LEGENDA : KETENAGAKERJAAN
REPUBLIK INDONESIA
A. MAIN ENTRANCE KEGIATAN :
K SULAWESI TENGAH
TAHUN ANGGARAN :
G. ASRAMA
H.1. WORKSHOP OTOMOTIF
H.2 H.2. WORKSHOP LAS
2023
LOKASI :
H.3. WORKSHOP BANGUNAN
I.4 I.1. WORKSHOP MANUFAKTUR
JL. KELINCI, TALISE,
KECAMATAN PALU TIM., KOTA PALU,
N
Jl.hang tuah
MENGETAHUI OLEH :
- 0.05
I.2. WORKSHOP REFRIGRASI
H.3
RG. ALAT
+ 0.05
DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI
(Pembangunan)
I.1
RG. INSTRUKTUR
+ 0.05
I.4. WORKSHOP KOMPUTER
+/- 0.00
WANITA
+/- 0.00
TOILET
JANITOR
+/- 0.00
+ 0.05
- 0.05
LOBBY
TERAS
AGUNG NUR ROHMAD, ST.,MM.
J. PARKIR
KORIDOR
+ 0.05
N N
+/- 0.00
WANITA
TOILET
NIP. 19760725B200501 1 001
RG. INSTRUKTUR
+ 0.05
K. SIDE ENTRANCE DISETUJUI OLEH :
+/- 0.00
E C
RG. ALAT
+ 0.05
- 0.05
ADITYA WIBAWA S.P, ST
NIP. 19860707
AKHIRUDIN, 201503 1 003
S.T.,M.Ec.Dev
N B NIP. 19851004200912 1 001
J DI BUAT OLEH :
GROUND TANK
KONSULTAN PERENCANA
250
3000
250
5000
HOLE
LOUVRE PANEL
R. POMPA
FFL. -0.550
TERAS
-0.580
ramp
HOLE
250
3000
250
5000
TERAS
-0.580
D
MVDP
LOUVRE PANEL
R. TRAVO
FFL. -0.550
TERAS
-0.580
ramp
TRANCH KABEL
GEN OUT GENSET TRAFO OUTGOING BANK
INCOM INCOM CAP.
FLOOR FINISH LEVEL
TRANCH KABEL
GRILL HOLLOW 20.40.4
-0.550
HOLLOW 40.40.4
FRAME GRILL
TERAS
-0.580
ramp
R. GENSET
FFL. -0.550
SILENCER
300 kVA
DG-1
KNALPOT Ø 100
GENSET
A
LOUVRE PANEL
MANUAL PUMP
P. POMPA SOLAR
DAILY TANK
1000 litre
BAMBANG RIYANTO
TEAM LEADER
Digambar -
Diperiksa -
Jl.kelinci Disetujui -
Nama Gambar Skala
SITE PLAN
Kode Gmbr. No. Lembar Jml. Lembar
ARS 01 109
A B C D E F G H
500 400 500 600 500 400 500
400 100
100 400 B
KEMENTRIAN
1 KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :
- 0.05
400
400
PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH
PEKERJAAN :
2
PEMBANGUNAN WORKSHOP MANUFAKTUR,
REFRIGASI, DAN KANTOR TAHAP II
TOILET TOILET
WANITA WANITA
+/- 0.00 +/- 0.00
TAHUN ANGGARAN :
600
600
JANITOR
+/- 0.00
2023
RG. WORKSHOP MANUFAKTUR RG. WORKSHOP REFRIGASI LOKASI :
+/- 0.00 +/- 0.00
- 0.05 RG.PANEL - 0.05
JL. KELINCI, TALISE,
+ 0.05 KECAMATAN PALU TIM., KOTA PALU,
3 SULAWESI TENGAH - 94118
MENGETAHUI OLEH :
2345
KORIDOR
+ 0.05
600
600
AGUNG NUR ROHMAD, ST.,MM.
A A NIP. 19760725B200501 1 001
DISETUJUI OLEH :
PEJABAT PEMBUAT
PEJABAT PEMBUATKOMITMEN (PPK)
KOMITMEN
4
LOBBY
+ 0.05
400
RG. ALAT RG. INSTRUKTUR RG. INSTRUKTUR RG. ALAT
+ 0.05 + 0.05 + 0.05 + 0.05
NIP.AKHIRUDIN,
19860707 201503 1 003
S.T.,M.Ec.Dev
NIP. 19851004200912 1 001
DI BUAT OLEH :
5
KONSULTAN PERENCANA
345
345
TERAS
+/- 0.00
6
BAMBANG RIYANTO
TEAM LEADER
MT - 0.50
B Digambar -
500 400 500 600 500 400 500
Diperiksa -
3400 Disetujui -
DENAH LANTAI 1 Nama Gambar Skala
Skala 1:130
DENAH 1:130
ARS 02 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
A B C D E F G H
KEGIATAN :
500 400 500 600 500 400 500
100 400 400 100 100 400 400 100 PERENCANAAN PEMBANGUNAN
B BLK PALU
SULAWESI TENGAH
1
PEKERJAAN :
400
REFRIGASI, DAN KANTOR TAHAP II
TAHUN ANGGARAN :
2
2023
LOKASI :
600
SULAWESI TENGAH - 94118
MENGETAHUI OLEH :
2000
3 +/- 0.00 +/- 0.00
600
A A ADITYA WIBAWA S.P, ST
NIP. 19860707
AKHIRUDIN, 201503 1 003
S.T.,M.Ec.Dev
NIP. 19851004200912 1 001
4 DI BUAT OLEH :
RG. KELAS
+4.15 KONSULTAN PERENCANA
400
400
5
BAMBANG RIYANTO
100 400 400 100 300 300 100 400 400 100 TEAM LEADER
Digambar -
500 400 500 600 500 400 500
Diperiksa -
3400 Disetujui -
DENAH LANTAI 2
Skala 1:130
Nama Gambar Skala
B DENAH 1:130
ARS 03 109
A B C D E F G H
KEMENTRIAN
500 400 500 600 500 400 500 KETENAGAKERJAAN
REPUBLIK INDONESIA
B KEGIATAN :
PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH
1
PEKERJAAN :
400
REFRIGASI, DAN KANTOR TAHAP II
TAHUN ANGGARAN :
2
2023
LOKASI :
600
SULAWESI TENGAH - 94118
MENGETAHUI OLEH :
3
AGUNG NUR ROHMAD, ST.,MM.
NIP. 19760725B200501 1 001
DISETUJUI OLEH :
PEJABAT PEMBUAT
PEJABAT PEMBUAT KOMITMEN (PPK)
KOMITMEN
A A
600
600
ADITYA WIBAWA S.P, ST
NIP.AKHIRUDIN,
19860707S.T.,M.Ec.Dev
201503 1 003
NIP. 19851004200912 1 001
4 DI BUAT OLEH :
KONSULTAN PERENCANA
400
400
5
BAMBANG RIYANTO
155
155
TEAM LEADER
Digambar -
DENAH 1:130
ARS 04 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :
PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH
PEKERJAAN :
TAHUN ANGGARAN :
2023
LOKASI :
MENGETAHUI OLEH :
PEJABAT PEMBUAT
PEJABAT PEMBUAT KOMITMEN
KOMITMEN (PPK)
DI BUAT OLEH :
KONSULTAN PERENCANA
BAMBANG RIYANTO
TAMPAK DEPAN TEAM LEADER
Skala 1:130
Digambar -
Diperiksa -
Disetujui -
Nama Gambar Skala
TAMPAK 1:130
ARS 05 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :
PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH
PEKERJAAN :
TAHUN ANGGARAN :
2023
LOKASI :
MENGETAHUI OLEH :
PEJABAT PEMBUAT
PEJABAT PEMBUAT KOMITMEN
KOMITMEN (PPK)
DI BUAT OLEH :
KONSULTAN PERENCANA
BAMBANG RIYANTO
TAMPAK KANAN TEAM LEADER
Skala 1:130
Digambar -
Diperiksa -
Disetujui -
Nama Gambar Skala
TAMPAK 1:130
ARS 06 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :
PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH
PEKERJAAN :
TAHUN ANGGARAN :
2023
LOKASI :
MENGETAHUI OLEH :
PEJABAT PEMBUAT
PEJABAT PEMBUAT KOMITMEN
KOMITMEN (PPK)
DI BUAT OLEH :
KONSULTAN PERENCANA
BAMBANG RIYANTO
TEAM LEADER
Digambar -
TAMPAK KIRI
Skala 1:130 Diperiksa -
Disetujui -
Nama Gambar Skala
TAMPAK 1:130
ARS 07 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :
PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH
PEKERJAAN :
TAHUN ANGGARAN :
2023
LOKASI :
MENGETAHUI OLEH :
PEJABAT PEMBUAT
PEJABAT KOMITMEN
PEMBUAT (PPK)
KOMITMEN
DI BUAT OLEH :
KONSULTAN PERENCANA
BAMBANG RIYANTO
TEAM LEADER
Digambar -
TAMPAK BELAKANG
Skala 1:130 Diperiksa -
Disetujui -
Nama Gambar Skala
TAMPAK 1:130
ARS 08 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :
PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH
PEKERJAAN :
TAHUN ANGGARAN :
2023
LOKASI :
MENGETAHUI OLEH :
PEJABAT PEMBUAT
PEJABAT KOMITMEN
PEMBUAT (PPK)
KOMITMEN
DI BUAT OLEH :
KONSULTAN PERENCANA
BAMBANG RIYANTO
TEAM LEADER
Disetujui -
Nama Gambar Skala
PERSPEKTIF -
ARS 09 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :
PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH
PEKERJAAN :
TAHUN ANGGARAN :
2023
LOKASI :
MENGETAHUI OLEH :
PERSPEKTIF BANGUNAN
Skala -
PEJABAT PEMBUAT
PEJABAT PEMBUAT KOMITMEN
KOMITMEN (PPK)
DI BUAT OLEH :
KONSULTAN PERENCANA
BAMBANG RIYANTO
TEAM LEADER
Digambar -
Diperiksa -
Disetujui -
Nama Gambar Skala
PERSPEKTIF -
PERSPEKTIF BANGUNAN
Skala -
Kode Gmbr. No. Lembar Jml. Lembar
ARS 10 109
+ 20.025
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :
PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH
PEKERJAAN :
2023
LOKASI :
A B C D E F G H
BAMBANG RIYANTO
3400
TEAM LEADER
Disetujui -
Nama Gambar Skala
POTONGAN 1:130
ARS 11 109
Gording CNP 150.50.20.2,5
Atap Bitumen
+ 20.025 KEMENTRIAN
KETENAGAKERJAAN
I-WF 125X250.6.9mm REPUBLIK INDONESIA
KEGIATAN :
PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH
TAHUN ANGGARAN :
2023
LOKASI :
MENGETAHUI OLEH :
+ 7.65
+ 7.50
PEJABAT PEMBUAT
PEJABAT KOMITMEN
PEMBUAT (PPK)
KOMITMEN
+ 4.15
+ 4.00
DI BUAT OLEH :
Sloof 50x30
+/- 0.00
- 0.50 KONSULTAN PERENCANA
- 1.10
Pondasi Pile Cap
Digambar -
Disetujui -
Nama Gambar Skala
PERSPEKTIF 1:130
ARS 12 109
A B C D E F G H
500 400 500 600 500 400 500
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :
1
PC2 PC2 PC2 PC2 PC2 PC2 PERENCANAAN PEMBANGUNAN
PC1 PC1 BLK PALU
SULAWESI TENGAH
400
400
PEKERJAAN :
2023
LOKASI :
600
600
JL. KELINCI, TALISE,
KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118
MENGETAHUI OLEH :
PC2 PC2
PC1 PC1
2345
AGUNG NUR ROHMAD, ST.,MM.
600
600
NIP. 19760725B200501 1 001
DISETUJUI OLEH :
PEJABAT PEMBUAT
PEJABAT PEMBUAT KOMITMEN (PPK)
KOMITMEN
4
ADITYA WIBAWA S.P, ST
PC2 PC2 NIP.AKHIRUDIN,
19860707S.T.,M.Ec.Dev
201503 1 003
PC1 PC1 NIP. 19851004200912 1 001
400
400
DI BUAT OLEH :
KONSULTAN PERENCANA
5
PC2 PC2 PC2 PC2 PC2 PC2
PC1 PC1
345
345
BAMBANG RIYANTO
TEAM LEADER
6 Digambar -
Diperiksa -
Disetujui -
Nama Gambar Skala
500 400 500 600 500 400 500
STR 13 109
28 70
25 KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
150 45 70 KEGIATAN :
38
70
PERENCANAAN PEMBANGUNAN
BLK PALU
25 SULAWESI TENGAH
100 25
PEKERJAAN :
28
38
PEMBANGUNAN WORKSHOP MANUFAKTUR,
REFRIGASI, DAN KANTOR TAHAP II
28 25 45 25 28 28 25 45 25 28
TAHUN ANGGARAN :
150 150
2023
28 25 45 25 28 28 25 45 25 28 LOKASI :
MENGETAHUI OLEH :
60 60
PEJABAT PEMBUAT
PEJABAT PEMBUATKOMITMEN (PPK)
KOMITMEN
600 600
DI BUAT OLEH :
KONSULTAN PERENCANA
BAMBANG RIYANTO
70 70
PC Wire 4-∅7mm PC Wire 4-∅7mm TEAM LEADER
Digambar -
25 25 ∅3mm-200 25 25 ∅3mm-200 Diperiksa -
25 25 Disetujui -
Nama Gambar Skala
RENCANA -
1:30
Detail Pancang PC-1 Detail Pancang PC-2 PONDASI PANCANG
SKALA 1:30 SKALA 1:30 Kode Gmbr. No. Lembar Jml. Lembar
STR 14 109
A B C D E F G H
500 400 500 600 500 400 500
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
1 KEGIATAN :
400
PEKERJAAN :
2023
600
600
LOKASI :
MENGETAHUI OLEH :
3 DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI
PP2 PP2
PP1 PP1
2345
AGUNG NUR ROHMAD, ST.,MM.
