NO URAIAN
1 2
N ( SNI 7394:2008)
MUTU f'C= 9,8 Mpa (K125), Slump (12 2)cm, w/c = 0,78
GAN BESI POLOS ATAU BESI ULIR
NG UNTUK SLOOF
NG UNTUK BALOK
NG UNTUK KOLOM
ENDELA KUPU-KUPU
CTANK
KURAN 200X150X100
RJAAN RUMAH TINGGAL SEDERHANA
SATUAN VOLUME HARGA SATUAN
3 4 5
M 192.00 13,000.00
M 4.00 1,082,510.00
M 0.20 223,236.00
M' 48.00 134,980.00
M 67.62 47,500.00
M 50.33 15,833.33
M 19.44 229,000.00
M 41.65 709,950.00
M 18.10 435,105.00
M 349.85 218,089.00
M 0.01 1,315,350.00
M 50.04 49,725.20
M 515.01 44,511.20
M 515.01 27,662.50
M 0.57 11,931,250.00
M 8.77 752,500.00
M 26.50 524,200.00
M 0.64 11,020,000.00
M 0.13 10,399,400.00
M' 12.10 130,500.00
M 127.36 115,475.00
M 127.36 43,475.00
M 18.84 797,665.95
10 kg 0.80 102,877.50
M 26.80 196,227.50
M 64.76 508,308.00
M 41.62 499,777.50
M 127.36 67,262.50
M' 34.56 136,300.00
1 bh 6.00 115,518.85
M 157.05 226,333.00
1 bh 2.00 2,137,249.00
1 bh 2.00 741,694.00
M' 21.50 39,213.75
M' 36.93 142,321.25
1 bh 4.00 30,115.00
1 bh 7.00 73,550.00
1 ps 24.00 69,600.00
1 ps 30.00 69,600.00
1 bh 30.00 65,905.00
1 bh 2.00 43,400.00
M 84.20 198,011.80
M' 201.22 22,758.00
M 6.71 191,520.00
M 23.08 213,750.00
M 21.08 499,487.50
M 20.55 36,765.00
M 515.01 37,056.50
M 16.21 146,375.00
M 4.05 259,406.00
Titik 8.00 201,000.00
Titik 3.00 231,000.00
Titik 1.00 307,500.00
Titik 2.00 206,000.00
2,496,000.00
4,330,040.00
44,647.20
6,479,040.00
13,349,727.20
3,211,950.00
796,891.67
4,451,760.00
8,460,601.67
29,569,417.50
7,875,400.50
37,444,818.00
76,298,436.65
13,153.50
76,311,590.15
2,488,249.01
22,923,713.11
14,246,464.13
39,658,426.25
6,800,812.50
6,599,425.00
13,891,300.00
7,052,800.00
1,351,922.00
1,579,050.00
14,706,896.00
5,536,976.00
57,519,181.50
15,028,026.54
82,302.00
5,258,897.00
32,919,042.70
20,800,739.55
74,089,007.79
8,566,552.00
4,710,528.00
693,113.10
13,970,193.10
35,545,597.65
35,545,597.65
4,274,498.00
1,483,388.00
843,095.63
5,255,923.76
120,460.00
11,977,365.39
514,850.00
1,670,400.00
2,088,000.00
1,977,150.00
86,800.00
6,337,200.00
16,672,593.27
4,579,364.76
1,285,099.20
4,933,350.00
10,529,196.50
37,999,603.73
755,520.75
19,084,468.07
19,839,988.82
2,372,738.75
1,050,594.30
3,423,333.05
1,608,000.00
693,000.00
307,500.00
412,000.00
3,020,500.00
2,419,250.00
2,419,250.00
DIHITUNG OLEH :
I PEKERJAAN PERSIAPAN
1 1 M2 MEMBERSIHKAN LAPANGAN DAN PERALATAN 192.00 M 13,000.00 2496000.000
2 1 M2 PEMBUATAN GUDANG SEMEN DAN ALAT - ALAT 4.00 M 1,082,510.00 4330040.000
3 1 M2 MEMBUAT BAK ADUKAN UKURAN 40X50X20 0.20 M 223,236.00 44647.200
3 1 M1 PENGUKURAN DAN PEMASANGAN BOWPLANK 48.00 M' 134,980.00 6479040.000
