Seven
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.3900 140,000.00 54,600.00
Tukang besi/las L.02 OH 0.7000 147,000.00 102,900.00
Kepala tukang L.03 OH 0.7000 160,000.00 112,000.00
Mandor L.04 OH 0.0070 170,000.00 1,190.00
B BAHAN
ACP PVDF 4 mm ex. SevenACP PVDF 4 mm ex. Seven m2 1.1000 420,500.00 462,550.00
Hollow Besi Galvanis Uk 4 x 4 x 1 mm btg 0.8000 115,000.00 92,000.00
Braket Siku / spigot / stiffener btg 0.2670 60,000.00 16,020.00
Paku Skrup Beton kg 0.0800 21,600.00 1,728.00
Paku Skrup kg 0.1100 21,600.00 2,376.00
Sealant tube 0.2500 25,000.00 6,250.00
JUMLAH HARGA BAHAN 580,924.00
C PERALATAN
Sewa Stager (2set) set 0.0200 110,000.00 2,200.00
Listrik Kerja ls 1.0000 5,000.00 5,000.00
Alat bantu lainnya ls 1.0000 10,000.00 10,000.00
JUMLAH HARGA PERALATAN 17,200.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.3500 140,000.00 49,000.00
Tukang L.02 OH 0.3500 147,000.00 51,450.00
Kepala tukang L.03 OH 0.0350 160,000.00 5,600.00
Mandor L.04 OH 0.0180 170,000.00 3,060.00
B BAHAN
Rangka metal hollow 40.40 M¹ 4.0000 28,750.00 115,000.00
Assesoris (perkuatan, las dll) Ls 100% x rangka 28,750.00 28,750.00
- -
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0200 140,000.00 2,800.00
Mandor L.04 OH 0.0100 170,000.00 1,700.00
B BAHAN
C PERALATAN
- -
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0400 140,000.00 5,600.00
Mandor L.04 OH 0.0200 170,000.00 3,400.00
B BAHAN
C PERALATAN
- -
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0200 140,000.00 2,800.00
Tukang L.02 OH 0.0500 147,000.00 7,350.00
Kepala Tukang L.03 OH 0.0050 160,000.00 800.00
Mandor L.04 OH 0.0010 170,000.00 170.00
B BAHAN
C PERALATAN
- -
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0400 140,000.00 5,600.00
Tukang L.02 OH 0.0500 147,000.00 7,350.00
Kepala Tukang L.03 OH 0.0050 160,000.00 800.00
Mandor L.04 OH 0.0010 160,000.00 160.00
B BAHAN
C PERALATAN
- -
- -
Karpet M² 55.00
Underlayer M² 55.10
Parquet kayu M² 55.20
Parquet gymfloor M² 55.30
Vynil Buah 55.40
Wallpaper M¹ 55.50
Floor harderner Kg 55.60
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 1.0000 140,000.00 140,000.00
Tukang kayu L.02 OH 2.0000 147,000.00 294,000.00
Kepala tukang L.03 OH 0.1000 160,000.00 16,000.00
Mandor L.04 OH 0.0500 170,000.00 8,500.00
B BAHAN
Bambu diameter 6-8/600 cm Batang 1.2500 1.00 1.25
Tali ijuk M³ 0.1860 2.00 0.37
C PERALATAN
- -
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0420 140,000.00 5,880.00
Tukang kayu L.02 OH 0.0040 147,000.00 588.00
Kepala tukang L.03 OH 0.0020 160,000.00 320.00
Mandor L.04 OH 0.0420 170,000.00 7,140.00
B BAHAN
Kawat jaring Lbr 0.1434 3.00 0.43
C PERALATAN
- -
- -
JUMLAH HARGA PERALATAN -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.3750 140,000.00 52,500.00
Tukang kayu L.02 OH 0.1250 147,000.00 18,375.00
Kepala tukang L.03 OH 0.0120 160,000.00 1,920.00
Mandor L.04 OH 0.0190 170,000.00 3,230.00
B BAHAN
Panel beton pracetak Lbr 0.9860 4.00 3.94
Kolom beton pracetak Batang 0.5250 5.00 2.63
Semen Portlan Kg 45.0000 6.00 270.00
Pasir Beton M³ 0.0740 6.40 0.47
Kerikil M³ 0.1460 8.00 1.17
C PERALATAN
- -
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.1500 140,000.00 21,000.00
Mandor L.04 OH 0.0150 170,000.00 2,550.00
B BAHAN
Ijuk Kg 6.0000 9.00 54.00
C PERALATAN
- -
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.7800 140,000.00 109,200.00
Tukang batu L.02 OH 0.3900 147,000.00 57,330.00
Kepala tukang L.03 OH 0.0390 160,000.00 6,240.00
Mandor L.04 OH 0.0390 170,000.00 6,630.00
B BAHAN
Batu belah M³ 1.2000 10.00 12.00
Pasir urug M³ 0.4320 6.60 2.85
C PERALATAN
- -
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 1.6500 140,000.00 231,000.00
Tukang batu L.02 OH 0.2750 147,000.00 40,425.00
Kepala tukang L.03 OH 0.0280 160,000.00 4,480.00
Mandor L.04 OH 0.0830 170,000.00 14,110.00
B BAHAN
Semen Portland Kg 247.0000 6.00 1,482.00
Pasir beton Kg 869.0000 6.40 5,561.60
Kerikil (Maks 30mm) Kg 999.0000 8.00 7,992.00
Air Liter 215.0000 12.00 2,580.00
C PERALATAN
- -
- -
JUMLAH HARGA PERALATAN -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 1.6500 140,000.00 231,000.00
Tukang batu L.02 OH 0.2750 147,000.00 40,425.00
Kepala tukang L.03 OH 0.0280 160,000.00 4,480.00
Mandor L.04 OH 0.0830 170,000.00 14,110.00
B BAHAN
Semen Portland Kg 276.0000 6.00 1,656.00
Pasir beton Kg 828.0000 6.40 5,299.20
Kerikil (Maks 30mm) Kg 1,012.0000 8.00 8,096.00
Air Liter 215.0000 12.00 2,580.00
C PERALATAN
- -
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 1.6500 140,000.00 231,000.00
Tukang batu L.02 OH 0.2750 147,000.00 40,425.00
Kepala tukang L.03 OH 0.0280 160,000.00 4,480.00
Mandor L.04 OH 0.0830 170,000.00 14,110.00
B BAHAN
Semen Portland Kg 299.0000 6.00 1,794.00
Pasir beton Kg 799.0000 6.40 5,113.60
Kerikil (Maks 30mm) Kg 1,017.0000 8.00 8,136.00
Air Liter 215.0000 12.00 2,580.00
C PERALATAN
- -
- -
JUMLAH HARGA PERALATAN -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 1.6500 140,000.00 231,000.00
Tukang batu L.02 OH 0.2750 147,000.00 40,425.00
Kepala tukang L.03 OH 0.0280 160,000.00 4,480.00
Mandor L.04 OH 0.0830 170,000.00 14,110.00
B BAHAN
Semen Portland Kg 326.0000 6.00 1,956.00
Pasir beton Kg 760.0000 6.40 4,864.00
Kerikil (Maks 30mm) Kg 1,029.0000 8.00 8,232.00
Air Liter 215.0000 12.00 2,580.00
C PERALATAN
- -
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 1.6500 140,000.00 231,000.00
Tukang batu L.02 OH 0.2750 147,000.00 40,425.00
Kepala tukang L.03 OH 0.0280 160,000.00 4,480.00
Mandor L.04 OH 0.0830 170,000.00 14,110.00
B BAHAN
Semen Portland Kg 352.0000 6.00 2,112.00
Pasir beton Kg 731.0000 6.40 4,678.40
Kerikil (Maks 30mm) Kg 1,031.0000 8.00 8,248.00
Air Liter 215.0000 12.00 2,580.00
C PERALATAN
- -
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 1.6500 140,000.00 231,000.00
Tukang batu L.02 OH 0.2750 147,000.00 40,425.00
Kepala tukang L.03 OH 0.0280 160,000.00 4,480.00
Mandor L.04 OH 0.0830 170,000.00 14,110.00
B BAHAN
Semen Portland Kg 371.0000 6.00 2,226.00
Pasir beton Kg 698.0000 6.40 4,467.20
Kerikil (Maks 30mm) Kg 1,047.0000 8.00 8,376.00
Air Liter 215.0000 12.00 2,580.00
C PERALATAN
- -
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 1.6500 140,000.00 231,000.00
Tukang batu L.02 OH 0.2750 147,000.00 40,425.00
Kepala tukang L.03 OH 0.0280 160,000.00 4,480.00
Mandor L.04 OH 0.0830 170,000.00 14,110.00
B BAHAN
Semen Portland Kg 384.0000 6.00 2,304.00
Pasir beton Kg 692.0000 6.40 4,428.80
Kerikil (Maks 30mm) Kg 1,039.0000 8.00 8,312.00
Air Liter 215.0000 12.00 2,580.00
C PERALATAN
- -
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 1.6500 140,000.00 231,000.00
Tukang batu L.02 OH 0.2750 147,000.00 40,425.00
Kepala tukang L.03 OH 0.0280 160,000.00 4,480.00
Mandor L.04 OH 0.0830 170,000.00 14,110.00
B BAHAN
Semen Portland Kg 406.0000 6.00 2,436.00
Pasir beton Kg 684.0000 6.40 4,377.60
Kerikil (Maks 30mm) Kg 1,026.0000 8.00 8,208.00
Air Liter 215.0000 12.00 2,580.00
C PERALATAN
- -
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 1.6500 140,000.00 231,000.00
Tukang batu L.02 OH 0.2750 147,000.00 40,425.00
Kepala tukang L.03 OH 0.0280 160,000.00 4,480.00
Mandor L.04 OH 0.0830 170,000.00 14,110.00
B BAHAN
Semen Portland Kg 413.0000 6.00 2,478.00
Pasir beton Kg 681.0000 6.40 4,358.40
Kerikil (Maks 30mm) Kg 1,021.0000 8.00 8,168.00
Air Liter 215.0000 12.00 2,580.00
C PERALATAN
- -
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 2.1000 140,000.00 294,000.00
Tukang batu L.02 OH 0.3500 147,000.00 51,450.00
Kepala tukang L.03 OH 0.0350 160,000.00 5,600.00
Mandor L.04 OH 0.1050 170,000.00 17,850.00
B BAHAN
Semen Portland Kg 400.0000 6.00 2,400.00
Pasir beton M³ 0.4800 6.40 3.07
Kerikil (Maks 30mm) M³ 0.8000 8.00 6.40
Strorox – 100 Kg 1.2000 13.00 15.60
Air Liter 210.0000 12.00 2,520.00
C PERALATAN
- -
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0025 140,000.00 350.00
Tukang besi L.02 OH 0.0025 147,000.00 367.50
Kepala tukang L.03 OH 0.0025 160,000.00 400.00
Mandor L.04 OH 0.0001 170,000.00 17.00
B BAHAN
Jaring Anyaman Tulangan Tunggal M6-M8 Kg 1.0200 14.00 14.28
Kawat benrad Kg 0.0050 15.00 0.08
C PERALATAN
- -
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.5200 140,000.00 72,800.00
Tukang kayu L.02 OH 0.2600 147,000.00 38,220.00
Kepala tukang L.03 OH 0.0260 160,000.00 4,160.00
Mandor L.04 OH 0.0260 170,000.00 4,420.00
B BAHAN
Papan Kayu kelas III M³ 0.0400 7.30 0.29
Paku 5 – 10 cm Kg 0.3000 18.00 5.40
Minyak bekisting Liter 0.1000 20.00 2.00
C PERALATAN
- -
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.5200 140,000.00 72,800.00
Tukang kayu L.02 OH 0.2600 147,000.00 38,220.00
Kepala tukang L.03 OH 0.0260 160,000.00 4,160.00
Mandor L.04 OH 0.0260 170,000.00 4,420.00
B BAHAN
Papan Kayu kelas III M³ 0.0450 7.30 0.33
Paku 5 – 10 cm Kg 0.3000 18.00 5.40
Minyak bekisting Liter 0.1000 20.00 2.00
C PERALATAN
- -
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.6600 140,000.00 92,400.00
Tukang kayu L.02 OH 0.3300 147,000.00 48,510.00
Kepala tukang L.03 OH 0.0330 160,000.00 5,280.00
Mandor L.04 OH 0.0330 170,000.00 5,610.00
B BAHAN
Papan Kayu kelas III M³ 0.0400 7.30 0.29
Paku 5 cm – 12 cm Kg 0.4000 18.00 7.20
Minyak bekisting Liter 0.2000 20.00 4.00
Balok kayu kelas II M³ 0.0150 16.00 0.24
Plywood tebal 9 mm Lbr 0.3500 21.00 7.35
Dolken kayu ø 8-10cm panjang 4 m Batang 2.0000 22.00 44.00
C PERALATAN
- -
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.6600 140,000.00 92,400.00
Tukang kayu L.02 OH 0.3300 147,000.00 48,510.00
Kepala tukang L.03 OH 0.0330 160,000.00 5,280.00
Mandor L.04 OH 0.0330 170,000.00 5,610.00
B BAHAN
Papan Kayu kelas III M³ 0.0400 7.30 0.29
Paku 5 cm – 12 cm Kg 0.4000 19.00 7.60
Minyak bekisting Liter 0.2000 20.00 4.00
Balok kayu kelas II M³ 0.0180 16.00 0.29
Plywood tebal 9 mm Lbr 0.3500 21.00 7.35
Dolken kayu ø 8-10cm panjang 4 m Batang 2.0000 22.00 44.00
C PERALATAN
- -
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.6600 140,000.00 92,400.00
Tukang kayu L.02 OH 0.3300 147,000.00 48,510.00
Kepala tukang L.03 OH 0.0330 160,000.00 5,280.00
Mandor L.04 OH 0.0330 170,000.00 5,610.00
B BAHAN
Papan Kayu kelas III M³ 0.0400 7.30 0.29
Paku 5 cm – 12 cm Kg 0.4000 19.00 7.60
Minyak bekisting Liter 0.2000 20.00 4.00
Balok kayu kelas II M³ 0.0150 16.00 0.24
Plywood tebal 9 mm Lbr 0.3500 21.00 7.35
Dolken kayu ø 8-10cm panjang 4 m Batang 6.0000 22.00 132.00
C PERALATAN
- -
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.6600 140,000.00 92,400.00
Tukang kayu L.02 OH 0.3300 147,000.00 48,510.00
Kepala tukang L.03 OH 0.0330 160,000.00 5,280.00
Mandor L.04 OH 0.0330 170,000.00 5,610.00
B BAHAN
Papan Kayu kelas III M³ 0.0300 7.30 0.22
Paku 5 cm – 12 cm Kg 0.4000 19.00 7.60
Minyak bekisting Liter 0.2000 20.00 4.00
Balok kayu kelas II M³ 0.0200 16.00 0.32
Plywood tebal 9 mm Lbr 0.3500 21.00 7.35
Dolken kayu ø 8-10cm panjang 4 m Batang 3.0000 22.00 66.00
Penjaga jarak bekisting/spacer Buah 4.0000 23.00 92.00
C PERALATAN
- -
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.6600 140,000.00 92,400.00
Tukang kayu L.02 OH 0.3300 147,000.00 48,510.00
Kepala tukang L.03 OH 0.0330 160,000.00 5,280.00
Mandor L.04 OH 0.0330 170,000.00 5,610.00
B BAHAN
Papan Kayu kelas III M³ 0.0300 7.30 0.22
Paku 5 cm – 12 cm Kg 0.4000 19.00 7.60
Minyak bekisting Liter 0.1500 20.00 3.00
Balok kayu kelas II M³ 0.0150 16.00 0.24
Plywood tebal 9 mm Lbr 0.3500 21.00 7.35
Dolken kayu ø 8-10cm panjang 4 m Batang 2.0000 22.00 44.00
C PERALATAN
- -
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.1500 140,000.00 21,000.00
Tukang kayu L.02 OH 0.0500 147,000.00 7,350.00
Kepala tukang L.03 OH 0.0050 160,000.00 800.00
Mandor L.04 OH 0.0080 170,000.00 1,360.00
B BAHAN
Papan Kayu kelas III M³ 0.0264 7.30 0.19
Paku 5 cm – 12 cm Kg 0.6000 19.00 11.40
Dolken kayu ø 8-10cm panjang 4 m Batang 0.5000 22.00 11.00
C PERALATAN
- -
- -
A.4.1.2.5. Pembuatan 1 m2 Bekisting untuk Pelat Beton Pracetak Komponen Modular Bangunan Gedung ( 5 kali pakai)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0070 140,000.00 980.00
Tukang kayu L.02 OH 0.0760 147,000.00 11,172.00
Kepala tukang L.03 OH 0.0080 160,000.00 1,280.00
Mandor L.04 OH 0.0010 170,000.00 170.00
B BAHAN
Lantai kerja t=10cm M³ 0.0080 338,411.70 2,707.29
Besi hollow (50 x 50 x 3) mm Kg 9.3940 25.00 234.85
Kayu kaso 5/7 (lebar 5 cm, tinggi 7 cm) M³ 0.0050 24.00 0.12
Phenol film 12mm Lbr 0.0800 26.00 2.08
Minyak cetakan (bekisting) Liter 0.2000 27.00 5.40
Dinabolt Ø 12mm (10 s.d.15cm) Buah 3.8820 28.00 108.70
C PERALATAN
- -
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0040 140,000.00 560.00
Tukang kayu L.02 OH 0.0380 147,000.00 5,586.00
