Gambar Rencana Pondasi, Kolom, Sloof, Keramik, Ringbalk
Gambar Rencana Pondasi, Kolom, Sloof, Keramik, Ringbalk
DETAIL ENGINEERING
DESIGN
500
NAMA PROYEK
1
300
300
LOKASI PROYEK
DRAFTER
300
300
LUKMAN HAKIM
KERAMIK
50x50 cm KONSULTAN
3
300
300
MENYETUJUI
NAMA GAMBAR
500
DENAH RENCANA KERAMIK
NAMA PROYEK
1
300
300
D
LOKASI PROYEK
DRAFTER
B
300
300
LUKMAN HAKIM
KONSULTAN
3
C
300
300
MENYETUJUI
NAMA GAMBAR
500
enah
Skala 1:50
encana ondasi NO.LMBR JUML.LMBR
DETAIL ENGINEERING
A B DESIGN
500
NAMA PROYEK
1
GEDUNG APOTEK CITO FARMA
LUAS BANGUNAN 45 M2
LOKASI PROYEK
300
300
JL. POROS MAMUJU-PALU
DUSUN LOTU- KEC. KAROSSA
KAB.MAMUJU TENGAH
2
SLOOF 20/30
DRAFTER
LUKMAN HAKIM
SLOOF 20/30
SLOOF 20/30
300
300
KONSULTAN
3
SLOOF 20/30
SLOOF 20/30
SLOOF 20/30
MENYETUJUI
300
300
SLOOF 20/30
4
NAMA GAMBAR
500
DENAH RENCANA SLOOF
enah
Skala 1:50
encana loof NO.LMBR JUML.LMBR
DETAIL ENGINEERING
DESIGN
NAMA PROYEK
K. Exterior 1
K. Exterior
300
300
LOKASI PROYEK
DRAFTER
300
300
LUKMAN HAKIM
Kp Kp KONSULTAN
3
300
300
MENYETUJUI
KI KI 4
enah
Skala 1:50
encana olom NO.LMBR JUML.LMBR
A B DETAIL ENGINEERING
500 DESIGN
NAMA PROYEK
1
300
300
LOKASI PROYEK
DRAFTER
RINGBALK 15/20
RINGBALK 15/20
300
300
LUKMAN HAKIM
KONSULTAN
3
RINGBALK 15/20
RINGBALK 15/20
RINGBALK 15/20
300
300
MENYETUJUI
RINGBALK 15/20
NAMA GAMBAR
500
Skala 1:50
enah encana ingbalk NO.LMBR JUML.LMBR
DETAIL ENGINEERING
A B DESIGN
500
NAMA PROYEK
300
300
LOKASI PROYEK
BALOK 5/5
JL. POROS MAMUJU-PALU
PLAFON ETERNIT DUSUN LOTU- KEC. KAROSSA
KAB.MAMUJU TENGAH
DRAFTER
116
155
300
300
LUKMAN HAKIM
80 80 80 80 80 80
152,5
KONSULTAN
116
132,5
116
300
300
MENYETUJUI
140
116
NAMA GAMBAR
500
DETAIL RENCANA PLAFOND
LOKASI PROYEK
300
KAB.MAMUJU TENGAH
DRAFTER
2
RINGBALK 15/20
LUKMAN HAKIM
BAJA RINGAN
RENG
RINGBALK 15/20
Skala 1:50
300
300
RINGBALK 15/20
X 3
RINGBALK 15/20
MENYETUJUI
300
300
NAMA GAMBAR
4
DENAH RENCANA ATAP
NO.LMBR JUML.LMBR
500
Y