Anda di halaman 1dari 1

CASH FLOW EMBUNG SEMANGKO

TANGGAL 15 OKT
Ongkos rumah ke Caringin 2 50,000 100,000
Bis Primajasa 2 170,000 340,000
Sarapan 3 org di Bandara Samarinda 1 185,000 185,000
Aqua ke lokasi embung 6 5,000 30,000
Guide desa 4 org 1 300,000 300,000
Ngopi2 di warung 1 50,000 50,000
Makan siang 3 org 1 120,000 120,000
Cemilan buat di hotel 1 62,000 62,000
Makan malam 3 org 1 98,000 98,000
Mobil pa nanang ke lokasi 1 800,000 800,000
1,285,000
TANGGAL 16 OKT
Makan siang 3 org 1 118,000 118,000
Makan malam 3 org 1 152,000 152,000
Cemilan buat di hotel 1 40,000 40,000
Mobil pa nanang di tenggarong 1 500,000 500,000
810,000
TANGGAL 17 OKT
Makan pagi di Bandara (pa dede) 1 100,000 100,000
Travel + taksi ke Tangerang 1 150,000 150,000
Hotel di Kukar 3 300,000 900,000
Mobil pa nanang ke bandara 1 400,000 400,000
1,550,000

JUMLAH 3,645,000
TRANSFER 14 OKT 3,000,000

PENGAJUAN 18 OKT - 22 OKT


Kekurangan dana 645,000
Uang Saku Pa Dede 2 hr
Uang Saku Nendi 3 hr 750,000
Kasbon ke-1 MM pa Dede
Jumlah - I 1,395,000

GPS Geodetic RTK Comnav T300 (set) 6 800,000 4,800,000


Surveyor 6 350,000 2,100,000
Asisten 6 250,000 1,500,000
Helper ( 2 org x 5 hr) 10 150,000 1,500,000
Guide desa 1 200,000 200,000
Mobil pa nanang k lokasi PP 2 800,000 1,600,000
Operasional 5 250,000 1,250,000
Penginapan 5 300,000 1,500,000
Patok BM + upah (3 bm & 3 cp) 1 1,000,000 1,000,000
Peralatan safety 1 500,000 500,000
Makan dan minum personel 5 200,000 1,000,000
Pengolahan Data Dan Penggambaran 1 5,000,000 5,000,000
Jumlah - II 21,950,000

Anda mungkin juga menyukai