95
64 A.4.4.3.57. PEMASANGAN 1 M2 DINDING BATU PARAS M2 162.191,54
65 A.4.4.3.58. PEMASANGAN 1 M2 DINDING BATU TEMPEL HITAM M2 167.338,20
66 A.4.4.3.59. PEMASANGAN 1 M2 LANTAI VYNIL UKURAN 30CM X 30CM M2 677.360,12
67 A.4.4.3.60. PEMASANGAN 1 M2 WALLPAPER LEBAR 50 CM M2 370.170,34
68 A.4.4.3.61. PEMASANGAN 1 M2 FLOOR HARDERNER M2 693.962,90
69 A.4.4.3.62. PEMASANGAN 1 M’ PLINT VYNIL 15CM X 30CM M' 58.522,12
70 A.4.4.3.63. PEMASANGAN 1 M’ PLINT KAYU TEBAL 2 CM LEBAR 10 CM M' 85.530,85
71 A.4.4.3.64. PEMASANGAN 1 M2 PAVING BLOCK NATURAL TEBAL 6 CM M2 155.462,81
72 A.4.4.3.65. PEMASANGAN 1 M2 PAVING BLOCK NATURAL TEBAL 8 CM M2 190.140,83
73 A.4.4.3.66. PEMASANGAN 1 M2 PAVING BLOCK BERWARNA TEBAL 6 CM M2 168.622,61
74 A.4.4.3.67. PEMASANGAN 1 M2 PAVING BLOCK BERWARNA TEBAL 8 CM M2 203.300,62
75 A.4.4.3.68. PEMASANGAN 1 M2 ALUMINIUM COMPOSITE PANEL M2 357.402,69

A.4.5.1 HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)

1 A.4.5.1.1. PEMASANGAN 1 M2 LANGIT-LANGIT ASBES SEMEN, TEBAL 4 MM, 5 MM, DAN 6 MM M2 41.148,90

2 A.4.5.1.2. PEMASANGAN 1 M2 LANGIT-LANGIT AKUSTIK UKURAN (30 X 30) CM M2 209.235,89


3 A.4.5.1.3. PEMASANGAN 1 M2 LANGIT-LANGIT AKUSTIK UKURAN (30 X 60) CM M2 203.313,39
4 A.4.5.1.4. PEMASANGAN 1 M2 LANGIT-LANGIT AKUSTIK UKURAN (60 X 120) CM M2 200.575,24
PEMASANGAN 1 M2 LANGIT-LANGIT TRIPLEKS UKURAN (120 X 240) CM, TEBAL 3 MM, 4 MM &
5 A.4.5.1.5. M2 67.857,42
6
6 A.4.5.1.6. PEMASANGAN 1 M2 LANGIT-LANGIT LAMBRISERING KAYU, TEBAL 9 MM M2 330.027,06

7 A.4.5.1.7. PEMASANGAN 1 M2 LANGIT-LANGIT GYPSUM BOARD UKURAN (120X240X9) MM, TEBAL 9 MM M2 54.862,39

PEMASANGAN 1 M2 LANGIT-LANGIT AKUSTIK UKURAN (60 X 120) CM BERIKUT RANGKA


8 A.4.5.1.8. M2 613.442,20
ALLUMINIUM
9 A.4.5.1.9. PEMASANGAN 1 M’ LIST LANGIT-LANGIT KAYU PROFIL M' 174.103,68
10 A.4.5.1.10. PEMASANGAN 1 M2 PLAFOND PVC M2 197.270,71
11 A.4.5.1.10. PEMASANGAN 1 M2 LIST PLAFOND PVC M2 84.793,53
12 A.4.5.1.10. PEMASANGAN RANGKA PLAFON GYPSUM RANGKA METAL FURING M2 123.037,32
13 A.4.5.1.10. PEMASANGAN DINDING PARTISI DOUBLE {PEMBATAS RUANG (GYPSUM) M2 314.748,92
14 A.4.5.1.10. PEMASANGAN RANGKA PLAFON HOLLOW M2 875.709,19

A.4.5.2. HARGA SATUAN PEKERJAAN PENUTUP ATAP

STANDAR SATUAN HARGA, PEMERINTAH KABUPATEN JEMBER, TAHUN 2021 883


KODE REKENING
NO JENIS PEKERJAAN SATUAN HARGA (Rp)
BELANJA
1 2 3 6 7
1 A.4.5.2.1. PEMASANGAN 1 M2 ATAP GENTENG PALENTONG KECIL M2 82.630,38
2 A.4.5.2.2. PEMASANGAN 1 M2 ATAP GENTENG KODOK GLAZUUR M2 131.560,00
3 A.4.5.2.3. PEMASANGAN 1 M2 ATAP GENTENG PALENTONG BESAR/SUPER M2 77.665,25
4 A.4.5.2.4. PEMASANGAN 1 M’ BUBUNG GENTENG PALENTONG M' 190.186,13
5 A.4.5.2.5. PEMASANGAN 1 M’ BUBUNG GENTENG KODOK GLAZUUR M' 190.186,13
6 A.4.5.2.6. PEMASANGAN 1 M’ BUBUNG GENTENG PALENTONG BESAR M' 170.641,88
7 A.4.5.2.7. PEMASANGAN 1 M2 ROOF LIGHT FIBREGLASS 90X180 M2 121.819,79
8 A.4.5.2.8. PEMASANGAN 1 M2 ATAP ASBES GELOMBANG 0,92MX2,5M X 5MM M2 107.200,13
9 A.4.5.2.9. PEMASANGAN 1 M2 ATAP ASBES GELOMBANG 0,92MX2,25M X 5MM M2 122.776,30
10 A.4.5.2.10. PEMASANGAN 1 M2 ATAP ASBES GELOMBANG 0,92MX2,00M X 5MM M2 121.873,55
11 A.4.5.2.11. PEMASANGAN 1 M2 ATAP ASBES GELOMBANG 0,92MX1.80M X 5MM M2 145.237,81
12 A.4.5.2.12. PEMASANGAN 1 M2 ATAP ASBES GELOMBANG 1.05MX3.00M X 4MM M2 82.933,11
13 A.4.5.2.13. PEMASANGAN 1 M2 ATAP ASBES GELOMBANG 1.05MX2.70M X 4MM M2 93.836,44
14 A.4.5.2.14. PEMASANGAN 1 M2 ATAP ASBES GELOMBANG 1.05MX2.40M X 4MM M2 96.951,67
15 A.4.5.2.15. PEMASANGAN 1 M2 ATAP ASBES GELOMBANG 1.05MX2.10M X 4MM M2 107.854,99
16 A.4.5.2.16. PEMASANGAN 1 M2 ATAP ASBES GELOMBANG 1.05MX1.50M X 4MM M2 153.025,90
17 A.4.5.2.17. PEMASANGAN 1 M2 ATAP ASBES GELOMBANG 1.08MX3.00M X 6MM M2 86.048,35
18 A.4.5.2.18. PEMASANGAN 1 M2 ATAP ASBES GELOMBANG 1.08MX2.70M X 6MM M2 87.605,97
19 A.4.5.2.19. PEMASANGAN 1 M2 ATAP ASBES GELOMBANG 1.08MX2.40M X 6MM M2 100.066,91
20 A.4.5.2.20. PEMASANGAN 1 M2 ATAP ASBES GELOMBANG 1.08MX2.10M X 6MM M2 104.739,76
21 A.4.5.2.21. PEMASANGAN 1 M2 ATAP ASBES GELOMBANG 1.08MX1.80M X 6MM M2 117.200,70
22 A.4.5.2.22. PEMASANGAN 1 M’ BUBUNG STEL GELOMBANG 0,92M M' 438.740,18
23 A.4.5.2.23. PEMASANGAN 1 M’ BUBUNG STEL GELOMBANG 1,05M M' 402.849,83
24 A.4.5.2.24. PEMASANGAN 1 M’ BUBUNG STEL GELOMBANG 1,08M M' 396.868,11
25 A.4.5.2.25. PEMASANGAN 1 M’ NOK PATEN 0,92M M' 214.158,98
26 A.4.5.2.26. PEMASANGAN 1 M’ NOK PATEN 1,05M M' 214.158,98
27 A.4.5.2.27. PEMASANGAN 1 M’ NOK PATEN 1,08M M' 214.158,98
28 A.4.5.2.28. PEMASANGAN 1 M’ NOK STEL RATA 0,92M M' 213.844,80
29 A.4.5.2.29. PEMASANGAN 1 M’ NOK STEL RATA 1,05M M' 208.947,18
30 A.4.5.2.30. PEMASANGAN 1 M2 GENTENG BETON M2 102.810,86
31 A.4.5.2.31. PEMASANGAN 1 M2 GENTENG ASPAL M2 232.565,36
32 A.4.5.2.32. PEMASANGAN 1 M2 GENTENG METAL UKURAN 80 X 100 ATAP PELANA M2 170.114,33
33 A.4.5.2.33. PEMASANGAN 1 M2 GENTENG METAL UKURAN 80 X 100 ATAP JURAI M2 240.177,50
34 A.4.5.2.34. PEMASANGAN 1 M2 ATAP SIRAP KAYU M2 333.676,87
35 A.4.5.2.35. PEMASANGAN 1 M’ NOK GENTENG BETON M' 140.419,17
36 A.4.5.2.36. PEMASANGAN 1 M’ NOK GENTENG ASPAL M' 191.047,09
37 A.4.5.2.37. PEMASANGAN 1 M’ NOK GENTENG METAL M' 153.844,99
38 A.4.5.2.38. PEMASANGAN 1 M’ NOK SIRAP M' 76.282,66
39 A.4.5.2.39. PEMASANGAN 1 M2 ATAP SENG GELOMBANG M2 112.187,68
40 A.4.5.2.40. PEMASANGAN 1 M’NOK ATAP SENG M2 47.076,98
41 A.4.5.2.41. PEMASANGAN 1 M2 ATAP ALUMUNIUM M2 316.860,13
42 A.4.5.2.42. PEMASANGAN 1 M’ NOK ALUMUNIUM M' 228.376,89
43 A.4.5.2.43. PEMASANGAN 1 M2 ALUMUNIUM FOIL/SISALATION M2 35.222,34