600
600
NIP. 19760725B200501 1 001
DISETUJUI OLEH :
4
PP2 PP2 ADITYA WIBAWA S.P, ST
PP1 PP1 NIP.AKHIRUDIN,
19860707 S.T.,M.Ec.Dev
201503 1 003
NIP. 19851004200912 1 001
400
400
DI BUAT OLEH :
KONSULTAN PERENCANA
5
PP2 PP3 PP3 PP3 PP3 PP2
PP1 PP1
345
345
BAMBANG RIYANTO
TEAM LEADER
6 Digambar -
PP4 PP4
Diperiksa -
Disetujui -
500 400 500 600 500 400 500 Nama Gambar Skala
STR 15 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :
PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH
150
PEKERJAAN :
48 55 48
PEMBANGUNAN WORKSHOP MANUFAKTUR,
REFRIGASI, DAN KANTOR TAHAP II
2023
D16-200
D16-200
45
D10-100 55 150 30 LOKASI :
HWF 300.300
Base Plate 2 cm
55
Grouting 3 cm
AGUNG NUR ROHMAD, ST.,MM.
20-D16
NIP. 19760725B200501 1 001
Angkur Ø19 mm DISETUJUI OLEH :
STD-00-IAB019
DI BUAT OLEH :
5
5
Lantai Kerja
Pasir Urug
KONSULTAN PERENCANA
5 150 5
160
Detail PILE CAP PP-1 Detail Join Kolom Baja K-1 BAMBANG RIYANTO
Digambar -
Diperiksa -
Disetujui -
Nama Gambar Skala
RENCANA -
1:30
PILE CAPE
STR 16 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :
PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH
PEKERJAAN :
53 45 53 TAHUN ANGGARAN :
16-D16 2023
28
LOKASI :
D16-200
D16-200
35
45 100 20 JL. KELINCI, TALISE,
D10-100
KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118
D16-200 45 20 35
28 MENGETAHUI OLEH :
D16-200
DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI
45
45
5 150 5
160
Digambar -
Diperiksa -
Disetujui -
Nama Gambar Skala
RENCANA -
1:30
PILE CAPE
STR 17 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :
PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH
PEKERJAAN :
TAHUN ANGGARAN :
150 2023
50 50 50
LOKASI :
D16-200
SULAWESI TENGAH - 94118
16 D16
30 100 Begel 40 MENGETAHUI OLEH :
D10-100 D10-100
30
DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI
D16-200 35 30 15 20
D16-200
50
50
AGUNG NUR ROHMAD, ST.,MM.
Kolom IWF 300.150.6,5.9
NIP. 19760725B200501 1 001
Base Plate 1,5 mm
Grouting 3 cm DISETUJUI OLEH :
10-D16 PEJABAT PEMBUAT KOMITMEN (PPK)
PEJABAT PEMBUAT KOMITMEN
Angkur Ø19 mm
STD-00-IAB019
D16-200
50
D10-100 62
5 KONSULTAN PERENCANA
5
Lantai Kerja
Pasir Urug
5 150 5
BAMBANG RIYANTO
160
Detail Join Kolom Baja K-3 TEAM LEADER
Disetujui -
Nama Gambar Skala
RENCANA -
1:30
PILE CAPE
PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH
PEKERJAAN :
TAHUN ANGGARAN :
100 2023
28 45 28
LOKASI :
D16-200
D16-200
35
20 MENGETAHUI OLEH :
D10-100 45 100
DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI
45 20 35
D16-200 28
D16-200
45
45
AGUNG NUR ROHMAD, ST.,MM.
Kolom HWF 200.200 NIP. 19760725B200501 1 001
Base Plate 1,5 mm
Grouting 3 cm
DISETUJUI OLEH :
16-D16 PEJABAT PEMBUAT KOMITMEN (PPK)
PEJABAT PEMBUAT KOMITMEN
Angkur Ø19 mm
STD-00-IAB019
50
D10-100 92
ADITYA WIBAWA S.P, ST
AKHIRUDIN,
NIP. 19860707 S.T.,M.Ec.Dev
201503 1 003
NIP. 19851004200912 1 001
D16-200
D16-200
60 DI BUAT OLEH :
70
5 KONSULTAN PERENCANA
5
Lantai Kerja
Pasir Urug
5 100 5
110
Detail PILE CAP PP-4 Detail Join Kolom Baja K-2 (PP-4)
SKALA 1:30 SKALA 1:30 BAMBANG RIYANTO
TEAM LEADER
Digambar -
Diperiksa -
Disetujui -
Nama Gambar Skala
RENCANA -
1:30
PILE CAPE
1 KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :
400
400
PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH
2 PEKERJAAN :
TAHUN ANGGARAN :
600
600
2023
LOKASI :
MENGETAHUI OLEH :
2345
DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI
600
600
AGUNG NUR ROHMAD, ST.,MM.
NIP. 19760725B200501 1 001
DISETUJUI OLEH :
PEJABAT PEMBUAT
PEJABAT KOMITMEN
PEMBUAT (PPK)
KOMITMEN
4
400
NIP. 19860707
AKHIRUDIN, 201503 1 003
S.T.,M.Ec.Dev
NIP. 19851004200912 1 001
DI BUAT OLEH :
5
KONSULTAN PERENCANA
345
345
6
BAMBANG RIYANTO
TEAM LEADER
Diperiksa -
3400
Disetujui -
DENAH RENCANA SLOOF Nama Gambar Skala
Skala 1:130
DENAH RENCANA -
1:130
SLOOF
Keterangan
Sloof 50x30cm Kode Gmbr. No. Lembar Jml. Lembar
STR 19 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :
PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH
PEKERJAAN :
TAHUN ANGGARAN :
50
2023
5 LOKASI :
5
JL. KELINCI, TALISE,
KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118
MENGETAHUI OLEH :
500
PEJABAT PEMBUAT
PEJABAT PEMBUATKOMITMEN (PPK)
KOMITMEN
10-D16
30
Detail Pot Sloof C5-D5
SKALA 1:30
ADITYA WIBAWA S.P, ST
NIP.AKHIRUDIN,
19860707 201503 1 003
S.T.,M.Ec.Dev
50
DI BUAT OLEH :
Rabat Beton
5 5
Pasir Urug
KONSULTAN PERENCANA
0 40
Detail POT.Sloof
SKALA 1:20
BAMBANG RIYANTO
TEAM LEADER
Digambar -
Diperiksa -
Disetujui -
Nama Gambar Skala
RENCANA -
1:30
SLOOF
STR 20 109
A B C D E F G H
500 400 500 600 500 400 500
PERENCANAAN PEMBANGUNAN
400
400
BLK PALU
SULAWESI TENGAH
PL
PEKERJAAN :
2
PEMBANGUNAN WORKSHOP MANUFAKTUR,
REFRIGASI, DAN KANTOR TAHAP II
Wiremesh ∅8-150
520
520
2023
600
600
LOKASI :
80
80
3 MENGETAHUI OLEH :
2345
600
600
AGUNG NUR ROHMAD, ST.,MM.
NIP. 19760725B200501 1 001
DISETUJUI OLEH :
400
NIP. 19851004200912 1 001
DI BUAT OLEH :
5 KONSULTAN PERENCANA
345
345
330
330
RAMP COR BETON RAMP COR BETON
BAMBANG RIYANTO
6 TEAM LEADER
370 370
Digambar -
Disetujui -
3400 Nama Gambar Skala
DENAH RENCANA SLOOF
Skala 1:130 DENAH RENCANA -
1:130
PLAT LANTAI
STR 21 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :
PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH
Wiremesh ∅8-150
PEKERJAAN :
10
5 PEMBANGUNAN WORKSHOP MANUFAKTUR,
5
REFRIGASI, DAN KANTOR TAHAP II
Lantai Kerja
Pasir Urug
TAHUN ANGGARAN :
2023
80 520 LOKASI :
MENGETAHUI OLEH :
38
DI BUAT OLEH :
5 5
KONSULTAN PERENCANA
36
BAMBANG RIYANTO
TEAM LEADER
Digambar -
Diperiksa -
Disetujui -
Nama Gambar Skala
RENCANA -
1:30
PLAT LANTAI
STR 22 109
A B C D E F G H
500 400 500 600 500 400 500
100 400 400 100
400 100 100 400 KEMENTRIAN
KETENAGAKERJAAN
1 KP KP REPUBLIK INDONESIA
K2-a K3 K3 K1-a K1-a KP K3 K3 KP
K2-a
KEGIATAN :
200
200
PERENCANAAN PEMBANGUNAN
400
400
BLK PALU
KP KP
SULAWESI TENGAH
200
200
PEKERJAAN :
300 300
K1-b K1-b
2 KP KP KP
K2-a K4 K4 K2-a PEMBANGUNAN WORKSHOP MANUFAKTUR,
100 100 REFRIGASI, DAN KANTOR TAHAP II
270
300
300
TAHUN ANGGARAN :
450
450
100 100
2023
600
600
KP KP KP
85
KP KP
KP KP LOKASI :
95
300
300
KP KP KP KP JL. KELINCI, TALISE,
200 200 200
150
150
KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118
3 KP
K2-a K4 K1-a K1-a K4 MENGETAHUI OLEH :
K2-a
300
2345
395
400
600
600
KP KP
AGUNG NUR ROHMAD, ST.,MM.
