SUMMARY

PROJECT : PT. SATRIA PIRANTI PERKASA


WORK : WAREHOUSE BUILDING & INFRASTRUCTURE (A = 24,449 m2) PT. MULTIBRATA ANUGERAH UTAMA
LOCATION : JL. KENARI RAYA KAV.G6-02 & G6-02A Bandung, September 04th, 2018

I. PREPARATION WORK #REF!

II. WAREHOUSE BUILDING = 23,625.00 M2 #REF!

III. UTILITY BUILDING #REF!

IV GUARD HOUSE #REF!

V. GARBAGE #REF!

VI. GWT & PUMP ROOM #REF!

VII. INFRASTRUCTURE WORK #REF!

VIII. PLUMBING WORK #REF!

IX. EARTH WORK #REF!

Note : 1. Piling work assumption depth 9 m' & 18 m' and will be calculate actual on site. TOTAL #REF!
2. Exclude : PROFIT 0% -
- PPN 10%
- Electrical Work TOTAL #REF!
- Mechanical Work Pph 0% -

TOTAL #REF!

ROUNDED 79,773,500,000.00
12,298,542,000.00 12.298.542.000 000
PT. KERETA API INDONESIA (Persero)
UNIT BUILDING 542 298 12
Ribu 12298542000 uluh Dua Ribu Rupiah
Dua Belas Milyar Du
Lima Ratus Empat Puluh Dua
Dua BelasDua Ratus Sembilan Puluh Delapan Milyar
NOMOR : Rupiah Juta
PEKERJAAN : PEMBANGUNAN GRIYA KARYA SEMARANG TAWANG
LOKASI : DIVRE 3 PALEMBANG

RENCANA ANGGARAN BIAYA

HARGA SATUAN (Rp) NILAI PEKERJAAN (Rp)


NO VOL SAT URAIAN PEKERJAAN
UPAH BAHAN UPAH BAHAN
I PEKERJAAN PERSIAPAN
I.A PEKERJAAN PERSIAPAN & PEMBONGKARAN
1 20.0 m2 Pembuatan gudang semen dan alat-alat, 369,500.00 455,643.00 7,390,000.00 9,112,860.00
2 25.0 m2 Pembuatan bedeng buruh, 369,500.00 438,213.00 9,237,500.00 10,955,325.00
3 1.0 LS Pek. Mobilisasi & Demobilisasi, 50,000,000.00 50,000,000.00
4 214.5 m Pek. Pengukuran dan Pasang Papan Bowplank, 24,550.00 26,930.00 5,265,975.00 5,776,485.00
5 234.5 m Pek. Pembuatan Pagar sementara dari seng gelombang tinggi 2 m, 73,400.00 216,276.50 17,212,300.00 50,716,839.25
6 1,752.8 m² Pek. Pembersihan Lapangan dan Peralatan, (termasuk relokasi utilitas eksisting) 18,000.00 - 31,550,004.00 -
7 1.00 ls Sewa Scafolding, - 20,000,000.00 - 20,000,000.00
8 1.00 ls Pek. Pembongkaran Bangunan Eksisting, 25,000,000.00 - 25,000,000.00 -
9 1.0 LS Keselamatan Dan kesehatan Kerja 23,967,000.00 23,967,000.00
Jumlah I 145,655,779.00 120,528,509.25
II STRUKTUR
II.A PEKERJAAN TANAH DAN PONDASI BATU KALI
II.A1 PEKERJAAN TANAH DAN PONDASI BATU KALI BANGUNAN UTAMA
1 517.08 m³ Pek. Galian Tanah , 89,500.00 - 46,278,427.30 -
2 15.55 m³ Pek. Pengurugan dengan pasir urug, 35,800.00 300,000.00 556,732.96 4,665,360.00
3 299.36 m³ Pek. Pengurugan Tanah Bekas Galian, 29,790.00 - 8,917,952.27 -
4 31.10 m³ Pek. Pembuatan Pondasi Batu Kosong (Aanstamping), 141,180.00 345,000.00 4,391,036.83 10,730,328.00
5 186.61 m³ Pek. Pemasangan Pondasi Batu Kali 1 Pc : 4 Ps, 253,650.00 712,918.00 47,334,742.56 133,040,764.82
6 558.90 m² Pek. Anti Rayap, Setara Fumida - 40,250.00 - 22,495,725.00
II.A2 PEKERJAAN TANAH PILE CAP
1 182.95 m³ Pek. Galian Tanah , 89,500.00 - 16,374,204.00 -
2 3.40 m³ Pek. Pengurugan dengan pasir urug, 35,800.00 300,000.00 121,791.60 1,020,600.00
3 6.80 m³ Pek. Pembuatan Beton Tumbuk ad. 1 Pc : 3 Ps : 5 Kr, untuk lantai kerja 229,900.00 866,818.00 1,564,239.60 5,897,829.67
II.A3 PEKERJAAN TANAH DAN PONDASI BATU KALI BANGUNAN GENSET
1 19.80 m Pek. Pengukuran dan Pasang Papan Bowplank, 24,550.00 26,930.00 486,090.00 533,214.00
2 26.33 m³ Pek. Galian Tanah , 89,500.00 - 2,356,893.00 -
3 0.79 m³ Pek. Pengurugan dengan pasir urug, 35,800.00 300,000.00 28,353.60 237,600.00
4 1.58 m³ Pek. Pembuatan Pondasi Batu Kosong (Aanstamping), 141,180.00 345,000.00 223,629.12 546,480.00
5 9.50 m³ Pek. Pemasangan Pondasi Batu Kali 1 Pc : 4 Ps, 253,650.00 712,918.00 2,410,689.60 6,775,572.67
6 23.96 m³ Pek. Pengurugan tanah bekas galian, 29,790.00 - 713,708.82 -
II.A4 PEKERJAAN TANAH PLAT LANTAI
1 419.17 m³ Pek. Pengurugan Tanah Dengan Tanah Urug, 35,800.00 159,078.00 15,006,465.00 66,681,520.65
2 27.95 m³ Pek. Pengurugan dengan pasir urug, 35,800.00 300,000.00 1,000,431.00 8,383,500.00
3 55.89 m³ Pek. Pembuatan Beton Tumbuk ad. 1 Pc : 3 Ps : 5 Kr, untuk lantai kerja 229,900.00 866,818.00 12,849,111.00 48,446,458.02
II.A5 PEKERJAAN TANAH BANGUNAN TORENT
1 2.67 m³ Pek. Galian Tanah , 89,500.00 - 239,233.50 -
2 1.59 m³ Pek. Pengurugan Tanah Bekas Galian, 29,790.00 - 47,455.47 -
II.A6 PEKERJAAN TANAH GWT
1 51.94 m³ Pek. Galian Tanah , 89,500.00 - 4,648,182.50 -
2 1.44 m³ Pek. Pengurugan dengan pasir urug, 35,800.00 300,000.00 51,552.00 432,000.00
3 0.72 m³ Pek. Pembuatan Beton Tumbuk ad. 1 Pc : 3 Ps : 5 Kr, untuk lantai kerja 229,900.00 866,818.00 165,528.00 624,108.96
II.A5 PEKERJAAN TANAH TIANG PJU
1 2.85 m³ Pek. Galian Tanah , 89,500.00 - 255,075.00 -
2 0.30 m³ Pek. Pengurugan dengan pasir urug, 35,800.00 300,000.00 10,883.20 91,200.00
3 1.03 m³ Pek. Pengurugan tanah bekas galian, 29,790.00 - 30,564.54 -
II.A6 PEKERJAAN TANAH BIO SEPTITANK
1 13.44 m³ Pek. Galian Tanah , 89,500.00 - 1,202,880.00 -
2 0.84 m³ Pek. Pengurugan dengan pasir urug, 35,800.00 300,000.00 30,072.00 252,000.00
3 1.80 m³ Pek. Pengurugan tanah bekas galian, 29,790.00 - 53,622.00 -
II.A7 PEKERJAAN EKSISTING JALAN

1 262.92 m³ Pek. Stripping. Penghamparan tanah urug dan pemadatan tanah urug dengan alat berat, 13,538.00 171,033.00 3,559,366.28 44,967,431.95
2 262.92 m³ Angkut Material Pembongkaran Eksisting menggunakan Dump Truck, 39,600.00 - 10,411,501.32 -
3 13.15 m³ Pek. Pengurugan dengan pasir urug, 35,800.00 300,000.00 470,620.89 3,943,750.50
II.8 PEKERJAAN TANAH SUMUR RESAPAN & BOX CONTROL

1 61.32 m³ Pek. Galian Tanah , 89,500.00 - 5,488,578.55 -


II.A9 PEKERJAAN EKSISTING PAVING BLOK

1 1,752.78 m² Pek. Pembongkaran Paving Block, 37,962.50 34,320.00 66,539,834.83 60,155,340.96

Jumlah II.A 253,819,448.35 419,920,785.20


II.B PEKERJAAN STRUKTUR BAWAH
II.B1 PEKERJAAN STRUKTUR BAWAH BANGUNAN UTAMA
HARGA SATUAN (Rp) NILAI PEKERJAAN (Rp)
NO VOL SAT URAIAN PEKERJAAN
UPAH BAHAN UPAH BAHAN
PEKERJAAN PONDASI SPUN PILE Ø30 CM
1 1,008.00 m Pek. Penyediaan Tiang Pancang Spun pile uk 30X30 Bottom 12 m kelas A3, 8,723.00 318,380.85 8,792,784.00 320,927,896.80
2 672.00 m Pek. Penyediaan Tiang Pancang Spun pile uk 30X30 Upper 8 m kelas A3, 8,723.00 351,980.85 5,861,856.00 236,531,131.20
3 1,680.00 m Pek. Penetrasi Tiang Pancang Spun Pile Uk 30X30, 70,880.00 104,000.00 119,078,400.00 174,720,000.00
4 84.00 ttk Pek. Pengelasan dengan Las Listrik, 66,505.20 169,465.80 5,586,436.80 14,235,127.20
5 4.0 titik Pek. Test PDA, - 7,925,000.00 - 31,700,000.00
PEKERJAAN TREATMENT PILE HEAD SPUN PILE
1 3.19 m³ Pek. Pembuatan Beton Ready Mix dengan mutu K.250, 144,205.60 1,085,750.00 460,465.03 3,466,924.36
2 866.96 kg Pek. Pembesian dengan Besi Ulir, 1,712.00 14,472.00 1,484,230.94 12,546,606.42
PEKERJAAN PILE CAP 1 Uk. 1350 x 600 MM
1 34.02 m³ Pek. Pembuatan Beton Ready Mix dengan mutu K.250, 144,205.60 1,085,750.00 4,905,874.51 36,937,215.00
2 3,921.06 kg Pek. Pembesian dengan Besi Ulir, 1,712.00 14,472.00 6,712,855.57 56,745,587.49
3 151.20 m² Pek. Pemasangan dinding bata ringan tebal 10 cm, 14,350.00 91,512.00 2,169,720.00 13,836,614.40
PEKERJAAN PEDESTAL PD1
1 2.66 m³ Pek. Pembuatan Beton Ready Mix dengan mutu K.250, 144,205.60 1,085,750.00 383,082.18 2,884,294.87
2 1,017.8 kg Pek. Pembesian dengan Besi Ulir, (Tulangan Lentur) 1,712.00 14,472.00 1,742,431.26 14,729,243.69
3 213.1 kg Pek. Pembesian dengan Besi Polos, (Tulangan Polos) 1,712.00 12,897.00 364,782.94 2,748,017.27
4 51 m² Pek. Pemasangan dinding bata ringan tebal 10 cm, 14,350.00 91,512.00 726,110.00 4,630,507.20
PEKERJAAN PEDESTAL PD2
1 2.36 m³ Pek. Pembuatan Beton Ready Mix dengan mutu K.250, 144,205.60 1,085,750.00 340,296.37 2,562,152.85
2 420.1 kg Pek. Pembesian dengan Besi Ulir, (Tulangan Lentur) 1,712.00 14,472.00 719,234.53 6,079,884.37
3 121.7 kg Pek. Pembesian dengan Besi Polos, (Tulangan Polos) 1,712.00 12,897.00 208,294.80 1,569,146.03
4 48 m² Pek. Pemasangan dinding bata ringan tebal 10 cm, 14,350.00 91,512.00 689,144.40 4,394,772.29
PEKERJAAN PEDESTAL PD3
1 5.17 m³ Pek. Pembuatan Beton Ready Mix dengan mutu K.250, 144,205.60 1,085,750.00 745,182.44 5,610,613.12
2 350.1 kg Pek. Pembesian dengan Besi Ulir, (Tulangan Lentur) 1,712.00 14,472.00 599,362.10 5,066,570.31
3 101.4 kg Pek. Pembesian dengan Besi Polos, (Tulangan Polos) 1,712.00 12,897.00 173,579.00 1,307,621.69
4 112 m² Pek. Pemasangan dinding bata ringan tebal 10 cm, 14,350.00 91,512.00 1,604,330.00 10,231,041.60
PEKERJAAN SLOOF (SL1) 300X400 MM
1 40.06 m³ Pek. Pembuatan Beton Ready Mix dengan mutu K.250, 144,205.60 1,085,750.00 5,777,525.26 43,500,030.87
2 4,858.4 kg Pek. Pembesian dengan Besi Ulir, (Tulangan Lentur) 1,712.00 14,472.00 8,317,558.09 70,310,572.87
3 2,755.3 kg Pek. Pembesian dengan Besi Polos, (Tulangan Polos) 1,712.00 12,897.00 4,716,988.20 35,534,460.79
4 549 m² Pek. Pemasangan dinding bata ringan tebal 10 cm, 14,350.00 91,512.00 7,884,693.60 50,281,817.47
PEKERJAAN SLOOF (SL2) 150 X 200 MM
1 4.99 m³ Pek. Pembuatan Beton Ready Mix dengan mutu K.250, 144,205.60 1,085,750.00 719,019.94 5,413,630.93
2 718.11 kg Pek. Pembesian dengan Besi Ulir, (Tulangan Lentur) 1,712.00 14,472.00 1,229,404.91 10,392,492.92
3 537.76 kg Pek. Pembesian dengan Besi Polos, (Tulangan Polos) 1,712.00 12,897.00 920,650.25 6,935,529.39
4 106.37 m² Pek. Pemasangan dinding bata ringan tebal 10 cm, 14,350.00 91,512.00 1,526,403.76 9,734,094.84
II.B2 PEKERJAAN STRUKTUR BAWAH BANGUNAN GENSET
PEKERJAAN SLOOF
1 0.99 m³ Pek. Pembuatan Beton Ready Mix dengan mutu K.250, 144,205.60 1,085,750.00 142,763.54 1,074,892.50
2 83.42 kg Pek. Pembesian dengan Besi Ulir, (Tulangan Lentur) 1,712.00 14,472.00 142,812.30 1,207,231.08
3 83.07 kg Pek. Pembesian dengan Besi Polos, (Tulangan Sengkang) 1,712.00 12,897.00 142,220.77 1,071,390.93
4 13.86 m² Pek. Pemasangan dinding bata ringan tebal 10 cm, 14,350.00 91,512.00 198,891.00 1,268,356.32
II.B3 PEKERJAAN STRUKTUR BAWAH TIANG PJU
PEKERJAAN PILE CAP Uk. 400 x 400 x 500 MM
1 1.52 m³ Pek. Pembuatan Beton Ready Mix dengan mutu K.250, 144,205.60 1,085,750.00 219,192.51 1,650,340.00
2 253.40 kg Pek. Pembesian dengan Besi Ulir, 1,712.00 14,472.00 433,824.00 3,667,231.84
3 15.20 m² Pek. Pemasangan dinding bata ringan tebal 10 cm, 14,350.00 91,512.00 218,120.00 1,390,982.40
II.B4 PEKERJAAN GROUND WATER TANK
PEKERJAAN DINDING BETON
1 21.58 m³ Pek. Pembuatan Beton Ready Mix dengan mutu K.250, 144,205.60 1,085,750.00 3,111,380.03 23,426,142.00
2 2,643.55 kg Pek. Pembesian dengan Besi Ulir, (Tulangan Lentur) 1,712.00 14,472.00 4,525,757.60 38,257,455.57
3 43.12 m² Pek. Pemasangan dinding bata ringan tebal 10 cm, 14,350.00 91,512.00 618,772.00 3,945,997.44
4 42.64 m² Pek. Pemasangan Bekisting untuk Dinding Beton + Multiplek Film 9 mm, 78,500.00 145,180.00 3,347,240.00 6,190,475.20
II.B5 PEKERJAAN STRUKTUR TORN
PEKERJAAN SLOOF
1 1.26 m³ Pek. Pembuatan Beton Ready Mix dengan mutu K.250, 144,205.60 1,085,750.00 181,699.06 1,368,045.00
2 158.80 kg Pek. Pembesian dengan Besi Ulir, (Tulangan Lentur) 1,712.00 14,472.00 271,858.85 2,298,096.52
3 132.16 kg Pek. Pembesian dengan Besi Polos, (Tulangan Polos) 1,712.00 12,897.00 226,260.32 1,704,485.58
4 12.60 m² Pek. Pemasangan dinding bata ringan tebal 10 cm, 14,350.00 91,512.00 180,810.00 1,153,051.20
PEKERJAAN PILE CAP Uk. 600 x 600 MM
1 1.08 m³ Pek. Pembuatan Beton Ready Mix dengan mutu K.250, 144,205.60 1,085,750.00 155,742.05 1,172,610.00
2 137.54 kg Pek. Pembesian dengan Besi Ulir, 1,712.00 14,472.00 235,463.68 1,990,438.34
3 7.20 m² Pek. Pemasangan dinding bata ringan tebal 10 cm, 14,350.00 91,512.00 103,320.00 658,886.40

