Anda di halaman 1dari 2

RENCANA ANGGARAN BIAYA

Propinsi : Jawa Timur Lokasi : Dsn. Krajan RT. 00 RW. 00


Kabupaten : Situbondo Jenis Kegiatan : Saluran Drainase
Kecamatan : Cipta Desa Ukuran/Dimensi : 72 m'
Desa : ..................

VOLUME Harga Jumlah Jumlah


URAIAN Dari Dari Satuan Satuan Swadaya Dana Desa
Total
Swadaya Dana Desa ( Rp. ) Rp Rp
BAHAN a b c= a - b d f g=bxf h=cxf
1 Semen 40 kg #REF! #REF! Zak 58,000 #REF!
2 Pasir #REF! #REF! m2 225,000 #REF!
3 Pasir Urug #REF! #REF! m3 150,000 #REF!
4 Batu Bata #REF! #REF! bh 700 #REF!
5 Buis Beton U 30 #REF! #REF! m 85,000 #REF!

Sub Total 1) #REF!


ALAT
1 Arco 0.00 bh 550,000 -
2 Sekrop 0.00 bh 75,000 -
3 Timba 0.00 bh 11,000 -
4 Benang 0.00 bh 7,000 -

Sub Total 2) -
UPAH
1 Pekerja #REF! #REF! Oh 70,000 #REF!
2 Tukang #REF! #REF! Oh 80,000 #REF!

Sub Total 3) - #REF!


Total biaya ( Dana Desa + Swada #REF!
Sumber Dana Total biaya Dana Desa #REF!
Total biaya Swadaya -
Terbilang :
Lima Puluh Dua Juta Seratus Tiga Puluh Ribu Rupiah

Dibuat Oleh,
Kader Teknis Tim Pengelola Kegiatan (TPK)
Desa ................. Desa .....................

................................ ................................

Mengetahui,
Kepala Desa .............

.................................

hal1
RENCANA ANGGARAN BIAYA
Propinsi : Jawa Timur Lokasi : Dsn. ........
Kabupaten : Situbondo Panjang : 119 x 2,2 m
Kecamatan : Cipta Desa
Desa : ...........

VOLUME Jumlah Jumlah


Harga Satuan
URAIAN Dari Dari Dana Satuan Swadaya DD
Total
Swadaya DD ( Rp. ) ( Rp. ) ( Rp )
a b c=a-b d e g=bxf h=cxe
BAHAN
1 Kanstin 1,195.00 1,195.00 bh 28,000.00 - 33,460,000.00
2 Pasir 16.00 16.00 m³ 145,000.00 - 2,320,000.00
3 Paving 84.00 84.00 m² 58,000.00 - 4,872,000.00
4 Mahkota 1,587.00 1,587.00 Bh 4,000.00 - 6,348,000.00
5 Semen 40 kg 127.00 127.00 zak 58,000.00 - 7,366,000.00
6 Batu Bata 9,300.00 9,300.00 bh 700.00 - 6,510,000.00
7 Buis Beton U 30 148.00 148.00 bh 65,000.00 - 9,620,000.00
8 Koral 5.00 5.00 m³ 350,000.00 - 1,750,000.00
9 Besi Ø 10 108.00 108.00 ljr 85,000.00 - 9,180,000.00
10 Bendrat 11.00 11.00 kg 22,000.00 - 242,000.00
11 Kayu 4/6 8.00 8.00 kg 55,000.00 - 440,000.00
12 Paku 1.00 1.00 kg 22,000.00 - 22,000.00
13 Tripleks 4.00 4.00 lbr 75,000.00 - 300,000.00
14 Pipa PVC 3" 30.00 30.00 Jjr 225,000.00 - 6,750,000.00

SUB TOTAL I - 89,180,000.00


UPAH
1 Pekerja 440.00 440.00 Oh 80,000.00 - 35,200,000.00
2 Tukang 226.00 226.00 Oh 90,000.00 - 20,340,000.00
3 Pemotongan Pohon 2.00 2.00 bh 500,000.00 - 1,000,000.00
SUB TOTAL II - 56,540,000.00
BIAYA OPRASIONAL
1 Perencanaan 1.00 1.00 ls 2,000,000.00 - 2,000,000.00
2 Benang 1.00 1.00 bh 7,000.00 - 7,000.00
3 Meteran 1.00 1.00 bh 33,000.00 - 33,000.00

SUB TOTAL III - 2,040,000.00


Total Biaya DD (I + II + III) 147,760,000.00
Sumber Dana
Total Biaya Swadaya (I + II + III) -
JUMLAH TOTAL ( DD + Swadaya ) -
Terbilang :
Seratus Empat Puluh Tujuh Juta Tujuh Ratus Enam Puluh Ribu Rupiah

Mengetahui, Pengelola Kegiatan (TPK)


Kepala Desa .................... Desa .........................

............................. .............................

Perencana,

.............................

Anda mungkin juga menyukai