Anda di halaman 1dari 1

PT.

PEMBANGKITAN JAWA BALI SERVICES No Form


SIAP INTEGRATED MANAGEMENT SYSTEM Status Revisi
LAPORAN CBM - THERMOGRAPHY Tanggal Terbit
PLTU ROPA Halaman 1

MACHINE DATA STATUS


No. Record
Nama Peralatan
-
CIRCULATING WATER PUMP B #1 CRITICAL
Asset ID 160105RP10PAC02AP001
MPI -
Tanggal Test NOVEMBER 2020
Jenis Tes THERMOGRAPHY

PENGUKURAN

Motor Outboard Motor Inboard Pompa Inboard Pompa Outboard

MEASUREMENT
EQUIPMENT STANDARD UNIT MINGGU 1 MINGGU 2 MINGGU 3 MINGGU 4 STATUS
POINT
Winding Celcius
Fasa R Outgoing Celcius
Fasa S Outgoing Celcius
CIRCULATING WATER Fasa T Outgoing Celcius
EPRI Critical
PUMP B #1 Bearing M1 Celcius 85 52,9
Bearing M2 Celcius 88 82,5
Bearing P1 Celcius 63 48,9
Bearing P2 Celcius 60 32,3

ANALYSIS
- Temperatur tinggi pada bearing motor CWP B dengan nilai di atas 82 C.
- Indikasi kurang pelumasan
- Indikasi putaran berat
- Indkasi permasalahan bearing motor

REKOMENDASI
Jangka pendek:
- Lakukan penambahan pelumas (grease) di motor
- Cek arus ampere motor.
- Cek thermography outgoing breaker fase R, S, T di breaker panel motor
- Cek putaran rpm shaft
- Monitoring terhadap kenaikan temperature bearing motor

Jangka panjang:
- Lakukan pengecekan bearing motor saat shutdown. Ganti bearing jika sudah mengalami kerusakan.

COST BENEFIT ANALYSIS


- Kerugian derating akibat motor CWP B rusak. Estimasi derating 4 MW selama 12 jam dan harga jual listrik Rp 1.655 : 79.440.000,00
- Biaya pelaksanaan FDT. Estimasi biaya pemeliharaan penggantian bearing motor. 50.000.000,00
- Saving : 29.440.000,00
Sidoarjo, 26 November 2020

Disetujui Oleh Diperiksa Oleh Dibuat Oleh

Hilman Aziz Tamimi Roni Sandro Sitohang