PT.

PUTRA SATRIA PRIMA


PROJECT DESIGN & CONSTRUCTION MANAGEMENT

FORM BETON NO. : 03

EVALUASI KUALITAS BESI BETON


DIAMETER : …….. mm
PROYEK : DI ANALISA OLEH :
KONTRAKTOR : SITE ENGINEER
SUPPLIER BESI BETON : NAMA : …………………………..

SUMBER BESI HARUS DARI PABRIK YANG SAMA.


PENGETESAN DILAKUKAN MINIMUM 1 (SATU) SET SAMPLE UNTUK SETIAP UKURAN PENAMPANG DARI TIAP TAHAP PENGIRIMAN BARANG ATAU SATU BUAH UNTUK SETIAP 7000KG / SESUAI SPESIFIKASI
1 (SATU) SET SAMPLE TERDIRI DARI 3(TIGA) BUAH SAMPLE DENGAN PANJANG 1(SATU) METER: 2 BUAH SAMPLE UNTUK UJI TARIK DAN 1 BUAH SAMPLE UNTUK UJI BENDING
BJTP 24, BATAS ULUR MINIMUM = 235 N/MM2 = 24 KGF/MM2, KUAT TARIK MINIMUM = 382 N/MM2 = 39 KGF/MM2, REGANG MINIMUM = 20 %, DIAMETER UJI LENGKUNG 3D, SUDUT UJI LENGKUNG 180
BJTP 40, BATAS ULUR MINIMUM = 392 N/MM2 = 40 KGF/MM2, KUAT TARIK MINIMUM = 559 N/MM2 = 57 KGF/MM2, REGANG MINIMUM = 16 %, DIAMETER UJI LENGKUNG 5D, SUDUT UJI LENGKUNG 180
BJTP Φ10, A = 0.785 CM2, D = 9,70-10.30 MM, W = 0.617 KG/M' BJTD Φ13, A = 1.330 CM2, D = 12.60-13.38 MM, W = 1.040 KG/M' BJTD Φ16, A = 2.010 CM2, D = 15.61-16.41 MM,W = 1.580 KG/M'
BJTD Φ19, A = 2.840 CM2, D = 18.54-19.50 MM,W = 2.230 KG/M' BJTD Φ22, A = 3.800 CM2, D = 21.44-22.54 MM, W = 2.980 KG/M' BJTD Φ25, A = 4.910 CM2, D = 24.37-25.62 MM, W = 3.850 KG/M'
KONTROL PEMASUKAN BESI KONTROL PENGETESAN
NO. SURAT JALAN JUMLAH BERAT JUMLAH DIAMETER BATAS ULUR KUAT TARIK REGANGAN UJI
TANGGAL JAM PASS/FAIL
NO. (BATANG) (KG) SAMPLE (SET) ( MM ) ( Kg/MM2) ( Kg/MM2) (%) LENGKUNG
1