Rekap Volume Opname Mandor
Rekap Volume Opname Mandor
Satria
WIRE
MAWAR RONDI Keteranga
BAKTI JUMLAH JUMLAH JUMLAH TOTAL JUMLAH
HARGA HARGA HARGA VOLUME HARGA n
10 11 12
B. KAWANG B. KAWANG
Sapta
PROYEK : REVITALISASI JARINGAN IRIGASI DI JURANG SATE HILIR
TGL : 8 MARET 2023
NO NAMA MANDOR Jumlah Dibayar Retensi Potongan Semen Potongan Molen Total Harga
1 WIRA 9,604,254.00 717,066.00 4,020,000.00 14,341,320.00
2 RIZAL/MUNDUR 54,736,360.00 3,512,440.00 12,000,000.00 70,248,800.00
3 RONDI 13,871,842.00 938,518.00 3,960,000.00 18,770,360.00
4 MAWAR 23,841,427.50 1,599,022.50 6,540,000.00 31,980,450.00
5 SAHDI 133,423,317.50 8,443,332.50 27,000,000.00 168,866,650.00
6 DARTE 35,431,067.50 2,780,582.50 11,400,000.00 6,000,000.00 55,611,650.00
7 MUSTIAH 51,360,360.00 4,008,440.00 16,800,000.00 8,000,000.00 80,168,800.00
8 UDIN 144,547,439.00 9,976,181.00 42,000,000.00 3,000,000.00 199,523,620.00
9 NORMAN 27,533,400.00 1,878,600.00 8,160,000.00 37,572,000.00
10 SUHUR 60,737,370.00 4,407,230.00 18,000,000.00 5,000,000.00 88,144,600.00
11 HERI 20,513,600.00 1,474,400.00 7,500,000.00 29,488,000.00
12 ERWIN 123,425,350.00 7,127,650.00 12,000,000.00 142,553,000.00
TOTAL 699,025,787.50 46,863,462.50 169,380,000.00 22,000,000.00 937,269,250.00
Satria Sapta
BAHOK H.SUBKI ERWIN MUSTIAH
No Uraian Pekerjaan Satuan Harga Satuan ( Rp ) JUMLAH JUMLAH JUMLAH JUMLAH
1 HARGA 2 HARGA 3 HARGA HARGA 4
OPNAME KETEJER OPNAME TANGGAK OPNAME BT OPNAME TR BT. TULIS TW. RAMPAK KASBON
KASBON
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - 0.50 2,500,000.00
- - 1.50 180,000,000.00
- - - -
- - 212,500,000.00
- -
20,000,000.00 10,000,000.00 10,000,000.00
Sapta
PROYEK : REVITALISASI JARINGAN IRIGASI DI JURANG SATE HILIR
TGL : 8 MARET 2023
NO NAMA MANDOR Jumlah Dibayar Yang Telah dibayar Retensi Potongan Semen Potongan Molen
1 BAHOK 25,500,000.00 1,500,000.00 3,000,000.00
2 H.SUBKI 25,500,000.00 1,500,000.00 3,000,000.00
3 ERWIN 58,187,500.00 58,187,500.00 6,125,000.00 -
4 MUSTIAH 20,000,000.00
5 H. KARIM 10,000,000.00
30,000,000.00
30,000,000.00
122,500,000.00
20,000,000.00
10,000,000.00
-
-
-
-
-
-
-
212,500,000.00
H. SUBKI BAHOK/SUHAIMI
No Uraian Pekerjaan Satuan Harga Satuan ( Rp ) JUMLAH JUMLAH JUMLAH
1 HARGA 2 HARGA HARGA
RJ. TANGGAK RJ. TANGGAK RJ. KETEJER BKT RM. KETEJER BKT TR
51,000,000.00
ERWIN HERI SAHDI MUSTIAH
JUMLAH JUMLAH JUMLAH JUMLAH JUMLAH JUMLAH
3 HARGA HARGA HARGA 4 HARGA 5 HARGA 6 HARGA
BT BNC R.J. TW. RAMPAK R.J. BT. TULIS BNC PN PN PN PN PN PN
- - - - 98.79 1,481,850.00 -
64.82 - - 29,817,000.00 392.66 180,623,600.00 - -
- - - 15.15 6,060,000.00 - -
- - - - 713.18 328,062,000.00 467.95 215,257,000.00
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - 75.00 750,000.00 - -
3,750,000.00 - - - - -
0.75 90,000,000.00 90,000,000.00 - - - -
- - - - - -
93,750,000.00 90,000,000.00 29,817,000.00 187,433,600.00 329,544,000.00 215,257,000.00
59,375,000.00 57,000,000.00 - - 20,513,600.00 133,423,317.50 51,360,360.00
