D A E R A H
KEGIATAN
PEKERJAAN
LOKASI
SUMBER BIAYA
TAHUN ANGGARAN
NO
URAIAN PEKERJAAN
PEKERJAAN PERSIAPAN
1
2
3
Galian tanah
Cerucuk pondasi 8 - 2 m
5
6
Kolom 20/20 cm
- Beton mutu K-175
- Pembesian tulangan pokok 12 mm
- Pembesian tulangan begel 8 mm
- Bekisting
Plesteran lantai
SUB JUMLAH D
F
1
G
1
Kawat harmonika
SUB JUMLAH G
H
PEKERJAAN PENGECATAN
1
J
1
Cat dinding
SUB JUMLAH H
PEKERJAAN LAIN-LAIN
Waterproofing
SUB JUMLAH J
KONTRAK
VOLUME
UNIT
KODE
ANALISA
1.00
Ls
HARGA SATUAN
( Rp. )
6
JUMLAH BIAYA
( Rp. )
7
19.08
17,537.50
334,615.50
14.20
M'
48,316.91
686,100.05
4.00
M2
2.08
M3
77,193.75
160,563.00
0.02
25,731.25
514.63
1,020,715.55
10.00
Btg
45,000.00
450,000.00
50.00
Btg
45,000.00
2,250,000.00
0.26
0.91
M
M3
133,227.50
995,936.45
34,106.24
908,294.04
2.35
M3
133,227.50
313,351.08
0.90
M3
1,346,388.63
1,206,364.22
66.60
Kg
12,228.12
814,392.96
4.48
171,621.52
768,864.39
6,906,450.55
1.53
M3
1,281,144.17
1,960,150.59
52.70
Kg
12,228.12
644,422.06
48.23
Kg
14,477.70
698,198.42
15.30
M2
196,980.63
3,013,803.56
1.13
M3
1,200,653.48
1,361,541.05
Kg
M2
1.30
M3
1,346,388.63
1,752,998.00
436.08
Kg
12,155.67
5,300,845.66
2.70
368,844.33
995,879.69
0.19
M3
1,200,653.48
230,525.47
30.90
Kg
13,212.24
408,268.63
8.66
Kg
14,477.70
125,347.88
3.84
M2
333,424.33
1,280,349.43
0.24
M3
1,200,653.48
291,758.80
40.18
Kg
12,228.12
491,277.05
13.71
Kg
14,477.70
198,521.05
6.48
343,513.51
2,225,967.54
20,979,854.89
7.75
M2
102,474.20
794,175.05
15.50
M2
67,006.50
1,038,600.72
10.32
67,006.50
691,507.06
11.34
M2
94,982.69
1,077,103.66
3,601,386.49
0.17
4,177,700.00
701,853.60
30.50
30.50
M2
51,745.83
1,578,247.82
56,485.70
1,722,813.85
6.10
M'
40,987.15
250,021.62
4,252,936.88
1.00
Bh
12.86
M2
64,670.50
831,429.82
-
831,429.82
25.82
M2
M2
24,872.78
642,215.05
642,215.05
JUMLAH
38,234,989.22
DIBULATKAN
38,235,000.00
NO.
A
JENIS PEKERJAAN
PEK. PERSIAPAN
2 PEMBERSIHAN LOKASI DAN PERATAAN
3 PENGUKURAN DAN PEMASANGAN BOUWPLANK
3 CERUCUK PONDASI 8 - 2 M
4 CERUCUK PONDASI GENSET 10 - 4 M
5 URUGAN PASIR PONDASI t = 10 cm
6 URUGAN PASIR PONDASI GENSET t = 15 cm
7 LANTAI KERJA PONDASI + PONDASI GENSET t = 5 cm
BEKISTING
2 PELAT LANTAI TAPAK MESIN GENSET (1,4 x 3,10 x 0,30 m)
COR BETON K-250
TULANGAN D 16 mm (ULIR)
BEKISTING
3 PLAT LANTAI BETON TUMBUK
- BETON K-175
- PEMBESIAN M-5
- BEKISTING
4 KOLOM 20/20
- BETON K-175
- BEKISTING
5 RING BALOK 10/15
- BETON K-175
- PEMBESIAN
- BEKISTING
PEK. KAYU
1 KONSTRUKSI KUDA-KUDA (KAYU 5/7)
VOLUME
190.00
M2
19.00 x
49.89
M'
49.89
M3
24.89
18.06
M3
10.00
GALIAN
24.89
URUGAN PASIR
LANTAI KERJA
PONDASI
URUGAN KEMBALI
24.89
10.00
BTG
5 x
4.00
50.00
BTG
5 x
10.00
0.26
M3
0.80
0.80
2.35
M3
3.20
4.90
0.91
M3
0.80
3.20
x
x
0.80
4.90
0.90
M3
0.80
0.80
66.60
KG
2.18
btg
4.48
M2
0.35
x
0.80
Sloof 20/45
17.00
17.00
m'
x
17.00
1.14
x
x
5.00
114.33
0.20
1.53
M3
52.70
48.23
KG
KG
15.30
M2
17.00
0.45
1.30
M3
1.40
3.10
436.08
KG
22.81
2.70
M2
0.30
1.40
1.13
M3
3.20
1.40
x
x
4.90
3.10
0.10
11.34
tulangan pokok
beugel
tinggi x Luas
-
KG
M2
0.19
M3
30.90
8.66
KG
KG
3.84
M2
M3
40.18
13.71
KG
KG
tulangan pokok
beugel
tulangan pokok
beugel
0.20
4
9
1.20
4
Panjang
0.24
btg
x
x
0.20
16.20 m'
16.20
x
0.1
4
109
x
x
16.20
0.34
Panjang
6.48
M2
0.17
M3
16.20 m'
16.20
x
16.20
x
0.15
0.10
2.42
2.42
12.88
4.00
0.05
0.07
30.50
M2
6.10
+
2.00
6.10
30.50
M2
6.10
+
2.00
6.10
6.10
M'
M3
4.74
1.19
0.90
6.82 M3
-
6.82
2.00
40.00
0.10
4.00
0.15
x
x
0.05
0.05
4.00
0.35
4.00
4
x
8.72 =
4.00
4.00
9
4.00
7.4
0.45
x
x
0.620
0.370
2.00
0.30
23
btg
2.00
=
=
15.68
4.34
11.34
=
=
52.700
48.226
18.96
0.30
3.10 x
M2
0.20
2.17
0.65
x
x
1.20
4.00
4.00
1.20
0.15
x
x
0.620
0.370
=
=
x
x
0.890
0.370
40.18
13.71
=
=
30.90
8.66
2.00 =
=
4.86
1.62
6.48
3.60
3.22
BTG
0.0035
2.50
2.50
0.62 +
0.62
4.00 =
0.014
15.25 x
2.00
15.25 x
2.00
4.00 BTG
TUNGAN VOLUME
1.04 +
1.04 +
1.12 =
12.88
4.00 =
0.056 x
3.00 =
0.17
30.50
30.50
190.00
49.89
M2
M'
0 M3
18.06
M3
10.00
BTG
50.00
BTG
0.26
M3
2.35
M3
0.13 M3
0.78 M3
0.90
M3
66.60
KG
4.48
M2
1.53
M3
52.700 KG
48.226 KG
15.30
M2
1.30
M3
436.08
KG
2.70
M2
1.13
M3
KG
0.19
M3
30.90
8.66
KG
KG
3.84
M2
0.24
M3
40.18
13.71
KG
KG
6.48
M2
0.17
M3
30.50
M2
30.50
M2
1.5
4.25
1.43
0.75
1.08
1.2
1.7
1.2
0.5
1.44
2.04
2.34
1.2
18
18.955
23,5 m
1.0965 m2
0.969 m3
12.5125 m2
49.15 m
2.8
13
18.72
11.08
Bowplank
Luas Area
Galian
Lantai kerja
pasir urug
Pondasi
p3
p2
p1
p4
0.6
Cerucuk
23.7
1.05
D10
24.885
Tul Pokok p3
p2
p1
p4
Bekesting p3
p2
p1
p4
cor plat
p3
p1
p2
p4
Tulangan pedestal
bekesting kolom
cor kolom
sloof
bekisting
tulangan
begel
cor
4.875
28
60.96
243.84
406.4
2.7432
urug pasir 15
wiremesh
69.83
3.525
66.305
cor
9.94575
cor
4.122272
cor
kolom
0.088308
1.60875
49.89 m1
190 m2
24.885 m3
1.185 m3
4.74 m3
2.25 m3
1.5 m3
1 m3
3.8 m3
20.55 m3
183 btg
13.09
11.1
15.54
28.14
13
9.99
11.27
14.43
0.975 m2
0.75 m2
7.8 m2
1.74 m2
luas
2.25
1
1.5
3.8
0.15
0.15
0.15
0.15
177.76 m
7.92 m2
0.297 m3
m
m
buah
9.94575
66.305
m3
m3
36.576 m2
11.27 m
21
15
9
30
117
m3
NO.
