Anda di halaman 1dari 4

DIRENCANAKAN DIPERIKSA/DISETUJUI DIKETAHUI JUDUL GAMBAR : NO. GAMBAR : REV.

TANGGAL KETERANGAN TTD


PT. ITNASINDO JAYA KONSULTAN PT. HUTAMA KARYA INFRASTRUKTUR PT. HUTAMA KARYA
PENYUSUNAN RENCANA TEKNIK AKHIR
DED GEDUNG ARSIP ARS-044
(DETAILED ENGINEERING DESIGN)
PADA PEKERJAAN PERENCANAAN
KODE GAMBAR NO. REF. TANGGAL SKALA :
GEDUNG ARSIP, GEDUNG WORKSHOP DAN PENATAAN SITE
PT. HUTAMA KARYA INFRASTRUKTUR
PT. HUTAMA KARYA INFRASTRUKTUR
DEDDY I., ST., MT., IAI, AA HADI S. W. S., ST., MT., IPP.
AHLI ARSITEKTUR AHLI STRUKTUR
RIF'AT, ST., MT.
AHLI M E P
AKHMAD GAZALI, ST., MT.
AHLI GEOTEKNIK
Dr. ADI S. D., ST., MT.
TEAM LEADER
MUTIAR WARMAN
KA.DEP TEKNIK
GATOT ARIES P.
KA.DEP CORPLAN
ARS 1:150

36.00

1.00 3.00 3.25 6.00 6.00 3.00 1.50 1.50 6.00 6.00

D
KM/WC KM/WC
A1 A1 A1 A2 -0.05 -0.05

TOILET A1
±0.00 LIFT A1

1.20

R. PENYIMPANAN
A1 A1 A1 A1

±0.00
12.00

A1 A1 A1 A1 A1
A1
LOBBY
±0.00

R. PENYIMPANAN
±0.00

A1 A1 A2 RUANG FUMIGASI
±0.00
A2

B
A1 A1 A2

7.00
6.00 AREA SORTIR
±0.00
TERAS
±0.00
1.80
A2 A1 A1

A
-0.15 -0.15
1.18
-0.30 -0.30
-0.45 -0.45

1 2 3 4 5 6 7
REKAPITULASI TIPE LEMARI
ARSIP

TIPE LEMARILANTAI 1 LANTAI 2 TOTAL


ARS DENAH PELETAKAN LEMARI ARSIP Lt.1
- - 1 : 150 A1 21 bh 16 bh 37 bh
A2 5 bh 9 bh 14 bh
DIRENCANAKAN DIPERIKSA/DISETUJUI DIKETAHUI JUDUL GAMBAR : NO. GAMBAR : REV. TANGGAL KETERANGAN TTD
PT. ITNASINDO JAYA KONSULTAN PT. HUTAMA KARYA INFRASTRUKTUR PT. HUTAMA KARYA
PENYUSUNAN RENCANA TEKNIK AKHIR
DED GEDUNG ARSIP ARS-045
(DETAILED ENGINEERING DESIGN)
PADA PEKERJAAN PERENCANAAN
KODE GAMBAR NO. REF. TANGGAL SKALA :
GEDUNG ARSIP, GEDUNG WORKSHOP DAN PENATAAN SITE
PT. HUTAMA KARYA INFRASTRUKTUR
PT. HUTAMA KARYA INFRASTRUKTUR
DEDDY I., ST., MT., IAI, AA HADI S. W. S., ST., MT., IPP.
AHLI ARSITEKTUR AHLI STRUKTUR
RIF'AT, ST., MT.
AHLI M E P
AKHMAD GAZALI, ST., MT.
AHLI GEOTEKNIK
Dr. ADI S. D., ST., MT.
TEAM LEADER
MUTIAR WARMAN
KA.DEP TEKNIK
GATOT ARIES P.
KA.DEP CORPLAN
ARS 1:150