JUMLAH II.C 208,896,824.59 1,289,059,706.59


II.C PEKERJAAN STRUKTUR ATAS
II.C1 PEKERJAAN STRUKTUR ATAS BANGUNAN UTAMA
PEKERJAAN KOLOM K1 130X350
HARGA SATUAN (Rp) NILAI PEKERJAAN (Rp)
NO VOL SAT URAIAN PEKERJAAN
UPAH BAHAN UPAH BAHAN
1 13.86 m³ Pek. Pembuatan Beton Ready Mix dengan mutu K.250, 144,205.60 1,085,750.00 1,998,689.62 15,048,495.00
2 3,906.06 kg Pek. Pembesian dengan Besi Ulir, (Tulangan Lentur) 1,712.00 14,472.00 6,687,168.62 56,528,448.76
3 1,163.78 kg Pek. Pembesian dengan Besi Polos, (Tulangan Polos) 1,712.00 12,897.00 1,992,385.02 15,009,222.88
4 264.00 m² Pek. Pemasangan Bekisting untuk Kolom Beton + Multiplek Film 9 mm, 76,200.00 106,680.00 20,116,800.00 28,163,520.00
PEKERJAAN KOLOM K2 130X350X350
1 12.31 m³ Pek. Pembuatan Beton Ready Mix dengan mutu K.250, 144,205.60 1,085,750.00 1,775,459.35 13,367,754.00
2 3,125.85 kg Pek. Pembesian dengan Besi Ulir, (Tulangan Lentur) 1,712.00 14,472.00 5,351,447.36 45,237,234.92
3 634.79 kg Pek. Pembesian dengan Besi Polos, (Tulangan Polos) 1,712.00 12,897.00 1,086,755.46 8,186,848.84
4 250.56 m² Pek. Pemasangan Bekisting untuk Kolom Beton + Multiplek Film 9 mm, 76,200.00 106,680.00 19,092,672.00 26,729,740.80
PEKERJAAN KOLOM K3 130X350X350
1 10.26 m³ Pek. Pembuatan Beton Ready Mix dengan mutu K.250, 144,205.60 1,085,750.00 1,479,549.46 11,139,795.00
2 2,604.87 kg Pek. Pembesian dengan Besi Ulir, (Tulangan Lentur) 1,712.00 14,472.00 4,459,539.47 37,697,695.77
3 528.99 kg Pek. Pembesian dengan Besi Polos, (Tulangan Polos) 1,712.00 12,897.00 905,629.55 6,822,374.03
4 208.80 m² Pek. Pemasangan Bekisting untuk Kolom Beton + Multiplek Film 9 mm, 76,200.00 106,680.00 15,910,560.00 22,274,784.00
PEKERJAAN KOLOM PRAKTIS KP 110*110
1 26.53 m³ Pek. Pembuatan Beton Bertulang 1 Pc : 2 Ps : 3 Kr, 229,900.00 839,132.00 6,098,672.25 22,260,074.13
2 5,138.89 kg Pek. Pembesian dengan Besi Ulir, (Tulangan Lentur) 1,712.00 14,472.00 8,797,779.46 74,370,014.22
3 2,035.31 kg Pek. Pembesian dengan Besi Polos, (Tulangan Polos) 1,712.00 12,897.00 3,484,457.20 26,249,441.92
4 707.40 m² Pek. Pemasangan Bekisting untuk Kolom Beton + Multiplek Film 9 mm, 76,200.00 106,680.00 53,903,880.00 75,465,432.00
PEKERJAAN KOLOM K4
1 1.04 m³ Pek. Pembuatan Beton Ready Mix dengan mutu K.250, 144,205.60 1,085,750.00 149,901.72 1,128,637.13
2 82.52 kg Pek. Pembesian dengan Besi Ulir, (Tulangan Lentur) 1,712.00 14,472.00 141,278.21 1,194,263.00
3 134.28 kg Pek. Pembesian dengan Besi Polos, (Tulangan Polos) 1,712.00 12,897.00 229,890.58 1,731,833.41
4 19.80 m² Pek. Pemasangan Bekisting untuk Kolom Beton + Multiplek Film 9 mm, 76,200.00 106,680.00 1,508,760.00 2,112,264.00
BALOK B1
1 41.62 m³ Pek. Pembuatan Beton Ready Mix dengan mutu K.250, 144,205.60 1,085,750.00 6,002,377.84 45,192,986.56
2 4,460.89 kg Pek. Pembesian dengan Besi Ulir, (Tulangan Lentur) 1,712.00 14,472.00 7,637,050.53 64,558,057.96
3 2,956.33 kg Pek. Pembesian dengan Besi Polos, (Tulangan Polos) 1,712.00 12,897.00 5,061,240.59 38,127,815.33
4 570.84 m² Pek. Pemasangan Bekisting untuk Balok Beton + Multiplek Film 9 mm, 78,500.00 109,380.00 44,810,940.00 62,438,479.20
BALOK B2
1 4.37 m³ Pek. Pembuatan Beton Ready Mix dengan mutu K.250, 144,205.60 1,085,750.00 629,890.06 4,742,556.00
2 786.37 kg Pek. Pembesian dengan Besi Ulir, (Tulangan Lentur) 1,712.00 14,472.00 1,346,259.50 11,380,296.39
3 545.79 kg Pek. Pembesian dengan Besi Polos, (Tulangan Polos) 1,712.00 12,897.00 934,390.15 7,039,036.09
4 101.92 m² Pek. Pemasangan Bekisting untuk Balok Beton + Multiplek Film 9 mm, 78,500.00 109,380.00 8,000,720.00 11,148,009.60
BALOK B3
1 45.82 m³ Pek. Pembuatan Beton Ready Mix dengan mutu K.250, 144,205.60 1,085,750.00 6,607,464.54 49,748,793.56
2 5,729.02 kg Pek. Pembesian dengan Besi Ulir, (Tulangan Lentur) 1,712.00 14,472.00 9,808,079.21 82,910,351.80
3 3,495.42 kg Pek. Pembesian dengan Besi Polos, (Tulangan Polos) 1,712.00 12,897.00 5,984,153.52 45,080,390.15
4 672.02 m² Pek. Pemasangan Bekisting untuk Balok Beton + Multiplek Film 9 mm, 78,500.00 109,380.00 52,753,805.50 73,505,875.74
BALOK B4
1 10.96 m³ Pek. Pembuatan Beton Ready Mix dengan mutu K.250, 144,205.60 1,085,750.00 1,580,204.96 11,897,648.50
2 1,370.12 kg Pek. Pembesian dengan Besi Ulir, (Tulangan Lentur) 1,712.00 14,472.00 2,345,646.41 19,828,384.81
3 1,080.96 kg Pek. Pembesian dengan Besi Polos, (Tulangan Polos) 1,712.00 12,897.00 1,850,608.60 13,941,179.43
4 197.24 m² Pek. Pemasangan Bekisting untuk Balok Beton + Multiplek Film 9 mm, 78,500.00 109,380.00 15,483,654.00 21,574,548.72
RING BALOK RB1
1 7.56 m³ Pek. Pembuatan Beton Ready Mix dengan mutu K.250, 144,205.60 1,085,750.00 1,090,670.21 8,211,852.98
2 1,361.61 kg Pek. Pembesian dengan Besi Ulir, (Tulangan Lentur) 1,712.00 14,472.00 2,331,081.60 19,705,264.58
3 945.05 kg Pek. Pembesian dengan Besi Polos, (Tulangan Polos) 1,712.00 12,897.00 1,617,919.65 12,188,265.04
4 176.48 m² Pek. Pemasangan Bekisting untuk Balok Beton + Multiplek Film 9 mm, 78,500.00 109,380.00 13,853,444.50 19,303,054.26
PEKERJAAN RABAT BETON UNTUK LANTAI 1
1 55.89 m³ Pek. Pembuatan Beton Ready Mix dengan mutu K.175, 144,205.60 1,016,750.00 8,059,650.98 56,826,157.50
2 4,756.24 kg Pek. Pemasangan Wiremesh, 925.50 15,552.00 4,401,899.19 73,969,028.93
PEKERJAAN PELAT S1 UNTUK LANTAI 2
1 61.09 m³ Pek. Pembuatan Beton Ready Mix dengan mutu K.250, 144,205.60 1,085,750.00 8,809,808.52 66,330,639.00
2 4,332.44 kg Pek. Pemasangan Wiremesh, 925.50 15,552.00 4,009,674.15 67,378,122.43
3 509.10 m² Pek. Pemasangan Bekisting Lantai dengan Floordeck t = 0.75 mm tipe balok T, 10,260.00 206,004.19 5,223,366.00 104,876,733.13
PEKERJAAN PELAT S1 UNTUK ATAP DAK
1 23.97 m³ Pek. Pembuatan Beton Ready Mix dengan mutu K.250, 144,205.60 1,085,750.00 3,456,608.23 26,025,427.50
2 2,460.47 kg Pek. Pemasangan Wiremesh, 925.50 15,552.00 2,277,165.19 38,265,232.93
3 199.75 m² Pek. Pemasangan Bekisting Lantai dengan Floordeck t = 0.75 mm tipe balok T, 10,260.00 206,004.19 2,049,435.00 41,149,336.95
4 60.62 m² Pek. Pemasangan Bekisting untuk Balok Beton + Multiplek Film 9 mm, 78,500.00 109,380.00 4,758,630.75 6,630,560.91
II.C2 PEKERJAAN STRUKTUR ATAS BANGUNAN GENSET
PEKERJAAN KOLOM
1 0.72 m³ Pek. Pembuatan Beton Ready Mix dengan mutu K.250, 144,205.60 1,085,750.00 103,828.03 781,740.00
2 82.58 kg Pek. Pembesian dengan Besi Ulir, (Tulangan Lentur) 1,712.00 14,472.00 141,384.18 1,195,158.77
3 60.71 kg Pek. Pembesian dengan Besi Polos, (Tulangan Sengkang) 1,712.00 12,897.00 103,940.31 783,012.98
4 10.80 m² Pek. Pemasangan Bekisting untuk Kolom Beton + Multiplek Film 9 mm, 76,200.00 106,680.00 822,960.00 1,152,144.00
PEKERJAAN BALOK
1 1.19 m³ Pek. Pembuatan Beton Ready Mix dengan mutu K.250, 144,205.60 1,085,750.00 171,316.25 1,289,871.00
2 83.42 kg Pek. Pembesian dengan Besi Ulir, (Tulangan Lentur) 1,712.00 14,472.00 142,812.30 1,207,231.08
HARGA SATUAN (Rp) NILAI PEKERJAAN (Rp)
NO VOL SAT URAIAN PEKERJAAN
UPAH BAHAN UPAH BAHAN
3 67.24 kg Pek. Pembesian dengan Besi Polos, (Tulangan Sengkang) 1,712.00 12,897.00 115,115.16 867,196.43
4 15.84 m² Pek. Pemasangan Bekisting untuk Balok Beton + Multiplek Film 9 mm, 78,500.00 109,380.00 1,243,440.00 1,732,579.20
PEKERJAAN PLAT LANTAI
1 4.62 m³ Pek. Pembuatan Beton Ready Mix dengan mutu K.250, 144,205.60 1,085,750.00 666,229.87 5,016,165.00
2 222.36 kg Pek. Pembesian dengan Besi Ulir, (Tulangan Lentur) 1,712.00 14,472.00 380,688.26 3,218,061.08
PEKERJAAN DAK BETON
1 5.93 m³ Pek. Pembuatan Beton Ready Mix dengan mutu K.250, 144,205.60 1,085,750.00 854,418.18 6,433,068.75
2 676.44 kg Pek. Pembesian dengan Besi Ulir, (Tulangan Lentur) 1,712.00 14,472.00 1,158,061.29 9,789,405.91
3 39.50 m² Pek. Pemasangan Bekisting untuk Plat Lantai Beton + Multiplek Film 9 mm, 78,500.00 154,680.00 3,100,750.00 6,109,860.00
II.C3 PEKERJAAN STRUKTUR TORN
PEKERJAAN KOLOM 300x300
1 3.24 m³ Pek. Pembuatan Beton Ready Mix dengan mutu K.250, 144,205.60 1,085,750.00 467,226.14 3,517,830.00
2 431.83 kg Pek. Pembesian dengan Besi Ulir, (Tulangan Lentur) 1,712.00 14,472.00 739,297.70 6,249,483.85
3 257.47 kg Pek. Pembesian dengan Besi Polos, (Tulangan Polos) 1,712.00 12,897.00 440,781.94 3,320,540.09
4 43.20 m² Pek. Pemasangan Bekisting untuk Kolom Beton + Multiplek Film 9 mm, 76,200.00 106,680.00 3,291,840.00 4,608,576.00
PEKERJAAN BALOK B1 250x350
1 3.68 m³ Pek. Pembuatan Beton Ready Mix dengan mutu K.250, 144,205.60 1,085,750.00 529,955.58 3,990,131.25
2 406.02 kg Pek. Pembesian dengan Besi Ulir, (Tulangan Lentur) 1,712.00 14,472.00 695,098.73 5,875,857.99
3 316.15 kg Pek. Pembesian dengan Besi Polos, (Tulangan Sengkang) 1,712.00 12,897.00 541,250.17 4,077,396.87
4 39.90 m² Pek. Pemasangan Bekisting untuk Balok Beton + Multiplek Film 9 mm, 78,500.00 109,380.00 3,132,150.00 4,364,262.00
PEKERJAAN BALOK B2 250X200
1 0.78 m³ Pek. Pembuatan Beton Ready Mix dengan mutu K.250, 144,205.60 1,085,750.00 112,191.96 844,713.50
2 97.28 kg Pek. Pembesian dengan Besi Ulir, (Tulangan Lentur) 1,712.00 14,472.00 166,537.04 1,407,782.75
3 105.60 kg Pek. Pembesian dengan Besi Polos, (Tulangan Sengkang) 1,712.00 12,897.00 180,792.88 1,361,965.95
4 10.89 m² Pek. Pemasangan Bekisting untuk Balok Beton + Multiplek Film 9 mm, 78,500.00 109,380.00 855,022.00 1,191,366.96
PEKERJAAN BALOK B3 200X200
1 0.84 m³ Pek. Pembuatan Beton Ready Mix dengan mutu K.250, 144,205.60 1,085,750.00 121,132.70 912,030.00
2 88.42 kg Pek. Pembesian dengan Besi Ulir, (Tulangan Lentur) 1,712.00 14,472.00 151,381.04 1,279,664.95
3 71.32 kg Pek. Pembesian dengan Besi Polos, (Tulangan Sengkang) 1,712.00 12,897.00 122,091.84 919,753.79
4 12.60 m² Pek. Pemasangan Bekisting untuk Balok Beton + Multiplek Film 9 mm, 78,500.00 109,380.00 989,100.00 1,378,188.00
PEKERJAAN PLAT LANTAI
1 2.16 m³ Pek. Pembuatan Beton Ready Mix dengan mutu K.250, 144,205.60 1,085,750.00 311,484.10 2,345,220.00
2 153.00 kg Pek. Pemasangan Wiremesh, 925.50 15,552.00 141,601.50 2,379,456.00
3 18.00 m² Pek. Pemasangan Bekisting Lantai dengan Floordeck t = 0.75 mm tipe balok T, 10,260.00 206,004.19 184,680.00 3,708,075.42

JUMLAH II.C 410,125,673.88 1,687,999,749.37


II.D PEKERJAAN STRUKTUR ATAP GEDUNG UTAMA
PEKERJAAN RANGKA ATAP BAJA RINGAN
1 662.77 m² Pek. Pemasangan Kuda-kuda Baja Ringan + Reng untuk Bitumen (terpasang), 78,750.00 181,010.00 52,193,389.50 119,968,576.93
JUMLAH II.D 52,193,389.50 119,968,576.93
II.E PEKERJAAN TANGGA
II.E1 PEKERJAAN TANGA 1
PONDASI TANGGA
1 2.00 m³ Pek. Galian Tanah , 89,500.00 - 179,000.00 -
2 0.08 m³ Pek. Pengurugan dengan pasir urug, 35,800.00 300,000.00 2,864.00 24,000.00
3 0.80 m³ Pek. Pengurugan Tanah Bekas Galian, 29,790.00 - 23,832.00 -
4 0.16 m³ Pek. Pembuatan Pondasi Batu Kosong (Aanstamping), 141,180.00 345,000.00 22,588.80 55,200.00
5 0.96 m³ Pek. Pemasangan Pondasi Batu Kali 1 Pc : 4 Ps, 253,650.00 712,918.00 243,504.00 684,401.28
STRUKTUR TANGGA
1 18.03 m³ Pek. Pembuatan Beton Ready Mix dengan mutu K.250, 144,205.60 1,085,750.00 2,600,026.97 19,576,072.50
2 154.57 kg Pek. Pembesian dengan Besi Ulir, (Tulangan Lentur) 1,712.00 14,472.00 264,622.84 2,236,928.62
3 33.211 m² Pek. Pemasangan Bekisting untuk Tangga + Multiplek Film 9 mm, 78,500.00 98,260.00 2,607,063.50 3,263,312.86

JUMLAH II.E 5,943,502.11 25,839,915.26


JUMLAH STRUKTUR 1,076,634,617.43 3,663,317,242.61
III. ARSITEKTUR
III.A PEKERJAAN DINDING
III.A1 PEKERJAAN PASANGAN DINDING BATA BANGUNAN UTAMA
1 2,760.95 m² Pek. Pemasangan dinding bata ringan tebal 10 cm, 14,350.00 91,512.00 39,619,699.94 252,660,486.51
2 5,521.91 m² Pek. Pemasangan Plesteran dengan Mortar tebal 2 cm, Setara Mortar Indonesia D-2 48,350.00 52,096.00 266,984,319.49 287,669,392.10
3 5,521.91 m² Pek. Acian dengan Mortar, Setara MU-200 48,350.00 18,400.00 266,984,319.49 101,603,132.96

III.A2 PEKERJAAN PASANGAN DINDING BATA BANGUNAN GENSET


1 56.20 m² Pek. Pemasangan dinding bata ringan tebal 10 cm, 14,350.00 91,512.00 806,470.00 5,142,974.40
2 112.40 m² Pek. Pemasangan Plesteran dengan Mortar tebal 2 cm, Setara Mortar Indonesia D-2 48,350.00 52,096.00 5,434,540.00 5,855,590.40
3 112.40 m² Pek. Acian dengan Mortar, Setara MU-200 48,350.00 18,400.00 5,434,540.00 2,068,160.00