Kepala tukang L.03 OH 0.0040 160,000.00 640.00
Mandor L.04 OH 0.0010 170,000.00 170.00
B BAHAN
Kayu kaso 5/7 (lebar 5 cm, tinggi 7 cm) M³ 0.0050 24.00 0.12
Phenol film 12mm Lbr 0.0430 26.00 1.12
Minyak cetakan (bekisting) Liter 0.2000 27.00 5.40
Paku (5 s.d.7) cm Kg 0.0460 18.00 0.83
Dinabolt Ø12mm (10 s.d.15cm) Buah 0.6930 28.00 19.40
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0040 140,000.00 560.00
Tukang kayu L.02 OH 0.0380 147,000.00 5,586.00
Kepala tukang L.03 OH 0.0040 160,000.00 640.00
Mandor L.04 OH 0.0010 170,000.00 170.00
B BAHAN
Kayu kaso 5/7 (lebar 5 cm, tinggi 7 cm) M³ 0.0040 24.00 0.10
Phenol film 12mm Lbr 0.0480 26.00 1.25
Minyak cetakan (bekisting) Liter 0.2000 27.00 5.40
Paku (5 s.d.7) cm Kg 0.0460 18.00 0.83
Dinabolt Ø12mm (10 s.d.15cm) Buah 0.6930 28.00 19.40
C PERALATAN
- -
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0530 140,000.00 7,420.00
Tukang kayu L.02 OH 0.0180 147,000.00 2,646.00
Mandor L.04 OH 0.0050 170,000.00 850.00
B BAHAN
- -
C PERALATAN
- -
JUMLAH HARGA BAHAN -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0890 140,000.00 12,460.00
Tukang kayu L.02 OH 0.0300 147,000.00 4,410.00
Mandor L.04 OH 0.0050 170,000.00 850.00
B BAHAN
- -
C PERALATAN
- -
JUMLAH HARGA PERALATAN -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0710 140,000.00 9,940.00
Tukang kayu L.02 OH 0.0240 147,000.00 3,528.00
Mandor L.04 OH 0.0050 170,000.00 850.00
B BAHAN
- -
C PERALATAN
- -
JUMLAH HARGA PERALATAN -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0640 140,000.00 8,960.00
Tukang batu L.02 OH 0.2440 147,000.00 35,868.00
Tukang vibrator L.02 OH 0.1280 147,000.00 18,816.00
Kepala tukang L.03 OH 0.0340 160,000.00 5,440.00
Mandor L.04 OH 0.0730 170,000.00 12,410.00
B BAHAN
- -
C PERALATAN
- -
JUMLAH HARGA PERALATAN -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0690 140,000.00 9,660.00
Tukang batu L.02 OH 0.2420 147,000.00 35,574.00
Tukang vibrator L.02 OH 0.1380 147,000.00 20,286.00
Kepala tukang L.03 OH 0.0370 160,000.00 5,920.00
Mandor L.04 OH 0.0730 170,000.00 12,410.00
B BAHAN
- -
C PERALATAN
- -
JUMLAH HARGA PERALATAN -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0610 140,000.00 8,540.00
Tukang batu L.02 OH 0.2130 147,000.00 31,311.00
Tukang vibrator L.02 OH 0.1220 147,000.00 17,934.00
Kepala tukang L.03 OH 0.0330 160,000.00 5,280.00
Mandor L.04 OH 0.0730 170,000.00 12,410.00
B BAHAN
- -
C PERALATAN
- -
JUMLAH HARGA PERALATAN -
B BAHAN
- -
C PERALATAN
Sewa crane unit hari 0.0670 250,000.00 16,750.00
Sewa pipe support buah hari 1.1000 200,000.00 220,000.00
B BAHAN
- -
C PERALATAN
Sewa crane unit hari 0.0610 250,000.00 15,250.00
Sewa pipe support buah hari 1.1000 200,000.00 220,000.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0190 140,000.00 2,660.00
Tukang batu L.02 OH 0.0380 147,000.00 5,586.00
B BAHAN
- -
C PERALATAN
Sewa crane unit hari 0.0190 250,000.00 4,750.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0190 140,000.00 2,660.00
Tukang batu L.02 OH 0.0380 147,000.00 5,586.00
B BAHAN
- -
C PERALATAN
Sewa crane unit hari 0.0190 250,000.00 4,750.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0190 140,000.00 2,660.00
Tukang batu L.02 OH 0.0380 147,000.00 5,586.00
B BAHAN
- -
C PERALATAN
Sewa crane unit hari 0.0190 250,000.00 4,750.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Tukang batu L.02 OH 0.3670 147,000.00 53,949.00
Kepala tukang L.03 OH 0.0740 160,000.00 11,840.00
Mandor L.04 OH 0.0370 170,000.00 6,290.00
B BAHAN
- -
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.1470 140,000.00 20,580.00
Tukang kayu L.02 OH 0.1470 147,000.00 21,609.00
Kepala tukang L.03 OH 0.0150 160,000.00 2,400.00
Mandor L.04 OH 0.0050 170,000.00 850.00
B BAHAN
Kayu kaso 5/7 (lebar 5 cm, tinggi 7 cm) M³ 0.0120 24.00 0.29
Papan cor M³ 0.0040 7.30 0.03
Paku (5 s.d.7) cm Kg 0.2640 18.00 4.75
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.2200 140,000.00 30,800.00
Tukang kayu L.02 OH 0.0220 147,000.00 3,234.00
Kepala tukang L.03 OH 0.2200 160,000.00 35,200.00
Mandor L.04 OH 0.0110 170,000.00 1,870.00
B BAHAN
- -
- -
- -
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0600 140,000.00 8,400.00
Tukang las konstruksi L.02 OH 0.0600 147,000.00 8,820.00
Kepala tukang L.03 OH 0.0060 160,000.00 960.00
Mandor L.04 OH 0.0030 170,000.00 510.00
Pekerja L.01 OH 0.0600 140,000.00 8,400.00
B BAHAN
Baja Profil Kg 1.1500 29.00 33.35
Kawat las - -
- -
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 1.2000 140,000.00 168,000.00
Tukang las biasa L.02 OH 1.2000 147,000.00 176,400.00
Kepala tukang L.03 OH 0.1200 160,000.00 19,200.00
Mandor L.04 OH 0.0060 170,000.00 1,020.00
B BAHAN
Pintu gulung besi M² 1.0000 30.00 30.00
- -
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 1.0000 140,000.00 140,000.00
Tukang khusus aluminium L.02 OH 1.0000 147,000.00 147,000.00
Kepala tukang L.03 OH 0.1000 160,000.00 16,000.00
Mandor L.04 OH 0.0500 170,000.00 8,500.00
B BAHAN
Rolling door aluminium M² 1.0000 32.00 32.00
- -
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.4400 140,000.00 61,600.00
Tukang L.02 OH 0.4400 147,000.00 64,680.00
Kepala tukang L.03 OH 0.0440 160,000.00 7,040.00
Mandor L.04 OH 0.0220 170,000.00 3,740.00
B BAHAN
Pintu lipat M² 1.0000 33.00 33.00
- -
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0800 140,000.00 11,200.00
Tukang L.02 OH 0.8000 147,000.00 117,600.00
Kepala tukang L.03 OH 0.0800 160,000.00 12,800.00
Mandor L.04 OH 0.0040 170,000.00 680.00
B BAHAN
Sunscreen aluminium M² 1.0000 34.00 34.00
- -
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 1.6700 140,000.00 233,800.00
Tukang L.02 OH 1.6700 147,000.00 245,490.00
Kepala tukang L.03 OH 0.1670 160,000.00 26,720.00
Mandor L.04 OH 0.0830 147,000.00 12,201.00
B BAHAN
Besi strip Kg 6.1770 35.00 216.20
Pengelasan Cm 27.0800 36.00 974.88
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.1000 140,000.00 14,000.00
Tukang L.02 OH 0.1000 147,000.00 14,700.00
Kepala tukang L.03 OH 0.0100 160,000.00 1,600.00
Mandor L.04 OH 0.0050 170,000.00 850.00
B BAHAN
Kawat nyamuk M² 1.1000 37.00 40.70
Pengelasan Cm 11.1100 36.00 399.96
Baja strip (0,2 x 2) cm Kg 1.7160 38.00 65.21
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.2000 140,000.00 28,000.00
Tukang L.02 OH 0.2000 147,000.00 29,400.00
Kepala tukang L.03 OH 0.0200 160,000.00 3,200.00
Mandor L.04 OH 0.0010 170,000.00 170.00
B BAHAN
Jendela nako (rangka + kaca 5 mm, lebar 15 cm) M² 1.1000 39.00 42.90
Paku skrup 1 cm – 2,5 cm Bh 10.0000 40.00 400.00
Besi strip M¹ 7.0000 41.00 287.00
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.2000 140,000.00 28,000.00
Tukang L.02 OH 0.2000 147,000.00 29,400.00
Kepala tukang L.03 OH 0.0200 160,000.00 3,200.00
Mandor L.04 OH 0.0010 170,000.00 170.00
B BAHAN
Seng pelat M¹ 1.0500 42.00 44.10
Paku skrup 1 cm – 2,5 cm Kg 0.0150 40.00 0.60
Papan kayu kelas II atau III M³ 0.0190 7.30 0.14
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.1500 140,000.00 21,000.00
Tukang L.02 OH 0.3000 147,000.00 44,100.00
Kepala tukang L.03 OH 0.0300 160,000.00 4,800.00
Mandor L.04 OH 0.0080 170,000.00 1,360.00
B BAHAN
Seng pelat M¹ 1.0500 42.00 44.10
Paku skrup 1 cm – 2,5 cm Kg 0.0100 40.00 0.40
Besi strip Kg 0.5000 41.00 20.50
C PERALATAN
- -
A.4.2.1.20. Pemasangan 1 m2 Rangka Besi Hollow Galvanis 40.40 mm, Modul 60 x 120 cm, untuk Partisi
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.2500 140,000.00 35,000.00
Tukang L.02 OH 0.2500 147,000.00 36,750.00
Kepala tukang L.03 OH 0.0250 160,000.00 4,000.00
Mandor L.04 OH 0.0130 170,000.00 2,210.00
B BAHAN
Seng pelat M¹ 3,500.0000 42.00 147,000.00
Paku skrup 1 cm – 2,5 cm Ls 100% x rangka 40.00 42.00
- -
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.3500 140,000.00 49,000.00
Tukang L.02 OH 0.3500 147,000.00 51,450.00
Kepala tukang L.03 OH 0.0350 160,000.00 5,600.00
Mandor L.04 OH 0.0180 170,000.00 3,060.00
B BAHAN
Rangka metal hollow 40.40 M¹ 4.0000 28,750.00 115,000.00
Assesoris (perkuatan, las dll) Ls 100% x rangka 28,750.00 28,750.00
- -
C PERALATAN
- -
A.4.2.1.22. Pemasangan 1 m2 Atap Pelana Rangka Atap Baja Ringan (Canai Dingin) profil C75
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.7340 140,000.00 102,760.00
Tukang besi L.02 OH 0.7340 147,000.00 107,898.00
Kepala tukang L.03 OH 0.0730 160,000.00 11,680.00
Mandor L.04 OH 0.0370 170,000.00 6,290.00
B BAHAN
Rangka metal hollow 40.40 Btg 0.8730 28,750.00 25,098.75
Assesoris (perkuatan, las dll) Ls 100% x rangka 28,750.00 28,750.00
- -
C PERALATAN
Aksesoris % (bahan) 10.0000 5,384.88 5,384.88
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.7604 140,000.00 106,456.00
Tukang besi L.02 OH 0.7604 147,000.00 111,778.80
Kepala tukang L.03 OH 0.0760 160,000.00 12,160.00
Mandor L.04 OH 0.0380 170,000.00 6,460.00
B BAHAN
Baja ringan canai dingin C75 Btg 0.8730 44.00 38.41
- -
C PERALATAN
Aksesoris % (bahan) 10.0000 3.84 3.84
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0430 140,000.00 6,020.00
Tukang khusus aluminium L.02 OH 0.0430 147,000.00 6,321.00
Kepala tukang L.03 OH 0.0043 160,000.00 688.00
Mandor L.04 OH 0.0021 170,000.00 357.00
B BAHAN
Profil aluminium 4 inch M¹ 1.1000 45.00 49.50
Skrup fixer Buah 2.0000 46.00 92.00
Sealant Tube 0.0600 47.00 2.82
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0850 140,000.00 11,900.00
Tukang khusus aluminium L.02 OH 0.0850 147,000.00 12,495.00
Kepala tukang L.03 OH 0.0085 160,000.00 1,360.00
Mandor L.04 OH 0.0042 170,000.00 714.00
B BAHAN
Profil aluminium M¹ 4.4000 45.00 198.00
Aluminium strip M¹ 14.6000 48.00 700.80
- -
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0850 140,000.00 11,900.00
Tukang aluminium/kaca L.02 OH 0.0850 147,000.00 12,495.00
Kepala tukang L.03 OH 0.0090 160,000.00 1,440.00
Mandor L.04 OH 0.0050 170,000.00 850.00
B BAHAN
Pintu aluminium M¹ 4.4000 49.00 215.60
Profil kaca M¹ 4.5000 50.00 225.00
Sealant Tube 0.2700 51.00 13.77
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.3500 140,000.00 49,000.00
Tukang L.02 OH 0.3500 147,000.00 51,450.00
Kepala tukang L.03 OH 0.0350 160,000.00 5,600.00
Mandor L.04 OH 0.0180 170,000.00 3,060.00
B BAHAN
Venetions blinds dan vertical blinds (tirai) M² 1.0000 52.00 52.00
- -
- -
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.6000 140,000.00 84,000.00
Tukang batu L.02 OH 0.2000 147,000.00 29,400.00
Kepala tukang L.03 OH 0.0200 160,000.00 3,200.00
Mandor L.04 OH 0.0300 170,000.00 5,100.00
B BAHAN
Bata merah Buah 140.0000 5.50 770.00
Semen Portland Kg 43.5000 6.00 261.00
Pasir pasang M³ 0.0800 6.50 0.52
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.6000 140,000.00 84,000.00
Tukang batu L.02 OH 0.2000 147,000.00 29,400.00
Kepala tukang L.03 OH 0.0200 160,000.00 3,200.00
Mandor L.04 OH 0.0300 170,000.00 5,100.00
B BAHAN
Bata merah Buah 140.0000 5.50 770.00
Semen Portland Kg 32.9500 6.00 197.70
Pasir pasang M³ 0.0910 6.50 0.59
C PERALATAN
- -
A.4.4.1.3. Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal 1 Batu dengan Mortar tipe N,fc’ 5,2 Mpa ( Setara Campuran 1SP : 4PP)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.6000 140,000.00 84,000.00
Tukang batu L.02 OH 0.2000 147,000.00 29,400.00
Kepala tukang L.03 OH 0.0200 160,000.00 3,200.00
Mandor L.04 OH 0.0300 170,000.00 5,100.00
B BAHAN
Bata merah Buah 140.0000 5.50 770.00
Semen Portland Kg 26.5500 6.00 159.30
Pasir pasang M³ 0.0930 6.50 0.60
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.6000 140,000.00 84,000.00
Tukang batu L.02 OH 0.2000 147,000.00 29,400.00
Kepala tukang L.03 OH 0.0200 160,000.00 3,200.00
Mandor L.04 OH 0.0300 170,000.00 5,100.00
B BAHAN
Bata merah Buah 140.0000 5.50 770.00
Semen Portland Kg 22.2000 6.00 133.20
Pasir pasang M³ 0.1020 6.50 0.66
C PERALATAN
- -
A.4.4.1.5 Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal 1 batu Campuran 1SP : 6PP
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.6000 140,000.00 84,000.00
Tukang batu L.02 OH 0.2000 147,000.00 29,400.00
Kepala tukang L.03 OH 0.0200 160,000.00 3,200.00
Mandor L.04 OH 0.0300 170,000.00 5,100.00
B BAHAN
Bata merah Buah 140.0000 5.50 770.00
Semen Portland Kg 18.5000 6.00 111.00
Pasir pasang M³ 0.1220 6.50 0.79
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.3000 140,000.00 42,000.00
Tukang batu L.02 OH 0.1000 147,000.00 14,700.00
Kepala tukang L.03 OH 0.0100 160,000.00 1,600.00
Mandor L.04 OH 0.0150 170,000.00 2,550.00
B BAHAN
Bata merah Buah 70.0000 5.50 385.00
Semen Portland Kg 18.9500 6.00 113.70
Pasir pasang M³ 0.0380 6.50 0.25
C PERALATAN
- -
A.4.4.1.8 Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal ½ Batu dengan Mortar tipe S, fc’ 12, 5 Mpa ( Setara Campuran 1SP : 3PP).
