Anda di halaman 1dari 18

TOTAL HARGA PENAWARAN

JASA KEBERSIHAN GEDUNG KANTOR DAN RUMAH DINAS PERUSAHAAN PT PERTAMINA EP CEPU FIELD
POLENG
No. Tender : SHUO-211797A-A17

No. KOMPONEN BIAYA ESTIMASI BIAYA JUMLAH TOTAL BIAYA (Rp.)

A B C=AxB

1 Jasa Cleaning Services Indoor & Outdoor 9,200,000.00 36 Kali Rp 331,200,000.00

2 Jasa Kebersihan Babat Rumput 56,350,000.00 12 Kali Rp 676,200,000.00


3 Kelola Sampah 3,880,000.00 36 Kali Rp 139,680,000.00
4 Disinfektan & Fogging 16,155,000.00 18 Kali Rp 290,790,000.00
5 APD 5,610,000.00 3 Kali Rp 16,830,000.00
6 MCU 8,775,000.00 3 Kali Rp 26,325,000.00

TOTAL JASA KEBERSIHAN 36 BULAN Rp 1,481,025,000.00

Terbilang :

Surabaya, 31 Mei 2023 OE : 1,482,558,000.00


PT. PETRO TEKNIK KONSTRUKSI

Materai

Dody Choirul
Direktur
1. JASA CLEANING
ESTIMASI
ESTIMASI LUASAN BIAYA PER M2 /
No. KOMPONEN BIAYA BIAYA TOTAL
FREKUENSI MAKSIMUM BULAN
PER BULAN

A B C D=AxBxC
1 Cleaning Services Indoor & Outdoor
Area Indoor
1 Gedung Kantor (Fix Volume) 1 Kali/Bulan 320 M2 Rp 0 Rp 0

Rumah Dinas Perusahaan


2 4 Kali/Bulan 219.4 M2 Rp 0 Rp 0
(BJA : 01,02,03,04,05,07,11,12,13,14)

Area Outdoor
Outdoor Area Gedung Kantor (Fix
1 1 Kali/Bulan 3867 M2 Rp 0 Rp 0
Volume)

2 Sport Center & Taman (Babat Rumput) 2 Kali/Bulan 1079.68 M2 Rp 0 Rp 0

3 Pagar Kantor (Babat Tanaman) 2 Kali/Bulan 162.82 M Rp 0 Rp 0

Rumah Dinas Perusahaan


4 1 Kali/Bulan 135.522 M2 Rp 0 Rp 0
(BJA : 01,02,03,04,05,07,11,12,13,14)

BIAYA CLEANING SERVICES (Belum Termasuk PPN) Rp 0


2. BABAT RUMPUT
ESTIMASI
ESTIMASI LUASAN
No. KOMPONEN BIAYA BIAYA PER M2 / BULAN BIAYA TOTAL
FREKUENSI MAKSIMUM
PER BULAN
A B C D=AxBxC

2 Jasa Kebersihan Babat Rumput

1 Sumur Gerigis (Babat Rumput) 1 Kali/Bulan 15340 M2 Rp 2500 Rp 38350000

2 Sumur Suci A (Babat Rumput) 1 Kali/Bulan 2400 M2 Rp 2500 Rp 6000000

3 Sumur Suci B (Babat Rumput) 1 Kali/Bulan 2400 M2 Rp 2500 Rp 6000000

4 Sumur Suci C (Babat Rumput) 1 Kali/Bulan 2400 M2 Rp 2500 Rp 6000000

BIAYA JASA KEBERSIHAN BABAT RUMPUT (Belum Termasuk PPN) Rp 56350000


3. KELOLA SAMPAH
BIAYA
No. KOMPONEN BIAYA JUMLAH WAKTU SUBTOTAL
PER LOT
1 Pengangkutan/Pembuangan Sampah A B C D=AxBxC

Pengangkutan/Pembuangan Sampah Area Perkantoran include :


- Manpower (minimum 1 (Satu) Orang Supir + 1 (Satu) Orang Helper.
- 1 Lot 1 Bulan Rp 3260000 Rp 3260000
- Satu Unit Kendaraan Pengangkut Sampah termasuk BBM.
- Pengambilan Sampah Minimal Dua kali seminggu

Pengangkutan/Pembuangan Sampah Area Rumah Dinas Perusahaan


Pondok Mutiara Sidoarjo (BJA : 01,02,03,04,05,07,11,12,13,14)
- include: 1 Lot 1 Bulan Rp 120000 Rp 120000
- Manpower (1 Orang)
- Pengambilan Sampah Setiap Hari untuk 10 RDP