III.B PEKERJAAN INTERIOR


III.B.1 32.00 Pekerjaan Langit - Langit Kamar
1 1,168.72 m² Pek. Pemasangan langit-langit gypsum board t=9 mm, Setara Jayaboard 18,350.00 48,727.43 21,446,012.00 56,948,719.65
HARGA SATUAN (Rp) NILAI PEKERJAAN (Rp)
NO VOL SAT URAIAN PEKERJAAN
UPAH BAHAN UPAH BAHAN
2 1,168.72 m² Pek. Pemasangan rangka besi hollow galvalum 40x40x0.3 mm untuk plafond, 85,990.00 22,500.00 100,498,232.80 26,296,200.00
3 1,168.72 m² Pek. Pengecatan Interior Plafond (Cat Setara setara Duluxe Pentalite White 1501), 10,437.00 31,400.10 12,197,930.64 36,697,924.87
4 2,244.72 m Pek. Pemasangan List Shadow Line, 12,340.00 7,479.50 27,699,844.80 16,789,383.24
5 4.80 m² Pek. Pengecatan Dinding Baru Eksterior (Cat Setara komprol White ST100 By Gamma Pain), 10,437.00 51,008.50 50,097.60 244,840.80
6 321.90 m Pek. Plafond Kisi-kisi Kayu Setara Duma WPC Click On Hollow 50/100, 22,020.00 60,197.50 7,088,238.00 19,377,575.25
7 91.87 m² Pek. Pemasangan rangka besi hollow Galvanis 40x40x0.8 mm untuk rangka plafond WPC, 85,990.00 191,091.67 7,899,471.35 17,554,635.96

III.B.2 Pekerjaan Penutup Lantai


1 615.44 m² Pek. Pemasangan Granite Tile 600 x 600 mm Glossy Setara Himalaya White, 44,655.00 261,412.18 27,482,473.20 160,883,511.38
2 158.95 m² Pek. Pemasangan Granite Tile 600 x 600 mm Setara Cemento Griss Matte, 44,655.00 164,175.23 7,097,733.63 26,094,996.81
4 333.80 m² Pek. Pemasangan Statuari Marble 600 x 600 mm, 44,655.00 236,507.54 14,905,812.21 78,946,074.95
8 73.84 m Pek. Pemasangan Stainless inlay, 21,645.00 54,145.00 1,598,266.80 3,998,066.80
16 1,125.30 m Pek. Pemasangan plint, 21,645.00 57,750.00 24,357,118.50 64,986,075.00
32 110.16 m² Pek. Waterproofing Toilet, Setara Damdex 14,820.00 36,225.00 1,632,571.20 3,990,546.00

III.B.3 32.00 Pekerjaan Penutup Dinding


1 555.13 m² Pek. Pemasangan Granite Tile 600 x 600 mm Setara Cemento Griss Matte, 44,655.00 164,175.23 24,789,497.61 91,139,213.55
2 715.54 m² Pek. Pengecatan Interior tembok baru (Cat Setara Duluxe Pentalite Briliant White LS 2290), 10,437.00 62,225.70 7,468,044.01 44,524,697.36
3 872.28 m² Pek. Pengecatan Dinding Baru Eksterior (Cat Setara komprol White ST100 By Gamma Pain), 10,437.00 51,008.50 9,103,986.36 44,493,694.38
4 59.52 m² Pek. Pengecatan Dinding Baru Eksterior kamprot Halus (Cat Setara Duluxe Pentalite Darkened Storm 42BB 09/032), 10,437.00 57,717.80 621,241.55 3,435,536.61
5 1,520.74 m² Pek. Pengecatan interior tembok baru duluxe pentalite timeles grey 40466 Glossy, 10,437.00 51,366.00 15,871,963.38 78,114,330.84
6 269.44 m² Pek. Pengecatan interior tembok baru duluxe pentalite Artic Shadow 40345, 10,437.00 41,361.20 2,812,145.28 11,144,361.73

III.B.4 32.00 Pekerjaan Sanitari


1 32.00 bh Pek. Pemasangan kloset duduk / monoblok Setara toto CW500PJ/SW500JP, 515,940.00 7,350,570.00 16,510,080.00 235,218,240.00
2 32.00 bh Pek. Pemasangan Jet Shower Setara Toto TX403SEV2C, 11,900.00 521,198.38 380,800.00 16,678,348.00
3 64.00 bh Pek. Pemasangan Floor Drain Setara Toto TX1CV2, 13,700.00 845,000.00 876,800.00 54,080,000.00
4 32.00 bh Pek. Pemasangan tissue holder Setara Toto TX703M3AV1, 13,700.00 772,000.00 438,400.00 24,704,000.00
5 32.00 bh Pek. Pemasangan Robe Hook Setara Toto TX704AES, 13,700.00 321,000.00 438,400.00 10,272,000.00
6 32.00 bh Pek. Pemasangan Towel Holder Setara Toto TX4W, 13,700.00 2,576,000.00 438,400.00 82,432,000.00
7 32.00 set Pek. Pemasangan Shower Kolom Setara Toto TX492SES, 13,700.00 9,108,198.38 438,400.00 291,462,348.00
7 36.00 bh Pek. Pemasangan Kran Setara Toto TX124LES, 13,700.00 1,700,198.38 493,200.00 61,207,141.50
8 32.00 bh Pek. Pemasangan roof drain RDP1104 setar Paloma, 13,700.00 331,500.00 438,400.00 10,608,000.00
9 3.00 bh Pek. Pemasangan Kran Air Tempat Wudhu Setara Toto TX130L, 11,900.00 459,198.38 35,700.00 1,377,595.13
10 32.00 set Pek. Pemasangan wastafel Setara Toto LW 951 CJ + Assesoris, 209,250.00 2,328,796.00 6,696,000.00 74,521,472.00
11 32.00 bh Memasang 1 buah Kran Wastafel Setara Toto TX109LV, 13,700.00 1,240,198.38 438,400.00 39,686,348.00
12 21.31 m2 Pek. Pembuatan Meja Beton Bertulang, 145,212.00 410,884.16 3,094,758.14 8,756,763.22
13 32.00 bh Pek. Pemasangan Corner Soap Basket setara TOTO Corner Soap Basket TX2AV1B, 13,700.00 864,500.00 438,400.00 27,664,000.00
14 26.88 m² Pek. Pemasangan Top Table Setara Niro Granite GCO10 Marquina Nero (60x120), 44,655.00 526,144.18 1,200,326.40 14,142,755.56
15 151.20 m² Pek. Pemasangan Multiplek 18 mm + Fin HPL Setara Taco TH 131 AA, 15,075.00 190,645.85 2,279,340.00 28,825,652.33
16 46.08 m² Pek. Pemasangan Partisi Kaca Tempered 10 mm, 20,422.50 825,000.00 941,068.80 38,016,000.00
17 23.04 m² Pek. Pemasangan Kaca Cermin t=5 mm, 20,422.50 165,000.00 470,534.40 3,801,600.00

III.B.5 32.00 Pekerjaan Kusen dan Pintu Jendela


1 32.00 unit Pek. Pemasangan Pintu P1, 1,505,843.73 4,908,192.19 48,186,999.42 157,062,150.24
- Kusen Alumunium 4" motif kayu
- Panel Daun Kayu Jati
- Finishing Cat Plitur Melamic
-Handle 1 Set Pintu Setara PALOMA DLP 3121 Digital Lock
- Engsel Pintu Setara Paloma BHP 412
- Door Stopper Setara Paloma DSP 245 Magnet 026
2 32.00 unit Pek. Pemasangan Pintu P2 (Kamar Mandi), 1,211,246.57 4,139,247.87 38,759,890.40 132,455,931.90
- Kusen Alumunium 4" motif kayu
- Panel Daun Kayu Jati
- Finishing Cat Plitur Melamic
- Handle Pintu Geser Setara PALOMA MLP 222 + CMP 221 + ECP 363 + CLP 306
- Rel Pintu Sliding Setara Paloma SRP 004
3 3.00 unit Pek. Pemasangan Pintu P3, 1,323,548.04 5,220,463.30 3,970,644.11 15,661,389.89
- Kusen Alumunium 4" motif kayu
- Panel Daun Kayu Jati
- Finishing Cat Plitur Melamic

-Handle 1 Set Pintu Setara Paloma HRP 354 + Body Mortise Setara Paloma MLP 542 + Cylinder kunci Setara
Paloma KC-CK CLP614

- Engsel Pintu Setara Paloma BHP 412


- Door Stopper Setara Paloma DSP 245 Magnet 026
4 2.00 unit Pek. Pemasangan Jendela J1, 1,297,702.23 8,559,478.94 2,595,404.46 17,118,957.89
- Kusen Alumunium 4" motif kayu
- Panel Daun jendela Alumunium 4"
- Kunci jendela rambuncis Paloma BRP RBP 671/672/674
- Engsel Casement jendela setara Paloma Superior 16 inch SSS FSP 305
HARGA SATUAN (Rp) NILAI PEKERJAAN (Rp)
NO VOL SAT URAIAN PEKERJAAN
UPAH BAHAN UPAH BAHAN
- Kaca riben 5 mm
5 4.00 unit Pek. Pemasangan Jendela J2, 709,041.73 4,664,119.49 2,836,166.92 18,656,477.95
- Kusen Alumunium 4" motif kayu
- Panel Daun jendela Alumunium 4"
- Kunci jendela rambuncis Paloma BRP RBP 671/672/674
- Engsel Casement jendela setara Paloma Superior 16 inch SSS FSP 305
- Kaca riben 5 mm
6 32.00 unit Pek. Pemasangan Jendela J3, 825,181.10 2,217,357.17 26,405,795.20 70,955,429.28
- Kusen Alumunium 4" motif kayu
- Panel Daun jendela Alumunium 4"
- Kunci jendela rambuncis Paloma BRP RBP 671/672/674
- Engsel Casement jendela setara Paloma Superior 16 inch SSS FSP 305
- Kaca riben 5 mm
7 1.00 unit Pek. Pemasangan Pintu PJ1, 1,906,539.69 12,188,215.82 1,906,539.69 12,188,215.82
- Kusen Alumunium 4" motif kayu
- Panel Daun jendela Alumunium 4"
- Kunci jendela rambuncis Paloma BRP RBP 671/672/674
- Engsel Casement jendela setara Paloma Superior 16 inch SSS FSP 305
- Kaca Tempered 12 mm
- Kaca riben 5 mm
8 1.00 unit Pek. Pemasangan Pintu PJ2, 718,379.03 5,651,791.65 718,379.03 5,651,791.65
- Kusen Alumunium 4" motif kayu
- Panel Daun jendela Alumunium 4"
- Kunci jendela rambuncis Paloma BRP RBP 671/672/674
- Engsel Casement jendela setara Paloma Superior 16 inch SSS FSP 305
- Kaca Tempered 12 mm
- Kaca riben 5 mm
9 1.00 unit Pek. Pemasangan Pintu PJ3, 760,911.97 4,583,994.40 760,911.97 4,583,994.40
- Kusen Alumunium 4" motif kayu
- Panel Daun jendela Alumunium 4"
- Kunci jendela rambuncis Paloma BRP RBP 671/672/674
- Engsel Casement jendela setara Paloma Superior 16 inch SSS FSP 305
- Kaca Tempered 12 mm
- Kaca riben 5 mm
10 3.00 unit Pek. Pemasangan Jendela J1A, 1,572,924.96 9,357,781.25 4,718,774.88 28,073,343.74
- Kusen Alumunium 4" motif kayu
- Panel Daun jendela Alumunium 4"
- Kaca riben 5 mm
11 4.00 unit Pek. Pemasangan Jendela J2A, 830,659.86 4,857,379.49 3,322,639.44 19,429,517.95
- Kusen Alumunium 4" motif kayu
- Panel Daun jendela Alumunium 4"
- Kaca riben 5 mm
12 2.00 unit Pek. Pemasangan Jendela J2B, 2,535,634.26 14,937,563.81 5,071,268.52 29,875,127.62
- Kusen Alumunium 4" motif kayu
- Panel Daun jendela Alumunium 4"
- Kaca riben 5 mm
13 32.00 unit Pek. Pemasangan Pintu Shaft PS1, 370,196.40 1,899,300.77 11,846,284.80 60,777,624.58
- Besi Hollow 40x40
- Engsel Pintu Setara Paloma BHP 412
- Handle Pintu + Body Mortise + Kunci Setara Paloma
14 1.00 unit Pek. Pemasangan Pintu R Genset, 172,790.00 13,487,500.00 172,790.00 13,487,500.00
- Panep pintu baja
- kusen baja ber-architrave
- 4 engsel
- 5 titik kunci
- kaca pengintip
- handle
15 6.00 m Pek. Pemasangan Railling Balkon, 46,300.00 831,452.00 277,800.00 4,988,712.00

III.C PEKERJAAN ATAP


1 662.77 m² Pek. Pemasangan Insulation t = 4 mm, 4,145.00 35,150.00 2,747,194.91 23,296,477.98
2 662.77 m² Pek. Pemasangan Multiplek 12 mm utntuk alas atap bitumen, 18,350.00 67,500.00 12,161,888.22 44,737,191.00
3 662.77 m² Pek. Pemasangan Atap Bitumen + Underlayer, 2,700.00 270,916.50 1,789,487.64 179,556,195.64
4 32.00 m' Pek. Pemasangan Nok Atap Bitumen, 25,125.00 103,783.20 804,000.00 3,321,062.40
5 218.00 m Pek. Pemasangan Lisplang GRC lebar 30 cm dan lebar 20 cm tebal 8 mm setara Kalsiplank, 35,950.00 31,627.23 7,837,100.00 6,894,736.69
6 199.75 m² Pek. Pemasangan Plesteran dengan Mortar tebal 2 cm, Setara Mortar Indonesia D-2 48,350.00 52,096.00 9,657,912.50 10,406,176.00
7 199.75 m² Pek. Acian dengan Mortar, Setara MU-200 untuk atap beton 48,350.00 18,400.00 9,657,912.50 3,675,400.00
8 227.95 m² Pek. Waterproofing Membran, Setara Mapei 92,375.00 144,696.83 21,056,881.25 32,983,641.26

III.D PEKERJAAN FASADE


HARGA SATUAN (Rp) NILAI PEKERJAAN (Rp)
NO VOL SAT URAIAN PEKERJAAN
UPAH BAHAN UPAH BAHAN
1 535.25 m² Pek. Pemasangan dinding bata ringan tebal 10 cm, 14,350.00 91,512.00 7,680,808.80 48,981,614.98
2 535.25 m² Pek. Pemasangan Plesteran dengan Mortar tebal 2 cm, Setara Mortar Indonesia D-2 48,350.00 52,096.00 25,879,240.80 27,884,279.81
3 535.25 m² Pek. Acian dengan Mortar, Setara MU-200 48,350.00 18,400.00 25,879,240.80 9,848,563.20
4 48.91 m² Pek. Pemasangan rangka besi hollow galvanis 40x40x1.6 mm dinding GRC, (untuk Backdrop resepsionist) 85,990.00 205,878.75 4,205,770.90 10,069,529.66
5 48.91 m² Pek. Pemasangan Gypsum Board uk.120x240x9 mm untuk Partisi Dinding, Setara Jayaboard 18,350.00 137,585.83 897,498.50 6,729,322.85
6 48.91 m² Pek. Pemasangan Backdrop Resepsionist , 192,604.00 443,154.34 9,420,261.64 21,674,678.70
7 1.00 ls Pek. Pemasangan Huruf Stainless Steel, 192,604.00 2,139,330.65 192,604.00 2,139,330.65
8 198.60 m² Pek. Pemasangan rangka besi hollow galvanis 40x40x1.6 mm dinding GRC, (untuk fasade) 85,990.00 205,878.75 17,077,614.00 40,887,519.75
9 198.60 m² Pek. Pemasangan Panel Ornamen GRC t = 20 mm, 48,350.00 719,120.00 9,602,310.00 142,817,232.00

III.E PEKERJAAN LANDSCAPE


1 169.25 m³ Pek. Pengurugan Tanah Dengan Tanah Merah untuk tanaman, 35,800.00 150,000.00 6,059,293.20 25,388,100.00
2 564.18 m² Pek. Penanaman Rumput Gajah Mini, 9,515.00 50,250.00 5,368,172.70 28,350,045.00
3 21.00 bh Pek. Penanaman Pohon Tabebuya, 9,515.00 2,147,750.00 199,815.00 45,102,750.00
4 35.70 m Pek. Pemasangan U Ditch uk. (70x50x120 )+ Penutup, 116,060.00 886,241.47 4,143,342.00 31,638,820.36
5 162.60 m Pek. Pemasangan U Ditch uk. (40 x 30 x 120 )+ Penutup, 116,060.00 768,174.80 18,871,356.00 124,905,222.48
6 51.60 m² Pek. Pemasangan Grassblock, Grassblock 8 Setara Conbloc 53,620.00 182,810.00 2,766,792.00 9,432,996.00
7 463.92 m² Pek. Pemasangan Paving Block , Cobblestone 6 Setara Conbloc 53,620.00 262,081.11 24,875,390.40 121,584,669.07
8 316.43 m Pek. Pemasangan Kanstin 15x15x50, Setara Conbloc 41,890.00 98,366.00 13,255,252.70 31,125,953.38
9 13.00 un Pek. Sumur Resapan , 116,060.00 6,176,936.63 1,508,780.00 80,300,176.20
10 10.00 bh Pek. Pemasangan Box Control 300 x 300 x 450 mm, 40,062.50 1,125,973.19 400,625.00 11,259,731.93

III.F PEKERJAAN TANGGA


1 27.70 m² Pek. Acian dengan Mortar, Setara MU-200 48,350.00 18,400.00 1,339,135.44 509,619.28
2 18.63 m² Pek. Pemasangan lantai Parket Kayu Solid, 122,375.00 501,517.50 2,279,846.25 9,343,271.03
3 6.00 m Pek. Pemasangan Railling Balkon, 46,300.00 831,452.00 277,800.00 4,988,712.00