JENIS PEKERJAAN
PEK. PERSIAPAN
1 PAPAN NAMA PROYEK
2 PEMBERSIHAN LOKASI DAN PERATAAN
3 PENGUKURAN DAN PEMASANGAN BOUWPLANK
4 PEMBUATAN BARAK KERJA
3 CERUCUK PONDASI 8 - 2 M
4 CERUCUK PONDASI GENSET 10 - 4 M
5 URUGAN PASIR PONDASI t = 10 cm
6 URUGAN PASIR PONDASI GENSET t = 15 cm
7 LANTAI KERJA PONDASI + PONDASI GENSET t = 5 cm
BEKISTING
2 PELAT LANTAI TAPAK MESIN GENSET (1,4 x 3,10 x 0,30 m)
COR BETON K-250
TULANGAN D 16 mm (ULIR)
BEKISTING
3 PLAT LANTAI BETON TUMBUK
- BETON K-175
- PEMBESIAN M-5
- BEKISTING
4 KOLOM 20/20
- BETON K-175
- BEKISTING
- BEKISTING
PEK. KAYU
1 KONSTRUKSI KUDA-KUDA (KAYU 5/7)
VOLUME
1.00
LS
19.08
M2
3.60 x
14.20
M'
3.60
4.00
M2
2.00 x
2.08
M3
0.65
0.02
M3
5.30
+
5.30
2.00
GALIAN
0.80
2.08
URUGAN PASIR
LANTAI KERJA
PONDASI
URUGAN KEMBALI
2.08
10.00
BTG
5 x
4.00
50.00
BTG
5 x
10.00
0.26
M3
0.80
0.80
2.35
M3
3.20
4.90
0.91
M3
0.80
3.20
x
x
0.80
4.90
0.90
M3
0.80
66.60
KG
2.18
btg
4.48
M2
0.35
0.80
1.53
M3
17.00
17.00
m'
x
0.20
52.70
48.23
KG
KG
17.00
1.14
x
x
5.00
114.33
15.30
M2
17.00
0.45
1.30
M3
1.40
3.10
436.08
KG
22.81
2.70
M2
0.30
1.40
1.13
M3
3.20
1.40
x
x
4.90
3.10
0.10
11.34
Sloof 20/45
tulangan pokok
beugel
tinggi x Luas
-
KG
M2
0.19
M3
30.90
8.66
KG
KG
3.84
M2
0.80
x
btg
tulangan pokok
beugel
4
9
1.20
0.20
x
x
0.20
Panjang
0.24
M3
40.18
13.71
KG
KG
tulangan pokok
beugel
Panjang
6.48
M2
0.17
M3
16.20 m'
16.20
x
4
109
x
x
16.20 m'
16.20
x
16.20
x
0.1
16.20
0.34
0.15
0.10
2.42
2.42
12.88
4.00
0.05
0.07
30.50
M2
6.10
+
2.00
6.10
30.50
M2
6.10
+
2.00
6.10
6.10
M'
4.00
M3
0.26
0.91
0.90
2.06 M3
-
2.06
2.00
40.00
0.10
4.00
0.15
x
x
0.05
0.05
4.00
4.00
0.35
4.00
8.72 =
4.00
0.45
x
x
0.620
0.370
2.00
0.30
23
btg
2.00
=
=
15.68
4.34
11.34
4.00
=
=
52.700
48.226
18.96
0.30
7.4
3.10 x
M2
0.20
2.17
0.65
x
x
1.20
4.00
4.00
1.20
x
x
0.890
0.370
=
=
30.90
8.66
x
x
x
0.15
0.620
0.370
=
=
40.18
13.71
2.00 =
=
4.86
1.62
6.48
3.60
3.22
BTG
0.0035
2.50
2.50
0.62 +
0.62
4.00 =
0.014
15.25 x
2.00
15.25 x
2.00
4.00 BTG
TUNGAN VOLUME
1.04 +
1.04 +
1.12 =
12.88
4.00 =
0.056 x
3.00 =
0.17
30.50
30.50
19.08
M2
14.20
M'
4.00
M2
2.08 M3
0.02
M3
10.00
BTG
50.00
BTG
0.26
M3
2.35
M3
0.13 M3
0.78 M3
0.90
M3
66.60
KG
4.48
M2
1.53
M3
52.700 KG
48.226 KG
15.30
M2
1.30
M3
436.08
KG
2.70
M2
1.13
M3
KG
0.19
M3
30.90
8.66
KG
KG
3.84
M2
0.24
M3
40.18
13.71
KG
KG
6.48
M2
0.17
M3
30.50
M2
30.50
M2
NO.
D.
JENIS PEKERJAAN
2 PLESTERAN DINDING
3 PLESTERAN KOLOM DAN BALOK
4 PLESTERAN LANTAI
F.
G.
PEK. PENGECATAN
1 CAT TEMBOK
H.
J.
PEK. LAIN-LAIN
VOLUME ADENDUM
7.75
M2
15.50
M2
dinding
10.32
M2
kolom 20x20 cm
balok 10x15 cm
Panjang
11.34
M2
DAN VENTILASI
KG
NGAN PINTU)
0.22 M2
12.86 M2
KAWAT HARMONIKA
25.82 M2
Dinding
Kolom
5.00 TTK
1.00 BH
4.00 BH
1.00 BH
2.00 BH
1.00 BH
RINCIAN PERH
0.50
0.50
0.50
0.50
0.50
x
x
x
x
x
1.25
1.25
3.20
4.90
4.90
7.75
2.00
4.00
20x20 cm
10x15 cm
16.20 m'
16.20
16.20
HARMONIKA
0.55
0.55
0.05
0.55
0.55
0.55
x
x
x
x
x
x
x
x
0.63
0.63
1.60
2.45
2.45 +
7.75
M2
0.20
0.15
0.10
0.24
=
=
=
=
=
2.00 =
=
0.32 +
1.25
1.25
0.70
3.20
4.90
4.90
=
=
=
=
=
=
1.20
0.10
0.69
0.69
0.04
1.76
2.70
2.70 +
8.56
1/2
1/2
x
x
1.94 x
1.94 x
15.50 m2
10.32 m2
1.05 =
1.05 =
4.00
4.86
1.62 +
6.48 M2
0.14 +
0.47 x
0.14 x
1.02 x
1.02 x
2.00 =
2.00 =
2.04
2.04 +
4.07
2.00
7.75
M2
15.50
M2
3.84
M2
6.48
M2
0.22 M2
12.63 M2
25.82 m2
No
A
Uraian
TENAGA
1 Pekerja
2 Mandor
BAHAN
PERALATAN
D
E
F
Jumlah (A+B+C)
Overhead & Profit (Contoh 15%)
Harga Satuan Pekerjaan (D+E)
Kode
Satuan
L.01
L.02
OH
OH
Kode
Satuan
L.01
L.02
L.03
L.04
OH
OH
OH
OH
No
A
Uraian
TENAGA
1 Pekerja
2 Tukang Kayu
3 Kepala Tukang
4 Mandor
BAHAN
Kayu Pancang (Dolken) d = 6-8 cm, p = 4m
Paku
Papan Kayu Kelas III
C
PERALATAN
D
E
F
Jumlah (A+B+C)
Overhead & Profit (Contoh 15%)
Harga Satuan Pekerjaan (D+E)
Btg
Kg
M3
No
A
Uraian
TENAGA
1 Pekerja
2 Tukang Kayu
3 Kepala Tukang
4 Mandor
BAHAN
1 Dolken kayu
8-10/400cm
2 Kayu
3 Paku Biasa
4 Seng Gelombang
PERALATAN
D
E
F
Jumlah (A+B+C)
Overhead & Profit (Contoh 15%)
Harga Satuan Pekerjaan (D+E)
Kode
Satuan
L.01
L.02
L.03
L.04
OH
OH
OH
OH
Batang
m
Kg
Kg
Koefisien
0.100
0.050
JUMLAH TENAGA KERJA
85,000.00
135,000.00
15% x D
Koefisien
0.100
0.100
0.010
0.005
JUMLAH TENAGA KERJA
85,000.00
100,000.00
125,000.00
135,000.00
8,500.00
10,000.00
1,250.00
675.00
20,425.00
1.000
0.020
0.007
JUMLAH HARGA BAHAN
6,400.00
19,900.00
2,113,100.00
6,400.00
398.00
14,791.70
21,589.70
15% x D
42,014.70
6,302.21
48,316.91
Koefisien
1.000
1.500
0.150
0.050
JUMLAH TENAGA KERJA
85,000.00
100,000.00
125,000.00
135,000.00
85,000.00
150,000.00
18,750.00
6,750.00
260,500.00
3.000
0.276
0.700
1.500
JUMLAH HARGA BAHAN
7,700.00
3,135,000.00
19,900.00
44,200.00
23,100.00
865,260.00
13,930.00
66,300.00
968,590.00
15% x D
1,229,090.00
184,363.50
1,413,453.50
No
A
Uraian
TENAGA
1 Pekerja
2 Mandor
BAHAN
PERALATAN
Kode
Satuan
L.01
L.04
OH
OH
Koefisien
0.750
0.025
JUMLAH TENAGA KERJA
Jumlah (A+B+C)
Overhead & Profit (Contoh 15%)
Harga Satuan Pekerjaan (D+E)
15% x D
No
A
Uraian
TENAGA
1 Pekerja
2 Mandor
BAHAN
PERALATAN
Kode
Satuan
L.01
L.04
OH
OH
Koefisien
0.250
0.008
JUMLAH TENAGA KERJA
Jumlah (A+B+C)
Overhead & Profit (Contoh 15%)
Harga Satuan Pekerjaan (D+E)
15% x D
H TENAGA KERJA
H HARGA BAHAN
H HARGA ALAT
67,125.00
10,068.75
77,193.75
15% x D
jaan galiaan
H TENAGA KERJA
H HARGA BAHAN
H HARGA ALAT
15% x D
22,375.00
3,356.25
25,731.25
URAIAN PEKERJAAN
SATUAN
HRG. SAT.
