Anda di halaman 1dari 88

KEMENTRIAN

LEGENDA : KETENAGAKERJAAN
REPUBLIK INDONESIA
A. MAIN ENTRANCE KEGIATAN :

N B. KANTOR PENGELOLA PERENCANAAN PEMBANGUNAN

(Pekerjaa Tahap II) BLK PALU

K SULAWESI TENGAH

H.1 C. BANGUNAN EXISTING PEKERJAAN :


D. UTILITAS
PEMBANGUNAN WORKSHOP MANUFAKTUR,
E. GUEST HOUSE
G I.3 F. KANTIN
REFRIGASI, DAN KANTOR TAHAP II

TAHUN ANGGARAN :
G. ASRAMA
H.1. WORKSHOP OTOMOTIF
H.2 H.2. WORKSHOP LAS
2023
LOKASI :
H.3. WORKSHOP BANGUNAN
I.4 I.1. WORKSHOP MANUFAKTUR
JL. KELINCI, TALISE,
KECAMATAN PALU TIM., KOTA PALU,
N

SULAWESI TENGAH - 94118


(Pembangunan)

Jl.hang tuah
MENGETAHUI OLEH :

- 0.05
I.2. WORKSHOP REFRIGRASI
H.3

RG. ALAT
+ 0.05
DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI
(Pembangunan)
I.1

RG. WORKSHOP MANUFAKTUR


+/- 0.00
F I.3. WORKSHOP MENJAHIT

RG. INSTRUKTUR
+ 0.05
I.4. WORKSHOP KOMPUTER

+/- 0.00
WANITA
+/- 0.00

TOILET
JANITOR
+/- 0.00

+ 0.05

- 0.05
LOBBY
TERAS
AGUNG NUR ROHMAD, ST.,MM.
J. PARKIR

KORIDOR
+ 0.05
N N

+/- 0.00
WANITA
TOILET
NIP. 19760725B200501 1 001

RG. INSTRUKTUR
+ 0.05
K. SIDE ENTRANCE DISETUJUI OLEH :

RG. WORKSHOP MANUFAKTUR


I.2 L. LAPANGAN BASKET PEJABAT PEMBUAT
PEJABAT PEMBUAT KOMITMEN
KOMITMEN (PPK)

+/- 0.00
E C

RG. ALAT
+ 0.05

- 0.05
ADITYA WIBAWA S.P, ST
NIP. 19860707
AKHIRUDIN, 201503 1 003
S.T.,M.Ec.Dev
N B NIP. 19851004200912 1 001

J DI BUAT OLEH :
GROUND TANK

KONSULTAN PERENCANA
250

3000

250

5000
HOLE
LOUVRE PANEL

R. POMPA
FFL. -0.550

TERAS
-0.580

ramp
HOLE
250

3000

250

5000

TERAS
-0.580

D
MVDP
LOUVRE PANEL

R. TRAVO
FFL. -0.550

TERAS
-0.580

ramp

TRAFO 1000 kVA


Sound insulation at inside
all the wall & ceilling

TRANCH KABEL
GEN OUT GENSET TRAFO OUTGOING BANK
INCOM INCOM CAP.
FLOOR FINISH LEVEL

TRANCH KABEL
GRILL HOLLOW 20.40.4
-0.550

HOLLOW 40.40.4
FRAME GRILL

TERAS
-0.580

ramp
R. GENSET
FFL. -0.550

SILENCER
300 kVA
DG-1

KNALPOT Ø 100
GENSET

A
LOUVRE PANEL
MANUAL PUMP

P. POMPA SOLAR
DAILY TANK
1000 litre

BAMBANG RIYANTO
TEAM LEADER

Digambar -

Diperiksa -

Jl.kelinci Disetujui -
Nama Gambar Skala

SITE PLAN 1:750

SITE PLAN
Kode Gmbr. No. Lembar Jml. Lembar

ARS 01 109
A B C D E F G H
500 400 500 600 500 400 500
400 100
100 400 B
KEMENTRIAN
1 KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :
- 0.05
400

400
PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH

PEKERJAAN :
2
PEMBANGUNAN WORKSHOP MANUFAKTUR,
REFRIGASI, DAN KANTOR TAHAP II
TOILET TOILET
WANITA WANITA
+/- 0.00 +/- 0.00
TAHUN ANGGARAN :
600

600
JANITOR
+/- 0.00
2023
RG. WORKSHOP MANUFAKTUR RG. WORKSHOP REFRIGASI LOKASI :
+/- 0.00 +/- 0.00
- 0.05 RG.PANEL - 0.05
JL. KELINCI, TALISE,
+ 0.05 KECAMATAN PALU TIM., KOTA PALU,
3 SULAWESI TENGAH - 94118

MENGETAHUI OLEH :

DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

2345
KORIDOR
+ 0.05
600

600
AGUNG NUR ROHMAD, ST.,MM.
A A NIP. 19760725B200501 1 001
DISETUJUI OLEH :

PEJABAT PEMBUAT
PEJABAT PEMBUATKOMITMEN (PPK)
KOMITMEN
4
LOBBY
+ 0.05

ADITYA WIBAWA S.P, ST


400

400
RG. ALAT RG. INSTRUKTUR RG. INSTRUKTUR RG. ALAT
+ 0.05 + 0.05 + 0.05 + 0.05
NIP.AKHIRUDIN,
19860707 201503 1 003
S.T.,M.Ec.Dev
NIP. 19851004200912 1 001

DI BUAT OLEH :

5
KONSULTAN PERENCANA
345

345
TERAS
+/- 0.00

6
BAMBANG RIYANTO
TEAM LEADER
MT - 0.50
B Digambar -
500 400 500 600 500 400 500
Diperiksa -

3400 Disetujui -
DENAH LANTAI 1 Nama Gambar Skala
Skala 1:130

DENAH 1:130

Kode Gmbr. No. Lembar Jml. Lembar

ARS 02 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
A B C D E F G H
KEGIATAN :
500 400 500 600 500 400 500
100 400 400 100 100 400 400 100 PERENCANAAN PEMBANGUNAN
B BLK PALU
SULAWESI TENGAH
1
PEKERJAAN :

PEMBANGUNAN WORKSHOP MANUFAKTUR,


400

400
REFRIGASI, DAN KANTOR TAHAP II

TAHUN ANGGARAN :

2
2023
LOKASI :

JL. KELINCI, TALISE,


RG. KELAS
KECAMATAN PALU TIM., KOTA PALU,
+4.15
600

600
SULAWESI TENGAH - 94118

MENGETAHUI OLEH :

DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

RG. WORKSHOP MANUFAKTUR RG. WORKSHOP MANUFAKTUR

2000
3 +/- 0.00 +/- 0.00

AGUNG NUR ROHMAD, ST.,MM.


NIP. 19760725B200501 1 001

BORDES KORIDOR DISETUJUI OLEH :


+ 2.15 +4.15
PEJABAT PEMBUAT
PEJABAT PEMBUAT KOMITMEN
KOMITMEN (PPK)
600

600
A A ADITYA WIBAWA S.P, ST
NIP. 19860707
AKHIRUDIN, 201503 1 003
S.T.,M.Ec.Dev
NIP. 19851004200912 1 001
4 DI BUAT OLEH :

RG. KELAS
+4.15 KONSULTAN PERENCANA
400

400
5
BAMBANG RIYANTO
100 400 400 100 300 300 100 400 400 100 TEAM LEADER

Digambar -
500 400 500 600 500 400 500

Diperiksa -
3400 Disetujui -
DENAH LANTAI 2
Skala 1:130
Nama Gambar Skala

B DENAH 1:130

Kode Gmbr. No. Lembar Jml. Lembar

ARS 03 109
A B C D E F G H
KEMENTRIAN
500 400 500 600 500 400 500 KETENAGAKERJAAN
REPUBLIK INDONESIA
B KEGIATAN :

PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH
1
PEKERJAAN :

PEMBANGUNAN WORKSHOP MANUFAKTUR,


400

400
REFRIGASI, DAN KANTOR TAHAP II

TAHUN ANGGARAN :

2
2023
LOKASI :

JL. KELINCI, TALISE,


KECAMATAN PALU TIM., KOTA PALU,
600

600
SULAWESI TENGAH - 94118

MENGETAHUI OLEH :

DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

3
AGUNG NUR ROHMAD, ST.,MM.
NIP. 19760725B200501 1 001
DISETUJUI OLEH :

PEJABAT PEMBUAT
PEJABAT PEMBUAT KOMITMEN (PPK)
KOMITMEN
A A
600

600
ADITYA WIBAWA S.P, ST
NIP.AKHIRUDIN,
19860707S.T.,M.Ec.Dev
201503 1 003
NIP. 19851004200912 1 001
4 DI BUAT OLEH :

KONSULTAN PERENCANA
400

400
5
BAMBANG RIYANTO
155

155
TEAM LEADER

Digambar -

B DENAH DAK ATAP


Diperiksa -
Skala 1:130
Disetujui -
Nama Gambar Skala

DENAH 1:130

Kode Gmbr. No. Lembar Jml. Lembar

ARS 04 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :

PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH

PEKERJAAN :

PEMBANGUNAN WORKSHOP MANUFAKTUR,


REFRIGASI, DAN KANTOR TAHAP II

TAHUN ANGGARAN :

2023
LOKASI :

JL. KELINCI, TALISE,


KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118

MENGETAHUI OLEH :

DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

AGUNG NUR ROHMAD, ST.,MM.


NIP. 19760725B200501 1 001
DISETUJUI OLEH :

PEJABAT PEMBUAT
PEJABAT PEMBUAT KOMITMEN
KOMITMEN (PPK)

ADITYA WIBAWA S.P, ST


NIP.AKHIRUDIN,
19860707 201503 1 003
S.T.,M.Ec.Dev
NIP. 19851004200912 1 001

DI BUAT OLEH :

KONSULTAN PERENCANA

BAMBANG RIYANTO
TAMPAK DEPAN TEAM LEADER
Skala 1:130

Digambar -

Diperiksa -

Disetujui -
Nama Gambar Skala

TAMPAK 1:130

Kode Gmbr. No. Lembar Jml. Lembar

ARS 05 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :

PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH

PEKERJAAN :

PEMBANGUNAN WORKSHOP MANUFAKTUR,


REFRIGASI, DAN KANTOR TAHAP II

TAHUN ANGGARAN :

2023
LOKASI :

JL. KELINCI, TALISE,


KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118

MENGETAHUI OLEH :

DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

AGUNG NUR ROHMAD, ST.,MM.


NIP. 19760725B200501 1 001
DISETUJUI OLEH :

PEJABAT PEMBUAT
PEJABAT PEMBUAT KOMITMEN
KOMITMEN (PPK)

ADITYA WIBAWA S.P, ST


NIP. 19860707
AKHIRUDIN, 201503 1 003
S.T.,M.Ec.Dev
NIP. 19851004200912 1 001

DI BUAT OLEH :

KONSULTAN PERENCANA

BAMBANG RIYANTO
TAMPAK KANAN TEAM LEADER
Skala 1:130

Digambar -

Diperiksa -

Disetujui -
Nama Gambar Skala

TAMPAK 1:130

Kode Gmbr. No. Lembar Jml. Lembar

ARS 06 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :

PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH

PEKERJAAN :

PEMBANGUNAN WORKSHOP MANUFAKTUR,


REFRIGASI, DAN KANTOR TAHAP II

TAHUN ANGGARAN :

2023
LOKASI :

JL. KELINCI, TALISE,


KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118

MENGETAHUI OLEH :

DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

AGUNG NUR ROHMAD, ST.,MM.


NIP. 19760725B200501 1 001
DISETUJUI OLEH :

PEJABAT PEMBUAT
PEJABAT PEMBUAT KOMITMEN
KOMITMEN (PPK)

ADITYA WIBAWA S.P, ST


NIP.AKHIRUDIN,
19860707 201503 1 003
S.T.,M.Ec.Dev
NIP. 19851004200912 1 001

DI BUAT OLEH :

KONSULTAN PERENCANA

BAMBANG RIYANTO
TEAM LEADER

Digambar -
TAMPAK KIRI
Skala 1:130 Diperiksa -

Disetujui -
Nama Gambar Skala

TAMPAK 1:130

Kode Gmbr. No. Lembar Jml. Lembar

ARS 07 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :

PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH

PEKERJAAN :

PEMBANGUNAN WORKSHOP MANUFAKTUR,


REFRIGASI, DAN KANTOR TAHAP II

TAHUN ANGGARAN :

2023
LOKASI :

JL. KELINCI, TALISE,


KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118

MENGETAHUI OLEH :

DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

AGUNG NUR ROHMAD, ST.,MM.


NIP. 19760725B200501 1 001
DISETUJUI OLEH :

PEJABAT PEMBUAT
PEJABAT KOMITMEN
PEMBUAT (PPK)
KOMITMEN

ADITYA WIBAWA S.P, ST


AKHIRUDIN,
NIP. 19860707S.T.,M.Ec.Dev
201503 1 003
NIP. 19851004200912 1 001

DI BUAT OLEH :

KONSULTAN PERENCANA

BAMBANG RIYANTO
TEAM LEADER

Digambar -
TAMPAK BELAKANG
Skala 1:130 Diperiksa -

Disetujui -
Nama Gambar Skala

TAMPAK 1:130

Kode Gmbr. No. Lembar Jml. Lembar

ARS 08 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :

PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH

PEKERJAAN :

PEMBANGUNAN WORKSHOP MANUFAKTUR,


REFRIGASI, DAN KANTOR TAHAP II

TAHUN ANGGARAN :

2023
LOKASI :

JL. KELINCI, TALISE,


KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118

MENGETAHUI OLEH :

DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

AGUNG NUR ROHMAD, ST.,MM.


NIP. 19760725B200501 1 001
DISETUJUI OLEH :

PEJABAT PEMBUAT
PEJABAT KOMITMEN
PEMBUAT (PPK)
KOMITMEN

ADITYA WIBAWA S.P, ST


AKHIRUDIN,
NIP. 19860707S.T.,M.Ec.Dev
201503 1 003
NIP. 19851004200912 1 001

DI BUAT OLEH :

KONSULTAN PERENCANA

BAMBANG RIYANTO
TEAM LEADER

PERSPEKTIF BANGUNAN Digambar -


Skala -
Diperiksa -

Disetujui -
Nama Gambar Skala

PERSPEKTIF -

Kode Gmbr. No. Lembar Jml. Lembar

ARS 09 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :

PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH

PEKERJAAN :

PEMBANGUNAN WORKSHOP MANUFAKTUR,


REFRIGASI, DAN KANTOR TAHAP II

TAHUN ANGGARAN :

2023
LOKASI :

JL. KELINCI, TALISE,


KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118

MENGETAHUI OLEH :

DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

PERSPEKTIF BANGUNAN
Skala -

AGUNG NUR ROHMAD, ST.,MM.


NIP. 19760725B200501 1 001
DISETUJUI OLEH :

PEJABAT PEMBUAT
PEJABAT PEMBUAT KOMITMEN
KOMITMEN (PPK)

ADITYA WIBAWA S.P, ST


NIP.AKHIRUDIN,
19860707 201503 1 003
S.T.,M.Ec.Dev
NIP. 19851004200912 1 001

DI BUAT OLEH :

KONSULTAN PERENCANA

BAMBANG RIYANTO
TEAM LEADER

Digambar -

Diperiksa -

Disetujui -
Nama Gambar Skala

PERSPEKTIF -

PERSPEKTIF BANGUNAN
Skala -
Kode Gmbr. No. Lembar Jml. Lembar

ARS 10 109
+ 20.025

KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :

PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH

PEKERJAAN :

PEMBANGUNAN WORKSHOP MANUFAKTUR,


REFRIGASI, DAN KANTOR TAHAP II
Atap Bitumen
I-WF 125X250.6.9mm
TAHUN ANGGARAN :
Gording CNP 150.50.20.2,5

2023
LOKASI :

JL. KELINCI, TALISE,


KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118
I-WF 100.200.5,5.8mm
MENGETAHUI OLEH :
+ 7.65
+ 7.50 Kisi-Kisi WPC DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI
Rangka Besi Hollow

AGUNG NUR ROHMAD, ST.,MM.


+ 4.15 NIP. 19760725B200501 1 001
+ 4.00
DISETUJUI OLEH :
Pas Bata
PEJABAT PEMBUAT KOMITMEN (PPK)
PEJABAT PEMBUAT KOMITMEN
H-WF 200X200.8.12mm

ADITYA WIBAWA S.P, ST


Sloof 50x30
+/- 0.00
NIP.AKHIRUDIN,
19860707 S.T.,M.Ec.Dev
201503 1 003
NIP. 19851004200912 1 001
- 0.50

- 1.10 DI BUAT OLEH :


Pondasi Pile Cap

- 6.50 Pondasi Pancang KONSULTAN PERENCANA

500 400 500 600 500 400 500

A B C D E F G H
BAMBANG RIYANTO
3400
TEAM LEADER

POTONGAN A-A Digambar -


Skala 1:130
Diperiksa -

Disetujui -
Nama Gambar Skala

POTONGAN 1:130

Kode Gmbr. No. Lembar Jml. Lembar

ARS 11 109
Gording CNP 150.50.20.2,5

Atap Bitumen

+ 20.025 KEMENTRIAN
KETENAGAKERJAAN
I-WF 125X250.6.9mm REPUBLIK INDONESIA
KEGIATAN :

PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH

Plafond OverStek Atap


PEKERJAAN :
Kalsiboard

PEMBANGUNAN WORKSHOP MANUFAKTUR,


REFRIGASI, DAN KANTOR TAHAP II

TAHUN ANGGARAN :

2023
LOKASI :

JL. KELINCI, TALISE,


Pas Bata KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118

MENGETAHUI OLEH :

DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

+ 7.65
+ 7.50

AGUNG NUR ROHMAD, ST.,MM.


NIP. 19760725B200501 1 001
DISETUJUI OLEH :

PEJABAT PEMBUAT
PEJABAT KOMITMEN
PEMBUAT (PPK)
KOMITMEN
+ 4.15
+ 4.00

ADITYA WIBAWA S.P, ST


NIP. 19860707
AKHIRUDIN, 201503 1 003
S.T.,M.Ec.Dev
NIP. 19851004200912 1 001

DI BUAT OLEH :
Sloof 50x30
+/- 0.00
- 0.50 KONSULTAN PERENCANA
- 1.10
Pondasi Pile Cap

- 6.50 Pondasi Pancang

345 400 600 600 400 BAMBANG RIYANTO


6 5 4 3 2 1 TEAM LEADER

Digambar -

POTONGAN B-B Diperiksa -


Skala 1:130

Disetujui -
Nama Gambar Skala

PERSPEKTIF 1:130

Kode Gmbr. No. Lembar Jml. Lembar

ARS 12 109
A B C D E F G H
500 400 500 600 500 400 500
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :
1
PC2 PC2 PC2 PC2 PC2 PC2 PERENCANAAN PEMBANGUNAN
PC1 PC1 BLK PALU
SULAWESI TENGAH
400

400
PEKERJAAN :

PEMBANGUNAN WORKSHOP MANUFAKTUR,


REFRIGASI, DAN KANTOR TAHAP II
2
PC2 PC2
TAHUN ANGGARAN :
PC1 PC1

2023
LOKASI :
600

600
JL. KELINCI, TALISE,
KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118

MENGETAHUI OLEH :

3 DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

PC2 PC2
PC1 PC1

2345
AGUNG NUR ROHMAD, ST.,MM.
600

600
NIP. 19760725B200501 1 001
DISETUJUI OLEH :

PEJABAT PEMBUAT
PEJABAT PEMBUAT KOMITMEN (PPK)
KOMITMEN

4
ADITYA WIBAWA S.P, ST
PC2 PC2 NIP.AKHIRUDIN,
19860707S.T.,M.Ec.Dev
201503 1 003
PC1 PC1 NIP. 19851004200912 1 001
400

400
DI BUAT OLEH :

KONSULTAN PERENCANA

5
PC2 PC2 PC2 PC2 PC2 PC2
PC1 PC1
345

345
BAMBANG RIYANTO
TEAM LEADER

6 Digambar -

Diperiksa -

Disetujui -
Nama Gambar Skala
500 400 500 600 500 400 500

3400 DENAH RENCANA -


1:130
PONDASI PANCANG
DENAH RENCANA PONDASI PANCANG
Skala 1:80
Kode Gmbr. No. Lembar Jml. Lembar

STR 13 109
28 70

25 KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA

150 45 70 KEGIATAN :
38
70
PERENCANAAN PEMBANGUNAN
BLK PALU
25 SULAWESI TENGAH
100 25

PEKERJAAN :
28
38
PEMBANGUNAN WORKSHOP MANUFAKTUR,
REFRIGASI, DAN KANTOR TAHAP II

28 25 45 25 28 28 25 45 25 28
TAHUN ANGGARAN :

150 150
2023
28 25 45 25 28 28 25 45 25 28 LOKASI :

JL. KELINCI, TALISE,


KECAMATAN PALU TIM., KOTA PALU,
150 150 SULAWESI TENGAH - 94118

MENGETAHUI OLEH :

DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

60 60

AGUNG NUR ROHMAD, ST.,MM.


