Anda di halaman 1dari 4

RENCANA ANGGARAN BIAYA (BILLING RATE )

I. RINCIAN BIAYA LANGSUNG PERSONIL (REMUNERATION)

NAMA PERSONIL POSISI ORANG BULAN WAKTU SATUAN BIAYA SATUAN JUMLAH (Rp.)

Nasional
PROFESIONAL STAF
Sitte Enggineer 1 2 Bulan OB 3,500,000.00 7,000,000.00

SUB. PROFESIONAL STAF


Inspector Lapangan 1 2 Bulan OB 2,000,000.00 4,000,000.00
Administrasi & Keuangan + Operator Komputer 1 2 Bulan OB 1,000,000.00 2,000,000.00
TOTAL BIAYA 13,000,000.00

II. RINCIAN BIAYA LANGSUNG NON PERSONIL (DIRECT REIMBURSABLE COST)

SATUAN BIAYA - BIAYA


JENIS BIAYA URAIAN BIAYA JUMLAH (Rp.)
( Hari/Kali) HARGA SATUAN LUMP SUM
Sewa Kendaraan Roda Dua 2 Bulan 600,000 1,200,000
Bahan Oprasional Kantor ( Alat Tulis kantor, dll ) 1 Ls 2,278,000 2,278,000
Biaya dan Material
Sewa Kantor 2 Bulan 1,250,000 2,500,000
Sewa Komputer + Printer + Alat Gambar 1 Unit 2 Bulan 500,000 1,000,000
Biaya Penggandaan Laporan Pendahuluan 5 Buku 200,000 1,000,000
Biaya Pelaporan &
Biaya Penggandaan Laporan Bulanan 5 Buku 150,000 750,000
Penggandaan Laporan
Biaya Penggandaan Laporan Akhir 5 Buku 200,000 1,000,000
TOTAL BIAYA 9,728,000.00
PEMERINTAH DAERAH KABUPATEN BUTON UTARA
DINAS PEKERJAAN UMUM DAN TATA RUANG
Kantor : Jln. Wakaka Komp. Perkantoran Bumi Sara’Ea

HARGA PERKIRAAN SENDIRI ( HPS )

REKAPITULASI BIAYA PENAWARAN

PEKERJAAN : PENGAWASAN PENATAAN RTH MINAMINANGA


LOKASI : KEL. LAKONEA
TA. : 2019

TOTAL HARGA
NO. URAIAN
(Rp.)

I Biaya Langsung Personil (Remuneration) 13,000,000.00

Biaya Langsung Non-Personil 9,728,000.00


II
(Direct Reimbursable Cost)

SUB TOTAL 22,728,000.00


PPN 10% 2,272,800.00
TOTAL 25,000,800.00
DIBULATKAN 25,000,000.00
TERBILANG : 0000000Dua Puluh Lima Juta 000000 Rupiah

BURANGA, .......................... 2019

PEJABAT PEMBUAT KOMITMEN ( PPK )


DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
KAB. BUTON UTARA

LA ODE KAMAL ADHAR, ST


NIP. 19800518 201101 1 013
PPN
25,000,000
0000000Dua Puluh Lima Juta 000000 Rupiah

25,000,000 25000000 000 0 0


25000000 25000 000 0 Ribu 0
25000 25 25 25 Juta 0
0 0 0 0 Milyard 0
0 0 0 0 Trilyun 0

0 0
1 Se 1 Satu
2 Dua 2 Dua
3 Tiga 3 Tiga
4 Empat 4 Empat
5 Lima 5 Lima
6 Enam 6 Enam
7 Tujuh 7 Tujuh
8 Delapan 8 Delapan
9 Sembilan 9 Sembilan
Rupiah Rupiah
0 0 000
0 0 000
2 Dua Puluh 5 Lima Juta 0Dua Puluh Lima Juta
0 0 000
0 0 000

Anda mungkin juga menyukai