( Rp. )
A
1
2
3
4
TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
OH
OH
OH
OH
100,000.00
85,000.00
125,000.00
135,000.00
Btg
7,700.00
Jumlah
B
BAHAN
1 Cerucuk/dolken dia. 8 cm - 4 meter
Jumlah
Harga Satuan
URAIAN PEKERJAAN
SATUAN
HRG. SAT.
( Rp. )
A
1
2
3
4
B
TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
1 Cerucuk/dolken dia. 10 cm - 4 meter
Jumlah
Harga Satuan
OH
OH
OH
OH
100,000.00
85,000.00
125,000.00
135,000.00
Btg
7,700.00
No
A
Uraian
TENAGA
1 Pekerja
2 Mandor
BAHAN
Pasir Urug
PERALATAN
D
E
Jumlah (A+B+C)
Overhead & Profit (Contoh 15%)
Kode
Satuan
L.01
L.04
OH
OH
4.1.1.4.a Membuat 1 m lantai kerja beton mutu f'c =7,4 Mpa ( K 100), slump (3-6) cm ,w
No
A
D
E
F
Uraian
TENAGA
1 Pekerja
2 Tukang
3 Kepala Tukang
4 Mandor
Kode
Satuan
L.01
L.02
L.03
L.04
OH
OH
OH
OH
BAHAN
1 Semen Portlan
2 Pasir Beton
3 Kerikil (Maks 30mm)
4 Air
Kg
Kg
Kg
Liter
PERALATAN
Sewa Molen
Sewa-hari
Jumlah (A+B+C)
Overhead & Profit (Contoh 15%)
Harga Satuan Pekerjaan (D+E)
4.1.1.8 Membuat 1 m beton mutu f'c =21,7 Mpa ( K 250), slump (12 2) cm ,w/c = 0,5
No
A
D
E
Uraian
TENAGA
1 Pekerja
2 Tukang
3 Kepala Tukang
4 Mandor
BAHAN
1 Semen Portlan
2 Pasir Beton
3 Kerikil (Maks 30mm)
4 Air
PERALATAN
Sewa Molen
Jumlah (A+B+C)
Overhead & Profit (Contoh 15%)
Kode
Satuan
L.01
L.02
L.03
L.04
OH
OH
OH
OH
Kg
Kg
Kg
Liter
Sewa-hari
No
A
Uraian
TENAGA
1 Pekerja
2 Tukang
3 Kepala Tukang
4 Mandor
Kode
Satuan
L.01
L.02
L.03
L.04
OH
OH
OH
OH
BAHAN
1 Besi Beton (polos/ulir) U 24
2 Kawat Beton
PERALATAN
D
E
F
G
Jumlah (A+B+C)
Overhead & Profit (Contoh 15%)
Harga Satuan Pekerjaan (D+E)
Harga Satuan Pekerjaan (D+E) per 1 kg
Kg
Kg
No
A
Uraian
TENAGA
1 Pekerja
2 Tukang
3 Kepala Tukang
4 Mandor
BAHAN
1 Papan Mal kelas III
2 Paku 5 - 10 cm
3 Cerucuk 6-8 cm - panj 4 m
PERALATAN
D
E
F
Jumlah (A+B+C)
Overhead & Profit (Contoh 15%)
Harga Satuan Pekerjaan (D+E)
Kode
Satuan
L.01
L.02
L.03
L.04
OH
OH
OH
OH
m
Kg
Btg
BIAYA
SATUAN
( Rp. )
KUANTITAS
0.250
0.100
0.025
0.005
25,000.00
8,500.00
3,125.00
675.00
37,300.00
1.000
7,700.00
7,700.00
45,000.00
BIAYA
SATUAN
( Rp. )
KUANTITAS
0.250
0.100
0.025
0.005
25,000.00
8,500.00
3,125.00
675.00
37,300.00
1.000
7,700.00
7,700.00
45,000.00
Koefisien
0.300
0.010
JUMLAH TENAGA KERJA
85,000.00
135,000.00
25,500.00
1,350.00
26,850.00
1.000
JUMLAH HARGA BAHAN
89,000.00
89,000.00
89,000.00
15% x D
115,850.00
17,377.50
133,227.50
Koefisien
0.960
0.130
0.013
0.048
JUMLAH TENAGA KERJA
85,000.00
100,000.00
125,000.00
135,000.00
81,600.00
13,000.00
1,625.00
6,480.00
102,705.00
230.000
893.000
1,027.000
JUMLAH HARGA BAHAN
1,520.00
63.57
307.41
-
349,600.00
56,769.29
315,707.41
722,076.69
165,000.00
41,250.00
41,250.00
0.250
JUMLAH HARGA ALAT
866,031.69
129,904.75
995,936.45
15% x D
Koefisien
1.650
0.275
0.028
0.083
JUMLAH TENAGA KERJA
85,000.00
100,000.00
125,000.00
135,000.00
140,250.00
27,500.00
3,500.00
11,205.00
182,455.00
384.000
692.000
1,039.000
JUMLAH HARGA BAHAN
1,520.00
63.57
307.41
-
583,680.00
43,991.43
319,396.30
947,067.72
165,000.00
41,250.00
41,250.00
0.250
JUMLAH HARGA ALAT
15% x D
1,170,772.72
175,615.91
1,346,388.63
Koefisien
0.070
0.070
0.007
0.004
JUMLAH TENAGA KERJA
85,000.00
100,000.00
125,000.00
135,000.00
5,950.00
7,000.00
875.00
540.00
14,365.00
10.500
0.150
JUMLAH HARGA BAHAN
10,600.00
20,000.00
111,300.00
3,000.00
114,300.00
15% x D
Koefisien
0.520
0.260
0.026
0.026
JUMLAH TENAGA KERJA
85,000.00
100,000.00
125,000.00
135,000.00
44,200.00
26,000.00
3,250.00
3,510.00
76,960.00
0.031
0.300
0.125
JUMLAH HARGA BAHAN
2,113,100.00
19,900.00
6,400.00
65,506.10
5,970.00
800.00
72,276.10
15% x D
149,236.10
22,385.42
171,621.52
4.1.1.7.a Membuat 1 m beton mutu f'c =19,3 Mpa ( K 225), slump (12 2) cm ,w/c = 0
No
A
D
E
F
Uraian
TENAGA
1 Pekerja
2 Tukang
3 Kepala Tukang
4 Mandor
Kode
Satuan
L.01
L.02
L.03
L.04
OH
OH
OH
OH
1.323
0.189
0.019
0.066
JUMLAH TENAGA KERJA
Kg
Kg
Kg
Liter
371.000
698.000
1,047.000
JUMLAH HARGA BAHAN
BAHAN
1 Semen Portlan
2 Pasir Beton
3 Kerikil (Maks 30mm)
4 Air
PERALATAN
Sewa Molen
Sewa-hari
Jumlah (A+B+C)
Overhead & Profit (Contoh 15%)
Harga Satuan Pekerjaan (D+E)
Koefisien
0.250
JUMLAH HARGA ALAT
15% x D
No
A
Uraian
TENAGA
1 Pekerja
2 Tukang
3 Kepala Tukang
4 Mandor
Kode
Satuan
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.520
0.260
0.026
0.026
JUMLAH TENAGA KERJA
m
Kg
Liter
0.045
0.300
0.100
JUMLAH HARGA BAHAN
BAHAN
1 Kayu kelas III
2 Paku 5 - 10 cm
3 Minyak Bekisting
Koefisien
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead & Profit (Contoh 15%)
Harga Satuan Pekerjaan (D+E)
15% x D
4.1.1.5.a Membuat 1 m beton mutu f'c =14,5 Mpa ( K 175), slump (12 2) cm ,w/c = 0
No
A
D
E
F
Uraian
TENAGA
1 Pekerja
2 Tukang
3 Kepala Tukang
4 Mandor
Kode
Satuan
L.01
L.02
L.03
L.04
OH
OH
OH
OH
1.323
0.189
0.019
0.066
JUMLAH TENAGA KERJA
Kg
Kg
Kg
Liter
326.000
760.000
1,029.000
JUMLAH HARGA BAHAN
BAHAN
1 Semen Portlan
2 Pasir Beton
3 Kerikil (Maks 30mm)
4 Air
PERALATAN
Sewa Molen
Sewa-hari
Jumlah (A+B+C)
Overhead & Profit (Contoh 15%)
Harga Satuan Pekerjaan (D+E)
Koefisien
0.250
JUMLAH HARGA ALAT
15% x D
4.1.1.8 Membuat 1 m beton mutu f'c =21,7 Mpa ( K 250), slump (12 2) cm ,w/c = 0,5
No
A
D
E
F
Uraian
TENAGA
1 Pekerja
2 Tukang
3 Kepala Tukang
4 Mandor
Kode
Satuan
L.01
L.02
L.03
L.04
OH
OH
OH
OH
1.650
0.275
0.028
0.083
JUMLAH TENAGA KERJA
Kg
Kg
Kg
Liter
384.000
692.000
1,039.000
JUMLAH HARGA BAHAN
BAHAN
1 Semen Portlan
2 Pasir Beton
3 Kerikil (Maks 30mm)