NIP. 19760725B200501 1 001
K2 KP
300
300
DISETUJUI OLEH :
205
200
PEJABAT PEMBUAT
PEJABAT KOMITMEN
PEMBUAT (PPK)
KOMITMEN
4 KP KP KP KP KP KP KP KP
K2-a K1-a K1-a K2-a
200
200
ADITYA WIBAWA S.P, ST
AKHIRUDIN,
NIP. 19860707S.T.,M.Ec.Dev
201503 1 003
400
400
KP KP NIP. 19851004200912 1 001
200
200
DI BUAT OLEH :
K1-a K1-a
5 KP KP KP KP KP KP KP
K2-a K3 K3 KP KP KP K3 K3 K2-a KONSULTAN PERENCANA
100 140 260 250 198 53 53 53 53 198 250 260 140 100
345
345
6 BAMBANG RIYANTO
K2-b K2-b TEAM LEADER
Digambar -
500 400 500 600 500 400 500 Diperiksa -
Disetujui -
3400
Nama Gambar Skala
PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH
PEKERJAAN :
TAHUN ANGGARAN :
2023
LOKASI :
400
K3 K1 JL. KELINCI, TALISE,
KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118
MENGETAHUI OLEH :
KP KP KP DISETUJUI OLEH :
PEJABAT PEMBUAT
PEJABAT KOMITMEN
PEMBUAT (PPK)
KOMITMEN
K3 K1
DI BUAT OLEH :
KONSULTAN PERENCANA
Digambar -
500
Diperiksa -
Disetujui -
D5 E5 Nama Gambar Skala
DENAH RENCANA
KOLOM LANTAI 1 -
1:30
PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH
PEKERJAAN :
TAHUN ANGGARAN :
2023
LOKASI :
400
K2 JL. KELINCI, TALISE,
KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118
MENGETAHUI OLEH :
K2
DI BUAT OLEH :
KONSULTAN PERENCANA
Digambar -
A3 Diperiksa -
Disetujui -
Nama Gambar Skala
Detail POT KOLOM A3
RENCANA
SKALA 1:30 KOLOM LANTAI 1 -
1:30
STR 25 109
45
30
35
20
55 30 45
45 20 35
KEMENTRIAN
KETENAGAKERJAAN
55
REPUBLIK INDONESIA
45
KEGIATAN :
HWF 300.300
Kolom HWF 200.200
PERENCANAAN PEMBANGUNAN
Base Plate 2 cm Base Plate 1,5 mm
Grouting 3 cm
BLK PALU
Grouting 3 cm
SULAWESI TENGAH
Angkur Ø19 mm
PEKERJAAN :
Angkur Ø19 mm
STD-00-IAB019 STD-00-IAB019
TAHUN ANGGARAN :
2023
LOKASI :
MENGETAHUI OLEH :
Detail Join Kolom Baja K-1 Detail Join Kolom Baja K-2
SKALA 1:30 SKALA 1:30
50
Angkur Ø19 mm
STD-00-IAB019
KONSULTAN PERENCANA
BAMBANG RIYANTO
TEAM LEADER
Digambar -
Diperiksa -
Disetujui -
Nama Gambar Skala
SKALA 1:30
Kode Gmbr. No. Lembar Jml. Lembar
STR 26 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :
PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH
PEKERJAAN :
Angkur ∅10-500
30 TAHUN ANGGARAN :
30 Pas Bata
15 2023
30
5
15
LOKASI :
30
∅6-15
13
30
JL. KELINCI, TALISE,
Cor Beton KECAMATAN PALU TIM., KOTA PALU,
40
SULAWESI TENGAH - 94118
Detail K1-a Detail K1-b 6-∅8
(H-WF 300.300.10.15mm) (H-WF 300.300.10.15mm
SKALA 1:20 Finshing Cor Beton Area Luar)
Detail Pot.Kolom K-4 MENGETAHUI OLEH :
PEJABAT PEMBUAT
PEJABAT KOMITMEN
PEMBUAT (PPK)
KOMITMEN
Angkur ∅10-500
20
20 ADITYA WIBAWA S.P, ST
Angkur ∅10-500 15 NIP. 19860707
AKHIRUDIN, 201503 1 003
S.T.,M.Ec.Dev
30
12
30
20
12
15
15
∅6-15 DI BUAT OLEH :
BAMBANG RIYANTO
TEAM LEADER
Digambar -
Diperiksa -
Disetujui -
Nama Gambar Skala
RENCANA
KOLOM LANTAI 1 -
1:20
STR 27 109
A B C D E F G H
500 400 500 600 500 400 500
100 400 400 100
400 100 100 400
1 KEMENTRIAN
K2-a
K2-a KETENAGAKERJAAN
BL
BL
REPUBLIK INDONESIA
200
200
KEGIATAN :
400
400
PERENCANAAN PEMBANGUNAN
BLK PALU
BL
BL
200
200
SULAWESI TENGAH
300 300
2 BL
PEKERJAAN :
K2-a BL K2-a
100
PEMBANGUNAN WORKSHOP MANUFAKTUR,
BL
BL
270
300
300
REFRIGASI, DAN KANTOR TAHAP II
450
450
100 100
TAHUN ANGGARAN :
600
600
2023
BL
BL
BL
BL
300
300
LOKASI :
200 200 200
150
150
BL
JL. KELINCI, TALISE,
3 KECAMATAN PALU TIM., KOTA PALU,
K2-a SULAWESI TENGAH - 94118
K2-a
MENGETAHUI OLEH :
300
BL
BL
2345
DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI
600
600
BL
BL
300
300
AGUNG NUR ROHMAD, ST.,MM.
NIP. 19760725B200501 1 001
BL
BL
DISETUJUI OLEH :
BL BL BL BL
4 PEJABAT PEMBUAT
PEJABAT PEMBUATKOMITMEN (PPK)
KOMITMEN
K2-a K2-a
200
BL
BL
400
400
ADITYA WIBAWA S.P, ST
NIP.AKHIRUDIN,
19860707 S.T.,M.Ec.Dev
201503 1 003
BL
BL
200
NIP. 19851004200912 1 001
BL BL BL BL BL BL BL DI BUAT OLEH :
5
K2-a
K2-a
KONSULTAN PERENCANA
345
345
6
BAMBANG RIYANTO
TEAM LEADER
Diperiksa -
3400
Disetujui -
DENAH RENCANA BALOK LATAI EV +2.60
Skala 1:130
Nama Gambar Skala
11
DENAH RENCANA -
1:130
BALOK LATAI LANTAI 1
15
Keterangan ∅6-15
BL=Balok Latai 11x15cm 4-∅8 Kode Gmbr. No. Lembar Jml. Lembar
Dinding Bata Detail Pot.Balok Latai
SKALA 1:20
STR 28 109
A B C D E F G H
500 400 500 600 500 400 500
100 400 400 100
2a 2a 2a 2a 2a 2a 2a 2a 2a 2a 2a 2a
1 KEMENTRIAN
3a 3c 3a 3a 3c 3a KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :
400
400
PERENCANAAN PEMBANGUNAN
100 BLK PALU
3a 3a
100
3a 3a SULAWESI TENGAH
1b 1b
2 PEKERJAAN :
1b 1b
3a 3b 1a 1a 3b 3a
200
200
PEMBANGUNAN WORKSHOP MANUFAKTUR,
4b 4b
REFRIGASI, DAN KANTOR TAHAP II
4a 3b 3b 4a
TAHUN ANGGARAN :
200
200
600
600
4b 4b
2023
4a 3b 3b 4a
LOKASI :
200
200
23 167.5
3a 3b 1a 1a 3b 3a
1b 1b
JL. KELINCI, TALISE,
3 KECAMATAN PALU TIM., KOTA PALU,
1b 3b 1b SULAWESI TENGAH - 94118
3b 1a 3b
3a 1a 3a
180
200
200
3d
MENGETAHUI OLEH :
2345
4b 4b
220
600
200
200
600
3d
4b 4b
4a 3b 3b 4a
AGUNG NUR ROHMAD, ST.,MM.
200
200
190 NIP. 19760725B200501 1 001
1a 1a
3a 3b 3b 3a
1b 1b DISETUJUI OLEH :
RB RB RB RB RB RB
RB
4 PEJABAT PEMBUAT KOMITMEN (PPK)
PEJABAT PEMBUAT KOMITMEN
1b 1b
3a 1a 1a 3a
3b 3b
200
200
4b 4b
400
400
RB RB RB RB
200
3a
Khusus Balok Baja Ini +4.30
3c 1a Khusus Balok Baja Ini +4.30
3a
NIP. 19851004200912 1 001
1a 3c
1b 1b
5 DI BUAT OLEH :
2a 2a 2a 2a 2a 2a 2a 2a 2a 2a 2a 2a
2b 2b
100 400 400 100
KONSULTAN PERENCANA
345
345
2b 2b
6
2a 2a
BAMBANG RIYANTO
TEAM LEADER
500 400 500 600 500 400 500
Digambar -
Diperiksa -
3400
Disetujui -
DENAH RENCANA BALOK LANTAI EV +4.00
Skala 1:130
Nama Gambar Skala
Keterangan
Catatan
1 = I-WF 150.300.6,5.9mm
DENAH RENCANA -
2 = I-WF 125X250.6.9mm Setiap Balok Baja Area Luar Bangunan BALOK LANTAI
1:130
Catatan
STR 29 109
30 30
KEMENTRIAN
27 KETENAGAKERJAAN
H-WF 300.300.10.15mm I-WF 150.300.6,5.9mm
15 REPUBLIK INDONESIA
6 - Baut HTB 6 - Baut HTB
+ 4.00
A325 Dia.16mm A325 Dia.16mm KEGIATAN :
7
I-WF 150.300.6,5.9mm
8
PERENCANAAN PEMBANGUNAN
30
30
30
8
T Joint H-WF 300.300.10.15mm End Plate T=12.150.610mm BLK PALU
8
SULAWESI TENGAH
8
H-WF 300.300.10.15m
8
61
60
61
8
End Plate T=12.150.610mm
8
PEKERJAAN :
8 8
30
29
30
Vouter
8
I-WF 150.300.6,5.9mm
PEMBANGUNAN WORKSHOP MANUFAKTUR,
7
6 - Baut HBT REFRIGASI, DAN KANTOR TAHAP II
6 - Baut HBT
A325 Dia.16mm
A325 Dia.16mm
51
Vouter
CT.I-WF 150.300.6,5.9mm TAHUN ANGGARAN :
27
15
15
KECAMATAN PALU TIM., KOTA PALU,
Detail Sambungan Baja (1a)
30
30
7
8
8
I-WF 150.300.6,5.9mm
30
30
30
ADITYA WIBAWA S.P, ST
8
8
End Plat T=12.150.610mm
H-WF 300.300.10.15mm AKHIRUDIN,
NIP. 19860707S.T.,M.Ec.Dev
201503 1 003
8
8
H-WF 300.300.10.15mm NIP. 19851004200912 1 001
61
61
61
8
8
DI BUAT OLEH :
8
8
Vouter
30
30
31
CT.I-WF 150.300.6,5.9mm
8
8
7
I-WF 150.300.6,5.9mm
BAMBANG RIYANTO
30
15
TEAM LEADER
Detail Sambungan Baja (1b) H-WF 300.300.10.15mm
I-WF 150.300.6,5.9mm Digambar -
SKALA 1:20
Diperiksa -
Disetujui -
Nama Gambar Skala
RENCANA -
1:20
BALOK LANTAI
STR 30 109
30
30
KEMENTRIAN
KETENAGAKERJAAN
I-WF 125X250.6.9mm
REPUBLIK INDONESIA
15 H-WF 300.300.10.15mm KEGIATAN :
6 - Baut HTB 6 - Baut HTB + 4.00
A325 Dia.16mm A325 Dia.16mm
8 5
8 5
PERENCANAAN PEMBANGUNAN
I-WF 125X250.6.9mm End Plat T=12.150.510mm
BLK PALU
25
25
25
SULAWESI TENGAH
10 5 8
10 5 8
End Plat T=12.150.610mm H-WF 300.300.10.15mm
50
51
51
T Joint H-WF 300.300.10.15mm PEKERJAAN :
25
25
25
8
8
Vouter
I-WF 150.300.6,5.9mm PEMBANGUNAN WORKSHOP MANUFAKTUR,
8
4 - Baut HTB 4 - Baut HTB REFRIGASI, DAN KANTOR TAHAP II
A325 Dia.16mm A325 Dia.16mm
Vouter
31 CT.I-WF 125X250.6.9mm
TAHUN ANGGARAN :
30
2023
LOKASI :
30
T Joint H-WF 300.300.10.15mm
JL. KELINCI, TALISE,
15
H-WF 300.300.10.15mm
10 - Baut HBT
Detail Sambungan Baja (2b) KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118
27
A325 Dia.16mm I-WF 125X250.6.9mm
I-WF 125X250.6.9mm
SKALA 1:20 MENGETAHUI OLEH :
30
AGUNG NUR ROHMAD, ST.,MM.
