1 K. 100 30-Aug-23 06-Sep-23 7 11,5 12,58 2374 140 97,36 7,92 97%
2 K. 100 30-Aug-23 06-Sep-23 7 11,5 12,42 2343 115 79,98 6,51 80%
Lantai Kerja Kantong
3 K. 100 30-Aug-23 06-Sep-23 7 11,5 12,54 2366 125 86,93 7,07 87% Lumpur STA 0+259,38
PT. NINDYA KARYA
s/d STA 0+295,22
Note :
- 1 kN = 102 Kg
- Luas Penampang Silinder 176,71
PPK Irigasi dan Rawa II SNVT PJPA - BBWS Laboratorium Material Dan Beton
PT.Virama Karya Kso Ciriajasa EC - Saka BYS PT. NINDYA KARYA
Citarum PT. NINDYA BETON
( Sri Agustino , Amd.T ) ( Sidik Budi Sayogyo ) ( Imam Dwi Nugraha ) Kuwat Setiyo
Pengawas Pekerjaan Quality Engineer Quality Engineer Quality Control
MATERIAL AND CONCRETE LABORATORY
PT. NINDYA BETON PLANT ON SITE SALAMDARMA
Note :
- 1 kN = 102 Kg
- Luas Penampang Silinder 176,71
PPK Irigasi dan Rawa II SNVT PJPA - BBWS Laboratorium Material Dan Beton
PT.Virama Karya Kso Ciriajasa EC - Saka BYS PT. NINDYA KARYA
Citarum PT. NINDYA BETON
( Sri Agustino , Amd.T ) ( Sidik Budi Sayogyo ) ( Imam Dwi Nugraha ) Kuwat Setiyo
Pengawas Pekerjaan Quality Engineer Quality Engineer Quality Control
MATERIAL AND CONCRETE LABORATORY
PT. NINDYA BETON PLANT ON SITE SALAMDARMA
1 K. 300 30-Aug-23 06-Sep-23 7 11 12,00 2264 340 236,45 19,24 79% Dinding Sisi Kiri Kanan
dan Lantai Bagian Atas
2 K. 300 30-Aug-23 06-Sep-23 7 11 11,75 2217 280 194,72 15,85 65% Saluran Tertutup STA
360 20,37 0+831,49 s/d STA
3 K. 300 30-Aug-23 06-Sep-23 7 11 11,98 2260 250,36 83%
0+854,7 (Vol. 88 m3),
4 K. 300 30-Aug-23 06-Sep-23 7 12 12,15 2292 340 236,45 19,24 79% Dinding Kantong
Lumpur Sisi Kanan STA
5 PT. NINDYA KARYA K. 300 30-Aug-23 06-Sep-23 7 12 12,01 2266 340 236,45 19,24 79% 0+259,88 s/d STA
6 K. 300 30-Aug-23 06-Sep-23 7 12 12,25 2311 340 236,45 19,24 79% 0+283,20 (Vol. 20 m3)
dan Lantai dan Cemper
7 K. 300 30-Aug-23 06-Sep-23 7 11,5 12,16 2294 350 243,40 19,81 81% Kantong Lumpur STA
0+297,02 s/d STA
8 K. 300 30-Aug-23 06-Sep-23 7 11,5 12,10 2283 300 208,63 16,98 70%
0+306,52 (Vol. 30 m3)
9 K. 300 30-Aug-23 06-Sep-23 7 11,5 12,04 2272 305 212,11 17,26 71%
Rata - Rata : 328 228,34 18,58 76%
Note :
- 1 kN = 102 Kg
- Luas Penampang Silinder 176,71
PPK Irigasi dan Rawa II SNVT PJPA - BBWS Laboratorium Material Dan Beton
PT.Virama Karya Kso Ciriajasa EC - Saka BYS PT. NINDYA KARYA
Citarum PT. NINDYA BETON
( Sri Agustino , Amd.T ) ( Sidik Budi Sayogyo ) ( Imam Dwi Nugraha ) Kuwat Setiyo
Pengawas Pekerjaan Quality Engineer Quality Engineer Quality Control