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.3000 140,000.00 42,000.00
Tukang batu L.02 OH 0.1000 147,000.00 14,700.00
Kepala tukang L.03 OH 0.0100 160,000.00 1,600.00
Mandor L.04 OH 0.0150 170,000.00 2,550.00
B BAHAN
Bata merah Buah 70.0000 5.50 385.00
Semen Portland Kg 14.3700 6.00 86.22
Pasir pasang M³ 0.0400 6.50 0.26
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.3000 140,000.00 42,000.00
Tukang batu L.02 OH 0.1000 147,000.00 14,700.00
Kepala tukang L.03 OH 0.0100 160,000.00 1,600.00
Mandor L.04 OH 0.0150 170,000.00 2,550.00
B BAHAN
Bata merah Buah 70.0000 5.50 385.00
Semen Portland Kg 11.5000 6.00 69.00
Pasir pasang M³ 0.0430 6.50 0.28
C PERALATAN
- -
A.4.4.1.10 Pemasangan 1m2 Dinding Bata Merah (5x11x22)cm Tebal ½ Batu dengan Mortar tipe O, fc’ 2,4 Mpa ( Setara Campuran 1SP : 5PP)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.3000 140,000.00 42,000.00
Tukang batu L.02 OH 0.1000 147,000.00 14,700.00
Kepala tukang L.03 OH 0.0100 160,000.00 1,600.00
Mandor L.04 OH 0.0150 170,000.00 2,550.00
B BAHAN
Bata merah Buah 70.0000 5.50 385.00
Semen Portland Kg 9.6800 6.00 58.08
Pasir pasang M³ 0.0450 6.50 0.29
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.3000 140,000.00 42,000.00
Tukang batu L.02 OH 0.1000 147,000.00 14,700.00
Kepala tukang L.03 OH 0.0100 160,000.00 1,600.00
Mandor L.04 OH 0.0150 170,000.00 2,550.00
B BAHAN
Bata merah Buah 70.0000 5.50 385.00
Semen Portland Kg 8.3200 6.00 49.92
Pasir pasang M³ 0.0490 6.50 0.32
C PERALATAN
- -
A.4.4.1.16. Pemasangan 1m2 Dinding Conblock HB20 dengan Mortar Tipe S,fc’ 12, 5 Mpa ( Setara Campuran 1SP : 3PP)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.3500 140,000.00 49,000.00
Tukang batu L.02 OH 0.1500 147,000.00 22,050.00
Kepala tukang L.03 OH 0.0150 160,000.00 2,400.00
Mandor L.04 OH 0.0180 170,000.00 3,060.00
B BAHAN
HB-20 Buah 12.5000 41.50 518.75
Semen Portland Kg 30.3200 6.00 181.92
Pasir pasang M³ 0.7280 6.50 4.73
Besi angker diameter 8 Kg 0.2800 41.60 11.65
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.3500 140,000.00 49,000.00
Tukang batu L.02 OH 0.1500 147,000.00 22,050.00
Kepala tukang L.03 OH 0.0150 160,000.00 2,400.00
Mandor L.04 OH 0.0180 170,000.00 3,060.00
B BAHAN
HB-20 Buah 12.5000 41.50 518.75
Semen Portland Kg 24.2600 6.00 145.56
Pasir pasang M³ 0.7720 6.50 5.02
Besi angker diameter 8 Kg 0.2800 41.60 11.65
C PERALATAN
- -
A.4.4.1.18. Pemasangan 1m2 Dinding Conblock HB15 dengan Mortar Tipe S, fc’ 12, 5 Mpa ( Setara Campuran 1SP : 3PP)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.3200 140,000.00 44,800.00
Tukang batu L.02 OH 0.1200 147,000.00 17,640.00
Kepala tukang L.03 OH 0.0120 160,000.00 1,920.00
Mandor L.04 OH 0.0160 170,000.00 2,720.00
B BAHAN
HB-20 Buah 12.5000 41.50 518.75
Semen Portland Kg 22.7400 6.00 136.44
Pasir pasang M³ 0.5500 6.50 3.58
Besi angker diameter 8 Kg 0.2800 41.60 11.65
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.3200 140,000.00 44,800.00
Tukang batu L.02 OH 0.1200 147,000.00 17,640.00
Kepala tukang L.03 OH 0.0120 160,000.00 1,920.00
Mandor L.04 OH 0.0160 170,000.00 2,720.00
B BAHAN
HB-20 Buah 12.5000 41.50 518.75
Semen Portland Kg 18.2000 6.00 109.20
Pasir pasang M³ 0.5820 6.50 3.78
Besi angker diameter 8 Kg 0.2800 41.60 11.65
C PERALATAN
- -
A.4.4.1.20. Pemasangan 1 m2 Dinding Conblock HB10 dengan Mortar Tipe S, fc’ 12, 5 Mpa ( Setara Campuran 1SP : 3PP)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.3000 140,000.00 42,000.00
Tukang batu L.02 OH 0.1000 147,000.00 14,700.00
Kepala tukang L.03 OH 0.0100 160,000.00 1,600.00
Mandor L.04 OH 0.0150 170,000.00 2,550.00
B BAHAN
HB-20 Buah 12.5000 41.50 518.75
Semen Portland Kg 15.1600 6.00 90.96
Pasir pasang M³ 0.3640 6.50 2.37
Besi angker diameter 8 Kg 0.2800 41.60 11.65
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.3000 140,000.00 42,000.00
Tukang batu L.02 OH 0.1000 147,000.00 14,700.00
Kepala tukang L.03 OH 0.0100 160,000.00 1,600.00
Mandor L.04 OH 0.0150 170,000.00 2,550.00
B BAHAN
HB-20 Buah 12.5000 41.50 518.75
Semen Portland Kg 12.1300 6.00 72.78
Pasir pasang M³ 0.3880 6.50 2.52
Besi angker diameter 8 Kg 0.2800 41.60 11.65
C PERALATAN
- -
A.4.4.1.22. Pemasangan 1 m2 Dinding Terawang (rooster) 12x11x24 dengan Mortar Tipe S,fc’ 12, 5 Mpa ( Setara Campuran 1SP : 3PP)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.3000 140,000.00 42,000.00
Tukang batu L.02 OH 0.1000 147,000.00 14,700.00
Kepala tukang L.03 OH 0.0100 160,000.00 1,600.00
Mandor L.04 OH 0.0150 170,000.00 2,550.00
B BAHAN
Bata rooster Buah 30.0000 5.60 168.00
Semen Portland Kg 11.0000 6.00 66.00
Pasir pasang M³ 0.0350 6.50 0.23
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.3000 140,000.00 42,000.00
Tukang batu L.02 OH 0.1000 147,000.00 14,700.00
Kepala tukang L.03 OH 0.0100 160,000.00 1,600.00
Mandor L.04 OH 0.0150 170,000.00 2,550.00
B BAHAN
Bata Terawang Buah 30.0000 5.70 171.00
Semen Portland Kg 11.0000 6.00 66.00
Pasir pasang M³ 0.0350 6.50 0.23
C PERALATAN
- -
A.4.4.1.24. Pemasangan 1 m2 Dinding bata Berongga Ekspose 12x11x24 dengan Mortar Tipe S,fc’ 12, 5 Mpa ( Setara Campuran 1SP : 3PP)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.3000 140,000.00 42,000.00
Tukang batu L.02 OH 0.1500 147,000.00 22,050.00
Kepala tukang L.03 OH 0.0150 160,000.00 2,400.00
Mandor L.04 OH 0.0150 170,000.00 2,550.00
B BAHAN
Bata Berongga Buah 70.0000 5.80 406.00
Semen Portland Kg 14.0000 6.00 84.00
Pasir pasang M³ 0.0320 6.50 0.21
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.6700 140,000.00 93,800.00
Tukang batu L.02 OH 0.1300 147,000.00 19,110.00
Kepala tukang L.03 OH 0.0130 160,000.00 2,080.00
Mandor L.04 OH 0.0030 170,000.00 510.00
B BAHAN
Bata ringan tebal 7,5cm Buah 8.4000 5.90 49.56
Mortar Siap Pakai (semen instan) Kg 0.4730 5.10 2.41
C PERALATAN
Peralatan
% (bahan) 10.0000 5.20 5.20
A.4.4.1.26. Pemasangan 1m2 Dinding Bata Ringan Tebal 10cm dengan Mortar Siap Pakai
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.6710 140,000.00 93,940.00
Tukang batu L.02 OH 0.1300 147,000.00 19,110.00
Kepala tukang L.03 OH 0.0130 160,000.00 2,080.00
Mandor L.04 OH 0.0030 170,000.00 510.00
B BAHAN
Bata ringan tebal 10cm Buah 8.4000 5.95 49.98
Mortar Siap Pakai (semen instan) Kg 0.0630 5.10 0.32
C PERALATAN
Peralatan
% (bahan) 10.0000 5.03 5.03
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.1500 140,000.00 21,000.00
Tukang batu L.02 OH 0.0750 147,000.00 11,025.00
Kepala tukang L.03 OH 0.0080 160,000.00 1,280.00
Mandor L.04 OH 0.0080 170,000.00 1,360.00
B BAHAN
Semen Portlan Kg 5.1840 6.00 31.10
Pasir Pasang M³ 0.0260 6.50 0.17
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0800 140,000.00 11,200.00
Tukang batu L.02 OH 0.4000 147,000.00 58,800.00
Kepala tukang L.03 OH 0.0400 160,000.00 6,400.00
Mandor L.04 OH 0.0040 170,000.00 680.00
B BAHAN
Semen Portlan Kg 0.5000 6.00 3.00
Pasir Pasang M³ 0.0130 6.50 0.08
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.4500 140,000.00 63,000.00
Tukang batu L.02 OH 0.2250 147,000.00 33,075.00
Kepala tukang L.03 OH 0.0230 160,000.00 3,680.00
Mandor L.04 OH 0.0230 170,000.00 3,910.00
B BAHAN
Semen Portlan Kg 10.0000 6.00 60.00
Serbuk Batu granit Kg 15.0000 7.50 112.50
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.4500 140,000.00 63,000.00
Tukang batu L.02 OH 0.2250 147,000.00 33,075.00
Kepala tukang L.03 OH 0.0230 160,000.00 3,680.00
Mandor L.04 OH 0.0230 170,000.00 3,910.00
B BAHAN
Semen Portlan Kg 10.0000 6.00 60.00
Serbuk Batu Traso Kg 15.0000 7.40 111.00
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.3000 140,000.00 42,000.00
Tukang batu L.02 OH 0.1000 147,000.00 14,700.00
Kepala tukang L.03 OH 0.0100 160,000.00 1,600.00
Mandor L.04 OH 0.0150 170,000.00 2,550.00
B BAHAN
Semen Portlan Kg 4.3200 6.00 25.92
Pasir Pasang Kg 0.0060 6.50 0.04
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.1500 140,000.00 21,000.00
Tukang batu L.02 OH 0.0750 147,000.00 11,025.00
Kepala tukang L.03 OH 0.0080 160,000.00 1,280.00
Mandor L.04 OH 0.0080 170,000.00 1,360.00
B BAHAN
Semen Portlan Kg 3.1080 6.00 18.65
- -
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0700 140,000.00 9,800.00
Tukang batu L.02 OH 0.0350 147,000.00 5,145.00
Kepala tukang L.03 OH 0.0040 160,000.00 640.00
Mandor L.04 OH 0.0040 170,000.00 680.00
B BAHAN
Semen Portlan Kg 1.6000 6.00 9.60
- -
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.3000 140,000.00 42,000.00
Tukang batu L.02 OH 0.1500 147,000.00 22,050.00
Kepala tukang L.03 OH 0.0150 160,000.00 2,400.00
Mandor L.04 OH 0.0150 170,000.00 2,550.00
B BAHAN
Semen Portlan Kg 6.3400 6.00 38.04
Pasir Pasang M³ 0.0120 6.50 0.08
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.3000 140,000.00 42,000.00
Tukang batu L.02 OH 0.1500 147,000.00 22,050.00
Kepala tukang L.03 OH 0.0150 160,000.00 2,400.00
Mandor L.04 OH 0.0150 170,000.00 2,550.00
B BAHAN
Semen Portlan Kg 6.3400 6.00 38.04
Pasir Pasang M³ 0.0120 6.50 0.08
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.2500 140,000.00 35,000.00
Tukang batu L.02 OH 0.1250 147,000.00 18,375.00
Kepala tukang L.03 OH 0.0130 160,000.00 2,080.00
Mandor L.04 OH 0.0130 170,000.00 2,210.00
B BAHAN
Ubin Abu-abu Buah 6.6300 53.00 351.39
Semen Portlan Kg 9.8000 6.00 58.80
Pasir Pasang M³ 0.0450 6.50 0.29
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.2500 140,000.00 35,000.00
Tukang batu L.02 OH 0.1250 147,000.00 18,375.00
Kepala tukang L.03 OH 0.0130 160,000.00 2,080.00
Mandor L.04 OH 0.0130 170,000.00 2,210.00
B BAHAN
Ubin Abu-abu Buah 11.8700 53.00 629.11
Semen Portlan Kg 10.0000 6.00 60.00
Pasir Pasang M³ 0.0450 6.50 0.29
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.2700 140,000.00 37,800.00
Tukang batu L.02 OH 0.1350 147,000.00 19,845.00
Kepala tukang L.03 OH 0.0140 160,000.00 2,240.00
Mandor L.04 OH 0.0140 170,000.00 2,380.00
B BAHAN
Ubin Abu-abu Buah 26.5000 53.00 1,404.50
Semen Portlan Kg 10.4000 6.00 62.40
Pasir Pasang M³ 0.0450 6.50 0.29
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.2600 140,000.00 36,400.00
Tukang batu L.02 OH 0.1300 147,000.00 19,110.00
Kepala tukang L.03 OH 0.0130 160,000.00 2,080.00
Mandor L.04 OH 0.0130 170,000.00 2,210.00
B BAHAN
Ubin Abu-abu Buah 11.8700 53.00 629.11
Semen Portlan Kg 10.0000 6.00 60.00
Semen Warna Kg 0.6000 6.10 3.66
Pasir Pasang M³ 0.0450 6.50 0.29
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.2700 140,000.00 37,800.00
Tukang batu L.02 OH 0.1350 147,000.00 19,845.00
Kepala tukang L.03 OH 0.0140 160,000.00 2,240.00
Mandor L.04 OH 0.0140 170,000.00 2,380.00
B BAHAN
Ubin Abu-abu Buah 26.5000 53.00 1,404.50
Semen Portlan Kg 10.4000 6.00 62.40
Semen Warna Kg 1.0000 6.10 6.10
Pasir Pasang M³ 0.0450 6.50 0.29
C PERALATAN
- -
JUMLAH HARGA PERALATAN -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.2500 140,000.00 35,000.00
Tukang batu L.02 OH 0.1250 147,000.00 18,375.00
Kepala tukang L.03 OH 0.0130 160,000.00 2,080.00
Mandor L.04 OH 0.0130 170,000.00 2,210.00
B BAHAN
Ubin Teraso Buah 6.6300 53.10 352.05
Semen Portlan Kg 9.8000 6.00 58.80
Semen Warna Kg 1.3000 6.10 7.93
Pasir Pasang M³ 0.0450 6.50 0.29
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.2600 140,000.00 36,400.00
Tukang batu L.02 OH 0.1300 147,000.00 19,110.00
Kepala tukang L.03 OH 0.0130 160,000.00 2,080.00
Mandor L.04 OH 0.0130 170,000.00 2,210.00
B BAHAN
Ubin Teraso Buah 11.8700 53.10 630.30
Semen Portlan Kg 10.0000 6.00 60.00
Semen Warna Kg 1.5000 6.10 9.15
Pasir Pasang M³ 0.0450 6.50 0.29
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.2500 140,000.00 35,000.00
Tukang batu L.02 OH 0.1250 147,000.00 18,375.00
Kepala tukang L.03 OH 0.0130 160,000.00 2,080.00
Mandor L.04 OH 0.0130 170,000.00 2,210.00
B BAHAN
Ubin granit Buah 6.6300 53.20 352.72
Semen Portlan Kg 9.8000 6.00 58.80
Semen Warna Kg 1.3000 6.10 7.93
Pasir Pasang M³ 0.0450 6.50 0.29
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.2600 140,000.00 36,400.00
Tukang batu L.02 OH 0.1300 147,000.00 19,110.00
Kepala tukang L.03 OH 0.0130 160,000.00 2,080.00
Mandor L.04 OH 0.0130 170,000.00 2,210.00
B BAHAN
Ubin Teraso Buah 11.8700 53.10 630.30
Semen Portlan Kg 10.0000 6.00 60.00
Semen Warna Kg 1.5000 6.10 9.15
Pasir Pasang M³ 0.0450 6.50 0.29
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.2600 140,000.00 36,400.00
Tukang batu L.02 OH 0.1300 147,000.00 19,110.00
Kepala tukang L.03 OH 0.0130 160,000.00 2,080.00
Mandor L.04 OH 0.0130 170,000.00 2,210.00
B BAHAN
Ubin Teralux Buah 11.8700 53.30 632.67
Semen Portlan Kg 10.0000 6.00 60.00
Semen Warna Kg 1.5000 6.10 9.15
Pasir Pasang M³ 0.0450 6.50 0.29
C PERALATAN
- -
AA.4.4.3.13. Pemasangan 1m2 Lantai Ubin Teralux Marmer Ukuran 60cm x60cm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.2400 140,000.00 33,600.00
Tukang batu L.02 OH 0.1200 147,000.00 17,640.00
Kepala tukang L.03 OH 0.0120 160,000.00 1,920.00
Mandor L.04 OH 0.0120 170,000.00 2,040.00
B BAHAN
Ubin Teralux Buah 3.1000 53.30 165.23
Semen Portlan Kg 9.6000 6.00 57.60
Semen Warna Kg 1.5000 6.10 9.15
Pasir Pasang M³ 0.0450 6.50 0.29
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.2500 140,000.00 35,000.00