30
NIP. 19760725B200501 1 001
DISETUJUI OLEH :
PEJABAT PEMBUAT
PEJABAT KOMITMEN
PEMBUAT (PPK)
KOMITMEN
I-WF 125X250.6.9mm
15
6 - Baut HTB 6 - Baut HTB + 4.00
A325 Dia.16mm A325 Dia.16mm
8 5
8 5
I-WF 125X250.6.9mm End Plat T=12.150.510mm ADITYA WIBAWA S.P, ST
AKHIRUDIN, S.T.,M.Ec.Dev
25
25
25
NIP. 19860707 201503 1 003
10 5 8
10 5 8
End Plat T=12.150.610mm H-WF 300.300.10.15mm NIP. 19851004200912 1 001
50
51
51
H-WF 300.300.10.15mm DI BUAT OLEH :
Vouter
25
25
25
8
8
CT.I-WF 125X250.6.9mm
8
8
4 - Baut HTB 4 - Baut HTB KONSULTAN PERENCANA
A325 Dia.16mm A325 Dia.16mm
Vouter
31 CT.I-WF 125X250.6.9mm
Diperiksa -
I-WF 125X250.6.9mm H-WF 300.300.10.15mm
SKALA 1:20 Disetujui -
I-WF 125X250.6.9mm
Nama Gambar Skala
RENCANA -
1:20
BALOK LANTAI
STR 31 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :
7
10
2 - Baut HTB 10 PEKERJAAN :
20
20
+ 4.00
7
25
23
A325 Dia.16mm
28
30
15 3
15 3
7
4 7 4
4 7 4
20
20
15
Joint Plat T=12.60.230mm PEMBANGUNAN WORKSHOP MANUFAKTUR,
Joint Plat T=12.70.280mm 6 I-WF 125X250.6.9mm REFRIGASI, DAN KANTOR TAHAP II
3
3
7 I-WF 150.300.6,5.9mm
I-WF 100.200.5,5.8mm I-WF 100.200.5,5.8mm
15 12.5
H-WF 200X200.8.12mm Joint Plat T=12.100.150mm I-WF 125X250.6.9mm TAHUN ANGGARAN :
I-WF 150.300.6,5.9mm
2 - Baut HTB 2 - Baut HTB
H-WF 200X200.8.12mm 6 A325 Dia.16mm 5 A325 Dia.16mm
2023
10
10
20
Joint Plat T=12.100.150mm I-WF 100.200.5,5.8mm
10 7 6 LOKASI :
I-WF 100.200.5,5.8mm I-WF 100.200.5,5.8mm
2 - Baut HTB
A325 Dia.16mm H-WF 200X200.8.12mm Joint Plat T=12.70.280mm Joint Plat T=12.70.280mm
JL. KELINCI, TALISE,
15 13 KECAMATAN PALU TIM., KOTA PALU,
10
20
Detail Sambungan Baja (3a) Detail Sambungan Baja (3b) Detail Sambungan Baja (3c) MENGETAHUI OLEH :
I-WF 100.200.5,5.8mm I-WF 100.200.5,5.8mm I-WF 100.200.5,5.8mm
DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI
SKALA 1:20 SKALA 1:20 SKALA 1:20
10
4 7 4
15
15
7
20
18
20
20
18
7
30
10 DI BUAT OLEH :
I-WF 100.200.5,5.8mm
2 - Baut HTB I-WF 150.300.6,5.9mm I-WF 100.200.5,5.8mm
4 A325 Dia.16mm 2 - Baut HTB 2 - Baut HTB
A325 Dia.16mm A325 Dia.16mm KONSULTAN PERENCANA
6 4 11
10
8
5
I-WF 100.200.5,5.8mm
15
7 5 ∅6-15
I-WF 75.150.5.7mm I-WF 75.150.5.7mm
Joint Plat T=12.70.280mm
Joint Plat T=12.70.280mm Joint Plat T=12.50.180mm 4-∅8
10 15 10
Detail Ring Balk Praktis BAMBANG RIYANTO
Detail Sambungan Baja (3c) Detail Sambungan Baja (4a) Detail Sambungan Baja (4b) SKALA 1:20 TEAM LEADER
I-WF 100.200.5,5.8mm I-WF 75.150.5.7mm I-WF 75.150.5.7mm -
Digambar
SKALA 1:20 SKALA 1:20 SKALA 1:20
Diperiksa -
Disetujui -
Nama Gambar Skala
RENCANA -
1:20
BALOK LANTAI
STR 32 109
A B C D E F G H
500 400 500 600 500 400 500
100 400 400 100 KEMENTRIAN
KETENAGAKERJAAN
1 REPUBLIK INDONESIA
KEGIATAN :
PERENCANAAN PEMBANGUNAN
BLK PALU
400
400
SULAWESI TENGAH
PEKERJAAN :
108 600 108
2 PEMBANGUNAN WORKSHOP MANUFAKTUR,
REFRIGASI, DAN KANTOR TAHAP II
Wiremesh ∅8-150
TAHUN ANGGARAN :
2023
600
600
615
LOKASI :
2000
3 MENGETAHUI OLEH :
165
DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI
385
30
220
600
600
AGUNG NUR ROHMAD, ST.,MM.
NIP. 19760725B200501 1 001
402 DISETUJUI OLEH :
400
NIP. 19851004200912 1 001
DI BUAT OLEH :
5
KONSULTAN PERENCANA
3400
BAMBANG RIYANTO
DENAH RENCANA PLAT LANTAI EV + 4.15 LT.2 TEAM LEADER
Skala 1:130
Digambar -
Diperiksa -
Disetujui -
Nama Gambar Skala
RENCANA -
1:130
PLAT LANTAI 2
STR 33 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :
PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH
PEKERJAAN :
TAHUN ANGGARAN :
815 2023
LOKASI :
Bondek Wija Truss
JL. KELINCI, TALISE,
Wiremesh ∅8-150 KECAMATAN PALU TIM., KOTA PALU,
+ 4.15 SULAWESI TENGAH - 94118
15 MENGETAHUI OLEH :
D4 E4 PEJABAT PEMBUAT
PEJABAT PEMBUATKOMITMEN (PPK)
KOMITMEN
800
ADITYA WIBAWA S.P, ST
Detail Pot. Plat Lantai 2 PL-2 (A3-A2) NIP.AKHIRUDIN,
19860707 201503 1 003
S.T.,M.Ec.Dev
NIP. 19851004200912 1 001
SKALA 1:30
DI BUAT OLEH :
KONSULTAN PERENCANA
BAMBANG RIYANTO
TEAM LEADER
Digambar -
Diperiksa -
Disetujui -
Nama Gambar Skala
RENCANA -
1:30
KOLOM LANTAI 2
STR 34 109
A B C D E F G H
500 400 500 600 500 400 500
100 400 400 100 100 400 400 100
KEMENTRIAN
KETENAGAKERJAAN
1 KP KP
REPUBLIK INDONESIA
K2-a K3 K3 K1-a K1-a KP K3 K3 KP
K2-a
KEGIATAN :
200
200
PERENCANAAN PEMBANGUNAN
400
400
BLK PALU
KP KP
SULAWESI TENGAH
200
200
100 300 300 100 PEKERJAAN :
K1-b K1-b
2 KP KP KP
K2-a K4 K4 PEMBANGUNAN WORKSHOP MANUFAKTUR,
K2-a
REFRIGASI, DAN KANTOR TAHAP II
300
300
TAHUN ANGGARAN :
2023
600
600
KP KP
LOKASI :
300
300
JL. KELINCI, TALISE,
KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118
2000
3 KP KP
K2-a K4 K1-a K1-a KP K4 MENGETAHUI OLEH :
K2-a
300
600
600
KP KP
AGUNG NUR ROHMAD, ST.,MM.
NIP. 19760725B200501 1 001
KP KP KP KP KP
300
300
100 415 185 100 DISETUJUI OLEH :
PEJABAT PEMBUAT
PEJABAT PEMBUATKOMITMEN (PPK)
KOMITMEN
4 KP KP
K2-a K1-a K1-a K2-a
200
200
ADITYA WIBAWA S.P, ST
NIP.AKHIRUDIN,
19860707 201503 1 003
S.T.,M.Ec.Dev
400
400
KP KP NIP. 19851004200912 1 001
200
200
DI BUAT OLEH :
5 KP KP
K2-a K3 K3 K1-b K1-b KP K3 K3 KP
K2-a KONSULTAN PERENCANA
100 400 400 100 300 300 100 400 400 100
3400
BAMBANG RIYANTO
TEAM LEADER
DENAH RENCANA KOLOM LT.2
Skala 1:130
Digambar -
Keterangan
Diperiksa -
K1 = H-WF 300X300mm
K2 = H-WF 200X200mm Disetujui -
K3 = I-WF 150X300mm
K4 = Kolom 15x30cm Nama Gambar Skala
KP = Kolom Praktis
RENCANA -
1:130
KOLOM LANTAI 2
Keterangan
Kode Gmbr. No. Lembar Jml. Lembar
STR 35 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
52 KEGIATAN :
PERENCANAAN PEMBANGUNAN
BLK PALU
25 SULAWESI TENGAH
PEKERJAAN :
TAHUN ANGGARAN :
2023
LOKASI :
K3 K1
PEJABAT PEMBUAT
PEJABAT PEMBUATKOMITMEN (PPK)
KOMITMEN
KP
K3 K1
DI BUAT OLEH :
KONSULTAN PERENCANA
Digambar -
500
Diperiksa -
Disetujui -
Detail POT KOLOM LT.2 (D5-E5) Nama Gambar Skala
SKALA 1:30
RENCANA -
1:30
KOLOM LANTAI 2
STR 36 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :
35 PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH
25
PEKERJAAN :
TAHUN ANGGARAN :
2023
LOKASI :
K2 MENGETAHUI OLEH :
350 DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI
PEJABAT PEMBUAT
PEJABAT KOMITMEN
PEMBUAT (PPK)
KOMITMEN
K4
K2
ADITYA WIBAWA S.P, ST
NIP. 19860707
AKHIRUDIN, 201503 1 003
S.T.,M.Ec.Dev
NIP. 19851004200912 1 001
DI BUAT OLEH :
KONSULTAN PERENCANA
100
A3 BAMBANG RIYANTO
TEAM LEADER
Digambar -
Diperiksa -
Detail POT KOLOM LT.2 (A3) Disetujui -
SKALA 1:30 Nama Gambar Skala
RENCANA -
1:30
KOLOM LANTAI 2
STR 37 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :
PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH
PEKERJAAN :
Angkur ∅10-500
30 TAHUN ANGGARAN :
Pas Bata 15
30
2023
30
5
∅6-15
15
30
LOKASI :
30
13
JL. KELINCI, TALISE,
Cor Beton
6-∅8 KECAMATAN PALU TIM., KOTA PALU,
40
SULAWESI TENGAH - 94118
Detail K1-a Detail K1-b Detail Pot.Kolom K-4
(H-WF 300.300.10.15mm) (H-WF 300.300.10.15mm MENGETAHUI OLEH :
SKALA 1:20
SKALA 1:20
Finshing Cor Beton Area Luar)
SKALA 1:20 DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI
15
20 ADITYA WIBAWA S.P, ST
Angkur ∅10-500 AKHIRUDIN,
NIP. 19860707 S.T.,M.Ec.Dev
201503 1 003
30
NIP. 19851004200912 1 001
15
∅6-15
20
15
DI BUAT OLEH :
4-∅8
Detail K2-a
Cor Beton Detail Pot.Kolom Praktis KP
(H-WF 200X200.8.12mm) Detail K3 SKALA 1:20 KONSULTAN PERENCANA
SKALA 1:20 (I-WF 150.300.6,5.9mm
Finishing Cor Beton Area Luar)
SKALA 1:20
BAMBANG RIYANTO
TEAM LEADER
Digambar -
Diperiksa -
Disetujui -
Nama Gambar Skala
RENCANA -
1:30
KOLOM LANTAI 2
STR 38 109
KEMENTRIAN
A B C D E F G H KETENAGAKERJAAN
500 400 500 600 500 400 500 REPUBLIK INDONESIA
1 PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH
200
200
BL
BL
PEKERJAAN :
400
400
PEMBANGUNAN WORKSHOP MANUFAKTUR,
200
200
BL
BL
2 TAHUN ANGGARAN :
2023
BL
300
300
BL
LOKASI :
600
600
JL. KELINCI, TALISE,
KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118
BL
300
300
BL
MENGETAHUI OLEH :
2000
3
300
300
BL
BL
AGUNG NUR ROHMAD, ST.,MM.
NIP. 19760725B200501 1 001
DISETUJUI OLEH :
600
600
PEJABAT PEMBUAT KOMITMEN (PPK)
PEJABAT PEMBUAT KOMITMEN
BL
300
300
BL
200
BL
BL
DI BUAT OLEH :
400
400
KONSULTAN PERENCANA
200
200
BL
BL
5
100 400 400 100 300 300 100 400 400 100
BAMBANG RIYANTO
500 400 500 600 500 400 500 TEAM LEADER
Digambar -
3400
11
Diperiksa -
DENAH RENCANA BALOK LATAI EV +5.00 LT.2
Keterangan Skala 1:130 Disetujui -
15
STR 39 109
A B C D E F G H
500 400 500 600 500 400 500
100 400 400 100 100 400 400 100
KEMENTRIAN
KETENAGAKERJAAN
1 REPUBLIK INDONESIA
BL BL BL BL BL BL
KEGIATAN :
200
200
BL
BL
PERENCANAAN PEMBANGUNAN
400
400
BLK PALU
SULAWESI TENGAH
200
200
BL
BL
PEKERJAAN :
2
PEMBANGUNAN WORKSHOP MANUFAKTUR,
REFRIGASI, DAN KANTOR TAHAP II
300
300
BL
BL
TAHUN ANGGARAN :
2023
600
600
BL
BL
LOKASI :
BL
BL
300
300
JL. KELINCI, TALISE,
KECAMATAN PALU TIM., KOTA PALU,
BL SULAWESI TENGAH - 94118
2000
3
MENGETAHUI OLEH :
BL
300
300
BL
BL
600
600
BL AGUNG NUR ROHMAD, ST.,MM.
NIP. 19760725B200501 1 001
300
300
BL
BL
DISETUJUI OLEH :
PEJABAT PEMBUAT
PEJABAT KOMITMEN
PEMBUAT (PPK)
KOMITMEN
4
BL
BL
200
200
BL
BL
ADITYA WIBAWA S.P, ST
AKHIRUDIN,
NIP. 19860707S.T.,M.Ec.Dev
201503 1 003
400
400
NIP. 19851004200912 1 001
200
200
BL
BL
DI BUAT OLEH :
BL BL BL BL BL BL
5
KONSULTAN PERENCANA
100 400 400 100 300 300 100 400 400 100
3400
BAMBANG RIYANTO
DENAH RENCANA BALOK LATAI EV +6.75 LT.2 TEAM LEADER
Skala 1:80
Digambar -
11
Diperiksa -
Keterangan Disetujui -
15
STR 40 109
KEMENTRIAN
KETENAGAKERJAAN
500 400 500 600 500 400 500
REPUBLIK INDONESIA
100 400 400 100
KEGIATAN :
a a a a a a a a a a a a
A A A A A A PERENCANAAN PEMBANGUNAN
c b b c BLK PALU
RB RB
SULAWESI TENGAH
400
400
A A A A PEKERJAAN :
RB RB
PEMBANGUNAN WORKSHOP MANUFAKTUR,
c b b c
a a
REFRIGASI, DAN KANTOR TAHAP II
A
TAHUN ANGGARAN :
RB d
A d RB
2023
LOKASI :
A A A
600
600
A
JL. KELINCI, TALISE,
d
A d
KECAMATAN PALU TIM., KOTA PALU,
RB RB SULAWESI TENGAH - 94118
c c
MENGETAHUI OLEH :
b b
a a
A DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI
2000
RB RB
d d
A
A A
AGUNG NUR ROHMAD, ST.,MM.