JUMLAH ARSITEKTUR 1,335,375,593.58 4,194,913,569.47


IV. MEKANIKAL, ELEKTRIKAL, & PLUMBING (MEP)
IV.A ELECTRICAL
IV.A.1. ELECTRICAL BANGUNAN
Power Panel
1 1.00 un Panel LVMDP, 917,819.44 18,356,388.75 917,819.44 18,356,388.75
2 1.00 un Panel SDP.PUMP, 479,254.13 9,585,082.50 479,254.13 9,585,082.50
3 1.00 un Panel SDP-1, PJU, Kontaktor, dan Timer 440,615.57 8,812,311.38 440,615.57 8,812,311.38
4 33.00 un Panel MCB Box 4 Grup Setara Schneider, 31,736.12 634,722.37 1,047,291.92 20,945,838.37
Cable feeder instalation SDP
Panel LVMDP
1 45.00 m Pek. Pemasangan Kabel Power ( NYFGBY 4x120 mm ) Kwh Meter to Panel LVMDP, Setara Supreme 41,638.00 3,028,935.00 1,873,710.00 136,302,075.00
SDP. PUMP
2 35.00 m Pek. Pemasangan Kabel Power ( NYFGBY 4x16 mm ) + NYA 10 mm, Setara Supreme 41,638.00 258,930.00 1,457,330.00 9,062,550.00
SDP. 1
3 30.00 m Pek. Pemasangan Kabel Power ( NYFGBY 4x25 mm ) + NYA 10 mm, Setara Supreme 41,638.00 384,783.00 1,249,140.00 11,543,490.00
SDP. 2
4 30.00 m Pek. Pemasangan Kabel Power ( NYFGBY 4x25 mm ) + NYA 10 mm, Setara Supreme 41,638.00 384,783.00 1,249,140.00 11,543,490.00
Protection Feeder
5 100.00 m Cable Tray type C 300x50 (setara TRAYINDO), 46,300.00 437,379.50 4,630,000.00 43,737,950.00
6 30.00 m Pek. Pemasangan Pipa PVC tipe AW Ø 2" , Setara Rucika 11,814.00 50,533.87 354,420.00 1,516,016.25
Cable feeder instalation SDP. 1 to :
MCB. BOX 1.1
1 12.23 m Pek. Pemasangan Kabel Power ( NYY 3x4mm ), Setara Supreme 41,638.00 43,470.00 509,232.74 531,638.10
MCB. BOX 1.2
2 17.95 m Pek. Pemasangan Kabel Power ( NYY 3x4mm ), Setara Supreme 41,638.00 43,470.00 747,235.55 780,112.62
MCB. BOX 1.3
3 22.03 m Pek. Pemasangan Kabel Power ( NYY 3x4mm ), Setara Supreme 41,638.00 43,470.00 917,285.14 957,644.10
MCB. BOX 1.4
4 27.75 m Pek. Pemasangan Kabel Power ( NYY 3x4mm ), Setara Supreme 41,638.00 43,470.00 1,155,287.95 1,206,118.62
MCB. BOX 1.5
5 28.56 m Pek. Pemasangan Kabel Power ( NYY 3x4mm ), Setara Supreme 41,638.00 43,470.00 1,189,222.92 1,241,546.67
MCB. BOX 1.6
6 22.95 m Pek. Pemasangan Kabel Power ( NYY 3x4mm ), Setara Supreme 41,638.00 43,470.00 955,383.91 997,419.15
MCB. BOX 1.7
7 18.96 m Pek. Pemasangan Kabel Power ( NYY 3x4mm ), Setara Supreme 41,638.00 43,470.00 789,498.12 824,234.67
MCB. BOX 1.8
8 13.35 m Pek. Pemasangan Kabel Power ( NYY 3x4mm ), Setara Supreme 41,638.00 43,470.00 555,659.11 580,107.15
MCB. BOX 1.9
9 29.69 m Pek. Pemasangan Kabel Power ( NYY 3x4mm ), Setara Supreme 41,638.00 43,470.00 1,236,273.86 1,290,667.77
HARGA SATUAN (Rp) NILAI PEKERJAAN (Rp)
NO VOL SAT URAIAN PEKERJAAN
UPAH BAHAN UPAH BAHAN
MCB. BOX 1.10
10 23.85 m Pek. Pemasangan Kabel Power ( NYY 3x4mm ), Setara Supreme 41,638.00 43,470.00 993,066.30 1,036,759.50
MCB. BOX 1.11
11 19.41 m Pek. Pemasangan Kabel Power ( NYY 3x4mm ), Setara Supreme 41,638.00 43,470.00 808,193.58 843,752.70
MCB. BOX 1.12
12 13.80 m Pek. Pemasangan Kabel Power ( NYY 3x4mm ), Setara Supreme 41,638.00 43,470.00 574,604.40 599,886.00
MCB. BOX 1.13
13 16.12 m Pek. Pemasangan Kabel Power ( NYY 3x4mm ), Setara Supreme 41,638.00 43,470.00 671,204.56 700,736.40
MCB. BOX 1.14
14 21.49 m Pek. Pemasangan Kabel Power ( NYY 3x4mm ), Setara Supreme 41,638.00 43,470.00 894,634.07 933,996.42
MCB. BOX 1.15
15 25.22 m Pek. Pemasangan Kabel Power ( NYY 3x4mm ), Setara Supreme 41,638.00 43,470.00 1,050,110.36 1,096,313.40
MCB. BOX 1.16
16 30.59 m Pek. Pemasangan Kabel Power ( NYY 3x4mm ), Setara Supreme 41,638.00 43,470.00 1,273,539.87 1,329,573.42
Cable feeder instalation SDP. 2 to :
MCB. BOX 2.1
17 12.23 m Pek. Pemasangan Kabel Power ( NYY 3x4mm ), Setara Supreme 41,638.00 43,470.00 509,232.74 531,638.10
MCB. BOX 2.2
18 17.95 m Pek. Pemasangan Kabel Power ( NYY 3x4mm ), Setara Supreme 41,638.00 43,470.00 747,235.55 780,112.62
MCB. BOX 2.3
19 22.03 m Pek. Pemasangan Kabel Power ( NYY 3x4mm ), Setara Supreme 41,638.00 43,470.00 917,285.14 957,644.10
MCB. BOX 2.4
20 27.75 m Pek. Pemasangan Kabel Power ( NYY 3x4mm ), Setara Supreme 41,638.00 43,470.00 1,155,287.95 1,206,118.62
MCB. BOX 2.5
21 28.56 m Pek. Pemasangan Kabel Power ( NYY 3x4mm ), Setara Supreme 41,638.00 43,470.00 1,189,222.92 1,241,546.67
MCB. BOX 2.6
22 22.95 m Pek. Pemasangan Kabel Power ( NYY 3x4mm ), Setara Supreme 41,638.00 43,470.00 955,383.91 997,419.15
MCB. BOX 2.7
23 18.96 m Pek. Pemasangan Kabel Power ( NYY 3x4mm ), Setara Supreme 41,638.00 43,470.00 789,498.12 824,234.67
MCB. BOX 2.8
24 13.35 m Pek. Pemasangan Kabel Power ( NYY 3x4mm ), Setara Supreme 41,638.00 43,470.00 555,659.11 580,107.15
MCB. BOX 2.9
25 29.69 m Pek. Pemasangan Kabel Power ( NYY 3x4mm ), Setara Supreme 41,638.00 43,470.00 1,236,273.86 1,290,667.77
MCB. BOX 2.10
26 23.85 m Pek. Pemasangan Kabel Power ( NYY 3x4mm ), Setara Supreme 41,638.00 43,470.00 993,066.30 1,036,759.50
MCB. BOX 2.11
27 19.41 m Pek. Pemasangan Kabel Power ( NYY 3x4mm ), Setara Supreme 41,638.00 43,470.00 808,193.58 843,752.70
MCB. BOX 2.12
28 13.80 m Pek. Pemasangan Kabel Power ( NYY 3x4mm ), Setara Supreme 41,638.00 43,470.00 574,604.40 599,886.00
MCB. BOX 2.13
29 16.12 m Pek. Pemasangan Kabel Power ( NYY 3x4mm ), Setara Supreme 41,638.00 43,470.00 671,204.56 700,736.40
MCB. BOX 2.14
30 21.49 m Pek. Pemasangan Kabel Power ( NYY 3x4mm ), Setara Supreme 41,638.00 43,470.00 894,634.07 933,996.42
MCB. BOX 2.15
31 25.22 m Pek. Pemasangan Kabel Power ( NYY 3x4mm ), Setara Supreme 41,638.00 43,470.00 1,050,110.36 1,096,313.40
MCB. BOX 2.16
32 30.59 m Pek. Pemasangan Kabel Power ( NYY 3x4mm ), Setara Supreme 41,638.00 43,470.00 1,273,539.87 1,329,573.42
Penyambungan daya listrik PLN
33 1 pkt Pek. Penyambungan KWH Baru 147000, - 142,838,240.00 - 142,838,240.00
Grounding Installation LVMDP
BCC 25 mm2
34 20.00 m Pek. Instalasi Kabel BCC / BC 50 mm, LVMDP to Grounding Box 41,638.00 963,585.00 832,760.00 19,271,700.00
Grounding Installation Panel TR (Resistansi Max 2 Ohm)
- Copper Rod dia. 5/8 mm
- Excavation & Bacfilling
- Box Control 400 x 400 x 400 m3
35 2.00 bh Pek. Pemasangan Ground Copper Rod 5/8, 41,638.00 1,358,437.50 83,276.00 2,716,875.00
36 2.00 bh Pek. Pemasangan Box Control 400 x 400 x 400 mm, 41,638.00 2,100,000.00 83,276.00 4,200,000.00
JUMLAH IV.A.1. 43,338,897.90 470,333,020.63
IV.A.2. LIGHTING ARMATURE, CABELING
1 1.00 bh Pek. Pemasangan Lampu Ceiling Downlight LED 18 Watt, Setara Philips 41,638.00 269,850.00 41,638.00 269,850.00
2 181.00 bh Pek. Pemasangan Lampu Ceiling Downlight LED 12 Watt, Setara Philips 41,638.00 96,600.00 7,536,478.00 17,484,600.00
3 48.00 bh Pek. Pemasangan Lampu spotlight warm 8 watt, Setara Philips 41,638.00 140,595.00 1,998,624.00 6,748,560.00
4 16.00 bh Pek. Pemasangan Lampu spotlight outbow bulat 7 watt, Setara Philips 41,638.00 120,629.25 666,208.00 1,930,068.00
5 56.00 bh Pek. Pemasangan Lampu TL Slim T8 30 W, 41,638.00 157,500.00 2,331,728.00 8,820,000.00
6 1.00 un Pek. Pemasangan Lampu Sorot Rel White 2 Meter + 4 Lampu Sorot LED Fitting E27 Warm White, 41,638.00 283,761.29 41,638.00 283,761.29
7 1.00 bh Pek. Pemasangan Lampu Gantung, 41,638.00 7,009,250.00 41,638.00 7,009,250.00
8 12.00 bh Emergensy Twin Spot Led 2x3w, Setara Maxspid 41,638.00 2,574,239.85 499,656.00 30,890,878.20
9 36.00 titik Pek. Pemasangan Lampu LED Strip setara LED Strip 5050 SMD, 41,638.00 38,640.00 1,498,968.00 1,391,040.00
10 316.00 ttk Pek. Instalasi Titik Lampu, Kabel NYM Setara Supreme dan Pipa Conduit 41,638.00 171,780.00 13,157,608.00 54,282,480.00
11 19.00 un Pek. Pemasangan Tiang Lampu Taman Oktagonal, 141,768.00 2,741,760.00 2,693,592.00 52,093,440.00
HARGA SATUAN (Rp) NILAI PEKERJAAN (Rp)
NO VOL SAT URAIAN PEKERJAAN
UPAH BAHAN UPAH BAHAN
12 19.00 un Pek. Pemasangan Lampu Taman setara panasonic NNP44920GHL LUMINER LENGKAP LED 80W, 41,638.00 9,192,792.00 791,122.00 174,663,048.00
13 8.00 un Pek. Pemasangan Tiang Lampu Taman Industrial, 44,128.00 571,725.00 353,024.00 4,573,800.00
13 8.00 un Pek. Pemasangan Lampu Taman Industrial, 41,638.00 71,846.25 333,104.00 574,770.00
14 27.00 ttk Pek. Instalasi titik lampu luar, 41,638.00 1,329,831.25 1,124,226.00 35,905,443.75
Switch Fixtures & Installation
1 134.00 bh Pek. Pemasangan Saklar tunggal, Setara Schneider 41,638.00 120,629.25 5,579,492.00 16,164,319.50
2 9.00 bh Pek. Pemasangan Saklar Ganda, Setara Schneider 41,638.00 161,684.25 374,742.00 1,455,158.25
34.00 bh Pek. Pemasangan Saklar tunggal hotel, Setara Schneider 41,638.00 182,211.75 1,415,692.00 6,195,199.50
Socket Outlet Fixtures & Installation
1 34.00 ttk Pek Pemasangan Stop Kontak Outlet TV, 62,461.82 313,950.00 2,123,701.88 10,674,300.00
2 67.00 bh Pemasangan Stop Kontak Dinding Ganda, Setara Schneider Electric ZENcelo Schuko - E84T426_16S_SZ_G3 41,638.00 178,589.25 2,789,746.00 11,965,479.75
3 52.00 bh Pek. Pemasangan Stop Kontak Daya, 16 A Setara Schneider Electric Neo E3426_16SS_GS_G3 41,638.00 154,439.25 2,165,176.00 8,030,841.00
4 153.00 ttk Pek. Instalasi Titik Stop Kontak, kabel NYM 3 x 2,5 mm setara Supreme + conduit 41,638.00 267,172.50 6,370,614.00 40,877,392.50
JUMLAH IV.A.2. 53,928,415.88 492,283,679.74
IV.A.3. LIGHTING PROTECTION
Air Terminal type electrostatic radius 35 meter
1 4.00 bh Pek. Pemasangan Penangkal Petir, 41,638.00 2,913,750.00 166,552.00 11,655,000.00
Grounding (Electroda , resistansi max 2 Ohm)
- Include box control
1 8.00 bh Pek. Pemasangan Ground Copper Rod 5/8, 41,638.00 1,358,437.50 333,104.00 10,867,500.00
2 2.00 bh Pek. Pemasangan Box Control 400 x 400 x 400 mm, 41,638.00 2,100,000.00 83,276.00 4,200,000.00
3 6.00 m Pek. Pemasangan Busbar Strip 30x5 mm, 41,638.00 78,750.00 249,828.00 472,500.00
4 1.00 bh Pek. Pemasangan Copper plat 1000x1000x5mm, 41,638.00 3,018,750.00 41,638.00 3,018,750.00
FR-P Mast - 2M dan Counter Strike
1 1.00 bh Pek. Pemasangan FR-P Mast - 2M dan Counter Strike , 41,638.00 3,944,088.55 41,638.00 3,944,088.55
Obstruction Light, include light censor & Cabeling
2 1.00 bh Pek. Pemasangan Obstruction Light, 41,638.00 1,538,896.45 41,638.00 1,538,896.45
Coaxial 2x35 mm2
3 30.00 m Pek. Pemasangan Kabel Coaxial 2 x 35 mm², 41,638.00 509,250.00 1,249,140.00 15,277,500.00
Installation Cable NYM 3 x 2.5 mm² in Hi impact PVC conduit pipe
4 1.00 ttk Pek. Instalasi Titik Lampu Luar, 41,638.00 1,329,831.25 41,638.00 1,329,831.25
Tiang penyangga
5 4.00 m Pek. Pemasangan 1 meter Pipa BS Ø 2" (50 mm), 35,442.00 158,600.70 141,768.00 634,402.80
JUMLAH IV.A.3. 2,390,220.00 52,938,469.05
IV.B IV.B.1. CLEAN WATER
PEMASANGAN SUMUR BOR
1 1.00 bh Pek. Pembuatan sumur bor sedalam 100 m, (WLC, Box Pompa, Pipa PVC to GWT, Radar, Kabel, Accessories dll) 4,720,000.00 103,015,869.07 4,720,000.00 103,015,869.07
PEMASANGAN PDAM
1 1.00 pkt Pek. Pemasangan PDAM Baru, - 3,529,470.06 - 3,529,470.06
DISTRIBUTION PUMP
1 2.00 set Pek. Pemasangan Pompa Distribusi, Dari Grountank ke Torn include stopkran dan watermur 720,000.00 14,627,426.00 1,440,000.00 29,254,852.00
2 16.00 m Instalasi Kabel NYM 3x2.5 mm² (PVC Conduit), setara Supreme Pompa to Panel Distribusi Pump 41,638.00 38,167.50 666,208.00 610,680.00
3 1.00 unit Pek. Pemasangan Panel Distribution Pump, 278,730.37 5,853,337.87 278,730.37 5,853,337.87
4 20.00 m Pek. Pemasangan Kabel Power ( NYFGBY 3x4 mm ), Panel Pump to Panel Distribution Pump 41,638.00 68,659.50 832,760.00 1,373,190.00
5 15.00 m Pek. Pemasangan Pipa PVC tipe AW Ø 1 1/2", Protection Feeder Power Panel Pump to Panel Distribution Pump 11,814.00 39,681.90 177,210.00 595,228.50
6 2.00 bh Pek. Pemasangan Radar toren, 41,638.00 121,785.00 83,276.00 243,570.00
7 20.00 m Pek. Pemasangan NYY 2 x 1.5 mm (PVC Conduit),setara Supreme Radar to Panel Pompa Distribusi 41,638.00 24,228.75 832,760.00 484,575.00
8 35.00 m Pek. Pemasangan Pipa PVC tipe Rucika K6741 1 1/2", Pompa Distribusi to Torn 11,814.00 68,698.13 413,490.00 2,404,434.38
WATERTANK
1 2.00 bh Pek. Pemasangan Toren Air 5.100 Liter Setara Penyu, 1,511,200.00 12,923,707.50 3,022,400.00 25,847,415.00
BOOSTER PUMP
1 2.00 set Pek. Pemasangan Pompa Dorong Lengkap dengan stop kran + watermur, 1,018,300.00 4,090,500.00 2,036,600.00 8,181,000.00
2 30.00 m Instalasi Kabel NYM 3x2.5 mm² (PVC Conduit), setara Supreme 41,638.00 38,167.50 1,249,140.00 1,145,025.00
PLUMBING
1 104.65 m Pek. Pemasangan Pipa PVC tipe AW Ø 2", Setara Rucika 11,814.00 50,533.87 1,236,335.10 5,288,370.02