Tukang batu L.02 OH 0.1250 147,000.00 18,375.00
Kepala tukang L.03 OH 0.0130 160,000.00 2,080.00
Mandor L.04 OH 0.0130 170,000.00 2,210.00
B BAHAN
Ubin Teralux Marmer Buah 6.6300 53.40 354.04
Semen Portlan Kg 9.8000 6.00 58.80
Semen Warna Kg 1.3000 6.10 7.93
Pasir Pasang M³ 0.0450 6.50 0.29
C PERALATAN
- -
A.4.4.3.15. Pemasangan 1m2 Lantai Ubin Teralux Marmer Ukuran 30cm x30cm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.2600 140,000.00 36,400.00
Tukang batu L.02 OH 0.1300 147,000.00 19,110.00
Kepala tukang L.03 OH 0.0130 160,000.00 2,080.00
Mandor L.04 OH 0.0130 170,000.00 2,210.00
B BAHAN
Ubin Teralux Marmer Buah 11.8700 53.40 633.86
Semen Portlan Kg 10.0000 6.00 60.00
Semen Warna Kg 1.5000 6.10 9.15
Pasir Pasang M³ 0.0450 6.50 0.29
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0900 140,000.00 12,600.00
Tukang batu L.02 OH 0.0090 147,000.00 1,323.00
Kepala tukang L.03 OH 0.0090 160,000.00 1,440.00
Mandor L.04 OH 0.0050 170,000.00 850.00
B BAHAN
Plint Ubin PC Buah 5.3000 54.00 286.20
Semen Portlan Kg 1.6500 6.00 9.90
Pasir Pasang M³ 0.0040 6.50 0.03
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0900 140,000.00 12,600.00
Tukang batu L.02 OH 0.0900 147,000.00 13,230.00
Kepala tukang L.03 OH 0.0090 160,000.00 1,440.00
Mandor L.04 OH 0.0050 170,000.00 850.00
B BAHAN
Plint Ubin PC Buah 3.5300 54.00 190.62
Semen Portlan Kg 1.2400 6.00 7.44
Pasir Pasang M³ 0.0030 6.50 0.02
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0900 140,000.00 12,600.00
Tukang batu L.02 OH 0.0090 147,000.00 1,323.00
Kepala tukang L.03 OH 0.0090 160,000.00 1,440.00
Mandor L.04 OH 0.0050 170,000.00 850.00
B BAHAN
Plint Ubin PC Buah 2.6500 54.00 143.10
Semen Portlan Kg 1.2400 6.00 7.44
Pasir Pasang M³ 0.0030 6.50 0.02
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0900 140,000.00 12,600.00
Tukang batu L.02 OH 0.0090 147,000.00 1,323.00
Kepala tukang L.03 OH 0.0090 160,000.00 1,440.00
Mandor L.04 OH 0.0050 170,000.00 850.00
B BAHAN
Plint Ubin warna Buah 5.3000 54.10 286.73
Semen Portlan Kg 1.1400 6.00 6.84
Semen Warna Kg 0.1000 6.10 0.61
Pasir Pasang M³ 0.0030 6.50 0.02
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0900 140,000.00 12,600.00
Tukang batu L.02 OH 0.0090 147,000.00 1,323.00
Kepala tukang L.03 OH 0.0090 160,000.00 1,440.00
Mandor L.04 OH 0.0050 170,000.00 850.00
B BAHAN
Plint Ubin warna Buah 3.5300 54.10 190.97
Semen Portlan Kg 1.1400 6.00 6.84
Semen Warna Kg 0.1000 6.10 0.61
Pasir Pasang M³ 0.0030 6.50 0.02
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0900 140,000.00 12,600.00
Tukang batu L.02 OH 0.0090 147,000.00 1,323.00
Kepala tukang L.03 OH 0.0090 160,000.00 1,440.00
Mandor L.04 OH 0.0050 170,000.00 850.00
B BAHAN
Plint Ubin warna Buah 2.6500 54.10 143.37
Semen Portlan Kg 1.1400 6.00 6.84
Semen Warna Kg 0.1000 6.10
Pasir Pasang M³ 0.0030 6.50 0.02
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0900 140,000.00 12,600.00
Tukang batu L.02 OH 0.0090 147,000.00 1,323.00
Kepala tukang L.03 OH 0.0090 160,000.00 1,440.00
Mandor L.04 OH 0.0050 170,000.00 850.00
B BAHAN
Plint Ubin teraso Buah 3.5300 54.20 191.33
Semen Portlan Kg 1.1400 6.00 6.84
Semen Warna Kg 0.1000 6.10 0.61
Pasir Pasang M³ 0.0030 6.50 0.02
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0900 140,000.00 12,600.00
Tukang batu L.02 OH 0.0090 147,000.00 1,323.00
Kepala tukang L.03 OH 0.0090 160,000.00 1,440.00
Mandor L.04 OH 0.0050 170,000.00 850.00
B BAHAN
Plint Ubin teraso Buah 2.6500 54.20 143.63
Semen Portlan Kg 1.1400 6.00 6.84
Semen Warna Kg 0.1000 6.10 0.61
Pasir Pasang M³ 0.0030 6.50 0.02
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0900 140,000.00 12,600.00
Tukang batu L.02 OH 0.0090 147,000.00 1,323.00
Kepala tukang L.03 OH 0.0090 160,000.00 1,440.00
Mandor L.04 OH 0.0050 170,000.00 850.00
B BAHAN
Plint Ubin granit Buah 3.5300 54.30 191.68
Semen Portlan Kg 1.1400 6.00 6.84
Semen Warna Kg 0.1000 6.10 0.61
Pasir Pasang M³ 0.0030 6.50 0.02
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0900 140,000.00 12,600.00
Tukang batu L.02 OH 0.0090 147,000.00 1,323.00
Kepala tukang L.03 OH 0.0090 160,000.00 1,440.00
Mandor L.04 OH 0.0050 170,000.00 850.00
B BAHAN
Plint Ubin granit Buah 2.6500 54.30 143.89
Semen Portlan Kg 1.1400 6.00 6.84
Semen Warna Kg 0.1000 6.10 0.61
Pasir Pasang M³ 0.0030 6.50 0.02
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0900 140,000.00 12,600.00
Tukang batu L.02 OH 0.0090 147,000.00 1,323.00
Kepala tukang L.03 OH 0.0090 160,000.00 1,440.00
Mandor L.04 OH 0.0050 170,000.00 850.00
B BAHAN
Plint Teralux kerang Buah 3.5300 54.40 192.03
Semen Portlan Kg 1.1400 6.00 6.84
Semen Warna Kg 0.1000 6.10 0.61
Pasir Pasang M³ 0.0030 6.50 0.02
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0900 140,000.00 12,600.00
Tukang batu L.02 OH 0.0090 147,000.00 1,323.00
Kepala tukang L.03 OH 0.0090 160,000.00 1,440.00
Mandor L.04 OH 0.0050 170,000.00 850.00
B BAHAN
Plint Teralux kerang Buah 2.6300 54.40 143.07
Semen Portlan Kg 1.1400 6.00 6.84
Semen Warna Kg 0.1000 6.10 0.61
Pasir Pasang M³ 0.0030 6.50 0.02
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0900 140,000.00 12,600.00
Tukang batu L.02 OH 0.0090 147,000.00 1,323.00
Kepala tukang L.03 OH 0.0090 160,000.00 1,440.00
Mandor L.04 OH 0.0050 170,000.00 850.00
B BAHAN
Plint Teralux marmer Buah 3.5300 54.50 192.39
Semen Portlan Kg 1.1400 6.00 6.84
Semen Warna Kg 0.1000 6.10 0.61
Pasir Pasang M³ 0.0030 6.50 0.02
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0900 140,000.00 12,600.00
Tukang batu L.02 OH 0.0090 147,000.00 1,323.00
Kepala tukang L.03 OH 0.0090 160,000.00 1,440.00
Mandor L.04 OH 0.0050 170,000.00 850.00
B BAHAN
Plint Teralux marmer Buah 2.6500 54.50 144.42
Semen Portlan Kg 1.1400 6.00 6.84
Semen Warna Kg 0.1000 6.10 0.61
Pasir Pasang M³ 0.0030 6.50 0.02
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0900 140,000.00 12,600.00
Tukang batu L.02 OH 0.0090 147,000.00 1,323.00
Kepala tukang L.03 OH 0.0090 160,000.00 1,440.00
Mandor L.04 OH 0.0050 170,000.00 850.00
B BAHAN
Plint Teralux marmer Buah 1.7000 54.50 92.65
Semen Portlan Kg 1.1400 6.00 6.84
Semen Warna Kg 0.1000 6.10 0.61
Pasir Pasang M³ 0.0030 6.50 0.02
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.3600 140,000.00 50,400.00
Tukang batu L.02 OH 0.1800 147,000.00 26,460.00
Kepala tukang L.03 OH 0.0180 160,000.00 2,880.00
Mandor L.04 OH 0.0180 170,000.00 3,060.00
B BAHAN
Teraso Cor Buah 0.0360 5.20 0.19
Semen Warna Kg 0.1000 6.10 0.61
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.7000 140,000.00 98,000.00
Tukang batu L.02 OH 0.3500 147,000.00 51,450.00
Kepala tukang L.03 OH 0.0350 160,000.00 5,600.00
Mandor L.04 OH 0.0350 170,000.00 5,950.00
B BAHAN
Ubin Keramik Buah 106.0000 53.50 5,671.00
Semen Portlan Kg 8.1900 6.00 49.14
Pasir Pasang M³ 0.0450 6.50 0.29
Semen Warna Kg 3.2000 6.10 19.52
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.7000 140,000.00 98,000.00
Tukang batu L.02 OH 0.3500 147,000.00 51,450.00
Kepala tukang L.03 OH 0.0350 160,000.00 5,600.00
Mandor L.04 OH 0.0350 170,000.00 5,950.00
B BAHAN
Ubin Keramik Buah 53.0000 53.50 2,835.50
Semen Portlan Kg 8.1900 6.00 49.14
Pasir Pasang M³ 0.0450 6.50 0.29
Semen Warna Kg 2.7500 6.10 16.78
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.7000 140,000.00 98,000.00
Tukang batu L.02 OH 0.3500 147,000.00 51,450.00
Kepala tukang L.03 OH 0.0350 160,000.00 5,600.00
Mandor L.04 OH 0.0350 170,000.00 5,950.00
B BAHAN
Ubin Keramik Dus 1.0500 53.50 56.18
Semen Portlan Kg 10.4000 6.00 62.40
Pasir Pasang M³ 0.0450 6.50 0.29
Semen Warna Kg 0.5000 6.10 3.05
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.7000 140,000.00 98,000.00
Tukang batu L.02 OH 0.3500 147,000.00 51,450.00
Kepala tukang L.03 OH 0.0350 160,000.00 5,600.00
Mandor L.04 OH 0.0350 170,000.00 5,950.00
B BAHAN
Ubin Keramik Dus 1.0500 53.50 56.18
Semen Portlan Kg 10.0000 6.00 60.00
Pasir Pasang M³ 0.0450 6.50 0.29
Semen Warna Kg 0.5000 6.10 3.05
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 1.0500 140,000.00 147,000.00
Tukang batu L.02 OH 0.5250 147,000.00 77,175.00
Kepala tukang L.03 OH 0.0530 160,000.00 8,480.00
Mandor L.04 OH 0.0530 170,000.00 9,010.00
B BAHAN
Ubin Keramik Buah 33.0000 53.50 1,765.50
Semen Portlan Kg 9.8000 6.00 58.80
Pasir Pasang M³ 0.0450 6.50 0.29
Semen Warna Kg 4.3700 6.10 26.66
C PERALATAN
-
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0900 140,000.00 12,600.00
Tukang batu L.02 OH 0.0900 147,000.00 13,230.00
Kepala tukang L.03 OH 0.0350 160,000.00 5,600.00
Mandor L.04 OH 0.0050 170,000.00 850.00
B BAHAN
Plint Keramik Buah 10.6000 54.60 578.76
Semen Portlan Kg 1.1400 6.00 6.84
Pasir Pasang M³ 0.0030 6.50 0.02
Semen Warna Kg 0.0500 6.10 0.31
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0900 140,000.00 12,600.00
Tukang batu L.02 OH 0.0900 147,000.00 13,230.00
Kepala tukang L.03 OH 0.0350 160,000.00 5,600.00
Mandor L.04 OH 0.0050 170,000.00 850.00
B BAHAN
Plint Keramik Buah 5.3000 54.60 289.38
Semen Portlan Kg 1.1400 6.00 6.84
Pasir Pasang M³ 0.0030 6.50 0.02
Semen Warna Kg 0.0250 6.10 0.15
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.7500 140,000.00 105,000.00
Tukang batu L.02 OH 0.7500 147,000.00 110,250.00
Kepala tukang L.03 OH 0.0750 160,000.00 12,000.00
Mandor L.04 OH 0.0380 170,000.00 6,460.00
B BAHAN
Internal Cove Buah 5.3000 5.30 28.09
Semen Portlan Kg 1.1400 6.00 6.84
Pasir Pasang M³ 0.0030 6.50 0.02
Semen Warna Kg 0.1000 6.10 0.61
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.7000 140,000.00 98,000.00
Tukang batu L.02 OH 0.3500 147,000.00 51,450.00
Kepala tukang L.03 OH 0.0350 160,000.00 5,600.00
Mandor L.04 OH 0.0350 170,000.00 5,950.00
B BAHAN
Marmer Buah 1.0600 53.60 56.82
Semen Portlan Kg 8.1900 6.00 49.14
Pasir Pasang M³ 0.0450 6.50 0.29
Semen Warna Kg 0.1340 6.10 0.82
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.1700 140,000.00 23,800.00
Tukang kayu L.02 OH 0.1700 147,000.00 24,990.00
Kepala tukang L.03 OH 0.0170 160,000.00 2,720.00
Mandor L.04 OH 0.0090 170,000.00 1,530.00
B BAHAN
Karpet M² 1.0500 55.00 57.75
Lem Karet Kg 0.3500 55.70 19.50
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.1200 140,000.00 16,800.00
Tukang kayu L.02 OH 0.1200 147,000.00 17,640.00
Kepala tukang L.03 OH 0.0120 160,000.00 1,920.00
Mandor L.04 OH 0.0060 170,000.00 1,020.00
B BAHAN
Underlayer M² 1.0500 55.10 57.86
Lem Karet Kg 0.3500 55.70 19.50
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.7000 140,000.00 98,000.00
Tukang kayu L.02 OH 0.3500 147,000.00 51,450.00
Kepala tukang L.03 OH 0.0350 160,000.00 5,600.00
Mandor L.04 OH 0.0350 170,000.00 5,950.00
B BAHAN
Parquet kayu M² 1.0500 55.20 57.96
Lem Karet Kg 0.6000 55.70 33.42
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.7000 140,000.00 98,000.00
Tukang kayu L.02 OH 0.3500 147,000.00 51,450.00
Kepala tukang L.03 OH 0.0350 160,000.00 5,600.00
Mandor L.04 OH 0.0350 170,000.00 5,950.00
B BAHAN
Parquet gymfloor M² 1.0500 55.30 58.07
Lem Karet Kg 0.6000 55.70 33.42
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 1.0000 140,000.00 140,000.00
Tukang batu L.02 OH 0.5000 147,000.00 73,500.00
Kepala tukang L.03 OH 0.0500 160,000.00 8,000.00
Mandor L.04 OH 0.0500 170,000.00 8,500.00
B BAHAN
Porslen Doos 1.0500 56.00 58.80
Semen Portlan Kg 9.3000 6.00 55.80
Pasir Pasang M³ 0.0180 6.50 0.12
Semen Warna Kg 0.5000 6.10 3.05
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.9000 140,000.00 126,000.00
Tukang batu L.02 OH 0.4500 147,000.00 66,150.00
Kepala tukang L.03 OH 0.0450 160,000.00 7,200.00
Mandor L.04 OH 0.0450 170,000.00 7,650.00
B BAHAN
Porslen Buah 53.0000 56.10 2,973.30
Semen Portlan Kg 9.3000 6.00 55.80
Pasir Pasang M³ 0.0180 6.50 0.12
Semen Warna Kg 2.7500 6.10 16.78
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.9000 140,000.00 126,000.00
Tukang batu L.02 OH 0.4500 147,000.00 66,150.00
Kepala tukang L.03 OH 0.0450 160,000.00 7,200.00
Mandor L.04 OH 0.0450 170,000.00 7,650.00
B BAHAN
Porslen Buah 26.0000 56.10 1,458.60
Semen Portlan Kg 9.3000 6.00 55.80
Pasir Pasang M³ 0.0180 6.50 0.12
Semen Warna Kg 1.9400 6.10 11.83
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.9000 140,000.00 126,000.00
Tukang batu L.02 OH 0.4500 147,000.00 66,150.00
Kepala tukang L.03 OH 0.0450 160,000.00 7,200.00
Mandor L.04 OH 0.0450 170,000.00 7,650.00
B BAHAN
Keramik Artistik Buah 52.0000 53.70 2,792.40
Semen Portlan Kg 9.3000 6.00 55.80
Pasir Pasang M³ 0.0180 6.50 0.12
Semen Warna Kg 2.7500 6.10 16.78
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.9000 140,000.00 126,000.00
Tukang batu L.02 OH 0.4500 147,000.00 66,150.00
Kepala tukang L.03 OH 0.0450 160,000.00 7,200.00
Mandor L.04 OH 0.0450 170,000.00 7,650.00
B BAHAN
Keramik Artistik Buah 104.0000 53.70 5,584.80
Semen Portlan Kg 9.3000 6.00 55.80
Pasir Pasang M³ 0.0180 6.50 0.12
Semen Warna Kg 2.9000 6.10 17.69
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.9000 140,000.00 126,000.00
Tukang batu L.02 OH 0.4500 147,000.00 66,150.00
Kepala tukang L.03 OH 0.0450 160,000.00 7,200.00
Mandor L.04 OH 0.0450 170,000.00 7,650.00