36.00

2.75 3.25 6.00 6.00 4.50 1.50 6.00 6.00

D
KM/WC
A1 A1 A2 A1 +3.95 A2
A1
LIFT
6.00

TANGGA DARURAT A1 A1
+4.00

C R. PENYIMPANAN
+4.00
12.00

A1 A1 A1

R. PENYIMPANAN R.KERJA AREA BACA


18.00 +4.00
+4.00 +4.00 A1

A2 A1 A1 A2
A2
1.50

B 12.00

A2 A1 A1 A2

8.00 R.RAPAT
+4.00

A2 A1 A1 A2
8.50
A
1.68

3.00
8.00

1 2 3 4 5 6 7
REKAPITULASI TIPE LEMARI
ARSIP

TIPE LEMARILANTAI 1 LANTAI 2 TOTAL


ARS DENAH PELETAKAN LEMARI ARSIP Lt.2
- - 1 : 150 A1 21 bh 16 bh 37 bh
A2 5 bh 9 bh 14 bh
DIRENCANAKAN DIPERIKSA/DISETUJUI DIKETAHUI JUDUL GAMBAR : NO. GAMBAR : REV. TANGGAL KETERANGAN TTD
PT. ITNASINDO JAYA KONSULTAN PT. HUTAMA KARYA INFRASTRUKTUR PT. HUTAMA KARYA
PENYUSUNAN RENCANA TEKNIK AKHIR
DED GEDUNG ARSIP ARS-046
(DETAILED ENGINEERING DESIGN)
PADA PEKERJAAN PERENCANAAN
KODE GAMBAR NO. REF. TANGGAL SKALA :
GEDUNG ARSIP, GEDUNG WORKSHOP DAN PENATAAN SITE
PT. HUTAMA KARYA INFRASTRUKTUR
PT. HUTAMA KARYA INFRASTRUKTUR
DEDDY I., ST., MT., IAI, AA HADI S. W. S., ST., MT., IPP.
AHLI ARSITEKTUR AHLI STRUKTUR
RIF'AT, ST., MT.
AHLI M E P
AKHMAD GAZALI, ST., MT.
AHLI GEOTEKNIK
Dr. ADI S. D., ST., MT.
TEAM LEADER
MUTIAR WARMAN
KA.DEP TEKNIK
GATOT ARIES P.
KA.DEP CORPLAN
ARS 1:25

4 Unit Double Dinamis

0.40 0.80 0.40 0.40 0.40 0.40


4.40 0.40 0.40 0.40 0.40 0.40

1 Unit Single Dinamis 1 Unit Single Statis

2.00

0.40 0.80 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 2.00

0.40

1 Unit Single Statis 1 Unit Single Dinamis


0.40

0.40
2.20 2.20

0.40

0.40

4 Unit Double Dinamis

ARS DETAIL LEMARI PENYIMPANAN


- - 1 : 25
DIRENCANAKAN DIPERIKSA/DISETUJUI DIKETAHUI JUDUL GAMBAR : NO. GAMBAR : REV. TANGGAL KETERANGAN TTD
PT. ITNASINDO JAYA KONSULTAN PT. HUTAMA KARYA INFRASTRUKTUR PT. HUTAMA KARYA
PENYUSUNAN RENCANA TEKNIK AKHIR
DED GEDUNG ARSIP ARS-047
(DETAILED ENGINEERING DESIGN)
PADA PEKERJAAN PERENCANAAN
KODE GAMBAR NO. REF. TANGGAL SKALA :
GEDUNG ARSIP, GEDUNG WORKSHOP DAN PENATAAN SITE
PT. HUTAMA KARYA INFRASTRUKTUR
PT. HUTAMA KARYA INFRASTRUKTUR
DEDDY I., ST., MT., IAI, AA HADI S. W. S., ST., MT., IPP.
AHLI ARSITEKTUR AHLI STRUKTUR
RIF'AT, ST., MT.
AHLI M E P
AKHMAD GAZALI, ST., MT.
AHLI GEOTEKNIK
Dr. ADI S. D., ST., MT.
TEAM LEADER
MUTIAR WARMAN
KA.DEP TEKNIK
GATOT ARIES P.
KA.DEP CORPLAN
ARS 1:25

1 Unit Double Dinamis

0.40 0.40 0.40 0.80 0.40

1 Unit Single Dinamis 1 Unit Single Statis

2.00

2.00
0.40 0.80 0.40 0.40 0.40

0.40

1 Unit Single Statis 1 Unit Single Dinamis


0.40

0.40
2.20 2.20

0.40

0.40

1 Unit Double Dinamis

ARS DETAIL LEMARI PENYIMPANAN


- - 1 : 25

Anda mungkin juga menyukai