A.4.6.1 HARGA SATUAN PEKERJAAN KAYU

1 A.4.6.1.1. PEMBUATAN DAN PEMASANGAN 1 M3 KUSEN PINTU DAN KUSEN JENDELA, KAYU KELAS I M3 23.621.482,71

PEMBUATAN DAN PEMASANGAN 1 M3 KUSEN PINTU DAN KUSEN JENDELA, KAYU KELAS II
2 A.4.6.1.2. M3 24.880.575,74
ATAU III
3 A.4.6.1.3. PEMBUATAN DAN PEMASANGAN 1 M2 PINTU KLAMP STANDAR, KAYU KELAS II M2 1.038.447,99
4 A.4.6.1.4. PEMBUATAN DAN PEMASANGAN 1 M2 PINTU KLAMP SEDERHANA, KAYU KELAS III M2 1.038.447,99
5 A.4.6.1.5. PEMBUATAN DAN PEMASANGAN 1 M2 DAUN PINTU PANEL, KAYU KELAS I ATAU II M2 1.434.874,55

6 A.4.6.1.6. PEMBUATAN DAN PEMASANGAN 1 M2 PINTU DAN JENDELA KACA, KAYU KELAS I ATAU II M2 968.116,23

7 A.4.6.1.7. PEMBUATAN DAN PEMASANGAN 1 M2 PINTU DAN JENDELA JALUSI KAYU KELAS I ATAU II M2 1.944.730,73

8 A.4.6.1.8. PEMBUATAN 1 M2 DAUN PINTU PLYWOOD RANGKAP, RANGKA KAYU KELAS II TERTUTUP M2 1.075.683,55

9 A.4.6.1.9. PEMBUATAN 1 M2 PINTU PLYWOOD RANGKAP, RANGKA EXPOSE KAYU KELAS I ATAU II M2 1.142.025,70

10 A.4.6.1.10. PEMASANGAN 1 M2 JALUSI KUSEN, KAYU KELAS I ATAU II M2 1.675.311,66


11 A.4.6.1.11. PEMASANGAN 1 M2 TEAKWOOD RANGKAP, RANGKA EXPOSE KAYU KELAS I M2 1.075.266,10

12 A.4.6.1.12. PEMASANGAN 1 M2 TEAKWOOD RANGKAP LAPIS FORMIKA, RANGKA EXPOSE KAYU KELAS II M2 1.209.327,35

PEMASANGAN 1 M3 KONSTRUKSI KUDA-KUDA KONVENSIONAL, KAYU KELAS I, II DAN III


13 A.4.6.1.13. M3 22.227.560,53
BENTANG 6 METER
14 A.4.6.1.14. PEMASANGAN 1 M3 KONSTRUKSI KUDA-KUDA EXPOSE, KAYU KELAS I M3 25.469.696,30
15 A.4.6.1.15. PEMASANGAN 1 M3 KONSTRUKSI GORDENG, KAYU KELAS II M3 23.620.751,03

STANDAR SATUAN HARGA, PEMERINTAH KABUPATEN JEMBER, TAHUN 2021 884


KODE REKENING
NO JENIS PEKERJAAN SATUAN HARGA (Rp)
BELANJA
1 2 3 6 7
16 A.4.6.1.16. PEMASANGAN 1 M2 RANGKA ATAP GENTENG KERAMIK, KAYU KELAS II M2 225.731,65
17 A.4.6.1.17. PEMASANGAN 1 M2 RANGKA ATAP GENTENG BETON, KAYU KELAS II M2 279.050,14
18 A.4.6.1.18. PEMASANGAN 1 M2 RANGKA ATAP SIRAP, KAYU KELAS II M2 190.275,00

19 A.4.6.1.19. PEMASANGAN 1 M2 RANGKA LANGIT-LANGIT (50 X 100) CM, KAYU KELAS II ATAU III M2 161.438,79

20 A.4.6.1.20. PEMASANGAN 1 M2 RANGKA LANGIT-LANGIT (60 X 60) CM, KAYU KELAS II ATAU III M2 164.503,56
21 A.4.6.1.21. PEMASANGAN 1 M’ LISPLANK UKURAN (3 X 20) CM, KAYU KELAS I ATAU KELAS II M' 271.073,91
22 A.4.6.1.22. PEMASANGAN 1 M’ LISPLANK UKURAN (3 X 30) CM, KAYU KELAS I ATAU KELAS II M' 274.286,27

