PENYEL.
BOBOT VOLUME PROSENTASE
S/D
No. Uraian Satuan Volume S/D
RENCANA MINGGU MINGGU S/D MINGGU MINGGU MINGGU MGG INI
MINGGU
(%) LALU INI INI LALU INI INI (%)
1. UNIT GEDUNG UTAMA
A. PEKERJAAN SIPIL
I. PEKERJAAN PERSIAPAN
1 Pekerjaan Pembersihan Lapangan Dan K3 Ls 1,00 0,13 - 1,00 1,00 - 0,13 0,13 100,00
2 Direksi Keet + Gudang Ls 1,00 0,23 - - - - -
3 Mobilisasi Alat Berat Ls 1,00 0,32 - - - -
4 Papan Nama Kegiatan Ls 1,00 0,01 - - - -
5 Sewa Lift Barang bln 4,00 0,10 - - - -
6 Pekerjaan Pagar pengaman m' 336,27 0,32 336,00 336,00 - 0,32 0,32 99,92
-
V. PEKERJAAN BAJA
1 Kolom WF 200.100.5,5.8 Kg 272,64 0,04
2 Balok WF 200.100.5,5.8 Kg 935,50 0,15
3 Vute WF 200.100.5,5.8 Kg 230,04 0,04
4 Plat Joint tb. 12 mm Kg 75,36 0,01
5 Plandes tb. 15 Kg 29,44 0,00
PENYEL.
BOBOT VOLUME PROSENTASE
S/D
No. Uraian Satuan Volume S/D
RENCANA MINGGU MINGGU S/D MINGGU MINGGU MINGGU MGG INI
MINGGU
(%) LALU INI INI LALU INI INI (%)
6 Baut M16 Bh 192,00 0,02
7 Angkur M16 Bh 64,00 0,03
8 Hollow 50/100 M 24,64 0,01
B. PEKERJAAN ARSITEK
I. PEKERJAAN DINDING
1 Lantai 01
- Pas. Dinding Bata Ringan tb : 10 cm Dengan Mortar Siap Pakai M2 1.736,40 0,87
-
2 Lantai 02 -
- Pas. Dinding Bata Ringan tb : 10 cm Dengan Mortar Siap Pakai M2 2.223,12 1,11
-
3 Lantai 03 -
- Pas. Dinding Bata Ringan tb : 10 cm Dengan Mortar Siap Pakai M2 661,59 0,33
-
4 Lantai Rumah Lift -
- Pas. Dinding Bata Ringan tb : 10 cm Dengan Mortar Siap Pakai M2 170,91 0,09
V. PEKERJAAN PLAFOND
1 Lantai 01
- Rangka Plafond Metal Furing M2 944,25 0,74
- Pas.Plafond Gypsum Board 9 mm M2 915,36 0,16
- Pas.Plafond Kalsi Board 6 mm M2 28,89 0,01
- List Plafond Gypsum 12 cm M' 813,65 0,14
- Beton Expose Trowel Finish M2 174,76 0,03
-
2 Lantai 02 -
- Rangka Plafond Metal Furing M2 830,03 0,65
- Pas.Plafond Gypsum Board 9 mm M2 787,69 0,14
- Pas.Plafond Kalsi Board 6 mm M2 42,34 0,01
- List Plafond Gypsum 12 cm M' 1.085,85 0,18
-
3 Lantai Rumah Lift -
- Beton Expose Trowel Finish M2 11,85 0,00
-
IX. PEKERJAAN PENGECATAN
1 Lantai 01 -
Pengecatan Dinding -
- Pengecatan Dinding Interior (Anti Bacterial) M2 1.334,23 0,30
- Pengecatan Dinding Eksterior M2 1.432,50 0,32
- Pengecatan Plafond M2 944,25 0,11
-
2 Lantai 02 -
Pengecatan Dinding -
- Pengecatan Dinding Interior (Anti Bacterial) M2 1.770,63 0,39
- Pengecatan Dinding Eksteriror M2 1.821,87 0,40
- Pengecatan Plafond M2 830,03 0,10
-
3 Lantai 03 -
Pengecatan Dinding -
PENYEL.
