Anda di halaman 1dari 1

DATA PENGELUARAN BARANG DAN JASA RENOVASI MASJID DKM MIFTAHULHUDA

Tanggal Pengeluaran Jumlah Tanggal Pengeluaran Jumlah


Upah Kerja Rp 1,600,000.00 23/1/2023 Barang Matrial (nota 1) Rp 13,640,000.00
Upah Kerja Rp 1,560,000.00 1/2/2023 Barang Matrial (nota 2) Rp 80,000.00
16/02/2023 Upah Kerja Rp 1,400,000.00 2/2/2023 Barang Matrial (nota 3) Rp 250,000.00
24/02/2023 Upah Kerja Rp 1,400,000.00 12/2/2023 Barang Material (nota 4) Rp 4,176,000.00
2/3/2023 Upah Kerja Rp 460,000.00 20/02/2023 Barang Material (nota 5) Rp 1,142,000.00
9/3/2023 upah+material Rp 2,000,000.00 21/02/2023 Barang Material (nota 6) Rp 65,000.00
16/03/2023 upah + gergaji Rp 1,523,000.00 semen 5 sak Rp 350,000.00
22/03/2023 upah kerja Rp 720,000.00 22/02/2023 Barang Matrial (nota 8) Rp 910,000.00
30/03/2023 Upah Kerja dan paku Rp 750,000.00 24/02/2023 semen (nota 9) Rp 68,000.00
6/4/2023 upah kerja Rp 1,050,000.00 28/02/2023 Barang Matrial (nota 10) Rp 1,326,000.00
13/04/2023 Upah Kerja Rp 1,050,000.00 matrial bata merah Rp 1,050,000.00
4/5/2023 Upah Kerja Rp 500,000.00 6/4/2023 Barang Matrial (Nota 11) Rp 2,000,000.00
11/5/2023 Upah Kerja Rp 525,000.00 8/4/2023 Barang Matrial (Nota 12) Rp 1,300,000.00
18/5/2023 Upah Kerja Rp 1,025,000.00 Barang matrial Rp 1,000,000.00
18/5/2023 Upah Kerja Rp 250,000.00 30/04/23 Barang Matrial (Nota 13) Rp 1,500,000.00
21/5/2023 Upah Kerja Rp 110,000.00 10/5/2023 Barang Matrial (Nota 14) Rp 1,260,000.00
2/6/2023 Upah Kerja Rp 480,000.00 18/5/2023 Semen Rp 1,050,000.00
8/6/2023 Upah Kerja Rp 400,000.00 27/05/2023 Barang Matrial Rp 700,000.00
15/06/2023 Upah Kerja Rp 160,000.00 29/05/2023 Barang Matrial Rp 200,000.00
22/06/2023 Upah Kerja Rp 480,000.00 1/6/2023 Barang Matrial Rp 100,000.00
28/06/2023 Upah Kerja Rp 240,000.00 10/6/2023 Dempul Rp 50,000.00
3/7/2023 Upah Kerja Rp 250,000.00 17/06/2023 Semen Rp 150,000.00
20/07/2023 Upah Kerja Rp 320,000.00 17/06/2023 Rol Pintu Rp 500,000.00
27/07/2023 Upah Kerja Rp 480,000.00 17/06/2023 Kaca Rp 1,000,000.00
3/8/2023 Upah Kerja Rp 1,200,000.00 24/06/2023 Barang Matrial Rp 1,000,000.00
9/8/2023 Upah Kerja Rp 1,200,000.00 15/07/2023 Barang Matrial (semen) Rp 350,000.00
17/08/2023 Upah Kerja Rp 1,100,000.00 19/07/2023 Barang matrial (Selot) Rp 250,000.00
24/08/2023 Upah Kerja Rp 1,100,000.00 20/07/2023 Barang Matrial (Semen) Rp 150,000.00
31/08/2023 Upah Kerja Rp 1,250,000.00 25/07/2023 Barang Matrial (Loster) Rp 4,000,000.00
7/9/2023 Upah Kerja Rp 600,000.00 25/07/2023 Barang Matrial Rp 100,000.00
TOTAL PENGELUARAN UPAH Rp 25,183,000.00 1/8/2023 Barang Matrial Rp 180,000.00
6/8/2023 Barang Matrial (Semen) Rp 100,000.00
15/08/2023 Barang Matrial (Semen) Rp 100,000.00
19/08/2023 Barang Matrial (Bata) Rp 550,000.00
21/08/2023 Barang Matrial (Semen) Rp 75,000.00
2/9/2023 Barang Matrial Rp 150,000.00
2/9/2023 Barang Matrial Rp 150,000.00
6/9/2023 Barang Matrial Rp 150,000.00
9/9/2023 Barang Matrial (CAT) Rp 2,000,000.00
9/9/2023 Barang Matrial (Paku,Cat) Rp 100,000.00
9/9/2023 Barang Matrial (semen) Rp 320,000.00
TOTAL PENGELUARAN BARANG Rp 43,592,000.00

TOTAL PENGELUARAN BARANG DAN UPAH KERJA : Rp 68,775,000.00


TOTAL PEMASUKAN SAMPAI 24 SEPTEMBER 2023 : Rp 68,823,000.00 SISA SALDO : Rp. 48.000,00

Anda mungkin juga menyukai