Anda di halaman 1dari 3

20 Januari-24 Januari

PRIMARY NEEDS
EGIN
Transportasi
Pesawat Pergi 1,450,000
Pulang 2,000,000
Travel BPN SMD Pergi 190,000
Pulang 190,000
Total 3,830,000

TALI
Transportasi
Pesawat Pergi 1,450,000
Pulang 2,400,000
Kebandara Pergi 100,000
Pulang 100,000
Total 4,050,000

SECONDARY NEEDS
Public Transport 400,000
Kuota 200,000
Makan, Jajan 300x2x3 1,800,000
Total 2,400,000
PRIMARY NEEDS 10,480,000
Hotel SECONDARY NEED 2,400,000 Minimal bawa
800,000 2 Biaya tak teduga 2,000,000 SGD 300
Total 1,600,000 Total 14,880,000

Paspor
500 (2 pax) 1,000,000

TOTAL 10,480,000
ITINERARY

Jam
Hari Kegiatan
Egin Tali
12.55 14.00 Ke KL
Minggu 15.45 17.10 Landing
18.00 Jalan2
06.00 Ke SG 1 pesawat
07.10 Landing
Senin
Jalan2
14.00 Checking Hotel
Selasa 20.00 Konser

Anda mungkin juga menyukai