9075000 m
9075000 m
63.8 ha
9074500 m
9074500 m
77.9 ha
m
44 78.7 ha
DEPARTEMEN TEKNIK SIPIL
0m 500 m 1000 m 1500 m
m
9074000 m
40
9074000 m
71.7 ha
FAKULTAS TEKNIK SIPIL,
Sungai PERENCANAAN DAN
KEBUMIAN
9073500 m
Garis Kontur
9073500 m
77.7 ha
95.0 ha
m Jalan
38
69.5 ha
INSTITUT TEKNOLOGI
SEPULUH NOPEMBER
9073000 m
9073000 m
59.4 ha
MATA KULIAH
81.9 ha
9072500 m
90.3 ha
9072500 m
IRIGASI DAN
m
28
81.6 ha
BANGUNAN AIR
m
26
9072000 m
71.5 ha
9072000 m
NAMA TUGAS
m
30
70.7 ha
m 73.3 ha
36
PERENCANAAN SISTEM IRIGASI
9071500 m
9071500 m
62.2 ha
DAN BANGUNAN AIR
100 ha
75.2 ha 81.3 ha
9071000 m
DOSEN PENGAJAR
9071000 m
67.9 ha
Dr. Yang Ratri Savitri, S.T., M.T.
75.8 ha
9070500 m
9070500 m
m
24
59.6 ha
Damar Negara, S.T., M.T.
DOSEN ASISTEN
9070000 m
9070000 m
84.6 ha 68.7 ha
Dr. Yang Ratri Savitri, S.T., M.T.
NAMA MAHASISWA
9069500 m
9069500 m
Hernanda Rovika Agustina
Manindri Auresa Palindria
m
22
9069000 m
NRP MAHASISWA
9069000 m
5012211035
185000 m 185500 m 186000 m 186500 m 187000 m 187500 m 188000 m 188500 m 189000 m 189500 m 190000 m 190500 m 191000 m 191500 m 192000 m 192500 m 193000 m 193500 m 194000 m 5012211132
NAMA GAMBAR SKALA
Peta Daerah
Irigasi 1 : 25.000
NOMOR LEMBAR
LEGENDA:
50 - 65 ha
Bangunan In-take Saluran Pembuang
Saluran Primer
Kontur 86 - 100 ha