II PEKERJAAN TANAH
1 1 M3 GALIAN TANAH BIASA DALAM 1 METER 67.62 M 47,500.00 3211950.000
2 1 M3 URUGAN KEMBALI 50.33 M 15,833.33 796891.667
3 1 M3 URUGAN PASIR 19.44 M 229,000.00 4451760.000
IV PEKERJAAN BETON
1 MEMBUAT 1 M BETON MUTU f'C= 9,8 Mpa (K125), Slump (12 2)cm, w/c = 0,78 18.84 M 797,665.95 15028026.543
2 PEMBESIAN 10 KG DENGAN BESI POLOS ATAU BESI ULIR 0.80 10 kg 102,877.50 82302.000
3 1 M2 PASANG BEKISTING UNTUK SLOOF 26.80 M 196,227.50 5258897.000
4 1 M2 PASANG BEKISTING UNTUK BALOK 64.76 M 508,308.00 32919042.696
5 1 M2 PASANG BEKISTING UNTUK KOLOM 41.62 M 499,777.50 20800739.550
V PEKERJAAN KAYU
1 MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA KAYU KELAS I 0.57 M 11,931,250.00 6800812.500
2 MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA KONVENSIONAL, KAYU KELAS I,II,III Bentang 6 M' 0.64 M 11,020,000.00 7052800.000
VI PEKERJAAN ATAP
1 1 M2 PASANGAN USUK GENTENG KAYU KAMPER 127.36 M 115,475.00 14706896.000
2 1 M2 PASANGAN RENG GENTENG KAYU KAMPER 127.36 M 43,475.00 5536976.000
3 1 M2 PEKERJAAN ATAP GENTENG PLENTONG 127.36 M 67,262.50 8566552.000
4 1 M1 PASANG BUBUNGAN GENTENG PLENTONG 34.56 M' 136,300.00 4710528.000
5 1 BH PEKERJAAN PASANGAN MURDA/BETALA/IKUT CELEDU 6.00 1 bh 115,518.85 693113.100
6 MEMASANG 1 M3 KONSTRUKSI GORDENG, KAYU KELAS II 0.13 M 10,399,400.00 1351922.000
7 MEMASANG 1 M' LISPLANK UKURAN (3 X 20) CM, KAYU KELAS I/II 12.10 M' 130,500.00 1579050.000
0.5655 0.5655
0.9811 0.9811 100.0000
0.0101 0.0101 98.0853
1.4680 0.7340 0.7340
95.9995
100%
0.7277 0.3639 0.3639
0.1806 0.0903 0.0903
1.0086 0.3000 0.7086
90.2534
82.2150
3.4049 0.5000 0.5000 0.5000 1.5000 0.4049
90%
0.0186 0.0047 0.0047 0.0047 0.0047
1.1915 0.5958 0.5958
7.4584 2.0000 2.0000 3.4584
4.7128 2.0000 2.7128
74.1767
1.5409 0.3852 0.5000 0.5000 0.1556
1.5979 1.4000 0.1979
0.5638 0.5638
70%
5.1938 3.5000 1.6938
55.6219
3.2278 3.2278
70%
55.6219
0.1166 0.1166
0.3785 0.3785
0.4731 0.4731
0.4480 0.4480
0.0197 28.9215 0.0197
40%
0.9685 0.9685
0.3361 0.3361
0.1910 0.1910
1.1908 0.5954 0.5954
0.0273 0.0273
30%
0.5481 0.2741 0.2741
17.0984
0.3643 0.1822 0.0911 0.0911
0.1570 0.0785 0.0393 0.0393
0.0697 0.0348 0.0174 0.0174
0.0933 0.0467 0.0233 0.0233
20%
9.9597
0.1712 0.0856 0.0856
4.3240 1.4413 1.4413 1.4413
5.5751 10%
0.5376 0.2688 0.2688
0.2380 0.1190 0.1190
100.0000 2.2907
GGUAN 2.2907 3.2844 4.3846 7.1387 11.8231 13.3804 13.3201 10.3322 8.2226 8.0383 8.0384 5.7461 2.0858 1.9147
TIME SCHEDULE CURVE S
Pekerjaan : Pembangunan Rumah Tinggal Tidak Bertingkat Tipe 135
