ANALISA TERAPAN
Ter. 1 m2 Wiremash
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.6600 150,000.00 99,000.00
Tukang Besi L.02 OH 0.3300 180,000.00 59,400.00
Kepala Tukang L.03 OH 0.0330 260,000.00 8,580.00
Mandor L.04 OH 0.0330 270,000.00 8,910.00
JUMLAH TENAGA KERJA 175,890.00
B. BAHAN
Besi beton kg 2.2320 12,000.00 26,784.00