Kawasan Hutan (Ha) Tarif Jumlah Keterangan 1 2 3 4 5 6 L1 353.7 HP 1 Bukaan Tambang Aktif 8.21 1 X 3,500,000 28,735,000 2 Pabrik Pengolahan 6.64 1 X 3,500,000 23,240,000 3 Jalan 2.44 1 X 3,500,000 8,540,000 4 Kantor dan Mess Transit 3.92 1 X 3,500,000 13,720,000 5 Perumahan Karyawan 0 1 X 3,500,000 - 6 Penunjang Operasi 0.15 1 X 3,500,000 525,000 7 Area Penyangga/Pengembangan 332.34 1 X 1,750,000 581,595,000 L2 0 HP 1 Bukaan Tambang Selesai 0 4 X 3,500,000 - 2 Top Soil Area 3.06 4 X 3,500,000 42,840,000 3 Tailing Storage 1.4 4 X 3,500,000 19,600,000 4 Settling Pond 0.19 4 X 3,500,000 2,660,000 5 Wastedump 4.49 4 X 3,500,000 62,860,000 TOTAL POKOK I+II+III 353.7 784,315,000