23 A.4.6.1.23. PEMASANGAN 1 M2 RANGKA DINDING PEMISAH (60 X 120) CM KAYU KELAS II ATAU III M2 586.183,21

24 A.4.6.1.24. PEMASANGAN 1 M2 DINDING PEMISAH TEAKWOOD RANGKAP, RANGKA KAYU KELAS II M2 848.028,78

25 A.4.6.1.25. PEMASANGAN 1 M2 DINDING PEMISAH PLYWOOD RANGKAP, RANGKA KAYU KELAS II M2 767.337,19

26 A.4.6.1.26. PEMASANGAN 1 M2 DINDING LAMBRISERING DARI KAYU PAPAN KELAS I M2 475.464,74

27 A.4.6.1.27. PEMASANGAN 1 M2 DINDING LAMBRISERING DARI PLYWOOD UKURAN (120 X 240) CM M2 62.325,11

28 A.4.6.1.28. PEMASANGAN 1 M2 DINDING BILIK, RANGKA KAYU KELAS III ATAU IV M2 135.579,55

A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA


1 A.4.6.2.1. PEMASANGAN 1 BUAH KUNCI TANAM ANTIK BUAH 213.086,95
2 A.4.6.2.2. PEMASANGAN 1 BUAH KUNCI TANAM BIASA BUAH 151.257,20
3 A.4.6.2.3. PEMASANGAN 1 BUAH KUNCI KAMAR MANDI BUAH 180.655,23
4 A.4.6.2.4. PEMASANGAN 1 BUAH KUNCI SILINDER BUAH 339.378,23
5 A.4.6.2.5. PEMASANGAN 1 BUAH ENGSEL PINTU BUAH 71.934,23
6 A.4.6.2.6. PEMASANGAN 1 BUAH ENGSEL JENDELA KUPU-KUPU BUAH 137.184,08
7 A.4.6.2.7. PEMASANGAN 1 BUAH ENGSEL ANGIN BUAH 105.894,88
8 A.4.6.2.8. PEMASANGAN 1 BUAH SPRING KNIP BUAH 55.711,18
9 A.4.6.2.9. PEMASANGAN 1 BUAH KAIT ANGIN BUAH 42.089,43
10 A.4.6.2.10. PEMASANGAN 1 BUAH DOOR CLOSER BUAH 305.762,00
11 A.4.6.2.11. PEMASANGAN 1 BUAH KUNCI SLOT BUAH 306.349,65
12 A.4.6.2.12. PEMASANGAN 1 BUAH DOOR HOLDER BUAH 215.740,00
13 A.4.6.2.13. PEMASANGAN 1 BUAH DOOR STOP BUAH 125.341,95
14 A.4.6.2.14. PEMASANGAN 1 BUAH RREL PINTU SORONG BUAH 185.843,45
15 A.4.6.2.15. PEMASANGAN 1 BUAH KUNCI LEMARI BUAH 196.681,05
16 A.4.6.2.16. PEMASANGAN 1 M2 KACA TEBAL 3 MM M2 152.480,23
17 A.4.6.2.17. PEMASANGAN 1 M2 KACA TEBAL 5 MM M2 178.539,23
18 A.4.6.2.18. PEMASANGAN 1 M2 KACA TEBAL 8 MM M2 321.144,98
19 A.4.6.2.19. PEMASANGAN 1 M2 KACA BURAM TEBAL 12 MM M2 339.804,19
20 A.4.6.2.20. PEMASANGAN 1 M2 KACA CERMIN TEBAL 5 MM M2 191.158,75
21 A.4.6.2.21. PEMASANGAN 1 M2 KACA CERMIN TEBAL 8 MM M2 247.734,84
22 A.4.6.2.22. PEMASANGAN 1 M2 KACA WIREGLASSED TEBAL 5 MM M2 801.590,83
23 A.4.6.2.23. PEMASANGAN 1 M2 KACA PATRI TEBAL 5 MM M2 277.978,58

A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN


1 A.4.7.1.1. PENGIKISAN/PENGEROKAN 1 M2 PERMUKAAN CAT LAMA M2 18.262,58
2 A.4.7.1.2. PENCUCIAN 1 M2 BIDANG PERMUKAAN TEMBOK YANG PERNAH DICAT M2 17.463,00
3 A.4.7.1.3. PENGEROKAN 1 M2 KARAT PADA PERMUKAAN BAJA CARA MANUAL M2 18.124,29
PENGECATAN 1 M2 BIDANG KAYU BARU (1 LAPIS PLAMUUR, 1 LAPIS CAT DASAR, 2 LAPIS
4 A.4.7.1.4. M2 74.320,13
CAT PENUTUP)
PENGECATAN 1 M2 BIDANG KAYU BARU (1 LAPIS PLAMUUR, 1 LAPIS CAT DASAR, 3 LAPIS
5 A.4.7.1.5. M2 94.396,72
CAT PENUTUP)
6 A.4.7.1.6. PELABURAN 1 M2 BIDANG KAYU DENGAN TEAK OIL M2 45.917,20
7 A.4.7.1.7. PELABURAN 1 M2 BIDANG KAYU DENGAN POLITUR M2 78.643,61
8 A.4.7.1.8. PELABURAN 1 M2 BIDANG KAYU DENGAN CAT RESIDU DAN TER M2 24.904,40
9 A.4.7.1.9. PELABURAN 1 M2 BIDANG KAYU DENGAN VERNIS M2 51.371,71
PENGECATAN 1 M2 TEMBOK BARU ( 1LAPIS PLAMUUR, 1 LAPIS CAT DASAR, 2 LAPIS CAT
10 A.4.7.1.10. M2 31.967,47
PENUTUP)
11 A.4.7.1.11. PENGECATAN 1 M2 TEMBOK LAMA ( 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP) M2 22.118,41
12 A.4.7.1.12. PELABURAN 1 M2 TEMBOK DENGAN KALKARIUM M2 9.977,29
13 A.4.7.1.13. PELABURAN 1 M2 TEMBOK DENGAN KAPUR SIRIH M2 18.689,14
14 A.4.7.1.14. PELABURAN 1 M2 TEMBOK LAMA DENGAN KAPUR SIRIH (PEMELIHARAAN) M2 8.354,87
15 A.4.7.1.15. PEMASANGAN 1 M2 WALLPAPER M2 204.444,13
16 A.4.7.1.16. PENGECATAN 1 M2 PERMUKAAN BAJA DENGAN MENIE BESI M2 38.039,64
17 A.4.7.1.17. PENGECATAN 1 M2 PERMUKAAN BAJA DENGAN MENIE BESI DENGAN PERANCAH M2 72.425,32
18 A.4.7.1.18. PENGECATAN 1 M2 PERMUKAAN BAJA GALVANIS SECARA MANUAL 4 LAPIS M2 84.911,06
PENGECATAN 1 M2 PERMUKAAN BAJA GALVANIS SECARA MANUAL SISTEM 1 LAPIS CAT
19 A.4.7.1.19. M2 44.198,41
MUTAKHIR

