Anda di halaman 1dari 1

SPESIFIKASI TEKNIK

PENGADAAN PENATAAN DAN PENYEDIAAN FASILITAS PENUNJANG GEDUNG KANTOR OTORITAS


JASA KEUANGAN KALIMANTAN BARAT
PEKERJAAN APAR

NO. URAIAN PEKERJAAN SPESIFIKASI

IV Pekerjaan APAR

A Lantai 1
1 Area resepsionis, Yamato / Chubb
Dry Powder 6 kg
2 Pantry, Dry Powder 6 kg Yamato / Chubb
Dry Powder 6 kg
Sub Total Lantai 1

B Lantai 2
1 Area resepsionis, Dry Powder 6 kg Yamato / Chubb
Dry Powder 6 kg
2 Pantry, Dry Powder 6 kg Yamato / Chubb
Dry Powder 6 kg
Sub Total Lantai 2

C Lantai 3
1 Area resepsionis, Dry Powder 6 kg Yamato / Chubb
Dry Powder 6 kg
2 Pantry, Dry Powder 6 kg Yamato / Chubb
Dry Powder 6 kg
Sub Total Lantai 3

Total Pekerjaan APAR