Volume
Harga Satuan Jumlah Total
Total Kebutuhan Satuan
No URAIAN
(Rp) (Rp) ( Rp ) (Rp)
BAHAN
Sub Total 1) -
ALAT
1 Mobilisasi / Demobilisasi 2.00 2.00 Ls 4,530,000.00 9,060,000.00
2 Bulldozer 23.00 23.00 Jam 710,000.00 16,330,000.00
3 Vibro Roller - - Jam 710,000.00 -
4 Motor Grader - - Jam 850,000.00 -
Sub Total 2) 25,390,000.00
UPAH
1 Pekerja - - Hok 100,000.00 -
2 Tukang - - Hok 120,000.00 -
Sub Total 3) -
SUMBER DANA Total Biaya DD 25,390,000.00
HARAFIK