STANDAR SATUAN HARGA, PEMERINTAH KABUPATEN JEMBER, TAHUN 2021 885


KODE REKENING
NO JENIS PEKERJAAN SATUAN HARGA (Rp)
BELANJA
1 2 3 6 7

20 A.4.7.1.20. PENGECATAN 1 M2 PERMUKAAN BAJA GALVANIS SECARA MANUAL SISTEM 3 LAPIS M2 191.784,35

PENGECATAN 1 M2 PERMUKAAN BAJA GALVANIS SECARA SEMPROT SISTEM 3 LAPIS CAT


21 A.4.7.1.21. M2 172.086,52
MUTAKHIR
22 A.4.7.1.22. PLITURAN 10 M2 DENGAN PLITUR MELAMIC M2 172.086,52

A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG


1 A.5.1.1.1. (K3) PEMASANGAN 1 BUAH CLOSET DUDUK/MONOBLOCK BUAH 1.544.387,90
2 A.5.1.1 2. PEMASANGAN 1 BUAH CLOSET JONGKOK PORSLEN BUAH 660.213,85
3 A.5.1.1 3. PEMASANGAN 1 BUAH CLOSET JONGKOK TERASO BUAH 651.884,98
4 A.5.1.1 4. (K3) PEMASANGAN 1 BUAH URINOIR BUAH 609.521,82
5 A.5.1.1 5. (K3) PEMASANGAN 1 BUAH WASTAFEL BUAH 761.001,37
6 A.5.1.1 6. (K3) PEMASANGAN 1 BUAH BATHCUIP PORSELEN BUAH 1.110.867,23
7 A.5.1.1 7. (K3) PEMASANGAN 1 BUAH BAK FIBREGLASS VOL 1 M3 BUAH 1.521.316,60
8 A.5.1.1 8. (K3) PEMASANGAN 1 BUAH BAK MANDI BATU BATA VOL 0,30 M3 BUAH 2.112.811,05
9 A.5.1.1 9. PEMASANGAN 1 BUAH BAK MANDI TERASO VOL 0,30 M3 BUAH 1.521.316,60
10 A.5.1.1 10. PEMASANGAN 1 BUAH BAK AIR FIBREGLASS VOL 1 M3 BUAH 598.458,85
11 A.5.1.1 11. PEMASANGAN 1 BUAH BAK BETON VOLUME 1 M3 BUAH 29.113.925,44
12 A.5.1.1 12. PEMASANGAN 1 BUAH BAK CUCI PIRING STAINLESSTEEL BUAH 439.988,85
13 A.5.1.1 13. PEMASANGAN 1 BUAH BAK CUCI PIRING TERASO BUAH 516.197,05
14 A.5.1.1 14. PEMASANGAN 1 BUAH FLOOR DRAIN BUAH 98.690,70
15 A.5.1.1 15. PEMASANGAN 1 BUAH BAK KONTROL PASANGAN BATA 30X30 TINGGI 35 CM BUAH 531.031,71

16 A.5.1.1 16. PEMASANGAN 1 BUAH BAK KONTROL PASANGAN BATA 45CM X45CM TINGGI 50 CM BUAH 788.075,22

17 A.5.1.1 17. PEMASANGAN 1 BUAH BAK KONTROL PASANGAN BATA 60CM X60CM TINGGI 65 CM BUAH 955.896,12

18 A.5.1.1 18. PEMASANGAN 1 M’ PIPA GALVANIS DIAMETER ½” M' 55.634,36


19 A.5.1.1 19. PEMASANGAN 1 BUAH KRAN DIAMETER ½” ATAU 3/4” BUAH 102.447,32
20 A.5.1.1 20. PEMASANGAN 1 M’ PIPA GALVANIS DIAMETER 3/4” M' 90.174,38
21 A.5.1.1 21. PEMASANGAN 1 M’ PIPA GALVANIS DIAMETER 1” M' 123.754,95
22 A.5.1.1 22. PEMASANGAN 1 M’ PIPA GALVANIS DIAMETER 1 ½” M' 193.057,40
23 A.5.1.1 23. PEMASANGAN 1 M’ PIPA GALVANIS DIAMETER 3” M' 396.440,31
24 A.5.1.1 24. PEMASANGAN 1 M’ PIPA GALVANIS DIAMETER 4” M' 548.992,06
25 A.5.1.1 25. PEMASANGAN 1 M’ PIPA PVC TIPE AW DIAMETER 1/2” M' 38.491,54
26 A.5.1.1 26. PEMASANGAN 1 M’ PIPA PVC TIPE AW DIAMETER 3/4” M' 38.491,54
27 A.5.1.1 27. PEMASANGAN 1 M’ PIPA PVC TIPE AW DIAMETER 1” M' 40.410,43
28 A.5.1.1 28. PEMASANGAN 1 M’ PIPA PVC TIPE AW DIAMETER 11/2” M' 68.770,92
29 A.5.1.1 29. PEMASANGAN 1 M’ PIPA PVC TIPE AW DIAMETER 2” M' 94.675,94
30 A.5.1.1 30. PEMASANGAN 1 M’ PIPA PVC TIPE AW DIAMETER 21/2” M' 122.279,16
31 A.5.1.1 31. PEMASANGAN 1 M’ PIPA PVC TIPE AW DIAMETER 3” M' 155.859,73
32 A.5.1.1 32. PEMASANGAN 1 M’ PIPA PVC TIPE AW DIAMETER 4” M' 194.237,53
33 A.5.1.1 33. PEMASANGAN 1 M’ PIPA AIR LIMBAH JENIS PIPA TANAH M' 233.350,57
34 A.5.1.1 34. PEMASANGAN 1 M’ PIPA AIR LIMBAH JENIS PIPA TANAH DIAMETER 15 CM M' 173.122,48
35 A.5.1.1 35. PEMASANGAN 1 M’ PIPA BETON DIAMETER 15 - 20 CM M' 162.947,79
36 A.5.1.1.36. PEMASANGAN 1 M’ PIPA BETON DIAMETER 30 - 100 CM M' 225.218,47

A.8.4.1 HARGA SATUAN PEKERJAAN PEMASANGAN PIPA


1 A.8.4.1.1 (K3) PEMASANGAN 1 M PIPA PVC Ø 63 MM M' 22.270,58
2 A.8.4.1.2 (K3) PEMASANGAN 1 M PIPA PVC Ø 90 MM M' 26.393,37
3 A.8.4.1.3 (K3) PEMASANGAN 1 M PIPA PVC Ø 110 MM M' 28.654,78
4 A.8.4.1.4 (K3) PEMASANGAN 1 M PIPA PVC Ø 150 MM M' 32.185,33
5 A.8.4.1.5 (K3) PEMASNGAN 1 M PIPA PVC Ø 200 MM M' 48.595,99
6 A.8.4.1.6 (K3) PEMASANGAN 1 M PIPA PVC Ø 250 MM M' 65.628,98
7 A.8.4.1.7 (K3) PEMASANGAN 1 M PIPA PVC Ø 300 MM M' 78.903,80
8 A.8.4.1.8 (K3) PEMASANGAN 1 M PIPA PVC Ø 400 MM M' 134.325,52
9 A.8.4.1.9 (K3) PEMASANGAN 1 M PIPA PVC Ø 450 MM M' 164.534,76
10 A.8.4.1.10 (K3) PEMASANGAN 1 M PIPA PVC Ø 500 MM M' 203.948,18
11 A.8.4.1.11 (K3) PEMASANGAN 1 M PIPA PVC Ø 600 MM M' 240.744,16
12 A.8.4.1.12 (K3) PEMASANGAN 1 M PIPA PVC Ø 800 MM M' 385.399,39
13 A.8.4.1.13 (K3) PEMASANGAN 1 M PIPA PVC Ø 900 MM M' 408.668,19
14 A.8.4.1.14 (K3) PEMASANGAN 1 M PIPA PVC Ø 1000 MM M' 453.951,33
15 A.8.4.1.15 (K3) PEMASANGAN 1 M PIPA PVC Ø 1100 MM M' 520.547,60
16 A.8.4.1.16 (K3) PEMASANGAN 1 M PIPA PVC Ø 1200 MM M' 564.861,06
17 A.8.4.1.17 (K3) PEMASANGAN 1 M PIPA HDPE Ø 63 MM M' 25.130,18
18 A.8.4.1.18 (K3) PEMASANGAN 1 M PIPA HDPE Ø 100 MM M' 41.582,65
19 A.8.4.1.19 (K3) PEMASANGAN 1 M PIPA HDPE Ø 125 MM M' 53.297,13
20 A.8.4.1.20 (K3) PEMASANGAN 1 M PIPA HDPE Ø 150 MM M' 83.528,44
21 A.8.4.1.21 (K3) PEMASANGAN 1 M PIPA HDPE Ø 200 MM M' 130.013,74