A A NIP. 19760725B200501 1 001
600
600
DISETUJUI OLEH :
d d
A
PEJABAT PEMBUAT
PEJABAT KOMITMEN
PEMBUAT (PPK)
KOMITMEN
RB RB
c b b c
a a
A
ADITYA WIBAWA S.P, ST
RB RB NIP. 19860707
AKHIRUDIN, 201503 1 003
S.T.,M.Ec.Dev
RB RB NIP. 19851004200912 1 001
A
d
A d
DI BUAT OLEH :
A
400
400
A A
RB RB
c b b c KONSULTAN PERENCANA
A A A A A A A
a a a a a a a a a a a a a a
STR 41 109
30 KEMENTRIAN
30 KETENAGAKERJAAN
REPUBLIK INDONESIA
5
BLK PALU
5
I-WF 100.200.5,5.8mm
20
5 10 4 5 10
SULAWESI TENGAH
20
20
5 10 4 5 10
40
39
40
VouteR PEKERJAAN :
CT.I-WF 150.300.6,5.9mm
19
19
19
End Plate T=12.150.400mm
H-WF 300.300.10.15mm
PEMBANGUNAN WORKSHOP MANUFAKTUR,
VouteR REFRIGASI, DAN KANTOR TAHAP II
4 - Baut HTB
CT.I-WF 150.300.6,5.9mm 4 - Baut HTB A325 Dia.16mm
End Plate T=12.150.400mm A325 Dia.16mm
30 TAHUN ANGGARAN :
30
2023
LOKASI :
10
30
JL. KELINCI, TALISE,
H-WF 300.300.10.15mm
Detail Sambungan Baja (A-a) KECAMATAN PALU TIM., KOTA PALU,
I-WF 100.200.5,5.8mm
8 - Baut HTB I-WF 100.200.5,5.8mm SULAWESI TENGAH - 94118
A325 Dia.16mm SKALA 1:20 MENGETAHUI OLEH :
5
ADITYA WIBAWA S.P, ST
5
I-WF 100.200.5,5.8mm
20
5 10 4 5 10
NIP.AKHIRUDIN,
19860707S.T.,M.Ec.Dev
201503 1 003
20
20
5 10 4 5 10
40
39
40
VouteR
CT.I-WF 150.300.6,5.9mm
19
DI BUAT OLEH :
19
19
10
8 - Baut HTB
I-WF 100.200.5,5.8mm A325 Dia.16mm
BAMBANG RIYANTO
End Plate T=12.150.400mm TEAM LEADER
Diperiksa -
SKALA 1:20 H-WF 300.300.10.15mm
Disetujui -
30
Nama Gambar Skala
RENCANA -
1:30
RING BALK
STR 42 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :
PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH
PEKERJAAN :
TAHUN ANGGARAN :
2023
LOKASI :
15 3
15 3
4 7 4
4 7 4
20
20
20
15
3
3
I-WF 100.200.5,5.8mm I-WF 100.200.5,5.8mm
20
KONSULTAN PERENCANA
BAMBANG RIYANTO
TEAM LEADER
Digambar -
Diperiksa -
Disetujui -
Nama Gambar Skala
RENCANA -
1:130
RING BALK
STR 43 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :
PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH
PEKERJAAN :
TAHUN ANGGARAN :
7
JL. KELINCI, TALISE,
20
20
18
7
KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118
7
5 Joint Plat T=12.50.180mm
MENGETAHUI OLEH :
I-WF 100.200.5,5.8mm
15
DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI
10
I-WF 100.200.5,5.8mm ∅8-15
20
2 - Baut HTB
4 A325 Dia.16mm
4-∅10
10
5
Detail Ring Balk
AGUNG NUR ROHMAD, ST.,MM.
I-WF 100.200.5,5.8mm SKALA 1:20 NIP. 19760725B200501 1 001
Joint Plat T=12.70.280mm
DISETUJUI OLEH :
10
PEJABAT PEMBUAT
PEJABAT PEMBUATKOMITMEN (PPK)
KOMITMEN
Detail Sambungan Baja (A-d)
I-WF 100.200.5,5.8mm
SKALA 1:20
ADITYA WIBAWA S.P, ST
NIP.AKHIRUDIN,
19860707 S.T.,M.Ec.Dev
201503 1 003
NIP. 19851004200912 1 001
DI BUAT OLEH :
KONSULTAN PERENCANA
BAMBANG RIYANTO
TEAM LEADER
Digambar -
Diperiksa -
Disetujui -
Nama Gambar Skala
RENCANA -
1:130
RING BALK
STR 44 109
KEMENTRIAN
A B C D E F G H KETENAGAKERJAAN
REPUBLIK INDONESIA
500 400 500 600 500 400 500
KEGIATAN :
100 400 400 100
PERENCANAAN PEMBANGUNAN
1 BLK PALU
SULAWESI TENGAH
PEKERJAAN :
400
400
PEMBANGUNAN WORKSHOP MANUFAKTUR,
REFRIGASI, DAN KANTOR TAHAP II
2 TAHUN ANGGARAN :
2023
Wiremesh ∅8-150
LOKASI :
Bondek Wija Truss
JL. KELINCI, TALISE,
600
600
KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118
MENGETAHUI OLEH :
2000
3
600
PEJABAT PEMBUAT
PEJABAT PEMBUATKOMITMEN (PPK)
KOMITMEN
DI BUAT OLEH :
Wiremesh ∅8-150
400
400
KONSULTAN PERENCANA
BAMBANG RIYANTO
500 400 500 600 500 400 500 TEAM LEADER
Digambar -
3400
Diperiksa -
DENAH RENCANA PLAT LANTAI EV + 4.15 LT.2
Skala 1:80
Disetujui -
Nama Gambar Skala
RENCANA -
1:130
PLAT LANTAI
STR 45 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :
PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH
PEKERJAAN :
TAHUN ANGGARAN :
2023
LOKASI :
15
PEJABAT PEMBUAT
PEJABAT PEMBUATKOMITMEN (PPK)
KOMITMEN
600
DI BUAT OLEH :
SKALA 1:30
BAMBANG RIYANTO
TEAM LEADER
Digambar -
Diperiksa -
Disetujui -
Nama Gambar Skala
RENCANA -
1:30
PLAT LANTAI
STR 46 109
Gording CNP 150.50.20.2,5 KEMENTRIAN
KETENAGAKERJAAN
Jarak 45 cm REPUBLIK INDONESIA
1400 1400
700 700 700 700 KEGIATAN :
155
BLK PALU
SULAWESI TENGAH
PEKERJAAN :
KK-1 KK-1
PEMBANGUNAN WORKSHOP MANUFAKTUR,
400
400
REFRIGASI, DAN KANTOR TAHAP II
TAHUN ANGGARAN :
2023
KK-2 KK-2 LOKASI :
600
MENGETAHUI OLEH :
PEJABAT PEMBUAT
PEJABAT KOMITMEN
PEMBUAT (PPK)
KOMITMEN
600
600
ADITYA WIBAWA S.P, ST
NIP. 19860707
AKHIRUDIN, 201503 1 003
S.T.,M.Ec.Dev
NIP. 19851004200912 1 001
DI BUAT OLEH :
KK-2 KK-2
KONSULTAN PERENCANA
400
400
155
155
BAMBANG RIYANTO
KK-1 KK-1 TEAM LEADER
Digambar -
RENCANA -
1:130
ATAP
STR 47 109
KEMENTRIAN
KETENAGAKERJAAN
C REPUBLIK INDONESIA
KEGIATAN :
PERENCANAAN PEMBANGUNAN
375 BLK PALU
SULAWESI TENGAH
PEKERJAAN :
I-WF 100.200.5,5.8mm
TAHUN ANGGARAN :
2023
LOKASI :
I-WF 100.200.5,5.8mm
D NIP. 19760725B200501 1 001
DISETUJUI OLEH :
45
DI BUAT OLEH :
I-WF 125X250.6.9mm I-WF 125X250.6.9mm 45
485
KONSULTAN PERENCANA
K3 K3
BAMBANG RIYANTO
B A TEAM LEADER
52
35 77 Digambar -
60
25 25
Diperiksa -
Disetujui -
K2 K1
Nama Gambar Skala
RENCANA -
500 399 500
1:60
ATAP
PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH
PEKERJAAN :
2023
LOKASI :
MENGETAHUI OLEH :
I-WF 100.200.5,5.8mm
1260
45
45
KONSULTAN PERENCANA
BAMBANG RIYANTO
TEAM LEADER
Digambar -
52 Diperiksa -
35 77
60
25 25 Disetujui -
Nama Gambar Skala
K2 K1
RENCANA -
1:60
ATAP
1400
STR 49 109
714 KEMENTRIAN
Baut HTB A325 Dia.16mm KETENAGAKERJAAN
REPUBLIK INDONESIA
Join Plate T=12.100.150mm KEGIATAN :
PERENCANAAN PEMBANGUNAN
BLK PALU
400
SULAWESI TENGAH
TAHUN ANGGARAN :
2023
LOKASI :
600
KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118
MENGETAHUI OLEH :
PEJABAT PEMBUAT
PEJABAT PEMBUATKOMITMEN (PPK)
KOMITMEN
600
DI BUAT OLEH :
KONSULTAN PERENCANA
400
BAMBANG RIYANTO
TEAM LEADER
Digambar -
Diperiksa -
Disetujui -
STR 50 109
I-WF 125X250.6.9mm
10 - Baut HTB
Baut HTB A325 Dia.12mm
A325 Dia.16mm KEMENTRIAN
20
Besi L 5.5 KETENAGAKERJAAN
REPUBLIK INDONESIA
11
Gording CNP 150.50.20.2,5
KEGIATAN :
10
Atap Bitumen
11
50
PERENCANAAN PEMBANGUNAN
11
Sirip Segi Tiga T=10mm
62
11
BLK PALU
10
SULAWESI TENGAH
12
I-WF 125X250.6.9mm
13
11
End Plate T=12.200.620mm PEKERJAAN :
12
5 6
10
35
I-WF 100.200.5,5.8mm PEMBANGUNAN WORKSHOP MANUFAKTUR,
11
20
10 4 5 10
REFRIGASI, DAN KANTOR TAHAP II
End Plate T=12.150.410mm
62
60
41
10
Plat Stiffners T=10mm
TAHUN ANGGARAN :
20
25 Vouter
13
H-WF 300.300.10.15mm I-WF 100.200.5,5.8mm
6
13 2023
5 6
15
8 - Baut HTB
10 4 5 10
A325 Dia.16mm
LOKASI :
41
JL. KELINCI, TALISE,
20
KECAMATAN PALU TIM., KOTA PALU,
6
SULAWESI TENGAH - 94118
33
MENGETAHUI OLEH :
4
DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI
11
NIP. 19851004200912 1 001
11
10
11
DI BUAT OLEH :
10
50
11
62
11
11
52
62
10
Sirip Segi Tiga T=10mm
12
10
I-WF 125X250.6.9mm
KONSULTAN PERENCANA
77
13
25
13
H-WF 300.300.10.15mm
BAMBANG RIYANTO
TEAM LEADER
Digambar -
Diperiksa -
STR 51 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :
PERENCANAAN PEMBANGUNAN
BLK PALU
10 - Baut HTB 15 SULAWESI TENGAH
A325 Dia.16mm
PEKERJAAN :
11
8
Atap Bitumen I-WF 125X250.6.9mm PEMBANGUNAN WORKSHOP MANUFAKTUR,
REFRIGASI, DAN KANTOR TAHAP II
8
50
Baut HTB A325 Dia.12mm
8
11
8
TAHUN ANGGARAN :
85
Gording CNP 150.50.20.2,5
9
8
Besi L 5.5 Vouter
50
50
11
I-WF 125X250.6.9mm
8
32
8
LOKASI :
8
45
9
6
Vouter
11
6 - Baut HTB JL. KELINCI, TALISE,
I-WF 125X250.6.9mm
A325 Dia.16mm KECAMATAN PALU TIM., KOTA PALU,
8
32
32
SULAWESI TENGAH - 94118
8
MENGETAHUI OLEH :
45
Vouter
78
I-WF 125X250.6.9mm
64
4
SKALA 1:20 ADITYA WIBAWA S.P, ST
NIP.AKHIRUDIN,
19860707 S.T.,M.Ec.Dev
201503 1 003
NIP. 19851004200912 1 001
4 DI BUAT OLEH :
2 - Baut HTB
8 A325 Dia.16mm
Joint Plate T=12.80.120mm
BAMBANG RIYANTO
TEAM LEADER
5 6 5
12
Digambar -
I-WF 100.200.5,5.8mm
I-WF 150.300.6,5.9mm Diperiksa -
Disetujui -
Detail Sambungan Baja Nama Gambar Skala
Kuda-Kuda KK (D)
SKALA 1:20 RENCANA -
1:20
ATAP
STR 52 109
D3 E3 KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
600
KEGIATAN :
PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH
PEKERJAAN :
TAHUN ANGGARAN :
2023
LOKASI :
+ 2.35
+ 2.55
+ 2.75
+ 2.95
+ 3.15
+ 3.35
+ 3.55
+ 3.75
+ 3.95
+ 4.15
KECAMATAN PALU TIM., KOTA PALU,
158 SULAWESI TENGAH - 94118
MENGETAHUI OLEH :
DI BUAT OLEH :
158
+ 1.85
+ 1.65
+ 1.45
+ 1.25
+ 1.15
+ 0.95
+ 0.75
+ 0.55
+ 0.35
+ 0.15
H-WF 200X200.8.12mm
KONSULTAN PERENCANA
BAMBANG RIYANTO
Anak tangga Plat Besi Ralling Hollow Tangga TEAM LEADER
Digambar -
Diperiksa -
160 282 Disetujui -
Nama Gambar Skala
RENCANA TANGGA LT.1
RENCANA -
1:30
SKALA 1:30 TANGGA
STR 53 109
D3 E3
KEMENTRIAN
KETENAGAKERJAAN
600 REPUBLIK INDONESIA
KEGIATAN :
PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH
TAHUN ANGGARAN :
2023
LOKASI :
+ 2.35
+ 2.55
+ 2.75
+ 2.95
+ 3.15
+ 3.35
+ 3.55
+ 3.75
+ 3.95
+ 4.15
JL. KELINCI, TALISE,
158 KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118
MENGETAHUI OLEH :
BORDES
HOMOGENOUS TILE
LANTAI 2 AGUNG NUR ROHMAD, ST.,MM.