NIP. 19760725B200501 1 001
DISETUJUI OLEH :

PEJABAT PEMBUAT
PEJABAT PEMBUATKOMITMEN (PPK)
KOMITMEN

600 600

ADITYA WIBAWA S.P, ST


540 540 NIP.AKHIRUDIN,
19860707 S.T.,M.Ec.Dev
201503 1 003
NIP. 19851004200912 1 001

DI BUAT OLEH :

KONSULTAN PERENCANA

BAMBANG RIYANTO
70 70
PC Wire 4-∅7mm PC Wire 4-∅7mm TEAM LEADER

Digambar -
25 25 ∅3mm-200 25 25 ∅3mm-200 Diperiksa -

25 25 Disetujui -
Nama Gambar Skala

RENCANA -
1:30
Detail Pancang PC-1 Detail Pancang PC-2 PONDASI PANCANG

SKALA 1:30 SKALA 1:30 Kode Gmbr. No. Lembar Jml. Lembar

STR 14 109
A B C D E F G H
500 400 500 600 500 400 500

KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA

1 KEGIATAN :

PP2 PP3 PP3 PP3 PP3 PP2


PERENCANAAN PEMBANGUNAN
PP1 PP1
BLK PALU
SULAWESI TENGAH
400

400
PEKERJAAN :

PEMBANGUNAN WORKSHOP MANUFAKTUR,


REFRIGASI, DAN KANTOR TAHAP II
2
PP2 PP2
PP1 PP1 TAHUN ANGGARAN :

2023
600

600
LOKASI :

JL. KELINCI, TALISE,


KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118

MENGETAHUI OLEH :
3 DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI
PP2 PP2
PP1 PP1

2345
AGUNG NUR ROHMAD, ST.,MM.
600

600
NIP. 19760725B200501 1 001
DISETUJUI OLEH :

PEJABAT PEMBUAT KOMITMEN (PPK)


PEJABAT PEMBUAT KOMITMEN

4
PP2 PP2 ADITYA WIBAWA S.P, ST
PP1 PP1 NIP.AKHIRUDIN,
19860707 S.T.,M.Ec.Dev
201503 1 003
NIP. 19851004200912 1 001
400

400
DI BUAT OLEH :

KONSULTAN PERENCANA
5
PP2 PP3 PP3 PP3 PP3 PP2
PP1 PP1
345

345
BAMBANG RIYANTO
TEAM LEADER

6 Digambar -
PP4 PP4
Diperiksa -

Disetujui -

500 400 500 600 500 400 500 Nama Gambar Skala

3400 DENAH RENCANA -


1:130
PILE CAPE
DENAH RENCANA PONDASI PILE CAP
Skala 1:130
Kode Gmbr. No. Lembar Jml. Lembar

STR 15 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :

PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH
150
PEKERJAAN :
48 55 48
PEMBANGUNAN WORKSHOP MANUFAKTUR,
REFRIGASI, DAN KANTOR TAHAP II

20-D16 48 TAHUN ANGGARAN :

2023
D16-200

D16-200
45
D10-100 55 150 30 LOKASI :

JL. KELINCI, TALISE,


KECAMATAN PALU TIM., KOTA PALU,
55 30 45 SULAWESI TENGAH - 94118
D16-200
48 MENGETAHUI OLEH :
D16-200
55 DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

HWF 300.300

Base Plate 2 cm
55
Grouting 3 cm
AGUNG NUR ROHMAD, ST.,MM.
20-D16
NIP. 19760725B200501 1 001
Angkur Ø19 mm DISETUJUI OLEH :
STD-00-IAB019

50 D16-200 PEJABAT PEMBUAT


PEJABAT PEMBUAT KOMITMEN
KOMITMEN (PPK)
D10-100 62

ADITYA WIBAWA S.P, ST


D16-200 60 NIP.AKHIRUDIN,
19860707 201503 1 003
S.T.,M.Ec.Dev
70
NIP. 19851004200912 1 001

DI BUAT OLEH :
5
5
Lantai Kerja
Pasir Urug
KONSULTAN PERENCANA

5 150 5
160

Detail PILE CAP PP-1 Detail Join Kolom Baja K-1 BAMBANG RIYANTO

SKALA 1:30 SKALA 1:30 TEAM LEADER

Digambar -

Diperiksa -

Disetujui -
Nama Gambar Skala

RENCANA -
1:30
PILE CAPE

Kode Gmbr. No. Lembar Jml. Lembar

STR 16 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :

PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH

PEKERJAAN :

PEMBANGUNAN WORKSHOP MANUFAKTUR,


REFRIGASI, DAN KANTOR TAHAP II
150

53 45 53 TAHUN ANGGARAN :

16-D16 2023
28

LOKASI :

D16-200

D16-200
35
45 100 20 JL. KELINCI, TALISE,
D10-100
KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118

D16-200 45 20 35
28 MENGETAHUI OLEH :
D16-200
DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI
45
45

Kolom HWF 200.200

Base Plate 1,5 mm


Grouting 3 cm
16-D16
AGUNG NUR ROHMAD, ST.,MM.
NIP. 19760725B200501 1 001
Angkur Ø19 mm
STD-00-IAB019
DISETUJUI OLEH :
D16-200
50
D10-100 PEJABAT PEMBUAT KOMITMEN (PPK)
62 PEJABAT PEMBUAT KOMITMEN

D16-200 60 ADITYA WIBAWA S.P, ST


70
NIP.AKHIRUDIN,
19860707 S.T.,M.Ec.Dev
201503 1 003
NIP. 19851004200912 1 001
5
5 DI BUAT OLEH :
Lantai Kerja
Pasir Urug
KONSULTAN PERENCANA

5 150 5
160

Detail Join Kolom Baja K-2


Detail PILE CAP PP-2 SKALA 1:30 BAMBANG RIYANTO
SKALA 1:30 TEAM LEADER

Digambar -

Diperiksa -

Disetujui -
Nama Gambar Skala

RENCANA -
1:30
PILE CAPE

Kode Gmbr. No. Lembar Jml. Lembar

STR 17 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :

PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH

PEKERJAAN :

PEMBANGUNAN WORKSHOP MANUFAKTUR,


REFRIGASI, DAN KANTOR TAHAP II

TAHUN ANGGARAN :

150 2023
50 50 50
LOKASI :

JL. KELINCI, TALISE,


10-D16 35 KECAMATAN PALU TIM., KOTA PALU,
D16-200

D16-200
SULAWESI TENGAH - 94118
16 D16
30 100 Begel 40 MENGETAHUI OLEH :
D10-100 D10-100
30
DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

D16-200 35 30 15 20
D16-200
50
50
AGUNG NUR ROHMAD, ST.,MM.
Kolom IWF 300.150.6,5.9
NIP. 19760725B200501 1 001
Base Plate 1,5 mm
Grouting 3 cm DISETUJUI OLEH :
10-D16 PEJABAT PEMBUAT KOMITMEN (PPK)
PEJABAT PEMBUAT KOMITMEN
Angkur Ø19 mm
STD-00-IAB019

D16-200
50
D10-100 62

ADITYA WIBAWA S.P, ST


NIP.AKHIRUDIN,
19860707 S.T.,M.Ec.Dev
201503 1 003
NIP. 19851004200912 1 001

D16-200 60 DI BUAT OLEH :


70

5 KONSULTAN PERENCANA
5
Lantai Kerja
Pasir Urug

5 150 5
BAMBANG RIYANTO
160
Detail Join Kolom Baja K-3 TEAM LEADER

Detail PILE CAP PP-3 SKALA 1:30 Digambar -

SKALA 1:30 Diperiksa -

Disetujui -
Nama Gambar Skala

RENCANA -
1:30
PILE CAPE

Kode Gmbr. No. Lembar Jml. Lembar

STR 18a 109


KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :

PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH

PEKERJAAN :

PEMBANGUNAN WORKSHOP MANUFAKTUR,


REFRIGASI, DAN KANTOR TAHAP II

TAHUN ANGGARAN :

100 2023
28 45 28
LOKASI :

16-D16 JL. KELINCI, TALISE,


28
KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118

D16-200
D16-200
35
20 MENGETAHUI OLEH :
D10-100 45 100
DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI
45 20 35
D16-200 28
D16-200
45
45
AGUNG NUR ROHMAD, ST.,MM.
Kolom HWF 200.200 NIP. 19760725B200501 1 001
Base Plate 1,5 mm
Grouting 3 cm
DISETUJUI OLEH :
16-D16 PEJABAT PEMBUAT KOMITMEN (PPK)
PEJABAT PEMBUAT KOMITMEN
Angkur Ø19 mm
STD-00-IAB019

50
D10-100 92
ADITYA WIBAWA S.P, ST
AKHIRUDIN,
NIP. 19860707 S.T.,M.Ec.Dev
201503 1 003
NIP. 19851004200912 1 001
D16-200
D16-200

60 DI BUAT OLEH :
70

5 KONSULTAN PERENCANA
5
Lantai Kerja
Pasir Urug
5 100 5
110

Detail PILE CAP PP-4 Detail Join Kolom Baja K-2 (PP-4)
SKALA 1:30 SKALA 1:30 BAMBANG RIYANTO
TEAM LEADER

Digambar -

Diperiksa -

Disetujui -
Nama Gambar Skala

RENCANA -
1:30
PILE CAPE

Kode Gmbr. No. Lembar Jml. Lembar

STR 18b 109


A B C D E F G H
500 400 500 600 500 400 500

1 KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :
400

400
PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH

2 PEKERJAAN :

PEMBANGUNAN WORKSHOP MANUFAKTUR,


REFRIGASI, DAN KANTOR TAHAP II

TAHUN ANGGARAN :
600

600
2023
LOKASI :

JL. KELINCI, TALISE,


KECAMATAN PALU TIM., KOTA PALU,
3 SULAWESI TENGAH - 94118

MENGETAHUI OLEH :

2345
DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI
600

600
AGUNG NUR ROHMAD, ST.,MM.
NIP. 19760725B200501 1 001
DISETUJUI OLEH :

PEJABAT PEMBUAT
PEJABAT KOMITMEN
PEMBUAT (PPK)
KOMITMEN
4

ADITYA WIBAWA S.P, ST


400

400
NIP. 19860707
AKHIRUDIN, 201503 1 003
S.T.,M.Ec.Dev
NIP. 19851004200912 1 001

DI BUAT OLEH :
5
KONSULTAN PERENCANA
345

345
6
BAMBANG RIYANTO
TEAM LEADER

500 400 500 600 500 400 500 Digambar -

Diperiksa -
3400
Disetujui -
DENAH RENCANA SLOOF Nama Gambar Skala
Skala 1:130

DENAH RENCANA -
1:130
SLOOF
Keterangan
Sloof 50x30cm Kode Gmbr. No. Lembar Jml. Lembar

STR 19 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :

PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH

PEKERJAAN :

PEMBANGUNAN WORKSHOP MANUFAKTUR,


REFRIGASI, DAN KANTOR TAHAP II
10-D16 D10-150

TAHUN ANGGARAN :

50
2023
5 LOKASI :
5
JL. KELINCI, TALISE,
KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118

MENGETAHUI OLEH :

DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

500

C5 D5 AGUNG NUR ROHMAD, ST.,MM.


NIP. 19760725B200501 1 001
DISETUJUI OLEH :

PEJABAT PEMBUAT
PEJABAT PEMBUATKOMITMEN (PPK)
KOMITMEN
10-D16
30
Detail Pot Sloof C5-D5
SKALA 1:30
ADITYA WIBAWA S.P, ST
NIP.AKHIRUDIN,
19860707 201503 1 003
S.T.,M.Ec.Dev
50

D10-150 NIP. 19851004200912 1 001

DI BUAT OLEH :

Rabat Beton
5 5

Pasir Urug
KONSULTAN PERENCANA
0 40

Detail POT.Sloof
SKALA 1:20

BAMBANG RIYANTO
TEAM LEADER

Digambar -

Diperiksa -

Disetujui -
Nama Gambar Skala

RENCANA -
1:30
SLOOF

Kode Gmbr. No. Lembar Jml. Lembar

STR 20 109
A B C D E F G H
500 400 500 600 500 400 500

120 120 KEMENTRIAN


KETENAGAKERJAAN
1 REPUBLIK INDONESIA
KEGIATAN :

PERENCANAAN PEMBANGUNAN
400

400
BLK PALU
SULAWESI TENGAH
PL
PEKERJAAN :

2
PEMBANGUNAN WORKSHOP MANUFAKTUR,
REFRIGASI, DAN KANTOR TAHAP II

Wiremesh ∅8-150 TAHUN ANGGARAN :

Wiremesh ∅8-150
520

520
2023
600

600
LOKASI :

JALUR KABEL TRAY JL. KELINCI, TALISE,


KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118

80

80
3 MENGETAHUI OLEH :

DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

2345
600

600
AGUNG NUR ROHMAD, ST.,MM.
NIP. 19760725B200501 1 001
DISETUJUI OLEH :

PEJABAT PEMBUAT KOMITMEN (PPK)


PEJABAT PEMBUAT KOMITMEN

ADITYA WIBAWA S.P, ST


AKHIRUDIN,
NIP. 19860707 S.T.,M.Ec.Dev
201503 1 003
400

400
NIP. 19851004200912 1 001

DI BUAT OLEH :

5 KONSULTAN PERENCANA
345

345
330

330
RAMP COR BETON RAMP COR BETON
BAMBANG RIYANTO
6 TEAM LEADER
370 370
Digambar -

500 400 500 600 500 400 500 Diperiksa -

Disetujui -
3400 Nama Gambar Skala
DENAH RENCANA SLOOF
Skala 1:130 DENAH RENCANA -
1:130
PLAT LANTAI

Kode Gmbr. No. Lembar Jml. Lembar

STR 21 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :

PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH
Wiremesh ∅8-150
PEKERJAAN :

10
5 PEMBANGUNAN WORKSHOP MANUFAKTUR,
5
REFRIGASI, DAN KANTOR TAHAP II
Lantai Kerja
Pasir Urug
TAHUN ANGGARAN :

2023
80 520 LOKASI :

JL. KELINCI, TALISE,


KECAMATAN PALU TIM., KOTA PALU,
600 SULAWESI TENGAH - 94118

MENGETAHUI OLEH :

A3 A2 DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

Detail Pot. Plat Lantai 1 (A3-A2)


AGUNG NUR ROHMAD, ST.,MM.
SKALA 1:30 NIP. 19760725B200501 1 001
DISETUJUI OLEH :

26 PEJABAT PEMBUAT KOMITMEN (PPK)


PEJABAT PEMBUAT KOMITMEN
8 10 8
Besi Plat 3mm
∅8-150 Rangka Penutup Besi L 4x4

ADITYA WIBAWA S.P, ST


NIP.AKHIRUDIN,
19860707 S.T.,M.Ec.Dev
201503 1 003
NIP. 19851004200912 1 001

38
DI BUAT OLEH :

5 5

KONSULTAN PERENCANA

36

Detail POT.Kabel Tray Lantai


SKALA 1:20

BAMBANG RIYANTO
TEAM LEADER

Digambar -

Diperiksa -

Disetujui -
Nama Gambar Skala

RENCANA -
1:30
PLAT LANTAI

Kode Gmbr. No. Lembar Jml. Lembar

STR 22 109
A B C D E F G H
500 400 500 600 500 400 500
100 400 400 100
400 100 100 400 KEMENTRIAN
KETENAGAKERJAAN
1 KP KP REPUBLIK INDONESIA
K2-a K3 K3 K1-a K1-a KP K3 K3 KP
K2-a
KEGIATAN :
200

200
PERENCANAAN PEMBANGUNAN
400

400
BLK PALU
KP KP
SULAWESI TENGAH
200

200
PEKERJAAN :
300 300
K1-b K1-b
2 KP KP KP
K2-a K4 K4 K2-a PEMBANGUNAN WORKSHOP MANUFAKTUR,
100 100 REFRIGASI, DAN KANTOR TAHAP II

270
300

300
TAHUN ANGGARAN :

450

450
100 100

2023
600

600
KP KP KP

85
KP KP
KP KP LOKASI :

95
300

300
KP KP KP KP JL. KELINCI, TALISE,
200 200 200

150

150
KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118
3 KP
K2-a K4 K1-a K1-a K4 MENGETAHUI OLEH :
K2-a

DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI


300

300

2345
395

400
600

600
KP KP
AGUNG NUR ROHMAD, ST.,MM.
NIP. 19760725B200501 1 001
K2 KP
300

300
DISETUJUI OLEH :
205

200
PEJABAT PEMBUAT
PEJABAT KOMITMEN
PEMBUAT (PPK)
KOMITMEN
4 KP KP KP KP KP KP KP KP
K2-a K1-a K1-a K2-a
200

200
ADITYA WIBAWA S.P, ST
AKHIRUDIN,
NIP. 19860707S.T.,M.Ec.Dev
201503 1 003
400

400
KP KP NIP. 19851004200912 1 001
200

200
DI BUAT OLEH :

K1-a K1-a
5 KP KP KP KP KP KP KP
K2-a K3 K3 KP KP KP K3 K3 K2-a KONSULTAN PERENCANA
100 140 260 250 198 53 53 53 53 198 250 260 140 100
345

345
6 BAMBANG RIYANTO
K2-b K2-b TEAM LEADER

Digambar -
500 400 500 600 500 400 500 Diperiksa -

Disetujui -
3400
Nama Gambar Skala

Keterangan DENAH RENCANA KOLOM LT.1 DENAH RENCANA -


1:130
Skala 1:130 KOLOM LANTAI 1
K1 = H-WF 300.300.10.15mm
K2 = H-WF 200X200.8.12mm Kode Gmbr. No. Lembar Jml. Lembar
K3 = I-WF 150.300.6,5.9mm
K4 = Kolom 15x30cm
KP = Kolom Praktis STR 23 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :

PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH

PEKERJAAN :

PEMBANGUNAN WORKSHOP MANUFAKTUR,


REFRIGASI, DAN KANTOR TAHAP II

TAHUN ANGGARAN :

2023
LOKASI :
400
K3 K1 JL. KELINCI, TALISE,
KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118

MENGETAHUI OLEH :

DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

AGUNG NUR ROHMAD, ST.,MM.


NIP. 19760725B200501 1 001

KP KP KP DISETUJUI OLEH :

PEJABAT PEMBUAT
PEJABAT KOMITMEN
PEMBUAT (PPK)
KOMITMEN
K3 K1

ADITYA WIBAWA S.P, ST


NIP. 19860707
AKHIRUDIN, 201503 1 003
S.T.,M.Ec.Dev
NIP. 19851004200912 1 001

DI BUAT OLEH :

KONSULTAN PERENCANA

250 198 53 53 BAMBANG RIYANTO


TEAM LEADER

Digambar -
500
Diperiksa -

Disetujui -
D5 E5 Nama Gambar Skala

DENAH RENCANA
KOLOM LANTAI 1 -
1:30

Detail POT KOLOM D5-E5


Kode Gmbr. No. Lembar Jml. Lembar
SKALA 1:30
STR 24 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :

PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH

PEKERJAAN :

PEMBANGUNAN WORKSHOP MANUFAKTUR,


REFRIGASI, DAN KANTOR TAHAP II

TAHUN ANGGARAN :

2023
LOKASI :

400
K2 JL. KELINCI, TALISE,
KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118

MENGETAHUI OLEH :

DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

AGUNG NUR ROHMAD, ST.,MM.