STANDAR SATUAN HARGA, PEMERINTAH KABUPATEN JEMBER, TAHUN 2021 886


KODE REKENING
NO JENIS PEKERJAAN SATUAN HARGA (Rp)
BELANJA
1 2 3 6 7
22 A.8.4.1.22 (K3) PEMASANGAN 1 M PIPA HDPE Ø 250 MM M' 197.315,67
23 A.8.4.1.23 (K3) PEMASANGAN 1 M PIPA HDPE Ø 300 MM M' 305.926,51
24 A.8.4.1.24 (K3) PEMASANGAN 1 M PIPA HDPE Ø 400 MM M' 486.428,89
25 A.8.4.1.25 (K3) PEMASANGAN 1 M PIPA HDPE Ø 450 MM M' 624.125,36
26 A.8.4.1.26 (K3) PEMASANGAN 1 M PIPA HDPE Ø 500 MM M' 773.810,82
27 A.8.4.1.27 (K3) PEMASANGAN 1 M PIPA HDPE Ø 600 MM M' 1.204.331,28
28 A.8.4.1.28 (K3) PEMASANGAN 1 M PIPA HDPE Ø 800 MM M' 2.052.989,79
29 A.8.4.1.29 (K3) PEMASANGAN 1 M PIPA HDPE Ø 900 MM M' 2.690.618,44
30 A.8.4.1.30 (K3) PEMASANGAN 1 M PIPA HDPE Ø 1000 MM M' 3.280.270,02
31 A.8.4.1.31 (K3) PEMASANGAN 1 M PIPA HDPE Ø 1100 MM M' 3.592.277,14
32 A.8.4.1.32 (K3) PEMASANGAN 1 M PIPA HDPE Ø 1200 MM M' 4.069.458,86
33 A.8.4.1.33 (K3) PEMASANGAN 1 M PIPA GIP Ø 63 MM M' 88.805,48
34 A.8.4.1.34 (K3) PEMASANGAN 1 M PIPA GIP Ø 100 MM M' 104.435,71
35 A.8.4.1.35 (K3) PEMASANGAN 1 M PIPA GIP Ø 125 MM M' 125.775,57
36 A.8.4.1.36 (K3) PEMASANGAN 1 M PIPA GIP Ø 150 MM M' 150.812,08
37 A.8.4.1.37 (K3) PEMASANGAN 1 M PIPA GIP Ø 200 MM M' 248.876,95
38 A.8.4.1.38 (K3) PEMASANGAN 1 M PIPA GIP Ø 250 MM M' 333.457,04
39 A.8.4.1.39 (K3) PEMASANGAN 1 M PIPA GIP Ø 300 MM M' 413.840,54
40 A.8.4.1.40 (K3) PEMASANGAN 1 M PIPA GIP Ø 400 MM M' 635.227,66
41 A.8.4.1.41 (K3) PEMASANGAN 1 M PIPA GIP Ø 450 MM M' 776.121,40
42 A.8.4.1.42 (K3) PEMASANGAN 1 M PIPA GIP Ø 500 MM M' 898.865,38
43 A.8.4.1.43 (K3) PEMASANGAN 1 M PIPA GIP Ø 600 MM M' 1.024.841,44
44 A.8.4.1.44 (K3) PEMASANGAN 1 M PIPA GIP Ø 800 MM M' 1.466.887,11
45 A.8.4.1.45 (K3) PEMASANGAN 1 M PIPA GIP Ø 900 MM M' 1.695.199,83
46 A.8.4.1.46 (K3) PEMASANGAN 1 M PIPA GIP Ø 1000 MM M' 1.833.174,00
47 A.8.4.1.47 (K3) PEMASANGAN 1 M PIPA GIP Ø 1100 MM M' 2.257.907,60
48 A.8.4.1.48 (K3) PEMASANGAN 1 M PIPA GIP Ø 1200 MM M' 2.123.560,97
49 A.8.4.1.49 (K3) PEMASANGAN 1 M PIPA DCI Ø 100 MM M' 108.886,95
50 A.8.4.1.50 (K3) PEMASANGAN 1 M PIPA DCI Ø 125 MM M' 119.730,76
51 A.8.4.1.51 (K3) PEMASANGAN 1 M PIPA DCI Ø 150 MM M' 165.579,88
52 A.8.4.1.52 (K3) PEMASANGAN 1 M PIPA DCI Ø 200 MM M' 212.914,57
53 A.8.4.1.53 (K3) PEMASANGAN 1 M PIPA DCI Ø 250 MM M' 228.508,22
54 A.8.4.1.54 (K3) PEMASANGAN 1 M PIPA DCI Ø 300 MM M' 239.370,63
55 A.8.4.1.55 (K3) PEMASANGAN 1 M PIPA DCI Ø 400 MM M' 320.341,32
56 A.8.4.1.56 (K3) PEMASANGAN 1 M PIPA DCI Ø 450 MM M' 432.686,27
57 A.8.4.1.57 (K3) PEMASANGAN 1 M PIPA DCI Ø 500 MM M' 628.409,68
58 A.8.4.1.58 (K3) PEMASANGAN 1 M PIPA DCI Ø 600 MM M' 762.203,95
59 A.8.4.1.59 (K3) PEMASANGAN 1 M PIPA DCI Ø800 MM M' 1.103.699,97
60 A.8.4.1.60 (K3) PEMASANGAN 1 M PIPA DCI Ø900 MM M' 1.396.996,26
61 A.8.4.1.61 (K3) PEMASANGAN 1 M PIPA DCI Ø1000 MM M' 1.781.224,09
62 A.8.4.1.62 (K3) PEMASANGAN 1 M PIPA DCI Ø1100 MM M' 2.162.306,62
63 A.8.4.1.63 (K3) PEMASANGAN 1 M PIPA DCI Ø1200 MM M' 2.441.519,69
64 A.8.4.1.64 (K3) PEMASANGAN 1 M PIPA BAJA Ø 63 MM M' 142.167,58
65 A.8.4.1.65 (K3) PEMASANGAN 1 M PIPA BAJA Ø 100 MM M' 178.799,68
66 A.8.4.1.66 (K3) PEMASANGAN 1 M PIPA BAJA Ø 125 MM M' 353.032,38
67 A.8.4.1.67 (K3) PEMASANGAN 1 M PIPA BAJA Ø 150 MM M' 514.058,83
68 A.8.4.1.68 (K3) PEMASANGAN 1 M PIPA BAJA Ø 200 MM M' 793.240,31
69 A.8.4.1.69 (K3) PEMASANGAN 1 M' PIPA BAJA Ø 250 MM M' 1.160.851,15
70 A.8.4.1.70 (K3) PEMASANGAN 1 M PIPA BAJA Ø 300 MM M' 1.650.115,20
71 A.8.4.1.71 (K3) PEMASANGAN 1 M PIPA BAJA Ø 400 MM M' 2.906.297,57
72 A.8.4.1.72 (K3) PEMASANGAN 1 M PIPA BAJA Ø 450 MM M' 3.495.978,02
73 A.8.4.1.73 (K3) PEMASANGAN 1 M PIPA BAJA Ø 500 MM M' 4.251.137,15
74 A.8.4.1.74 (K3) PEMASANGAN 1 M PIPA BAJA Ø 600 MM M' 5.490.210,26
75 A.8.4.1.75 (K3) PEMASANGAN 1 M PIPA BAJA Ø 800 MM M' 7.716.820,23
76 A.8.4.1.76 (K3) PEMASANGAN 1 M PIPA BAJA Ø 900 MM M' 9.020.525,77
77 A.8.4.1.77 (K3) PEMASANGAN 1 M PIPA BAJA Ø 1000 MM M' 9.946.461,33
78 A.8.4.1.78 (K3) PEMASANGAN 1 M PIPA BAJA Ø 1100 MM M' 11.365.925,64
79 A.8.4.1.79 (K3) PEMASANGAN 1 M PIPA BAJA Ø 1200 MM M' 12.367.430,96