BOBOT VOLUME PROSENTASE
S/D
No. Uraian Satuan Volume S/D
RENCANA MINGGU MINGGU S/D MINGGU MINGGU MINGGU MGG INI
MINGGU
(%) LALU INI INI LALU INI INI (%)
- Pengecatan Dinding Interior (Anti Bacterial) M2 661,59 0,15
- Pengecatan Dinding Eksteriror M2 704,97 0,16
-
4 Lantai Atap -
Pengecatan Dinding -
- Pengecatan Dinding Interior (Anti Bacterial) M2 205,09 0,05
- Pengecatan Dinding Eksteriror M2 136,73 0,03
B. PEKERJAAN ARSITEK
I. PEKERJAAN DINDING
Lantai 01
- Pekerjaan Pasangan Dinding Bata Ringan tb : 10 cm M2 379,83 0,19
V. PEKERJAAN SANITASI
Lantai 01
- Pas.Closet Duduk Ex.Toto (Komplit) Bh 2,00 0,02
- Pas. Wastafel Persegi Bh 2,00 0,01
- Pas. Kaca 135 x 100 cm + Accesories Bh 2,00 0,00
- Pas.Skat Urinoir Bh 3,00 0,00
A. PEKERJAAN SIPIL
I. PEKERJAAN TANAH
1 Pekerjaan Galian Tanah M3 143,49 0,05
PENYEL.
BOBOT VOLUME PROSENTASE
S/D
No. Uraian Satuan Volume S/D
RENCANA MINGGU MINGGU S/D MINGGU MINGGU MINGGU MGG INI
MINGGU
(%) LALU INI INI LALU INI INI (%)
2 Pekerjaan Urugan Tanah Kembali M3 50,22 0,01
3 Pekerjaan Urugan Tanah Padat M3 27,16 0,02
B. PEKERJAAN ARSITEK
I. PEKERJAAN DINDING
1 Lantai 1
- Pekerjaan Pasangan Dinding Bata Ringan tb : 10 cm M2 374,55 0,19
V. PEKERJAAN SANITASI
1 Lantai 01
- Pas.Closet Duduk Ex.Toto (Komplit) Unit 1,00 0,01
A. PEKERJAAN SIPIL
I. PEKERJAAN TANAH
1 Galian Tanah M3 13,28 0,00
2 Urugan tanah Kembali M3 4,65 0,00
B. PEKERJAAN ARSITEK
I. PEKERJAAN DINDING
- Pek. Dinding Bata Ringan tb : 10 cm M2 60,54 0,03
PENYEL.
BOBOT VOLUME PROSENTASE
S/D
No. Uraian Satuan Volume S/D
RENCANA MINGGU MINGGU S/D MINGGU MINGGU MINGGU MGG INI
MINGGU
(%) LALU INI INI LALU INI INI (%)
II. PEKERJAAN PLESTERAN
- - Plesteran Dengan Mortar Siap Pakai +Fin. ACI M2 121,09 0,04
- - Benangan M' 24,00 0,00
V. PEKERJAAN KUSEN
- Kusen Pintu Type 1 (P1) Unit 1,00 0,02
- Pas.Roster M2 2,56 0,01
-
VI. PEKERJAAN PENGECATAN -
- Pengecatan Dinding Interior M2 33,30 0,01
- Pengecatan Dinding Eksteriror M2 27,24 0,01
- Pengecatan Plafond M2 16,44 0,00
A. PEKERJAAN SIPIL
I. PEKERJAAN TANAH
PENYEL.
BOBOT VOLUME PROSENTASE
S/D
No. Uraian Satuan Volume S/D
RENCANA MINGGU MINGGU S/D MINGGU MINGGU MINGGU MGG INI
MINGGU
(%) LALU INI INI LALU INI INI (%)
1 Galian Tanah M3 16,09 0,01
2 Urugan tanah Kembali M3 5,63 0,00
B. PEKERJAAN ARSITEK
I. PEKERJAAN DINDING
- Pek. Dinding Bata Ringan tb : 10 cm M2 33,67 0,02
V. PEKERJAAN KUSEN
- Kusen Pintu Type 1 (P1) Unit 1,00 0,02
A. PEKERJAAN SIPIL
I. PEKERJAAN TANAH
1 Galian Tanah M3 127,68 0,05
2 Urugan tanah Kembali M3 44,69 0,01
B. PEKERJAAN ARSITEK
I. PEKERJAAN DINDING
- Pek. Dinding Bata Ringan Tb : 10 cm M2 54,78 0,03
V. PEKERJAAN KUSEN
- Pek.Kusen Pintu (P1) Unit 1,00 0,02
- Pek. Roster Bata M2 1,54 0,00
PENYEL.