B BAHAN
Keramik Buah 52.0000 53.80 2,797.60
Semen Portlan Kg 9.3000 6.00 55.80
Pasir Pasang M³ 0.0180 6.50 0.12
Semen Warna Kg 2.7500 6.10 16.78
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.9000 140,000.00 126,000.00
Tukang batu L.02 OH 0.4500 147,000.00 66,150.00
Kepala tukang L.03 OH 0.0450 160,000.00 7,200.00
Mandor L.04 OH 0.0450 170,000.00 7,650.00
B BAHAN
Keramik Buah 26.0000 53.80 1,398.80
Semen Portlan Kg 9.3000 6.00 55.80
Pasir Pasang M³ 0.0180 6.50 0.12
Semen Warna Kg 1.9400 6.10 11.83
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 1.3000 140,000.00 182,000.00
Tukang batu L.02 OH 0.6500 147,000.00 95,550.00
Kepala tukang L.03 OH 0.0650 160,000.00 10,400.00
Mandor L.04 OH 0.0650 170,000.00 11,050.00
B BAHAN
Marmer Buah 1.0600 53.60 56.82
Semen Portlan Kg 12.4400 6.00 74.64
Pasir Pasang M³ 0.0250 6.50 0.16
Semen Warna Kg 0.6500 6.10 3.97
Paku 12cm Buah 3.0300 40.40 122.41
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 1.0000 140,000.00 140,000.00
Tukang batu L.02 OH 0.5000 147,000.00 73,500.00
Kepala tukang L.03 OH 0.0500 170,000.00 8,500.00
Mandor L.04 OH 0.0500 170,000.00 8,500.00
B BAHAN
Bata Pelapis Buah 63.0000 5.99 377.37
Semen Portlan Kg 12.4400 6.00 74.64
Pasir Pasang M³ 0.0250 6.50 0.16
Semen Warna Kg 2.7500 6.10 16.78
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.7000 140,000.00 98,000.00
Tukang batu L.02 OH 0.3500 147,000.00 51,450.00
Kepala tukang L.03 OH 0.0350 160,000.00 5,600.00
Mandor L.04 OH 0.0350 170,000.00 5,950.00
B BAHAN
Batu paras Buah 1.1000 7.30 8.03
Semen Portlan Kg 11.7500 6.00 70.50
Pasir Pasang M³ 0.0350 6.50 0.23
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.7000 140,000.00 98,000.00
Tukang batu L.02 OH 0.3500 147,000.00 51,450.00
Kepala tukang L.03 OH 0.0350 160,000.00 5,600.00
Mandor L.04 OH 0.0350 170,000.00 5,950.00
B BAHAN
Batu Tempel hitam Buah 1.1000 7.20 7.92
Semen Portlan Kg 11.7500 6.00 70.50
Pasir Pasang M³ 0.0350 6.50 0.23
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.1500 140,000.00 21,000.00
Tukang batu L.02 OH 0.1500 147,000.00 22,050.00
Kepala tukang L.03 OH 0.0150 160,000.00 2,400.00
Mandor L.04 OH 0.0080 170,000.00 1,360.00
B BAHAN
Vynil Buah 11.8700 55.40 657.60
Lem Karet Kg 0.3500 55.70 19.50
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.3500 140,000.00 49,000.00
Tukang batu L.02 OH 0.1750 147,000.00 25,725.00
Kepala tukang L.03 OH 0.0170 160,000.00 2,720.00
Mandor L.04 OH 0.0020 160,000.00 320.00
B BAHAN
Wallpaper M¹ 2.2000 55.50 122.10
Lem Karet Kg 0.2500 55.70 13.93
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.1200 140,000.00 16,800.00
Tukang batu L.02 OH 0.1200 147,000.00 17,640.00
Kepala tukang L.03 OH 0.0120 160,000.00 1,920.00
Mandor L.04 OH 0.0060 170,000.00 1,020.00
B BAHAN
Floor harderner Kg 5.0000 55.60 278.00
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.1200 140,000.00 16,800.00
Tukang batu L.02 OH 0.1200 147,000.00 17,640.00
Kepala tukang L.03 OH 0.0120 160,000.00 1,920.00
Mandor L.04 OH 0.0060 170,000.00 1,020.00
B BAHAN
Vynil Buah 3.1000 55.40 171.74
Lem Karet Kg 0.0800 55.70 4.46
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.1200 140,000.00 16,800.00
Tukang batu L.02 OH 0.1200 147,000.00 17,640.00
Kepala tukang L.03 OH 0.0120 160,000.00 1,920.00
Mandor L.04 OH 0.0060 170,000.00 1,020.00
B BAHAN
Papan kayu kelas 1 M³ 0.0030 7.10 0.02
Paku/skrup 5cm Kg 0.0500 88.00 4.40
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.2500 140,000.00 35,000.00
Tukang batu L.02 OH 0.5000 147,000.00 73,500.00
Kepala tukang L.03 OH 0.0500 160,000.00 8,000.00
Mandor L.04 OH 0.0013 170,000.00 221.00
B BAHAN
Pavingblock 6cm M² 1.0100 5.35 5.40
Pasir beton M³ 0.0500 6.40 0.32
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.5000 140,000.00 70,000.00
Tukang batu L.02 OH 0.5000 147,000.00 73,500.00
Kepala tukang L.03 OH 0.0500 160,000.00 8,000.00
Mandor L.04 OH 0.0013 170,000.00 221.00
B BAHAN
Pavingblock 8cm natural M² 1.0100 5.40 5.45
Pasir beton M³ 0.0800 6.40 0.51
C PERALATAN
Peralatan % 10.0000 - -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.2500 140,000.00 35,000.00
Tukang batu L.02 OH 0.5000 147,000.00 73,500.00
Kepala tukang L.03 OH 0.0500 160,000.00 8,000.00
Mandor L.04 OH 0.0013 170,000.00 221.00
B BAHAN
Paving block 6cm berwarna M² 1.0100 5.34 5.39
Pasir beton M³ 0.0500 6.40 0.32
C PERALATAN
Peralatan % 10.0000 - -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.5000 140,000.00 70,000.00
Tukang batu L.02 OH 0.5000 147,000.00 73,500.00
Kepala tukang L.03 OH 0.0500 160,000.00 8,000.00
Mandor L.04 OH 0.0013 170,000.00 221.00
B BAHAN
Paving block 8cm berwarna M² 1.0100 5.41 5.46
Pasir beton M³ 0.0800 6.40 0.51
C PERALATAN
Peralatan % Bahan 10.0000 - -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0300 140,000.00 4,200.00
Tukang kayu L.02 OH 0.0700 147,000.00 10,290.00
Kepala tukang L.03 OH 0.0070 160,000.00 1,120.00
Mandor L.04 OH 0.0040 170,000.00 680.00
B BAHAN
Serat semen M² 1.1000 6.10 6.71
Paku tripleks Kg 0.0100 40.30 0.40
C PERALATAN
Peralatan % Bahan 10.0000 7.11 0.71
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.1200 140,000.00 16,800.00
Tukang kayu L.02 OH 0.1200 147,000.00 17,640.00
Kepala tukang L.03 OH 0.0120 160,000.00 1,920.00
Mandor L.04 OH 0.0060 170,000.00 1,020.00
B BAHAN
Akustik Lembar 12.0000 7.00 84.00
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.1200 140,000.00 16,800.00
Tukang kayu L.02 OH 0.1200 147,000.00 17,640.00
Kepala tukang L.03 OH 0.0120 160,000.00 1,920.00
Mandor L.04 OH 0.0060 170,000.00 1,020.00
B BAHAN
Akustik Lembar 5.8000 7.00 40.60
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.1000 140,000.00 14,000.00
Tukang kayu L.02 OH 0.1000 147,000.00 14,700.00
Kepala tukang L.03 OH 0.0100 160,000.00 1,600.00
Mandor L.04 OH 0.0050 170,000.00 850.00
B BAHAN
Akustik Lembar 1.5000 7.00 10.50
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.1000 140,000.00 14,000.00
Tukang kayu L.02 OH 0.1000 147,000.00 14,700.00
Kepala tukang L.03 OH 0.0100 160,000.00 1,600.00
Mandor L.04 OH 0.0050 170,000.00 850.00
B BAHAN
Kayu Lapis Lembar 0.3750 7.20 2.70
Paku tripleks Kg 0.0300 40.30 1.21
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.8000 140,000.00 112,000.00
Tukang kayu L.02 OH 0.8000 147,000.00 117,600.00
Kepala tukang L.03 OH 0.0800 160,000.00 12,800.00
Mandor L.04 OH 0.0400 170,000.00 6,800.00
B BAHAN
Kayu papan M³ 0.0150 17.10 0.26
Paku tripleks Kg 0.0100 40.30 0.40
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.1000 140,000.00 14,000.00
Tukang kayu L.02 OH 0.0500 147,000.00 7,350.00
Kepala tukang L.03 OH 0.0050 160,000.00 800.00
Mandor L.04 OH 0.0050 170,000.00 850.00
B BAHAN
Papan Gipsum 120x240 cm Lembar 0.3640 21.21 7.72
Paku sekrup Kg 0.1100 40.00 4.40
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0500 140,000.00 7,000.00
Tukang kayu L.02 OH 0.0500 147,000.00 7,350.00
Kepala tukang L.03 OH 0.0050 160,000.00 800.00
Mandor L.04 OH 0.0030 170,000.00 510.00
B BAHAN
List Kayu profil M¹ 1.0500 17.17 18.03
Paku Kg 0.0100 18.00 0.18
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.5000 140,000.00 70,000.00
Tukang besi L.02 OH 0.5000 147,000.00 73,500.00
Kepala tukang L.03 OH 0.0500 160,000.00 8,000.00
Mandor L.04 OH 0.0250 170,000.00 4,250.00
B BAHAN
Profil Alum”T” M¹ 3.6000 39.00 140.40
Kawat Ø4 mm Kg 0.1500 40.00 6.00
Ramset Buah 1.0500 41.00 43.05
Akustik 60 x 120 Lembar 1.5000 7.00 10.50
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.1500 140,000.00 21,000.00
Tukang kayu L.02 OH 0.0750 147,000.00 11,025.00
Kepala tukang L.03 OH 0.0075 160,000.00 1,200.00
Mandor L.04 OH 0.0080 170,000.00 1,360.00
B BAHAN
Genteng palentong Buah 25.0000 30.00 750.00
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.1500 140,000.00 21,000.00
Tukang kayu L.02 OH 0.0750 147,000.00 11,025.00
Kepala tukang L.03 OH 0.0080 160,000.00 1,280.00
Mandor L.04 OH 0.0080 170,000.00 1,360.00
B BAHAN
Genteng kodok Buah 25.0000 30.10 752.50
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.1500 140,000.00 21,000.00
Tukang kayu L.02 OH 0.0750 147,000.00 11,025.00
Kepala tukang L.03 OH 0.0080 160,000.00 1,280.00
Mandor L.04 OH 0.0080 170,000.00 1,360.00
B BAHAN
Genteng palentong besar ( morando) Buah 12.0000 30.20 362.40
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.4000 140,000.00 56,000.00
Tukang kayu L.02 OH 0.2000 147,000.00 29,400.00
Kepala tukang L.03 OH 0.0200 160,000.00 3,200.00
Mandor L.04 OH 0.0020 170,000.00 340.00
B BAHAN
Genteng Bubung Buah 5.0000 30.30 151.50
Semen Portlan Kg 8.0000 6.00 48.00
Pasir Pasang M³ 0.0320 6.50 0.21
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.4000 140,000.00 56,000.00
Tukang kayu L.02 OH 0.2000 147,000.00 29,400.00
Kepala tukang L.03 OH 0.0200 160,000.00 3,200.00
Mandor L.04 OH 0.0020 170,000.00 340.00
B BAHAN
Genteng Bubung Buah 5.0000 30.30 151.50
Semen Portlan Kg 8.0000 6.00 48.00
Pasir Pasang M³ 0.0320 6.50 0.21
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.4000 140,000.00 56,000.00
Tukang kayu L.02 OH 0.2000 147,000.00 29,400.00
Kepala tukang L.03 OH 0.0200 160,000.00 3,200.00
Mandor L.04 OH 0.0020 170,000.00 340.00
B BAHAN
Genteng Bubung Buah 4.0000 30.30 121.20
Semen Portlan Kg 8.0000 6.00 48.00
Pasir Pasang M³ 0.0320 6.50 0.21
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.1400 140,000.00 19,600.00
Tukang kayu L.02 OH 0.0670 147,000.00 9,849.00
Kepala tukang L.03 OH 0.0070 160,000.00 1,120.00
Mandor L.04 OH 0.0070 170,000.00 1,190.00
B BAHAN
Rooflight 90x180 Buah 0.6000 7.20 4.32
Paku biasa ½”-1” Kg 0.0500 18.00 0.90
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.1400 140,000.00 19,600.00
Tukang kayu L.02 OH 0.0750 147,000.00 11,025.00
Kepala tukang L.03 OH 0.0080 160,000.00 1,280.00
Mandor L.04 OH 0.0080 170,000.00 1,360.00
B BAHAN
Serat semen gel 92x250 Lbr 0.5000 6.20 3.10
Paku pancing 6x23 Kg 0.1200 41.41 4.97
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.1400 140,000.00 19,600.00
Tukang kayu L.02 OH 0.0750 147,000.00 11,025.00
Kepala tukang L.03 OH 0.0080 160,000.00 1,280.00
Mandor L.04 OH 0.0080 170,000.00 1,360.00
B BAHAN
Serat semen gel 92x2,25 Lbr 0.6000 6.10 3.66
Paku pancing 6x23 Kg 0.1200 41.41 4.97
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.1400 140,000.00 19,600.00
Tukang kayu L.02 OH 0.0700 147,000.00 10,290.00
Kepala tukang L.03 OH 0.0070 160,000.00 1,120.00
Mandor L.04 OH 0.0070 170,000.00 1,190.00
B BAHAN
Serat semen gel 92x200 Lbr 0.6000 6.10 3.66
Paku pancing 6x23 Kg 0.1200 41.41 4.97
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.1400 140,000.00 19,600.00
Tukang kayu L.02 OH 0.0700 147,000.00 10,290.00
Kepala tukang L.03 OH 0.0070 160,000.00 1,120.00
Mandor L.04 OH 0.0070 170,000.00 1,190.00
B BAHAN
Serat semen gel 92x180 Lbr 0.7500 6.10 4.57
Paku pancing 6x23 Kg 0.1200 41.41 4.97
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.1400 140,000.00 19,600.00
Tukang kayu L.02 OH 0.0700 147,000.00 10,290.00
Kepala tukang L.03 OH 0.0070 160,000.00 1,120.00
Mandor L.04 OH 0.0070 170,000.00 1,190.00
B BAHAN
Serat semen gel 105x300 Lbr 0.3500 6.32 2.21
Paku pancing 6x23 Kg 0.1200 41.41 4.97
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.1400 140,000.00 19,600.00
Tukang kayu L.02 OH 0.0700 147,000.00 10,290.00
Kepala tukang L.03 OH 0.0070 160,000.00 1,120.00
Mandor L.04 OH 0.0070 170,000.00 1,190.00
B BAHAN
Serat semen gel 105x240 Lbr 0.4400 6.35 2.79
Paku pancing 6x23 Kg 0.1200 41.41 4.97
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.1400 140,000.00 19,600.00
Tukang kayu L.02 OH 0.0700 147,000.00 10,290.00
Kepala tukang L.03 OH 0.0070 160,000.00 1,120.00
Mandor L.04 OH 0.0070 170,000.00 1,190.00
B BAHAN
Serat Semen Gel 105x210 Lbr 0.5100 6.31 3.22
Paku pancing 6x23 Kg 0.1200 41.41 4.97
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.1400 140,000.00 19,600.00
Tukang kayu L.02 OH 0.0700 147,000.00 10,290.00
Kepala tukang L.03 OH 0.0070 160,000.00 1,120.00
Mandor L.04 OH 0.0070 170,000.00 1,190.00
B BAHAN
Serat semen gel 105x150 Lbr 0.8000 6.30 5.04
Paku pancing 6x23 Kg 0.1200 41.41 4.97
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.1400 140,000.00 19,600.00
Tukang kayu L.02 OH 0.0700 147,000.00 10,290.00
Kepala tukang L.03 OH 0.0070 160,000.00 1,120.00
Mandor L.04 OH 0.0070 170,000.00 1,190.00
B BAHAN
Serat semen gel 108x300 Lbr 0.3700 6.38 2.36
Paku pancing 6x23 Kg 0.1200 41.41 4.97
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.1400 140,000.00 19,600.00
Tukang kayu L.02 OH 0.0700 147,000.00 10,290.00
Kepala tukang L.03 OH 0.0070 160,000.00 1,120.00
Mandor L.04 OH 0.0070 170,000.00 1,190.00
B BAHAN
Serat semen gel 108x270 Lbr 0.3800 6.37 2.42
Paku pancing 6x23 Kg 0.1200 41.41 4.97
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.1400 140,000.00 19,600.00
Tukang kayu L.02 OH 0.0700 147,000.00 10,290.00
Kepala tukang L.03 OH 0.0070 160,000.00 1,120.00
Mandor L.04 OH 0.0070 170,000.00 1,190.00
B BAHAN
Serat Semen gel 108x240 Lbr 0.4600 6.36 2.93
Paku pancing 6x23 Kg 0.1200 41.41 4.97
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.1400 140,000.00 19,600.00