NIP. 19760725B200501 1 001
DISETUJUI OLEH :
K4
PEJABAT PEMBUAT
PEJABAT PEMBUAT KOMITMEN
KOMITMEN (PPK)

K2

ADITYA WIBAWA S.P, ST


NIP. 19860707
AKHIRUDIN, 201503 1 003
S.T.,M.Ec.Dev
NIP. 19851004200912 1 001

DI BUAT OLEH :

KONSULTAN PERENCANA

100 BAMBANG RIYANTO


TEAM LEADER

Digambar -
A3 Diperiksa -

Disetujui -
Nama Gambar Skala
Detail POT KOLOM A3
RENCANA
SKALA 1:30 KOLOM LANTAI 1 -
1:30

Kode Gmbr. No. Lembar Jml. Lembar

STR 25 109
45
30

35
20
55 30 45

45 20 35
KEMENTRIAN
KETENAGAKERJAAN
55
REPUBLIK INDONESIA
45
KEGIATAN :
HWF 300.300
Kolom HWF 200.200
PERENCANAAN PEMBANGUNAN
Base Plate 2 cm Base Plate 1,5 mm
Grouting 3 cm
BLK PALU
Grouting 3 cm
SULAWESI TENGAH

Angkur Ø19 mm
PEKERJAAN :
Angkur Ø19 mm
STD-00-IAB019 STD-00-IAB019

PEMBANGUNAN WORKSHOP MANUFAKTUR,


REFRIGASI, DAN KANTOR TAHAP II

TAHUN ANGGARAN :

2023
LOKASI :

JL. KELINCI, TALISE,


KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118

MENGETAHUI OLEH :

DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

Detail Join Kolom Baja K-1 Detail Join Kolom Baja K-2
SKALA 1:30 SKALA 1:30

AGUNG NUR ROHMAD, ST.,MM.


NIP. 19760725B200501 1 001
40
DISETUJUI OLEH :
30
PEJABAT PEMBUAT
PEJABAT PEMBUAT KOMITMEN (PPK)
KOMITMEN
30 15 20

50

ADITYA WIBAWA S.P, ST


Kolom IWF 300.150.6,5.9 NIP. AKHIRUDIN,
19860707S.T.,M.Ec.Dev
201503 1 003
Base Plate 1,5 mm
NIP. 19851004200912 1 001
Grouting 3 cm
DI BUAT OLEH :

Angkur Ø19 mm
STD-00-IAB019

KONSULTAN PERENCANA

BAMBANG RIYANTO
TEAM LEADER

Digambar -

Diperiksa -

Disetujui -
Nama Gambar Skala

Detail Join Kolom Baja K-3 RENCANA


KOLOM LANTAI 1 -
1:30

SKALA 1:30
Kode Gmbr. No. Lembar Jml. Lembar

STR 26 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :

PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH

PEKERJAAN :

PEMBANGUNAN WORKSHOP MANUFAKTUR,


REFRIGASI, DAN KANTOR TAHAP II

Angkur ∅10-500
30 TAHUN ANGGARAN :

30 Pas Bata
15 2023

30
5

15
LOKASI :
30

∅6-15

13

30
JL. KELINCI, TALISE,
Cor Beton KECAMATAN PALU TIM., KOTA PALU,
40
SULAWESI TENGAH - 94118
Detail K1-a Detail K1-b 6-∅8
(H-WF 300.300.10.15mm) (H-WF 300.300.10.15mm
SKALA 1:20 Finshing Cor Beton Area Luar)
Detail Pot.Kolom K-4 MENGETAHUI OLEH :

SKALA 1:20 SKALA 1:20 DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

AGUNG NUR ROHMAD, ST.,MM.


NIP. 19760725B200501 1 001
DISETUJUI OLEH :

PEJABAT PEMBUAT
PEJABAT KOMITMEN
PEMBUAT (PPK)
KOMITMEN

Angkur ∅10-500
20
20 ADITYA WIBAWA S.P, ST
Angkur ∅10-500 15 NIP. 19860707
AKHIRUDIN, 201503 1 003
S.T.,M.Ec.Dev
30
12

NIP. 19851004200912 1 001


20

30
20

12

15
15
∅6-15 DI BUAT OLEH :

Cor Beton Cor Beton 4-∅8


Detail K2-a 30 Detail K3
(H-WF 200X200.8.12mm) Detail K2-b (I-WF 150.300.6,5.9mm
Detail Pot.Kolom Praktis KP KONSULTAN PERENCANA
SKALA 1:20 (H-WF 200X200.8.12mm Finishing Cor Beton Area Luar) SKALA 1:20
Finishing Cor Beton) SKALA 1:20
SKALA 1:20

BAMBANG RIYANTO
TEAM LEADER

Digambar -

Diperiksa -

Disetujui -
Nama Gambar Skala

RENCANA
KOLOM LANTAI 1 -
1:20

Kode Gmbr. No. Lembar Jml. Lembar

STR 27 109
A B C D E F G H
500 400 500 600 500 400 500
100 400 400 100
400 100 100 400

1 KEMENTRIAN
K2-a
K2-a KETENAGAKERJAAN

BL

BL
REPUBLIK INDONESIA
200

200
KEGIATAN :
400

400
PERENCANAAN PEMBANGUNAN
BLK PALU
BL

BL
200

200
SULAWESI TENGAH
300 300
2 BL
PEKERJAAN :
K2-a BL K2-a
100
PEMBANGUNAN WORKSHOP MANUFAKTUR,
BL

BL
270
300

300
REFRIGASI, DAN KANTOR TAHAP II

450

450
100 100
TAHUN ANGGARAN :
600

600
2023
BL

BL
BL
BL
300

300
LOKASI :
200 200 200

150

150
BL
JL. KELINCI, TALISE,
3 KECAMATAN PALU TIM., KOTA PALU,
K2-a SULAWESI TENGAH - 94118
K2-a

MENGETAHUI OLEH :

300
BL

BL

2345
DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI
600

600
BL

BL
300

300
AGUNG NUR ROHMAD, ST.,MM.
NIP. 19760725B200501 1 001

BL

BL
DISETUJUI OLEH :
BL BL BL BL
4 PEJABAT PEMBUAT
PEJABAT PEMBUATKOMITMEN (PPK)
KOMITMEN
K2-a K2-a

200
BL

BL
400

400
ADITYA WIBAWA S.P, ST
NIP.AKHIRUDIN,
19860707 S.T.,M.Ec.Dev
201503 1 003
BL

BL

200
NIP. 19851004200912 1 001

BL BL BL BL BL BL BL DI BUAT OLEH :
5
K2-a
K2-a

KONSULTAN PERENCANA
345

345
6
BAMBANG RIYANTO
TEAM LEADER

500 400 500 600 500 400 500 Digambar -

Diperiksa -
3400
Disetujui -
DENAH RENCANA BALOK LATAI EV +2.60
Skala 1:130
Nama Gambar Skala
11

DENAH RENCANA -
1:130
BALOK LATAI LANTAI 1
15

Keterangan ∅6-15

BL=Balok Latai 11x15cm 4-∅8 Kode Gmbr. No. Lembar Jml. Lembar
Dinding Bata Detail Pot.Balok Latai
SKALA 1:20

STR 28 109
A B C D E F G H
500 400 500 600 500 400 500
100 400 400 100
2a 2a 2a 2a 2a 2a 2a 2a 2a 2a 2a 2a

1 KEMENTRIAN
3a 3c 3a 3a 3c 3a KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :
400

400
PERENCANAAN PEMBANGUNAN
100 BLK PALU
3a 3a
100
3a 3a SULAWESI TENGAH
1b 1b

2 PEKERJAAN :
1b 1b
3a 3b 1a 1a 3b 3a

200

200
PEMBANGUNAN WORKSHOP MANUFAKTUR,
4b 4b
REFRIGASI, DAN KANTOR TAHAP II

4a 3b 3b 4a
TAHUN ANGGARAN :

200

200
600

600
4b 4b
2023
4a 3b 3b 4a
LOKASI :

200

200
23 167.5
3a 3b 1a 1a 3b 3a
1b 1b
JL. KELINCI, TALISE,
3 KECAMATAN PALU TIM., KOTA PALU,
1b 3b 1b SULAWESI TENGAH - 94118
3b 1a 3b
3a 1a 3a

180
200

200
3d
MENGETAHUI OLEH :

2345
4b 4b

DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI


3b
4a 3d 4a

220
600

200

200

600
3d
4b 4b

4a 3b 3b 4a
AGUNG NUR ROHMAD, ST.,MM.
200

200
190 NIP. 19760725B200501 1 001
1a 1a
3a 3b 3b 3a
1b 1b DISETUJUI OLEH :
RB RB RB RB RB RB
RB
4 PEJABAT PEMBUAT KOMITMEN (PPK)
PEJABAT PEMBUAT KOMITMEN
1b 1b
3a 1a 1a 3a
3b 3b
200

200
4b 4b
400

400
RB RB RB RB

4a 3b 3b 4a ADITYA WIBAWA S.P, ST


NIP.AKHIRUDIN,
19860707 201503 1 003
S.T.,M.Ec.Dev
200

200
3a
Khusus Balok Baja Ini +4.30
3c 1a Khusus Balok Baja Ini +4.30
3a
NIP. 19851004200912 1 001
1a 3c
1b 1b

5 DI BUAT OLEH :
2a 2a 2a 2a 2a 2a 2a 2a 2a 2a 2a 2a
2b 2b
100 400 400 100
KONSULTAN PERENCANA
345

345
2b 2b

6
2a 2a
BAMBANG RIYANTO
TEAM LEADER
500 400 500 600 500 400 500
Digambar -

Diperiksa -
3400

Disetujui -
DENAH RENCANA BALOK LANTAI EV +4.00
Skala 1:130
Nama Gambar Skala
Keterangan
Catatan
1 = I-WF 150.300.6,5.9mm
DENAH RENCANA -
2 = I-WF 125X250.6.9mm Setiap Balok Baja Area Luar Bangunan BALOK LANTAI
1:130

3 = I-WF 100.200.5,5.8mm Yang Sejajar Dengan Pasangan Dinding


4 = I-WF 75.150.5.7mm Di Lakukan Pengecoran Area Luar Balok Kode Gmbr. No. Lembar Jml. Lembar
RB= Ring Balk Praktis

Catatan
STR 29 109
30 30

KEMENTRIAN
27 KETENAGAKERJAAN
H-WF 300.300.10.15mm I-WF 150.300.6,5.9mm
15 REPUBLIK INDONESIA
6 - Baut HTB 6 - Baut HTB
+ 4.00
A325 Dia.16mm A325 Dia.16mm KEGIATAN :

7
I-WF 150.300.6,5.9mm

8
PERENCANAAN PEMBANGUNAN

30

30

30
8
T Joint H-WF 300.300.10.15mm End Plate T=12.150.610mm BLK PALU

8
SULAWESI TENGAH

8
H-WF 300.300.10.15m

8
61

60
61
8
End Plate T=12.150.610mm

8
PEKERJAAN :

8 8
30

29

30
Vouter

8
I-WF 150.300.6,5.9mm
PEMBANGUNAN WORKSHOP MANUFAKTUR,

7
6 - Baut HBT REFRIGASI, DAN KANTOR TAHAP II
6 - Baut HBT
A325 Dia.16mm
A325 Dia.16mm
51
Vouter
CT.I-WF 150.300.6,5.9mm TAHUN ANGGARAN :
27
15

6 - Baut HTB 2023


A325 Dia.16mm
End Plate T=12.150.610mm I-WF 150.300.6,5.9mm
LOKASI :
T Joint H-WF 300.300.10.15m
JL. KELINCI, TALISE,

15
KECAMATAN PALU TIM., KOTA PALU,
Detail Sambungan Baja (1a)
30

SULAWESI TENGAH - 94118


H-WF 300.300.10.15mm
I-WF 150.300.6,5.9mm MENGETAHUI OLEH :
SKALA 1:20
30 DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

30

30 AGUNG NUR ROHMAD, ST.,MM.


NIP. 19760725B200501 1 001
DISETUJUI OLEH :
I-WF 150.300.6,5.9mm
PEJABAT PEMBUAT
PEJABAT KOMITMEN
PEMBUAT (PPK)
KOMITMEN
15
6 - Baut HTB 6 - Baut HTB + 4.00
A325 Dia.16mm A325 Dia.16mm
7

7
8

8
I-WF 150.300.6,5.9mm
30

30

30
ADITYA WIBAWA S.P, ST
8

8
End Plat T=12.150.610mm
H-WF 300.300.10.15mm AKHIRUDIN,
NIP. 19860707S.T.,M.Ec.Dev
201503 1 003
8

8
H-WF 300.300.10.15mm NIP. 19851004200912 1 001
61

61

61
8

8
DI BUAT OLEH :
8

8
Vouter
30

30

31
CT.I-WF 150.300.6,5.9mm
8

8
7

6 - Baut HBT 6 - Baut HTB


KONSULTAN PERENCANA
A325 Dia.16mm A325 Dia.16mm
51 VouteR
CT.I-WF 150.300.6,5.9mm
12 - Baut HTB
30 A325 Dia.16mm
End Plat T=12.150.610mm

I-WF 150.300.6,5.9mm
BAMBANG RIYANTO
30

15

TEAM LEADER
Detail Sambungan Baja (1b) H-WF 300.300.10.15mm
I-WF 150.300.6,5.9mm Digambar -
SKALA 1:20
Diperiksa -

Disetujui -
Nama Gambar Skala

RENCANA -
1:20
BALOK LANTAI

Kode Gmbr. No. Lembar Jml. Lembar

STR 30 109
30
30

KEMENTRIAN
KETENAGAKERJAAN
I-WF 125X250.6.9mm
REPUBLIK INDONESIA
15 H-WF 300.300.10.15mm KEGIATAN :
6 - Baut HTB 6 - Baut HTB + 4.00
A325 Dia.16mm A325 Dia.16mm

8 5

8 5
PERENCANAAN PEMBANGUNAN
I-WF 125X250.6.9mm End Plat T=12.150.510mm
BLK PALU

25

25

25
SULAWESI TENGAH

10 5 8

10 5 8
End Plat T=12.150.610mm H-WF 300.300.10.15mm

50
51

51
T Joint H-WF 300.300.10.15mm PEKERJAAN :

25

25

25
8

8
Vouter
I-WF 150.300.6,5.9mm PEMBANGUNAN WORKSHOP MANUFAKTUR,

8
4 - Baut HTB 4 - Baut HTB REFRIGASI, DAN KANTOR TAHAP II
A325 Dia.16mm A325 Dia.16mm
Vouter
31 CT.I-WF 125X250.6.9mm
TAHUN ANGGARAN :

30
2023
LOKASI :

30
T Joint H-WF 300.300.10.15mm
JL. KELINCI, TALISE,

15
H-WF 300.300.10.15mm

10 - Baut HBT
Detail Sambungan Baja (2b) KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118
27
A325 Dia.16mm I-WF 125X250.6.9mm
I-WF 125X250.6.9mm
SKALA 1:20 MENGETAHUI OLEH :

DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI


12.5

30
AGUNG NUR ROHMAD, ST.,MM.
30
NIP. 19760725B200501 1 001
DISETUJUI OLEH :

PEJABAT PEMBUAT
PEJABAT KOMITMEN
PEMBUAT (PPK)
KOMITMEN
I-WF 125X250.6.9mm

15
6 - Baut HTB 6 - Baut HTB + 4.00
A325 Dia.16mm A325 Dia.16mm
8 5

8 5
I-WF 125X250.6.9mm End Plat T=12.150.510mm ADITYA WIBAWA S.P, ST
AKHIRUDIN, S.T.,M.Ec.Dev
25

25

25
NIP. 19860707 201503 1 003
10 5 8

10 5 8
End Plat T=12.150.610mm H-WF 300.300.10.15mm NIP. 19851004200912 1 001

50
51

51
H-WF 300.300.10.15mm DI BUAT OLEH :
Vouter
25

25

25
8

8
CT.I-WF 125X250.6.9mm
8

8
4 - Baut HTB 4 - Baut HTB KONSULTAN PERENCANA
A325 Dia.16mm A325 Dia.16mm
Vouter
31 CT.I-WF 125X250.6.9mm

10 - Baut HTB BAMBANG RIYANTO


30 A325 Dia.16mm TEAM LEADER
End Plat T=12.150.510mm
Digambar -
Detail Sambungan Baja (2a)
12.5
30

Diperiksa -
I-WF 125X250.6.9mm H-WF 300.300.10.15mm
SKALA 1:20 Disetujui -
I-WF 125X250.6.9mm
Nama Gambar Skala

RENCANA -
1:20
BALOK LANTAI

Kode Gmbr. No. Lembar Jml. Lembar

STR 31 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :

2 - Baut HTB 2 - Baut HTB


A325 Dia.16mm A325 Dia.16mm PERENCANAAN PEMBANGUNAN
20 20 15 I-WF 100.200.5,5.8mm 12.5 I-WF 100.200.5,5.8mm BLK PALU
2 - Baut HTB + 4.00 + 4.00 SULAWESI TENGAH
Joint Plat T=12.100.150mm A325 Dia.16mm

7
10
2 - Baut HTB 10 PEKERJAAN :

20

20
+ 4.00

7
25
23
A325 Dia.16mm

28
30
15 3

15 3

7
4 7 4

4 7 4
20

20
15
Joint Plat T=12.60.230mm PEMBANGUNAN WORKSHOP MANUFAKTUR,
Joint Plat T=12.70.280mm 6 I-WF 125X250.6.9mm REFRIGASI, DAN KANTOR TAHAP II
3

3
7 I-WF 150.300.6,5.9mm
I-WF 100.200.5,5.8mm I-WF 100.200.5,5.8mm
15 12.5
H-WF 200X200.8.12mm Joint Plat T=12.100.150mm I-WF 125X250.6.9mm TAHUN ANGGARAN :
I-WF 150.300.6,5.9mm
2 - Baut HTB 2 - Baut HTB
H-WF 200X200.8.12mm 6 A325 Dia.16mm 5 A325 Dia.16mm
2023

10

10
20
Joint Plat T=12.100.150mm I-WF 100.200.5,5.8mm
10 7 6 LOKASI :
I-WF 100.200.5,5.8mm I-WF 100.200.5,5.8mm
2 - Baut HTB
A325 Dia.16mm H-WF 200X200.8.12mm Joint Plat T=12.70.280mm Joint Plat T=12.70.280mm
JL. KELINCI, TALISE,
15 13 KECAMATAN PALU TIM., KOTA PALU,
10

20

SULAWESI TENGAH - 94118


10

Detail Sambungan Baja (3a) Detail Sambungan Baja (3b) Detail Sambungan Baja (3c) MENGETAHUI OLEH :
I-WF 100.200.5,5.8mm I-WF 100.200.5,5.8mm I-WF 100.200.5,5.8mm
DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI
SKALA 1:20 SKALA 1:20 SKALA 1:20
10

AGUNG NUR ROHMAD, ST.,MM.