BOBOT VOLUME PROSENTASE
S/D
No. Uraian Satuan Volume S/D
RENCANA MINGGU MINGGU S/D MINGGU MINGGU MINGGU MGG INI
MINGGU
(%) LALU INI INI LALU INI INI (%)
A. PEKERJAAN SIPIL
I. PEKERJAAN TANAH
1 Galian Tanah M3 3,83 0,00
2 Urugan tanah Kembali M3 1,34 0,00
B. PEKERJAAN ARSITEK
I. PEKERJAAN DINDING
- Pek. Dinding Bata Ringan tb : 10 cm M2 11,48 0,01
PENYEL.
BOBOT VOLUME PROSENTASE
S/D
No. Uraian Satuan Volume S/D
RENCANA MINGGU MINGGU S/D MINGGU MINGGU MINGGU MGG INI
MINGGU
(%) LALU INI INI LALU INI INI (%)
II. PEKERJAAN PLESTERAN
- Plesteran Dengan Mortar Siap Pakai +Fin. ACI M2 22,97 0,01
- Benangan M' 4,80 0,00
-
IV. PEKERJAAN PLAFOND
- Rangka Plafond Metal Furing M2 1,56 0,00
- Pek.Plafond Gypsumboard tb : 9 mm M2 1,56 0,00
- List Plafond Gypsum M' 4,32 0,00
V. PEKERJAAN KUSEN
- Kusen Pintu Type 1 (P1) Unit 1,00 0,02
- Jendela Type 1 (J1) Unit 3,00 0,02
A. PEKERJAAN SIPIL
PENYEL.
BOBOT VOLUME PROSENTASE
S/D
No. Uraian Satuan Volume S/D
RENCANA MINGGU MINGGU S/D MINGGU MINGGU MINGGU MGG INI
MINGGU
(%) LALU INI INI LALU INI INI (%)
I. PEKERJAAN TANAH
1 PEKERJAAN CUT & FILL
- Urugan Tanah dari Luar + Pemadatan M3 237,67 0,29
-
2 TIMBUNAN LANDSCAPE -
- Pek Tanah Humus tb : 10 cm M3 10,73 0,00
A. GEDUNG UTAMA
I. PEKERJAAN LAMPU & KOTAK KONTAK
LANTAI 1
1 Lampu Down Light Meson 200 24W 65K/30K ID RECESSED LED Bh 6,00 0,01
2 Lampu Down Light Meson 200 24W 65K/30K ID RECESSED LED Bh 8,00 0,01
3 Lampu Down Light Meson 200 24W 65K/30K ID RECESSED LED Bh 9,00 0,01
4 Lampu Down Light Meson 200 24W 65K/30K ID RECESSED LED Bh 64,00 0,06
5 Lampu Down Light Meson 200 24W 65K/30K ID RECESSED LED Bh 11,00 0,01
6 Down Light RD 125 E 27 SAVY LED BULB 6,5-60W Bh 32,00 0,04
7 Down Light RD 150 E 27 SAVY LED BULB 10,5-85W Bh 72,00 0,11
8 BARET SCB 20 ACR 11,5 W Bh 26,00 0,08
9 Lampu Strip Light indoor 10-77W ( 10 m) life time 50.000 jam + trafo M 96,00 0,21
10 Exhaust fan 110 Cfm Ceiling Mounted Bh 10,00 0,02
11 Stop Kontak 200 W Bh 97,00 0,02
12 Sakelar Ganda Bh 36,00 0,01
13 Sakelar Tunggal Bh 47,00 0,01
14 Instalasi Lampu NYM 3x2.5 mm² dalam pipa conduit PVC HI 20 mm Ttk 238,00 0,42
15 Instalasi stop kontak NYM 3x2.5 mm² dalam pipa conduit PVC HI 20 mm Ttk 97,00 0,21
16 Instalasi Exhaust Fan dengan Ducting PVC 4 "+ installasi listrik Ttk 10,00 0,04
- -
LANTAI 2 - -
1 Lampu Down Light Meson 200 24W 65K/30K ID RECESSED LED Bh 72,00 0,07
2 Lampu Down Light Meson 200 24W 65K/30K ID RECESSED LED Bh 15,00 0,01
3 Lampu Down Light Meson 200 24W 65K/30K ID RECESSED LED Bh 3,00 0,00
4 Lampu Down Light Meson 200 24W 65K/30K ID RECESSED LED Bh 2,00 0,00
5 Down Light RD 125 E 27 SAVY LED BULB 6,5-60W Bh 65,00 0,09
6 Down Light RD 150 E 27 SAVY LED BULB 10,5-85W Bh 69,00 0,11
7 BARET SCB 20 ACR 11,5 W Bh 11,00 0,03
8 Exhaust fan 110 Cfm Ceiling Mounted Bh 20,00 0,04
9 Stop Kontak 200 W Bh 170,00 0,03
PENYEL.