34,375,000.00 33,000,000.00 29,817,000.00 - 166,920,000.00 196,120,682.50 163,896,640.00
4,650,000.00 4,500,000.00 1,450,000.00 9,350,000.00 16,450,000.00 10,750,000.00
20,000,000.00
3,000,000.00 6,000,000.00 33,000,000.00 48,000,000.00 39,000,000.00
14,000,000.00
29,725,000.00 25,500,000.00 22,367,000.00 124,570,000.00 131,670,682.00 80,100,000.00
145,083,600.00 131,460,360.00
89,100,000.00 82,500,000.00
MAWAR H. MUNARIS JUANIS BENI H. KARIM NORMAN NORMAN
JUMLAH JUMLAH JUMLAH JUMLAH JUMLAH
7 HARGA 8 HARGA 9 HARGA 10 HARGA 11 HARGA 12 12
166.666666666667
RIZAL RIZAL DARTE SAMIRAH UDIN
JUMLAH JUMLAH JUMLAH JUMLAH JUMLAH JUMLAH
HARGA HARGA 13 13 HARGA HARGA 14 HARGA 15 HARGA 16
PN BKT PN BKT PN BKT BNC BNC REGASA
60,319,360.00
SUHUR Keteranga
JUMLAH JUMLAH TOTAL JUMLAH
HARGA HARGA VOLUME HARGA n
17
REGASA RAGASA RAGASA
807,300.00 - 721.32 10,819,800.00
246,376,920.00 335.79 154,465,240.00 2,630.07 1,209,830,360.00
57,963,200.00 97.21 38,882,400.00 540.85 216,341,600.00
- - 1,312.41 603,708,600.00
- - 15.33 153,300.00
- - 11.60 174,000.00
- - 100.58 1,257,250.00
- - - -
- - - -
- - 4,119.79 1,235,937.00
- - 16,151.76 7,268,292.00
- - 75.00 4,500,000.00
- - - -
- - - -
- 58.85 1,177,000.00 528.70 10,574,000.00
1,000,000.00 100.00 1,000,000.00 275.00 2,750,000.00
- - 0.75 3,750,000.00
- - 2.50 300,000,000.00
- - - -
306,147,420.00 195,524,640.00 2,372,363,139.00
144,547,439.00 60,737,370.00
161,599,981.00 134,787,270.00
15,300,000.00 9,770,000.00
66,000,000.00 37,500,000.00
5,100,000.00 7,100,000.00
75,199,000.00 80,417,270.00
Dibuat oleh:
75199000 141,154,640.00
Sapta
PROYEK : REVITALISASI JARINGAN IRIGASI DI JURANG SATE HILIR
TGL : 8 MARET 2023
NO NAMA MANDOR Jumlah Dibayar Retensi Potongan Semen Potongan Molen Telah dibayar Kasbon Total Harga
1 H. SUBKI 25,500,000.00 3,000,000.00 6,000,000.00 - 25,500,000.00 - 60,000,000.00
2 BAHOK/SUHAIMI 213,655,850.00 14,000,000.00 28,500,000.00 25,500,000.00 281,655,850.00
3 ERWIN 77,592,000.00 10,600,000.00 9,000,000.00 116,375,000.00 213,567,000.00
4 HERI 124,570,000.00 9,350,000.00 33,000,000.00 20,513,600.00 187,433,600.00
5 SAHDI 131,670,682.00 16,450,000.00 48,000,000.00 133,423,317.50 329,543,999.50
6 MUSTIAH 80,100,000.00 10,750,000.00 39,000,000.00 14,000,000.00 51,360,360.00 20,000,000.00 215,210,360.00
7 MAWAR 5,419,150.00 2,000,000.00 10,000,000.00 - 23,841,000.00 - 41,260,150.00
8 H. MUNARIS 7,524,000.00 396,000.00 - - - - 7,920,000.00
9 JUANIS 21,848,000.00 1,300,000.00 3,000,000.00 - - - 26,148,000.00
10 BENI 30,944,000.00 1,944,000.00 6,000,000.00 - - - 38,888,000.00
11 H. KARIM 20,486,000.00 2,070,000.00 9,000,000.00 - - 10,000,000.00 41,556,000.00
12 NORMAN 54,858,000.00 5,430,000.00 21,000,000.00 - 27,533,400.00 - 108,821,400.00
13 RIZAL 52,519,000.00 7,144,000.00 28,500,000.00 - 54,736,360.00 - 142,899,360.00
14 DARTE 50,135,283.00 8,400,000.00 34,500,000.00 15,000,000.00 35,431,067.50 25,000,000.00 168,466,350.50
15 SAMIRAH 7,268,292.00 7,268,292.00