383 68 NIP. 19760725B200501 1 001
60X60
+ 2.15
+4.15 DISETUJUI OLEH :
PEJABAT PEMBUAT
PEJABAT KOMITMEN
PEMBUAT (PPK)
KOMITMEN
+ 1.65
+ 1.45
+ 1.25
+ 1.15
+ 0.95
+ 0.75
+ 0.55
+ 0.35
+ 0.15
KONSULTAN PERENCANA
Digambar -
Diperiksa -
160 282
Disetujui -
Nama Gambar Skala
RENCANA -
RENCANA TANGGA LT.2 TANGGA
1:30
STR 54 109
150 117
196
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :
PERENCANAAN PEMBANGUNAN
Besi Hollow 4x4 100 BLK PALU
SULAWESI TENGAH
LANTAI 2
Besi Hollow 2x4 PEKERJAAN :
+ 4.15
PEMBANGUNAN WORKSHOP MANUFAKTUR,
REFRIGASI, DAN KANTOR TAHAP II
TAHUN ANGGARAN :
160 2023
LOKASI :
20 LANTAI 1
A
15 +/- 0.00
BAMBANG RIYANTO
TEAM LEADER
Digambar -
Diperiksa -
Disetujui -
Nama Gambar Skala
367 233
RENCANA -
1:30
600 TANGGA
Besi L 65x65
PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH
28
20
PEKERJAAN :
I-WF 100.200.5,5.8mm
7
Base Plate 1,5 mm PEMBANGUNAN WORKSHOP MANUFAKTUR,
20
REFRIGASI, DAN KANTOR TAHAP II
21
Finishing Homogenous TIle 60x60
Wiremesh ∅8-150
15
Bordes Cor Beton TAHUN ANGGARAN :
15
2023
Angkur Ø19 mm I-WF 100.200.5,5.8mm
STD-00-IAB019 LOKASI :
MENGETAHUI OLEH :
Semua Sambungan Di Joinkan Dengan Las
DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI
Detail Sambungan Baja Tangga (A) Detail Sambungan Baja Tangga (C)
SKALA 1:20 SKALA 1:20
20
DI BUAT OLEH :
50
5 5
10
Semua Sambungan Di Joinkan Dengan Las
30
Detail Sambungan Baja Tangga (B) 40
BAMBANG RIYANTO
TEAM LEADER
SKALA 1:20
Detail Sambungan Baja Kolom 200x200 Tangga Digambar -
SKALA 1:20
Diperiksa -
Disetujui -
Nama Gambar Skala
RENCANA -
1:30
TANGGA
STR 56 109
A B C D E F G H
500 400 500 600 500 400 500
400 100 KEMENTRIAN
100 400
KETENAGAKERJAAN
1 REPUBLIK INDONESIA
KEGIATAN :
PERENCANAAN PEMBANGUNAN
400
400
BLK PALU
SULAWESI TENGAH
V1 V1 PEKERJAAN :
TAHUN ANGGARAN :
2023
600
600
LOKASI :
P3 P3
JL. KELINCI, TALISE,
KECAMATAN PALU TIM., KOTA PALU,
P3 SULAWESI TENGAH - 94118
P3
3 MENGETAHUI OLEH :
2345
600
600
AGUNG NUR ROHMAD, ST.,MM.
NIP. 19760725B200501 1 001
DISETUJUI OLEH :
400
NIP. 19851004200912 1 001
DI BUAT OLEH :
5 KONSULTAN PERENCANA
J1 P1 J2 J2 PJ1 J2 J2 P1 J1
345
345
BAMBANG RIYANTO
6 TEAM LEADER
Digambar -
Disetujui -
3400 Nama Gambar Skala
DENAH RENCANA KUSEN LT.1
Skala 1:80 DENAH RENCANA -
1:130
KUSEN
ARS 57 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
A B C D E F G H KEGIATAN :
R1 R1
PEMBANGUNAN WORKSHOP MANUFAKTUR,
REFRIGASI, DAN KANTOR TAHAP II
400
400
R1 R1 TAHUN ANGGARAN :
2 2023
R1 R1 LOKASI :
600
J4 J4
MENGETAHUI OLEH :
R1 R1
DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI
R1 R1
2000
3
P2 AGUNG NUR ROHMAD, ST.,MM.
R1 R1 NIP. 19760725B200501 1 001
DISETUJUI OLEH :
R1 J3 J3 R1
PEJABAT PEMBUAT KOMITMEN (PPK)
PEJABAT PEMBUAT KOMITMEN
600
600
P2
R1 R1
ADITYA WIBAWA S.P, ST
R1 R1 NIP.AKHIRUDIN,
19860707 S.T.,M.Ec.Dev
201503 1 003
NIP. 19851004200912 1 001
4 DI BUAT OLEH :
R1 R1
J4 J4
KONSULTAN PERENCANA
400
400
R1
5
BAMBANG RIYANTO
TEAM LEADER
J3 J3 J3 J3 J3 J3
Digambar -
500 400 500 600 500 400 500
Diperiksa -
Disetujui -
DENAH RENCANA KUSEN LT.2
Skala 1:80 Nama Gambar Skala
DENAH RENCANA -
1:130
KUSEN
ARS 58 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :
PERENCANAAN PEMBANGUNAN
EK EK BLK PALU
SULAWESI TENGAH
PEKERJAAN :
2023
KC
LOKASI :
115
JL. KELINCI, TALISE,
KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118
EK EK
CH CH CH CH
MENGETAHUI OLEH :
10
DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI
PEJABAT PEMBUAT
PEJABAT KOMITMEN
PEMBUAT (PPK)
KOMITMEN
80 80
75 75 164,5 75 75
469
Lantai 2 - Digambar -
Diperiksa -
Disetujui -
Nama Gambar Skala
RENCANA -
1:30
KUSEN
ARS 59 109
97,5
EK EK
129,7 KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :
PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH
87,5
10 10 EK EK
PEKERJAAN :
75
PEMBANGUNAN WORKSHOP MANUFAKTUR,
EK
4 REFRIGASI, DAN KANTOR TAHAP II
405 401 EK 141,8 401 405
TAHUN ANGGARAN :
FS FS 131
GP 2023
LOKASI :
EK EK
MENGETAHUI OLEH :
GP
80
EK EK
EK EK
PEJABAT PEMBUAT
PEJABAT PEMBUATKOMITMEN (PPK)
KOMITMEN
Keterangan Aksesories
Type Pintu / Jendela :
Keterangan Aksesories Nama jml/unit Keterangan KONSULTAN PERENCANA
Simbol Pasang
Aksesories (Buah)
Type Pintu / Jendela : jml/unit Keterangan
Nama
Simbol Pasang Engsel Bubut 34"
Aksesories (Buah) EK 8
Friction Stay/Engsel Casement FS 1 Psg Kiri Kanan Grandel Pintu GP 2 Atas Bawah
-
BAMBANG RIYANTO
Casement Handle / Handle CH 1 Kusen BESI UNP 7x5x 5mm + angkur ∅16 jarak 30cm TEAM LEADER
Ket. notasi =
P : Pintu
Ket. notasi = Allumunium Wihite Coating 4" x 1 34" PJ : Pintu & Jendela Rangka BESI 4X4(Rangka) -
P : Pintu
Kusen
J : Jendela Daun
Digambar
PJ : Pintu & Jendela Double Multiplek 18mm CW: Curtain Wall
J : Jendela
Daun V : Ventilasi
CW: Curtain Wall
Finishing Finishing Besi Plat 3mm (2 sisi) Diperiksa -
V : Ventilasi Finishing HPL
R :Roster
Jumlah 2 Unit Disetujui -
Lantai 1 2
RENCANA -
1:30
KUSEN
ARS 60 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :
PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH
10
FB 20 20 20
PEKERJAAN :
13
10 20
2
EK EK
PEMBANGUNAN WORKSHOP MANUFAKTUR,
20 REFRIGASI, DAN KANTOR TAHAP II
405 40,5 EK
20
TAHUN ANGGARAN :
45,8 50
20
40
160 2023
20
10
LOKASI :
20
EK
40 EK
240 235,5
LH PH
JL. KELINCI, TALISE,
EK 215 210,5 20 KECAMATAN PALU TIM., KOTA PALU,
KC
SULAWESI TENGAH - 94118
20
40 MENGETAHUI OLEH :
10
115 115
60 DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI
75 75
154,5
45
EK EK EK
2
13
Keterangan Aksesories Keterangan Aksesories AGUNG NUR ROHMAD, ST.,MM.