BOBOT VOLUME PROSENTASE
S/D
No. Uraian Satuan Volume S/D
RENCANA MINGGU MINGGU S/D MINGGU MINGGU MINGGU MGG INI
MINGGU
(%) LALU INI INI LALU INI INI (%)
10 Sakelar Ganda Bh 31,00 0,01
11 Sakelar Tunggal Bh 93,00 0,02
12 Instalasi Lampu NYM 3x2.5 mm² dalam pipa conduit PVC HI 20 mm Ttk 208,00 0,36
13 Instalasi stop kontak NYM 3x2.5 mm² dalam pipa conduit PVC HI 20 mm Ttk 170,00 0,36
14 Instalasi Exhaust Fan dengan Ducting PVC 4 "+ installasi listrik Ttk 20,00 0,08
-
LANTAI 3 -
1 Lampu Down Light Meson 200 24W 65K/30K ID RECESSED LED Bh 8,00 0,01
2 Stop Kontak 200 W Bh 4,00 0,00
3 Sakelar Ganda Bh 4,00 0,00
4 Instalasi Lampu NYM 3x2.5 mm² dalam pipa conduit PVC HI 20 mm Ttk 8,00 0,01
5 Instalasi stop kontak NYM 3x2.5 mm² dalam pipa conduit PVC HI 20 mm Ttk 4,00 0,01
-
LANTAI ATAP -
1 Lampu Down Light Meson 200 24W 65K/30K ID RECESSED LED Bh 7,00 0,01
2 Sakelar Ganda Bh 1,00 0,00
3 Sakelar Tunggal Bh 1,00 0,00
4 Instalasi Lampu NYM 3x2.5 mm² dalam pipa conduit PVC HI 20 mm Ttk 7,00 0,01
VI. PEKERJAAN INSTALASI AIR KOTOR , AIR BEKAS & VENT CAP
Instalasi Pipa Air Kotor & Bekas
Lantai 1
1 Pipa PVC Type AW Ø 1 1/2 " m 33,00 0,02
2 Pipa PVC Type AW Ø 2 " m 42,00 0,01
3 Pipa PVC Type AW Ø 3 " m 86,00 0,03
4 Pipa PVC Type AW Ø 4 " m 148,00 0,09
5 Pipa PVC Type AW Ø 6 " ( main line air kotor ) m 84,00 0,12
7 Pipa PVC Type AW Ø 6 " ( main line air bekas ) m 44,00 0,06
8 Alat bantu+hanger dan u trap ls 1,00 0,01
PENYEL.