NIP. 19760725B200501 1 001
DISETUJUI OLEH :
2 - Baut HTB 2 - Baut HTB 2 - Baut HTB
A325 Dia.16mm A325 Dia.16mm A325 Dia.16mm PEJABAT PEMBUAT
PEJABAT PEMBUAT KOMITMEN
KOMITMEN (PPK)
10 I-WF 100.200.5,5.8mm 15 + 4.00
I-WF 75.150.5.7mm 10 + 4.00
I-WF 75.150.5.7mm
+ 4.00
28 4 7 4

4 7 4
15

15
7

20

18
20

20
18
7

30

ADITYA WIBAWA S.P, ST


7

Joint Plat T=12.50.180mm


5 Joint Plat T=12.50.180mm 5
I-WF 100.200.5,5.8mm
NIP.AKHIRUDIN,
19860707 201503 1 003
S.T.,M.Ec.Dev
Joint Plat T=12.70.280mm
I-WF 100.200.5,5.8mm NIP. 19851004200912 1 001
7
I-WF 150.300.6,5.9mm

10 DI BUAT OLEH :
I-WF 100.200.5,5.8mm
2 - Baut HTB I-WF 150.300.6,5.9mm I-WF 100.200.5,5.8mm
4 A325 Dia.16mm 2 - Baut HTB 2 - Baut HTB
A325 Dia.16mm A325 Dia.16mm KONSULTAN PERENCANA
6 4 11
10

8
5
I-WF 100.200.5,5.8mm

15
7 5 ∅6-15
I-WF 75.150.5.7mm I-WF 75.150.5.7mm
Joint Plat T=12.70.280mm
Joint Plat T=12.70.280mm Joint Plat T=12.50.180mm 4-∅8
10 15 10
Detail Ring Balk Praktis BAMBANG RIYANTO
Detail Sambungan Baja (3c) Detail Sambungan Baja (4a) Detail Sambungan Baja (4b) SKALA 1:20 TEAM LEADER
I-WF 100.200.5,5.8mm I-WF 75.150.5.7mm I-WF 75.150.5.7mm -
Digambar
SKALA 1:20 SKALA 1:20 SKALA 1:20
Diperiksa -

Disetujui -
Nama Gambar Skala

RENCANA -
1:20
BALOK LANTAI

Kode Gmbr. No. Lembar Jml. Lembar

STR 32 109
A B C D E F G H
500 400 500 600 500 400 500
100 400 400 100 KEMENTRIAN
KETENAGAKERJAAN
1 REPUBLIK INDONESIA
KEGIATAN :

PERENCANAAN PEMBANGUNAN
BLK PALU
400

400
SULAWESI TENGAH

PEKERJAAN :
108 600 108
2 PEMBANGUNAN WORKSHOP MANUFAKTUR,
REFRIGASI, DAN KANTOR TAHAP II

Bondek Wija Truss

Wiremesh ∅8-150
TAHUN ANGGARAN :

2023
600

600
615
LOKASI :

JL. KELINCI, TALISE,


KECAMATAN PALU TIM., KOTA PALU,
432 168 SULAWESI TENGAH - 94118

2000
3 MENGETAHUI OLEH :

165
DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

385
30

220
600

600
AGUNG NUR ROHMAD, ST.,MM.
NIP. 19760725B200501 1 001
402 DISETUJUI OLEH :

PEJABAT PEMBUAT KOMITMEN (PPK)


PEJABAT PEMBUAT KOMITMEN
PL2
4
615

Wiremesh ∅8-150 ADITYA WIBAWA S.P, ST


AKHIRUDIN,
NIP. 19860707S.T.,M.Ec.Dev
201503 1 003
400

400
NIP. 19851004200912 1 001

DI BUAT OLEH :

5
KONSULTAN PERENCANA

500 400 500 600 500 400 500

3400
BAMBANG RIYANTO
DENAH RENCANA PLAT LANTAI EV + 4.15 LT.2 TEAM LEADER
Skala 1:130

Digambar -

Diperiksa -

Disetujui -
Nama Gambar Skala

RENCANA -
1:130
PLAT LANTAI 2

Kode Gmbr. No. Lembar Jml. Lembar

STR 33 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :

PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH

PEKERJAAN :

PEMBANGUNAN WORKSHOP MANUFAKTUR,


REFRIGASI, DAN KANTOR TAHAP II

TAHUN ANGGARAN :

815 2023
LOKASI :
Bondek Wija Truss
JL. KELINCI, TALISE,
Wiremesh ∅8-150 KECAMATAN PALU TIM., KOTA PALU,
+ 4.15 SULAWESI TENGAH - 94118

15 MENGETAHUI OLEH :

DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

AGUNG NUR ROHMAD, ST.,MM.


100 600 100 NIP. 19760725B200501 1 001
DISETUJUI OLEH :

D4 E4 PEJABAT PEMBUAT
PEJABAT PEMBUATKOMITMEN (PPK)
KOMITMEN

800
ADITYA WIBAWA S.P, ST
Detail Pot. Plat Lantai 2 PL-2 (A3-A2) NIP.AKHIRUDIN,
19860707 201503 1 003
S.T.,M.Ec.Dev
NIP. 19851004200912 1 001
SKALA 1:30
DI BUAT OLEH :

KONSULTAN PERENCANA

BAMBANG RIYANTO
TEAM LEADER

Digambar -

Diperiksa -

Disetujui -
Nama Gambar Skala

RENCANA -
1:30
KOLOM LANTAI 2

Kode Gmbr. No. Lembar Jml. Lembar

STR 34 109
A B C D E F G H
500 400 500 600 500 400 500
100 400 400 100 100 400 400 100
KEMENTRIAN
KETENAGAKERJAAN
1 KP KP
REPUBLIK INDONESIA
K2-a K3 K3 K1-a K1-a KP K3 K3 KP
K2-a
KEGIATAN :
200

200
PERENCANAAN PEMBANGUNAN
400

400
BLK PALU
KP KP
SULAWESI TENGAH
200

200
100 300 300 100 PEKERJAAN :
K1-b K1-b
2 KP KP KP
K2-a K4 K4 PEMBANGUNAN WORKSHOP MANUFAKTUR,
K2-a
REFRIGASI, DAN KANTOR TAHAP II
300

300
TAHUN ANGGARAN :

2023
600

600
KP KP

LOKASI :
300

300
JL. KELINCI, TALISE,
KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118

2000
3 KP KP
K2-a K4 K1-a K1-a KP K4 MENGETAHUI OLEH :
K2-a

DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI


300

300
600

600
KP KP
AGUNG NUR ROHMAD, ST.,MM.
NIP. 19760725B200501 1 001
KP KP KP KP KP
300

300
100 415 185 100 DISETUJUI OLEH :

PEJABAT PEMBUAT
PEJABAT PEMBUATKOMITMEN (PPK)
KOMITMEN
4 KP KP
K2-a K1-a K1-a K2-a
200

200
ADITYA WIBAWA S.P, ST
NIP.AKHIRUDIN,
19860707 201503 1 003
S.T.,M.Ec.Dev
400

400
KP KP NIP. 19851004200912 1 001
200

200
DI BUAT OLEH :

5 KP KP
K2-a K3 K3 K1-b K1-b KP K3 K3 KP
K2-a KONSULTAN PERENCANA
100 400 400 100 300 300 100 400 400 100

500 400 500 600 500 400 500

3400
BAMBANG RIYANTO
TEAM LEADER
DENAH RENCANA KOLOM LT.2
Skala 1:130
Digambar -
Keterangan
Diperiksa -
K1 = H-WF 300X300mm
K2 = H-WF 200X200mm Disetujui -
K3 = I-WF 150X300mm
K4 = Kolom 15x30cm Nama Gambar Skala
KP = Kolom Praktis
RENCANA -
1:130
KOLOM LANTAI 2
Keterangan
Kode Gmbr. No. Lembar Jml. Lembar

STR 35 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
52 KEGIATAN :

PERENCANAAN PEMBANGUNAN
BLK PALU
25 SULAWESI TENGAH

PEKERJAAN :

PEMBANGUNAN WORKSHOP MANUFAKTUR,


REFRIGASI, DAN KANTOR TAHAP II

TAHUN ANGGARAN :

2023
LOKASI :

427 JL. KELINCI, TALISE,


KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118

350 350 MENGETAHUI OLEH :

DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

K3 K1

AGUNG NUR ROHMAD, ST.,MM.


NIP. 19760725B200501 1 001
DISETUJUI OLEH :

PEJABAT PEMBUAT
PEJABAT PEMBUATKOMITMEN (PPK)
KOMITMEN
KP
K3 K1

ADITYA WIBAWA S.P, ST


NIP.AKHIRUDIN,
19860707 S.T.,M.Ec.Dev
201503 1 003
NIP. 19851004200912 1 001

DI BUAT OLEH :

KONSULTAN PERENCANA

400 100 BAMBANG RIYANTO


TEAM LEADER

Digambar -
500
Diperiksa -

Disetujui -
Detail POT KOLOM LT.2 (D5-E5) Nama Gambar Skala
SKALA 1:30
RENCANA -
1:30
KOLOM LANTAI 2

Kode Gmbr. No. Lembar Jml. Lembar

STR 36 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :

35 PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH
25
PEKERJAAN :

PEMBANGUNAN WORKSHOP MANUFAKTUR,


REFRIGASI, DAN KANTOR TAHAP II

TAHUN ANGGARAN :

2023
LOKASI :

JL. KELINCI, TALISE,


KECAMATAN PALU TIM., KOTA PALU,
410 SULAWESI TENGAH - 94118

K2 MENGETAHUI OLEH :
350 DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

AGUNG NUR ROHMAD, ST.,MM.


NIP. 19760725B200501 1 001
DISETUJUI OLEH :

PEJABAT PEMBUAT
PEJABAT KOMITMEN
PEMBUAT (PPK)
KOMITMEN

K4

K2
ADITYA WIBAWA S.P, ST
NIP. 19860707
AKHIRUDIN, 201503 1 003
S.T.,M.Ec.Dev
NIP. 19851004200912 1 001

DI BUAT OLEH :

KONSULTAN PERENCANA

100

A3 BAMBANG RIYANTO
TEAM LEADER

Digambar -

Diperiksa -
Detail POT KOLOM LT.2 (A3) Disetujui -
SKALA 1:30 Nama Gambar Skala

RENCANA -
1:30
KOLOM LANTAI 2

Kode Gmbr. No. Lembar Jml. Lembar

STR 37 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :

PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH

PEKERJAAN :

PEMBANGUNAN WORKSHOP MANUFAKTUR,


REFRIGASI, DAN KANTOR TAHAP II

Angkur ∅10-500
30 TAHUN ANGGARAN :

Pas Bata 15
30
2023

30
5
∅6-15

15

30
LOKASI :
30

13
JL. KELINCI, TALISE,
Cor Beton
6-∅8 KECAMATAN PALU TIM., KOTA PALU,
40
SULAWESI TENGAH - 94118
Detail K1-a Detail K1-b Detail Pot.Kolom K-4
(H-WF 300.300.10.15mm) (H-WF 300.300.10.15mm MENGETAHUI OLEH :
SKALA 1:20
SKALA 1:20
Finshing Cor Beton Area Luar)
SKALA 1:20 DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

AGUNG NUR ROHMAD, ST.,MM.


NIP. 19760725B200501 1 001
DISETUJUI OLEH :

PEJABAT PEMBUAT KOMITMEN (PPK)


PEJABAT PEMBUAT KOMITMEN

15
20 ADITYA WIBAWA S.P, ST
Angkur ∅10-500 AKHIRUDIN,
NIP. 19860707 S.T.,M.Ec.Dev
201503 1 003
30
NIP. 19851004200912 1 001

15
∅6-15
20

15

DI BUAT OLEH :
4-∅8

Detail K2-a
Cor Beton Detail Pot.Kolom Praktis KP
(H-WF 200X200.8.12mm) Detail K3 SKALA 1:20 KONSULTAN PERENCANA
SKALA 1:20 (I-WF 150.300.6,5.9mm
Finishing Cor Beton Area Luar)
SKALA 1:20

BAMBANG RIYANTO
TEAM LEADER

Digambar -

Diperiksa -

Disetujui -
Nama Gambar Skala

RENCANA -
1:30
KOLOM LANTAI 2

Kode Gmbr. No. Lembar Jml. Lembar

STR 38 109
KEMENTRIAN
A B C D E F G H KETENAGAKERJAAN
500 400 500 600 500 400 500 REPUBLIK INDONESIA

100 400 400 100 100 400 400 100 KEGIATAN :

1 PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH
200

200
BL
BL

PEKERJAAN :
400

400
PEMBANGUNAN WORKSHOP MANUFAKTUR,
200

200
BL

REFRIGASI, DAN KANTOR TAHAP II

BL
2 TAHUN ANGGARAN :

2023

BL
300

300
BL

LOKASI :
600

600
JL. KELINCI, TALISE,
KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118
BL
300

300
BL
MENGETAHUI OLEH :

DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

2000
3
300

300
BL

BL
AGUNG NUR ROHMAD, ST.,MM.
NIP. 19760725B200501 1 001
DISETUJUI OLEH :
600

600
PEJABAT PEMBUAT KOMITMEN (PPK)
PEJABAT PEMBUAT KOMITMEN

BL
300

300
BL

ADITYA WIBAWA S.P, ST


4 AKHIRUDIN,
NIP. 19860707 S.T.,M.Ec.Dev
201503 1 003
NIP. 19851004200912 1 001
200

200
BL
BL

DI BUAT OLEH :
400

400
KONSULTAN PERENCANA
200

200
BL
BL

5
100 400 400 100 300 300 100 400 400 100

BAMBANG RIYANTO
500 400 500 600 500 400 500 TEAM LEADER

Digambar -
3400
11
Diperiksa -
DENAH RENCANA BALOK LATAI EV +5.00 LT.2
Keterangan Skala 1:130 Disetujui -
15

BL =Balok Latai 11x15cm ∅6-15


Nama Gambar Skala
Dinding Bata
4-∅8
Detail Pot.Balok Latai RENCANA
SKALA 1:20 -
1:130
BALOK LATAI LANTAI 2

Kode Gmbr. No. Lembar Jml. Lembar

STR 39 109
A B C D E F G H
500 400 500 600 500 400 500
100 400 400 100 100 400 400 100
KEMENTRIAN
KETENAGAKERJAAN
1 REPUBLIK INDONESIA
BL BL BL BL BL BL
KEGIATAN :
200

200
BL

BL
PERENCANAAN PEMBANGUNAN
400

400
BLK PALU
SULAWESI TENGAH
200

200
BL

BL
PEKERJAAN :

2
PEMBANGUNAN WORKSHOP MANUFAKTUR,
REFRIGASI, DAN KANTOR TAHAP II
300

300
BL

BL
TAHUN ANGGARAN :

2023
600

600
BL

BL
LOKASI :
BL

BL
300

300
JL. KELINCI, TALISE,
KECAMATAN PALU TIM., KOTA PALU,
BL SULAWESI TENGAH - 94118

2000
3
MENGETAHUI OLEH :

DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI


BL

BL
300

300
BL
BL
600

600
BL AGUNG NUR ROHMAD, ST.,MM.
NIP. 19760725B200501 1 001
300

300
BL

BL
DISETUJUI OLEH :

PEJABAT PEMBUAT
PEJABAT KOMITMEN
PEMBUAT (PPK)
KOMITMEN
4
BL

BL
200

200
BL

BL
ADITYA WIBAWA S.P, ST
AKHIRUDIN,
NIP. 19860707S.T.,M.Ec.Dev
201503 1 003
400

400
NIP. 19851004200912 1 001
200

200
BL

BL
DI BUAT OLEH :

BL BL BL BL BL BL
5
KONSULTAN PERENCANA
100 400 400 100 300 300 100 400 400 100

500 400 500 600 500 400 500

3400
BAMBANG RIYANTO
DENAH RENCANA BALOK LATAI EV +6.75 LT.2 TEAM LEADER
Skala 1:80
Digambar -

11
Diperiksa -

Keterangan Disetujui -
15

BL =Balok Latai 11x15cm ∅6-15


Nama Gambar Skala
Dinding Bata
4-∅8
Detail Pot.Balok Latai RENCANA
SKALA 1:20 -
1:130
BALOK LATAI LANTAI 2

Kode Gmbr. No. Lembar Jml. Lembar

STR 40 109
KEMENTRIAN
KETENAGAKERJAAN
500 400 500 600 500 400 500
REPUBLIK INDONESIA
100 400 400 100
KEGIATAN :
a a a a a a a a a a a a

A A A A A A PERENCANAAN PEMBANGUNAN
c b b c BLK PALU
RB RB
SULAWESI TENGAH
400

400
A A A A PEKERJAAN :

RB RB
PEMBANGUNAN WORKSHOP MANUFAKTUR,
c b b c
a a
REFRIGASI, DAN KANTOR TAHAP II
A
TAHUN ANGGARAN :

RB d
A d RB
2023
LOKASI :
A A A
600

600
A
JL. KELINCI, TALISE,
d
A d
KECAMATAN PALU TIM., KOTA PALU,
RB RB SULAWESI TENGAH - 94118

c c
MENGETAHUI OLEH :
b b
a a
A DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

2000
RB RB
d d
A
A A
AGUNG NUR ROHMAD, ST.,MM.
A A NIP. 19760725B200501 1 001
600

600
DISETUJUI OLEH :
d d
A
PEJABAT PEMBUAT
PEJABAT KOMITMEN
PEMBUAT (PPK)
KOMITMEN
RB RB

c b b c
a a
A
ADITYA WIBAWA S.P, ST
RB RB NIP. 19860707
AKHIRUDIN, 201503 1 003
S.T.,M.Ec.Dev
RB RB NIP. 19851004200912 1 001

A
d
A d
DI BUAT OLEH :
A
400

400
A A
RB RB
c b b c KONSULTAN PERENCANA
A A A A A A A
a a a a a a a a a a a a a a

500 400 500 600 500 400 500


BAMBANG RIYANTO
TEAM LEADER
3400
Digambar -
DENAH RENCANA RING BALK EV +7.50
Skala 1:80
Diperiksa -
Keterangan
A = I-WF 100X200mm Disetujui -
RB = Ring Balk 15x20cm Nama Gambar Skala
Catatan
RENCANA -
1:130
Setiap Balok Baja Area Luar Bangunan RING BALK

Yang Sejajar Dengan Pasangan Dinding


Di Lakukan Pengecoran Area Luar Balok Kode Gmbr. No. Lembar Jml. Lembar

STR 41 109
30 KEMENTRIAN
30 KETENAGAKERJAAN
REPUBLIK INDONESIA

4 - Baut HTB KEGIATAN :


I-WF 100.200.5,5.8mm H-WF 300.300.10.15mm 15 A325 Dia.16mm
4 - Baut HTB
+ 7.50 A325 Dia.16mm PERENCANAAN PEMBANGUNAN

5
BLK PALU

5
I-WF 100.200.5,5.8mm

20
5 10 4 5 10
SULAWESI TENGAH

20

20
5 10 4 5 10

40
39

40
VouteR PEKERJAAN :
CT.I-WF 150.300.6,5.9mm

19
19

19
End Plate T=12.150.400mm
H-WF 300.300.10.15mm
PEMBANGUNAN WORKSHOP MANUFAKTUR,
VouteR REFRIGASI, DAN KANTOR TAHAP II
4 - Baut HTB
CT.I-WF 150.300.6,5.9mm 4 - Baut HTB A325 Dia.16mm
End Plate T=12.150.400mm A325 Dia.16mm
30 TAHUN ANGGARAN :

30
2023
LOKASI :

10

30
JL. KELINCI, TALISE,
H-WF 300.300.10.15mm
Detail Sambungan Baja (A-a) KECAMATAN PALU TIM., KOTA PALU,
I-WF 100.200.5,5.8mm
8 - Baut HTB I-WF 100.200.5,5.8mm SULAWESI TENGAH - 94118
A325 Dia.16mm SKALA 1:20 MENGETAHUI OLEH :

DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

AGUNG NUR ROHMAD, ST.,MM.