A.8.4.2 HARGA SATUAN PEKERJAAN PEMOTONGAN PIPA


1 A.8.4.2.1 (K3) PEMOTONGAN 1 BUAH PIPA PVC Ø 63 MM BUAH 8.124,70
2 A.8.4.2.2 (K3) PEMOTONGAN 1 BUAH PIPA PVC Ø 90 MM BUAH 11.576,08
3 A.8.4.2.3 (K3) PEMOTONGAN 1 BUAH PIPA PVC Ø 110 MM BUAH 13.081,89
4 A.8.4.2.4 (K3) PEMOTONGAN 1 BUAH PIPA PVC Ø 150 MM BUAH 15.880,65
5 A.8.4.2.5 (K3) PEMOTONGAN 1 BUAH PIPA PVC Ø 200 MM BUAH 28.817,55
6 A.8.4.2.6 (K3) PEMOTONGAN 1 BUAH PIPA PVC Ø 250 MM BUAH 42.731,13
7 A.8.4.2.7 (K3) PEMOTONGAN 1 BUAH PIPA PVC Ø 300 MM BUAH 54.151,59
8 A.8.4.2.8 (K3) PEMOTONGAN 1 BUAH PIPA PVC Ø 400 MM BUAH 97.722,19

STANDAR SATUAN HARGA, PEMERINTAH KABUPATEN JEMBER, TAHUN 2021 887


KODE REKENING
NO JENIS PEKERJAAN SATUAN HARGA (Rp)
BELANJA
1 2 3 6 7
9 A.8.4.2.9 (K3) PEMOTONGAN 1 BUAH PIPA PVC Ø 450 MM BUAH 97.290,94
10 A.8.4.2.10 (K3) PEMOTONGAN 1 BUAH PIPA PVC Ø 500 MM BUAH 152.326,32
11 A.8.4.2.11 (K3) PEMOTONGAN 1 BUAH PIPA PVC Ø 600 MM BUAH 181.725,62
12 A.8.4.2.12 (K3) PEMOTONGAN 1 BUAH PIPA PVC Ø 800 MM BUAH 293.561,08
13 A.8.4.2.13 (K3) PEMOTONGAN 1 BUAH PIPA PVC Ø 900 MM BUAH 313.204,50
14 A.8.4.2.14 (K3) PEMOTONGAN 1 BUAH PIPA PVC Ø 1000 MM BUAH 351.642,43
15 A.8.4.2.15 (K3) PEMOTONGAN 1 BUAH PIPA PVC Ø 1100 MM BUAH 404.682,11
16 A.8.4.2.16 (K3) PEMOTONGAN 1 BUAH PIPA PVC Ø 1200 MM BUAH 438.842,05
17 A.8.4.2.17 (K3) PEMOTONGAN 1 BUAH PIPA HDPE Ø 63 MM BUAH 27.229,61
18 A.8.4.2.18 (K3) PEMOTONGAN 1 BUAH PIPA HDPE Ø 100 MM BUAH 52.428,44
19 A.8.4.2.19 (K3) PEMOTONGAN 1 BUAH PIPA HDPE Ø 125 MM BUAH 69.777,03
20 A.8.4.2.20 (K3) PEMOTONGAN 1 BUAH PIPA HDPE Ø 150 MM BUAH 104.545,66
21 A.8.4.2.21 (K3) PEMOTONGAN 1 BUAH PIPA HDPE Ø 200 MM BUAH 161.359,16
22 A.8.4.2.22 (K3) PEMOTONGAN 1 BUAH PIPA HDPE Ø 250 MM BUAH 239.151,92
23 A.8.4.2.23 (K3) PEMOTONGAN 1 BUAH PIPA HDPE Ø 300 MM BUAH 357.284,19
24 A.8.4.2.24 (K3) PEMOTONGAN 1 BUAH PIPA HDPE Ø 400 MM BUAH 555.659,01
25 A.8.4.2.25 (K3) PEMOTONGAN 1 BUAH PIPA HDPE Ø 450 MM BUAH 701.627,19
26 A.8.4.2.26 (K3) PEMOTONGAN 1 BUAH PIPA HDPE Ø 500 MM BUAH 859.408,40
27 A.8.4.2.27 (K3) PEMOTONGAN 1 BUAH PIPA HDPE Ø 600 MM BUAH 1.309.565,64
28 A.8.4.2.28 (K3) PEMOTONGAN 1 BUAH PIPA HDPE Ø 800 MM BUAH 2.185.380,50
29 A.8.4.2.29 (K3) PEMOTONGAN 1 BUAH PIPA HDPE Ø 900 MM BUAH 2.819.110,00
30 A.8.4.2.30 (K3) PEMOTONGAN 1 BUAH PIPA HDPE Ø 1000 MM BUAH 3.451.922,87
31 A.8.4.2.31 (K3) PEMOTONGAN 1 BUAH PIPA HDPE Ø 1100 MM BUAH 3.742.923,80
32 A.8.4.2.32 (K3) PEMOTONGAN 1 BUAH PIPA HDPE Ø 1200 MM BUAH 4.212.147,10
33 A.8.4.2.33 (K3) PEMOTONGAN 1 BUAH PIPA GIP Ø 63 MM BUAH 29.100,53
34 A.8.4.2.34 (K3) PEMOTONGAN 1 BUAH PIPA GIP Ø 100 MM BUAH 41.592,64
35 A.8.4.2.35 (K3) PEMOTONGAN 1 BUAH PIPA GIP Ø 125 MM BUAH 61.492,59
36 A.8.4.2.36 (K3) PEMOTONGAN 1 BUAH PIPA GIP Ø 150 MM BUAH 91.878,70
37 A.8.4.2.37 (K3) PEMOTONGAN 1 BUAH PIPA GIP Ø 200 MM BUAH 167.240,28