Tukang kayu L.02 OH 0.0700 147,000.00 10,290.00
Kepala tukang L.03 OH 0.0070 160,000.00 1,120.00
Mandor L.04 OH 0.0070 170,000.00 1,190.00
B BAHAN
Serat Semen gel 108x210 Lbr 0.4900 6.34 3.11
Paku pancing 6x23 Kg 0.1200 41.41 4.97
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.1400 140,000.00 19,600.00
Tukang kayu L.02 OH 0.0700 147,000.00 10,290.00
Kepala tukang L.03 OH 0.0070 160,000.00 1,120.00
Mandor L.04 OH 0.0070 170,000.00 1,190.00
B BAHAN
Serat semen gel 108x180 Lbr 0.5700 6.33 3.61
Paku pancing 6x23 Kg 0.1200 41.41 4.97
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0840 140,000.00 11,760.00
Tukang kayu L.02 OH 0.1250 147,000.00 18,375.00
Kepala tukang L.03 OH 0.0130 160,000.00 2,080.00
Mandor L.04 OH 0.0040 170,000.00 680.00
B BAHAN
Bubung Setel gel. Lbr 2.4000 7.00 16.80
Paku skrup 3,5” Buah 6.0000 41.00 246.00
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0840 140,000.00 11,760.00
Tukang kayu L.02 OH 0.1250 147,000.00 18,375.00
Kepala tukang L.03 OH 0.0130 160,000.00 2,080.00
Mandor L.04 OH 0.0040 170,000.00 680.00
B BAHAN
Bubung setel gel. Lbr 2.1000 7.00 14.70
Paku skrup 3,5” Buah 6.0000 41.00 246.00
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0840 140,000.00 11,760.00
Tukang kayu L.02 OH 0.1250 147,000.00 18,375.00
Kepala tukang L.03 OH 0.0130 160,000.00 2,080.00
Mandor L.04 OH 0.0040 170,000.00 680.00
B BAHAN
Bubung setel gel. Lbr 2.1000 7.00 14.70
Paku skrup 3,5” Buah 6.0000 41.00 246.00
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0840 140,000.00 11,760.00
Tukang kayu L.02 OH 0.1250 147,000.00 18,375.00
Kepala tukang L.03 OH 0.0130 160,000.00 2,080.00
Mandor L.04 OH 0.0040 170,000.00 680.00
B BAHAN
Nok Paten 92cm Lbr 1.1000 7.10 7.81
Paku skrup 3,5” Buah 6.0000 41.00 246.00
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0840 140,000.00 11,760.00
Tukang kayu L.02 OH 0.1250 147,000.00 18,375.00
Kepala tukang L.03 OH 0.0130 160,000.00 2,080.00
Mandor L.04 OH 0.0040 170,000.00 680.00
B BAHAN
Nok Paten 105cm Lbr 1.2000 7.20 8.64
Paku skrup 3,5” Buah 6.0000 41.00 246.00
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0840 140,000.00 11,760.00
Tukang kayu L.02 OH 0.1250 147,000.00 18,375.00
Kepala tukang L.03 OH 0.0130 160,000.00 2,080.00
Mandor L.04 OH 0.0040 170,000.00 680.00
B BAHAN
Nok Paten 108cm Lbr 1.2000 7.30 8.76
Paku skrup 3,5” Buah 6.0000 41.00 246.00
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.1000 140,000.00 14,000.00
Tukang kayu L.02 OH 0.1500 147,000.00 22,050.00
Kepala tukang L.03 OH 0.0130 160,000.00 2,080.00
Mandor L.04 OH 0.0040 170,000.00 680.00
B BAHAN
Nok setel rata 92cm Lbr 1.1000 7.40 8.14
Paku skrup 3,5” Buah 6.0000 41.00 246.00
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0840 140,000.00 11,760.00
Tukang kayu L.02 OH 0.1250 147,000.00 18,375.00
Kepala tukang L.03 OH 0.0130 160,000.00 2,080.00
Mandor L.04 OH 0.0040 170,000.00 680.00
B BAHAN
Nok Setel rata 105cm Lbr 1.1000 7.50 8.25
Paku skrup 3,5” Buah 6.0000 41.00 246.00
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.2000 140,000.00 28,000.00
Tukang kayu L.02 OH 0.1000 147,000.00 14,700.00
Kepala tukang L.03 OH 0.0100 160,000.00 1,600.00
Mandor L.04 OH 0.0100 170,000.00 1,700.00
B BAHAN
Genteng Beton Buah 11.0000 30.40 334.40
Paku biasa 2”-5” Kg 0.0300 18.00 0.54
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.2000 140,000.00 28,000.00
Tukang kayu L.02 OH 0.3000 147,000.00 44,100.00
Kepala tukang L.03 OH 0.0030 160,000.00 480.00
Mandor L.04 OH 0.0100 170,000.00 1,700.00
B BAHAN
Genteng aspal Ukuran 0,8x1m Buah 1.5000 30.50 45.75
Plywood 6mm Lbr 0.3500 7.20 2.52
Paku biasa ½”-1” Kg 0.0300 18.00 0.54
Plastik aerator Buah 0.5000 31.10 15.55
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.1660 140,000.00 23,240.00
Tukang kayu L.02 OH 0.2500 147,000.00 36,750.00
Kepala tukang L.03 OH 0.0250 160,000.00 4,000.00
Mandor L.04 OH 0.0080 170,000.00 1,360.00
B BAHAN
Sirap kayu Buah 30.0000 30.00 900.00
Paku biasa ½”-1” Kg 0.2000 18.00 3.60
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.4000 140,000.00 56,000.00
Tukang kayu L.02 OH 0.2000 147,000.00 29,400.00
Kepala tukang L.03 OH 0.0200 160,000.00 3,200.00
Mandor L.04 OH 0.0200 170,000.00 3,400.00
B BAHAN
Nok Genteng beton Buah 3.5000 7.60 26.60
Paku biasa ½”-1” Kg 0.0500 18.00 0.90
Semen Portlan Kg 10.8000 6.00 64.80
Pasir Pasang M³ 0.0320 6.50 0.21
Semen Warna Kg 1.0000 6.10 6.10
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.1250 140,000.00 17,500.00
Tukang kayu L.02 OH 0.2500 147,000.00 36,750.00
Kepala tukang L.03 OH 0.0250 160,000.00 4,000.00
Mandor L.04 OH 0.0060 170,000.00 1,020.00
B BAHAN
Nok genteng aspal Buah 2.0000 7.70 15.40
Paku biasa ½”-1” Kg 0.0500 18.00 0.90
Kayu balok borneo M³ 0.0035 17.70 0.06
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.2500 140,000.00 35,000.00
Tukang kayu L.02 OH 0.1500 147,000.00 22,050.00
Kepala tukang L.03 OH 0.0150 160,000.00 2,400.00
Mandor L.04 OH 0.0130 170,000.00 2,210.00
B BAHAN
Nok genteng metal panjang 100cm Buah 1.1000 7.80 8.58
Paku biasa ½”-1” Kg 0.0500 18.00 0.90
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.1250 140,000.00 17,500.00
Tukang kayu L.02 OH 0.2500 147,000.00 36,750.00
Kepala tukang L.03 OH 0.0250 160,000.00 4,000.00
Mandor L.04 OH 0.0060 170,000.00 1,020.00
B BAHAN
Seng pelat 3’ x 6’ 90cmx180cm Lbr 0.4000 42.10 16.84
Paku biasa ½”-1” 1,5cm -2,5cm Kg 0.0500 18.00 0.90
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.1200 140,000.00 16,800.00
Tukang kayu L.02 OH 0.0600 147,000.00 8,820.00
Kepala tukang L.03 OH 0.0060 160,000.00 960.00
Mandor L.04 OH 0.0060 170,000.00 1,020.00
B BAHAN
Seng gel 3”x6” Lbr 0.7000 42.20 29.54
Paku biasa ½”-1” Kg 0.0200 18.00 0.36
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.1500 140,000.00 21,000.00
Tukang kayu L.02 OH 0.0700 147,000.00 10,290.00
Kepala tukang L.03 OH 0.0070 160,000.00 1,120.00
Mandor L.04 OH 0.0060 170,000.00 1,020.00
B BAHAN
Seng pelat 3”x6”bjls28 Lbr 0.3000 42.30 12.69
Paku biasa ½”-1” Kg 0.0400 18.00 0.72
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.1500 140,000.00 21,000.00
Tukang kayu L.02 OH 0.0750 147,000.00 11,025.00
Kepala tukang L.03 OH 0.0080 160,000.00 1,280.00
Mandor L.04 OH 0.0060 170,000.00 1,020.00
B BAHAN
Aluminium gel Ukuran 95cmx180cm Lbr 0.7500 42.40 31.80
Paku pancing Kg 0.0200 41.41 0.83
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.1000 140,000.00 14,000.00
Tukang kayu L.02 OH 1.0000 147,000.00 147,000.00
Kepala tukang L.03 OH 0.1000 160,000.00 16,000.00
Mandor L.04 OH 0.0500 170,000.00 8,500.00
B BAHAN
Nok standar Buah 1.2000 7.77 9.32
Paku pancing Kg 0.0200 41.41 0.83
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.1500 140,000.00 21,000.00
Tukang kayu L.02 OH 0.0500 147,000.00 7,350.00
Kepala tukang L.03 OH 0.0050 160,000.00 800.00
Mandor L.04 OH 0.0080 170,000.00 1,360.00
B BAHAN
Aluminium foil Buah 1.0500 88.00 92.40
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.1400 140,000.00 19,600.00
Tukang kayu L.02 OH 0.0700 147,000.00 10,290.00
Kepala tukang L.03 OH 0.0070 160,000.00 1,120.00
Mandor L.04 OH 0.0070 170,000.00 1,190.00
B BAHAN
Serat semen gel 105x270 Lbr 0.4200 6.31 2.65
Paku pancing 6x23 Kg 0.1200 41.41 4.97
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 7.0000 140,000.00 980,000.00
Tukang kayu L.02 OH 21.0000 147,000.00 3,087,000.00
Kepala tukang L.03 OH 2.1000 160,000.00 336,000.00
Mandor L.04 OH 0.3500 170,000.00 59,500.00
B BAHAN
Balok Kayu M³ 1.1000 16.00 17.60
Paku 10 cm Kg 1.2500 18.00 22.50
Lem kayu Kg 1.0000 55.80 55.80
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 6.0000 140,000.00 840,000.00
Tukang kayu L.02 OH 18.0000 147,000.00 2,646,000.00
Kepala tukang L.03 OH 1.8000 160,000.00 288,000.00
Mandor L.04 OH 0.3000 170,000.00 51,000.00
B BAHAN
Balok Kayu M³ 1.2000 16.00 19.20
Paku 10 cm Kg 1.2500 18.00 22.50
Lem kayu Kg 1.0000 55.80 55.80
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.3500 140,000.00 49,000.00
Tukang kayu L.02 OH 1.0500 147,000.00 154,350.00
Kepala tukang L.03 OH 0.1050 160,000.00 16,800.00
Mandor L.04 OH 0.0180 170,000.00 3,060.00
B BAHAN
Papan kayu M³ 0.0400 7.20 0.29
Paku 5 – 7 cm Kg 0.0500 18.00 0.90
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.3500 140,000.00 49,000.00
Tukang kayu L.02 OH 1.0500 147,000.00 154,350.00
Kepala tukang L.03 OH 0.1050 160,000.00 16,800.00
Mandor L.04 OH 0.0180 170,000.00 3,060.00
B BAHAN
Papan kayu M³ 0.0400 7.20 0.29
Paku 5 – 7 cm Kg 0.0500 18.00 0.90
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 1.0000 140,000.00 140,000.00
Tukang kayu L.02 OH 3.0000 147,000.00 441,000.00
Kepala tukang L.03 OH 0.3000 160,000.00 48,000.00
Mandor L.04 OH 0.0500 170,000.00 8,500.00
B BAHAN
Papan kayu M³ 0.0400 7.20 0.29
Lem kayu Kg 0.5000 55.80 27.90
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.8000 140,000.00 112,000.00
Tukang kayu L.02 OH 2.4000 147,000.00 352,800.00
Kepala tukang L.03 OH 0.2400 160,000.00 38,400.00
Mandor L.04 OH 0.0400 170,000.00 6,800.00
B BAHAN
Papan kayu M³ 0.0240 7.20 0.17
Lem kayu Kg 0.3000 55.80 16.74
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 1.0000 140,000.00 140,000.00
Tukang kayu L.02 OH 3.0000 147,000.00 441,000.00
Kepala tukang L.03 OH 0.3000 160,000.00 48,000.00
Mandor L.04 OH 0.0500 170,000.00 8,500.00
B BAHAN
Papan kayu M³ 0.0640 7.20 0.46
Lem kayu Kg 0.5000 55.80 27.90
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.7000 140,000.00 98,000.00
Tukang kayu L.02 OH 2.1000 147,000.00 308,700.00
Kepala tukang L.03 OH 0.2100 160,000.00 33,600.00
Mandor L.04 OH 0.0350 170,000.00 5,950.00
B BAHAN
Papan Kayu M³ 0.0250 7.20 0.18
Paku 1 cm – 2,5 cm Kg 0.0300 18.00 0.54
Lem kayu Kg 0.5000 55.80 27.90
Plywood tebal 4 mm Ukuran (90 x 220) cm Lembar 1.0000 7.10 7.10
C PERALATAN
- -
A.4.6.1.9. Pembuatan 1m2 Pintu Plywood Rangkap, Rangka Expose Kayu Kelas I atau II
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.8000 140,000.00 112,000.00
Tukang kayu L.02 OH 2.4000 147,000.00 352,800.00
Kepala tukang L.03 OH 0.2400 160,000.00 38,400.00
Mandor L.04 OH 0.0400 170,000.00 6,800.00
B BAHAN
Papan Kayu M³ 0.0256 7.20 0.18
Paku 1 cm – 2,5 cm Kg 0.0300 18.00 0.54
Lem kayu Kg 0.5000 55.80 27.90
Plywood tebal 4 mm Ukuran (90 x 220) cm Lembar 1.0000 7.10 7.10
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.6700 140,000.00 93,800.00
Tukang kayu L.02 OH 2.0000 147,000.00 294,000.00
Kepala tukang L.03 OH 0.2000 160,000.00 32,000.00
Mandor L.04 OH 0.3350 170,000.00 56,950.00
B BAHAN
Papan Kayu M³ 0.0600 7.20 0.43
Paku 1 cm – 2,5 cm Kg 0.1500 18.00 2.70
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.8000 140,000.00 112,000.00
Tukang kayu L.02 OH 2.4000 147,000.00 352,800.00
Kepala tukang L.03 OH 0.2400 160,000.00 38,400.00
Mandor L.04 OH 0.0400 170,000.00 6,800.00
B BAHAN
Papan Kayu M³ 0.0250 7.20 0.18
Paku 1 cm – 2,5 cm Kg 0.0300 18.00 0.54
Lem kayu Kg 0.3000 55.80 16.74
Teakwood 4 mm 90 x 220 cm Lembar 1.0000 7.11 7.11
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.8500 140,000.00 119,000.00
Tukang kayu L.02 OH 2.5500 147,000.00 374,850.00
Kepala tukang L.03 OH 0.2550 160,000.00 40,800.00
Mandor L.04 OH 0.0430 170,000.00 7,310.00
B BAHAN
Papan Kayu M³ 0.0250 7.20 0.18
Paku 1 cm – 2,5 cm Kg 0.0300 18.00 0.54
Lem kayu Kg 0.8000 55.80 44.64
Teakwood 4 mm 90 x 220 cm Lembar 1.0000 7.11 7.11
Formika 120x240 Lembar 0.5000 7.12 3.56
C PERALATAN
- -
A.4.6.1.13. Pemasangan 1 m3 Konstruksi Kuda-kuda Konvensional, Kayu Kelas I, II dan III Bentang Sampai Dengan 6 Meter
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 4.0000 140,000.00 560,000.00
Tukang kayu L.02 OH 12.0000 147,000.00 1,764,000.00
Kepala tukang L.03 OH 1.2000 160,000.00 192,000.00
Mandor L.04 OH 0.2000 170,000.00 34,000.00
B BAHAN
Balok Kayu M³ 1.1000 15.00 16.50
Besi Strip tebal 5mm Kg 15.0000 35.00 525.00
Paku 12 cm Kg 5.6000 18.00 100.80
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 6.7000 140,000.00 938,000.00
Tukang kayu L.02 OH 20.1000 147,000.00 2,954,700.00
Kepala tukang L.03 OH 2.0100 160,000.00 321,600.00
Mandor L.04 OH 0.3350 170,000.00 56,950.00
B BAHAN
Balok Kayu M³ 1.2000 15.00 18.00
Besi Strip tebal 5mm Kg 15.0000 35.00 525.00
Paku 12 cm Kg 5.6000 18.00 100.80
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 2.4000 140,000.00 336,000.00
Tukang kayu L.02 OH 7.2000 147,000.00 1,058,400.00
Kepala tukang L.03 OH 0.7200 160,000.00 115,200.00
Mandor L.04 OH 0.1200 170,000.00 20,400.00
B BAHAN
Balok Kayu M³ 1.1000 15.00 16.50
Besi Strip tebal 5mm Kg 15.0000 35.00 525.00
Paku 12 cm Kg 3.0000 18.00 54.00
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.1000 140,000.00 14,000.00
Tukang kayu L.02 OH 0.1000 147,000.00 14,700.00
Kepala tukang L.03 OH 0.0100 160,000.00 1,600.00
Mandor L.04 OH 0.0050 170,000.00 850.00
B BAHAN
Kaso-kaso 5 x 7cm M³ 0.0140 17.20 0.24
Reng 2 x 3 cm M³ 0.0036 17.30 0.06
Paku 5 dan 10 cm Kg 0.2500 18.00 4.50
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.1000 140,000.00 14,000.00
Tukang kayu L.02 OH 0.1000 147,000.00 14,700.00
