DESIGN CALCULATION OF JOB NO : 225809 REV
CONTENTS
PAGE
3. REFERENSI 6
P T. R E K A D A Y A E L E K T R I K A
DESIGN CALCULATION OF JOB NO : 225809 REV
Dimana :
Q = Beban pendingin (Btu/h)
p = Dimensi panjang ruangan (m)
l = Dimensi lebar ruangan (m)
C = Konstanta beban pendingin untuk ruangan (m2/TR)
12000 = Konversi dari TR (Tons of refrigeration to Btu/h)
Dimana nilai C dapat diperoleh dari handbook HVAC equation chapter 6 cooling load rules of thumb
sebagai berikut :
Nilai Konstanta
Jenis Ruangan C (ft2/TR) C (m2/TR)
Ruangan komputer/panel 400 14
Ruangan kantor 150 37
Nilai beban pendingin yang didapat kemudian digunakan untuk menentukan perangkat pendingin yang
akan digunakan sesuai ketersediaan equipment.
P T. R E K A D A Y A E L E K T R I K A
DESIGN CALCULATION OF JOB NO : 225809 REV
Nilai ACH berdasarkan proyek referensi yang telah dilaksanakan oleh PT RE yaitu kontrak PLTU Sofifi.
Dimana nilai ACH dapat diperoleh dengan pemilihan sebagai berikut :
- Maintenance room/shop 10 – 15
- Office area 2
- Toilet/shower/locker 10
- Laboratory 20
- Machine room 20
- Ware house 5
- Battery room/rectifier room 15
- Chemical storage/plant 10
- Turbine hall 12
- Other supporting building 5
Perhitungan :Q =
= 5189 btu/h
Dimana pemilihan kapasitas AC dapat mengikuti list berikut :
Equipment Availibility
Daya (pk) Capacity (Btu/h) Tipe
0,5 5000 Split, Wall Mounted
1 9000 Split, Wall Mounted
2 17500 Split, Wall Mounted
3 24000 Split, Wall Mounted
Untuk kebutuhan pendinginan ruangan 2500 Btu/h menggunakan AC split daya 1 pk sebanyak 1 pcs.
P T. R E K A D A Y A E L E K T R I K A
DESIGN CALCULATION OF JOB NO : 225809 REV
Untuk kebutuhan pendinginan ruangan 68 m3/h dapat dipilih kapasitas fan 100 m3/h sebanyak 1 pcs.
3. REFERENSI
Bell, Arthur A.2007. HVAC Equations, Data, and Rules of Thumb. 2nd Edition.New York, America
:McGraw-Hill.
P T. R E K A D A Y A E L E K T R I K A
AIR CONDITIONING CALCULATION SHEET
No. Document 225809-00-M-04-SAM-001 Revision No. 00 01 02
Project Name PENGADAAN BARANG/JASA PEKERJAAN RELOKASI Date 18/07/2022 09/092022 20/09/2022
PEMBANGKIT KE HALMAHERA TIMUR Prepared By DDE/TAK TAK TAK
Checked By RSY RSY RSY
Approved By KRS KRS KRS
Total Cooling Equipment Equipment
Panjang Lebar Konstanta (C)
No Nama Ruangan Load pk Capacity Quantity
(m) (m) (m2/TR) (Btu/h) (Btu/h) (pcs)
1 CCR & Switch Gear Building
CCR & Switch Gear room 20 8 14 137143 3 24000 6
AC/DC Room 6 4 14 20571 2 17500 2
Meeting Room 4 4 37 5189 1 9000 1
Operator Room 4 9 37 11676 1 9000 2
Battery room 6 4 14 20571 2 17500 2
2 Admin Building
Office Room 5 9
37 38919 2 17500 3
5 15
Manager Room 1 5 3 37 4865 1 9000 1
Manager Room 2 5 3 37 4865 1 9000 1
Meeting Room 1 7 3,5 37 7946 1 9000 1
Meeting Room 2 5 4 37 6486 1 9000 1
Lobby + koridor 6 5
37 14595 2 17500 1
10 1,5
Mushola 2,5 3 37 2432 1 9000 1
3 Guard House
Office 4 4 37 5189 1 9000 1
4 Mosque
Mosque 9 9,25
37 28703 2 17500 2
3 1,75
6 MCC ROOM
MCC Room 8,4 5,4 14 38880 2 17500 3
Equipment Availibility
Daya (pk) CAPACITY (BTU/H) TIPE
1 9000 Split, Wall Mounted
2 17500 Split, Wall Mounted
3 24000 Split, Wall Mounted
Nilai Konstanta
Jenis Ruangan C (ft2/TR) C (m2/TR)
2 Admin Building
Pantry 2,5 2,5 4 10 250 300 1
Toilet Pria 5 2,5 4 10 500 600 1
Toilet Wanta 2,5 3,75 4 10 375 400 1
File room 5 3 4 10 600 650 1
R. wudhu 2 2,5 4 10 200 300 1
3 Guard House
Toilet 1,5 1,5 3 10 68 100 1
4 Mosque
Men toilet 5 3,5 3 10 525 550 1
women toilet 5 3,5 3 10 525 550 1
TOTAL
MINIMUM AIR CHANGES PER HOUR MINIMUM AIR CHANGES PER HOUR
- Maintenance room/shop 10 – 15 - Ware house 5
- Office area 2 - Battery room/rectifier room 15
- Toilet/shower/locker 10 - Chemical storage/plant 10
- Laboratory 20 - Turbine hall 12
- Machine room 20 - Other supporting building 5