4 Air
PERALATAN
Sewa Molen
Jumlah (A+B+C)
Overhead & Profit (Contoh 15%)
Harga Satuan Pekerjaan (D+E)
Sewa-hari
Koefisien
0.250
JUMLAH HARGA ALAT
15% x D
No
A
Uraian
TENAGA
1 Pekerja
2 Tukang
3 Kepala Tukang
4 Mandor
Kode
Satuan
L.01
L.02
L.03
L.04
OH
OH
OH
OH
BAHAN
1 Kayu kelas III
2 Paku 5 - 12 cm
3 Minyak Bekisting
4 Balok kayu kelas II
5 Papan Mal kelas III
Dolken kayu 8-10 cm - panj 4
6
m
Koefisien
0.660
0.330
0.033
0.033
JUMLAH TENAGA KERJA
m
Kg
Liter
m
m
0.040
0.400
0.015
0.022
Batang
6.000
JUMLAH HARGA BAHAN
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead & Profit (Contoh 15%)
Harga Satuan Pekerjaan (D+E)
15% x D
No
A
Uraian
TENAGA
1 Pekerja
2 Tukang
3 Kepala Tukang
4 Mandor
BAHAN
1 Kayu kelas III
2 Paku 5 - 12 cm
3 Minyak Bekisting
4 Balok kayu kelas II
5 Papan Mal kelas III
Dolken kayu 8-10 cm - panj 4
6
m
Kode
Satuan
L.01
L.02
L.03
L.04
OH
OH
OH
OH
Koefisien
0.660
0.330
0.033
0.033
JUMLAH TENAGA KERJA
m
Kg
Liter
m
m
0.040
0.400
0.015
0.022
Batang
2.000
JUMLAH HARGA BAHAN
PERALATAN
Jumlah (A+B+C)
Overhead & Profit (Contoh 15%)
Harga Satuan Pekerjaan (D+E)
15% x D
No
A
Uraian
TENAGA
1 Pekerja
2 Tukang
3 Kepala Tukang
4 Mandor
Kode
Satuan
L.01
L.02
L.03
L.04
OH
OH
OH
OH
BAHAN
1 Kayu kelas III
2 Paku 5 - 12 cm
3 Minyak Bekisting
4 Balok kayu kelas II
5 Papan Mal kelas III
Dolken kayu 8-10 cm - panj 4
6
m
Koefisien
0.660
0.330
0.033
0.033
JUMLAH TENAGA KERJA
m
Kg
Liter
m
m
0.040
0.400
0.018
0.022
Batang
2.000
JUMLAH HARGA BAHAN
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead & Profit (Contoh 15%)
Harga Satuan Pekerjaan (D+E)
15% x D
No
A
Uraian
TENAGA
1 Pekerja
2 Tukang
3 Kepala Tukang
4 Mandor
BAHAN
1 Besi Beton Polos 8
2 Kawat Bendrat
PERALATAN
Kode
Satuan
Koefisien
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.070
0.070
0.007
0.004
JUMLAH TENAGA KERJA
Kg
Kg
10.500
0.150
JUMLAH HARGA BAHAN
Jumlah (A+B+C)
Overhead & Profit (Contoh 15%)
Harga Satuan Pekerjaan (D+E)
Harga Satuan Pekerjaan (D+E) per 1 kg
15% x D
No
A
Uraian
TENAGA
1 Pekerja
2 Tukang
3 Kepala Tukang
4 Mandor
Kode
Satuan
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.070
0.070
0.007
0.004
JUMLAH TENAGA KERJA
Kg
Kg
10.500
0.150
JUMLAH HARGA BAHAN
BAHAN
1 Besi Beton Polos 10
2 Kawat Bendrat
Koefisien
PERALATAN
JUMLAH HARGA ALAT
D
E
F
G
Jumlah (A+B+C)
Overhead & Profit (Contoh 15%)
Harga Satuan Pekerjaan (D+E)
Harga Satuan Pekerjaan (D+E) per 1 kg
15% x D
No
A
Uraian
TENAGA
1 Pekerja
2 Tukang
3 Kepala Tukang
4 Mandor
Kode
Satuan
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.070
0.070
0.007
0.004
JUMLAH TENAGA KERJA
Kg
Kg
10.500
0.150
JUMLAH HARGA BAHAN
BAHAN
1 Besi Beton Polos 12
2 Kawat Bendrat
Koefisien
PERALATAN
JUMLAH HARGA ALAT
D
E
F
G
Jumlah (A+B+C)
Overhead & Profit (Contoh 15%)
Harga Satuan Pekerjaan (D+E)
Harga Satuan Pekerjaan (D+E) per 1 kg
15% x D
No
A
Uraian
TENAGA
1 Pekerja
2 Tukang
3 Kepala Tukang
4 Mandor
Kode
Satuan
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.070
0.070
0.007
0.004
JUMLAH TENAGA KERJA
Kg
Kg
10.500
0.150
JUMLAH HARGA BAHAN
BAHAN
1 Besi Beton D16 (ulir)
2 Kawat Bendrat
Koefisien
PERALATAN
JUMLAH HARGA ALAT
D
E
F
G
Jumlah (A+B+C)
Overhead & Profit (Contoh 15%)
Harga Satuan Pekerjaan (D+E)
Harga Satuan Pekerjaan (D+E) per 1 kg
15% x D
85,000.00
100,000.00
125,000.00
135,000.00
112,455.00
18,900.00
2,375.00
8,910.00
142,640.00
1,520.00
63.57
307.41
-
563,920.00
44,372.86
321,855.56
930,148.41
165,000.00
41,250.00
41,250.00
ENAGA KERJA
ARGA BAHAN
ARGA ALAT
1,114,038.41
167,105.76
1,281,144.17
44,200.00
26,000.00
3,250.00
3,510.00
76,960.00
1,963,500.00
19,900.00
88,357.50
5,970.00
94,327.50
ENAGA KERJA
ARGA BAHAN
ARGA ALAT
171,287.50
25,693.13
196,980.63
85,000.00
100,000.00
125,000.00
135,000.00
112,455.00
18,900.00
2,375.00
8,910.00
142,640.00
1,520.00
63.57
307.41
-
495,520.00
48,314.29
316,322.22
860,156.51
165,000.00
41,250.00
41,250.00
ENAGA KERJA
ARGA BAHAN
ARGA ALAT
1,044,046.51
156,606.98
1,200,653.48
140,250.00
27,500.00
3,500.00
11,205.00
182,455.00
1,520.00
63.57
307.41
-
583,680.00
43,991.43
319,396.30
947,067.72
165,000.00
41,250.00
41,250.00
ENAGA KERJA
ARGA BAHAN
ARGA ALAT
1,170,772.72
175,615.91
1,346,388.63
85,000.00
100,000.00
125,000.00
135,000.00
56,100.00
33,000.00
4,125.00
4,455.00
97,680.00
1,963,500.00
19,900.00
2,924,400.00
2,113,100.00
78,540.00
7,960.00
43,866.00
46,488.20
7,700.00
46,200.00
ENAGA KERJA
ARGA BAHAN
223,054.20
ARGA ALAT
320,734.20
48,110.13
368,844.33
56,100.00
33,000.00
4,125.00
4,455.00
97,680.00
1,963,500.00
19,900.00
2,924,400.00
2,113,100.00
78,540.00
7,960.00
43,866.00
46,488.20
7,700.00
15,400.00
ENAGA KERJA
ARGA BAHAN
192,254.20
ARGA ALAT
289,934.20
43,490.13
333,424.33
85,000.00
100,000.00
125,000.00
135,000.00
56,100.00
33,000.00
4,125.00
4,455.00
97,680.00
1,963,500.00
19,900.00
2,924,400.00
2,113,100.00
78,540.00
7,960.00
52,639.20
46,488.20
7,700.00
15,400.00
ENAGA KERJA
ARGA BAHAN
201,027.40
ARGA ALAT
298,707.40
44,806.11
343,513.51
5,950.00
7,000.00
875.00
540.00
14,365.00
10,336.00
20,000.00
108,528.00
3,000.00
111,528.00
ENAGA KERJA
ARGA BAHAN
9395.973
939.5973 +
10335.57
ARGA ALAT
125,893.00
18,883.95
144,776.95
14,477.70
85,000.00
100,000.00
125,000.00
135,000.00
5,950.00
7,000.00
875.00
540.00
14,365.00
8,473.00
20,000.00
88,966.50
3,000.00
91,966.50
ENAGA KERJA
ARGA BAHAN
7702.703
770.2703 +
8472.973
ARGA ALAT
106,331.50
15,949.73
122,281.23
12,228.12
5,950.00