Kepala tukang L.03 OH 0.0100 160,000.00 1,600.00
Mandor L.04 OH 0.0050 170,000.00 850.00
B BAHAN
Kaso-kaso 5 x 7cm M³ 0.0140 17.20 0.24
Reng (3 x 4) cm M³ 0.0057 17.50 0.10
Paku 5 dan 10 cm Kg 0.2500 18.00 4.50
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.1200 140,000.00 16,800.00
Tukang kayu L.02 OH 0.1200 147,000.00 17,640.00
Kepala tukang L.03 OH 0.0120 160,000.00 1,920.00
Mandor L.04 OH 0.0060 170,000.00 1,020.00
B BAHAN
Kayu Kelas II M³ 0.1650 77.70 12.82
Paku 5 - 10 cm Kg 0.2000 18.00 3.60
C PERALATAN
- -
A.4.6.1.19. Pemasangan 1 m2 Rangka Langit-Langit (50 x 100) cm, Kayu kelas II atau III
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.1500 140,000.00 21,000.00
Tukang kayu L.02 OH 0.3000 147,000.00 44,100.00
Kepala tukang L.03 OH 0.0300 160,000.00 4,800.00
Mandor L.04 OH 0.0750 170,000.00 12,750.00
B BAHAN
Kaso-kaso 5 x 7cm M³ 0.0154 17.20 0.26
Paku 7 cm – 10 cm Kg 0.2000 18.00 3.60
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.2000 140,000.00 28,000.00
Tukang kayu L.02 OH 0.3000 147,000.00 44,100.00
Kepala tukang L.03 OH 0.0300 160,000.00 4,800.00
Mandor L.04 OH 0.0100 170,000.00 1,700.00
B BAHAN
Kaso-kaso 5 x 7cm M³ 0.0163 17.20 0.28
Paku 7 cm – 10 cm Kg 0.2500 18.00 4.50
C PERALATAN
- -
A.4.6.1.21. Pemasangan 1 m’ Lisplank Ukuran (3 x 20) cm, Kayu Kelas I atau Kelas II
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.1000 140,000.00 14,000.00
Tukang kayu L.02 OH 0.2000 147,000.00 29,400.00
Kepala tukang L.03 OH 0.0200 160,000.00 3,200.00
Mandor L.04 OH 0.0050 170,000.00 850.00
B BAHAN
Kaso-kaso 5 x 7cm M³ 0.0108 17.20 0.19
Paku 5 dan 7 cm Kg 0.1000 18.00 1.80
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.1000 140,000.00 14,000.00
Tukang kayu L.02 OH 0.2000 147,000.00 29,400.00
Kepala tukang L.03 OH 0.0200 160,000.00 3,200.00
Mandor L.04 OH 0.0050 170,000.00 850.00
B BAHAN
Papan Kayu M³ 0.0110 7.20 0.08
Paku 5 dan 7 cm Kg 0.0500 18.00 0.90
C PERALATAN
- -
A.4.6.1.23. Pemasangan 1 m2 Rangka Dinding Pemisah (60 x 120) cm Kayu kelas II atau III
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.1500 140,000.00 21,000.00
Tukang kayu L.02 OH 0.4500 147,000.00 66,150.00
Kepala tukang L.03 OH 0.0450 160,000.00 7,200.00
Mandor L.04 OH 0.0080 170,000.00 1,360.00
B BAHAN
Balok Kayu M³ 0.0280 16.00 0.45
Paku 5 dan 7 cm Kg 0.1500 18.00 2.70
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.1500 140,000.00 21,000.00
Tukang kayu L.02 OH 0.4500 147,000.00 66,150.00
Kepala tukang L.03 OH 0.0450 160,000.00 7,200.00
Mandor L.04 OH 0.0080 170,000.00 1,360.00
B BAHAN
Balok kayu, 6 x 12 M³ 0.0280 16.00 0.45
Paku 5 dan 10 Kg 0.1500 18.00 2.70
Plywood 4 mm, 120 x 240 Lembar 0.8600 7.10 6.11
Lem kayu Kg 0.5600 55.80 31.25
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.6000 140,000.00 84,000.00
Tukang kayu L.02 OH 1.8000 147,000.00 264,600.00
Kepala tukang L.03 OH 0.1800 160,000.00 28,800.00
Mandor L.04 OH 0.0300 170,000.00 5,100.00
B BAHAN
Papan Kayu M³ 0.0070 7.10 0.05
Paku 5 cm dan 10 cm Kg 0.1000 18.00 1.80
Paku sekrup 10 cm Kg 0.1500 19.00 2.85
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0250 140,000.00 3,500.00
Tukang kayu L.02 OH 0.0750 147,000.00 11,025.00
Kepala tukang L.03 OH 0.0080 160,000.00 1,280.00
Mandor L.04 OH 0.0010 170,000.00 170.00
B BAHAN
kayu lapis 4 mm Lembar 0.4000 7.20 2.88
Paku 1 dan 2,5 Kg 0.0500 18.00 0.90
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.1000 140,000.00 14,000.00
Tukang kayu L.02 OH 0.0500 147,000.00 7,350.00
Kepala tukang L.03 OH 0.0050 160,000.00 800.00
Mandor L.04 OH 0.0050 170,000.00 850.00
B BAHAN
Bilik bambu M² 1.5000 200.00 300.00
Kaso-kaso 5 cm x 7 cm M³ 0.0140 17.20 0.24
Paku Kg 0.0120 18.00 0.22
List kayu 2cmx4xm M³ 0.0030 17.17 0.05
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0600 140,000.00 8,400.00
Tukang kayu L.02 OH 0.6000 147,000.00 88,200.00
Kepala tukang L.03 OH 0.0600 160,000.00 9,600.00
Mandor L.04 OH 0.0030 170,000.00 510.00
B BAHAN
Kunci tanam antik Buah 1.0000 120.00 120.00
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0100 140,000.00 1,400.00
Tukang kayu L.02 OH 0.5000 147,000.00 73,500.00
Kepala tukang L.03 OH 0.0500 160,000.00 8,000.00
Mandor L.04 OH 0.0050 170,000.00 850.00
B BAHAN
Kunci tanam biasa Buah 1.0000 50.00 50.00
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0050 140,000.00 700.00
Tukang kayu L.02 OH 0.5000 147,000.00 73,500.00
Kepala tukang L.03 OH 0.0500 160,000.00 8,000.00
Mandor L.04 OH 0.0030 170,000.00 510.00
B BAHAN
Kunci tanam KM Buah 1.0000 60.00 60.00
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0050 140,000.00 700.00
Tukang kayu L.02 OH 0.5000 147,000.00 73,500.00
Kepala tukang L.03 OH 0.0500 160,000.00 8,000.00
Mandor L.04 OH 0.0030 170,000.00 510.00
B BAHAN
Kunci silinder Buah 1.0000 70.00 70.00
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0150 140,000.00 2,100.00
Tukang kayu L.02 OH 0.1500 147,000.00 22,050.00
Kepala tukang L.03 OH 0.0150 160,000.00 2,400.00
Mandor L.04 OH 0.0008 170,000.00 136.00
B BAHAN
Engsel pintu Buah 1.0000 40.00 40.00
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0100 140,000.00 1,400.00
Tukang kayu L.02 OH 0.1000 147,000.00 14,700.00
Kepala tukang L.03 OH 0.0100 160,000.00 1,600.00
Mandor L.04 OH 0.0005 170,000.00 85.00
B BAHAN
Engsel Buah 1.0000 30.00 30.00
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.1000 140,000.00 14,000.00
Tukang kayu L.02 OH 0.2000 147,000.00 29,400.00
Kepala tukang L.03 OH 0.0200 160,000.00 3,200.00
Mandor L.04 OH 0.0005 170,000.00 85.00
B BAHAN
Engsel angin Buah 1.0000 35.00 35.00
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0150 140,000.00 2,100.00
Tukang kayu L.02 OH 0.1500 147,000.00 22,050.00
Kepala tukang L.03 OH 0.0150 160,000.00 2,400.00
Mandor L.04 OH 0.0080 170,000.00 1,360.00
B BAHAN
Spring knip Buah 1.0000 20.00 20.00
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0150 140,000.00 2,100.00
Tukang kayu L.02 OH 0.1500 147,000.00 22,050.00
Kepala tukang L.03 OH 0.0150 160,000.00 2,400.00
Mandor L.04 OH 0.0080 170,000.00 1,360.00
B BAHAN
Kait angin Buah 1.0000 15.00 15.00
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0500 140,000.00 7,000.00
Tukang kayu L.02 OH 0.5000 147,000.00 73,500.00
Kepala tukang L.03 OH 0.0500 160,000.00 8,000.00
Mandor L.04 OH 0.0030 170,000.00 510.00
B BAHAN
Door closer Set 1.0000 250.00 250.00
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0200 140,000.00 2,800.00
Tukang kayu L.02 OH 0.2000 147,000.00 29,400.00
Kepala tukang L.03 OH 0.0200 160,000.00 3,200.00
Mandor L.04 OH 0.0010 170,000.00 170.00
B BAHAN
Kunci slot Buah 1.0000 120.00 120.00
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0500 140,000.00 7,000.00
Tukang kayu L.02 OH 0.5000 147,000.00 73,500.00
Kepala tukang L.03 OH 0.0500 160,000.00 8,000.00
Mandor L.04 OH 0.0030 170,000.00 510.00
B BAHAN
Door holder Buah 1.0000 150.00 150.00
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0100 140,000.00 1,400.00
Tukang kayu L.02 OH 0.1000 147,000.00 14,700.00
Kepala tukang L.03 OH 0.0100 160,000.00 1,600.00
Mandor L.04 OH 0.0050 170,000.00 850.00
B BAHAN
Door stop Buah 1.0000 80.00 80.00
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0600 140,000.00 8,400.00
Tukang kayu L.02 OH 0.6000 147,000.00 88,200.00
Kepala tukang L.03 OH 0.0600 160,000.00 9,600.00
Mandor L.04 OH 0.0030 170,000.00 510.00
B BAHAN
Rel pintu sorong Buah 1.0000 90.00 90.00
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0250 140,000.00 3,500.00
Tukang kayu L.02 OH 0.2500 147,000.00 36,750.00
Kepala tukang L.03 OH 0.0250 160,000.00 4,000.00
Mandor L.04 OH 0.0013 170,000.00 221.00
B BAHAN
Kunci lemari Set 1.0000 65.00 65.00
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0150 140,000.00 2,100.00
Tukang kayu L.02 OH 0.1500 147,000.00 22,050.00
Kepala tukang L.03 OH 0.0150 160,000.00 2,400.00
Mandor L.04 OH 0.0008 170,000.00 136.00
B BAHAN
Kaca Tebal 3mm M² 1.1000 80.00 88.00
Silicone Sealant 300 ml Tube 0.0500 75.00 3.75
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0150 140,000.00 2,100.00
Tukang kayu L.02 OH 0.1500 147,000.00 22,050.00
Kepala tukang L.03 OH 0.0150 160,000.00 2,400.00
Mandor L.04 OH 0.0008 170,000.00 136.00
B BAHAN
Kaca tebal 5 mm M² 1.1000 100.00 110.00
Silicone Sealant 300 ml Tube 0.0500 75.00 3.75
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0170 140,000.00 2,380.00
Tukang kayu L.02 OH 0.1700 147,000.00 24,990.00
Kepala tukang L.03 OH 0.0170 160,000.00 2,720.00
Mandor L.04 OH 0.0009 170,000.00 153.00
B BAHAN
Kaca tebal 8 mm M² 1.1000 100.00 110.00
Silicone Sealant 300 ml Tube 0.0700 75.00 5.25
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0250 140,000.00 3,500.00
Tukang kayu L.02 OH 0.2500 147,000.00 36,750.00
Kepala tukang L.03 OH 0.0250 160,000.00 4,000.00
Mandor L.04 OH 0.0013 170,000.00 221.00
B BAHAN
Kaca buram 12 mm M² 1.1000 140.00 154.00
Silicone Sealant 300 ml Tube 0.0700 75.00 5.25
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0150 140,000.00 2,100.00
Tukang kayu L.02 OH 0.1500 147,000.00 22,050.00
Kepala tukang L.03 OH 0.0150 160,000.00 2,400.00
Mandor L.04 OH 0.0080 170,000.00 1,360.00
B BAHAN
Kaca cermin 5 mm M² 1.1000 170.00 187.00
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0170 140,000.00 2,380.00
Tukang kayu L.02 OH 0.1700 147,000.00 24,990.00
Kepala tukang L.03 OH 0.0170 160,000.00 2,720.00
Mandor L.04 OH 0.0090 170,000.00 1,530.00
B BAHAN
Kaca cermin 8 mm M² 1.1000 200.00 220.00
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0150 140,000.00 2,100.00
Tukang kayu L.02 OH 0.1500 147,000.00 22,050.00
Kepala tukang L.03 OH 0.0150 160,000.00 2,400.00
Mandor L.04 OH 0.0080 170,000.00 1,360.00
B BAHAN
Kaca wireglassed 5 mm M² 1.1000 250.00 275.00
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0750 140,000.00 10,500.00
Tukang kayu L.02 OH 0.1500 147,000.00 22,050.00
Kepala tukang L.03 OH 0.0150 160,000.00 2,400.00
Mandor L.04 OH 0.0040 170,000.00 680.00
B BAHAN
Kaca patri 5mm M² 1.1000 180.00 198.00
Silicone Sealant 300 ml Tube 0.0500 75.00 3.75
C PERALATAN
- -
A.4.7.1.22. Pengecatan 1 m2 Permukaan Baja Galvanis Secara Semprot Sistem 3 Lapis Cat Terakhir
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.4000 140,000.00 56,000.00
Tukang cat L.02 OH 0.7000 147,000.00 102,900.00
Kepala tukang L.03 OH 0.0700 160,000.00 11,200.00
Mandor L.04 OH 0.0200 170,000.00 3,400.00
B BAHAN
Cat dasar Kg 0.3000 20.00 6.00
Pengencer Ltr 0.0100 14.00 0.14
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.5000 140,000.00 70,000.00
Tukang batu L.02 OH 1.1000 147,000.00 161,700.00
Kepala tukang L.03 OH 0.0100 160,000.00 1,600.00
Mandor L.04 OH 0.1600 170,000.00 27,200.00
B BAHAN
Closet duduk Unit 1.0000 1,250.00 1,250.00
Perlengkapan Ls 6% x closet 1,250.00 75.00
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 1.0000 140,000.00 140,000.00
Tukang batu L.02 OH 1.5000 147,000.00 220,500.00
Kepala tukang L.03 OH 0.1500 160,000.00 24,000.00
Mandor L.04 OH 0.1600 170,000.00 27,200.00
B BAHAN
Closet jongkok Unit 1.0000 450.00 450.00
Pasangan bata 1PC:3PS M² 0.0360 -
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 1.0000 140,000.00 140,000.00
Tukang batu L.02 OH 1.5000 147,000.00 220,500.00
Kepala tukang L.03 OH 0.1500 160,000.00 24,000.00
Mandor L.04 OH 0.0500 170,000.00 8,500.00
B BAHAN
Closet jongkok Unit 1.0000 450.00 450.00
Pas. Bata 1PC:PS M² 0.0360 -
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 1.0000 140,000.00 140,000.00
Tukang batu L.02 OH 1.0000 147,000.00 147,000.00
Kepala tukang L.03 OH 0.1000 160,000.00 16,000.00
Mandor L.04 OH 0.0500 170,000.00 8,500.00
B BAHAN
Urinoir Lengkap Unit 1.0000 1,500.00 1,500.00
Semen Portland Kg 6.0000 6.00 36.00
Pasir pasang M³ 0.0100 6.50 0.07
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 1.2000 140,000.00 168,000.00
Tukang batu L.02 OH 1.4500 147,000.00 213,150.00
Kepala tukang L.03 OH 0.1500 160,000.00 24,000.00
Mandor L.04 OH 0.0600 170,000.00 10,200.00
B BAHAN
Wastafel Lengkap Unit 1.2000 750.00 900.00
Semen Portland Kg 6.0000 6.00 36.00
Pasir pasang M³ 0.0100 6.50 0.07
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 3.0000 140,000.00 420,000.00
Tukang batu L.02 OH 4.5000 147,000.00 661,500.00
Kepala tukang L.03 OH 0.0500 160,000.00 8,000.00
Mandor L.04 OH 0.9000 170,000.00 153,000.00
B BAHAN
Bak Teraso Unit 1.0000 850.00 850.00
Perlengkapan Ls 12%xbak 850.00 102.00
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 3.0000 140,000.00 420,000.00
Tukang batu L.02 OH 4.5000 147,000.00 661,500.00
Kepala tukang L.03 OH 0.0500 160,000.00 8,000.00
Mandor L.04 OH 0.9000 170,000.00 153,000.00
B BAHAN
Bak fibreglass Unit 1.0000 600.00 600.00
Perlengkapan Ls 12%xbak 600.00 72.00
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 6.0000 140,000.00 840,000.00
Tukang batu L.02 OH 3.0000 147,000.00 441,000.00
Kepala tukang L.03 OH 0.3000 160,000.00 48,000.00
Mandor L.04 OH 0.0300 170,000.00 5,100.00
B BAHAN
Bata Merah Buah 150.0000 5.50 825.00
Semen portlan Kg 120.0000 6.00 720.00
Pasir Pasang M³ 0.3000 6.50 1.95