2 154.10 m Pek. Pemasangan Pipa PVC tipe AW Ø 1", LT 2 ke LT 1 Per Shaf Kamar setara Rucika 11,814.00 23,147.77 1,820,537.40 3,567,072.13

3 305.90 m Pek. Pemasangan Pipa PVC tipe AW Ø 3/4", Setara Rucika 11,814.00 16,906.73 3,613,902.60 5,171,767.18

4 32.00 bh Pek. Pemasangan Stop Kran 3/4" Setara Onda, Masing Masing Kamar 13,700.00 63,898.38 438,400.00 2,044,748.00

5 154.10 m Pek. Pemasangan pipa PVC tipe AW diameter 1/2", Setara Rucika 11,814.00 16,642.80 1,820,537.40 2,564,655.48

6 15.00 titik Pek. Sprinkler Taman Setara EECOO Sprinkler Air Taman 360 Derajat , 20,880.00 403,951.87 313,200.00 6,059,278.12

7 1.00 bh Digital Garden Timer Elektronik Automatic Garden Setara HANCI HCT-311, - 809,853.00 - 809,853.00
JUMLAH IV.B.1. 24,995,486.88 208,044,390.81
IV.B.2. SEWAGE WATER INSTALATION SYSTEM
MAIN EQUIPMENT
BIO SEPTI TANK
1 2.0 bh Pek. Pemasangan Bio Septitank 5000L, 1,511,200.00 19,057,500.00 3,022,400.00 38,115,000.00
O.2.2. SEWAGE PIPE & SUPPORTING MATERIAL
1 209.3 m Pek. Pemasangan Pipa PVC tipe AW Ø 6" (150 mm), Setara Rucika 11,814.00 375,549.75 2,472,670.20 78,602,562.68
JUMLAH IV.B.2. 5,495,070.20 116,717,562.68
IV.B.3. WASTE WATER INSTALLATION SYSTEM
HARGA SATUAN (Rp) NILAI PEKERJAAN (Rp)
NO VOL SAT URAIAN PEKERJAAN
UPAH BAHAN UPAH BAHAN
1 287.50 m Pek. Pemasangan Pipa PVC tipe AW Ø 4" (114 mm), Setara Rucika 17,273.00 202,880.70 4,965,987.50 58,328,201.25
JUMLAH IV.B.3. 4,965,987.50 58,328,201.25
IV.B.4. RAIN WATER INSTALLATION SYSTEM
1 227.70 m Pek. Pemasangan Pipa PVC tipe AW Ø 4" (114 mm), Setara Rucika 17,273.00 202,880.70 3,933,062.10 46,195,935.39
JUMLAH IV.B.4. 3,933,062.10 46,195,935.39
IV.B.5. PEMASANGAN FIRE ALARM
1 33.00 bh Pek. Pemasangan Smoke Ditector, Setara Notifier 41,638.00 2,381,379.00 1,374,054.00 78,585,507.00
2 33.00 ttk Pek. Instalasi Titik Smoke Ditector, 41,638.00 224,950.00 1,374,054.00 7,423,350.00
3 2.00 bh Pek. Pemasangan Fire Break Glass, Setara Notifier 41,638.00 2,468,384.26 83,276.00 4,936,768.51
4 2.00 ttk Pek. Instalasi Titik Fire Break Glas, 41,638.00 251,160.00 83,276.00 502,320.00
5 2.00 bh Pek. Pemasangan MCFA, Setara GuardALL 41,638.00 5,091,625.00 83,276.00 10,183,250.00
6 2.00 bh Pek. Pemasangan TBFA, Setara Hooseki 41,638.00 982,075.27 83,276.00 1,964,150.55
7 2.00 bh Pek. Pemasangan Horn Strobe, Setara GuardALL 41,638.00 1,870,618.75 83,276.00 3,741,237.50
8 2.00 ttk Pek. Instalasi Titik Horn Strobe, 41,638.00 171,780.00 83,276.00 343,560.00

JUMLAH IV.B.6. 3,247,764.00 107,680,143.56


IV.C MEKANIKAL
IV.C.1. AIR CONDITIONING
1 36.00 ttk Pek. Pemasangan Stop Kontak AC, 41,638.00 115,710.00 1,498,968.00 4,165,560.00
2 36.00 unit Pek. Pemasangan AC Split 1 PK setara Daikin, 188,700.80 6,232,905.00 6,793,228.80 224,384,580.00
AC Single Installation
1 190.00 m Pek. Pemasangan Pipa Refrigerant, 62,537.70 106,081.50 11,882,163.00 20,155,485.00
2 288.00 m Pek. Pemasangan Pipa PVC tipe AW Ø 3/4 , Setara Rucika 11,814.00 16,906.73 3,402,432.00 4,869,136.80
JUMLAH IV.C.1. 23,576,791.80 253,574,761.80
IV.C.2. VENTILATION FAN
1 2.00 bh Pek. Pemasangan Axial Fan, Setara CKE 41,638.00 5,487,800.00 83,276.00 10,975,600.00
2 2.00 ttk Pek. Instalasi Titik Axial Fan, 41,638.00 171,780.00 83,276.00 343,560.00
3 10.00 m Pek. Pemasangan Pipa PVC tipe D Ø 4", 11,814.00 88,632.22 118,140.00 886,322.25
4 36.00 ttk Pek. Instalasi Titik Exhaust Fan, 41,638.00 171,780.00 1,498,968.00 6,184,080.00
5 360.00 m Pek. Pemasangan Pipa PVC tipe D Ø 4", 11,814.00 88,632.22 4,253,040.00 31,907,601.00
JUMLAH IV.C.1. 6,036,700.00 50,297,163.25
JUMLAH MEP 171,908,396.26 1,856,393,328.16
HARGA SATUAN (Rp) NILAI PEKERJAAN (Rp)
NO VOL SAT URAIAN PEKERJAAN
UPAH BAHAN UPAH BAHAN

REKAPITULASI
JUMLAH TOTAL 2,583,918,607.27 9,714,624,140.25
JUMLAH RAYA 12,298,542,747.52
JUMLAH RAYA (PEMBULATAN) 12,298,542,000.00
Terbilang :
Dua Belas Milyar Dua Ratus Sembilan Puluh Delapan Juta Lima Ratus Empat Puluh Dua Ribu Rupiah

Mengetahui Jakarta, Agustus 2023


PB PBB Tim Leader Konsultan

MUHAMAD ABRAR DEDHI NOVIANDY


NIPP. 45513 NIPP. 61594 ADANG HIDAYAT
THE "S" CURVE

WEEKLY PROGRESS REPORT WEEK : 32 Minggu

BULAN 1 BULAN 2 BULAN 3 BULAN 4 BULAN 5 BULAN 6 BULAN 7 BULAN 8


RNK
NO Uraian Pekerjaan Quantity Work Value% 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
%

I PEKERJAAN PERSIAPAN 2.1644% 0.4570% 0.5341% 0.1668% 0.1160% 0.0985% 0.0429% 0.0429% 0.0429% 0.0429% 0.0429% 0.0429% 0.0429% 0.0317% 0.0242% 0.0242% 0.0242% 0.0242% 0.0242% 0.0242% 0.0242% 0.0242% 0.0242% 0.0242% 0.0242% 0.0242% 0.0242% 0.0242% 0.0242% 0.0242% 0.0242% 0.0242% 0.0242%
I.A PEKERJAAN PERSIAPAN & PEMBONGKARAN
1 Pembuatan gudang semen dan alat-alat, 20.00 0.1342% 0.0112% 0.0112% 0.0112% 0.0112% 0.0112% 0.0112% 0.0112% 0.0112% 0.0112% 0.0112% 0.0112% 0.0112% 0.1342%
2 Pembuatan bedeng buruh, 25.00 0.1642% 0.0821% 0.0821% 0.1642%
3 Pek. Mobilisasi & Demobilisasi, 1.00 0.4066% 0.0127% 0.0127% 0.0127% 0.0127% 0.0127% 0.0127% 0.0127% 0.0127% 0.0127% 0.0127% 0.0127% 0.0127% 0.0127% 0.0127% 0.0127% 0.0127% 0.0127% 0.0127% 0.0127% 0.0127% 0.0127% 0.0127% 0.0127% 0.0127% 0.0127% 0.0127% 0.0127% 0.0127% 0.0127% 0.0127% 0.0127% 0.0127% 0.4066%
4 Pek. Pengukuran dan Pasang Papan Bowplank, 214.50 0.0898% 0.0075% 0.0075% 0.0075% 0.0075% 0.0075% 0.0075% 0.0075% 0.0075% 0.0075% 0.0075% 0.0075% 0.0075% 0.0898%
5 Pek. Pembuatan Pagar sementara dari seng gelombang tinggi 2 m, 234.50 0.5523% 0.2762% 0.2762% 0.5523%
6 Pek. Pembersihan Lapangan dan Peralatan, (termasuk relokasi utilitas eksisting) 1,752.78 0.2565% 0.0513% 0.0513% 0.0513% 0.0513% 0.0513% 0.2565%
7 Sewa Scafolding, 1.00 0.1626% 0.0054% 0.0054% 0.0054% 0.0054% 0.0054% 0.0054% 0.0054% 0.0054% 0.0054% 0.0054% 0.0054% 0.0054% 0.0054% 0.0054% 0.0054% 0.0054% 0.0054% 0.0054% 0.0054% 0.0054% 0.0054% 0.0054% 0.0054% 0.0054% 0.0054% 0.0054% 0.0054% 0.0054% 0.0054% 0.0054% 0.1626%
8 Pek. Pembongkaran Bangunan Eksisting, 1.00 0.2033% 0.0218% 0.0871% 0.0726% 0.0218% 0.2033%
9 Keselamatan Dan kesehatan Kerja 1.00 0.1949% 0.0017% 0.0061% 0.0061% 0.0061% 0.0104% 0.0061% 0.0061% 0.0061% 0.0061% 0.0061% 0.0061% 0.0061% 0.0061% 0.0061% 0.0061% 0.0061% 0.0061% 0.0061% 0.0061% 0.0061% 0.0061% 0.0061% 0.0061% 0.0061% 0.0061% 0.0061% 0.0061% 0.0061% 0.0061% 0.0061% 0.0061% 0.0061% 0.1949%