7,000.00
875.00
540.00
14,365.00
9,288.00
20,000.00
97,524.00
3,000.00
100,524.00
ENAGA KERJA
ARGA BAHAN
ARGA ALAT
114,889.00
17,233.35
132,122.35
13,212.24
8442.777
844.2777 +
9287.054
5,950.00
7,000.00
875.00
540.00
14,365.00
8,413.00
20,000.00
88,336.50
3,000.00
91,336.50
ENAGA KERJA
ARGA BAHAN
ARGA ALAT
105,701.50
15,855.23
121,556.73
12,155.67
7647.679
764.7679
8412.447
Uraian
TENAGA
1 Pekerja
2 Tukang batu
3 Kepala Tukang
4 Mandor
Kode
Satuan
L.01
L.02
L.03
L.04
OH
OH
OH
OH
Koefisien
0.350
0.150
0.015
0.018
JUMLAH TENAGA KERJA
BAHAN
1 Batako 20/40/7 (cetak mesin)
Bh
2 Semen Portland
3 Pasir pasang
Kg
m
12.500
7.500
0.027
JUMLAH HARGA BAHAN
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead & Profit (Contoh 15%)
Harga Satuan Pekerjaan (D+E)
15% x D
Harga Satuan
(Rp)
85,000.00
100,000.00
125,000.00
135,000.00
LAH TENAGA KERJA
29,750.00
15,000.00
1,875.00
2,430.00
49,055.00
2,100.00
26,250.00
1,520.00
89,000.00
LAH HARGA BAHAN
11,400.00
2,403.00
40,053.00
xD
89,108.00
13,366.20
102,474.20
Uraian
TENAGA
1 Pekerja
2 Tukang batu
3 Kepala Tukang
4 Mandor
Kode
Satuan
L.01
L.03
L.03
L.04
OH
OH
OH
OH
0.300
0.150
0.015
0.015
JUMLAH TENAGA KERJA
Kg
m
7.776
0.023
JUMLAH HARGA BAHAN
BAHAN
1 PC
2 PP
PERALATAN
D
E
F
Jumlah (A+B+C)
Overhead & Profit (Contoh 15%)
Harga Satuan Pekerjaan (D+E)
Koefisien
Uraian
TENAGA
1 Pekerja
2 Tukang batu
3 Kepala Tukang
4 Mandor
Kode
Satuan
L.01
L.03
L.03
L.04
OH
OH
OH
OH
0.400
0.200
0.020
0.022
JUMLAH TENAGA KERJA
Kg
m
13.632
0.027
JUMLAH HARGA BAHAN
BAHAN
1 PC
2 PP
Koefisien
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead & Profit (Contoh 15%)
Harga Satuan Pekerjaan (D+E)
15% x D
Harga Satuan
(Rp)
Jumlah Harga
(Rp)
85,000.00
100,000.00
125,000.00
135,000.00
H TENAGA KERJA
25,500.00
15,000.00
1,875.00
2,025.00
44,400.00
1,520.00
89,000.00
11,819.52
2,047.00
13,866.52
H HARGA BAHAN
H HARGA ALAT
58,266.52
8,739.98
67,006.50
Harga Satuan
(Rp)
Jumlah Harga
(Rp)
85,000.00
100,000.00
125,000.00
135,000.00
H TENAGA KERJA
34,000.00
20,000.00
2,500.00
2,970.00
59,470.00
1,520.00
89,000.00
20,720.64
2,403.00
23,123.64
H HARGA BAHAN
H HARGA ALAT
82,593.64
12,389.05
94,982.69
A.4.7.1.10. Pengecatan 1 m2 tembok baru ( 1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup)
No.
URAIAN PEKERJAAN
KODE
TENAGA
1 Pekerja
2 Tukang cat
3 Kepala tukang
4 Mandor
SATUAN
3
L.01
L.02
L.03
L.04
OH
OH
OH
OH
Jumlah
B
C
D
E
BAHAN
Plamur
Cat dasar (setara vinilex)
Cat penutup (setara vinilex)
Jumlah
Jumlah A + B
Overhead & Profit
Harga Satuan Pekerjaan ( C+D)
Kg
Kg
Kg
HARGA
SATUAN
( Rp. )
BIAYA
SATUAN
( Rp. )
0.02
0.063
0.0063
0.003
85,000.00
100,000.00
125,000.00
135,000.00
1,700.00
6,300.00
787.50
405.00
9,192.50
0.10
0.10
0.26
31,500.00
23,700.00
26,600.00
3,150.00
2,370.00
6,916.00
12,436.00
21,628.50
3,244.28
24,872.78
URAIAN PEKERJAAN
SATUAN
HRG. SAT.
( Rp. )
A
1
2
3
4
B
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah
BAHAN
Kawat Harmonika
Paku 1/2" - 1"
1
2
3 Besi Profil
C
D
Jumlah
Jumlah A + B
Harga Satuan
OH
OH
OH
OH
85,000.00
100,000.00
125,000.00
135,000.00
M2
Kg
kg
26,300.00
19,900.00
13,500.00
KUANTITAS
0.100
0.100
0.010
0.0005
1.100
0.020
1.150
BIAYA
SATUAN
( Rp. )
8,500.00
10,000.00
1,250.00
67.50
19,817.50
28,930.00
398.00
15,525.00
44,853.00
64,670.50
64,670.50
URAIAN PEKERJAAN
A
1
2
3
4
SATUAN
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
Jumlah
C
D
BAHAN
1 Ky. klas II Mabang uk. 5/7 - 4 M ( tdk ketam )
2 Besi Strip
3 Paku 1-5
Jumlah
Jumlah A + B
Harga Satuan
M3
Kg
Kg
URAIAN PEKERJAAN
A
1
2
3
4
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
C
D
A.4.5.2.38.
OH
OH
OH
OH
Jumlah
1 BAHAN
2 Kayu Kelas II (4/6) (Tidak Ketam)
3 Paku
Jumlah
Jumlah A + B
Harga Satuan
M3
Kg
No.
URAIAN PEKERJAAN
SATUAN
TENAGA
1 Pekerja
2 Tukang kayu
3 Kepala Tukang
KODE
L.01
L.03
L.11
4 Mandor
L.15
Jumlah
C
D
E
A.4.5.2.39.a
BAHAN
1 Seng gelombang bjls 20
2 Paku seng "-1"
Jumlah
Jumlah A + B
Overhead & Profit
Harga Satuan Pekerjaan ( C+D)
No.
URAIAN PEKERJAAN
TENAGA
1 Pekerja
2 Tukang kayu
3 Kepala Tukang
4 Mandor
L.01
L.03
L.11
L.15
Jumlah
C
D
E
KODE
BAHAN
1 Seng plat 3"x6" bjls.20 lebar 90 cm
2 Paku biasa "-1"
Jumlah
Jumlah A + B
Overhead & Profit
Harga Satuan Pekerjaan ( C+D)
KUANTITAS
BIAYA
SATUAN
( Rp. )
HRG. SAT.
( Rp. )
0.12
0.06
0.006
0.006
85,000.00
100,000.00
125,000.00
135,000.00
10,200.00
6,000.00
750.00
810.00
17,760.00
1.100
15.000
5.600
3,135,000.00
40,000.00
19,900.00
3,448,500.00
600,000.00
111,440.00
4,159,940.00
4,177,700.00
4,177,700.00
KUANTITAS
BIAYA
SATUAN
( Rp. )
HRG. SAT.
( Rp. )
0.12
0.06
0.006
0.006
85,000.00
100,000.00
125,000.00
135,000.00
10,200.00
6,000.00
750.00
810.00
17,760.00
0.011
0.075
2,924,400.00
19,900.00
32,493.33
1,492.50
33,985.83
51,745.83
51,745.83
20
SATUAN
KOEFISIEN
HARGA
SATUAN
( Rp. )
OH
OH
OH
0.12
0.06
0.006
85,000.00
100,000.00
125,000.00
OH
0.006
135,000.00
Lbr
Kg
0.70
0.02
44,200.000
20,900.000
SATUAN
KOEFISIEN
HARGA
SATUAN
( Rp. )
OH
OH
OH
OH
0.15
0.07
0.007
0.006
85,000.00
100,000.00
125,000.00
135,000.00
Lbr
Kg
0.30
0.04
44,700.000
19,900.000
BIAYA
SATUAN
( Rp. )
6
10,200.00
6,000.00
750.00
810.00
17,760.00
30,940.00
418.00
31,358.00
49,118.00
7,367.70
56,485.70
BIAYA
SATUAN
( Rp. )
6
12,750.00
7,000.00
875.00
810.00
21,435.00
13,410.00
796.00
14,206.00
35,641.00
5,346.15
40,987.15
LAMPIRAN II
PERATURAN WALIKOTA PONTIANAK
NOMOR
TAHUN 2015
TENTANG STANDAR HARGA SATUAN DASA
KOTA PONTIANAK
NO
B.
