HARGA SATUAN PEKERJAAN

NO KODE SATUAN PEKERJAAN SAT HARGASATUAN

1 PEKERJAAN TANAH
A.2.3.1.1 PENGGALIAN 1 M3 TANAH BIASA SEDALAM 1 METER M3 62.920,00
Dihit 1 PENGGALIAN 1 M' BORE PILE MENGGUNAKAN ALAT M' 104.737,60
Dihit 2 PENGURUGAN 1 M3 DENGAN TANAH PADAT M3 154.770,00
A.2.3.1.9 PENGURUGAN KEMBALI 1 M3 GALIAN TANAH M3 15.179,99
A.2.3.1.11 PENGURUGAN 1 M3 DENGAN ABU BATU M3 249.964,00

2 PEKERJAAN PONDASI
A.3.2.1.5 PEMASANGAN 1 M3 PONDASI BATU BELAH HITAM, CAMPURAN 1 PC : 8 PB M3 809.267,47

3 PEKERJAAN DINDING DAN PLESTERAN


A.4.4.1.12 PEMASANGAN 1 M² DINDING BATA MERAH (5x11x22) cm TEBAL ½ BATU CAMPURAN 1 PC : 8 PB M2 123.926,00
A.4.4.2.8 PEMASANGAN 1 M2 PLESTERAN 1 PC : 8 PB TEBAL 15 mm M2 57.065,58
A.4.4.2.27 PEMASANGAN 1 M² ACIAN M2 32.483,00

4 PEKERJAAN BETON BERTULANG


A.4.1.1.2 MEMBUAT 1 M3 BETON MUTU Fʾᴄ =9,8 MPa(K 125), SLUMP (12 ± 2 ) cm,W/C =0,78 M3 957.917,18
A.4.1.1.3 MEMBUAT BETON MUTU F'C =12,2 MPA (K 150), SLUMP (12 + 2), W/C = 0,72 M3 979.780,78
A.A.4.1.1.5 MEMBUAT 1 M3 BETON MUTU Fʾᴄ =14,5 MPa(K 175), SLUMP (12 ± 2 ) cm,W/C =0,66 M3 1.005.650,14
A.A.4.1.1.6 MEMBUAT 1 M³ BETON MUTU f’c = 19,3 MPa (K 200), SLUMP (12 ± 2) cm, w/c = 0,61 M3 1.030.473,51
A.4.1.1.7 MEMBUAT 1 M³ BETON MUTU f’c = 19,3 MPa (K 225), SLUMP (12 ± 2) cm, w/c = 0,58 M3 1.049.367,22
A.4.1.1.8 MEMBUAT 1 M³ BETON MUTU f’c = 21,7 MPa (K 250), SLUMP (12 ± 2) cm, w/c = 0,56 M3 1.061.422,67
A.4.1.1.17 PEMBESIAN 1KG DENGAN BESI POLOS/ULIR KG 16.196,35
Dihit 3 MEMBUAT 1 M2 BEKISTING PONDASI (2x Pemakaian) M2 129.039,90
Dihit 4 MEMBUAT 1 M2 BEKISTING SLOOF (2x Pemakaian) M2 135.059,10
Dihit 5 MEMBUAT 1 M2 BEKISTING KOLOM (2x Pemakaian) M2 206.776,90
Dihit 6 MEMBUAT 1 M2 BEKISTING BALOK (2x Pemakaian) M2 215.356,90
Dihit 7 MEMBUAT 1 M2 BEKISTING LANTAI (2x Pemakaian) M2 288.176,90
A.4.1.1.35 MEMBUAT 1 M' KOLOM PRAKTIS (11x11) cm M' 89.003,64
A.4.1.1.36 MEMBUAT 1 M' BALOK DAN RING BALOK PRAKTIS (11x15) cm M' 109.693,76

5 PEKERJAAN PENUTUP ATAP


Dihit 8 PEMASANGAN 1 M² RANGKA ATAP BAJA RINGAN C.75 M2 201.922,44
A.4.5.2.1 MEMASANG 1 M2 ATAP GENTENG EX. WIROKO M2 73.716,78
A.4.5.2.4 MEMASANG 1 M' BUMBUNG GENTENG PRESS M' 110.589,16
A.4.2.1.18 MEMASANG 1 M' TALANG DATAR / JURAI SENG BJLS 28 LEBAR 90 cm M' 272.766,45
SNI 3434:2008 6.21 PEMASANGAN 1 M2 LISPLANK WOODPLANK M2 202.248,20

6 PEKERJAAN PENUTUP LANTAI DAN DINDING


SNI 7395.2008 6.35.a PEMASANGAN 1 M² LANTAI KERAMIK UKURAN 40 x 40 CM MOTIF M2 231.152,90
Dihit. 9 PEMASANGAN 1 M² DINDING KERAMIK UKURAN 20 x 40 CM MOTIF M2 258.681,39

7 PEKERJAAN KUSEN PINTU, JENDELA DAN PENGGANTUNG


Dihit 10 PEMASANGAN 1 M KUSEN ALUMUNIUM 4" PINTU DAN JENDELA M' 127.683,66
Dihit 11 PEMASANGAN 1 M² PINTU ALUMUNIUM Fin. MDF + HPL 2 SISI M2 672.001,00
Dihit 12 PEMASANGAN 1 M² JENDELA ALUMUNIUM Fin. Kaca 5 mm BENING M2 552.926,00

8 PEKERJAAN KACA
A.4.6.2.17 PEMASANGAN 1 M² KACA BENING TEBAL 5 MM M2 195.756,99
A.4.6.2.18 PEMASANGAN 1 M² KACA RAYBAND TEBAL 5 MM M2 234.509,99

9 PEKERJAAN LANGIT-LANGIT
Dihit 18 PEMASANGAN 1 M² LANGIT - LANGIT GYPSUM BOARD UKURAN (120x240x9) MM, TEBAL 9 MM M2 177.217,15
Dihit 19 PEMASANGAN 1 M² LANGIT - LANGIT KALSIBOARD UKURAN (120x240x4) MM, TEBAL 4 MM M2 167.834,15
Dihit 20 PEMASANGAN 1 M' LIST GYPSUM LEBAR 10 cm M' 26.375,25

10 PEKERJAAN CAT - CATAN

1
NO KODE SATUAN PEKERJAAN SAT HARGASATUAN

A.4.7.1.10 PENGECATAN 1 M² BIDANG TEMBOK BARU (1 LAPIS PLAMUUR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP) M2 23.175,08
A.4.7.1.16 PENGECATAN 1 M² PERMUKAAN BAJA DENGAN MENIE BESI M2 28.693,50
Dihit 21 PENGECATAN 1 M² BIDANG WATERPROOFING M2 22.319,28
Dihit 22 PENGECATAN 1 M² BIDANG MENGGUNAKAN CAT MINYAK M2 36.386,08