30 NIP. 19760725B200501 1 001
DISETUJUI OLEH :
30
PEJABAT PEMBUAT
PEJABAT PEMBUAT KOMITMEN (PPK)
KOMITMEN
4 - Baut HTB
I-WF 100.200.5,5.8mm H-WF 300.300.10.15mm
15 A325 Dia.16mm
4 - Baut HTB
+ 7.50 A325 Dia.16mm

5
ADITYA WIBAWA S.P, ST
5

I-WF 100.200.5,5.8mm

20
5 10 4 5 10
NIP.AKHIRUDIN,
19860707S.T.,M.Ec.Dev
201503 1 003
20

20
5 10 4 5 10

T Joint H-WF 300.300.10.15mm


NIP. 19851004200912 1 001

40
39

40

VouteR
CT.I-WF 150.300.6,5.9mm

19
DI BUAT OLEH :
19

19

End Plate T=12.150.400mm


H-WF 300.300.10.15mm
VouteR
4 - Baut HTB
CT.I-WF 150.300.6,5.9mm 4 - Baut HTB KONSULTAN PERENCANA
30 A325 Dia.16mm
End Plate T=12.150.400mm A325 Dia.16mm

10

8 - Baut HTB
I-WF 100.200.5,5.8mm A325 Dia.16mm
BAMBANG RIYANTO
End Plate T=12.150.400mm TEAM LEADER

Detail Sambungan Baja (A-b) T Joint H-WF 300.300.10.15mm Digambar -


I-WF 100.200.5,5.8mm
30

Diperiksa -
SKALA 1:20 H-WF 300.300.10.15mm
Disetujui -
30
Nama Gambar Skala

RENCANA -
1:30
RING BALK

Kode Gmbr. No. Lembar Jml. Lembar

STR 42 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :

PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH

PEKERJAAN :

PEMBANGUNAN WORKSHOP MANUFAKTUR,


REFRIGASI, DAN KANTOR TAHAP II

TAHUN ANGGARAN :

2023
LOKASI :

JL. KELINCI, TALISE,


KECAMATAN PALU TIM., KOTA PALU,
20 20 SULAWESI TENGAH - 94118
2 - Baut HTB
Joint Plat T=12.100.150mm A325 Dia.16mm MENGETAHUI OLEH :
10
2 - Baut HTB 10 + 4.00
A325 Dia.16mm DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

15 3

15 3
4 7 4

4 7 4
20

20

20
15
3

3
I-WF 100.200.5,5.8mm I-WF 100.200.5,5.8mm

H-WF 200X200.8.12mm Joint Plat T=12.100.150mm


AGUNG NUR ROHMAD, ST.,MM.
H-WF 200X200.8.12mm NIP. 19760725B200501 1 001
DISETUJUI OLEH :
20
Joint Plat T=12.100.150mm PEJABAT PEMBUAT
PEJABAT PEMBUATKOMITMEN (PPK)
KOMITMEN
10 I-WF 100.200.5,5.8mm
2 - Baut HTB
A325 Dia.16mm H-WF 200X200.8.12mm
10

20

ADITYA WIBAWA S.P, ST


10

Detail Sambungan Baja (A-c) AKHIRUDIN,


NIP. 19860707 S.T.,M.Ec.Dev
201503 1 003
I-WF 100.200.5,5.8mm NIP. 19851004200912 1 001

SKALA 1:20 DI BUAT OLEH :


10

KONSULTAN PERENCANA

BAMBANG RIYANTO
TEAM LEADER

Digambar -

Diperiksa -

Disetujui -
Nama Gambar Skala

RENCANA -
1:130
RING BALK

Kode Gmbr. No. Lembar Jml. Lembar

STR 43 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :

PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH

PEKERJAAN :

PEMBANGUNAN WORKSHOP MANUFAKTUR,


REFRIGASI, DAN KANTOR TAHAP II

TAHUN ANGGARAN :

2 - Baut HTB 2023


A325 Dia.16mm
10 I-WF 100.200.5,5.8mm LOKASI :
+ 7.50

7
JL. KELINCI, TALISE,

20

20
18
7
KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118

7
5 Joint Plat T=12.50.180mm
MENGETAHUI OLEH :
I-WF 100.200.5,5.8mm
15
DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI
10
I-WF 100.200.5,5.8mm ∅8-15

20
2 - Baut HTB
4 A325 Dia.16mm
4-∅10
10
5
Detail Ring Balk
AGUNG NUR ROHMAD, ST.,MM.
I-WF 100.200.5,5.8mm SKALA 1:20 NIP. 19760725B200501 1 001
Joint Plat T=12.70.280mm
DISETUJUI OLEH :
10
PEJABAT PEMBUAT
PEJABAT PEMBUATKOMITMEN (PPK)
KOMITMEN
Detail Sambungan Baja (A-d)
I-WF 100.200.5,5.8mm
SKALA 1:20
ADITYA WIBAWA S.P, ST
NIP.AKHIRUDIN,
19860707 S.T.,M.Ec.Dev
201503 1 003
NIP. 19851004200912 1 001

DI BUAT OLEH :

KONSULTAN PERENCANA

BAMBANG RIYANTO
TEAM LEADER

Digambar -

Diperiksa -

Disetujui -
Nama Gambar Skala

RENCANA -
1:130
RING BALK

Kode Gmbr. No. Lembar Jml. Lembar

STR 44 109
KEMENTRIAN
A B C D E F G H KETENAGAKERJAAN
REPUBLIK INDONESIA
500 400 500 600 500 400 500
KEGIATAN :
100 400 400 100

PERENCANAAN PEMBANGUNAN
1 BLK PALU
SULAWESI TENGAH

PEKERJAAN :
400

400
PEMBANGUNAN WORKSHOP MANUFAKTUR,
REFRIGASI, DAN KANTOR TAHAP II

2 TAHUN ANGGARAN :

2023

Wiremesh ∅8-150
LOKASI :
Bondek Wija Truss
JL. KELINCI, TALISE,
600

600
KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118

MENGETAHUI OLEH :

DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

2000
3

Pas Bata T=20cm


AGUNG NUR ROHMAD, ST.,MM.
385

NIP. 19760725B200501 1 001


DISETUJUI OLEH :
600

600
PEJABAT PEMBUAT
PEJABAT PEMBUATKOMITMEN (PPK)
KOMITMEN

ADITYA WIBAWA S.P, ST


PL3 AKHIRUDIN,
NIP. 19860707 S.T.,M.Ec.Dev
201503 1 003
4 NIP. 19851004200912 1 001
615

DI BUAT OLEH :

Wiremesh ∅8-150
400

400
KONSULTAN PERENCANA

BAMBANG RIYANTO
500 400 500 600 500 400 500 TEAM LEADER

Digambar -
3400
Diperiksa -
DENAH RENCANA PLAT LANTAI EV + 4.15 LT.2
Skala 1:80
Disetujui -
Nama Gambar Skala

RENCANA -
1:130
PLAT LANTAI

Kode Gmbr. No. Lembar Jml. Lembar

STR 45 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :

PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH

PEKERJAAN :

PEMBANGUNAN WORKSHOP MANUFAKTUR,


REFRIGASI, DAN KANTOR TAHAP II

TAHUN ANGGARAN :

2023
LOKASI :

JL. KELINCI, TALISE,


KECAMATAN PALU TIM., KOTA PALU,
Pas Bata T=20cm Bondek Wija Truss SULAWESI TENGAH - 94118

Wiremesh ∅8-150 MENGETAHUI OLEH :


20 + 7.65
DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

15

AGUNG NUR ROHMAD, ST.,MM.


NIP. 19760725B200501 1 001
DISETUJUI OLEH :

PEJABAT PEMBUAT
PEJABAT PEMBUATKOMITMEN (PPK)
KOMITMEN
600

D4 E4 ADITYA WIBAWA S.P, ST


NIP.AKHIRUDIN,
19860707 S.T.,M.Ec.Dev
201503 1 003
NIP. 19851004200912 1 001

DI BUAT OLEH :

Detail Pot. Plat Dak PL-3 (A3-A2) KONSULTAN PERENCANA

SKALA 1:30

BAMBANG RIYANTO
TEAM LEADER

Digambar -

Diperiksa -

Disetujui -
Nama Gambar Skala

RENCANA -
1:30
PLAT LANTAI

Kode Gmbr. No. Lembar Jml. Lembar

STR 46 109
Gording CNP 150.50.20.2,5 KEMENTRIAN
KETENAGAKERJAAN
Jarak 45 cm REPUBLIK INDONESIA
1400 1400
700 700 700 700 KEGIATAN :

BesiØ14 PERENCANAAN PEMBANGUNAN


155

155
BLK PALU
SULAWESI TENGAH

PEKERJAAN :

KK-1 KK-1
PEMBANGUNAN WORKSHOP MANUFAKTUR,
400

400
REFRIGASI, DAN KANTOR TAHAP II

TAHUN ANGGARAN :

2023
KK-2 KK-2 LOKASI :

JL. KELINCI, TALISE,


KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118
600

600
MENGETAHUI OLEH :

DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

AGUNG NUR ROHMAD, ST.,MM.


KK-2 KK-2
NIP. 19760725B200501 1 001
DISETUJUI OLEH :

PEJABAT PEMBUAT
PEJABAT KOMITMEN
PEMBUAT (PPK)
KOMITMEN
600

600
ADITYA WIBAWA S.P, ST
NIP. 19860707
AKHIRUDIN, 201503 1 003
S.T.,M.Ec.Dev
NIP. 19851004200912 1 001

DI BUAT OLEH :

KK-2 KK-2

KONSULTAN PERENCANA
400

400
155

155
BAMBANG RIYANTO
KK-1 KK-1 TEAM LEADER

Digambar -

ATAP BITUMEN Diperiksa -


DENAH RENCANA ATAP
Skala 1:130
Disetujui -
Nama Gambar Skala

RENCANA -
1:130
ATAP

Kode Gmbr. No. Lembar Jml. Lembar

STR 47 109
KEMENTRIAN
KETENAGAKERJAAN
C REPUBLIK INDONESIA
KEGIATAN :

PERENCANAAN PEMBANGUNAN
375 BLK PALU
SULAWESI TENGAH

PEKERJAAN :

PEMBANGUNAN WORKSHOP MANUFAKTUR,


REFRIGASI, DAN KANTOR TAHAP II

I-WF 100.200.5,5.8mm
TAHUN ANGGARAN :

2023
LOKASI :

JL. KELINCI, TALISE,


KECAMATAN PALU TIM., KOTA PALU,
1425
SULAWESI TENGAH - 94118

400 MENGETAHUI OLEH :

DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI


1260

AGUNG NUR ROHMAD, ST.,MM.

I-WF 100.200.5,5.8mm
D NIP. 19760725B200501 1 001
DISETUJUI OLEH :

PEJABAT PEMBUAT KOMITMEN (PPK)


PEJABAT PEMBUAT KOMITMEN
I-WF 100.200.5,5.8mm I-WF 100.200.5,5.8mm
45

45

45 ADITYA WIBAWA S.P, ST


AKHIRUDIN,
NIP. 19860707S.T.,M.Ec.Dev
201503 1 003
NIP. 19851004200912 1 001
45

DI BUAT OLEH :
I-WF 125X250.6.9mm I-WF 125X250.6.9mm 45

485
KONSULTAN PERENCANA
K3 K3

BAMBANG RIYANTO
B A TEAM LEADER
52
35 77 Digambar -
60
25 25
Diperiksa -

Disetujui -
K2 K1
Nama Gambar Skala

RENCANA -
500 399 500
1:60
ATAP

Kode Gmbr. No. Lembar Jml. Lembar


1400

RENCANA KUDA-KUDA KK-1


SKALA 1:60 STR 48 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :

PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH

PEKERJAAN :

PEMBANGUNAN WORKSHOP MANUFAKTUR,


REFRIGASI, DAN KANTOR TAHAP II

643 TAHUN ANGGARAN :

2023
LOKASI :

JL. KELINCI, TALISE,


KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118

MENGETAHUI OLEH :

DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

I-WF 100.200.5,5.8mm
1260

AGUNG NUR ROHMAD, ST.,MM.


NIP. 19760725B200501 1 001
DISETUJUI OLEH :
BC PEJABAT PEMBUAT
PEJABAT PEMBUAT KOMITMEN
KOMITMEN (PPK)

45

ADITYA WIBAWA S.P, ST


45 NIP. 19860707
AKHIRUDIN, 201503 1 003
S.T.,M.Ec.Dev
NIP. 19851004200912 1 001
45
DI BUAT OLEH :
I-WF 125X250.6.9mm I-WF 125X250.6.9mm 45
617

45
KONSULTAN PERENCANA

BAMBANG RIYANTO
TEAM LEADER

Digambar -

52 Diperiksa -
35 77
60
25 25 Disetujui -
Nama Gambar Skala
K2 K1
RENCANA -
1:60
ATAP
1400

RENCANA KUDA-KUDA KK-2 Kode Gmbr. No. Lembar Jml. Lembar


SKALA 1:30

STR 49 109
714 KEMENTRIAN
Baut HTB A325 Dia.16mm KETENAGAKERJAAN
REPUBLIK INDONESIA
Join Plate T=12.100.150mm KEGIATAN :

PERENCANAAN PEMBANGUNAN
BLK PALU

400
SULAWESI TENGAH

Perkuatan Besi L T=6mm 65.65


PEKERJAAN :

PEMBANGUNAN WORKSHOP MANUFAKTUR,


REFRIGASI, DAN KANTOR TAHAP II

TAHUN ANGGARAN :

2023
LOKASI :

JL. KELINCI, TALISE,

600
KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118

MENGETAHUI OLEH :

DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

AGUNG NUR ROHMAD, ST.,MM.


NIP. 19760725B200501 1 001
DISETUJUI OLEH :

PEJABAT PEMBUAT
PEJABAT PEMBUATKOMITMEN (PPK)
KOMITMEN
600

ADITYA WIBAWA S.P, ST


NIP.AKHIRUDIN,
19860707 201503 1 003
S.T.,M.Ec.Dev
NIP. 19851004200912 1 001

DI BUAT OLEH :

KONSULTAN PERENCANA
400

BAMBANG RIYANTO
TEAM LEADER

Digambar -

Diperiksa -

Disetujui -

RENCANA BRACING KUDA KUDA Nama Gambar Skala


SKALA 1:100
RENCANA -
1:100
ATAP

Kode Gmbr. No. Lembar Jml. Lembar

STR 50 109
I-WF 125X250.6.9mm
10 - Baut HTB
Baut HTB A325 Dia.12mm
A325 Dia.16mm KEMENTRIAN
20
Besi L 5.5 KETENAGAKERJAAN
REPUBLIK INDONESIA

11
Gording CNP 150.50.20.2,5
KEGIATAN :

10
Atap Bitumen

11
50
PERENCANAAN PEMBANGUNAN

11
Sirip Segi Tiga T=10mm

62

11
BLK PALU

10
SULAWESI TENGAH

12
I-WF 125X250.6.9mm

13
11
End Plate T=12.200.620mm PEKERJAAN :

12

5 6
10
35
I-WF 100.200.5,5.8mm PEMBANGUNAN WORKSHOP MANUFAKTUR,

11

20

10 4 5 10
REFRIGASI, DAN KANTOR TAHAP II
End Plate T=12.150.410mm

62
60

41
10
Plat Stiffners T=10mm
TAHUN ANGGARAN :

20
25 Vouter

13
H-WF 300.300.10.15mm I-WF 100.200.5,5.8mm

6
13 2023

5 6
15
8 - Baut HTB

10 4 5 10
A325 Dia.16mm
LOKASI :

41
JL. KELINCI, TALISE,

20
KECAMATAN PALU TIM., KOTA PALU,

6
SULAWESI TENGAH - 94118

33
MENGETAHUI OLEH :

4
DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

Detail Sambungan Baja


Kuda-Kuda KK (A) 4
SKALA 1:20
Detail Sirip Segi Tiga AGUNG NUR ROHMAD, ST.,MM.
Skala 1:5 NIP. 19760725B200501 1 001
I-WF 125X250.6.9mm DISETUJUI OLEH :

Baut HTB A325 Dia.12mm PEJABAT PEMBUAT


PEJABAT KOMITMEN
PEMBUAT (PPK)
KOMITMEN
Besi L 5.5

Gording CNP 150.50.20.2,5 10 - Baut HTB


20 A325 Dia.16mm
Atap Bitumen
45

ADITYA WIBAWA S.P, ST


AKHIRUDIN,
NIP. 19860707S.T.,M.Ec.Dev
201503 1 003
8

11
NIP. 19851004200912 1 001
11

10
11

DI BUAT OLEH :
10

50

11
62

11
11

52
62

10
Sirip Segi Tiga T=10mm
12
10

I-WF 125X250.6.9mm
KONSULTAN PERENCANA
77

13

End Plate T=12.200.620mm


13

Plat Stiffners T=10mm


6

25
13

H-WF 300.300.10.15mm

BAMBANG RIYANTO
TEAM LEADER

Digambar -

Diperiksa -

K1 Detail Sambungan Baja


Disetujui
Nama Gambar
-
Skala
Kuda-Kuda KK (B)
RENCANA -
SKALA 1:20 ATAP
1:20

Kode Gmbr. No. Lembar Jml. Lembar

STR 51 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :

PERENCANAAN PEMBANGUNAN
BLK PALU
10 - Baut HTB 15 SULAWESI TENGAH
A325 Dia.16mm

PEKERJAAN :

11
8
Atap Bitumen I-WF 125X250.6.9mm PEMBANGUNAN WORKSHOP MANUFAKTUR,
REFRIGASI, DAN KANTOR TAHAP II

8
50
Baut HTB A325 Dia.12mm

8
11

8
TAHUN ANGGARAN :

85
Gording CNP 150.50.20.2,5

9
8
Besi L 5.5 Vouter

50
50

End Plate T=12.150.850mm


2023

11
I-WF 125X250.6.9mm

8
32
8
LOKASI :

8
45
9

6
Vouter

11
6 - Baut HTB JL. KELINCI, TALISE,
I-WF 125X250.6.9mm
A325 Dia.16mm KECAMATAN PALU TIM., KOTA PALU,

8
32

32
SULAWESI TENGAH - 94118

8
MENGETAHUI OLEH :

45
Vouter
78

I-WF 125X250.6.9mm DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

I-WF 125X250.6.9mm
64

AGUNG NUR ROHMAD, ST.,MM.


NIP. 19760725B200501 1 001
DISETUJUI OLEH :
46
PEJABAT PEMBUAT KOMITMEN (PPK)
PEJABAT PEMBUAT KOMITMEN

Detail Sambungan Baja


Kuda-Kuda KK (C)

4
SKALA 1:20 ADITYA WIBAWA S.P, ST
NIP.AKHIRUDIN,
19860707 S.T.,M.Ec.Dev
201503 1 003
NIP. 19851004200912 1 001

4 DI BUAT OLEH :

Detail Sirip Segi Tiga


Skala 1:5 KONSULTAN PERENCANA

2 - Baut HTB
8 A325 Dia.16mm
Joint Plate T=12.80.120mm
BAMBANG RIYANTO
TEAM LEADER
5 6 5
12

Digambar -
I-WF 100.200.5,5.8mm
I-WF 150.300.6,5.9mm Diperiksa -

Disetujui -
Detail Sambungan Baja Nama Gambar Skala
Kuda-Kuda KK (D)
SKALA 1:20 RENCANA -
1:20
ATAP

Kode Gmbr. No. Lembar Jml. Lembar

STR 52 109
D3 E3 KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
600
KEGIATAN :

PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH

PEKERJAAN :

PEMBANGUNAN WORKSHOP MANUFAKTUR,


REFRIGASI, DAN KANTOR TAHAP II

TAHUN ANGGARAN :

2023
LOKASI :

JL. KELINCI, TALISE,

+ 2.35

+ 2.55

+ 2.75

+ 2.95

+ 3.15

+ 3.35

+ 3.55

+ 3.75

+ 3.95

+ 4.15
KECAMATAN PALU TIM., KOTA PALU,
158 SULAWESI TENGAH - 94118

MENGETAHUI OLEH :

DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

BORDES AGUNG NUR ROHMAD, ST.,MM.


