READYMIX SUPPLIER
HASIL PENGUJIAN KUAT TEKAN BETON
PROYEK : PEMBANGUNAN JALAN TOL DUMAI TANGGAL TEST : 27-Mar-20
LOKASI : DUMAI
PELAKSANA : PT HUTAMA KARYA INFRASTRUKTUR
JENIS CONTOH : SILINDER
LUAS : 176,625 cm2
MUTU BETON (fc) : FC.20 MPa
KODE SLUMP TANGGAL UMUR LUAS BERAT VOLUME BERAT/ KUAT PREDIKSI
NO. SAMPLE COR TEKAN SAMPLE SAMPLE SAMPLE SAMPLE VOLUME BEBAN TEKAN 28 PEMBUAT
TEKAN
(cm) (hari) (cm2) (kg) (m3) (ton/m3) (MPa) HARI
1 6A/DS.10/STA 0+250 7,5 ± 2,5 11/03/20 27/03/20 16 176.625 12.50 0.005299 2.359 388 21.97 24.41 DIKI
2 6A/DS.10/STA 0+250 7,5 ± 2,5 11/03/20 27/03/20 16 176.625 12.66 0.005299 2.389 390 22.08 24.53 DIKI
3 6A/DS.10/STA 0+250 7,5 ± 2,5 11/03/20 27/03/20 16 176.625 12.73 0.005299 2.402 373 21.12 23.46 DIKI
PT FARIKA RIAU PERKASA PT.HUTAMA KARYA JALAN TOL PT.MULTI PHI BETA PT.HUTAMA KARYA INFRASTRUKTUR
QUALITY CONTROL
PT. FARIKA RIAU PERKASA
LABORATORIUM PENGUJIAN BETON
READYMIX SUPPLIER
HASIL PENGUJIAN KUAT TEKAN BETON
PROYEK : PEMBANGUNAN JALAN TOL DUMAI TANGGAL TEST : 27-Mar-20
LOKASI : DUMAI
PELAKSANA : PT HUTAMA KARYA INFRASTRUKTUR
JENIS CONTOH : SILINDER
LUAS : 176,625 cm2
MUTU BETON (fc) : FC.30 MPa
KODE SLUMP TANGGAL UMUR LUAS BERAT VOLUME BERAT/ KUAT PREDIKSI
NO. SAMPLE COR TEKAN SAMPLE SAMPLE SAMPLE SAMPLE VOLUME BEBAN TEKAN 28 PEMBUAT
TEKAN
(cm) (hari) (cm2) (kg) (m3) (ton/m3) (MPa) HARI
1 7,5 ± 2,5 11/03/20 27/03/20 16 176.625 12.70 0.005299 2.397 485 27.46 30.51 TIO
6A/CANSTEEN & BARRIER/STA 1+000 &
2 7,5 ± 2,5 11/03/20 27/03/20 16 176.625 12.82 0.005299 2.419 480 27.18 30.20 TIO
0+250
3 7,5 ± 2,5 11/03/20 27/03/20 16 176.625 12.66 0.005299 2.389 492 27.86 30.95 TIO
PT FARIKA RIAU PERKASA PT.HUTAMA KARYA JALAN TOL PT.MULTI PHI BETA PT.HUTAMA KARYA INFRASTRUKTUR
QUALITY CONTROL