Porselen 11x11 Buah 360.0000 9.00 3,240.00
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0750 140,000.00 10,500.00
Tukang batu L.02 OH 0.7500 147,000.00 110,250.00
Kepala tukang L.03 OH 0.0750 160,000.00 12,000.00
Mandor L.04 OH 0.0030 170,000.00 510.00
B BAHAN
Bathtub Unit 1.0000 2,500.00 2,500.00
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 3.5000 140,000.00 490,000.00
Tukang batu L.02 OH 4.5000 147,000.00 661,500.00
Kepala tukang L.03 OH 0.0500 160,000.00 8,000.00
Mandor L.04 OH 0.0180 170,000.00 3,060.00
B BAHAN
Beton 1:2:3 M³ 0.9000 - -
Baja tulangan Kg 180.0000 15.00 2,700.00
Kayu bekisting M² 8.0000 100.00 800.00
Ubin porselen 20x20cm Buah 500.0000 10.00 5,000.00
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.3000 140,000.00 42,000.00
Tukang batu L.02 OH 0.4500 147,000.00 66,150.00
Kepala tukang L.03 OH 0.0450 160,000.00 7,200.00
Mandor L.04 OH 0.0150 170,000.00 2,550.00
B BAHAN
Bak air fibreglass Unit 1.0000 600.00 600.00
Perlengkapan Ls 12%xBak 600.00 72.00
C PERALATAN
- -
A.5.1.1.16. Pemasangan 1 buah Bak Kontrol Pasangan Bata 30 x 30 cm Tinggi 35 cm dengan Tutup Beton
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 2.1600 140,000.00 302,400.00
Tukang batu L.02 OH 0.7200 147,000.00 105,840.00
Kepala tukang L.03 OH 0.0720 160,000.00 11,520.00
Mandor L.04 OH 0.0110 170,000.00 1,870.00
B BAHAN
Bata Merah Buah 40.0000 5.50 220.00
Semen Portlan Kg 44.0000 6.00 264.00
Pasir Pasang M³ 0.0700 6.50 0.46
Pasir Beton M³ 0.0600 6.40 0.38
Kerikil M³ 0.0700 8.00 0.56
Baja Tulangan Kg 1.6000 15.00 24.00
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 3.2000 140,000.00 448,000.00
Tukang batu L.02 OH 1.1500 147,000.00 169,050.00
Kepala tukang L.03 OH 0.0110 160,000.00 1,760.00
Mandor L.04 OH 0.0160 170,000.00 2,720.00
B BAHAN
Bata Merah Buah 70.0000 5.50 385.00
Semen Portlan Kg 77.0000 6.00 462.00
Pasir Pasang M³ 0.1300 6.50 0.85
Pasir Beton M³ 0.0900 6.40 0.58
Kerikil M³ 0.0200 8.00 0.16
Baja Tulangan Kg 2.6000 15.00 39.00
C PERALATAN
- -
A.5.1.1.18. Pemasangan 1 buah Bak Kontrol Pasangan Bata 60cm x 60cm Tinggi 65 cm dengan Tutup Beton
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 3.2000 140,000.00 448,000.00
Tukang batu L.02 OH 1.1500 147,000.00 169,050.00
Kepala tukang L.03 OH 0.0110 160,000.00 1,760.00
Mandor L.04 OH 0.0160 170,000.00 2,720.00
B BAHAN
Bata Merah Buah 123.0000 5.50 676.50
Semen Portlan Kg 114.0000 6.00 684.00
Pasir Pasang M³ 0.1840 6.50 1.20
Pasir Beton M³ 0.1200 6.40 0.77
Kerikil M³ 0.0330 8.00 0.26
Baja Tulangan Kg 4.8500 15.00 72.75
C PERALATAN
- -
JUMLAH HARGA PERALATAN -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0540 140,000.00 7,560.00
Tukang batu L.02 OH 0.0900 147,000.00 13,230.00
Kepala tukang L.03 OH 0.0090 160,000.00 1,440.00
Mandor L.04 OH 0.0270 170,000.00 4,590.00
B BAHAN
Pipa galvanis ½” M¹ 1.2000 120.00 144.00
Perlengkapan Ls 35%xpipa 42.00 42.00
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0540 140,000.00 7,560.00
Tukang batu L.02 OH 0.0900 147,000.00 13,230.00
Kepala tukang L.03 OH 0.0090 160,000.00 1,440.00
Mandor L.04 OH 0.0270 170,000.00 4,590.00
B BAHAN
Pipa galvanis 3/4” M¹ 1.2000 150.00 180.00
Perlengkapan Ls 35%xpipa 52.50 52.50
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0540 140,000.00 7,560.00
Tukang batu L.02 OH 0.0900 147,000.00 13,230.00
Kepala tukang L.03 OH 0.0090 160,000.00 1,440.00
Mandor L.04 OH 0.0270 170,000.00 4,590.00
B BAHAN
Pipa galvanis 1” M¹ 1.2000 180.00 216.00
Perlengkapan Ls 35%xpipa 63.00 63.00
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.1080 140,000.00 15,120.00
Tukang batu L.02 OH 0.1800 147,000.00 26,460.00
Kepala tukang L.03 OH 0.0180 160,000.00 2,880.00
Mandor L.04 OH 0.0050 170,000.00 850.00
B BAHAN
Pipa galvanis 11/2” M¹ 1.2000 200.00 240.00
Perlengkapan Ls 35%xpipa 70.00 70.00
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.1350 140,000.00 18,900.00
Tukang batu L.02 OH 0.2250 147,000.00 33,075.00
Kepala tukang L.03 OH 0.0230 160,000.00 3,680.00
Mandor L.04 OH 0.0070 170,000.00 1,190.00
B BAHAN
Pipa galvanis 3” M¹ 1.2000 250.00 300.00
Perlengkapan Ls 35%xpipa 87.50 87.50
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.1350 140,000.00 18,900.00
Tukang batu L.02 OH 0.2250 147,000.00 33,075.00
Kepala tukang L.03 OH 0.0230 160,000.00 3,680.00
Mandor L.04 OH 0.0070 170,000.00 1,190.00
B BAHAN
Pipa galvanis 4” M¹ 1.2000 300.00 360.00
Perlengkapan Ls 35%xpipa 105.00 105.00
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0360 140,000.00 5,040.00
Tukang batu L.02 OH 0.0600 147,000.00 8,820.00
Kepala tukang L.03 OH 0.0060 160,000.00 960.00
Mandor L.04 OH 0.0020 170,000.00 340.00
B BAHAN
Pipa PVC 1/2” M¹ 1.2000 10.00 12.00
Perlengkapan Ls 35%xpipa 3.50 3.50
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0360 140,000.00 5,040.00
Tukang batu L.02 OH 0.0600 147,000.00 8,820.00
Kepala tukang L.03 OH 0.0060 160,000.00 960.00
Mandor L.04 OH 0.0020 170,000.00 340.00
B BAHAN
Pipa PVC ¾” M¹ 1.2000 15.00 18.00
Perlengkapan Ls 35%xpipa 2.25 2.25
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0360 140,000.00 5,040.00
Tukang batu L.02 OH 0.0600 147,000.00 8,820.00
Kepala tukang L.03 OH 0.0060 160,000.00 960.00
Mandor L.04 OH 0.0020 170,000.00 340.00
B BAHAN
Pipa PVC 1” M¹ 1.2000 20.00 24.00
Perlengkapan Ls 35%xpipa 7.00 7.00
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0540 140,000.00 7,560.00
Tukang batu L.02 OH 0.0900 147,000.00 13,230.00
Kepala tukang L.03 OH 0.0090 160,000.00 1,440.00
Mandor L.04 OH 0.0030 170,000.00 510.00
B BAHAN
Pipa PVC 11/2” M¹ 1.2000 25.00 30.00
Perlengkapan Ls 35%xpipa 8.75 8.75
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0540 140,000.00 7,560.00
Tukang batu L.02 OH 0.0900 147,000.00 13,230.00
Kepala tukang L.03 OH 0.0090 160,000.00 1,440.00
Mandor L.04 OH 0.0030 170,000.00 510.00
B BAHAN
Pipa PVC 2” M¹ 1.2000 30.00 36.00
Perlengkapan Ls 35%xpipa 10.50 10.50
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0810 140,000.00 11,340.00
Tukang batu L.02 OH 0.1350 147,000.00 19,845.00
Kepala tukang L.03 OH 0.0135 160,000.00 2,160.00
Mandor L.04 OH 0.0040 170,000.00 680.00
B BAHAN
Pipa PVC 21/2” M¹ 1.2000 35.00 42.00
Perlengkapan Ls 35%xpipa 12.25 12.25
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0810 140,000.00 11,340.00
Tukang batu L.02 OH 0.1350 147,000.00 19,845.00
Kepala tukang L.03 OH 0.0135 160,000.00 2,160.00
Mandor L.04 OH 0.0040 170,000.00 680.00
B BAHAN
Pipa PVC 3” M¹ 1.2000 40.00 48.00
Perlengkapan Ls 35%xpipa 14.00 14.00
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0810 140,000.00 11,340.00
Tukang batu L.02 OH 0.1350 147,000.00 19,845.00
Kepala tukang L.03 OH 0.0135 160,000.00 2,160.00
Mandor L.04 OH 0.0040 170,000.00 680.00
B BAHAN
Pipa PVC 4” M¹ 1.2000 45.00 54.00
Perlengkapan Kg 35%xpipa 15.75 15.75
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0300 140,000.00 4,200.00
Tukang batu L.02 OH 0.3000 147,000.00 44,100.00
Kepala tukang L.03 OH 0.0300 160,000.00 4,800.00
Mandor L.04 OH 0.0150 170,000.00 2,550.00
B BAHAN
Bak cuci piring Unit 1.0000 450.00 450.00
Waterdrain Buah 1.0000 150.00 157.50
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0500 140,000.00 7,000.00
Tukang batu L.02 OH 0.5000 147,000.00 73,500.00
Kepala tukang L.03 OH 0.0500 160,000.00 8,000.00
Mandor L.04 OH 0.0250 170,000.00 4,250.00
B BAHAN
Bak cuci piring Unit 1.0000 450.00 450.00
Waterdrain Buah 1.0000 150.00 150.00
Semen portland Kg 20.0000 6.00 120.00
Pasir pasang M³ 0.0500 6.50 0.33
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0100 140,000.00 1,400.00
Tukang batu L.02 OH 0.4000 147,000.00 58,800.00
Kepala tukang L.03 OH 0.0400 160,000.00 6,400.00
Mandor L.04 OH 0.0050 170,000.00 850.00
B BAHAN
Kran air Buah 1.0000 25.00 25.00
Sealtape Buah 0.0250 10.00 0.25
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0100 140,000.00 1,400.00
Tukang batu L.02 OH 0.1000 147,000.00 14,700.00
Kepala tukang L.03 OH 0.0100 160,000.00 1,600.00
Mandor L.04 OH 0.0050 170,000.00 850.00
B BAHAN
Floor drain Unit 1.0000 350.00 350.00
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0800 140,000.00 11,200.00
Tukang batu L.02 OH 0.0400 147,000.00 5,880.00
Kepala tukang L.03 OH 0.0040 160,000.00 640.00
Mandor L.04 OH 0.0040 170,000.00 680.00
B BAHAN
Pipa Tanah Per M¹ 1.6000 50.00 80.00
Semen Portlan Kg 35.0000 6.00 210.00
Pasir Pasang M³ 0.0140 6.50 0.09
Pasir Urug M³ 0.0140 6.60 0.09
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0600 140,000.00 8,400.00
Tukang batu L.02 OH 0.0300 147,000.00 4,410.00
Kepala tukang L.03 OH 0.0030 160,000.00 480.00
Mandor L.04 OH 0.0030 170,000.00 510.00
B BAHAN
Pipa Tanah dia 15 Per M¹ 1.6000 55.00 88.00
Semen Portlan Kg 0.9300 6.00 5.58
Pasir Pasang M³ 0.0130 6.50 0.08
Pasir Urug M³ 0.0110 6.60 0.07
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.1400 140,000.00 19,600.00
Tukang batu L.02 OH 0.0700 147,000.00 10,290.00
Kepala tukang L.03 OH 0.0070 160,000.00 1,120.00
Mandor L.04 OH 0.0070 170,000.00 1,190.00
B BAHAN
Pipa Tanah dia 15 Per M¹ 1.1000 55.00 60.50
Bata Merah M³ 0.0270 5.50 0.15
Semen Portlan Kg 0.9300 6.00 5.58
Pasir Pasang M³ 0.0560 6.50 0.36
Pasir Urug M³ 0.0240 6.60 0.16
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.3800 140,000.00 53,200.00
Tukang batu L.02 OH 0.1900 147,000.00 27,930.00
Kepala tukang L.03 OH 0.0190 160,000.00 3,040.00
Mandor L.04 OH 0.0190 170,000.00 3,230.00
B BAHAN
Pipa Tanah dia 15 Per M¹ 1.1000 55.00 60.50
Bata Merah M³ 0.5500 5.50 3.03
Semen Portlan Kg 10.3000 6.00 61.80
Pasir Pasang M³ 0.0160 6.50 0.10
Pasir Urug M³ 0.0690 6.60 0.46
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Upah % 100.0000 147,000.00 147,000.00
B BAHAN
Pipa listrik 5/8” Btg 3.0000 20.00 60.00
Kabel M¹ 15.0000 25.00 375.00
T Dus Buah 1.0000 15.00 15.00
L Bow Buah 2.0000 10.00 20.00
Klem biasa Buah 24.0000 2.00 48.00
MCCB (Boks MCB) Buah 1.0000 15.00 15.00
MCB Buah 2.0000 150.00 300.00
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Upah % 100.0000 147,000.00 147,000.00
B BAHAN
Pipa listrik 5/8” Btg 3.0000 20.00 60.00
Kabel M¹ 24.0000 25.00 600.00
T Dus Buah 3.0000 15.00 45.00
L Bow Buah 4.0000 10.00 40.00
Las Dop Buah 3.0000 3.00 9.00
Klem Buah 24.0000 2.00 48.00
Mongkok Buah 1.0000 25.00 25.00
Saklar Buah 1.0000 45.00 45.00
Fitting Buah 1.0000 15.00 15.00
C PERALATAN
- -
SAT. HARGA
NO URAIAN PEKERJAAN VOLUME SAT.
(Rp.)
1. PEKERJAAN PERSIAPAN
1.1 Administrasi dan Dokumentasi 1 Ls 10,000,000.00
1.2 Papan Nama Proyek 1 Ls 1,800,000.00
1.3 SMK3 KONSTRUKSI 1 Ls 160,840,000.00
1.4 Mobiliasi dan Demobilisasi 3 Bln 28,000,000.00
Sub jumlah
2. PEKERJAAN TRIBUN BARAT
2.1 Pekerjaan Mahkota Kolom
2.1 Bongkaran Penutup GRC 360.8 m2 4,700.00
2.2 Bongkaran Rangka Penutup GRC 360.8 m2 11,300.00
2.3 Rangka Besi Galvanis Hollow 4x4 360.8 m2 288,400.00
2.4 Penutup ACP PVDF 4 mm ex. Seven 360.8 m2 670,600.00
2.2 Pekerjaan Gelagar Kolom
2.2.1 Bongkaran Penutup GRC 787.05 m2 4,700.00
2.2.2 Bongkaran Rangka Penutup GRC 787.05 m2 11,300.00
2.2.3 Rangka Besi Galvanis Hollow 4x4 787.05 m2 288,400.00
2.2.4 Penutup ACP PVDF 4 mm ex. Seven 787.05 m2 670,600.00
Sub Jumlah
3. PEKERJAAN TRIBUN TIMUR
3.1 Pekerjaan Mahkota Kolom
3.1.1 Bongkaran Penutup GRC 360.8 m2 4,700.00
3.1.2 Bongkaran Rangka Penutup GRC 360.8 m2 11,300.00
3.1.3 Rangka Besi Galvanis Hollow 4x4 360.8 m2 288,400.00
3.1.4 Penutup ACP PVDF 4 mm ex. Seven 360.8 m2 670,600.00
3.2 Pekerjaan Gelagar Kolom
3.2.1 Bongkaran Penutup GRC 787.05 m2 4,700.00
3.2.2 Bongkaran Rangka Penutup GRC 787.05 m2 11,300.00
3.2.3 Rangka Besi Galvanis Hollow 4x4 787.05 m2 288,400.00
3.2.4 Penutup ACP PVDF 4 mm ex. Seven 787.05 m2 670,600.00
Sub jumlah
4. PEKERJAAN TRIBUN UTARA
4.1 Bongkaran Penutup ACP Videotron 72 m2 14,100.00
4.2 Bongkaran Rangka Penutup ACP Videotron 72 m2 11,300.00
4.3 Rangka Besi Galvanis Hollow 4x4 112 m2 288,400.00
4.4 Penutup ACP PVDF 4 mm ex. Seven 112 m2 670,600.00
Sub jumlah
5. PEKERJAAN TRIBUN SELATAN
5.1 Bongkaran Penutup ACP Videotron 72 m2 14,100.00
5.2 Bongkaran Rangka Penutup ACP Videotron 72 m2 11,300.00
5.3 Rangka Besi Galvanis Hollow 4x4 112 m2 288,400.00
5.4 Penutup ACP PVDF 4 mm ex. Seven 112 m2 670,600.00
Sub jumlah
an Stadion SJH
JUMLAH HARGA
(Rp.)
10,000,000.00
1,800,000.00
160,840,000.00
84,000,000.00
256,640,000.00
1,695,760.00
4,077,040.00
104,054,720.00
241,952,480.00
3,699,135.00
8,893,665.00
226,985,220.00
527,795,730.00
1,119,153,750.00
1,695,760.00
4,077,040.00
104,054,720.00
241,952,480.00
3,699,135.00
8,893,665.00
226,985,220.00
527,795,730.00
1,119,153,750.00
1,015,200.00
813,600.00
32,300,800.00
75,107,200.00
109,236,800.00
1,015,200.00
813,600.00
32,300,800.00
75,107,200.00
109,236,800.00
HARGA PERKIRAAN SENDIRI
(HPS)
NO URAIAN PEKERJAAN
1. PEKERJAAN PERSIAPAN
2. PEKERJAAN TRIBUN BARAT
3. PEKERJAAN TRIBUN TIMUR
4. PEKERJAAN TRIBUN UTARA
5. PEKERJAAN TRIBUN SELATAN
PRASARANA GEDUNG
dan Gelagar Tribun Barat dan Stadion SJH
JUMLAH TOTAL
HARGA
(Rp.)
256,640,000.00
1,119,153,750.00
1,119,153,750.00
109,236,800.00
109,236,800.00
2,713,421,100.00
298,476,321.00
3,011,897,421.00
3,011,800,000.00