HOMOGENOUS TILE NIP. 19760725B200501 1 001
383 68 DISETUJUI OLEH :
60X60 LANTAI 1 PEJABAT PEMBUAT
PEJABAT PEMBUAT KOMITMEN
KOMITMEN (PPK)
+ 2.15 + 0.05

ADITYA WIBAWA S.P, ST


NIP. 19860707
AKHIRUDIN, 201503 1 003
S.T.,M.Ec.Dev
NIP. 19851004200912 1 001

DI BUAT OLEH :
158
+ 1.85

+ 1.65

+ 1.45

+ 1.25

+ 1.15

+ 0.95

+ 0.75

+ 0.55

+ 0.35

+ 0.15
H-WF 200X200.8.12mm
KONSULTAN PERENCANA

BAMBANG RIYANTO
Anak tangga Plat Besi Ralling Hollow Tangga TEAM LEADER

Digambar -

Diperiksa -
160 282 Disetujui -
Nama Gambar Skala
RENCANA TANGGA LT.1
RENCANA -
1:30
SKALA 1:30 TANGGA

Kode Gmbr. No. Lembar Jml. Lembar

STR 53 109
D3 E3
KEMENTRIAN
KETENAGAKERJAAN
600 REPUBLIK INDONESIA
KEGIATAN :

PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH

Ralling Hollow Tangga PEKERJAAN :

PEMBANGUNAN WORKSHOP MANUFAKTUR,


REFRIGASI, DAN KANTOR TAHAP II

TAHUN ANGGARAN :

2023
LOKASI :

+ 2.35

+ 2.55

+ 2.75

+ 2.95

+ 3.15

+ 3.35

+ 3.55

+ 3.75

+ 3.95

+ 4.15
JL. KELINCI, TALISE,
158 KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118

MENGETAHUI OLEH :

DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

BORDES
HOMOGENOUS TILE
LANTAI 2 AGUNG NUR ROHMAD, ST.,MM.
383 68 NIP. 19760725B200501 1 001
60X60
+ 2.15
+4.15 DISETUJUI OLEH :

PEJABAT PEMBUAT
PEJABAT KOMITMEN
PEMBUAT (PPK)
KOMITMEN

ADITYA WIBAWA S.P, ST


NIP. 19860707
AKHIRUDIN, 201503 1 003
S.T.,M.Ec.Dev
NIP. 19851004200912 1 001

158 DI BUAT OLEH :


+ 1.85

+ 1.65

+ 1.45

+ 1.25

+ 1.15

+ 0.95

+ 0.75

+ 0.55

+ 0.35

+ 0.15
KONSULTAN PERENCANA

Anak tangga Plat Besi BAMBANG RIYANTO


TEAM LEADER

Digambar -

Diperiksa -
160 282
Disetujui -
Nama Gambar Skala

RENCANA -
RENCANA TANGGA LT.2 TANGGA
1:30

SKALA 1:30 Kode Gmbr. No. Lembar Jml. Lembar

STR 54 109
150 117

196
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :

PERENCANAAN PEMBANGUNAN
Besi Hollow 4x4 100 BLK PALU
SULAWESI TENGAH
LANTAI 2
Besi Hollow 2x4 PEKERJAAN :
+ 4.15
PEMBANGUNAN WORKSHOP MANUFAKTUR,
REFRIGASI, DAN KANTOR TAHAP II

TAHUN ANGGARAN :

160 2023
LOKASI :

215 JL. KELINCI, TALISE,


KECAMATAN PALU TIM., KOTA PALU,
10 SULAWESI TENGAH - 94118
10 145 140
10 MENGETAHUI OLEH :
100
DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI
BORDES
+ 2.15

20 400 AGUNG NUR ROHMAD, ST.,MM.


20 NIP. 19760725B200501 1 001
DISETUJUI OLEH :
28 20 PEJABAT PEMBUAT KOMITMEN (PPK)
C PEJABAT PEMBUAT KOMITMEN
28 20
B 28 20
ADITYA WIBAWA S.P, ST
200 20 AKHIRUDIN,
NIP. 19860707S.T.,M.Ec.Dev
201503 1 003
NIP. 19851004200912 1 001
20
DI BUAT OLEH :
20
20 KONSULTAN PERENCANA

20 LANTAI 1
A
15 +/- 0.00

BAMBANG RIYANTO
TEAM LEADER

Digambar -

Diperiksa -

Disetujui -
Nama Gambar Skala
367 233
RENCANA -
1:30
600 TANGGA

POTONGAN TANGGA Kode Gmbr. No. Lembar Jml. Lembar


SKALA 1:30
STR 55 109
KEMENTRIAN
KETENAGAKERJAAN
Semua Sambungan Di Joinkan Dengan Las REPUBLIK INDONESIA
I-WF 100.200.5,5.8mm KEGIATAN :
Anak Tangga Besi Plat

Besi L 65x65
PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH
28

20
PEKERJAAN :
I-WF 100.200.5,5.8mm

7
Base Plate 1,5 mm PEMBANGUNAN WORKSHOP MANUFAKTUR,

20
REFRIGASI, DAN KANTOR TAHAP II

21
Finishing Homogenous TIle 60x60
Wiremesh ∅8-150

15
Bordes Cor Beton TAHUN ANGGARAN :

15
2023
Angkur Ø19 mm I-WF 100.200.5,5.8mm
STD-00-IAB019 LOKASI :

JL. KELINCI, TALISE,


KECAMATAN PALU TIM., KOTA PALU,
Bondek Wija Truss
SULAWESI TENGAH - 94118
I-WF 100.200.5,5.8mm

MENGETAHUI OLEH :
Semua Sambungan Di Joinkan Dengan Las
DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

Detail Sambungan Baja Tangga (A) Detail Sambungan Baja Tangga (C)
SKALA 1:20 SKALA 1:20

I-WF 100.200.5,5.8mm AGUNG NUR ROHMAD, ST.,MM.


Anak Tangga Besi Plat NIP. 19760725B200501 1 001
DISETUJUI OLEH :
Besi L 65x65
PEJABAT PEMBUAT KOMITMEN (PPK)
PEJABAT PEMBUAT KOMITMEN
28 Kolom HWF 200.200
20

Base Plate 1,5 mm


28
7

20

ADITYA WIBAWA S.P, ST


NIP.AKHIRUDIN, S.T.,M.Ec.Dev
21

19860707 201503 1 003


NIP. 19851004200912 1 001
20

DI BUAT OLEH :
50

I-WF 100.200.5,5.8mm Angkur Ø19 mm


STD-00-IAB019
KONSULTAN PERENCANA

5 5
10
Semua Sambungan Di Joinkan Dengan Las

30
Detail Sambungan Baja Tangga (B) 40
BAMBANG RIYANTO
TEAM LEADER
SKALA 1:20
Detail Sambungan Baja Kolom 200x200 Tangga Digambar -
SKALA 1:20
Diperiksa -

Disetujui -
Nama Gambar Skala

RENCANA -
1:30
TANGGA

Kode Gmbr. No. Lembar Jml. Lembar

STR 56 109
A B C D E F G H
500 400 500 600 500 400 500
400 100 KEMENTRIAN
100 400
KETENAGAKERJAAN
1 REPUBLIK INDONESIA
KEGIATAN :

PERENCANAAN PEMBANGUNAN
400

400
BLK PALU
SULAWESI TENGAH

V1 V1 PEKERJAAN :

2 PEMBANGUNAN WORKSHOP MANUFAKTUR,


REFRIGASI, DAN KANTOR TAHAP II

TAHUN ANGGARAN :

2023
600

600
LOKASI :
P3 P3
JL. KELINCI, TALISE,
KECAMATAN PALU TIM., KOTA PALU,
P3 SULAWESI TENGAH - 94118
P3
3 MENGETAHUI OLEH :

DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

2345
600

600
AGUNG NUR ROHMAD, ST.,MM.
NIP. 19760725B200501 1 001
DISETUJUI OLEH :

PJ2 P2 P2 PJ2 PEJABAT PEMBUAT KOMITMEN (PPK)


P2 P2 PEJABAT PEMBUAT KOMITMEN

ADITYA WIBAWA S.P, ST


NIP.AKHIRUDIN,
19860707 201503 1 003
S.T.,M.Ec.Dev
400

400
NIP. 19851004200912 1 001

DI BUAT OLEH :

5 KONSULTAN PERENCANA

J1 P1 J2 J2 PJ1 J2 J2 P1 J1
345

345
BAMBANG RIYANTO
6 TEAM LEADER

Digambar -

500 400 500 600 500 400 500 Diperiksa -

Disetujui -
3400 Nama Gambar Skala
DENAH RENCANA KUSEN LT.1
Skala 1:80 DENAH RENCANA -
1:130
KUSEN

Kode Gmbr. No. Lembar Jml. Lembar

ARS 57 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
A B C D E F G H KEGIATAN :

500 400 500 600 500 400 500


PERENCANAAN PEMBANGUNAN
J3 J3 J3 J3 J3 J3 BLK PALU
SULAWESI TENGAH
1
PEKERJAAN :

R1 R1
PEMBANGUNAN WORKSHOP MANUFAKTUR,
REFRIGASI, DAN KANTOR TAHAP II
400

400
R1 R1 TAHUN ANGGARAN :

2 2023
R1 R1 LOKASI :

R1 R1 JL. KELINCI, TALISE,


KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118
600

600
J4 J4
MENGETAHUI OLEH :
R1 R1
DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

R1 R1

2000
3
P2 AGUNG NUR ROHMAD, ST.,MM.
R1 R1 NIP. 19760725B200501 1 001
DISETUJUI OLEH :
R1 J3 J3 R1
PEJABAT PEMBUAT KOMITMEN (PPK)
PEJABAT PEMBUAT KOMITMEN
600

600
P2

R1 R1
ADITYA WIBAWA S.P, ST
R1 R1 NIP.AKHIRUDIN,
19860707 S.T.,M.Ec.Dev
201503 1 003
NIP. 19851004200912 1 001

4 DI BUAT OLEH :

R1 R1
J4 J4
KONSULTAN PERENCANA
400

400
R1

5
BAMBANG RIYANTO
TEAM LEADER
J3 J3 J3 J3 J3 J3
Digambar -
500 400 500 600 500 400 500
Diperiksa -

Disetujui -
DENAH RENCANA KUSEN LT.2
Skala 1:80 Nama Gambar Skala

DENAH RENCANA -
1:130
KUSEN

Kode Gmbr. No. Lembar Jml. Lembar

ARS 58 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :

PERENCANAAN PEMBANGUNAN
EK EK BLK PALU
SULAWESI TENGAH

PEKERJAAN :

PEMBANGUNAN WORKSHOP MANUFAKTUR,


FS FS FS FS
REFRIGASI, DAN KANTOR TAHAP II
FS FS FS FS
211

235,5 240 220 TAHUN ANGGARAN :


EK EK
PH PH

2023
KC
LOKASI :

115
JL. KELINCI, TALISE,
KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118

EK EK
CH CH CH CH
MENGETAHUI OLEH :
10
DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

AGUNG NUR ROHMAD, ST.,MM.


NIP. 19760725B200501 1 001
10 DISETUJUI OLEH :

PEJABAT PEMBUAT
PEJABAT KOMITMEN
PEMBUAT (PPK)
KOMITMEN
80 80

75 75 164,5 75 75

469

ADITYA WIBAWA S.P, ST


Keterangan Aksesories
AKHIRUDIN,
NIP. 19860707 S.T.,M.Ec.Dev
201503 1 003
Type Pintu / Jendela : jml/unit Keterangan
Nama NIP. 19851004200912 1 001
Simbol Pasang
Aksesories (Buah)

Engsel Kupu Kupu EK 6 -


DI BUAT OLEH :

PJ-1 Pull Handle PH 2 Set

Friction Stay/Engsel Casement FS 4 Psg Kiri Kanan KONSULTAN PERENCANA


Casement Handle / Handle CH 4

Kunci Pintu Allumunium KC 1 -

Kusen Allumunium Wihite Coating 4" x 1 34"

Daun Alumunium White Coating

Finishing Kaca Stopsol 5 mm BAMBANG RIYANTO


TEAM LEADER
Lantai 1 1

Lantai 2 - Digambar -

Diperiksa -

Disetujui -
Nama Gambar Skala

RENCANA -
1:30
KUSEN

Kode Gmbr. No. Lembar Jml. Lembar

ARS 59 109
97,5
EK EK

129,7 KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :

PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH
87,5
10 10 EK EK
PEKERJAAN :

75
PEMBANGUNAN WORKSHOP MANUFAKTUR,
EK
4 REFRIGASI, DAN KANTOR TAHAP II
405 401 EK 141,8 401 405

TAHUN ANGGARAN :

FS FS 131
GP 2023
LOKASI :
EK EK

240 140 80 JL. KELINCI, TALISE,


235,5 EK LH
206 EK
H
210 KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118
CH

MENGETAHUI OLEH :
GP

130 DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI


115

80
EK EK

EK EK

AGUNG NUR ROHMAD, ST.,MM.


4
NIP. 19760725B200501 1 001
DISETUJUI OLEH :

PEJABAT PEMBUAT
PEJABAT PEMBUATKOMITMEN (PPK)
KOMITMEN

10 7 ADITYA WIBAWA S.P, ST


NIP.AKHIRUDIN,
19860707 S.T.,M.Ec.Dev
201503 1 003
85,5 NIP. 19851004200912 1 001
66 75 35
90 75
176 176
169,5 DI BUAT OLEH :
360

Keterangan Aksesories
Type Pintu / Jendela :
Keterangan Aksesories Nama jml/unit Keterangan KONSULTAN PERENCANA
Simbol Pasang
Aksesories (Buah)
Type Pintu / Jendela : jml/unit Keterangan
Nama
Simbol Pasang Engsel Bubut 34"
Aksesories (Buah) EK 8

Engsel Kupu Kupu EK 3 - Engsel Bubut 21 " EK 3

PJ-2 Lever Handle LH 1 Set P-1 Handle Pintu Besi H 1 Set

Friction Stay/Engsel Casement FS 1 Psg Kiri Kanan Grandel Pintu GP 2 Atas Bawah
-
BAMBANG RIYANTO
Casement Handle / Handle CH 1 Kusen BESI UNP 7x5x 5mm + angkur ∅16 jarak 30cm TEAM LEADER
Ket. notasi =
P : Pintu
Ket. notasi = Allumunium Wihite Coating 4" x 1 34" PJ : Pintu & Jendela Rangka BESI 4X4(Rangka) -
P : Pintu
Kusen
J : Jendela Daun
Digambar
PJ : Pintu & Jendela Double Multiplek 18mm CW: Curtain Wall
J : Jendela
Daun V : Ventilasi
CW: Curtain Wall
Finishing Finishing Besi Plat 3mm (2 sisi) Diperiksa -
V : Ventilasi Finishing HPL
R :Roster
Jumlah 2 Unit Disetujui -
Lantai 1 2

Lantai 2 - Nama Gambar Skala

RENCANA -
1:30
KUSEN

Kode Gmbr. No. Lembar Jml. Lembar

ARS 60 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :

PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH
10
FB 20 20 20
PEKERJAAN :
13
10 20
2
EK EK
PEMBANGUNAN WORKSHOP MANUFAKTUR,
20 REFRIGASI, DAN KANTOR TAHAP II
405 40,5 EK

20
TAHUN ANGGARAN :
45,8 50
20
40
160 2023
20
10
LOKASI :
20
EK
40 EK
240 235,5
LH PH
JL. KELINCI, TALISE,
EK 215 210,5 20 KECAMATAN PALU TIM., KOTA PALU,
KC
SULAWESI TENGAH - 94118
20
40 MENGETAHUI OLEH :
10

115 115
60 DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI
75 75
154,5
45

EK EK EK
2
13
Keterangan Aksesories Keterangan Aksesories AGUNG NUR ROHMAD, ST.,MM.
FB Type Pintu / Jendela :
Nama jml/unit Keterangan Type Pintu / Jendela :
Nama jml/unit Keterangan NIP. 19760725B200501 1 001
Simbol Pasang Simbol Pasang
Aksesories (Buah) Aksesories (Buah) DISETUJUI OLEH :
V-1 R-1
Roster - 24 Buah 1 Set PEJABAT PEMBUAT KOMITMEN (PPK)
PEJABAT PEMBUAT KOMITMEN

Ket. notasi = Kusen Allumunium Wihite Coating 4" x 1 34" Ket. notasi = Kusen -
P : Pintu P : Pintu
PJ : Pintu & Jendela - PJ : Pintu & Jendela -
J : Jendela
Daun J : Jendela
Daun
10 10
CW: Curtain Wall CW: Curtain Wall ADITYA WIBAWA S.P, ST
V : Ventilasi Finishing Kaca Dark Blue 5 mm V : Ventilasi Finishing -
71 R :Roster R :Roster NIP. 19860707
AKHIRUDIN, 201503 1 003
S.T.,M.Ec.Dev
80 80
75,5 Lantai 1 2 Lantai 1 - NIP. 19851004200912 1 001
164,5
79,7 Lantai 2 - Lantai 2 24
169 DI BUAT OLEH :

Keterangan Aksesories Keterangan Aksesories


KONSULTAN PERENCANA
Type Pintu / Jendela : jml/unit Keterangan Type Pintu / Jendela :
Nama Nama jml/unit Keterangan
Simbol (Buah) Pasang Simbol
Aksesories Aksesories (Buah) Pasang

Engsel Kupu Kupu EK 6 - Engsel Kupu Kupu EK 3 -

P-2 Lever Handle LH 1 Set P-3 Pull Handle PH 1 Set

Flush Bolt FB 1 Set Kunci Pintu Allumunium KC 1 -

Ket. notasi = Allumunium Wihite Coating 4" x 1 34" Ket. notasi = Allumunium Wihite Coating 4" x 1 34"
BAMBANG RIYANTO
Kusen Kusen
P : Pintu P : Pintu TEAM LEADER
PJ : Pintu & Jendela Double Multiplek mm 18mm PJ : Pintu & Jendela Alumunium Strip White Coating
J : Jendela
Daun J : Jendela
Daun
CW: Curtain Wall CW: Curtain Wall Digambar -
V : Ventilasi Finishing HPL V : Ventilasi Finishing
R :Roster R :Roster
Lantai 1 4 Lantai 1 4
Diperiksa -
Lantai 2 2 Lantai 2 -
Disetujui -
Nama Gambar Skala

RENCANA -
1:30
KUSEN

Kode Gmbr. No. Lembar Jml. Lembar

ARS 61 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :

PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH

PEKERJAAN :

10
10 PEMBANGUNAN WORKSHOP MANUFAKTUR,
REFRIGASI, DAN KANTOR TAHAP II

TAHUN ANGGARAN :

2023
FS FS FS FS
151 151 LOKASI :
FS FS FS FS FS FS

JL. KELINCI, TALISE,


KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118

MENGETAHUI OLEH :
160 160

DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

CH CH CH CH CH

AGUNG NUR ROHMAD, ST.,MM.


NIP. 19760725B200501 1 001
DISETUJUI OLEH :
10 10
PEJABAT PEMBUAT
PEJABAT KOMITMEN
PEMBUAT (PPK)
KOMITMEN
75 75 75 75 75
229,5 154,5

ADITYA WIBAWA S.P, ST


NIP. 19860707
AKHIRUDIN, 201503 1 003
S.T.,M.Ec.Dev
Keterangan Aksesories Keterangan Aksesories
NIP. 19851004200912 1 001
Type Pintu / Jendela : jml/unit Keterangan Type Pintu / Jendela : jml/unit Keterangan
Nama Nama
Simbol Simbol
Aksesories (Buah) Pasang Aksesories (Buah) Pasang
J-1 J-2 DI BUAT OLEH :
Friction Stay/Engsel Casement FS 3 Psg Kiri Kanan Friction Stay/Engsel Casement FS 2 Psg Kiri Kanan

Casement Handle / Handle CH Casement Handle / Handle CH


3 2
Jendela ) Jendela )
KONSULTAN PERENCANA
3
Ket. notasi = Kusen Allumunium Wihite Coating 4" x 1 4" Ket. notasi = Kusen Allumunium Wihite Coating 4" x 1 34"
P : Pintu P : Pintu
PJ : Pintu & Jendela Alumunium White Coating PJ : Pintu & Jendela Alumunium White Coating
J : Jendela
Daun J : Jendela
Daun
CW: Curtain Wall CW: Curtain Wall
V : Ventilasi Finishing Kaca Stopsol 5 mm V : Ventilasi Finishing Kaca Stopsol 5 mm
R :Roster R :Roster
Lantai 1 2 Lantai 1 4

Lantai 2 - Lantai 2 -
BAMBANG RIYANTO
TEAM LEADER

Digambar -

Diperiksa -

Disetujui -
Nama Gambar Skala

RENCANA -
1:30
KUSEN

Kode Gmbr. No. Lembar Jml. Lembar

ARS 62 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :

10 PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH

PEKERJAAN :
Keterangan Aksesories
Type Pintu / Jendela : jml/unit Keterangan PEMBANGUNAN WORKSHOP MANUFAKTUR,
Nama
Simbol Pasang
Aksesories (Buah) REFRIGASI, DAN KANTOR TAHAP II
J-3
151 TAHUN ANGGARAN :

Ket. notasi = Kusen Allumunium Wihite Coating 4" x 1 34"


P : Pintu
PJ : Pintu & Jendela
J : Jendela
Daun - 2023
CW: Curtain Wall
V : Ventilasi Finishing Kaca Stopsol 5 mm
R :Roster LOKASI :
160 Lantai 1 -

Lantai 2 14 JL. KELINCI, TALISE,


KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118

MENGETAHUI OLEH :

90 90 90 90 DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI


364,5

10

AGUNG NUR ROHMAD, ST.,MM.