MATERIAL
BAHAN PENGISI
Pasir Kasar
Pasir Halus
Semen PC
Semen PC
Bataco 20 x 40 x 7 cm ( press )
C.
BAHAN KAYU
D.
BAHAN CAT
Plamur
E.
Besi Beton 8 mm
Besi Beton 10 mm
Besi Beton 12 mm
Kawat baja/bendrat
Kawat harmonika
F.
BAHAN PENGGANTUNG
Paku Seng
Paku beton
Paku triplek
Sekrup Fixer
G.
BAHAN ATAP
LAMPIRAN II
PERATURAN WALIKOTA PONTIANAK
NOMOR
TAHUN 2015
TENTANG STANDAR HARGA SATUAN DASAR UPAH DAN BAHAN
KOTA PONTIANAK
AR BAHAN
MATERIAL
SATUAN
M
M
Zak
Kg
Bh
4 M ( tdk ketam )
- 4 M ( tdk ketam )
10 - Pj. 4 M
M
M
Btg
Btg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
M
Kg
Kg
Kg
Kg
Bh
Lbr
Lbr
WALIKOTA PONTIANAK,
SUTARMIDJI
89,000.00
89,000.00
76,000.00
1,520.00
2,100.00
3,135,000.00
3,789,700.00
1,963,500.00
2,113,100.00
6,400.00
7,700.00
31,500.00
23,700.00
26,600.00
TA PONTIANAK,
TARMIDJI
10,336.00
8,473.00
9,288.00
8,413.00
20,000.00
26,300.00
20,900.00
19,900.00
31,400.00
18,100.00
2,500.00
64,000.00
44,700.00
LAMPIRAN II
PERATURAN WALIKOTA PONTIANAK
NOMOR
TAHUN 2015
TENTANG STANDAR HARGA SATUAN DASA
KOTA PONTIANAK
NO
B.
MATERIAL
BAHAN PENGISI
Batu Kong
10
11
Stone Dust
12
Aspal
13
Aspal Sealent
14
Pasir Kasar
15
Pasir Halus
16
Semen PC
17
Semen PC
18
19
20
Paving Block
21
Paving Stone
22
23
Bataco 15 x 30 x 7 cm
24
Bataco 15 x 30 x 6 cm
25
Bataco 20 x 40 x 9 cm ( press )
26
Bataco 20 x 40 x 7 cm ( press )
27
Kerawang ( roster ) 18 x 18 cm
28
29
Keramik 20 x 20 cm ex Roman
30
Keramik 30 x 30 cm ex Roman
31
Keramik 30 x 30 cm Unpolished
32
Keramik 30 x 30 cm Polish
33
Keramik 30 x 30 cm Artistik
34
35
Keramik 40 x 40 cm ex Roman
36
37
38
39
40
41
42
43
44
Marmer
45
Wood Flooring
46
47
48
49
50
Floor Hardener
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
Geotextile Woven
91
92
93
94
C.
BAHAN KAYU
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
Papan Simpiran
45
46
47
48
49
50
51
52
53
Alas laci
54
Wood Plank
55
Bambu Pj. 10 m
D.
BAHAN CAT
Amplas
Minyak cat
Cat kilat
Plamur
10
11
12
13
14
15
16
17
Dempul
18
Plitur
19
Thiner
20
Thiner ND
21
Melamic
22
Vernis
23
Meni
24
Oker
25
Lem Kayu
26
Sealent
27
Soda Api
28
29
Teak Oil
30
Ter / Residu
31
Kuas 4"
32
33
34
Glass Bead
35
36
Water Proofing
E.
Kawat baja/bendrat
Simpai roll
Kawat simpai
10
11
Besi Penahan
12
Beugel plat L. 3 cm
13
14
Besi Profil
15
Kawat Las
16
Kawat Las
17
Kawat harmonika
18
Kawat kasa
19
20
21
22
23
24
25
26
27
28
29
30
Folding gate
31
32
33
34
35
36
37
Rangka Baja Ringan Zincalume (truss/color) (Tanpa Jurai Dalam - Bentang s/d 16 m)
38
Rangka Baja Ringan Zincalume (truss/color) (Tanpa Jurai Dalam - Bentang 17 m s/d 30 m)
39
Rangka Baja Ringan Zincalume (truss/color) (Dengan Jurai Dalam - Bentang s/d 16m)
40
Rangka Baja Ringan Zincalume (truss/color) (Dengan Jurai Dalam - Bentang 17 m s/d 30 m)
41
Rangka Baja Ringan Zincalume (truss/polos) (Tanpa Jurai Dalam - Bentang s/d 16 m)
42
Rangka Baja Ringan Zincalume (truss/polos) (Tanpa Jurai Dalam - Bentang 17 m s/d 30 m)
43
Rangka Baja Ringan Zincalume (truss/polos) (Dengan Jurai Dalam - Bentang s/d 16m)
44
Rangka Baja Ringan Zincalume (truss/polos) (Dengan Jurai Dalam - Bentang 17 m s/d 30 m)
45
46
47
48
Dinabolt
49
L. Braket
50
Baut truss
51
Baut reng
52
Baut atap 5 cm
53
54
55
56
57
Besi tempa
F.
BAHAN PENGGANTUNG
Kait angin
Handle Jendela
Handle Pintu
Engsel jendela
Engsel pintu
Slot pintu
Slot jendela
10
11
12
13
Kunci silinder
14
Door Closer
15
Door Stoper
16
Paku Seng
17
18
Paku beton
19
Paku triplek
20
Paku GRC
21
Paku Zincalum
22
Paku Onduline
23
Sekrup Onduline
24
Sekrup Gibsum
25
Sekrup Fixer
26
27
28
29
30
31
32
33
34
Paku asbes
35
Sekrup Zincalume
36
37
38
39
G.
BAHAN ATAP
Sirap belian
Asbes
Eternit
10
11
12
13
14
15
16
17
18
19
20
21
22
Onduband
23
24
25
26
27
28
29
30
31
32
33
34
Atap polycarbonat
35
36
Nok bubungan genteng metal stone 1/2 lingkaran 0.35 (pj 40cm)
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
Aluminium Foil
55
56
57
58
59
60
Atap Steel Sheet 0.30 lurus (biru, merah, coklat, hijau tua, biru tua)
61
Atap Steel Sheet 0.35 lurus (coklat, biru, merah, hijau muda)
62
63
64
65
66
67
Atap Steel Sheet 0.30 lengkung (biru, merah, coklat, hijau tua, biru tua)
68
Atap Steel Sheet 0.35 lengkung (coklat, biru, merah, hijau muda)
69
70
71
72
73
74
Nok/Prabung Steel Sheet 0.25 lebar 333 mm (biru, merah, hijau tua)
75
Nok/Prabung Steel Sheet 0.30 lebar 333 mm (biru, merah, coklat, hijau tua, biru tua)
76
Nok/Prabung Steel Sheet 0.35 lebar 333 mm (coklat, biru, merah, hijau muda)
77
78
Nok/Prabung Steel Sheet 0.45 lebar 333 mm (biru, merah, hijau muda)
79
80
81
82
Nok/Prabung Steel Sheet 0.25 lebar 500 mm (biru, merah, hijau tua)
83
Nok/Prabung Steel Sheet 0.30 lebar 500 mm (biru, merah, coklat, hijau tua, biru tua)
84
Nok/Prabung Steel Sheet 0.35 lebar 500 mm (coklat, biru, merah, hijau muda)
85
86
Nok/Prabung Steel Sheet 0.45 lebar 500 mm (biru, merah, hijau muda)
H.
BAHAN KACA
Kaca Polos, t = 5 mm
Kaca Rayben, t = 5 mm
Kaca Patri
Sealent
10
Kaca Es
11
Kaca Polos, t = 8 mm
12
Kaca Raindown, t = 5 mm
13
Kaca Buram, t = 5 mm
I.
BAHAN TRIPLEK
Triplek t = 3 mm
Triplek t = 6 mm
Triplek t =9 mm
Triplex t = 12 mm
Teakwood t = 3 mm
Formika t = 0,03 mm
Multiplex t = 6 mm
Multiplex t = 9 mm
Multiplex t = 10 mm
10
Multiplek t = 12 mm
11
12
13
GypsumBoard t = 9mm
14
15
16
J.
BAHAN SANITASI
10
11
12
13
14
15
16
Kaca Cermin
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
Pelampung otomatis
42
43
44
45
K.