II STRUKTUR 36.3764% 0.0000% 0.5151% 0.5151% 1.8005% 1.9426% 2.3643% 3.3668% 1.3668% 1.6762% 1.3709% 0.5520% 0.7156% 0.5616% 0.6490% 0.1530% 0.8972% 1.9821% 2.8556% 1.5954% 0.8074% 0.5475% 0.5475% 0.3337% 0.2383% 0.2516% 0.0186% 0.0186% 0.1717% 0.1717% 0.1717% 0.0000% 0.0000%
II.A PEKERJAAN TANAH DAN PONDASI BATU KALI 0.0000%
II.A1 PEKERJAAN TANAH DAN PONDASI BATU KALI BANGUNAN UTAMA 0.0000%
1 Pek. Galian Tanah , 517.08 0.3763% 0.0941% 0.0941% 0.0941% 0.0941% 0.3763%
2 Pek. Pengurugan dengan pasir urug, 15.55 0.0425% 0.0142% 0.0142% 0.0142% 0.0425%
3 Pek. Pengurugan Tanah Bekas Galian, 299.36 0.0725% 0.0363% 0.0363% 0.0725%
4 Pek. Pembuatan Pondasi Batu Kosong (Aanstamping), 31.10 0.1230% 0.0410% 0.0410% 0.0410% 0.1230%
5 Pek. Pemasangan Pondasi Batu Kali 1 Pc : 4 Ps, 186.61 1.4666% 0.4889% 0.4889% 0.4889% 1.4666%
6 Pek. Anti Rayap, Setara Fumida 558.90 0.1829% 0.1829% 0.1829%
II.A2 PEKERJAAN TANAH PILE CAP 0.0000%
1 Pek. Galian Tanah , 182.95 0.1331% 0.0333% 0.0333% 0.0333% 0.0333% 0.1331%
2 Pek. Pengurugan dengan pasir urug, 3.40 0.0093% 0.0031% 0.0031% 0.0031% 0.0093%
3 Pek. Pembuatan Beton Tumbuk ad. 1 Pc : 3 Ps : 5 Kr, untuk lantai kerja 6.80 0.0607% 0.0303% 0.0303% 0.0607%
II.A3 PEKERJAAN TANAH DAN PONDASI BATU KALI BANGUNAN GENSET 0.0000%
1 Pek. Pengukuran dan Pasang Papan Bowplank, 19.80 0.0083% 0.0083% 0.0083%
2 Pek. Galian Tanah , 26.33 0.0192% 0.0192% 0.0192%
3 Pek. Pengurugan dengan pasir urug, 0.79 0.0022% 0.0022% 0.0022%
4 Pek. Pembuatan Pondasi Batu Kosong (Aanstamping), 1.58 0.0063% 0.0063% 0.0063%
5 Pek. Pemasangan Pondasi Batu Kali 1 Pc : 4 Ps, 9.50 0.0747% 0.0373% 0.0373% 0.0747%
6 Pek. Pengurugan tanah bekas galian, 23.96 0.0058% 0.0058% 0.0058%
II.A4 PEKERJAAN TANAH PLAT LANTAI 0.0000%
1 Pek. Pengurugan Tanah Dengan Tanah Urug, 419.17 0.6642% 0.2214% 0.2214% 0.2214% 0.6642%
2 Pek. Pengurugan dengan pasir urug, 27.95 0.0763% 0.0254% 0.0254% 0.0254% 0.0763%
3 Pek. Pembuatan Beton Tumbuk ad. 1 Pc : 3 Ps : 5 Kr, untuk lantai kerja 55.89 0.4984% 0.1661% 0.1661% 0.1661% 0.4984%
II.A5 PEKERJAAN TANAH BANGUNAN TORENT 0.0000%
1 Pek. Galian Tanah , 2.67 0.0019% 0.0019% 0.0019%
2 Pek. Pengurugan Tanah Bekas Galian, 1.59 0.0004% 0.0004% 0.0004%
II.A6 PEKERJAAN TANAH GWT 0.0000%
1 Pek. Galian Tanah , 51.94 0.0378% 0.0126% 0.0126% 0.0126% 0.0378%
2 Pek. Pengurugan dengan pasir urug, 1.44 0.0039% 0.0039% 0.0039%
3 Pek. Pembuatan Beton Tumbuk ad. 1 Pc : 3 Ps : 5 Kr, untuk lantai kerja 0.72 0.0064% 0.0064% 0.0064%
II.A5 PEKERJAAN TANAH TIANG PJU 0.0000%
1 Pek. Galian Tanah , 2.85 0.0021% 0.0007% 0.0007% 0.0007% 0.0021%
2 Pek. Pengurugan dengan pasir urug, 0.30 0.0008% 0.0004% 0.0004% 0.0008%
3 Pek. Pengurugan tanah bekas galian, 1.03 0.0002% 0.0002% 0.0002%
II.A6 PEKERJAAN TANAH BIO SEPTITANK 0.0000%
1 Pek. Galian Tanah , 13.44 0.0098% 0.0049% 0.0049% 0.0098%
2 Pek. Pengurugan dengan pasir urug, 0.84 0.0023% 0.0023% 0.0023%
3 Pek. Pengurugan tanah bekas galian, 1.80 0.0004% 0.0004% 0.0004%
II.A7 PEKERJAAN EKSISTING JALAN 0.0000%
1 Pek. Stripping. Penghamparan tanah urug dan pemadatan tanah urug dengan alat berat, 262.92 0.3946% 0.1315% 0.1315% 0.1315% 0.3946%
2 Angkut Material Pembongkaran Eksisting menggunakan Dump Truck, 262.92 0.0847% 0.0282% 0.0282% 0.0282% 0.0847%
3 Pek. Pengurugan dengan pasir urug, 13.15 0.0359% 0.0120% 0.0120% 0.0120% 0.0359%
II.8 PEKERJAAN TANAH SUMUR RESAPAN & BOX CONTROL 0.0000%
1 Pek. Galian Tanah , 61.32 0.0446% 0.0112% 0.0112% 0.0112% 0.0112% 0.0446%
II.A9 PEKERJAAN EKSISTING PAVING BLOK 0.0000%
1 Pek. Pembongkaran Paving Block, 1,752.78 1.0302% 0.5151% 0.5151% 1.0302%
0.0000%
0.0000%
II.B PEKERJAAN STRUKTUR BAWAH 0.0000%
II.B1 PEKERJAAN STRUKTUR BAWAH BANGUNAN UTAMA 0.0000%
PEKERJAAN PONDASI SPUN PILE Ø30 CM 0.0000%
1 Pek. Penyediaan Tiang Pancang Spun pile uk 30X30 Bottom 12 m kelas A3, 1,008.00 2.6810% 0.6702% 0.6702% 0.6702% 0.6702% 2.6810%
2 Pek. Penyediaan Tiang Pancang Spun pile uk 30X30 Upper 8 m kelas A3, 672.00 1.9709% 0.4927% 0.4927% 0.4927% 0.4927% 1.9709%
3 Pek. Penetrasi Tiang Pancang Spun Pile Uk 30X30, 1,680.00 2.3889% 0.5972% 0.5972% 0.5972% 0.5972% 2.3889%
4 Pek. Pengelasan dengan Las Listrik, 84.00 0.1612% 0.0403% 0.0403% 0.0403% 0.0403% 0.1612%
5 Pek. Test PDA, 4.00 0.2578% 0.2578% 0.2578%
PEKERJAAN TREATMENT PILE HEAD SPUN PILE 0.0000%
1 Pek. Pembuatan Beton Ready Mix dengan mutu K.250, 3.19 0.0319% 0.0160% 0.0160% 0.0319%
2 Pek. Pembesian dengan Besi Ulir, 866.96 0.1141% 0.0570% 0.0570% 0.1141%
PEKERJAAN PILE CAP 1 Uk. 1350 x 600 MM 0.0000%
1 Pek. Pembuatan Beton Ready Mix dengan mutu K.250, 34.02 0.3402% 0.1134% 0.1134% 0.1134% 0.3402%
2 Pek. Pembesian dengan Besi Ulir, 3,921.06 0.5160% 0.1720% 0.1720% 0.1720% 0.5160%
3 Pek. Pemasangan dinding bata ringan tebal 10 cm, 151.20 0.1301% 0.0434% 0.0434% 0.0434% 0.1301%
PEKERJAAN PEDESTAL PD1 0.0000%
1 Pek. Pembuatan Beton Ready Mix dengan mutu K.250, 2.66 0.0266% 0.0089% 0.0089% 0.0089% 0.0266%
2 Pek. Pembesian dengan Besi Ulir, (Tulangan Lentur) 1,017.78 0.1339% 0.0446% 0.0446% 0.0446% 0.1339%
3 Pek. Pembesian dengan Besi Polos, (Tulangan Polos) 213.07 0.0253% 0.0084% 0.0084% 0.0084% 0.0253%
4 Pek. Pemasangan dinding bata ringan tebal 10 cm, 50.60 0.0436% 0.0145% 0.0145% 0.0145% 0.0436%
PEKERJAAN PEDESTAL PD2 0.0000%
1 Pek. Pembuatan Beton Ready Mix dengan mutu K.250, 2.36 0.0236% 0.0079% 0.0079% 0.0079% 0.0236%
2 Pek. Pembesian dengan Besi Ulir, (Tulangan Lentur) 420.11 0.0553% 0.0184% 0.0184% 0.0184% 0.0553%
3 Pek. Pembesian dengan Besi Polos, (Tulangan Polos) 121.67 0.0145% 0.0048% 0.0048% 0.0048% 0.0145%
4 Pek. Pemasangan dinding bata ringan tebal 10 cm, 48.02 0.0413% 0.0138% 0.0138% 0.0138% 0.0413%
PEKERJAAN PEDESTAL PD3 0.0000%
1 Pek. Pembuatan Beton Ready Mix dengan mutu K.250, 5.17 0.0517% 0.0172% 0.0172% 0.0172% 0.0517%
2 Pek. Pembesian dengan Besi Ulir, (Tulangan Lentur) 350.09 0.0461% 0.0154% 0.0154% 0.0154% 0.0461%
3 Pek. Pembesian dengan Besi Polos, (Tulangan Polos) 101.39 0.0120% 0.0040% 0.0040% 0.0040% 0.0120%
4 Pek. Pemasangan dinding bata ringan tebal 10 cm, 111.80 0.0962% 0.0321% 0.0321% 0.0321% 0.0962%
PEKERJAAN SLOOF (SL1) 300X400 MM 0.0000%
1 Pek. Pembuatan Beton Ready Mix dengan mutu K.250, 40.06 0.4007% 0.2003% 0.2003% 0.4007%
2 Pek. Pembesian dengan Besi Ulir, (Tulangan Lentur) 4,858.39 0.6393% 0.3197% 0.3197% 0.6393%
3 Pek. Pembesian dengan Besi Polos, (Tulangan Polos) 2,755.25 0.3273% 0.1636% 0.1636% 0.3273%
4 Pek. Pemasangan dinding bata ringan tebal 10 cm, 549.46 0.4730% 0.2365% 0.2365% 0.4730%
PEKERJAAN SLOOF (SL2) 150 X 200 MM 0.0000%
1 Pek. Pembuatan Beton Ready Mix dengan mutu K.250, 4.99 0.0499% 0.0249% 0.0249% 0.0499%
2 Pek. Pembesian dengan Besi Ulir, (Tulangan Lentur) 718.11 0.0945% 0.0472% 0.0472% 0.0945%
3 Pek. Pembesian dengan Besi Polos, (Tulangan Polos) 537.76 0.0639% 0.0319% 0.0319% 0.0639%
4 Pek. Pemasangan dinding bata ringan tebal 10 cm, 106.37 0.0916% 0.0458% 0.0458% 0.0916%
II.B2 PEKERJAAN STRUKTUR BAWAH BANGUNAN GENSET 0.0000%
PEKERJAAN SLOOF 0.0000%
1 Pek. Pembuatan Beton Ready Mix dengan mutu K.250, 0.99 0.0099% 0.0099% 0.0099%
2 Pek. Pembesian dengan Besi Ulir, (Tulangan Lentur) 83.42 0.0110% 0.0110% 0.0110%
3 Pek. Pembesian dengan Besi Polos, (Tulangan Sengkang) 83.07 0.0099% 0.0099% 0.0099%
4 Pek. Pemasangan dinding bata ringan tebal 10 cm, 13.86 0.0119% 0.0119% 0.0119%
II.B3 PEKERJAAN STRUKTUR BAWAH TIANG PJU 0.0000%
PEKERJAAN PILE CAP Uk. 400 x 400 x 500 MM 0.0000%
1 Pek. Pembuatan Beton Ready Mix dengan mutu K.250, 1.52 0.0152% 0.0152% 0.0152%
2 Pek. Pembesian dengan Besi Ulir, 253.40 0.0333% 0.0111% 0.0111% 0.0111% 0.0333%
3 Pek. Pemasangan dinding bata ringan tebal 10 cm, 15.20 0.0131% 0.0065% 0.0065% 0.0131%
II.B4 PEKERJAAN GROUND WATER TANK 0.0000%
PEKERJAAN DINDING BETON 0.0000%
1 Pek. Pembuatan Beton Ready Mix dengan mutu K.250, 21.58 0.2158% 0.2158% 0.2158%
2 Pek. Pembesian dengan Besi Ulir, (Tulangan Lentur) 2,643.55 0.3479% 0.1160% 0.1160% 0.1160% 0.3479%
3 Pek. Pemasangan dinding bata ringan tebal 10 cm, 43.12 0.0371% 0.0124% 0.0124% 0.0124% 0.0371%
4 Pek. Pemasangan Bekisting untuk Dinding Beton + Multiplek Film 9 mm, 42.64 0.0776% 0.0388% 0.0388% 0.0776%
II.B5 PEKERJAAN STRUKTUR TORN 0.0000%
PEKERJAAN SLOOF 0.0000%
1 Pek. Pembuatan Beton Ready Mix dengan mutu K.250, 1.26 0.0126% 0.0126% 0.0126%
2 Pek. Pembesian dengan Besi Ulir, (Tulangan Lentur) 158.80 0.0209% 0.0104% 0.0104% 0.0209%
3 Pek. Pembesian dengan Besi Polos, (Tulangan Polos) 132.16 0.0157% 0.0078% 0.0078% 0.0157%
4 Pek. Pemasangan dinding bata ringan tebal 10 cm, 12.60 0.0108% 0.0054% 0.0054% 0.0108%
PEKERJAAN PILE CAP Uk. 600 x 600 MM 0.0000%
1 Pek. Pembuatan Beton Ready Mix dengan mutu K.250, 1.08 0.0108% 0.0108% 0.0108%
2 Pek. Pembesian dengan Besi Ulir, 137.54 0.0181% 0.0090% 0.0090% 0.0181%
3 Pek. Pemasangan dinding bata ringan tebal 10 cm, 7.20 0.0062% 0.0031% 0.0031% 0.0062%
0.0000%
0.0000%
II.C PEKERJAAN STRUKTUR ATAS 0.0000%
II.C1 PEKERJAAN STRUKTUR ATAS BANGUNAN UTAMA 0.0000%
PEKERJAAN KOLOM K1 130X350 0.0000%
1 Pek. Pembuatan Beton Ready Mix dengan mutu K.250, 13.86 0.1386% 0.0231% 0.0231% 0.0231% 0.0231% 0.0231% 0.0231% 0.1386%
2 Pek. Pembesian dengan Besi Ulir, (Tulangan Lentur) 3,906.06 0.5140% 0.0514% 0.0514% 0.0514% 0.0514% 0.0514% 0.0514% 0.0514% 0.0514% 0.0514% 0.0514% 0.5140%
3 Pek. Pembesian dengan Besi Polos, (Tulangan Polos) 1,163.78 0.1382% 0.0138% 0.0138% 0.0138% 0.0138% 0.0138% 0.0138% 0.0138% 0.0138% 0.0138% 0.0138% 0.1382%
4 Pek. Pemasangan Bekisting untuk Kolom Beton + Multiplek Film 9 mm, 264.00 0.3926% 0.0654% 0.0654% 0.0654% 0.0654% 0.0654% 0.0654% 0.3926%
PEKERJAAN KOLOM K2 130X350X350 0.0000%
1 Pek. Pembuatan Beton Ready Mix dengan mutu K.250, 12.31 0.1231% 0.0205% 0.0205% 0.0205% 0.0205% 0.0205% 0.0205% 0.1231%
2 Pek. Pembesian dengan Besi Ulir, (Tulangan Lentur) 3,125.85 0.4113% 0.0411% 0.0411% 0.0411% 0.0411% 0.0411% 0.0411% 0.0411% 0.0411% 0.0411% 0.0411% 0.4113%
3 Pek. Pembesian dengan Besi Polos, (Tulangan Polos) 634.79 0.0754% 0.0075% 0.0075% 0.0075% 0.0075% 0.0075% 0.0075% 0.0075% 0.0075% 0.0075% 0.0075% 0.0754%
4 Pek. Pemasangan Bekisting untuk Kolom Beton + Multiplek Film 9 mm, 250.56 0.3726% 0.0621% 0.0621% 0.0621% 0.0621% 0.0621% 0.0621% 0.3726%
PEKERJAAN KOLOM K3 130X350X350 0.0000%
1 Pek. Pembuatan Beton Ready Mix dengan mutu K.250, 10.26 0.1026% 0.0171% 0.0171% 0.0171% 0.0171% 0.0171% 0.0171% 0.1026%
2 Pek. Pembesian dengan Besi Ulir, (Tulangan Lentur) 2,604.87 0.3428% 0.0343% 0.0343% 0.0343% 0.0343% 0.0343% 0.0343% 0.0343% 0.0343% 0.0343% 0.0343% 0.3428%
3 Pek. Pembesian dengan Besi Polos, (Tulangan Polos) 528.99 0.0628% 0.0063% 0.0063% 0.0063% 0.0063% 0.0063% 0.0063% 0.0063% 0.0063% 0.0063% 0.0063% 0.0628%
4 Pek. Pemasangan Bekisting untuk Kolom Beton + Multiplek Film 9 mm, 208.80 0.3105% 0.0517% 0.0517% 0.0517% 0.0517% 0.0517% 0.0517% 0.3105%
PEKERJAAN KOLOM PRAKTIS KP 110*110 0.0000%
1 Pek. Pembuatan Beton Bertulang 1 Pc : 2 Ps : 3 Kr, 26.53 0.2306% 0.05765% 0.05765% 0.05765% 0.05765% 0.2306%
2 Pek. Pembesian dengan Besi Ulir, (Tulangan Lentur) 5,138.89 0.6762% 0.1127% 0.1127% 0.1127% 0.1127% 0.1127% 0.1127% 0.6762%
3 Pek. Pembesian dengan Besi Polos, (Tulangan Polos) 2,035.31 0.2418% 0.0403% 0.0403% 0.0403% 0.0403% 0.0403% 0.0403% 0.2418%
4 Pek. Pemasangan Bekisting untuk Kolom Beton + Multiplek Film 9 mm, 707.40 1.0519% 0.1753% 0.1753% 0.1753% 0.1753% 0.1753% 0.1753% 1.0519%
PEKERJAAN KOLOM K4 0.0000%
1 Pek. Pembuatan Beton Ready Mix dengan mutu K.250, 1.04 0.0104% 0.0035% 0.0035% 0.0035% 0.0104%
2 Pek. Pembesian dengan Besi Ulir, (Tulangan Lentur) 82.52 0.0109% 0.0022% 0.0022% 0.0022% 0.0022% 0.0022% 0.0109%
3 Pek. Pembesian dengan Besi Polos, (Tulangan Polos) 134.28 0.0160% 0.0032% 0.0032% 0.0032% 0.0032% 0.0032% 0.0160%
4 Pek. Pemasangan Bekisting untuk Kolom Beton + Multiplek Film 9 mm, 19.80 0.0294% 0.0098% 0.0098% 0.0098% 0.0294%
BALOK B1 0.0000%
1 Pek. Pembuatan Beton Ready Mix dengan mutu K.250, 41.62 0.4163% 0.2081% 0.2081% 0.4163%
2 Pek. Pembesian dengan Besi Ulir, (Tulangan Lentur) 4,460.89 0.5870% 0.1468% 0.1468% 0.1468% 0.1468% 0.5870%
3 Pek. Pembesian dengan Besi Polos, (Tulangan Polos) 2,956.33 0.3512% 0.0878% 0.0878% 0.0878% 0.0878% 0.3512%
4 Pek. Pemasangan Bekisting untuk Balok Beton + Multiplek Film 9 mm, 570.84 0.8720% 0.4360% 0.4360% 0.8720%
BALOK B2 0.0000%
1 Pek. Pembuatan Beton Ready Mix dengan mutu K.250, 4.37 0.0437% 0.0218% 0.0218% 0.0437%
2 Pek. Pembesian dengan Besi Ulir, (Tulangan Lentur) 786.37 0.1035% 0.0259% 0.0259% 0.0259% 0.0259% 0.1035%
3 Pek. Pembesian dengan Besi Polos, (Tulangan Polos) 545.79 0.0648% 0.0162% 0.0162% 0.0162% 0.0162% 0.0648%
4 Pek. Pemasangan Bekisting untuk Balok Beton + Multiplek Film 9 mm, 101.92 0.1557% 0.0778% 0.0778% 0.1557%
BALOK B3 0.0000%
1 Pek. Pembuatan Beton Ready Mix dengan mutu K.250, 45.82 0.4582% 0.2291% 0.2291% 0.4582%
2 Pek. Pembesian dengan Besi Ulir, (Tulangan Lentur) 5,729.02 0.7539% 0.1885% 0.1885% 0.1885% 0.1885% 0.7539%
3 Pek. Pembesian dengan Besi Polos, (Tulangan Polos) 3,495.42 0.4152% 0.1038% 0.1038% 0.1038% 0.1038% 0.4152%
4 Pek. Pemasangan Bekisting untuk Balok Beton + Multiplek Film 9 mm, 672.02 1.0266% 0.5133% 0.5133% 1.0266%
BALOK B4 0.0000%
1 Pek. Pembuatan Beton Ready Mix dengan mutu K.250, 10.96 0.1096% 0.0000%
2 Pek. Pembesian dengan Besi Ulir, (Tulangan Lentur) 1,370.12 0.1803% 0.0000%
3 Pek. Pembesian dengan Besi Polos, (Tulangan Polos) 1,080.96 0.1284% 0.0000%
4 Pek. Pemasangan Bekisting untuk Balok Beton + Multiplek Film 9 mm, 197.24 0.3013% 0.0000%
RING BALOK RB1 0.0000%
1 Pek. Pembuatan Beton Ready Mix dengan mutu K.250, 7.56 0.0756% 0.0000%
2 Pek. Pembesian dengan Besi Ulir, (Tulangan Lentur) 1,361.61 0.1792% 0.0000%
3 Pek. Pembesian dengan Besi Polos, (Tulangan Polos) 945.05 0.1123% 0.0000%
4 Pek. Pemasangan Bekisting untuk Balok Beton + Multiplek Film 9 mm, 176.48 0.2696% 0.0000%
PEKERJAAN RABAT BETON UNTUK LANTAI 1 0.0000%
1 Pek. Pembuatan Beton Ready Mix dengan mutu K.175, 55.89 0.5276% 0.0000%
2 Pek. Pemasangan Wiremesh, 4,756.24 0.6372% 0.0000%
PEKERJAAN PELAT S1 UNTUK LANTAI 2 0.0000%
1 Pek. Pembuatan Beton Ready Mix dengan mutu K.250, 61.09 0.6110% 0.0000%
2 Pek. Pemasangan Wiremesh, 4,332.44 0.5805% 0.0000%
3 Pek. Pemasangan Bekisting Lantai dengan Floordeck t = 0.75 mm tipe balok T, 509.10 0.8952% 0.0000%
PEKERJAAN PELAT S1 UNTUK ATAP DAK 0.0000%
1 Pek. Pembuatan Beton Ready Mix dengan mutu K.250, 23.97 0.2397% 0.0000%
2 Pek. Pemasangan Wiremesh, 2,460.47 0.3297% 0.0000%
3 Pek. Pemasangan Bekisting Lantai dengan Floordeck t = 0.75 mm tipe balok T, 199.75 0.3513% 0.0000%
4 Pek. Pemasangan Bekisting untuk Balok Beton + Multiplek Film 9 mm, 60.62 0.0926% 0.0000%
II.C2 PEKERJAAN STRUKTUR ATAS BANGUNAN GENSET 0.0000%
PEKERJAAN KOLOM 0.0000%
1 Pek. Pembuatan Beton Ready Mix dengan mutu K.250, 0.72 0.0072% 0.0000%
2 Pek. Pembesian dengan Besi Ulir, (Tulangan Lentur) 82.58 0.0109% 0.0000%
3 Pek. Pembesian dengan Besi Polos, (Tulangan Sengkang) 60.71 0.0072% 0.0000%
4 Pek. Pemasangan Bekisting untuk Kolom Beton + Multiplek Film 9 mm, 10.80 0.0161% 0.0000%
PEKERJAAN BALOK 0.0000%
1 Pek. Pembuatan Beton Ready Mix dengan mutu K.250, 1.19 0.0119% 0.0000%
2 Pek. Pembesian dengan Besi Ulir, (Tulangan Lentur) 83.42 0.0110% 0.0000%
3 Pek. Pembesian dengan Besi Polos, (Tulangan Sengkang) 67.24 0.0080% 0.0000%
4 Pek. Pemasangan Bekisting untuk Balok Beton + Multiplek Film 9 mm, 15.84 0.0242% 0.0000%
PEKERJAAN PLAT LANTAI 0.0000%
1 Pek. Pembuatan Beton Ready Mix dengan mutu K.250, 4.62 0.0462% 0.0000%
2 Pek. Pembesian dengan Besi Ulir, (Tulangan Lentur) 222.36 0.0293% 0.0000%
PEKERJAAN DAK BETON 0.0000%
1 Pek. Pembuatan Beton Ready Mix dengan mutu K.250, 5.93 0.0593% 0.0000%
2 Pek. Pembesian dengan Besi Ulir, (Tulangan Lentur) 676.44 0.0890% 0.0000%
3 Pek. Pemasangan Bekisting untuk Plat Lantai Beton + Multiplek Film 9 mm, 39.50 0.0749% 0.0000%
II.C3 PEKERJAAN STRUKTUR TORN 0.0000%
PEKERJAAN KOLOM 300x300 0.0000%
1 Pek. Pembuatan Beton Ready Mix dengan mutu K.250, 3.24 0.0324% 0.0000%
2 Pek. Pembesian dengan Besi Ulir, (Tulangan Lentur) 431.83 0.0568% 0.0000%
3 Pek. Pembesian dengan Besi Polos, (Tulangan Polos) 257.47 0.0306% 0.0000%
4 Pek. Pemasangan Bekisting untuk Kolom Beton + Multiplek Film 9 mm, 43.20 0.0642% 0.0000%
PEKERJAAN BALOK B1 250x350 0.0000%
1 Pek. Pembuatan Beton Ready Mix dengan mutu K.250, 3.68 0.0368% 0.0000%
2 Pek. Pembesian dengan Besi Ulir, (Tulangan Lentur) 406.02 0.0534% 0.0000%
3 Pek. Pembesian dengan Besi Polos, (Tulangan Sengkang) 316.15 0.0376% 0.0000%
4 Pek. Pemasangan Bekisting untuk Balok Beton + Multiplek Film 9 mm, 39.90 0.0610% 0.0000%
PEKERJAAN BALOK B2 250X200 0.0000%
1 Pek. Pembuatan Beton Ready Mix dengan mutu K.250, 0.78 0.0078% 0.0000%
2 Pek. Pembesian dengan Besi Ulir, (Tulangan Lentur) 97.28 0.0128% 0.0000%
3 Pek. Pembesian dengan Besi Polos, (Tulangan Sengkang) 105.60 0.0125% 0.0000%
4 Pek. Pemasangan Bekisting untuk Balok Beton + Multiplek Film 9 mm, 10.89 0.0166% 0.0000%
PEKERJAAN BALOK B3 200X200 0.0000%
1 Pek. Pembuatan Beton Ready Mix dengan mutu K.250, 0.84 0.0084% 0.0000%
2 Pek. Pembesian dengan Besi Ulir, (Tulangan Lentur) 88.42 0.0116% 0.0000%
3 Pek. Pembesian dengan Besi Polos, (Tulangan Sengkang) 71.32 0.0085% 0.0000%
4 Pek. Pemasangan Bekisting untuk Balok Beton + Multiplek Film 9 mm, 12.60 0.0192% 0.0000%
PEKERJAAN PLAT LANTAI 0.0000%
1 Pek. Pembuatan Beton Ready Mix dengan mutu K.250, 2.16 0.0216% 0.0000%
2 Pek. Pemasangan Wiremesh, 153.00 0.0205% 0.0000%
3 Pek. Pemasangan Bekisting Lantai dengan Floordeck t = 0.75 mm tipe balok T, 18.00 0.0317% 0.0000%
0.0000%
0.0000%
II.D PEKERJAAN STRUKTUR ATAP GEDUNG UTAMA 0.0000%
PEKERJAAN RANGKA ATAP BAJA RINGAN 0.0000%
1 Pek. Pemasangan Kuda-kuda Baja Ringan + Reng untuk Bitumen (terpasang), 662.77 1.3999% 0.0000%
0.0000%
0.0000%
II.E PEKERJAAN TANGGA 0.0000%
II.E1 PEKERJAAN TANGA 1 0.0000%
PONDASI TANGGA 0.0000%
1 Pek. Galian Tanah , 2.00 0.0015% 0.0000%
2 Pek. Pengurugan dengan pasir urug, 0.08 0.0002% 0.0000%
3 Pek. Pengurugan Tanah Bekas Galian, 0.80 0.0002% 0.0000%
4 Pek. Pembuatan Pondasi Batu Kosong (Aanstamping), 0.16 0.0006% 0.0000%
5 Pek. Pemasangan Pondasi Batu Kali 1 Pc : 4 Ps, 0.96 0.0075% 0.0000%
STRUKTUR TANGGA 0.0000%
1 Pek. Pembuatan Beton Ready Mix dengan mutu K.250, 18.03 0.1803% 0.0000%
2 Pek. Pembesian dengan Besi Ulir, (Tulangan Lentur) 154.57 0.0203% 0.0000%
3 Pek. Pemasangan Bekisting untuk Tangga + Multiplek Film 9 mm, 33.21 0.0477% 0.0000%
0.0000%
0.0000%