38 A.8.4.2.38 (K3) PEMOTONGAN 1 BUAH PIPA GIP Ø 250 MM BUAH 237.541,51
39 A.8.4.2.39 (K3) PEMOTONGAN 1 BUAH PIPA GIP Ø 300 MM BUAH 332.547,26
40 A.8.4.2.40 (K3) PEMOTONGAN 1 BUAH PIPA GIP Ø 400 MM BUAH 527.280,42
41 A.8.4.2.41 (K3) PEMOTONGAN 1 BUAH PIPA GIP Ø 450 MM BUAH 686.485,42
42 A.8.4.2.42 (K3) PEMOTONGAN 1 BUAH PIPA GIP Ø 500 MM BUAH 804.389,05
43 A.8.4.2.43 (K3) PEMOTONGAN 1 BUAH PIPA GIP Ø 600 MM BUAH 943.483,86
44 A.8.4.2.44 (K3) PEMOTONGAN 1 BUAH PIPA GIP Ø 800 MM BUAH 1.330.548,45
45 A.8.4.2.45 (K3) PEMOTONGAN 1 BUAH PIPA GIP Ø 900 MM BUAH 1.541.640,03
46 A.8.4.2.46 (K3) PEMOTONGAN 1 BUAH PIPA GIP Ø 1000 MM BUAH 1.665.230,89
47 A.8.4.2.47 (K3) PEMOTONGAN 1 BUAH PIPA GIP Ø 1100 MM BUAH 2.074.374,67
48 A.8.4.2.48 (K3) PEMOTONGAN 1 BUAH PIPA GIP Ø 1200 MM BUAH 2.264.845,95
49 A.8.4.2.49 (K3) PEMOTONGAN 1 BUAH PIPA DCI Ø 100 MM BUAH 38.891,86
50 A.8.4.2.50 (K3) PEMOTONGAN 1 BUAH PIPA DCI Ø 125 MM BUAH 47.405,65
51 A.8.4.2.51 (K3) PEMOTONGAN 1 BUAH PIPA DCI Ø 150 MM BUAH 90.736,10
52 A.8.4.2.52 (K3) PEMOTONGAN 1 BUAH PIPA DCI Ø 200 MM BUAH 133.803,17
53 A.8.4.2.53 (K3) PEMOTONGAN 1 BUAH PIPA DCI Ø 250 MM BUAH 159.281,22
54 A.8.4.2.54 (K3) PEMOTONGAN 1 BUAH PIPA DCI Ø 300 MM BUAH 171.709,52
55 A.8.4.2.55 (K3) PEMOTONGAN 1 BUAH PIPA DCI Ø 400 MM BUAH 294.777,71
56 A.8.4.2.56 (K3) PEMOTONGAN 1 BUAH PIPA DCI Ø 450 MM BUAH 397.758,76
57 A.8.4.2.57 (K3) PEMOTONGAN 1 BUAH PIPA DCI Ø 500 MM BUAH 584.475,95
58 A.8.4.2.58 (K3) PEMOTONGAN 1 BUAH PIPA DCI Ø 600 MM BUAH 687.202,12
59 A.8.4.2.59 (K3) PEMOTONGAN 1 BUAH PIPA DCI Ø 800 MM BUAH 947.880,95
60 A.8.4.2.60 (K3) PEMOTONGAN 1 BUAH PIPA DCI Ø 900 MM BUAH 1.272.014,11
61 A.8.4.2.61 (K3) PEMOTONGAN 1 BUAH PIPA DCI Ø 1000 MM BUAH 1.599.412,33
62 A.8.4.2.62 (K3) PEMOTONGAN 1 BUAH PIPA DCI Ø 1100 MM BUAH 1.992.737,57
63 A.8.4.2.63 (K3) PEMOTONGAN 1 BUAH PIPA DCI Ø 1200 MM BUAH 2.251.433,98
64 A.8.4.2.64 (K3) PEMOTONGAN 1 BUAH PIPA BAJA Ø 63 MM BUAH 75.566,63
65 A.8.4.2.65 (K3) PEMOTONGAN 1 BUAH PIPA BAJA Ø 100 MM BUAH 108.892,01
66 A.8.4.2.66 (K3) PEMOTONGAN 1 BUAH PIPA BAJA Ø 125 MM BUAH 280.221,37
67 A.8.4.2.67 (K3) PEMOTONGAN 1 BUAH PIPA BAJA Ø 150 MM BUAH 440.103,33
68 A.8.4.2.68 (K3) PEMOTONGAN 1 BUAH PIPA BAJA Ø 200 MM BUAH 703.882,34
69 A.8.4.2.69 (K3) PEMOTONGAN 1 BUAH PIPA BAJA Ø 250 MM BUAH 1.068.325,09
70 A.8.4.2.70 (K3) PEMOTONGAN 1 BUAH PIPA BAJA Ø 300 MM BUAH 1.556.757,60
71 A.8.4.2.71 (K3) PEMOTONGAN 1 BUAH PIPA BAJA Ø 400 MM BUAH 2.766.490,77
72 A.8.4.2.72 (K3) PEMOTONGAN 1 BUAH PIPA BAJA Ø 450 MM BUAH 3.370.665,54
73 A.8.4.2.73 (K3) PEMOTONGAN 1 BUAH PIPA BAJA Ø 500 MM BUAH 4.118.394,04
74 A.8.4.2.74 (K3) PEMOTONGAN 1 BUAH PIPA BAJA Ø 600 MM BUAH 5.373.701,47
75 A.8.4.2.75 (K3) PEMOTONGAN 1 BUAH PIPA BAJA Ø 800 MM BUAH 7.521.791,18
76 A.8.4.2.76 (K3) PEMOTONGAN 1 BUAH PIPA BAJA Ø 900 MM BUAH 8.901.831,67