- Iuran Lingkungan RDP (BJA) : 01,02,03,04,05,07,11,12,13,14) 1 Lot 1 Bulan Rp 500000 Rp 500000

BIAYA PENGANGKUTAN/PEMBUANGAN SAMPAH (Belum Termasuk PPN) Rp 3880000


4. DESINFEKTAN
No. KOMPONEN BIAYA JUMLAH WAKTU BIAYA PER LOT SUB TOTAL

1 Jasa Penyemprotan Disinfektan A B C D=AxBxC

Jasa Penyemprotan Disinfektan Area Perkantoran


dengan luasan 553 m2 meliputi area :
1. Gedung Kantor Indoor & Outdoor
2. Porta Camp
3. Mushola
- 2 Lot 1 Bulan Rp Rp 950,000 Rp Rp 1,900,000
4. Ruang Driver
5. Pantry
6. Pos Security
7. Klinik
8. KRP

Jasa Penyemprotan Disinfektan RDP dengan


- 10 Lot 1 Bulan Rp Rp 750,000 Rp Rp 7,500,000
luasan 216 m2 / Rumah

2 Jasa Pest Control & Fogging A B C D=AxBxC

Jasa Pest Control Area Perkantoran dengan luasan


553 m2 meliputi area :
1. Gedung Kantor Indoor & Outdoor
2. Porta Camp
3. Mushola
- 1 Lot 1 Bulan Rp Rp 705,000 Rp Rp 705,000
4. Ruang Driver
5. Pantry
6. Pos Security
7. Klinik
8. KRP

Jasa Pest Control area RDP dengan luasan 319 m2


- 10 Lot 1 Bulan Rp Rp 605,000 Rp Rp 6,050,000
/ Rumah

BIAYA DISINFEKTAN (Belum Termasuk PPN) Rp Rp 16,155,000


5. BIAYA APD
Jumlah (A) Harga Satuan (B) Total Harga (C = A x B)
No Item
Qty Satuan (IDR) (IDR)

1 Wearpack 5 Pcs Rp 270,000.00 Rp 1,350,000

2 Safety Shoes 5 Pcs 528,000.00 Rp 2,640,000

3 Safety Helmet 5 Pcs 132,000.00 Rp 660,000


4 Safety Glasses 5 Pcs 66,000.00 Rp 330,000
5 Jas hujan 5 Pcs 126,000.00 Rp 630,000
Total Biaya APD per tahun Rp 5,610,000
6. MCU
No Kebutuhan MCU Personel Jumlah (A) Harga Satuan (B) Total Harga (C = A x B)

1 Medical Check Up 5 Person 1,755,000.00 8,775,000.00

Biaya MCU 5 orang per tahun 8,775,000.00


PERLENGKAPAN KERJA

No Keterangan Harga satuan Perhitungan Jumlah


1 Coverall Rp 270,000.00 5 Rp 1,350,000.00
2 Safety Shoes Rp 528,000.00 5 Rp 2,640,000.00
3 Safety Helmet Rp 132,000.00 5 Rp 660,000.00
4 Safety Glasses Rp 66,000.00 5 Rp 330,000.00
5 Jas hujan Rp 126,000.00 5 Rp 630,000.00
Kepada Yth, Surabaya, 23 Mei 2023
PT PERTAMINA - POLENG Jawa Timur

Up : Ibu Evi

RE : Proposal Antimicrobial/Desinfektan Treatment

Dengan Hormat,

Bersama ini kami sampaikan “Package Price --- Antimicrobial Treatment” sebagai berikut :

1. Antimicrobial Package Price ( Price per treatment )

AREA PACKAGE PRICE PER TREATMENT

Perkantoran Luasan Area 553 m2, Biaya Package per Treatment : Rp 700.000,-
meliputi area :
1. Gedung Kantor Indoor & Outdoor
2. Porta Camp
3. Ruang Driver
4. Pos Security
5. Klinik
6. KRP

Area RDP Luasan 216 m2, Material Cost & Service Cost : @Rp 400.000,- (14 unit)
/rumah (14 Unit Rumah) : Rp 5.600.000,-

TOTAL PRICE PACKAGE PER TREATMENTRp. 6.300.000,- /Treatment (Excluding Ppn 11%)
Note : - Term of Payment : Full Payment in advance
- Biaya Excluding Ppn 11%
- Pembayaran via transfer ke : PT. Orcid Mantis Indonesia BCA. 6040 677 877
- Option Chemicals :
1. Diversey Virex II 256