III. ARSITEKTUR 44.9670% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000%
III.A PEKERJAAN DINDING
III.A1 PEKERJAAN PASANGAN DINDING BATA BANGUNAN UTAMA
1 Pek. Pemasangan dinding bata ringan tebal 10 cm, 2,760.95 2.3765%
2 Pek. Pemasangan Plesteran dengan Mortar tebal 2 cm, Setara Mortar Indonesia D-2 5,521.91 4.5099%
3 Pek. Acian dengan Mortar, Setara MU-200 5,521.91 2.9970%

III.A2 PEKERJAAN PASANGAN DINDING BATA BANGUNAN GENSET


1 Pek. Pemasangan dinding bata ringan tebal 10 cm, 56.20 0.0484%
2 Pek. Pemasangan Plesteran dengan Mortar tebal 2 cm, Setara Mortar Indonesia D-2 112.40 0.0918%
3 Pek. Acian dengan Mortar, Setara MU-200 112.40 0.0610%
III.B PEKERJAAN INTERIOR
III.B.1 Pekerjaan Langit - Langit Kamar
1 Pek. Pemasangan langit-langit gypsum board t=9 mm, Setara Jayaboard 1,168.72 0.6374%
2 Pek. Pemasangan rangka besi hollow galvalum 40x40x0.3 mm untuk plafond, 1,168.72 1.0310%
3 Pek. Pengecatan Interior Plafond (Cat Setara setara Duluxe Pentalite White 1501), 1,168.72 0.3976%
4 Pek. Pemasangan List Shadow Line, 2,244.72 0.3617%
5 Pek. Pengecatan Dinding Baru Eksterior (Cat Setara komprol White ST100 By Gamma Pain), 4.80 0.0024%
6 Pek. Plafond Kisi-kisi Kayu Setara Duma WPC Click On Hollow 50/100, 321.90 0.2152%
7 Pek. Pemasangan rangka besi hollow Galvanis 40x40x0.8 mm untuk rangka plafond WPC, 91.87 0.2070%

III.B.2 Pekerjaan Penutup Lantai


1 Pek. Pemasangan Granite Tile 600 x 600 mm Glossy Setara Himalaya White, 615.44 1.5316%
2 Pek. Pemasangan Granite Tile 600 x 600 mm Setara Cemento Griss Matte, 158.95 0.2699%
4 Pek. Pemasangan Statuari Marble 600 x 600 mm, 333.80 0.7631%
8 Pek. Pemasangan Stainless inlay, 73.84 0.0455%
16 Pek. Pemasangan plint, 1,125.30 0.7265%
32 Pek. Waterproofing Toilet, Setara Damdex 110.16 0.0457%

III.B.3 Pekerjaan Penutup Dinding


1 Pek. Pemasangan Granite Tile 600 x 600 mm Setara Cemento Griss Matte, 555.13 0.9426%
2 Pek. Pengecatan Interior tembok baru (Cat Setara Duluxe Pentalite Briliant White LS 2290), 715.54 0.4228%
3 Pek. Pengecatan Dinding Baru Eksterior (Cat Setara komprol White ST100 By Gamma Pain), 872.28 0.4358%
4 Pek. Pengecatan Dinding Baru Eksterior kamprot Halus (Cat Setara Duluxe Pentalite Darke 59.52 0.0330%
5 Pek. Pengecatan interior tembok baru duluxe pentalite timeles grey 40466 Glossy, 1,520.74 0.7642%
6 Pek. Pengecatan interior tembok baru duluxe pentalite Artic Shadow 40345, 269.44 0.1135%

III.B.4 Pekerjaan Sanitari


1 Pek. Pemasangan kloset duduk / monoblok Setara toto CW500PJ/SW500JP, 32.00 2.0468%
2 Pek. Pemasangan Jet Shower Setara Toto TX403SEV2C, 32.00 0.1387%
3 Pek. Pemasangan Floor Drain Setara Toto TX1CV2, 64.00 0.4469%
4 Pek. Pemasangan tissue holder Setara Toto TX703M3AV1, 32.00 0.2044%
5 Pek. Pemasangan Robe Hook Setara Toto TX704AES, 32.00 0.0871%
6 Pek. Pemasangan Towel Holder Setara Toto TX4W, 32.00 0.6738%
7 Pek. Pemasangan Shower Kolom Setara Toto TX492SES, 32.00 2.3735%
7 Pek. Pemasangan Kran Setara Toto TX124LES, 36.00 0.5017%
8 Pek. Pemasangan roof drain RDP1104 setar Paloma, 32.00 0.0898%
9 Pek. Pemasangan Kran Air Tempat Wudhu Setara Toto TX130L, 3.00 0.0115%
10 Pek. Pemasangan wastafel Setara Toto LW 951 CJ + Assesoris, 32.00 0.6604%
11 Memasang 1 buah Kran Wastafel Setara Toto TX109LV, 32.00 0.3263%
12 Pek. Pembuatan Meja Beton Bertulang, 21.31 0.0964%
13 Pek. Pemasangan Corner Soap Basket setara TOTO Corner Soap Basket TX2AV1B, 32.00 0.2285%
14 Pek. Pemasangan Top Table Setara Niro Granite GCO10 Marquina Nero (60x120), 26.88 0.1248%
15 Pek. Pemasangan Multiplek 18 mm + Fin HPL Setara Taco TH 131 AA, 151.20 0.2529%
16 Pek. Pemasangan Partisi Kaca Tempered 10 mm, 46.08 0.3168%
17 Pek. Pemasangan Kaca Cermin t=5 mm, 23.04 0.0347%

III.B.5 Pekerjaan Kusen dan Pintu Jendela


1 Pek. Pemasangan Pintu P1, 32.00 1.6689%
- Kusen Alumunium 4" motif kayu
- Panel Daun Kayu Jati
- Finishing Cat Plitur Melamic
-Handle 1 Set Pintu Setara PALOMA DLP 3121 Digital Lock
- Engsel Pintu Setara Paloma BHP 412
- Door Stopper Setara Paloma DSP 245 Magnet 026
2 Pek. Pemasangan Pintu P2 (Kamar Mandi), 32.00 1.3922%
- Kusen Alumunium 4" motif kayu
- Panel Daun Kayu Jati
- Finishing Cat Plitur Melamic
- Handle Pintu Geser Setara PALOMA MLP 222 + CMP 221 + ECP 363 + CLP 306
- Rel Pintu Sliding Setara Paloma SRP 004
3 Pek. Pemasangan Pintu P3, 3.00 0.1596%
- Kusen Alumunium 4" motif kayu
- Panel Daun Kayu Jati
- Finishing Cat Plitur Melamic
-Handle 1 Set Pintu Setara Paloma HRP 354 + Body Mortise Setara Paloma MLP 542 + Cylinder kunci Setara Paloma KC-CK CLP614
- Engsel Pintu Setara Paloma BHP 412
- Door Stopper Setara Paloma DSP 245 Magnet 026
4 Pek. Pemasangan Jendela J1, 2.00 0.1603%
- Kusen Alumunium 4" motif kayu
- Panel Daun jendela Alumunium 4"
- Kunci jendela rambuncis Paloma BRP RBP 671/672/674
- Engsel Casement jendela setara Paloma Superior 16 inch SSS FSP 305
- Kaca riben 5 mm
5 Pek. Pemasangan Jendela J2, 4.00 0.1748%
- Kusen Alumunium 4" motif kayu
- Panel Daun jendela Alumunium 4"
- Kunci jendela rambuncis Paloma BRP RBP 671/672/674
- Engsel Casement jendela setara Paloma Superior 16 inch SSS FSP 305
- Kaca riben 5 mm
6 Pek. Pemasangan Jendela J3, 32.00 0.7916%
- Kusen Alumunium 4" motif kayu
- Panel Daun jendela Alumunium 4"
- Kunci jendela rambuncis Paloma BRP RBP 671/672/674
- Engsel Casement jendela setara Paloma Superior 16 inch SSS FSP 305
- Kaca riben 5 mm
7 Pek. Pemasangan Pintu PJ1, 1.00 0.1146%
- Kusen Alumunium 4" motif kayu
- Panel Daun jendela Alumunium 4"
- Kunci jendela rambuncis Paloma BRP RBP 671/672/674
- Engsel Casement jendela setara Paloma Superior 16 inch SSS FSP 305
- Kaca Tempered 12 mm
- Kaca riben 5 mm
8 Pek. Pemasangan Pintu PJ2, 1.00 0.0518%
- Kusen Alumunium 4" motif kayu
- Panel Daun jendela Alumunium 4"
- Kunci jendela rambuncis Paloma BRP RBP 671/672/674
- Engsel Casement jendela setara Paloma Superior 16 inch SSS FSP 305
- Kaca Tempered 12 mm
- Kaca riben 5 mm
9 Pek. Pemasangan Pintu PJ3, 1.00 0.0435%
- Kusen Alumunium 4" motif kayu
- Panel Daun jendela Alumunium 4"
- Kunci jendela rambuncis Paloma BRP RBP 671/672/674
- Engsel Casement jendela setara Paloma Superior 16 inch SSS FSP 305
- Kaca Tempered 12 mm
- Kaca riben 5 mm
10 Pek. Pemasangan Jendela J1A, 3.00 0.2666%
- Kusen Alumunium 4" motif kayu
- Panel Daun jendela Alumunium 4"
- Kaca riben 5 mm
11 Pek. Pemasangan Jendela J2A, 4.00 0.1850%
- Kusen Alumunium 4" motif kayu
- Panel Daun jendela Alumunium 4"
- Kaca riben 5 mm
12 Pek. Pemasangan Jendela J2B, 2.00 0.2842%
- Kusen Alumunium 4" motif kayu
- Panel Daun jendela Alumunium 4"
- Kaca riben 5 mm
13 Pek. Pemasangan Pintu Shaft PS1, 32.00 0.5905%
- Besi Hollow 40x40
- Engsel Pintu Setara Paloma BHP 412
- Handle Pintu + Body Mortise + Kunci Setara Paloma
14 Pek. Pemasangan Pintu R Genset, 1.00 0.1111%
- Panep pintu baja
- kusen baja ber-architrave
- 4 engsel
- 5 titik kunci
- kaca pengintip
- handle
15 Pek. Pemasangan Railling Balkon, 6.00 0.0428%

III.C PEKERJAAN ATAP


1 Pek. Pemasangan Insulation t = 4 mm, 662.77 0.2118%
2 Pek. Pemasangan Multiplek 12 mm utntuk alas atap bitumen, 662.77 0.4626%
3 Pek. Pemasangan Atap Bitumen + Underlayer, 662.77 1.4745%
4 Pek. Pemasangan Nok Atap Bitumen, 32.00 0.0335%
5 Pek. Pemasangan Lisplang GRC lebar 30 cm dan lebar 20 cm tebal 8 mm setara Kalsiplank, 218.00 0.1198%
6 Pek. Pemasangan Plesteran dengan Mortar tebal 2 cm, Setara Mortar Indonesia D-2 199.75 0.1631%
7 Pek. Acian dengan Mortar, Setara MU-200 untuk atap beton 199.75 0.1084%
8 Pek. Waterproofing Membran, Setara Mapei 227.95 0.4394%
III.D PEKERJAAN FASADE
1 Pek. Pemasangan dinding bata ringan tebal 10 cm, 535.25 0.4607%
2 Pek. Pemasangan Plesteran dengan Mortar tebal 2 cm, Setara Mortar Indonesia D-2 535.25 0.4372%
3 Pek. Acian dengan Mortar, Setara MU-200 535.25 0.2905%
4 Pek. Pemasangan rangka besi hollow galvanis 40x40x1.6 mm dinding GRC, (untuk Backdrop 48.91 0.1161%
5 Pek. Pemasangan Gypsum Board uk.120x240x9 mm untuk Partisi Dinding, Setara Jayaboar 48.91 0.0620%
6 Pek. Pemasangan Backdrop Resepsionist , 48.91 0.2528%
7 Pek. Pemasangan Huruf Stainless Steel, 1.00 0.0190%
8 Pek. Pemasangan rangka besi hollow galvanis 40x40x1.6 mm dinding GRC, (untuk fasade) 198.60 0.4713%
9 Pek. Pemasangan Panel Ornamen GRC t = 20 mm, 198.60 1.2393%

III.E PEKERJAAN LANDSCAPE


1 Pek. Pengurugan Tanah Dengan Tanah Merah untuk tanaman, 169.25 0.2557%
2 Pek. Penanaman Rumput Gajah Mini, 564.18 0.2742%
3 Pek. Penanaman Pohon Tabebuya, 21.00 0.3684%
4 Pek. Pemasangan U Ditch uk. (70x50x120 )+ Penutup, 35.70 0.2909%
5 Pek. Pemasangan U Ditch uk. (40 x 30 x 120 )+ Penutup, 162.60 1.1691%
6 Pek. Pemasangan Grassblock, Grassblock 8 Setara Conbloc 51.60 0.0992%
7 Pek. Pemasangan Paving Block , Cobblestone 6 Setara Conbloc 463.92 1.1909%
8 Pek. Pemasangan Kanstin 15x15x50, Setara Conbloc 316.43 0.3609%
9 Pek. Sumur Resapan , 13.00 0.6652%
10 Pek. Pemasangan Box Control 300 x 300 x 450 mm, 10.00 0.0948%