Bensin industri
Minyak pelumas/Oli
Minyak tanah
Alat-alat bantu
L.
BATU ALAM
10
11
12
13
14
15
16
17
M.
Traffo
Traffo
Traffo
Traffo
Traffo
Traffo
Traffo
SON T 70 Watt
Traffo
Neon 40 Watt
Traffo
Neon 20 Watt
10
HPL
250 Watt
11
HPL
125 Watt
12
13
14
15
16
17
18
Pijar 5 Watt
19
Pijar 25 Watt
20
Pijar 40 Watt
21
Pijar 60 Watt
22
Pijar 75 Watt
23
24
25
Neon 40 Watt
26
Neon 20 Watt
27
Neon 10 Watt
28
Lampu XL 14 Watt
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
SL 14 Watt
45
SL 18 Watt
46
SL 23 Watt
47
TL Rina 32 Watt
48
49
50
51
NYY
1 x 1.5 mm
52
NYY
1 x 2.5 mm
53
NYY
1 x 4 mm
54
NYY
1 x 6 mm
55
NYY
2 x 2.5 mm
56
NYY
2 x 4 mm
57
NYY
2 x 6 mm
58
NYY
2 x 10 mm
59
NYY
3 x 4 mm
60
NYY
4 x 2.5 mm
61
NYY
4 x 4 mm
62
NYY
4 x 6 mm
63
NYY
4 x 10 mm
64
NYY
4 x 16 mm
65
NYY
4 x 25 mm
66
NYY
4 x 35 mm
67
NYY
4 x 50 mm
68
NYN
2 x 2,5 mm
69
NYN
3 x 1,5 mm
70
NYN
3 x 2,5 mm
71
NYA
1 x 1,5 mm
72
NYA
1 x 2,5 mm
73
NYA
1 x 4 mm
74
NYA
1 x 6 mm
75
NYM
3 x 4 mm
76
NYM
2 x 4 mm
77
NYM
2 x 2,5 mm
78
NYM
2 x 1,5 mm
79
NYM
3 x 1,5 mm
80
NYM
3 x 2,5 mm
81
NYM
4 x 2,5 mm
82
NYM
4 x 4 mm
83
NYMHYM 2 x 0,75 mm
84
NYMHYM 2 x 1,5 mm
85
Kabel 3 x 2,5 mm
86
Kabel TC 2 x 10 mm
87
Kabel TC 2 x 16 mm
88
89
Fitting Gantung
90
Fitting Duduk
91
Fitting Atom
92
Fitting Gantung E 27
93
Fitting Duduk E 27
94
Full Breket
95
Isolasi Unibel
96
Icnitor SN 58
97
Inector
98
Ignator
99
Kap Hijau E 27
100
Kap Hijau E 40
101
Kop Skring
102
k. Skum 10-8
103
MCB 1.A
104
MCB 2.A
105
MCB 25 A
106
MCB 63 A
107
MCB 40 A
108
MCB 50 A
109
MCB 10 A
110
MCB 16 A
111
MCB 6 A
112
MCB 32 A
113
MCB Box
114
Multi Tester
115
116
117
NH Fuse 80 A
118
Ornamen Pijar
119
Obeng Plus
120
Obeng Minus
121
122
123
Rel MCB
124
125
126
127
128
129
130
131
Solder Pistol
132
133
Steker Arde
134
Steker T
135
Sadel No. 6
136
Sadel No. 8
137
Sadel No. 9
138
Sadel No. 10
139
Sadel No. 12
140
Sadel No. 14
141
Sadel No. 19
142
Sadel No. 22
143
Stater
144
Tang Amper
145
Tang Potong
146
Tang Kombinasi
147
148
149
150
Tespen
LAMPIRAN II
PERATURAN WALIKOTA PONTIANAK
NOMOR
TAHUN 2015
TENTANG STANDAR HARGA SATUAN DASAR UPAH DAN BAHAN
KOTA PONTIANAK
AR BAHAN
h Bukit Tokok)
MATERIAL
SATUAN
M
M
M
M
M
M
M
M
M
M
M
Kg
Kg
M
M
Zak
Kg
M
M
d (setaraf Decogress)
d (setaraf Indogress)
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Kotak
Kotak
Kotak
Kotak
Kotak
Kotak
Kotak
Kotak
Kotak
Kotak
Kotak
za Polished
Kotak
za Unpolished
Kotak
za Polished
Kotak
za Unpolished
Kotak
M
M
Bh
Bh
m ex Roman
Kotak
m ex Roman
Kotak
Kg
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
Liter
Lembar
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
M
M
bh
bh
M
M
Tarik 50 KN/m
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
- 4 M ( ketam )
- 4 M ( tdk ketam )
- 4 M ( tdk ketam )
- 4 M ( ketam )
M
M
M
M
4 M ( tdk ketam )
4 M ( ketam )
4 M ( tdk ketam )
4 M ( ketam )
4 M ( tdk ketam )
4 M ( tdk ketam )
- 4 M ( tdk ketam )
- 4 M ( tdk ketam )
- 4 M ( tdk ketam )
4 M ( tdk ketam )
- 4 M ( tdk ketam )
- 4 M ( tdk ketam )
) tdk ketam
10 - Pj. 4 M
M
M
M
M
M
M
M
M
Btg
Btg
Btg
Btg
Btg
Btg
Btg
M
Btg
M'
Btg
Lbr
oat (acrylic)
tara Dulux
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Ltr
Ltr
Ltr
Ltr
Kg
Kg
Kg
Kg
Kg
Kg
Ltr
Ltr
Bh
Kg
Kg
Kg
Kg
M
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Btg
bh
bh
Bh
Kg
Btg
Kg
M
M
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
M
Meter
Meter
Unit
Meter
Meter
Meter
btg
btg
btg
bh
bh
bh
bh
bh
M
Lbr
g + Pemasangan
M
btg
btg
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Kg
Kg
Kg
Kg
Kg
Kg
Bh
Bh
Kg
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
m - uk. 87 x 213,5 cm
Unit
Unit
Unit
Unit
Lbr
Lbr
M
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
nsparan 2 x 0,95 m
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
0 x 50 cm (biru/premium)
Lbr
0 x 50 cm (florentino)
Lbr
Lbr
Lbr
Lbr
M
Lbr
Lbr
Lbr
Classic 0.35 )
Lbr
Prima 0.35 )
Lbr
M
M
M
M
M
M
M
Bh
Bh
M'
M'
M'
M'
Lbr
Lbr
Lbr
Lbr
M'
Lbr
egi 0.40(color)
M
Lbr
M
/15 pj. 50 cm
Lbr
M
M
M
M
M
ung (silver)
ung (silver)
M
M
M
M
M
M
M
M
M
M
Kg
10 daun polos
Bh
10 daun rayben
Bh
M
M
M
M
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Bh
Bh
Bh
Bh
Bh
Bh
Unit
Bh
Unit
Unit
Bh
Bh
Bh
Unit
Bh
M
Bh
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Unit
Unit
Unit
KEUNTUNGAN)
Ltr
Ltr
Ltr
Ltr
Kg
Set
M
M
M
M
M
M
M
M
M
M
M
M
M
buah
buah
kg
M
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
roll
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Bungkus
Bungkus
Bungkus
Bungkus
Bungkus
Bungkus
Bungkus
Bungkus
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
WALIKOTA PONTIANAK,
SUTARMIDJI
DAN BAHAN
192,500.00
200,000.00
308,500.00
333,300.00
350,000.00
375,000.00
400,000.00
415,000.00
429,100.00
495,100.00
295,600.00
13,000.00
30,000.00
89,000.00
89,000.00
76,000.00
1,520.00
191,100.00
247,700.00
2,200.00
3,500.00
1,500.00
1,100.00
900.00
2,500.00
2,100.00
12,000.00
53,700.00
70,500.00
82,800.00
85,700.00
90,000.00
93,000.00
243,000.00
100,000.00
140,000.00
155,000.00
319,500.00
323,000.00
284,000.00
290,000.00
223,000.00
230,000.00
850,000.00
275,000.00
8,300.00
52,600.00
76,000.00
86,400.00
9,600.00
944,000.00
991,300.00
1,025,000.00
1,059,300.00
1,134,000.00
1,189,300.00
1,225,000.00
1,240,000.00
1,266,700.00
1,306,500.00
1,341,500.00
1,377,500.00
1,406,500.00
1,432,500.00
1,467,500.00
1,504,000.00
1,536,500.00
38,300.00
11,300.00
960,000.00
1,060,400.00
1,200,000.00
1,379,400.00
1,716,000.00
780,000.00
896,500.00
900,000.00
1,024,100.00
1,620,000.00
2,160,000.00
2,970,000.00
1,300,000.00
1,625,000.00
1,950,000.00
27,500.00
3,000.00
50,000.00
35,000.00
30,000.00
40,000.00
50,000.00
65,000.00
425,000.00
375,000.00
10,142,500.00
9,621,000.00
7,936,100.00
7,617,200.00
9,567,900.00
9,412,000.00
13,020,900.00
10,416,700.00
10,000,000.00
11,154,500.00
10,058,300.00
11,015,700.00
10,928,600.00
10,273,400.00
13,252,300.00
12,682,300.00
6,699,200.00
6,510,400.00
5,227,600.00