FB Type Pintu / Jendela :
Nama jml/unit Keterangan Type Pintu / Jendela :
Nama jml/unit Keterangan NIP. 19760725B200501 1 001
Simbol Pasang Simbol Pasang
Aksesories (Buah) Aksesories (Buah) DISETUJUI OLEH :
V-1 R-1
Roster - 24 Buah 1 Set PEJABAT PEMBUAT KOMITMEN (PPK)
PEJABAT PEMBUAT KOMITMEN
Ket. notasi = Kusen Allumunium Wihite Coating 4" x 1 34" Ket. notasi = Kusen -
P : Pintu P : Pintu
PJ : Pintu & Jendela - PJ : Pintu & Jendela -
J : Jendela
Daun J : Jendela
Daun
10 10
CW: Curtain Wall CW: Curtain Wall ADITYA WIBAWA S.P, ST
V : Ventilasi Finishing Kaca Dark Blue 5 mm V : Ventilasi Finishing -
71 R :Roster R :Roster NIP. 19860707
AKHIRUDIN, 201503 1 003
S.T.,M.Ec.Dev
80 80
75,5 Lantai 1 2 Lantai 1 - NIP. 19851004200912 1 001
164,5
79,7 Lantai 2 - Lantai 2 24
169 DI BUAT OLEH :
Ket. notasi = Allumunium Wihite Coating 4" x 1 34" Ket. notasi = Allumunium Wihite Coating 4" x 1 34"
BAMBANG RIYANTO
Kusen Kusen
P : Pintu P : Pintu TEAM LEADER
PJ : Pintu & Jendela Double Multiplek mm 18mm PJ : Pintu & Jendela Alumunium Strip White Coating
J : Jendela
Daun J : Jendela
Daun
CW: Curtain Wall CW: Curtain Wall Digambar -
V : Ventilasi Finishing HPL V : Ventilasi Finishing
R :Roster R :Roster
Lantai 1 4 Lantai 1 4
Diperiksa -
Lantai 2 2 Lantai 2 -
Disetujui -
Nama Gambar Skala
RENCANA -
1:30
KUSEN
ARS 61 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :
PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH
PEKERJAAN :
10
10 PEMBANGUNAN WORKSHOP MANUFAKTUR,
REFRIGASI, DAN KANTOR TAHAP II
TAHUN ANGGARAN :
2023
FS FS FS FS
151 151 LOKASI :
FS FS FS FS FS FS
MENGETAHUI OLEH :
160 160
CH CH CH CH CH
Lantai 2 - Lantai 2 -
BAMBANG RIYANTO
TEAM LEADER
Digambar -
Diperiksa -
Disetujui -
Nama Gambar Skala
RENCANA -
1:30
KUSEN
ARS 62 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :
10 PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH
PEKERJAAN :
Keterangan Aksesories
Type Pintu / Jendela : jml/unit Keterangan PEMBANGUNAN WORKSHOP MANUFAKTUR,
Nama
Simbol Pasang
Aksesories (Buah) REFRIGASI, DAN KANTOR TAHAP II
J-3
151 TAHUN ANGGARAN :
MENGETAHUI OLEH :
10
151
Ket. notasi = Kusen Allumunium Wihite Coating 4" x 1 34"
P : Pintu
PJ : Pintu & Jendela
J : Jendela
Daun - ADITYA WIBAWA S.P, ST
CW: Curtain Wall
Kaca Stopsol 5 mm
NIP. 19860707
AKHIRUDIN, 201503 1 003
S.T.,M.Ec.Dev
V : Ventilasi Finishing
R :Roster NIP. 19851004200912 1 001
Lantai 1 -
160
Lantai 2 2 DI BUAT OLEH :
KONSULTAN PERENCANA
10
100 95 95 95 95 100
584,5
BAMBANG RIYANTO
TEAM LEADER
Digambar -
Diperiksa -
Disetujui -
Nama Gambar Skala
RENCANA -
1:30
KUSEN
ARS 63 109
450
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :
PERENCANAAN PEMBANGUNAN
120 BLK PALU
SULAWESI TENGAH
PEKERJAAN :
200
128 128
PEMBANGUNAN WORKSHOP MANUFAKTUR,
REFRIGASI, DAN KANTOR TAHAP II
2023
LOKASI :
PEJABAT PEMBUAT
PEJABAT PEMBUAT KOMITMEN
KOMITMEN (PPK)
180
ADITYA WIBAWA S.P, ST
NIP.AKHIRUDIN,
19860707 201503 1 003
S.T.,M.Ec.Dev
NIP. 19851004200912 1 001
KONSULTAN PERENCANA
128 128
200
120
BAMBANG RIYANTO
TEAM LEADER
Digambar -
Diperiksa -
Disetujui -
Nama Gambar Skala
RENCANA TOILET -
1:30
450
Kode Gmbr. No. Lembar Jml. Lembar
RENCANA TOILET
SKALA 1:50
ARS 64 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :
PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH
PEKERJAAN :
TAHUN ANGGARAN :
Homogenouse Tile
60x60 2023
LOKASI :
MENGETAHUI OLEH :
300
Grendel
PEJABAT PEMBUAT
PEJABAT KOMITMEN
PEMBUAT (PPK)
KOMITMEN
75 Backet
ADITYA WIBAWA S.P, ST
AKHIRUDIN,
NIP. 19860707 S.T.,M.Ec.Dev
201503 1 003
NIP. 19851004200912 1 001
10
DI BUAT OLEH :
KONSULTAN PERENCANA
90
128 128
BAMBANG RIYANTO
TEAM LEADER
450 Digambar -
Diperiksa -
POTONGAN TOILET Disetujui -
SKALA 1:50 Nama Gambar Skala
POTONGAN TOILET -
1:30
PERENCANAAN PEMBANGUNAN
- 0.05
BLK PALU
400
400
SULAWESI TENGAH
PEKERJAAN :
PLAFOND PLAFOND
KALSIBOARD KALSIBOARD TAHUN ANGGARAN :
+ 3.00 + 3.00
2023
600
600
LOKASI :
2345
386
600
600
AGUNG NUR ROHMAD, ST.,MM.
372
NIP. 19760725B200501 1 001
DISETUJUI OLEH :
4 PF1
PLAFOND GYBSUM
+ 3.00 ADITYA WIBAWA S.P, ST
AKHIRUDIN,
NIP. 19860707 S.T.,M.Ec.Dev
201503 1 003
PLAFOND GYBSUM PLAFOND GYBSUM PLAFOND GYBSUM PLAFOND GYBSUM
400
400
NIP. 19851004200912 1 001
+ 3.00 + 3.00 + 3.00 + 3.00
DI BUAT OLEH :
5 KONSULTAN PERENCANA
345
345
BAMBANG RIYANTO
6 TEAM LEADER
Digambar -
Diperiksa -
500 400 500 600 500 400 500
Disetujui -
ARS 65 109
A B C D E F G H
500 400 500 600 500 400 500
400 100 KEMENTRIAN
100 400
KETENAGAKERJAAN
1 REPUBLIK INDONESIA
KEGIATAN :
PERENCANAAN PEMBANGUNAN
- 0.05
BLK PALU
400
400
SULAWESI TENGAH
PEKERJAAN :
TAHUN ANGGARAN :
2023
600
600
LOKASI :
3 MENGETAHUI OLEH :
2345
600
600
AGUNG NUR ROHMAD, ST.,MM.
NIP. 19760725B200501 1 001
DISETUJUI OLEH :
PEJABAT PEMBUAT
PEJABAT PEMBUATKOMITMEN (PPK)
KOMITMEN
4 PF1
ADITYA WIBAWA S.P, ST
PLAFOND PLAFOND PLAFOND PLAFOND NIP.AKHIRUDIN,
19860707 S.T.,M.Ec.Dev
201503 1 003
400
400
KALSIBOARD KALSIBOARD KALSIBOARD KALSIBOARD NIP. 19851004200912 1 001
+ 4.00 + 4.00 + 4.00 + 4.00
DI BUAT OLEH :
5 KONSULTAN PERENCANA
100 393
393 100
345
345
BAMBANG RIYANTO
6 TEAM LEADER
Digambar -
Diperiksa -
500 400 500 600 500 400 500
Disetujui -
3400 Nama Gambar Skala
ARS 66 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :
PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH
Hollow Besi 4x4
PEKERJAAN :
Kawat Penggatung
Hollow Aluminium 4x4 PEMBANGUNAN WORKSHOP MANUFAKTUR,
Lis Plafond REFRIGASI, DAN KANTOR TAHAP II
TAHUN ANGGARAN :
+ 4.00
Plafond Kalsiboard
2023
LOKASI :
+ 3.00
Plafond Gypsum
AGUNG NUR ROHMAD, ST.,MM.
50 50 50 50 50 50 50 NIP. 19760725B200501 1 001
DISETUJUI OLEH :
100 100 100
PEJABAT PEMBUAT
PEJABAT PEMBUATKOMITMEN (PPK)
KOMITMEN
BAMBANG RIYANTO
TEAM LEADER
Digambar -
Diperiksa -
Disetujui -
Nama Gambar Skala
RENCANA -
1:30
PLAFOND
ARS 67 109
500 400 500 600 500 400 500
100 400 400 100 100 400 400 100
20 20
KEMENTRIAN
KETENAGAKERJAAN
155
155
REPUBLIK INDONESIA
KEGIATAN :
PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH
400
400
PEKERJAAN :
TAHUN ANGGARAN :
2023
600
600
LOKASI :
PLAFOND GYBSUM
+ 7.00
JL. KELINCI, TALISE,
KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118
MENGETAHUI OLEH :
2000
DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI
PLAFOND GYBSUM
+ 7.00
AGUNG NUR ROHMAD, ST.,MM.
600
600
NIP. 19760725B200501 1 001
DISETUJUI OLEH :
400
DI BUAT OLEH :
KONSULTAN PERENCANA
155
155
20 20
BAMBANG RIYANTO
100 400 400 100 300 300 100 400 400 100 TEAM LEADER
Diperiksa -
3400
Disetujui -
DENAH RENCANA PLAFOND LANTAI 2 EV +7.00
Skala 1:80 Nama Gambar Skala
DENAH RENCANA -
1:130
PLAFOND
ARS 68 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :
PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH
PEKERJAAN :
MENGETAHUI OLEH :
+ 7.00
Plafond Gypsum
50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 31
AGUNG NUR ROHMAD, ST.,MM.
100 100 100 100 100 100 100 NIP. 19760725B200501 1 001
DISETUJUI OLEH :
PEJABAT PEMBUAT
PEJABAT PEMBUAT KOMITMEN
KOMITMEN (PPK)
KONSULTAN PERENCANA
BAMBANG RIYANTO
TEAM LEADER
Digambar -
Diperiksa -
Disetujui -
Nama Gambar Skala
RENCANA -
1:30
PLAFOND
ARS 69 109
A B C D E F G H
500 400 500 600 500 400 500
400 100
100 400
KEMENTRIAN
1 KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :
- 0.05
PERENCANAAN PEMBANGUNAN
400
400
BLK PALU
SULAWESI TENGAH
PEKERJAAN :
2
PEMBANGUNAN WORKSHOP MANUFAKTUR,
REFRIGASI, DAN KANTOR TAHAP II
600
HOMOGENOUS TILE
60X60
2023
LOKASI :
2345
600
600
AGUNG NUR ROHMAD, ST.,MM.
NIP. 19760725B200501 1 001
DISETUJUI OLEH :
400
60X60 60X60 60X60 NIP. 19860707 201503 1 003
NIP. 19851004200912 1 001
DI BUAT OLEH :
5
KONSULTAN PERENCANA
345
345
HOMOGENOUS TILE
60X60
6 BAMBANG RIYANTO
TEAM LEADER
MT - 0.50 Digambar -
500 400 500 600 500 400 500
Diperiksa -
Disetujui -
3400
Nama Gambar Skala
DENAH RENCANA KERAMIK LT. 1
Skala 1:130
DENAH RENCANA -
1:130
KERAMIK
ARS 70 109
KEMENTRIAN
A B C D E F G H KETENAGAKERJAAN
REPUBLIK INDONESIA
500 400 500 600 500 400 500
KEGIATAN :
100 400 400 100 100 400 400 100
PERENCANAAN PEMBANGUNAN
1 BLK PALU
SULAWESI TENGAH
PEKERJAAN :
400
400
PEMBANGUNAN WORKSHOP MANUFAKTUR,
REFRIGASI, DAN KANTOR TAHAP II
TAHUN ANGGARAN :
2
2023
LOKASI :
600
60X60
KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118
MENGETAHUI OLEH :
2000
3
600
PEJABAT PEMBUAT
PEJABAT PEMBUATKOMITMEN (PPK)
KOMITMEN
HOMOGENOUS TILE
60X60 DI BUAT OLEH :
400
400
KONSULTAN PERENCANA
5
100 400 400 100 300 300 100 400 400 100
BAMBANG RIYANTO
TEAM LEADER
500 400 500 600 500 400 500
Digambar -
3400 Diperiksa -
DENAH RENCANA KERAMIK LT. 2 Disetujui
Skala 1:130
-
Nama Gambar Skala
DENAH RENCANA -
1:130
KERAMIK
ARS 71 109
FSD3 FSD3
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :
PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH
PEKERJAAN :
TAHUN ANGGARAN :
2023
LOKASI :
MENGETAHUI OLEH :
PEJABAT PEMBUAT
PEJABAT PEMBUAT KOMITMEN
KOMITMEN (PPK)
DI BUAT OLEH :
KONSULTAN PERENCANA
Diperiksa -
DENAH RENCANA ACP & FASAD LT.1
ACP1 Skala 1:80 Disetujui -
Nama Gambar Skala
DENAH RENCANA -
1:130
FINISHING FASAD
ARS 72 109
KS2
KEMENTRIAN
KETENAGAKERJAAN
3569
REPUBLIK INDONESIA
KEGIATAN :
75
PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH
PEKERJAAN :
TAHUN ANGGARAN :
2023
RG. KELAS LOKASI :
+4.15
JL. KELINCI, TALISE,
KECAMATAN PALU TIM., KOTA PALU,
SULAWESI TENGAH - 94118
MENGETAHUI OLEH :
2165
+/- 0.00 +/- 0.00
75 75
KORIDOR
BORDES
+4.15 KS2 AGUNG NUR ROHMAD, ST.,MM.