Keterangan Aksesories NIP. 19760725B200501 1 001
Type Pintu / Jendela : jml/unit Keterangan
Nama DISETUJUI OLEH :
Simbol Pasang
Aksesories (Buah)
J-4 PEJABAT PEMBUAT
PEJABAT KOMITMEN
PEMBUAT (PPK)
KOMITMEN

151
Ket. notasi = Kusen Allumunium Wihite Coating 4" x 1 34"
P : Pintu
PJ : Pintu & Jendela
J : Jendela
Daun - ADITYA WIBAWA S.P, ST
CW: Curtain Wall
Kaca Stopsol 5 mm
NIP. 19860707
AKHIRUDIN, 201503 1 003
S.T.,M.Ec.Dev
V : Ventilasi Finishing
R :Roster NIP. 19851004200912 1 001
Lantai 1 -
160
Lantai 2 2 DI BUAT OLEH :

KONSULTAN PERENCANA

10

100 95 95 95 95 100

584,5
BAMBANG RIYANTO
TEAM LEADER

Digambar -

Diperiksa -

Disetujui -
Nama Gambar Skala

RENCANA -
1:30
KUSEN

Kode Gmbr. No. Lembar Jml. Lembar

ARS 63 109
450

KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :

PERENCANAAN PEMBANGUNAN
120 BLK PALU
SULAWESI TENGAH

PEKERJAAN :
200
128 128
PEMBANGUNAN WORKSHOP MANUFAKTUR,
REFRIGASI, DAN KANTOR TAHAP II

300 TAHUN ANGGARAN :

2023
LOKASI :

180 JL. KELINCI, TALISE,


KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118

100 MENGETAHUI OLEH :

DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

AGUNG NUR ROHMAD, ST.,MM.


NIP. 19760725B200501 1 001

100 DISETUJUI OLEH :

PEJABAT PEMBUAT
PEJABAT PEMBUAT KOMITMEN
KOMITMEN (PPK)

180
ADITYA WIBAWA S.P, ST
NIP.AKHIRUDIN,
19860707 201503 1 003
S.T.,M.Ec.Dev
NIP. 19851004200912 1 001

300 DI BUAT OLEH :

KONSULTAN PERENCANA
128 128
200

120
BAMBANG RIYANTO
TEAM LEADER

Digambar -

Diperiksa -

Disetujui -
Nama Gambar Skala

RENCANA TOILET -
1:30

450
Kode Gmbr. No. Lembar Jml. Lembar
RENCANA TOILET
SKALA 1:50
ARS 64 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :

PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH

PEKERJAAN :

PEMBANGUNAN WORKSHOP MANUFAKTUR,


REFRIGASI, DAN KANTOR TAHAP II

TAHUN ANGGARAN :

Homogenouse Tile
60x60 2023
LOKASI :

JL. KELINCI, TALISE,


KECAMATAN PALU TIM., KOTA PALU,
Engsel SULAWESI TENGAH - 94118

MENGETAHUI OLEH :

DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI


Kaca Cermin

300
Grendel

Handle 230 240


AGUNG NUR ROHMAD, ST.,MM.
NIP. 19760725B200501 1 001
Meja Beton DISETUJUI OLEH :

PEJABAT PEMBUAT
PEJABAT KOMITMEN
PEMBUAT (PPK)
KOMITMEN

75 Backet
ADITYA WIBAWA S.P, ST
AKHIRUDIN,
NIP. 19860707 S.T.,M.Ec.Dev
201503 1 003
NIP. 19851004200912 1 001
10
DI BUAT OLEH :

KONSULTAN PERENCANA
90

128 128
BAMBANG RIYANTO
TEAM LEADER

450 Digambar -

Diperiksa -
POTONGAN TOILET Disetujui -
SKALA 1:50 Nama Gambar Skala

POTONGAN TOILET -
1:30

Kode Gmbr. No. Lembar Jml. Lembar

ARS 64b 109


A B C D E F G H
500 400 500 600 500 400 500
400 100 KEMENTRIAN
100 400
KETENAGAKERJAAN
1 REPUBLIK INDONESIA
KEGIATAN :

PERENCANAAN PEMBANGUNAN
- 0.05
BLK PALU
400

400
SULAWESI TENGAH

PEKERJAAN :

2 PEMBANGUNAN WORKSHOP MANUFAKTUR,


REFRIGASI, DAN KANTOR TAHAP II

PLAFOND PLAFOND
KALSIBOARD KALSIBOARD TAHUN ANGGARAN :
+ 3.00 + 3.00

2023
600

600
LOKASI :

JL. KELINCI, TALISE,


PLAFOND KECAMATAN PALU TIM., KOTA PALU,
- 0.05 GYBSUM - 0.05
SULAWESI TENGAH - 94118
+ 3.00
3 MENGETAHUI OLEH :
172
DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

2345
386
600

600
AGUNG NUR ROHMAD, ST.,MM.
372
NIP. 19760725B200501 1 001
DISETUJUI OLEH :

PEJABAT PEMBUAT KOMITMEN (PPK)


PEJABAT PEMBUAT KOMITMEN

4 PF1
PLAFOND GYBSUM
+ 3.00 ADITYA WIBAWA S.P, ST
AKHIRUDIN,
NIP. 19860707 S.T.,M.Ec.Dev
201503 1 003
PLAFOND GYBSUM PLAFOND GYBSUM PLAFOND GYBSUM PLAFOND GYBSUM
400

400
NIP. 19851004200912 1 001
+ 3.00 + 3.00 + 3.00 + 3.00
DI BUAT OLEH :

5 KONSULTAN PERENCANA
345

345
BAMBANG RIYANTO
6 TEAM LEADER

Digambar -

Diperiksa -
500 400 500 600 500 400 500

Disetujui -

3400 Nama Gambar Skala

DENAH RENCANA PLAFOND LT. 1 EV +3.00


Skala 1:80 DENAH RENCANA -
1:130
PLAFOND

Kode Gmbr. No. Lembar Jml. Lembar

ARS 65 109
A B C D E F G H
500 400 500 600 500 400 500
400 100 KEMENTRIAN
100 400
KETENAGAKERJAAN
1 REPUBLIK INDONESIA
KEGIATAN :

PERENCANAAN PEMBANGUNAN
- 0.05
BLK PALU
400

400
SULAWESI TENGAH

PEKERJAAN :

2 PEMBANGUNAN WORKSHOP MANUFAKTUR,


REFRIGASI, DAN KANTOR TAHAP II

TAHUN ANGGARAN :

2023
600

600
LOKASI :

JL. KELINCI, TALISE,


- 0.05 - 0.05
KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118

3 MENGETAHUI OLEH :

DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

2345
600

600
AGUNG NUR ROHMAD, ST.,MM.
NIP. 19760725B200501 1 001
DISETUJUI OLEH :

PEJABAT PEMBUAT
PEJABAT PEMBUATKOMITMEN (PPK)
KOMITMEN

4 PF1
ADITYA WIBAWA S.P, ST
PLAFOND PLAFOND PLAFOND PLAFOND NIP.AKHIRUDIN,
19860707 S.T.,M.Ec.Dev
201503 1 003
400

400
KALSIBOARD KALSIBOARD KALSIBOARD KALSIBOARD NIP. 19851004200912 1 001
+ 4.00 + 4.00 + 4.00 + 4.00
DI BUAT OLEH :

5 KONSULTAN PERENCANA
100 393
393 100
345

345
BAMBANG RIYANTO
6 TEAM LEADER

Digambar -

Diperiksa -
500 400 500 600 500 400 500

Disetujui -
3400 Nama Gambar Skala

DENAH RENCANA PLAFOND LT. 1 EV +4.00


Skala 1:80 DENAH RENCANA -
1:130
PLAFOND

Kode Gmbr. No. Lembar Jml. Lembar

ARS 66 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :

PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH
Hollow Besi 4x4
PEKERJAAN :
Kawat Penggatung
Hollow Aluminium 4x4 PEMBANGUNAN WORKSHOP MANUFAKTUR,
Lis Plafond REFRIGASI, DAN KANTOR TAHAP II

TAHUN ANGGARAN :

+ 4.00
Plafond Kalsiboard
2023
LOKASI :

JL. KELINCI, TALISE,


KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118

100 MENGETAHUI OLEH :

DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

+ 3.00
Plafond Gypsum
AGUNG NUR ROHMAD, ST.,MM.
50 50 50 50 50 50 50 NIP. 19760725B200501 1 001
DISETUJUI OLEH :
100 100 100
PEJABAT PEMBUAT
PEJABAT PEMBUATKOMITMEN (PPK)
KOMITMEN

ADITYA WIBAWA S.P, ST


NIP.AKHIRUDIN,
19860707 201503 1 003
S.T.,M.Ec.Dev
NIP. 19851004200912 1 001
100 400
DI BUAT OLEH :
DETAIL PLAFOND PF 1
SKALA 1:30 KONSULTAN PERENCANA

BAMBANG RIYANTO
TEAM LEADER

Digambar -

Diperiksa -

Disetujui -
Nama Gambar Skala

RENCANA -
1:30
PLAFOND

Kode Gmbr. No. Lembar Jml. Lembar

ARS 67 109
500 400 500 600 500 400 500
100 400 400 100 100 400 400 100
20 20
KEMENTRIAN
KETENAGAKERJAAN

155

155
REPUBLIK INDONESIA
KEGIATAN :

PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH
400

400
PEKERJAAN :

PEMBANGUNAN WORKSHOP MANUFAKTUR,


REFRIGASI, DAN KANTOR TAHAP II

TAHUN ANGGARAN :

2023
600

600
LOKASI :
PLAFOND GYBSUM
+ 7.00
JL. KELINCI, TALISE,
KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118

MENGETAHUI OLEH :

2000
DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

PLAFOND GYBSUM
+ 7.00
AGUNG NUR ROHMAD, ST.,MM.
600

600
NIP. 19760725B200501 1 001
DISETUJUI OLEH :

PEJABAT PEMBUAT KOMITMEN (PPK)


PEJABAT PEMBUAT KOMITMEN
PF2

ADITYA WIBAWA S.P, ST


NIP.AKHIRUDIN,
19860707 S.T.,M.Ec.Dev
201503 1 003
PLAFOND GYBSUM NIP. 19851004200912 1 001
+ 7.00
400

400
DI BUAT OLEH :

KONSULTAN PERENCANA
155

155

20 20
BAMBANG RIYANTO
100 400 400 100 300 300 100 400 400 100 TEAM LEADER

500 400 500 600 500 400 500 Digambar -

Diperiksa -
3400
Disetujui -
DENAH RENCANA PLAFOND LANTAI 2 EV +7.00
Skala 1:80 Nama Gambar Skala

DENAH RENCANA -
1:130
PLAFOND

Kode Gmbr. No. Lembar Jml. Lembar

ARS 68 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :

PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH

PEKERJAAN :

PEMBANGUNAN WORKSHOP MANUFAKTUR,


REFRIGASI, DAN KANTOR TAHAP II

Kawat Penggatung TAHUN ANGGARAN :


Hollow Aluminium 4x4
Lis Plafond 2023
LOKASI :

JL. KELINCI, TALISE,


KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118

MENGETAHUI OLEH :

DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI


50

+ 7.00
Plafond Gypsum
50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 31
AGUNG NUR ROHMAD, ST.,MM.
100 100 100 100 100 100 100 NIP. 19760725B200501 1 001
DISETUJUI OLEH :

PEJABAT PEMBUAT
PEJABAT PEMBUAT KOMITMEN
KOMITMEN (PPK)

100 600 100


ADITYA WIBAWA S.P, ST
800 NIP.AKHIRUDIN,
19860707 201503 1 003
S.T.,M.Ec.Dev
NIP. 19851004200912 1 001
DETAIL PLAFOND PF 2 DI BUAT OLEH :
SKALA 1:30

KONSULTAN PERENCANA

BAMBANG RIYANTO
TEAM LEADER

Digambar -

Diperiksa -

Disetujui -
Nama Gambar Skala

RENCANA -
1:30
PLAFOND

Kode Gmbr. No. Lembar Jml. Lembar

ARS 69 109
A B C D E F G H
500 400 500 600 500 400 500
400 100
100 400
KEMENTRIAN
1 KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :

- 0.05
PERENCANAAN PEMBANGUNAN
400

400
BLK PALU
SULAWESI TENGAH

PEKERJAAN :
2
PEMBANGUNAN WORKSHOP MANUFAKTUR,
REFRIGASI, DAN KANTOR TAHAP II

HOMOGENOUS TILE HOMOGENOUS TILE


60X60 60X60 TAHUN ANGGARAN :
600

600
HOMOGENOUS TILE
60X60
2023
LOKASI :

JL. KELINCI, TALISE,


- 0.05 HOMOGENOUS TILE
- 0.05
KECAMATAN PALU TIM., KOTA PALU,
60X60
SULAWESI TENGAH - 94118
3
MENGETAHUI OLEH :
HOMOGENOUS TILE
60X60 DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

2345
600

600
AGUNG NUR ROHMAD, ST.,MM.
NIP. 19760725B200501 1 001
DISETUJUI OLEH :

PEJABAT PEMBUAT KOMITMEN (PPK)


PEJABAT PEMBUAT KOMITMEN
4

HOMOGENOUS TILE HOMOGENOUS TILE HOMOGENOUS TILE


ADITYA WIBAWA S.P, ST
AKHIRUDIN, S.T.,M.Ec.Dev
400

400
60X60 60X60 60X60 NIP. 19860707 201503 1 003
NIP. 19851004200912 1 001

DI BUAT OLEH :

5
KONSULTAN PERENCANA
345

345
HOMOGENOUS TILE
60X60

6 BAMBANG RIYANTO
TEAM LEADER

MT - 0.50 Digambar -
500 400 500 600 500 400 500
Diperiksa -

Disetujui -
3400
Nama Gambar Skala
DENAH RENCANA KERAMIK LT. 1
Skala 1:130
DENAH RENCANA -
1:130
KERAMIK

Kode Gmbr. No. Lembar Jml. Lembar

ARS 70 109
KEMENTRIAN
A B C D E F G H KETENAGAKERJAAN
REPUBLIK INDONESIA
500 400 500 600 500 400 500
KEGIATAN :
100 400 400 100 100 400 400 100

PERENCANAAN PEMBANGUNAN
1 BLK PALU
SULAWESI TENGAH

PEKERJAAN :
400

400
PEMBANGUNAN WORKSHOP MANUFAKTUR,
REFRIGASI, DAN KANTOR TAHAP II

TAHUN ANGGARAN :
2
2023
LOKASI :

HOMOGENOUS TILE JL. KELINCI, TALISE,


600

600
60X60
KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118

MENGETAHUI OLEH :

DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

2000
3

AGUNG NUR ROHMAD, ST.,MM.


HOMOGENOUS HOMOGENOUS TILE NIP. 19760725B200501 1 001
TILE 60X60
60X60 DISETUJUI OLEH :
600

600
PEJABAT PEMBUAT
PEJABAT PEMBUATKOMITMEN (PPK)
KOMITMEN

ADITYA WIBAWA S.P, ST


NIP.AKHIRUDIN,
19860707 S.T.,M.Ec.Dev
201503 1 003
4 NIP. 19851004200912 1 001

HOMOGENOUS TILE
60X60 DI BUAT OLEH :
400

400
KONSULTAN PERENCANA

5
100 400 400 100 300 300 100 400 400 100
BAMBANG RIYANTO
TEAM LEADER
500 400 500 600 500 400 500
Digambar -

3400 Diperiksa -
DENAH RENCANA KERAMIK LT. 2 Disetujui
Skala 1:130
-
Nama Gambar Skala

DENAH RENCANA -
1:130
KERAMIK

Kode Gmbr. No. Lembar Jml. Lembar

ARS 71 109
FSD3 FSD3

KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :

PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH

PEKERJAAN :

PEMBANGUNAN WORKSHOP MANUFAKTUR,


REFRIGASI, DAN KANTOR TAHAP II

TAHUN ANGGARAN :

2023
LOKASI :

JL. KELINCI, TALISE,


KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118

MENGETAHUI OLEH :

DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

AGUNG NUR ROHMAD, ST.,MM.


NIP. 19760725B200501 1 001
DISETUJUI OLEH :

PEJABAT PEMBUAT
PEJABAT PEMBUAT KOMITMEN
KOMITMEN (PPK)

ADITYA WIBAWA S.P, ST


NIP.AKHIRUDIN,
19860707 201503 1 003
S.T.,M.Ec.Dev
NIP. 19851004200912 1 001

DI BUAT OLEH :

KONSULTAN PERENCANA

FSD4 FSD1 FSD4


FSD2 ACP2 FSD2
ACP2
BAMBANG RIYANTO
TEAM LEADER

FSD5 FSD5 Digambar -

Diperiksa -
DENAH RENCANA ACP & FASAD LT.1
ACP1 Skala 1:80 Disetujui -
Nama Gambar Skala

DENAH RENCANA -
1:130
FINISHING FASAD

Kode Gmbr. No. Lembar Jml. Lembar

ARS 72 109
KS2
KEMENTRIAN
KETENAGAKERJAAN
3569
REPUBLIK INDONESIA
KEGIATAN :

75
PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH

PEKERJAAN :

PEMBANGUNAN WORKSHOP MANUFAKTUR,


REFRIGASI, DAN KANTOR TAHAP II

TAHUN ANGGARAN :

2023
RG. KELAS LOKASI :
+4.15
JL. KELINCI, TALISE,
KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118

MENGETAHUI OLEH :

DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI


RG. WORKSHOP MANUFAKTUR RG. WORKSHOP MANUFAKTUR

2165
+/- 0.00 +/- 0.00
75 75

KORIDOR
BORDES
+4.15 KS2 AGUNG NUR ROHMAD, ST.,MM.
+ 2.15
NIP. 19760725B200501 1 001
DISETUJUI OLEH :

PEJABAT PEMBUAT
PEJABAT KOMITMEN
PEMBUAT (PPK)
KOMITMEN

ADITYA WIBAWA S.P, ST


NIP. 19860707
AKHIRUDIN, 201503 1 003
S.T.,M.Ec.Dev
NIP. 19851004200912 1 001
RG. KELAS
+4.15
DI BUAT OLEH :

KONSULTAN PERENCANA
75

1367 835 1367 BAMBANG RIYANTO


TEAM LEADER

Digambar -

KS2 KS1 KS2 DENAH RENCANA FASAD LT.2 Diperiksa -


Skala 1:80

Disetujui -
Nama Gambar Skala

DENAH RENCANA -
1:130
FINISHING FASAD

Kode Gmbr. No. Lembar Jml. Lembar

ARS 73 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :

PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH

PEKERJAAN :

PEMBANGUNAN WORKSHOP MANUFAKTUR,


ACP3
REFRIGASI, DAN KANTOR TAHAP II

TAHUN ANGGARAN :

2023
LOKASI :

JL. KELINCI, TALISE,


KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118

MENGETAHUI OLEH :

DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

AGUNG NUR ROHMAD, ST.,MM.