III.F PEKERJAAN TANGGA


1 Pek. Acian dengan Mortar, Setara MU-200 27.70 0.0150%
2 Pek. Pemasangan lantai Parket Kayu Solid, 18.63 0.0945%
3 Pek. Pemasangan Railling Balkon, 6.00 0.0428%

IV. MEKANIKAL, ELEKTRIKAL, & PLUMBING (MEP) 16.4922% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000%
IV.A ELECTRICAL
IV.A.1. ELECTRICAL BANGUNAN
Power Panel
1 Panel LVMDP, 1.00 0.1567%
2 Panel SDP.PUMP, 1.00 0.0818%
3 Panel SDP-1, PJU, Kontaktor, dan Timer 1.00 0.0752%
4 Panel MCB Box 4 Grup Setara Schneider, 33.00 0.1788%
Cable feeder instalation SDP
Panel LVMDP
1 Pek. Pemasangan Kabel Power ( NYFGBY 4x120 mm ) Kwh Meter to Panel LVMDP, Setara Supreme 45.00 1.1235%
SDP. PUMP
2 Pek. Pemasangan Kabel Power ( NYFGBY 4x16 mm ) + NYA 10 mm, Setara Supreme 35.00 0.0855%
SDP. 1
3 Pek. Pemasangan Kabel Power ( NYFGBY 4x25 mm ) + NYA 10 mm, Setara Supreme 30.00 0.1040%
SDP. 2
4 Pek. Pemasangan Kabel Power ( NYFGBY 4x25 mm ) + NYA 10 mm, Setara Supreme 30.00 0.1040%
Protection Feeder
5 Cable Tray type C 300x50 (setara TRAYINDO), 100.00 0.3933%
6 Pek. Pemasangan Pipa PVC tipe AW Ø 2" , Setara Rucika 30.00 0.0152%
Cable feeder instalation SDP. 1 to :
MCB. BOX 1.1
1 Pek. Pemasangan Kabel Power ( NYY 3x4mm ), Setara Supreme 12.23 0.0085%
MCB. BOX 1.2
2 Pek. Pemasangan Kabel Power ( NYY 3x4mm ), Setara Supreme 17.95 0.0124%
MCB. BOX 1.3
3 Pek. Pemasangan Kabel Power ( NYY 3x4mm ), Setara Supreme 22.03 0.0152%
MCB. BOX 1.4
4 Pek. Pemasangan Kabel Power ( NYY 3x4mm ), Setara Supreme 27.75 0.0192%
MCB. BOX 1.5
5 Pek. Pemasangan Kabel Power ( NYY 3x4mm ), Setara Supreme 28.56 0.0198%
MCB. BOX 1.6
6 Pek. Pemasangan Kabel Power ( NYY 3x4mm ), Setara Supreme 22.95 0.0159%
MCB. BOX 1.7
7 Pek. Pemasangan Kabel Power ( NYY 3x4mm ), Setara Supreme 18.96 0.0131%
MCB. BOX 1.8
8 Pek. Pemasangan Kabel Power ( NYY 3x4mm ), Setara Supreme 13.35 0.0092%
MCB. BOX 1.9
9 Pek. Pemasangan Kabel Power ( NYY 3x4mm ), Setara Supreme 29.69 0.0205%
MCB. BOX 1.10
10 Pek. Pemasangan Kabel Power ( NYY 3x4mm ), Setara Supreme 23.85 0.0165%
MCB. BOX 1.11
11 Pek. Pemasangan Kabel Power ( NYY 3x4mm ), Setara Supreme 19.41 0.0134%
MCB. BOX 1.12
12 Pek. Pemasangan Kabel Power ( NYY 3x4mm ), Setara Supreme 13.80 0.0095%
MCB. BOX 1.13
13 Pek. Pemasangan Kabel Power ( NYY 3x4mm ), Setara Supreme 16.12 0.0112%
MCB. BOX 1.14
14 Pek. Pemasangan Kabel Power ( NYY 3x4mm ), Setara Supreme 21.49 0.0149%
MCB. BOX 1.15
15 Pek. Pemasangan Kabel Power ( NYY 3x4mm ), Setara Supreme 25.22 0.0175%
MCB. BOX 1.16
16 Pek. Pemasangan Kabel Power ( NYY 3x4mm ), Setara Supreme 30.59 0.0212%
Cable feeder instalation SDP. 2 to :
MCB. BOX 2.1
17 Pek. Pemasangan Kabel Power ( NYY 3x4mm ), Setara Supreme 12.23 0.0085%
MCB. BOX 2.2
18 Pek. Pemasangan Kabel Power ( NYY 3x4mm ), Setara Supreme 17.95 0.0124%
MCB. BOX 2.3
19 Pek. Pemasangan Kabel Power ( NYY 3x4mm ), Setara Supreme 22.03 0.0152%
MCB. BOX 2.4
20 Pek. Pemasangan Kabel Power ( NYY 3x4mm ), Setara Supreme 27.75 0.0192%
MCB. BOX 2.5
21 Pek. Pemasangan Kabel Power ( NYY 3x4mm ), Setara Supreme 28.56 0.0198%
MCB. BOX 2.6
22 Pek. Pemasangan Kabel Power ( NYY 3x4mm ), Setara Supreme 22.95 0.0159%
MCB. BOX 2.7
23 Pek. Pemasangan Kabel Power ( NYY 3x4mm ), Setara Supreme 18.96 0.0131%
MCB. BOX 2.8
24 Pek. Pemasangan Kabel Power ( NYY 3x4mm ), Setara Supreme 13.35 0.0092%
MCB. BOX 2.9
25 Pek. Pemasangan Kabel Power ( NYY 3x4mm ), Setara Supreme 29.69 0.0205%
MCB. BOX 2.10
26 Pek. Pemasangan Kabel Power ( NYY 3x4mm ), Setara Supreme 23.85 0.0165%
MCB. BOX 2.11
27 Pek. Pemasangan Kabel Power ( NYY 3x4mm ), Setara Supreme 19.41 0.0134%
MCB. BOX 2.12
28 Pek. Pemasangan Kabel Power ( NYY 3x4mm ), Setara Supreme 13.80 0.0095%
MCB. BOX 2.13
29 Pek. Pemasangan Kabel Power ( NYY 3x4mm ), Setara Supreme 16.12 0.0112%
MCB. BOX 2.14
30 Pek. Pemasangan Kabel Power ( NYY 3x4mm ), Setara Supreme 21.49 0.0149%
MCB. BOX 2.15
31 Pek. Pemasangan Kabel Power ( NYY 3x4mm ), Setara Supreme 25.22 0.0175%
MCB. BOX 2.16
32 Pek. Pemasangan Kabel Power ( NYY 3x4mm ), Setara Supreme 30.59 0.0212%
Penyambungan daya listrik PLN
33 Pek. Penyambungan KWH Baru 147000, 1.00 1.1614%
Grounding Installation LVMDP
BCC 25 mm2
34 Pek. Instalasi Kabel BCC / BC 50 mm, LVMDP to Grounding Box 20.00 0.1635%
- Copper Rod dia. 5/8 mm
- Excavation & Bacfilling
35 Pek. Pemasangan Ground Copper Rod 5/8, 2.00 0.0228%
36 Pek. Pemasangan Box Control 400 x 400 x 400 mm, 2.00 0.0348%

IV.A.2. LIGHTING ARMATURE, CABELING


1 Pek. Pemasangan Lampu Ceiling Downlight LED 18 Watt, Setara Philips 1.00 0.0025%
2 Pek. Pemasangan Lampu Ceiling Downlight LED 12 Watt, Setara Philips 181.00 0.2034%
3 Pek. Pemasangan Lampu spotlight warm 8 watt, Setara Philips 48.00 0.0711%
4 Pek. Pemasangan Lampu spotlight outbow bulat 7 watt, Setara Philips 16.00 0.0211%
5 Pek. Pemasangan Lampu TL Slim T8 30 W, 56.00 0.0907%
6 Pek. Pemasangan Lampu Sorot Rel White 2 Meter + 4 Lampu Sorot LED Fitting E27 Warm White, 1.00 0.0026%
7 Pek. Pemasangan Lampu Gantung, 1.00 0.0573%
8 Emergensy Twin Spot Led 2x3w, Setara Maxspid 12.00 0.2552%
9 Pek. Pemasangan Lampu LED Strip setara LED Strip 5050 SMD, 36.00 0.0235%
10 Pek. Instalasi Titik Lampu, Kabel NYM Setara Supreme dan Pipa Conduit 316.00 0.5484%
11 Pek. Pemasangan Tiang Lampu Taman Oktagonal, 19.00 0.4455%
12 Pek. Pemasangan Lampu Taman setara panasonic NNP44920GHL LUMINER LENGKAP LED 80W, 19.00 1.4266%
13 Pek. Pemasangan Tiang Lampu Taman Industrial, 8.00 0.0401%
13 Pek. Pemasangan Lampu Taman Industrial, 8.00 0.0074%
14 Pek. Instalasi titik lampu luar, 27.00 0.3011%
Switch Fixtures & Installation
1 Pek. Pemasangan Saklar tunggal, Setara Schneider 134.00 0.1768%
2 Pek. Pemasangan Saklar Ganda, Setara Schneider 9.00 0.0149%
Pek. Pemasangan Saklar tunggal hotel, Setara Schneider 34.00 0.0619%
Socket Outlet Fixtures & Installation
1 Pek Pemasangan Stop Kontak Outlet TV, 34.00 0.1041%
2 Pemasangan Stop Kontak Dinding Ganda, Setara Schneider Electric ZENcelo Schuko - E84T426_1 67.00 0.1200%
3 Pek. Pemasangan Stop Kontak Daya, 16 A Setara Schneider Electric Neo E3426_16SS_GS_G3 52.00 0.0829%
4 Pek. Instalasi Titik Stop Kontak, kabel NYM 3 x 2,5 mm setara Supreme + conduit 153.00 0.3842%

IV.A.3. LIGHTING PROTECTION


Air Terminal type electrostatic radius 35 meter
1 Pek. Pemasangan Penangkal Petir, 4.00 0.0961%
Grounding (Electroda , resistansi max 2 Ohm)
- Include box control
1 Pek. Pemasangan Ground Copper Rod 5/8, 8.00 0.0911%
2 Pek. Pemasangan Box Control 400 x 400 x 400 mm, 2.00 0.0348%
3 Pek. Pemasangan Busbar Strip 30x5 mm, 6.00 0.0059%
4 Pek. Pemasangan Copper plat 1000x1000x5mm, 1.00 0.0249%
FR-P Mast - 2M dan Counter Strike
1 Pek. Pemasangan FR-P Mast - 2M dan Counter Strike , 1.00 0.0324%
Obstruction Light, include light censor & Cabeling
2 Pek. Pemasangan Obstruction Light, 1.00 0.0129%
Coaxial 2x35 mm2
3 Pek. Pemasangan Kabel Coaxial 2 x 35 mm², 30.00 0.1344%
Installation Cable NYM 3 x 2.5 mm² in Hi impact PVC conduit pipe
4 Pek. Instalasi Titik Lampu Luar, 1.00 0.0112%
Tiang penyangga
5 Pek. Pemasangan 1 meter Pipa BS Ø 2" (50 mm), 4.00 0.0063%

IV.B IV.B.1. CLEAN WATER


PEMASANGAN SUMUR BOR
1 Pek. Pembuatan sumur bor sedalam 100 m, (WLC, Box Pompa, Pipa PVC to GWT, Radar, Kabel, Acces 1.00 0.8760%
PEMASANGAN PDAM
1 Pek. Pemasangan PDAM Baru, 1.00 0.0287%
DISTRIBUTION PUMP
1 Pek. Pemasangan Pompa Distribusi, Dari Grountank ke Torn include stopkran dan watermur 2.00 0.2496%
2 Instalasi Kabel NYM 3x2.5 mm² (PVC Conduit), setara Supreme Pompa to Panel Distribusi Pump 16.00 0.0104%
3 Pek. Pemasangan Panel Distribution Pump, 1.00 0.0499%
4 Pek. Pemasangan Kabel Power ( NYFGBY 3x4 mm ), Panel Pump to Panel Distribution Pump 20.00 0.0179%
5 Pek. Pemasangan Pipa PVC tipe AW Ø 1 1/2", Protection Feeder Power Panel Pump to Panel Distrib 15.00 0.0063%
6 Pek. Pemasangan Radar toren, 2.00 0.0027%
7 Pek. Pemasangan NYY 2 x 1.5 mm (PVC Conduit),setara Supreme Radar to Panel Pompa Distribusi 20.00 0.0107%
8 Pek. Pemasangan Pipa PVC tipe Rucika K6741 1 1/2", Pompa Distribusi to Torn 35.00 0.0229%
WATERTANK
1 Pek. Pemasangan Toren Air 5.100 Liter Setara Penyu, 2.00 0.2347%
BOOSTER PUMP
1 Pek. Pemasangan Pompa Dorong Lengkap dengan stop kran + watermur, 2.00 0.0831%
2 Instalasi Kabel NYM 3x2.5 mm² (PVC Conduit), setara Supreme 30.00 0.0195%
PLUMBING
1 Pek. Pemasangan Pipa PVC tipe AW Ø 2", Setara Rucika 104.65 0.0531%
2 Pek. Pemasangan Pipa PVC tipe AW Ø 1", LT 2 ke LT 1 Per Shaf Kamar setara Rucika 154.10 0.0438%
3 Pek. Pemasangan Pipa PVC tipe AW Ø 3/4", Setara Rucika 305.90 0.0714%
4 Pek. Pemasangan Stop Kran 3/4" Setara Onda, Masing Masing Kamar 32.00 0.0202%
5 Pek. Pemasangan pipa PVC tipe AW diameter 1/2", Setara Rucika 154.10 0.0357%
6 Pek. Sprinkler Taman Setara EECOO Sprinkler Air Taman 360 Derajat , 15.00 0.0518%
7 Digital Garden Timer Elektronik Automatic Garden Setara HANCI HCT-311, 1.00 0.0066%

IV.B.2. SEWAGE WATER INSTALATION SYSTEM


MAIN EQUIPMENT
BIO SEPTI TANK
1 Pek. Pemasangan Bio Septitank 5000L, 2.00 0.3345%
O.2.2. SEWAGE PIPE & SUPPORTING MATERIAL
1 Pek. Pemasangan Pipa PVC tipe AW Ø 6" (150 mm), Setara Rucika 209.30 0.6592%

IV.B.3. WASTE WATER INSTALLATION SYSTEM


1 Pek. Pemasangan Pipa PVC tipe AW Ø 4" (114 mm), Setara Rucika 287.50 0.5146%

IV.B.4. RAIN WATER INSTALLATION SYSTEM


1 Pek. Pemasangan Pipa PVC tipe AW Ø 4" (114 mm), Setara Rucika 227.70 0.4076%

IV.B.5. PEMASANGAN FIRE ALARM


1 Pek. Pemasangan Smoke Ditector, Setara Notifier 33.00 0.6502%
2 Pek. Instalasi Titik Smoke Ditector, 33.00 0.0715%
3 Pek. Pemasangan Fire Break Glass, Setara Notifier 2.00 0.0408%
4 Pek. Instalasi Titik Fire Break Glas, 2.00 0.0048%
5 Pek. Pemasangan MCFA, Setara GuardALL 2.00 0.0835%
6 Pek. Pemasangan TBFA, Setara Hooseki 2.00 0.0166%
7 Pek. Pemasangan Horn Strobe, Setara GuardALL 2.00 0.0311%
8 Pek. Instalasi Titik Horn Strobe, 2.00 0.0035%

IV.C MEKANIKAL
IV.C.1. AIR CONDITIONING
1 Pek. Pemasangan Stop Kontak AC, 36.00 0.0461%
2 Pek. Pemasangan AC Split 1 PK setara Daikin, 36.00 1.8797%
AC Single Installation
1 Pek. Pemasangan Pipa Refrigerant, 190.00 0.2605%
2 Pek. Pemasangan Pipa PVC tipe AW Ø 3/4 , Setara Rucika 288.00 0.0673%

IV.C.2. VENTILATION FAN


1 Pek. Pemasangan Axial Fan, Setara CKE 2.00 0.0899%
2 Pek. Instalasi Titik Axial Fan, 2.00 0.0035%
3 Pek. Pemasangan Pipa PVC tipe D Ø 4", 10.00 0.0082%
4 Pek. Instalasi Titik Exhaust Fan, 36.00 0.0625%
5 Pek. Pemasangan Pipa PVC tipe D Ø 4", 360.00 0.2940%

PROGRESS PLAN 100.0000% 0.4570% 1.0492% 0.6819% 1.9165% 2.0412% 2.4072% 3.4097% 1.4096% 1.7191% 1.4137% 0.5949% 0.7585% 0.5933% 0.6732% 0.1772% 0.9214% 2.0063% 2.8798% 1.6196% 0.8316% 0.5717% 0.5717% 0.3579% 0.2625% 0.2758% 0.0429% 0.0429% 0.1959% 0.1959% 0.1959% 0.0242% 0.0242%
ACCUMULATIVE PROGRESS PLAN 0.0000% 0.4570% 1.5062% 2.1881% 4.1045% 6.1457% 8.5529% 11.9626% 13.3723% 15.0913% 16.5051% 17.0999% 17.8584% 18.4517% 19.1249% 19.3021% 20.2236% 22.2298% 25.1096% 26.7293% 27.5609% 28.1326% 28.7043% 29.0622% 29.3247% 29.6005% 29.6434% 29.6862% 29.8822% 30.0781% 30.2740% 30.2982% 30.3224% E
ACTUAL PROGRESS N
ACCUMULATIVE ACTUAL PROGRESS (R0) 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% D
DEVIATION (+ / -) 0.457% 1.506% 2.188% 4.105% 6.146% 8.553% 11.963% 13.372% 15.091% 16.505% 17.100% 17.858% 18.452% 19.125% 19.302% 20.224% 22.230% 25.110% 26.729% 27.561% 28.133% 28.704% 29.062% 29.325% 29.601% 29.643% 29.686% 29.882% 30.078% 30.274% 30.298% 30.322%