16 UDIN 75,199,000.00 15,300,000.00 66,000,000.00 5,100,000.00 144,547,439.00 - 306,146,439.00
17 SUHUR 80,417,270.00 9,770,000.00 37,500,000.00 7,100,000.00 60,737,370.00 - 195,524,640.00
TOTAL 1,059,706,527.00 117,904,000.00 379,000,000.00 41,200,000.00 719,498,914.00 55,000,000.00 2,372,309,441.00
141,154,640.00
Satria Sapta
SUHUR SUHUR H. SUBKI
No Uraian Pekerjaan Satuan Harga Satuan ( Rp ) JUMLAH JUMLAH
1 HARGA 1 HARGA 2
72,504,068.00
H. ARIFIN ERWIN ERWIN ERWIN H. MUNARIS
JUMLAH JUMLAH JUMLAH JUMLAH JUMLAH
HARGA 3 HARGA 4 HARGA 4 HARGA 4 HARGA 5
RJ. TANGGAK JEMPONG JEMPONG RJ. B. TULIS RJ. B. TULIS TW. RAMPAK TW. RAMPAK BNC BNC BUN KAWANG
38,940,150.00
15,090,150.00
H. MUNARIS SAHDI SAPRON SAMSUDIN TATANG
JUMLAH JUMLAH JUMLAH JUMLAH JUMLAH
HARGA 5 HARGA 6 HARGA 7 HARGA 8 HARGA 9
BUN KAWANG DAM BABI DAM BABI DAM BABI DAM BABI DAM BABI DAM BABI DAM BABI DAM BABI DAM BABI
201,600.00 - - - -
- - - - -
- - - - -
25,765,060.00 52.01 23,924,600.00 477.43 219,617,800.00 315.88 145,304,800.00 92.37 42,490,200.00 266.46
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
300
MUSTIAH MUSTIAH H. KARIM RONDI RONDI
JUMLAH JUMLAH JUMLAH JUMLAH JUMLAH JUMLAH
HARGA 10 HARGA 10 HARGA 11 HARGA 12 HARGA 12 HARGA
DAM BABI B. NGERENG PENAIK BKT BGR BPN
- - - 200.00 3,000,000.00 - -
- - - - - -
- - - - - -
122,571,600.00 245.20 112,792,000.00 495.69 228,017,400.00 132.68 61,032,800.00 49.80 22,908,000.00 99.52 45,779,200.00
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - 47.38 947,600.00 - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
85552400
95,608,790.00
HERI HERI BAHOK BAHOK BAHOK
JUMLAH JUMLAH JUMLAH JUMLAH
13 HARGA 13 HARGA 14 HARGA 14 HARGA 14
BPN BPN DAM BABI BKT RJ. KETEJER RJ. KETEJER BGR
3,524,000.00
39,741,710.00 57,663,270.00 102,388,770.00 28,500,000.00
376,703,600.00
RIZAL RIZAL JUANIS WIRA BAKTI UDIN
JUMLAH JUMLAH JUMLAH JUMLAH JUMLAH
HARGA 15 HARGA 15 HARGA 16 HARGA 17 HARGA 18
BGR PENAIK BKT BKT BPN REGASA
24,296,027.25
NORMAN NORMAN SAMIRAH Keteranga
JUMLAH JUMLAH JUMLAH JUMLAH TOTAL JUMLAH
HARGA HARGA HARGA HARGA VOLUME HARGA n
19 19 20
Sapta
PROYEK : REVITALISASI JARINGAN IRIGASI DI JURANG SATE HILIR
TGL : 8 MARET 2023
NO NAMA MANDOR Jumlah Dibayar Retensi Potongan Semen Potongan Molen Telah dibayar Kasbon Total Harga
1 SUHUR 72,504,068.00 14,839,932.00 58,200,000.00 10,100,000.00 141,154,640.00 - 296,798,640.00
2 H. SUBKI 28,500,000.00 4,500,000.00 6,000,000.00 - 51,000,000.00 - 90,000,000.00
3 H. ARIFIN 105,100,550.00 7,268,450.00 33,000,000.00 - - - 145,369,000.00
4 ERWIN 38,940,150.00 11,025,000.00 3,000,000.00 171,600,000.00 224,565,150.00
5 H. MUNARIS 27,872,697.00 2,494,563.00 12,000,000.00 7,524,000.00 49,891,260.00
6 SAHDI 178,636,910.00 10,980,890.00 30,000,000.00 - - 219,617,800.00
7 SAPRON 120,039,560.00 7,265,240.00 18,000,000.00 - 145,304,800.00
8 SAMSUDIN 31,365,690.00 2,124,510.00 9,000,000.00 - 42,490,200.00
9 TATANG 92,443,020.00 6,128,580.00 24,000,000.00 122,571,600.00