Hormat Kami, Mengetahui,

Rudy Hendrawan Marina S.Karema


Branch Officer Direktur
23

up 25%

175000 875000

1400000 7000000

2268000 8568000
A BIAYA RUTIN PERSONIL
1 Dedicated Pest Technician
2 MCU

B BIAYA PERAWATAN & CONSUMABLE AREA FASILITAS UMUM & RD


11 Hand Sprayer
12 Cold Fogger
13 Thermal Fogger
L
a
UPAH TENAGA KERJA m
p
DATA TENAGA KERJA i
No. KOMPONEN UPAH/BULAN TENAGA KERJA r
Supervisor Petugas Kebersihan Outdoor Petugas Kebersihan Outdoor
a
4,525,000 4,525,000 4,525,000 n
A. Jumlah Tenaga Kerja Org 1 2 2
I
Upah Pokok Rp 3,393,750 3,393,750 3,393,750
Tunj.Atas Upah Pokok (TAUP) Rp 1,131,250 1,131,250 1,131,250
s
u
Upah = Upah Pokok + TAUP Rp 4,525,000 4,525,000 4,525,000 r
Hari Kehadiran Hari 21 21 21 a
t
Tunjangan Kehadiran/hari Rp 25,000 25,000 25,000
Lembur : N
o
Tarif Lembur/Jam = 1/173 x Upah Rp 26,156 26,156 26,156 .
Tarif Transport Lembur PP/hari Rp 20,000 20,000 20,000
Tarif Uang Makan Lembur Pagi Rp 12,500 12,500 12,500
Tarif Uang Makan Lembur Siang dan Malam Rp 20,000 20,000 20,000
Hari Lembur/Bulan Hari 3 3 3
Jam Lembur/bulan (sudah konversi) Jam 48 48 48

I UPAH (SATUAN DALAM BULANAN)


1 Upah = Upah Pokok + Tunj.Atas Upah Pokok (TAUP) Rp 4,525,000 4,525,000 4,525,000 /
2 Tunjangan Kehadiran/hari = Tarif x hari kehadiran Rp 525,000 525,000 525,000 E
P
3 Jamsostek (Penyelenggara BPJS) 3
JKK = 1,74 % x Upah Rp 78,735 78,735 78,735 7
2
JK = 0.3% x Upah Rp 13,575 13,575 13,575 0
JHT = 5.7% x Upah Rp 167,425 167,425 167,425 /
2
JP = 3% x Upah Rp 90,500 90,500 90,500
0
JPK = 4% x Upah Rp 181,000 181,000 181,000 1
4 Santuan Pengakhiran Hubungan Kerja (SPHK)
9
-
SPHK = 2 x 8,33% x Upah Rp 753,865 753,865 753,865 S
5 Tunjangan Hari Raya Keagaman
0
THRK = 1/12 X Upah untuk setiap bulan. Rp 377,083 377,083 377,083 t
6 Lembur a
n
Harian = Tarif lembur x jam lembur Rp 1,255,491 1,255,491 1,255,491 g
Trans.Lembur = Tarif transport x hari lembur Rp 60,000 60,000 60,000 g
a
Uang Makan Lembur = Tarif makan x hari lembur Rp 52,500 52,500 52,500 l
B. TOTAL UPAH / ORG / BLN = 1 s/d 6 Rp 8,080,175 8,080,175 8,080,175
C. TOTAL UPAH / 36 BLN = (A x B) x 24 Rp 290,886,287.86 581,772,575.72 581,772,575.72
D. TOTAL UPAH 36 BLN = TOTAL C Rp 1,454,431,439.31
E. PROFIT 10% Rp 145,443,143.93
F. GRAND TOTAL Rp 1,599,874,583.24

Keterangan :
O
- Jumlah jam Lembur (setelah konversi)apabila dalam pelaksanaannya melebihi jumlah dalam kontrak, harus dibuatkan justifikasinya dan mendapat persetujuan dari Direksi k
Pekerjaan t
o
b
e
r
2
0
1
No Nama Barang Satuan Qty Harga Satuan Total

49 Pad Merah 16 Pcs 2 Rp 61,990 Rp 123,980

50 Pad Putih 16 Pcs 2 Rp 65,000 Rp 130,000

Plastik sampah
51 Kg 25 Rp 7,722 Rp 193,050
hitam 90x120cm

Plastik sampah
52 Kg 25 Rp 7,722 Rp 193,050
hitam 60x100cm

53 Kain Majun Kg 25 Rp 20,000 Rp 500,000

54 Lap Handuk Biru Pcs 12 Rp 40,000 Rp 480,000

55 Lap Handuk Merah Pcs 12 Rp 40,000 Rp 480,000

56 Kanebo Pcs 4 Rp 19,000 Rp 76,000

57 kain mop biru Pcs 5 Rp 56,999 Rp 284,995

58 kain mop merah Pcs 5 Rp 56,999 Rp 284,995


59 Floor Clotch Pcs 4 Rp 31,800 Rp 127,200

Cotton lobby duster


60 60 cm Pcs 3 Rp 90,000 Rp 270,000

Pembersih toilet
61 (four season\ Gln 5 Rp 116,000 Rp 580,000
setara)-galon

Pembersih
62 Kaca(Power View\ Gln 3 Rp 105,000 Rp 315,000
setara)-Pail

Pembersih keramik
toilet,wash
63 Gln 3 Rp 121,000 Rp 363,000
basin(power lime\
setara-galon