+ 2.15
NIP. 19760725B200501 1 001
DISETUJUI OLEH :
PEJABAT PEMBUAT
PEJABAT KOMITMEN
PEMBUAT (PPK)
KOMITMEN
KONSULTAN PERENCANA
75
Digambar -
Disetujui -
Nama Gambar Skala
DENAH RENCANA -
1:130
FINISHING FASAD
ARS 73 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :
PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH
PEKERJAAN :
TAHUN ANGGARAN :
2023
LOKASI :
MENGETAHUI OLEH :
DI BUAT OLEH :
KONSULTAN PERENCANA
BAMBANG RIYANTO
ACP3 TEAM LEADER
Digambar -
Diperiksa -
DENAH RENCANA ACP TOP FLOOR
Skala 1:80
Disetujui -
Nama Gambar Skala
DENAH RENCANA -
1:130
FINISHING FASAD
ARS 74 109
KEMENTRIAN
Pintu Jendela PJ1
KETENAGAKERJAAN
REPUBLIK INDONESIA
I-WF 150x300
Pasangan Bata KEGIATAN :
Acp Mereah Penutup Atap Teras
PERENCANAAN PEMBANGUNAN
BLK PALU
I-WF 125x250 SULAWESI TENGAH
∅8-15
Homogenous Tile 60x60 (Hitam) PEKERJAAN :
40 ∅8-15
40
8 8 8
PEMBANGUNAN WORKSHOP MANUFAKTUR,
140 REFRIGASI, DAN KANTOR TAHAP II
Pasangan Bata
115 99 115 99 99 115
∅8-15 TAHUN ANGGARAN :
Balok Latai
8 8 8 2023
40
Pintu Jendela PJ1
LOKASI :
∅8-15
Plat Lantai
Sloof 30x50
AGUNG NUR ROHMAD, ST.,MM.
NIP. 19760725B200501 1 001
DISETUJUI OLEH :
PEJABAT PEMBUAT
PEJABAT PEMBUATKOMITMEN (PPK)
KOMITMEN
8 37 67 8 8 67 37 8
120 480 120 Rabat Saluran Keliling
720
ADITYA WIBAWA S.P, ST
600 Sloof 30x50 NIP. 19860707
AKHIRUDIN, 201503 1 003
S.T.,M.Ec.Dev
NIP. 19851004200912 1 001
D5 D5 Plat Lantai
DI BUAT OLEH :
D5 E5 KONSULTAN PERENCANA
Pintu Jelndela PJ1
∅8-15 600
53 52 495 53 52
BAMBANG RIYANTO
TEAM LEADER
40 40
Digambar -
8 104 8 8 104 8
120 480 120 Diperiksa -
Pas Bata Kolom K1-b Disetujui -
Pas Bata Homogenous Tile 60x60 Kolom Praktis
Nama Gambar Skala
DETAIL FASAD FSD-1
SKALA 1:50
RENCANA -
1:50
FINISHING FASAD
ARS 75 109
KEMENTRIAN
Acp 2 KETENAGAKERJAAN
∅8-15
REPUBLIK INDONESIA
Acp 2
I-WF 125x250 233 8 176 I-WF 125x250 KEGIATAN :
30 146 30
8 8
PERENCANAAN PEMBANGUNAN
BLK PALU
Pasangan Bata SULAWESI TENGAH
140
138 122 122 PEKERJAAN :
∅8-15
Balok Latai
PEMBANGUNAN WORKSHOP MANUFAKTUR,
REFRIGASI, DAN KANTOR TAHAP II
8 8
Jendela J1
TAHUN ANGGARAN :
423 Jendela J1
160 160
175
160
423 2023
Kolom K2 (H-WF 200x200) LOKASI :
∅8-15 ∅8-15
Finshing Batu Alam Palimanan JL. KELINCI, TALISE,
30
8 8 KECAMATAN PALU TIM., KOTA PALU,
Pasangan Bata SULAWESI TENGAH - 94118
Pasangan Bata
85 MENGETAHUI OLEH :
Sloof 30x50
125 117 Plat Lantai 117
DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI
MT - 0.50
PEJABAT PEMBUAT
PEJABAT KOMITMEN
PEMBUAT (PPK)
KOMITMEN
30
30
8 BAMBANG RIYANTO
TEAM LEADER
Acp 2 233 185
418
Digambar -
500
Diperiksa -
G5 H5 Disetujui -
ARS 76 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :
PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH
PEKERJAAN :
2023
5
LOKASI :
MENGETAHUI OLEH :
170
345
+4.15 120
450 AGUNG NUR ROHMAD, ST.,MM.
NIP. 19760725B200501 1 001
DISETUJUI OLEH :
Sealant Putih PEJABAT PEMBUAT
PEJABAT PEMBUATKOMITMEN (PPK)
KOMITMEN
170
6
ADITYA WIBAWA S.P, ST
AKHIRUDIN,
NIP. 19860707 S.T.,M.Ec.Dev
201503 1 003
NIP. 19851004200912 1 001
40 DI BUAT OLEH :
KONSULTAN PERENCANA
40 133 120 120 120 133 40
825
BAMBANG RIYANTO
TEAM LEADER
Digambar -
Diperiksa -
Disetujui -
Nama Gambar Skala
RENCANA -
1:50
FINISHING FASAD
ARS 77 109
D E
113 600 113
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
5 KEGIATAN :
Acp Merah
70 PERENCANAAN PEMBANGUNAN
+3.60 BLK PALU
SULAWESI TENGAH
PEKERJAAN :
MENGETAHUI OLEH :
40
40 133 120 120 120 120 133 40 AGUNG NUR ROHMAD, ST.,MM.
NIP. 19760725B200501 1 001
825 DISETUJUI OLEH :
PEJABAT PEMBUAT
PEJABAT KOMITMEN
PEMBUAT (PPK)
KOMITMEN
15 KONSULTAN PERENCANA
55 50 25
10
5
+ 3.65
+ 3.60 Acp Putih
Acp Merah
170 170 70
340
Finishing FSD-4 Acp Putih Rangka Besi Hollow 4x4 BAMBANG RIYANTO
TEAM LEADER
Finishing FSD-1
Digambar -
Diperiksa -
Disetujui -
Nama Gambar Skala
RENCANA -
DETAIL FASAD ACP-1 FINISHING FASAD
1:50
SKALA 1:50
ARS 78 109
Acp Merah
40 180 180 40
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
78 78
KEGIATAN :
PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH
PEKERJAAN :
150
Pintu P1
PEMBANGUNAN WORKSHOP MANUFAKTUR,
REFRIGASI, DAN KANTOR TAHAP II
TAHUN ANGGARAN :
523
2023
445 145
LOKASI :
MENGETAHUI OLEH :
F5 G5
400 ADITYA WIBAWA S.P, ST
Pintu P1
Kolom K3 NIP.AKHIRUDIN,
19860707 S.T.,M.Ec.Dev
201503 1 003
NIP. 19851004200912 1 001
DI BUAT OLEH :
60 60 KONSULTAN PERENCANA
40 360 40
440 Acp Merah
Rangka Besi Hollow 4x4
Digambar -
Diperiksa -
Disetujui -
Nama Gambar Skala
RENCANA -
1:50
FINISHING FASAD
ARS 79 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :
PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH
PEKERJAAN :
70 13 25 13 25 16 25 13 68 20 40 19 40 40 19 40 20 68 13 25 16 25 13 25 13 70
TAHUN ANGGARAN :
2023
Finshing Batu Alam Palimanan
LOKASI :
MENGETAHUI OLEH :
PEJABAT PEMBUAT
PEJABAT PEMBUAT KOMITMEN
KOMITMEN (PPK)
BAMBANG RIYANTO
TEAM LEADER
Digambar -
Diperiksa -
Disetujui -
Nama Gambar Skala
RENCANA -
1:50
FINISHING FASAD
ARS 80 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :
PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH
PEKERJAAN :
30
TAHUN ANGGARAN :
I-WF 125x250
Finishing Beton 65
2023
LOKASI :
Fasad FSD-1
140
130 JL. KELINCI, TALISE,
Pas Bata Finishing KECAMATAN PALU TIM., KOTA PALU,
Batu Alam Palimanan
∅8-15 Balok Latai SULAWESI TENGAH - 94118
400
8 MENGETAHUI OLEH :
40
DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI
Jendela J1
300
314,8
375
175 425
160
DI BUAT OLEH :
420 60 30 20
BAMBANG RIYANTO
TEAM LEADER
Digambar -
Diperiksa -
Disetujui -
Nama Gambar Skala
RENCANA -
1:50
FINISHING FASAD
ARS 81 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KS2 KS1 KS2
KEGIATAN :
Rangka Besi Hollow 4x4 WPC 10x360 Jarak 10cm WPC 10x360 Jarak 10cm
PERENCANAAN PEMBANGUNAN
BLK PALU
1367 835 1367
SULAWESI TENGAH
+ 7.50
75 75
PEKERJAAN :
180
340
320
REFRIGASI, DAN KANTOR TAHAP II
360
380
180
TAHUN ANGGARAN :
40
118
2023
+ 3.90
LOKASI :
500 400 500 600 500 400 500
Join Dynabolt
(Khusus Area Yang terhubung langsung
180
ke Baja Di lakukan Pengelasan)
ADITYA WIBAWA S.P, ST
NIP. 19860707
AKHIRUDIN, 201503 1 003
S.T.,M.Ec.Dev
NIP. 19851004200912 1 001
KONSULTAN PERENCANA
180
BAMBANG RIYANTO
TEAM LEADER
Digambar -
Diperiksa -
DETAIL POTONGAN RANGKA KISI KISI
SKALA 1:50
Disetujui -
Nama Gambar Skala
RENCANA -
1:50
FINISHING FASAD
ARS 82 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :
PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH
PEKERJAAN :
TAHUN ANGGARAN :
320 320
2023
Acp Merah
33
Atap Bitumen
LOKASI :
89
JL. KELINCI, TALISE,
KECAMATAN PALU TIM., KOTA PALU,
Acp Merah SULAWESI TENGAH - 94118
136
Acp Putih Rangka Besi Hollow 4x4
Sealant Putih MENGETAHUI OLEH :
40
DIREKTUR BINA KELEMBAGAAN PELATIHAN VOKASI
113 170 170
40
24 Atap
Acp Putih
320 232 320
AGUNG NUR ROHMAD, ST.,MM.
NIP. 19760725B200501 1 001
DISETUJUI OLEH :
82 PEJABAT PEMBUAT
PEJABAT KOMITMEN
PEMBUAT (PPK)
KOMITMEN
150 150
25
98 120 120 120 98
Pas Bata ADITYA WIBAWA S.P, ST
Plat Dak Beton NIP. 19860707
AKHIRUDIN, 201503 1 003
S.T.,M.Ec.Dev
40 560 40
NIP. 19851004200912 1 001
Finising Kolom
640 13 20
DI BUAT OLEH :
33
KONSULTAN PERENCANA
600
D5 E5
BAMBANG RIYANTO
TEAM LEADER
DETAIL FASAD ACP-3
SKALA 1:30 Digambar -
Diperiksa -
Disetujui -
Nama Gambar Skala
RENCANA -
1:50
FINISHING FASAD
ARS 82 B 109
KEMENTRIAN
3725 KETENAGAKERJAAN
REPUBLIK INDONESIA
1470 750 1415
KEGIATAN :
PERENCANAAN PEMBANGUNAN
BLK PALU
80
SULAWESI TENGAH
SL2 PEKERJAAN :
TAHUN ANGGARAN :
2023
LOKASI :
MENGETAHUI OLEH :
SL1
2325
2235
2235
2325
AGUNG NUR ROHMAD, ST.,MM.
NIP. 19760725B200501 1 001
DISETUJUI OLEH :
PEJABAT PEMBUAT
PEJABAT PEMBUATKOMITMEN (PPK)
KOMITMEN
DI BUAT OLEH :
KONSULTAN PERENCANA
BAMBANG RIYANTO
80
TEAM LEADER
Digambar -
557 365 365 557
Diperiksa -
662 485 485 662
Disetujui -
DENAH RENCANA SALURAN KRLILING
Skala 1:80 Nama Gambar Skala
DENAH RENCANA -
1:130
SALURAN KELILING
ARS 83 109
KEMENTRIAN
KETENAGAKERJAAN
REPUBLIK INDONESIA
KEGIATAN :
PERENCANAAN PEMBANGUNAN
BLK PALU
SULAWESI TENGAH
PEKERJAAN :
60 TAHUN ANGGARAN :
H-WF 200X200
2023
Soof 30X50 15 45
15
Rabat Keliling LOKASI :
MT -0.50
Pasir Urug
Rabat beton
Rabat Saluran Krikil & Pasir AGUNG NUR ROHMAD, ST.,MM.
Pasir Urug
15 30 15
Tanah Urug NIP. 19760725B200501 1 001
60 DISETUJUI OLEH :
15 30 15 PEJABAT PEMBUAT KOMITMEN (PPK)
PEJABAT PEMBUAT KOMITMEN
DETAIL POT.SALURAN SL-1
SKALA 1:30
ADITYA WIBAWA S.P, ST
DETAIL POT.RESAPAN SALURAN SL-2 NIP. 19860707
AKHIRUDIN, 201503 1 003
S.T.,M.Ec.Dev
NIP. 19851004200912 1 001
SKALA 1:30
DI BUAT OLEH :
KONSULTAN PERENCANA
BAMBANG RIYANTO
TEAM LEADER
Digambar -
Diperiksa -
Disetujui -
Nama Gambar Skala
RENCANA -
1:30
SALURAN KELILING