STANDAR SATUAN HARGA, PEMERINTAH KABUPATEN JEMBER, TAHUN 2021 888


KODE REKENING
NO JENIS PEKERJAAN SATUAN HARGA (Rp)
BELANJA
1 2 3 6 7
77 A.8.4.2.77 (K3) PEMOTONGAN 1 BUAH PIPA BAJA Ø 1000 MM BUAH 9.704.143,36
78 A.8.4.2.78 (K3) PEMOTONGAN 1 BUAH PIPA BAJA Ø 1100 MM BUAH 11.100.875,30
79 A.8.4.2.79 (K3) PEMOTONGAN 1 BUAH PIPA BAJA Ø 1200 MM BUAH 12.077.900,74

A.8.4.3 HARGA SATUAN PEKERJAAN PEMASANGAN AKSESORIS PIPA


1 A.8.4.3.1 (K3) PEMASANGAN 1 BUAH VALVE Ø 150 MM BUAH 287.306,46
2 A.8.4.3.2 (K3) PEMASANGAN 1 BUAH VALVE Ø 200 MM BUAH 358.002,13
3 A.8.4.3.3 (K3) PEMASANGAN 1 BUAH VALVE Ø 250 MM BUAH 380.389,18
4 A.8.4.3.4 (K3) PEMASANGAN 1 BUAH VALVE Ø 300 MM BUAH 453.939,50
5 A.8.4.3.5 (K3) PEMASANGAN 1 BUAH VALVE Ø 400 MM BUAH 745.510,16
6 A.8.4.3.6 (K3) PEMASANGAN 1 BUAH VALVE Ø 450 MM BUAH 772.753,66
7 A.8.4.3.7 (K3) PEMASANGAN 1 BUAH VALVE Ø 500 MM BUAH 891.888,25
8 A.8.4.3.8 (K3) PEMASANGAN 1 BUAH VALVE Ø 600 MM BUAH 1.092.149,02
9 A.8.4.3.9 (K3) PEMASANGAN 1 BUAH VALVE Ø 700 MM BUAH 1.568.165,53
10 A.8.4.3.10 (K3) PEMASANGAN 1 BUAH VALVE Ø 800 MM BUAH 1.704.043,90
11 A.8.4.3.11 (K3) PEMASANGAN 1 BUAH VALVE Ø 900 MM BUAH 2.354.388,04
12 A.8.4.3.12 (K3) PEMASANGAN 1 BUAH VALVE Ø 1000 MM BUAH 3.047.676,83
13 A.8.4.3.13 (K3) PEMASANGAN 1 BUAH VALVE Ø 1100 MM BUAH 3.379.200,25
14 A.8.4.3.14 (K3) PEMASANGAN 1 BUAH VALVE Ø 1200 MM BUAH 3.491.727,75
15 A.8.4.3.15 (K3) PEMASANGAN 1 BUAH TEE Ø 150 MM BUAH 38.644,32
16 A.8.4.3.16 (K3) PEMASANGAN 1 BUAH TEE Ø 200 MM BUAH 68.484,03
17 A.8.4.3.17 (K3) PEMASANGAN 1 BUAH TEE Ø 250 MM BUAH 92.011,53
18 A.8.4.3.18 (K3) PEMASANGAN 1 BUAH TEE Ø 300 MM BUAH 132.796,02
19 A.8.4.3.19 (K3) PEMASANGAN 1 BUAH TEE Ø 400 MM BUAH 189.469,17
20 A.8.4.3.20 (K3) PEMASANGAN 1 BUAH TEE Ø 450 MM BUAH 232.315,87
21 A.8.4.3.21 (K3) PEMASANGAN 1 BUAH TEE Ø 500 MM BUAH 270.306,12
22 A.8.4.3.22 (K3) PEMASANGAN 1 BUAH TEE Ø 600 MM BUAH 516.815,53
23 A.8.4.3.23 (K3) PEMASANGAN 1 BUAH TEE Ø 700 MM BUAH 605.376,01
24 A.8.4.3.24 (K3) PEMASANGAN 1 BUAH TEE Ø 800 MM BUAH 697.712,09
25 A.8.4.3.25 (K3) PEMASANGAN 1 BUAH TEE Ø 900 MM BUAH 849.401,09
26 A.8.4.3.26 (K3) PEMASANGAN 1 BUAH TEE Ø 1000 MM BUAH 1.006.436,93
27 A.8.4.3.27 (K3) PEMASANGAN 1 BUAH TEE Ø 1100 MM BUAH 1.107.534,75
28 A.8.4.3.28 (K3) PEMASANGAN 1 BUAH TEE Ø 1200 MM BUAH 1.278.768,00

A.8.4.4 HARGA SATUAN PEKERJAAN PENYAMBUNGAN PIPA BARU KE PIPA LAMA


1 A.8.4.4.1 (K3) PENYAMBUNGAN 1 BUAH PIPA BARU KE PIPA YANG ADA Ø 80 MM BUAH 476.206,26
2 A.8.4.4.2 (K3) PENYAMBUNGAN 1 BUAH PIPA BARU KE PIPA YANG ADA Ø 100 MM BUAH 591.758,94
3 A.8.4.4.3 (K3) PENYAMBUNGAN 1 BUAH PIPA BARU KE PIPA YANG ADA Ø 150 MM BUAH 922.986,51
4 A.8.4.4.4 (K3) PENYAMBUNGAN 1 BUAH PIPA BARU KE PIPA YANG ADA Ø 200 MM BUAH 1.261.913,33
5 A.8.4.4.5 (K3) PENYAMBUNGAN 1 BUAH PIPA BARU KE PIPA YANG ADA Ø 250 MM BUAH 1.724.028,15
6 A.8.4.4.6 (K3) PENYAMBUNGAN 1 BUAH PIPA BARU KE PIPA YANG ADA Ø 300 MM BUAH 2.331.244,22
7 A.8.4.4.7 (K3) PENYAMBUNGAN 1 BUAH PIPA BARU KE PIPA YANG ADA Ø 400 MM BUAH 3.627.999,12
8 A.8.4.4.8 (K3) PENYAMBUNGAN 1 BUAH PIPA BARU KE PIPA YANG ADA Ø 450 MM BUAH 4.350.111,69
9 A.8.4.4.9 (K3) PENYAMBUNGAN 1 BUAH PIPA BARU KE PIPA YANG ADA Ø 500 MM BUAH 5.114.274,01
10 A.8.4.4.10 (K3) PENYAMBUNGAN 1 BUAH PIPA BARU KE PIPA YANG ADA Ø 600 MM BUAH 6.344.104,65
11 A.8.4.4.11 (K3) PENYAMBUNGAN 1 BUAH PIPA BARU KE PIPA YANG ADA Ø 700 MM BUAH 7.166.467,29
12 A.8.4.4.12 (K3) PENYAMBUNGAN 1 BUAH PIPA BARU KE PIPA YANG ADA Ø 800 MM BUAH 8.491.650,19

A.8.4.5 HARGA SATUAN PEKERJAAN PENGETESAN PIPA


1 A.8.4.5.1 (K3) PENGETESAN 1 M PIPA Ø 50 MM M 1.471,68
2 A.8.4.5.2 (K3) PENGETESAN 1 M PIPA Ø 75 MM M 1.476,06
3 A.8.4.5.3 (K3) PENGETESAN 1 M PIPA Ø 100 MM M 1.484,83
4 A.8.4.5.4 (K3) PENGETESAN 1 M PIPA Ø 150 MM M 1.506,74
5 A.8.4.5.5 (K3) PENGETESAN 1 M PIPA Ø 200 MM M 1.535,23
6 A.8.4.5.6 (K3) PENGETESAN 1 M PIPA Ø 250 MM M 1.574,67
7 A.8.4.5.7 (K3) PENGETESAN 1 M PIPA Ø 300 MM M 1.622,88
8 A.8.4.5.8 (K3) PENGETESAN 1 M PIPA Ø 400 MM M 1.743,40
9 A.8.4.5.9 (K3) PENGETESAN 1 M PIPA Ø 500 MM M 1.813,53
10 A.8.4.5.10 (K3) PENGETESAN 1 M PIPA Ø 600 MM M 2.087,44

A.8.4.6 HARGA SATUAN PEKERJAAN ELEKTRIKAL


1 A.8.4.6.1 (K3) PEMASANGAN 1 BUAH TITIK LAMPU TITIK 632.700,79
2 A.8.4.6.2 MEMASANG 1 TITIK INSTALASI PENERANGAN TITIK 381.494,39
3 A.8.4.6.3 MEMASANG 1 TITIK INSTALASI LAMPU TL TITIK 389.572,85
4 A.8.4.6.4 MEMASANG 1 TITIK INSTALASI LAMPU SL TITIK 350.484,35
5 A.8.4.6.5 MEMASANG 1 TITIK INSTALASI LAMPU XL TITIK 375.358,85
6 A.8.4.6.6 MEMASANG 1 TITIK INSTALASI LAMPU DOWNLIGHT TITIK 874.625,60
7 A.8.4.6.7 MEMASANG AC UKURAN 0.5 PK S/D 1 PK TITIK 5.355.846,13

STANDAR SATUAN HARGA, PEMERINTAH KABUPATEN JEMBER, TAHUN 2021 889


KODE REKENING
NO JENIS PEKERJAAN SATUAN HARGA (Rp)
BELANJA
1 2 3 6 7
8 A.8.4.6.7 MEMASANG AC UKURAN 1.5 PK S/D 2 PK TITIK 6.406.083,05

A.9 PEKERJAAN LAINNYA


1 A.9.1 PEMASANGAN RANGKA PLAFON HOLLOW TITIK 834.518,20
2 A.9.2 PEMASANGAN RANGKA PLAFON GYPSUM RANGKA METAL FURING TITIK 121.838,60
3 A.9.3 PEMASANGAN DINDING PARTISI DOUBLE {PEMBATAS RUANG (GYPSUM) TITIK 308.715,78

BUPATI JEMBER,

FAIDA

STANDAR SATUAN HARGA, PEMERINTAH KABUPATEN JEMBER, TAHUN 2021 890