10 MUSTIAH 95,608,790.00 17,087,850.00 60,600,000.00 17,000,000.00 131,460,360.00 20,000,000.00 341,757,000.00
11 H. KARIM 18,345,160.00 3,201,640.00 12,000,000.00 - 20,486,000.00 10,000,000.00 64,032,800.00
12 RONDI 56,552,840.00 3,434,360.00 8,700,000.00 - - - 68,687,200.00
13 HERI 97,404,980.00 16,391,470.00 69,000,000.00 - 145,083,600.00 - 327,880,050.00
14 BAHOK 137,280,833.75 23,590,141.25 75,300,000.00 - 239,155,850.00 - 475,326,825.00
15 RIZAL 24,296,027.25 8,707,967.75 33,900,000.00 - 107,255,360.00 - 174,159,355.00
16 JUANIS 3,631,043.95 1,498,897.05 3,000,000.00 - 21,848,000.00 - 29,977,941.00
17 WIRA BAKTI 34,994,247.50 2,141,802.50 5,700,000.00 - - 42,836,050.00
18 UDIN 32,748,560.00 17,373,421.00 70,500,000.00 7,100,000.00 219,746,439.00 - 347,468,420.00
19 NORMAN 31,373,097.50 4,091,952.50 16,500,000.00 - 29,874,000.00 81,839,050.00
20 SAMIRAH 2,961,000.00 2,961,000.00
TOTAL 1,230,599,224.95 164,146,667.05 548,400,000.00 34,200,000.00 1,286,188,249.00 30,000,000.00 3,293,534,141.00
Satria Sapta
PROYEK : REVITALISASI JARINGAN IRIGASI DI JURANG SATE HILIR
TGL : 8 MARET 2023
NO NAMA MANDOR Jumlah Dibayar Retensi Potongan Semen Potongan Molen Telah dibayar Kasbon Total Harga
1 SUHUR 72,504,068.00 14,839,932.00 58,200,000.00 10,100,000.00 141,154,640.00 - 296,798,640.00
2 H. SUBKI 28,500,000.00 4,500,000.00 6,000,000.00 - 51,000,000.00 - 90,000,000.00
3 H. ARIFIN 105,100,550.00 7,268,450.00 33,000,000.00 - - - 145,369,000.00
4 ERWIN 38,940,150.00 11,025,000.00 3,000,000.00 171,600,000.00 224,565,150.00
5 H. MUNARIS 27,872,697.00 2,494,563.00 12,000,000.00 7,524,000.00 49,891,260.00
6 SAHDI 178,636,910.00 10,980,890.00 30,000,000.00 - - 219,617,800.00
7 SAPRON 120,039,560.00 7,265,240.00 18,000,000.00 - 145,304,800.00
8 SAMSUDIN 31,365,690.00 2,124,510.00 9,000,000.00 - 42,490,200.00
9 TATANG 92,443,020.00 6,128,580.00 24,000,000.00 122,571,600.00
10 MUSTIAH 95,608,790.00 17,087,850.00 60,600,000.00 17,000,000.00 131,460,360.00 20,000,000.00 341,757,000.00
11 H. KARIM 18,345,160.00 3,201,640.00 12,000,000.00 - 20,486,000.00 10,000,000.00 64,032,800.00
12 RONDI 56,552,840.00 3,434,360.00 8,700,000.00 - - - 68,687,200.00
13 HERI 97,404,980.00 16,391,470.00 69,000,000.00 - 145,083,600.00 - 327,880,050.00
14 BAHOK 137,280,833.75 23,590,141.25 75,300,000.00 - 239,155,850.00 - 475,326,825.00
15 RIZAL 24,296,027.25 8,707,967.75 33,900,000.00 - 107,255,360.00 - 174,159,355.00
16 JUANIS 3,631,043.95 1,498,897.05 3,000,000.00 - 21,848,000.00 - 29,977,941.00
17 WIRA BAKTI 34,994,247.50 2,141,802.50 5,700,000.00 - - 42,836,050.00
18 UDIN 32,748,560.00 17,373,421.00 70,500,000.00 7,100,000.00 219,746,439.00 - 347,468,420.00
19 NORMAN 31,373,097.50 4,091,952.50 16,500,000.00 - 29,874,000.00 81,839,050.00
20 SAMIRAH 2,961,000.00 2,961,000.00
TOTAL 1,230,599,224.95 164,146,667.05 548,400,000.00 34,200,000.00 1,286,188,249.00 30,000,000.00 3,293,534,141.00
Satria Sapta
REKAPITULASI OPNAME MANDOR
Satria Sapta