Lokasi : Jln. Tirtalepang II No.88 , Kesiman, Tohpati, Denpasar
Nama : I Made Dedek Arta Jaya ( 07 / XII GB 1 )
I PEKERJAAN PERSIAPAN
1 1 M2 MEMBERSIHKAN LAPANGAN DAN PERALATAN 192.00 M 13,000.00 2496000.000
2 1 M2 PEMBUATAN GUDANG SEMEN DAN ALAT - ALAT 4.00 M 1,082,510.00 4330040.000
3 1 M2 MEMBUAT BAK ADUKAN UKURAN 40X50X20 0.20 M 223,236.00 44647.200
3 1 M1 PENGUKURAN DAN PEMASANGAN BOWPLANK 48.00 M' 134,980.00 6479040.000
II PEKERJAAN TANAH
1 1 M3 GALIAN TANAH BIASA DALAM 1 METER 67.62 M 47,500.00 3211950.000
2 1 M3 URUGAN KEMBALI 50.33 M 15,833.33 796891.667
3 1 M3 URUGAN PASIR 19.44 M 229,000.00 4451760.000
IV PEKERJAAN BETON
1 MEMBUAT 1 M BETON MUTU f'C= 9,8 Mpa (K125), Slump (12 2)cm, w/c = 0,78 18.84 M 797,665.95 15028026.543
2 PEMBESIAN 10 KG DENGAN BESI POLOS ATAU BESI ULIR 0.80 10 kg 102,877.50 82302.000
3 1 M2 PASANG BEKISTING UNTUK SLOOF 26.80 M 196,227.50 5258897.000
4 1 M2 PASANG BEKISTING UNTUK BALOK 64.76 M 508,308.00 32919042.696
5 1 M2 PASANG BEKISTING UNTUK KOLOM 41.62 M 499,777.50 20800739.550
V PEKERJAAN KAYU
1 MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA KAYU KELAS I 0.57 M 11,931,250.00 6800812.500
2 MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA KONVENSIONAL, KAYU KELAS I,II,III Bentang 6 M' 0.64 M 11,020,000.00 7052800.000
VI PEKERJAAN ATAP
1 1 M2 PASANGAN USUK GENTENG KAYU KAMPER 127.36 M 115,475.00 14706896.000
2 1 M2 PASANGAN RENG GENTENG KAYU KAMPER 127.36 M 43,475.00 5536976.000
3 1 M2 PEKERJAAN ATAP GENTENG PLENTONG 127.36 M 67,262.50 8566552.000
4 1 M1 PASANG BUBUNGAN GENTENG PLENTONG 34.56 M' 136,300.00 4710528.000
5 1 BH PEKERJAAN PASANGAN MURDA/BETALA/IKUT CELEDU 6.00 1 bh 115,518.85 693113.100
6 MEMASANG 1 M3 KONSTRUKSI GORDENG, KAYU KELAS II 0.13 M 10,399,400.00 1351922.000
7 MEMASANG 1 M' LISPLANK UKURAN (3 X 20) CM, KAYU KELAS I/II 12.10 M' 130,500.00 1579050.000
0.5655 0.5655
0.9811 0.9811 100.0000
0.0101 0.0101 98.0853
1.4680 0.7340 0.7340
95.9995
100%
0.7277 0.3639 0.3639
0.1806 0.0903 0.0903
1.0086 0.3000 0.7086
90.2534
82.2150
3.4049 0.5000 0.5000 0.5000 1.5000 0.4049
90%
0.0186 0.0047 0.0047 0.0047 0.0047
1.1915 0.5958 0.5958
7.4584 2.0000 2.0000 3.4584
4.7128 2.0000 2.7128
74.1767
1.5409 0.3852 0.5000 0.5000 0.1556
1.5979 1.4000 0.1979
0.5638 0.5638
70%
5.1938 3.5000 1.6938
55.6219
3.2278 3.2278
70%
55.6219
0.1166 0.1166
0.3785 0.3785
0.4731 0.4731
0.4480 0.4480
0.0197 28.9215 0.0197
40%
0.9685 0.9685
0.3361 0.3361
0.1910 0.1910
1.1908 0.5954 0.5954
0.0273 0.0273
30%
0.5481 0.2741 0.2741
17.0984
0.3643 0.1822 0.0911 0.0911
0.1570 0.0785 0.0393 0.0393
0.0697 0.0348 0.0174 0.0174