Pemebersih logam\
64 stainless steel(steel Gln 1 Rp 140,000 Rp 140,000
shine\setara)

Pembersih lantai
65 (action150\setara)- Gln 3 Rp 115,000 Rp 345,000
galon

66 Deterjen Pack 3 Rp 45,000 Rp 135,000

Pembersih
67 lantai(scrub Klg 2 Rp 28,500 Rp 57,000
powder)

Sanifect\
68 Gln 3 Rp 300,000 Rp 900,000
Disinfectant

69 Tissue toilet roll Lusin 170 Rp 5,250 Rp 892,500


70 Tissue meja Lusin 170 Rp 4,000 Rp 680,000

71 Sabun cuci tangan Botol 70 Rp 20,600 Rp 1,442,000

Total Rp 8,992,770
NO Nama Barang Satuan Qty Harga Satuan Total
1 Mesin Poles Lantai Low Speed Unit 1 2650000 2650000
2 Mesin Potong Rumput Unit 1 745000 745000
3 Wet & Dry Vacuum Cleaner 22 L/ Setara Unit 1 1095000 1095000
4 Dry Vacuum 20L/Setara Unit 1 568388 568388
5 Automatic Scrubber Mini Unit 1 180000 180000
6 Tangga Aluminium 2 Meter Pcs 1 485000 485000
7 Tangga Aluminium 3 Meter Pcs 1 734400 734400
8 Single Bucket Pcs 2 280000 560000
9 Double Bucket Pcs 2 575000 1150000
10 Warning Sign Unit 4 38500 154000
11 Floor Squegee 75 cm / Sapu karet lantai Unit 4 82500 330000
12 Tangkai Mop Set 6 28000 168000
13 Rug Ball Nylon / pembersih sarang laba-laba Pcs 4 32000 128000
14 Sapu Nylon Pcs 6 7855 47130
15 Sikat Nylon Tangan untuk Toilet Pcs 6 7499 44994
16 Sikat Nylon Tangan untuk lantai Toilet Set 6 3500 21000
17 Window Squegee 35 cm / karet jendela Set 4 31000 124000
18 Window Washer Set 4 22500 90000
19 Bucket (Ember) 5 L Pcs 4 4600 18400
20 Botol Sprayer Pcs 6 7500 45000
21 Scrapper / kape Set 3 2600 7800
22 Dustpan Tutup Unit 5 38500 192500
23 Kabel Roll 50 meter Set 2 125000 250000
24 Sikat Toilet/ Toilet Bowl Brush Pcs 4 10000 40000
25 Utility Bag / Tas Perlengkapan kerja Set 6 17000 102000
26 Kop Toilet Pcs 2 14500 29000
27 Fork Mop Acrilyc Pcs 5 88400 442000
28 Telescopic Pole Pcs 2 63000 126000
29 Dustbin 240 Ltr Pcs 3 579900 1739700
30 Rompi Jaring Set 3 7200 21600
31 Tapas Pcs 24 950 22800
32 Masker Kertas Set 48 6900 331200
33 Lobby Duster 60cm st/ pembersih lantai Pcs 3 34000 102000
34 Lobby Duster 60cm st/ pembersih lantai (refill) Pcs 5 15500 77500
35 Sarung Tangan Toilet (Orange) Pcs 5 9500 47500
36 Caddy Carry Pcs 4 62500 250000
37 Gunting Rumput Pcs 6 42500 255000
38 Cangkul Pcs 6 30500 183000
39 Selang 100 meter Pcs 2 158000 316000
40 Sapu Lidi Tangkai Pcs 5 42900 214500
41 Senar Potong Rumput Roll 2 35000 70000
42 Pisau Potong Rumput Pcs 1 39100 39100
43 Congkelan Gulma Pcs 1 79200 79200
44 Pisau Stik Dahan Pcs 1 49000 49000
45 Gunting Stik Dahan Pcs 1 89000 89000
46 Gergaji Pcs 1 61800 61800
47 Golok Pcs 1 85000 85000
48 Blade Senar Pcs 2 32500 65000
total 14626512

Anda mungkin juga menyukai