NIP. 19760725B200501 1 001
DISETUJUI OLEH :

PEJABAT PEMBUAT KOMITMEN (PPK)


PEJABAT PEMBUAT KOMITMEN

ADITYA WIBAWA S.P, ST


AKHIRUDIN,
NIP. 19860707 S.T.,M.Ec.Dev
201503 1 003
NIP. 19851004200912 1 001

DI BUAT OLEH :

KONSULTAN PERENCANA

BAMBANG RIYANTO
ACP3 TEAM LEADER

Digambar -

Diperiksa -
DENAH RENCANA ACP TOP FLOOR
Skala 1:80
Disetujui -
Nama Gambar Skala

DENAH RENCANA -
1:130
FINISHING FASAD

Kode Gmbr. No. Lembar Jml. Lembar

ARS 74 109
KEMENTRIAN
Pintu Jendela PJ1
KETENAGAKERJAAN
REPUBLIK INDONESIA
I-WF 150x300
Pasangan Bata KEGIATAN :
Acp Mereah Penutup Atap Teras

PERENCANAAN PEMBANGUNAN
BLK PALU
I-WF 125x250 SULAWESI TENGAH

∅8-15
Homogenous Tile 60x60 (Hitam) PEKERJAAN :
40 ∅8-15
40
8 8 8
PEMBANGUNAN WORKSHOP MANUFAKTUR,
140 REFRIGASI, DAN KANTOR TAHAP II
Pasangan Bata
115 99 115 99 99 115
∅8-15 TAHUN ANGGARAN :
Balok Latai

8 8 8 2023
40
Pintu Jendela PJ1
LOKASI :
∅8-15

360 JL. KELINCI, TALISE,


Homogenous Tile 60x60 (Hitam)
400 400 KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118
260
245 MENGETAHUI OLEH :
285 293 293 285
DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

Plat Lantai

Sloof 30x50
AGUNG NUR ROHMAD, ST.,MM.
NIP. 19760725B200501 1 001
DISETUJUI OLEH :

PEJABAT PEMBUAT
PEJABAT PEMBUATKOMITMEN (PPK)
KOMITMEN

8 37 67 8 8 67 37 8
120 480 120 Rabat Saluran Keliling
720
ADITYA WIBAWA S.P, ST
600 Sloof 30x50 NIP. 19860707
AKHIRUDIN, 201503 1 003
S.T.,M.Ec.Dev
NIP. 19851004200912 1 001
D5 D5 Plat Lantai
DI BUAT OLEH :

D5 E5 KONSULTAN PERENCANA
Pintu Jelndela PJ1
∅8-15 600

53 52 495 53 52

BAMBANG RIYANTO
TEAM LEADER
40 40
Digambar -
8 104 8 8 104 8
120 480 120 Diperiksa -
Pas Bata Kolom K1-b Disetujui -
Pas Bata Homogenous Tile 60x60 Kolom Praktis
Nama Gambar Skala
DETAIL FASAD FSD-1
SKALA 1:50
RENCANA -
1:50
FINISHING FASAD

Kode Gmbr. No. Lembar Jml. Lembar

ARS 75 109
KEMENTRIAN
Acp 2 KETENAGAKERJAAN
∅8-15
REPUBLIK INDONESIA
Acp 2
I-WF 125x250 233 8 176 I-WF 125x250 KEGIATAN :
30 146 30
8 8
PERENCANAAN PEMBANGUNAN
BLK PALU
Pasangan Bata SULAWESI TENGAH
140
138 122 122 PEKERJAAN :

∅8-15
Balok Latai
PEMBANGUNAN WORKSHOP MANUFAKTUR,
REFRIGASI, DAN KANTOR TAHAP II
8 8

Jendela J1
TAHUN ANGGARAN :
423 Jendela J1

160 160
175
160
423 2023
Kolom K2 (H-WF 200x200) LOKASI :
∅8-15 ∅8-15
Finshing Batu Alam Palimanan JL. KELINCI, TALISE,
30
8 8 KECAMATAN PALU TIM., KOTA PALU,
Pasangan Bata SULAWESI TENGAH - 94118
Pasangan Bata
85 MENGETAHUI OLEH :
Sloof 30x50
125 117 Plat Lantai 117
DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

Rabat Saluran Keliling Rabat Keliling

MT - 0.50

AGUNG NUR ROHMAD, ST.,MM.


418 NIP. 19760725B200501 1 001
DISETUJUI OLEH :

PEJABAT PEMBUAT
PEJABAT KOMITMEN
PEMBUAT (PPK)
KOMITMEN
30

ADITYA WIBAWA S.P, ST


NIP. 19860707
AKHIRUDIN, 201503 1 003
S.T.,M.Ec.Dev
NIP. 19851004200912 1 001
200
Kolom Praktis DI BUAT OLEH :
238
∅8-15 Pasangan Bata
Jelndela J1
Kolom K3
140 Finshing Batu Alam Palimanan

Kolom K2 (H-WF 200x200)


KONSULTAN PERENCANA

30

8 BAMBANG RIYANTO
TEAM LEADER
Acp 2 233 185
418
Digambar -
500
Diperiksa -
G5 H5 Disetujui -

DETAIL FASAD FSD-2 Nama Gambar Skala


SKALA 1:50
RENCANA -
1:50
FINISHING FASAD

Kode Gmbr. No. Lembar Jml. Lembar

ARS 76 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :

PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH

PEKERJAAN :

PEMBANGUNAN WORKSHOP MANUFAKTUR,


D E REFRIGASI, DAN KANTOR TAHAP II
Finishing FSD-4
113 600 113
TAHUN ANGGARAN :

2023
5
LOKASI :

70 JL. KELINCI, TALISE,


KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118

MENGETAHUI OLEH :

DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

170
345

Acp Merah Acp Merah

+4.15 120
450 AGUNG NUR ROHMAD, ST.,MM.
NIP. 19760725B200501 1 001
DISETUJUI OLEH :
Sealant Putih PEJABAT PEMBUAT
PEJABAT PEMBUATKOMITMEN (PPK)
KOMITMEN

170
6
ADITYA WIBAWA S.P, ST
AKHIRUDIN,
NIP. 19860707 S.T.,M.Ec.Dev
201503 1 003
NIP. 19851004200912 1 001

40 DI BUAT OLEH :

KONSULTAN PERENCANA
40 133 120 120 120 133 40

825

DETAIL FASAD ACP-1


SKALA 1:50

BAMBANG RIYANTO
TEAM LEADER

Digambar -

Diperiksa -

Disetujui -
Nama Gambar Skala

RENCANA -
1:50
FINISHING FASAD

Kode Gmbr. No. Lembar Jml. Lembar

ARS 77 109
D E
113 600 113

KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
5 KEGIATAN :

Acp Merah
70 PERENCANAAN PEMBANGUNAN
+3.60 BLK PALU
SULAWESI TENGAH

PEKERJAAN :

PEMBANGUNAN WORKSHOP MANUFAKTUR,


170 REFRIGASI, DAN KANTOR TAHAP II
345
Sealant Putih
Acp Merah Acp Putih TAHUN ANGGARAN :
+3.65 Acp Merah
450
2023
LOKASI :

JL. KELINCI, TALISE,


170 KECAMATAN PALU TIM., KOTA PALU,
6 SULAWESI TENGAH - 94118

MENGETAHUI OLEH :

DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

40

40 133 120 120 120 120 133 40 AGUNG NUR ROHMAD, ST.,MM.
NIP. 19760725B200501 1 001
825 DISETUJUI OLEH :

PEJABAT PEMBUAT
PEJABAT KOMITMEN
PEMBUAT (PPK)
KOMITMEN

ADITYA WIBAWA S.P, ST


NIP. 19860707
AKHIRUDIN, 201503 1 003
S.T.,M.Ec.Dev
NIP. 19851004200912 1 001
I-WF 150x300 Acp Merah
Sealant Putih Rangka Besi Hollow 4x4
Rangka Besi Hollow 4x4 DI BUAT OLEH :
450
+ 4.15
Acp Merah

15 KONSULTAN PERENCANA
55 50 25
10
5
+ 3.65
+ 3.60 Acp Putih
Acp Merah

170 170 70
340
Finishing FSD-4 Acp Putih Rangka Besi Hollow 4x4 BAMBANG RIYANTO
TEAM LEADER
Finishing FSD-1

Digambar -

Diperiksa -

Disetujui -
Nama Gambar Skala

RENCANA -
DETAIL FASAD ACP-1 FINISHING FASAD
1:50
SKALA 1:50

Kode Gmbr. No. Lembar Jml. Lembar

ARS 78 109
Acp Merah
40 180 180 40

KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
78 78
KEGIATAN :

PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH

PEKERJAAN :
150
Pintu P1
PEMBANGUNAN WORKSHOP MANUFAKTUR,
REFRIGASI, DAN KANTOR TAHAP II

TAHUN ANGGARAN :
523

2023
445 145

LOKASI :

JL. KELINCI, TALISE,


KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118

MENGETAHUI OLEH :

150 DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI


Ramp Beton

AGUNG NUR ROHMAD, ST.,MM.


NIP. 19760725B200501 1 001
40 360 40
DISETUJUI OLEH :
440 PEJABAT PEMBUAT KOMITMEN (PPK)
PEJABAT PEMBUAT KOMITMEN

F5 G5
400 ADITYA WIBAWA S.P, ST
Pintu P1
Kolom K3 NIP.AKHIRUDIN,
19860707 S.T.,M.Ec.Dev
201503 1 003
NIP. 19851004200912 1 001

DI BUAT OLEH :

60 60 KONSULTAN PERENCANA

40 360 40
440 Acp Merah
Rangka Besi Hollow 4x4

DETAIL FASAD ACP-2 BAMBANG RIYANTO


TEAM LEADER
SKALA 1:50

Digambar -

Diperiksa -

Disetujui -
Nama Gambar Skala

RENCANA -
1:50
FINISHING FASAD

Kode Gmbr. No. Lembar Jml. Lembar

ARS 79 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :

PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH

PEKERJAAN :

PEMBANGUNAN WORKSHOP MANUFAKTUR,


REFRIGASI, DAN KANTOR TAHAP II

70 13 25 13 25 16 25 13 68 20 40 19 40 40 19 40 20 68 13 25 16 25 13 25 13 70
TAHUN ANGGARAN :

2023
Finshing Batu Alam Palimanan

LOKASI :

JL. KELINCI, TALISE,


KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118

MENGETAHUI OLEH :

375 375 DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

AGUNG NUR ROHMAD, ST.,MM.


NIP. 19760725B200501 1 001
DISETUJUI OLEH :

PEJABAT PEMBUAT
PEJABAT PEMBUAT KOMITMEN
KOMITMEN (PPK)

ADITYA WIBAWA S.P, ST


NIP. 19860707
AKHIRUDIN, 201503 1 003
S.T.,M.Ec.Dev
NIP. 19851004200912 1 001

100 400 DI BUAT OLEH :

500 400 400 KONSULTAN PERENCANA


H1 F1 G1
DETAIL FASAD FSD-3
SKALA 1:50

BAMBANG RIYANTO
TEAM LEADER

Digambar -

Diperiksa -

Disetujui -
Nama Gambar Skala

RENCANA -
1:50
FINISHING FASAD

Kode Gmbr. No. Lembar Jml. Lembar

ARS 80 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :

PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH

PEKERJAAN :
30

Finishing Komport 20 PEMBANGUNAN WORKSHOP MANUFAKTUR,


REFRIGASI, DAN KANTOR TAHAP II
Fasad ACP-1
Fasad ACP-2
35

TAHUN ANGGARAN :
I-WF 125x250

Finishing Beton 65
2023
LOKASI :
Fasad FSD-1
140
130 JL. KELINCI, TALISE,
Pas Bata Finishing KECAMATAN PALU TIM., KOTA PALU,
Batu Alam Palimanan
∅8-15 Balok Latai SULAWESI TENGAH - 94118

400
8 MENGETAHUI OLEH :
40
DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI
Jendela J1
300
314,8

375
175 425
160

AGUNG NUR ROHMAD, ST.,MM.


NIP. 19760725B200501 1 001
Plat Lantai
DISETUJUI OLEH :
Sloof 30x50
Pasangan Bata PEJABAT PEMBUAT KOMITMEN (PPK)
PEJABAT PEMBUAT KOMITMEN
85 85 Rabat Saluran Keliling
Sloof 30x50
Plat Lantai Rabat Keliling

ADITYA WIBAWA S.P, ST


60 NIP. 19860707
AKHIRUDIN, 201503 1 003
S.T.,M.Ec.Dev
MT - 0.50 NIP. 19851004200912 1 001
15 5 20 5 15

DI BUAT OLEH :
420 60 30 20

DETAIL FASAD FSD-4 H-WF 200x200


Cor Beton Kolom
SKALA 1:50 KONSULTAN PERENCANA
Pas Bata
Finishing Batu Alam Palimanan

DETAIL FASAD FSD-5


SKALA 1:50

BAMBANG RIYANTO
TEAM LEADER

Digambar -

Diperiksa -

Disetujui -
Nama Gambar Skala

RENCANA -
1:50
FINISHING FASAD

Kode Gmbr. No. Lembar Jml. Lembar

ARS 81 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KS2 KS1 KS2
KEGIATAN :

Rangka Besi Hollow 4x4 WPC 10x360 Jarak 10cm WPC 10x360 Jarak 10cm
PERENCANAAN PEMBANGUNAN
BLK PALU
1367 835 1367
SULAWESI TENGAH
+ 7.50
75 75
PEKERJAAN :
180

PEMBANGUNAN WORKSHOP MANUFAKTUR,

340
320
REFRIGASI, DAN KANTOR TAHAP II
360

380
180

TAHUN ANGGARAN :

40
118
2023
+ 3.90

LOKASI :
500 400 500 600 500 400 500

A B C D E F G H JL. KELINCI, TALISE,


KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118
Rencana Kisi-Kisi Fasad
Skala 1:130
MENGETAHUI OLEH :

DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI

Kolom Baja I-WF 150x300

Finishing Cor Kolom Baja

Rangka Besi Hollow 4x4


75 AGUNG NUR ROHMAD, ST.,MM.
NIP. 19760725B200501 1 001
DISETUJUI OLEH :
Kisi Kisi WPC
PEJABAT PEMBUAT
PEJABAT PEMBUATKOMITMEN (PPK)
KOMITMEN

Join Dynabolt
(Khusus Area Yang terhubung langsung
180
ke Baja Di lakukan Pengelasan)
ADITYA WIBAWA S.P, ST
NIP. 19860707
AKHIRUDIN, 201503 1 003
S.T.,M.Ec.Dev
NIP. 19851004200912 1 001

360 DI BUAT OLEH :

KONSULTAN PERENCANA

180

BAMBANG RIYANTO
TEAM LEADER

Digambar -

Diperiksa -
DETAIL POTONGAN RANGKA KISI KISI
SKALA 1:50
Disetujui -
Nama Gambar Skala

RENCANA -
1:50
FINISHING FASAD

Kode Gmbr. No. Lembar Jml. Lembar

ARS 82 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :

PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH

PEKERJAAN :

PEMBANGUNAN WORKSHOP MANUFAKTUR,


REFRIGASI, DAN KANTOR TAHAP II

TAHUN ANGGARAN :

320 320
2023
Acp Merah
33
Atap Bitumen
LOKASI :
89
JL. KELINCI, TALISE,
KECAMATAN PALU TIM., KOTA PALU,
Acp Merah SULAWESI TENGAH - 94118
136
Acp Putih Rangka Besi Hollow 4x4
Sealant Putih MENGETAHUI OLEH :
40
DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI
113 170 170
40

24 Atap

Acp Putih
320 232 320
AGUNG NUR ROHMAD, ST.,MM.
NIP. 19760725B200501 1 001
DISETUJUI OLEH :
82 PEJABAT PEMBUAT
PEJABAT KOMITMEN
PEMBUAT (PPK)
KOMITMEN
150 150

25
98 120 120 120 98
Pas Bata ADITYA WIBAWA S.P, ST
Plat Dak Beton NIP. 19860707
AKHIRUDIN, 201503 1 003
S.T.,M.Ec.Dev
40 560 40
NIP. 19851004200912 1 001
Finising Kolom
640 13 20
DI BUAT OLEH :
33

KONSULTAN PERENCANA

600

D5 E5
BAMBANG RIYANTO
TEAM LEADER
DETAIL FASAD ACP-3
SKALA 1:30 Digambar -

Diperiksa -

Disetujui -
Nama Gambar Skala

RENCANA -
1:50
FINISHING FASAD

Kode Gmbr. No. Lembar Jml. Lembar

ARS 82 B 109
KEMENTRIAN
3725 KETENAGAKERJAAN
REPUBLIK INDONESIA
1470 750 1415

KEGIATAN :

PERENCANAAN PEMBANGUNAN
BLK PALU

80
SULAWESI TENGAH

SL2 PEKERJAAN :

PEMBANGUNAN WORKSHOP MANUFAKTUR,


REFRIGASI, DAN KANTOR TAHAP II
80

TAHUN ANGGARAN :

2023
LOKASI :

JL. KELINCI, TALISE,


KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118

MENGETAHUI OLEH :

DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI


80

SL1
2325

2235

2235
2325
AGUNG NUR ROHMAD, ST.,MM.
NIP. 19760725B200501 1 001
DISETUJUI OLEH :

PEJABAT PEMBUAT
PEJABAT PEMBUATKOMITMEN (PPK)
KOMITMEN

ADITYA WIBAWA S.P, ST


NIP.AKHIRUDIN,
19860707 201503 1 003
S.T.,M.Ec.Dev
NIP. 19851004200912 1 001

DI BUAT OLEH :

KONSULTAN PERENCANA

BAMBANG RIYANTO
80

TEAM LEADER

Digambar -
557 365 365 557
Diperiksa -
662 485 485 662

Disetujui -
DENAH RENCANA SALURAN KRLILING
Skala 1:80 Nama Gambar Skala

DENAH RENCANA -
1:130
SALURAN KELILING

Kode Gmbr. No. Lembar Jml. Lembar

ARS 83 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :

PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH

PEKERJAAN :

PEMBANGUNAN WORKSHOP MANUFAKTUR,


REFRIGASI, DAN KANTOR TAHAP II
90

60 TAHUN ANGGARAN :

H-WF 200X200
2023
Soof 30X50 15 45
15
Rabat Keliling LOKASI :
MT -0.50

Pasir Urug JL. KELINCI, TALISE,


40
65 55 55 KECAMATAN PALU TIM., KOTA PALU,
80,1 Pas Bata 60 30 60
SULAWESI TENGAH - 94118
Tanah Asli 5
5
5
10 MENGETAHUI OLEH :
5

40 15 DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI


55
45

Pasir Urug
Rabat beton
Rabat Saluran Krikil & Pasir AGUNG NUR ROHMAD, ST.,MM.
Pasir Urug
15 30 15
Tanah Urug NIP. 19760725B200501 1 001
60 DISETUJUI OLEH :
15 30 15 PEJABAT PEMBUAT KOMITMEN (PPK)
PEJABAT PEMBUAT KOMITMEN
DETAIL POT.SALURAN SL-1
SKALA 1:30
ADITYA WIBAWA S.P, ST
DETAIL POT.RESAPAN SALURAN SL-2 NIP. 19860707
AKHIRUDIN, 201503 1 003
S.T.,M.Ec.Dev
NIP. 19851004200912 1 001
SKALA 1:30
DI BUAT OLEH :

KONSULTAN PERENCANA

BAMBANG RIYANTO
TEAM LEADER

Digambar -

Diperiksa -

Disetujui -
Nama Gambar Skala

RENCANA -
1:30
SALURAN KELILING

Kode Gmbr. No. Lembar Jml. Lembar

ARS 84 109

Anda mungkin juga menyukai