BOBOT VOLUME PROSENTASE
S/D
No. Uraian Satuan Volume S/D
RENCANA MINGGU MINGGU S/D MINGGU MINGGU MINGGU MGG INI
MINGGU
(%) LALU INI INI LALU INI INI (%)
-
Pipa Vent -
1 Pipa PVC Type D Ø 1 1/2 " m 48,00 0,01
2 Pipa PVC Type D Ø 2 " m 31,00 0,01
3 Pipa PVC Type D Ø 4 " m 26,00 0,01
-
Lantai 2 -
1 Pipa PVC Type AW Ø 1 1/2 " m 35,00 0,02
2 Pipa PVC Type AW Ø 2 " m 41,00 0,01
3 Pipa PVC Type AW Ø 3 " m 152,00 0,06
4 Pipa PVC Type AW Ø 4 " m 128,00 0,08
5 Pipa PVC Type AW Ø 4 " ( shaft air kotor ) m 26,00 0,02
6 Pipa PVC Type AW Ø 4 " ( shaft air bekas ) m 26,00 0,02
7 Alat bantu+hanger dan u trap ls 1,00 0,01
-
Pipa Vent -
1 Pipa PVC Type D Ø 1 1/2 " m 63,00 0,01
2 Pipa PVC Type D Ø 2 " m 42,00 0,01
3 Pipa PVC Type D Ø 4 " m 26,00 0,01
- -
Lantai 3 - -
1 Pipa PVC Type AW Ø 1 1/2 " m 35,00 0,02
2 Pipa PVC Type AW Ø 2 " m 41,00 0,01
3 Pipa PVC Type AW Ø 3 " m 95,00 0,04
4 Pipa PVC Type AW Ø 4 " m 104,00 0,06
5 Pipa PVC Type AW Ø 4 " ( shaft air kotor ) m 26,00 0,02
6 Pipa PVC Type AW Ø 4 " ( shaft air bekas ) m 26,00 0,02
7 Alat bantu+hanger dan u trap ls 1,00 0,01
- -
Pipa Vent - -
1 Pipa PVC Type D Ø 1 1/2 " m 41,00 0,01
2 Pipa PVC Type D Ø 2" m 33,00 0,01
PENYEL.
BOBOT VOLUME PROSENTASE
S/D
No. Uraian Satuan Volume S/D
RENCANA MINGGU MINGGU S/D MINGGU MINGGU MINGGU MGG INI
MINGGU
(%) LALU INI INI LALU INI INI (%)
3 Pipa PVC Type D Ø 4 " m 26,00 0,01
B. UNIT SERVICE
1 Lampu Down Light Meson 200 24W 65K/30K ID RECESSED LED bh 3,00 0,00
2 BARET SCB 20 ACR 11,5 W bh 3,00 0,01
3 Stop Kontak bh 2,00 0,00
4 Sakelar Ganda bh 1,00 0,00
5 Sakelar Tunggal bh 1,00 0,00
6 Installasi titik lampu (NYM 3 X 2,5MM) ttk 6,00 0,01
7 Instalasi kotak kontak (NYM 3x2.5 mm2) ttk 2,00 0,01
PENYEL.
BOBOT VOLUME PROSENTASE
S/D
No. Uraian Satuan Volume S/D
RENCANA MINGGU MINGGU S/D MINGGU MINGGU MINGGU MGG INI
MINGGU
(%) LALU INI INI LALU INI INI (%)
E. UNIT TPS B3
I. PEKERJAAN ME UNIT GEDUNG B3
1 Lampu Down Light Meson 200 24W 65K/30K ID RECESSED LED bh 2,00 0,00
2 BARET SCB 20 ACR 11,5 W bh 1,00 0,00
3 Sakelar Ganda bh 1,00 0,00
4 Sakelar Tunggal bh 1,00 0,00
5 Installasi titik lampu (NYM 3 X 2,5MM) ttk 3,00 0,01
1 Lampu Down Light Meson 200 24W 65K/30K ID RECESSED LED bh 4,00 0,00
2 BARET SCB 20 ACR 11,5 W bh 2,00 0,01
3 Stop Kontak bh 2,00 0,00
4 Sakelar Ganda bh 1,00 0,00
5 Sakelar Tunggal bh 1,00 0,00
6 Installasi titik lampu (NYM 3 X 2,5MM) ttk 6,00 0,01
7 Instalasi kotak kontak (NYM 3x2.5 mm2) ttk 2,00 0,01
Salman Al Farisi AP
Rini Meila Sari Budiarto, ST. Pengawas
Direktur Pimpinan Proyek