READYMIX SUPPLIER
HASIL PENGUJIAN KUAT TEKAN BETON
PROYEK : PEMBANGUNAN JALAN TOL DUMAI TANGGAL TEST : 16-Mar-20
LOKASI : DUMAI
PELAKSANA : PT HUTAMA KARYA INFRASTRUKTUR
JENIS CONTOH : SILINDER
LUAS : 176,625 cm2
MUTU BETON (fc) : FC.20 MPa
KODE SLUMP TANGGAL UMUR LUAS BERAT VOLUME BERAT/ KUAT PREDIKSI
NO. SAMPLE COR TEKAN SAMPLE SAMPLE SAMPLE SAMPLE VOLUME BEBAN TEKAN 28 PEMBUAT
TEKAN
(cm) (hari) (cm2) (kg) (m3) (ton/m3) (MPa) HARI
1 6A/OUTLIT RCP/STA7+200 7,5 ± 2,5 09/03/20 16/03/20 7 176.625 12.90 0.005299 2.434 399 22.59 34.75 TIO
2 6A/OUTLIT RCP/STA7+200 7,5 ± 2,5 09/03/20 16/03/20 7 176.625 12.72 0.005299 2.400 401 22.70 34.93 TIO
3 6A/OUTLIT RCP/STA7+200 7,5 ± 2,5 09/03/20 16/03/20 7 176.625 12.66 0.005299 2.389 369 20.89 32.14 TIO
PT FARIKA RIAU PERKASA PT.HUTAMA KARYA JALAN TOL PT.MULTI PHI BETA PT.HUTAMA KARYA INFRASTRUKTUR
QUALITY CONTROL
PT. FARIKA RIAU PERKASA
LABORATORIUM PENGUJIAN BETON
READYMIX SUPPLIER
HASIL PENGUJIAN KUAT TEKAN BETON
PROYEK : PEMBANGUNAN JALAN TOL DUMAI TANGGAL TEST : 16-Mar-20
LOKASI : DUMAI
PELAKSANA : PT HUTAMA KARYA INFRASTRUKTUR
JENIS CONTOH : SILINDER
LUAS : 176,625 cm2
MUTU BETON (fc) : FC.20 MPa
KODE SLUMP TANGGAL UMUR LUAS BERAT VOLUME BERAT/ KUAT PREDIKSI
NO. SAMPLE COR TEKAN SAMPLE SAMPLE SAMPLE SAMPLE VOLUME BEBAN TEKAN 28 PEMBUAT
TEKAN
(cm) (hari) (cm2) (kg) (m3) (ton/m3) (MPa) HARI
1 6A/DS 10/ STA 5+000 7,5 ± 2,5 09/03/20 16/03/20 7 176.625 12.51 0.005299 2.361 382 21.63 33.27 YOSEP
2 6A/DS 10/ STA 5+000 7,5 ± 2,5 09/03/20 16/03/20 7 176.625 12.65 0.005299 2.387 376 21.29 32.75 YOSEP
3 6A/DS 10/ STA 5+000 7,5 ± 2,5 09/03/20 16/03/20 7 176.625 12.72 0.005299 2.400 376 21.29 32.75 YOSEP
PT FARIKA RIAU PERKASA PT.HUTAMA KARYA JALAN TOL PT.MULTI PHI BETA PT.HUTAMA KARYA INFRASTRUKTUR
QUALITY CONTROL
PT. FARIKA RIAU PERKASA
LABORATORIUM PENGUJIAN BETON
READYMIX SUPPLIER
HASIL PENGUJIAN KUAT TEKAN BETON
PROYEK : PEMBANGUNAN JALAN TOL DUMAI TANGGAL TEST : 16-Mar-20
LOKASI : DUMAI
PELAKSANA : PT HUTAMA KARYA INFRASTRUKTUR
JENIS CONTOH : SILINDER
LUAS : 176,625 cm2
MUTU BETON (fc) : FC.30 MPa
KODE SLUMP TANGGAL UMUR LUAS BERAT VOLUME BERAT/ KUAT PREDIKSI
NO. SAMPLE COR TEKAN SAMPLE SAMPLE SAMPLE SAMPLE VOLUME BEBAN TEKAN 28 PEMBUAT
TEKAN
(cm) (hari) (cm2) (kg) (m3) (ton/m3) (MPa) HARI
1 6A/KANSTIN/STA 0+250 7,5 ± 2,5 09/03/20 16/03/20 7 176.625 12.75 0.005299 2.406 483 27.35 42.07 HAMZAH
2 6A/KANSTIN/STA 0+250 7,5 ± 2,5 09/03/20 16/03/20 7 176.625 12.68 0.005299 2.393 485 27.46 42.25 HAMZAH
3 6A/KANSTIN/STA 0+250 7,5 ± 2,5 09/03/20 16/03/20 7 176.625 12.55 0.005299 2.368 492 27.86 42.85 HAMZAH
PT FARIKA RIAU PERKASA PT.HUTAMA KARYA JALAN TOL PT.MULTI PHI BETA PT.HUTAMA KARYA INFRASTRUKTUR
QUALITY CONTROL
PT. FARIKA RIAU PERKASA
LABORATORIUM PENGUJIAN BETON
READYMIX SUPPLIER
HASIL PENGUJIAN KUAT TEKAN BETON
PROYEK : PEMBANGUNAN JALAN TOL DUMAI TANGGAL TEST : 16-Mar-20
LOKASI : DUMAI
PELAKSANA : PT HUTAMA KARYA INFRASTRUKTUR
JENIS CONTOH : SILINDER
LUAS : 176,625 cm2
MUTU BETON (fc) : FC.20 MPa
KODE SLUMP TANGGAL UMUR LUAS BERAT VOLUME BERAT/ KUAT PREDIKSI
NO. SAMPLE COR TEKAN SAMPLE SAMPLE SAMPLE SAMPLE VOLUME BEBAN TEKAN 28 PEMBUAT
TEKAN
(cm) (hari) (cm2) (kg) (m3) (ton/m3) (MPa) HARI
1 6A/LERENG OP/STA 0+200 7,5 ± 2,5 09/03/20 16/03/20 7 176.625 12.86 0.005299 2.427 380 21.51 33.10 YOSEP
2 6A/LERENG OP/STA 0+200 7,5 ± 2,5 09/03/20 16/03/20 7 176.625 12.81 0.005299 2.417 374 21.17 32.58 YOSEP
3 6A/LERENG OP/STA 0+200 7,5 ± 2,5 09/03/20 16/03/20 7 176.625 12.70 0.005299 2.397 376 21.29 32.75 YOSEP
PT FARIKA RIAU PERKASA PT.HUTAMA KARYA JALAN TOL PT.MULTI PHI BETA PT.HUTAMA KARYA INFRASTRUKTUR
QUALITY CONTROL