Daftar Gambar Infrastruktur Casa Green Karawang 1 (Depan)

@Karawang, Jawa Barat


Keterangan
No Kode Gmbr Judul Gambar Skala @A3
Kertas Tanggal Rev.
IF.0 INFORMASI PROYEK
1 IF.0-00 Cover
2 IF.0-01 Daftar Gambar NTS A3 04 September 2023 0
3 IF.0-02 Standar Gambar NTS A3 04 September 2023 0
4 IF.0-03 Site Plan Casa Green Karawang 1 : 1300 A3 04 September 2023 0
5 IF.0-04 Daftar Matrial NTS A3 0

IF.1 REKAYASA KONTUR, CUT & FILL


6 IF.1-01 Kontur Existing (vendor a.n. Pranyoto) 1 : 750 A3 04 September 2023 0
7 IF.1-02 Rencana Rekayasa Kontur 1 : 750 A3 04 September 2023 0
8 IF.1-03 Area Cut & Fill Kavling 1 : 750 A3 04 September 2023 0
9 IF.1-04 Area Fill Tahap 1 1 : 750 A3 04 September 2023 0
10 IF.1-05 Area Fill Tahap 2 & Deposit Tanah 1 : 750 A3 04 September 2023 0
11 IF.1-06 Volume & Perhitungan RAB NTS A3 04 September 2023 0

IF.2 TURAB & PAGAR


12 IF.2-01 Denah Posisi Turab 1 : 75 A3 04 September 2023 0
13 IF.2-02 Detail & Potongan Turab 1 : 75 A3 04 September 2023 0
14 IF.2-03 Volume & Perhitungan RAB NTS A3 04 September 2023 0

IF.3 JEMBATAN MASUK CGK 1


15 IF.3-01 Detail Jembatan 1 : 40 A3 04 September 2023 0
16 IF.3-02 Detail Beton Bertulang 1 : 30 A3 04 September 2023 0
17 IF.3-03 Volume & Perhitungan RAB NTS A3 04 September 2023 0

IF.4 JALAN
18 IF.4-01 Denah Jalan & Kansteen 1 : 750 A3 04 September 2023 0
19 IF.4-02 Potongan Jalan (1) 1 : 50 A3 04 September 2023 0
20 IF.4-03 Detail Perkerasan Jalan & Long Storage 1 : 750 A3 04 September 2023 0
21 IF.4-04 Detail Kansteen 1 : 750 A3 04 September 2023 0
22 IF.4-05 Volume & Perhitungan RAB NTS A3 04 September 2023 0

IF.5 SALURAN
23 IF.5-01 Denah Rencana Saluran 1 : 750 A3 04 September 2023 0
24 IF.5-02 Detail Saluran & Elevasi 1 : 20 A3 04 September 2023 0
25 IF.5-03 Detail Bak Kontrol & Inlet 1 : 20 A3 04 September 2023 0
26 IF.5-04 Detail Duicker Jalan 1 : 20 A3 04 September 2023 0
27 IF.5-05 Volume & Perhitungan RAB NTS A3 04 September 2023 0

IF.6 RUANG TERBUKA HIJAU / RTH


28 IF.6-01 Denah RTH (1) 1 : 300 A3 04 September 2023 0
29 IF.6-02 Denah RTH (2) 1 : 300 A3 04 September 2023 0
30 IF.6-03 Volume & Perhitungan RAB NTS A3 04 September 2023 0

IF.7 TIANG LISTRIK


31 IF.7-01 Denah Tiang Listrik 1 : 750 A3 04 September 2023 0
32 IF.7-02 Volume & Perhitungan RAB NTS A3 04 September 2023 0

IF.8 PRASARANA TAMBAHAN


33 IF.8-01 Detail Pos Satpam 1 : 100 A3 04 September 2023 0
34 IF.8-02 Pagar Penutup Makam 1 : 100 A3 04 September 2023 0

1 of 1