Formulir Comment Sheet

TAKABONERATE
17 APRIL 2023 Rev. 0
1114 kWp

CIVIL
No. No. Gambar Status Revision Notes PLNE Response Rev
1. KSO-23PLN-TBR- 0
GEN-DWG-CIV-01

General Layout Fence


2. KSO-23PLN-TBR- 0
GEN-DWG-CIV-02

Fence & Gate


Installation Details
3. KSO-23PLN-TBR- 0
GEN-DWG-CIV-03

Plat Name Board &


Tiang Bendera
Installation Plan &
Details
4. KSO-23PLN-TBR- 0
PREP-DWG-CIV-01

Grading Layout Plan


5. KSO-23PLN-TBR- C 1. Desain saluran drainase dibuang melalui sumur 1.Semua Layout Siteplan sudah diperbaiki 1
PREP-DWG-CIV-02 resapan. Mohon melampirkan analisa perhitungan
sumur resapan terhadap curah hujan desain untuk
General Layout Civil memastikan jika hujan tidak terjadi genangan di
Plan area pembangkit. 2. Letak sumur, bangunan pompa
dan desalinasi akan menyesuaikan kondisi di
lapangan. 3. Letak mess operator berada di luar
Formulir Comment Sheet
TAKABONERATE
17 APRIL 2023 Rev. 0
1114 kWp
bangunan Power House. 4. Jumlah pendingin
ruangan akan menyesuaikan hasil perhitungan,
dengan minimum unit sesuai dengan dokumen
kontrak (RKS). 5. Desain final menunggu hasil
pengujian Soil Investigation
6. KSO-23PLN-TBR- 0
PREP-DWG-CIV-03

Building Temporary
layout
7. KSO-23PLN-TBR- 0
PREP-DWG-CIV-04

Building Temporary
Views and Section
8. KSO-23PLN-TBR- 0
PREP-DWG-CIV-05

General Layout Area


Drainage
9. KSO-23PLN-TBR- 0
PREP-DWG-CIV-06

Road & Drainage


Plan & Details
10. KSO-23PLN-TBR- 0
PVR-DWG-CIV-01

PV Module Support
Structure Plan &
Details
Formulir Comment Sheet
TAKABONERATE
17 APRIL 2023 Rev. 0
1114 kWp
11. KSO-23PLN-TBR- 0
PH-DWG-CIV-01

Power House - Plan


12. KSO-23PLN-TBR-PH- 0
DWG-CIV-02

Power House -
Elevation View
13. KSO-23PLN-TBR-PH- 0
DWG-CIV-03

Power House - Section


View
14. KSO-23PLN-TBR-PH- 0
DWG-CIV-04

Power House -
Foundation,Sloof Plan
and Details
15. KSO-23PLN-TBR- 0
PH-DWG-CIV-05

Power House - Floor


Plan and Details
16. KSO-23PLN-TBR- 0
PH-DWG-CIV-06

Power House - Roof


Plan and Details
Formulir Comment Sheet
TAKABONERATE
17 APRIL 2023 Rev. 0
1114 kWp
17. KSO-23PLN-TBR-PH- 0
DWG-CIV-07

Power House - Beam


Plan and Details
18. KSO-23PLN-TBR- 0
PH-DWG-CIV-08

Power House -
Column Plan and
Details
19. KSO-23PLN-TBR- 0
PH-DWG-CIV-09

Power House - Door


& Window Detail
20. KSO-23PLN-TBR- 0
PH-DWG-CIV-10

Power House-Cable
Trench Plan &
Details
21. KSO-23PLN-TBR- 0
BESS-DWG-CIV-01

Battery Racking
Support Detail
22. KSO-23PLN-TBR- 0
BESS-DWG-CIV-02
Formulir Comment Sheet
TAKABONERATE
17 APRIL 2023 Rev. 0
1114 kWp
Battery Inverter
Support Construction
Detail
23. KSO-23PLN-TBR- 0
B3-DWG-CIV-01

B3 Building Plan &


Details
24. KSO-23PLN-TBR- 0
GH-DWG-CIV-01

Guard House
Building Plan &
Details
25. KSO-23PLN-TBR- 0
PA-DWG-CIV-01

Parking Area
Construction Details
26. KSO-23PLN-TBR- 0
PYR-DWG-CIV-01

Weather Station
Foundation Detail
27. KSO-23PLN-TBR- 0
TRF-DWG-CIV-01

Transformation
Foundation and
Fence Detail
Formulir Comment Sheet
TAKABONERATE
17 APRIL 2023 Rev. 0
1114 kWp
28. KSO-23PLN-TBR- 0
RO-DWG-CIV-01

Desalination
System/Water
Osmosis
Construction Details
29. 0
30. 0
31. 0
32. 0
33. 0
34. 0