5,739,800.00
8,100,000.00
19,500,000.00
15,000,000.00
11,500,000.00
3,828,100.00
3,971,400.00
4,024,900.00
4,153,700.00
2,924,400.00
3,135,000.00
3,789,700.00
4,583,300.00
4,108,800.00
4,199,200.00
3,993,000.00
4,557,300.00
2,225,000.00
1,963,500.00
6,250,000.00
6,377,300.00
10,819,800.00
11,188,300.00
2,113,100.00
1,064,800.00
18,000.00
30,700.00
5,000.00
6,400.00
7,700.00
75,000.00
91,200.00
235,000.00
8,800.00
62,500.00
7,500.00
2,800.00
17,300.00
54,100.00
31,500.00
172,000.00
147,400.00
109,500.00
99,500.00
98,300.00
52,000.00
70,400.00
86,000.00
23,700.00
26,600.00
27,500.00
43,900.00
21,200.00
50,600.00
18,200.00
22,100.00
62,400.00
32,000.00
48,000.00
11,000.00
17,100.00
30,000.00
21,100.00
15,700.00
60,000.00
54,000.00
22,500.00
65,000.00
95,000.00
30,000.00
39,000.00
78,500.00
10,600.00
12,600.00
9,800.00
12,100.00
15,900.00
31,800.00
20,000.00
17,900.00
15,500.00
4,500.00
16,000.00
15,000.00
310,000.00
13,500.00
5,300.00
28,500.00
26,300.00
10,000.00
118,300.00
93,100.00
139,800.00
205,000.00
246,300.00
302,900.00
390,000.00
582,500.00
925,000.00
1,071,300.00
1,721,700.00
621,700.00
85,000.00
95,000.00
1,500,000.00
120,000.00
65,000.00
65,000.00
250,000.00
272,500.00
235,200.00
304,100.00
175,000.00
225,400.00
193,900.00
257,000.00
52,500.00
82,000.00
75,000.00
5,700.00
6,000.00
800.00
800.00
800.00
908,700.00
1,339,100.00
129,100.00
119,600.00
69,600.00
254,000.00
10,400.00
9,900.00
129,100.00
10,700.00
18,300.00
17,000.00
6,400.00
179,100.00
162,500.00
47,500.00
55,000.00
60,800.00
171,100.00
52,500.00
20,900.00
19,900.00
31,400.00
18,100.00
21,300.00
10,700.00
1,300.00
1,500.00
48,300.00
2,500.00
300.00
300.00
400.00
500.00
500.00
500.00
700.00
700.00
600.00
500.00
4,208,700.00
2,104,300.00
1,578,300.00
631,300.00
5,300.00
57,200.00
68,400.00
52,500.00
51,400.00
52,100.00
52,600.00
36,400.00
35,400.00
36,600.00
270,000.00
154,000.00
193,000.00
48,500.00
54,000.00
94,500.00
95,000.00
96,000.00
85,000.00
89,500.00
89,500.00
55,000.00
92,000.00
64,000.00
53,000.00
80,000.00
80,000.00
81,300.00
111,900.00
47,000.00
64,000.00
100,000.00
112,300.00
78,300.00
46,000.00
70,000.00
50,000.00
96,900.00
109,500.00
123,100.00
64,000.00
44,200.00
44,700.00
66,300.00
20,000.00
54,300.00
75,900.00
120,100.00
70,000.00
83,800.00
80,000.00
55,000.00
46,500.00
52,600.00
15,200.00
55,000.00
60,000.00
65,000.00
50,000.00
57,000.00
67,000.00
72,000.00
77,000.00
60,500.00
66,000.00
71,500.00
62,700.00
73,700.00
79,200.00
84,700.00
22,000.00
24,000.00
26,000.00
20,000.00
22,800.00
26,800.00
28,800.00
30,800.00
33,000.00
36,000.00
39,000.00
30,000.00
34,200.00
40,200.00
43,200.00
46,200.00
145,000.00
550,000.00
167,500.00
240,000.00
450,000.00
2,350,000.00
106,900.00
250,000.00
300,000.00
210,000.00
350,000.00
220,000.00
138,700.00
70,000.00
120,000.00
220,000.00
300,000.00
140,000.00
110,000.00
102,000.00
202,500.00
178,900.00
264,200.00
108,000.00
70,900.00
68,000.00
37,500.00
57,500.00
75,000.00
966,100.00
1,320,000.00
2,074,300.00
2,350,000.00
294,800.00
182,900.00
1,878,300.00
270,000.00
230,400.00
328,700.00
319,100.00
65,200.00
307,000.00
650,000.00
150,000.00
300,000.00
25,900.00
21,100.00
27,100.00
40,000.00
66,500.00
114,000.00
187,700.00
655,200.00
20,100.00
27,300.00
36,600.00
79,600.00
156,400.00
245,400.00
17,100.00
22,500.00
45,400.00
77,000.00
116,900.00
39,700.00
51,200.00
115,500.00
1,397,500.00
813,300.00
68,800.00
75,000.00
115,000.00
1,440,000.00
436,700.00
9,955.00
8,668.00
29,000.00
12,463.00
11,700.00
62,700.00
170,000.00
200,000.00
220,000.00
260,000.00
170,000.00
200,000.00
220,000.00
170,000.00
200,000.00
220,000.00
170,000.00
200,000.00
220,000.00
2,500,000.00
4,000,000.00
7,500.00
1,200,000.00
240,000.00
208,000.00
123,000.00
420,000.00
245,000.00
166,000.00
117,000.00
37,000.00
37,000.00
65,000.00
37,500.00
653,000.00
138,000.00
132,000.00
120,800.00
114,300.00
240,000.00
2,500.00
4,800.00
4,800.00
5,800.00
5,800.00
7,000.00
12,000.00
15,200.00
11,700.00
8,800.00
30,000.00
40,500.00
9,200.00
9,900.00
39,000.00
33,000.00
31,000.00
34,300.00
62,000.00
84,000.00
23,500.00
27,000.00
31,000.00
36,000.00
39,000.00
98,000.00
29,500.00
36,500.00
39,500.00
33,900.00
31,500.00
34,800.00
46,000.00
176,000.00
2,800.00
4,500.00
6,700.00
11,400.00
13,000.00
19,800.00
38,800.00
19,700.00
14,800.00
23,900.00
37,900.00
56,300.00
88,500.00
136,000.00
180,000.00
244,000.00
8,000.00
7,200.00
10,200.00
4,200.00
6,300.00
8,600.00
12,800.00
16,700.00
12,400.00
8,000.00
6,600.00
7,200.00
11,700.00
13,000.00
21,500.00
1,800.00
3,100.00
510,000.00
4,900.00
6,500.00
3,000.00
3,800.00
11,800.00
3,500.00
11,000.00
24,800.00
47,500.00
8,300.00
63,000.00
73,500.00
35,000.00
11,800.00
17,000.00
7,000.00
900.00
11,000.00
38,500.00
33,000.00
84,900.00
31,500.00
84,900.00
39,500.00
44,800.00
33,000.00
33,000.00
2,000.00
94,500.00
484,500.00
670,000.00
28,000.00
89,000.00
PONTIANAK,
RMIDJI
10,000.00
10,000.00
44,300.00
48,000.00
10,500.00
12,000.00
10,800.00
16,100.00
15,500.00
11,200.00
20,800.00
38,500.00
20,000.00
62,000.00
10,500.00
23,500.00
4,500.00
5,500.00
7,500.00
8,500.00
10,500.00
14,500.00
21,000.00
26,000.00
6,500.00
1,024,000.00
38,000.00
48,000.00
388,500.00
16,000.00
21,000.00
21,000.00
NO
A.
1
2
3
4
5
6
7
8
9
10
LAMPIRAN I
PERATURAN WALIKOTA PONTIANAK
NOMOR
TAHUN 2015
TENTANG STANDAR HARGA SATUAN DASAR UPAH D
KOTA PONTIANAK
TENAGA KERJA
UPAH
Pekerja
Tukang Gali / Batu / Tembok / Kayu /Besi / Cat / Pipa / Cor / Semen / Listrik / Pancang
Kepala Tukang
Mandor
Ahli alat berat (mekanik)
Operator Alat Berat
Pembantu Operator
Supir Truk
Kenek truk
Pembantu Mekanik
esember 2015 )
SATUAN
Org/hari
Org/hari
Org/hari
Org/hari
Org/hari
Org/hari
Org/hari
Org/hari
Org/hari
Org/hari
KODE
L.
L.
L.
L.
L.
L.
L.
L.
L.
L.
01
02
03
04
07
08
09
10
11
16
WALIKOTA PONTIANAK,
85,000.00
100,000.00
125,000.00
135,000.00
110,000.00
150,000.00
80,000.00
100,000.00
70,000.00
100,000.00
SUTARMIDJI