0.0933 0.0467 0.0233 0.0233
20%
9.9597
0.1712 0.0856 0.0856
4.3240 1.4413 1.4413 1.4413
5.5751 10%
0.5376 0.2688 0.2688
0.2380 0.1190 0.1190
100.0000 2.2907
GGUAN 2.2907 3.2844 4.3846 7.1387 11.8231 13.3804 13.3201 10.3322 8.2226 8.0383 8.0384 5.7461 2.0858 1.9147
RENCANA ANGGARAN BIAY
NO URAIAN
1 2
N ( SNI 7394:2008)
MUTU f'C= 9,8 Mpa (K125), Slump (12 2)cm, w/c = 0,78
GAN BESI POLOS ATAU BESI ULIR
NG UNTUK SLOOF
NG UNTUK BALOK
NG UNTUK KOLOM
ENDELA KUPU-KUPU
CTANK
KURAN 200X150X100
RJAAN RUMAH TINGGAL SEDERHANA
SATUAN VOLUME HARGA SATUAN
3 4 5
M 192.00 13,000.00
M 4.00 1,082,510.00
M 0.20 223,236.00
M' 48.00 134,980.00
M 67.62 47,500.00
M 50.33 15,833.33
M 19.44 229,000.00
M 41.65 709,950.00
M 18.10 435,105.00
M 349.85 218,089.00
M 0.01 1,315,350.00
M 50.04 49,725.20
M 515.01 44,511.20
M 515.01 27,662.50
M 0.57 11,931,250.00
M 8.77 752,500.00
M 26.50 524,200.00
M 0.64 11,020,000.00
M 0.13 10,399,400.00
M' 12.10 130,500.00
M 127.36 115,475.00
M 127.36 43,475.00
M 18.84 797,665.95
10 kg 0.80 102,877.50
M 26.80 196,227.50
M 64.76 508,308.00
M 41.62 499,777.50
M 127.36 67,262.50
M' 34.56 136,300.00
1 bh 6.00 115,518.85
M 157.05 226,333.00
1 bh 2.00 2,137,249.00
1 bh 2.00 741,694.00
M' 21.50 39,213.75
M' 36.93 142,321.25
1 bh 4.00 30,115.00
1 bh 7.00 73,550.00
1 ps 24.00 69,600.00
1 ps 30.00 69,600.00
1 bh 30.00 65,905.00
1 bh 2.00 43,400.00
M 84.20 198,011.80
M' 201.22 22,758.00
M 6.71 191,520.00
M 23.08 213,750.00
M 21.08 499,487.50
M 20.55 36,765.00
M 515.01 37,056.50
M 16.21 146,375.00
M 4.05 259,406.00
Titik 8.00 201,000.00
Titik 3.00 231,000.00
Titik 1.00 307,500.00
Titik 2.00 206,000.00
2,496,000.00
4,330,040.00
44,647.20
6,479,040.00
13,349,727.20
3,211,950.00
796,891.67
4,451,760.00
8,460,601.67
29,569,417.50
7,875,400.50
37,444,818.00
76,298,436.65
13,153.50
76,311,590.15
2,488,249.01
22,923,713.11
14,246,464.13
39,658,426.25
6,800,812.50
6,599,425.00
13,891,300.00
7,052,800.00
1,351,922.00
1,579,050.00
14,706,896.00
5,536,976.00
57,519,181.50
15,028,026.54
82,302.00
5,258,897.00
32,919,042.70
20,800,739.55
74,089,007.79
8,566,552.00
4,710,528.00
693,113.10
13,970,193.10
35,545,597.65
35,545,597.65
4,274,498.00
1,483,388.00
843,095.63
5,255,923.76
120,460.00
11,977,365.39
514,850.00
1,670,400.00
2,088,000.00
1,977,150.00
86,800.00
6,337,200.00
16,672,593.27
4,579,364.76
1,285,099.20
4,933,350.00
10,529,196.50
37,999,603.73
755,520.75
19,084,468.07
19,839,988.82
2,372,738.75
1,050,594.30
3,423,333.05
1,608,000.00
693,000.00
307,500.00
412,000.00
3,020,500.00
2,419,250.00
2,419,250.00
DIHITUNG OLEH :