No.

Tanggal Toko Item Nilai


1 10/04/2022 TB. Bahagia batu bata, pasir, paku, semen, karung Rp.960.500
2 11/04/2022 TB. Bahagia roster, ram, multi, besi, mata gergaji Rp.370.000
3 15/04/2022 BJ Home keramik lantai dan dinding Rp.775.350
4 16/04/2022 Upah Upah tukang s/d 16 april 2022 Rp.2.280.000
5 16/04/2022 TB. Bahagia plug, karung, sealtape Rp.98.500
6 19/04/2022 TB. Bahagia Accessories pipa, lem pvc, semen Rp.340.500
7 20/04/2022 TB. Makmur Jaya Bata Rp.22.500
8 20/04/2022 TB. Makmur Jaya Tutup kuras bak, bata Rp.41.000
9 21/04/2022 BJ Home Sika top 107, keramik Rp.396.750
10 22/04/2022 TB. Bahagia knie 4", pipa 4" Rp.62.500
11 23/04/2022 Upah Upah tukang s/d 23 april 2022 Rp.2.280.000
12 25/04/2022 BJ Home keran onda Rp.192.000
13 25/04/2022 RKM plamir envi, cat jotaplast Rp.506.261
14 26/04/2022 Brangkal buang berangkal Rp.200.000
15 27/04/2022 Upah Upah tukang s/d 27 april 2022 Rp.1.520.000
16 10/05/2022 TB. Bahagia Gipsum, hollow, sekrup, karung Rp.705.000
15 14/05/2022 Upah Upah tukang s/d 14 Mei 2022 Rp.1.900.000

Total Rp.12.650.861
Fee 10% Rp.1.265.086
Grand Total Rp.13.915.947
Kasbon Rp.5.000.000
Sisa Rp.8.915.947
ABSENSI HARIAN UPAHAN Tanggal 16/04/2022
PROYEK : RENOVASI CIJAWURA
HARI
No. NAMA PEKERJA HARGA SAT JUMLAH
M S S R K J S
1 CIJAWURA
Pak momo TK 1 2 3 4 5 6 6 140.000 840.000
Hendra TK 1 2 3 4 5 6 6 140.000 840.000
Tery knk 1 2 3 4 5 6 6 100.000 600.000

TOTAL 2.280.000

ABSENSI HARIAN UPAHAN Tanggal 23/04/2022


PROYEK : RENOVASI CIJAWURA
HARI
No. NAMA PEKERJA HARGA SAT JUMLAH
M S S R K J S
1 CIJAWURA
Pak momo TK 1 2 3 4 5 6 6 140.000 840.000
Hendra TK 1 2 3 4 5 6 6 140.000 840.000
Tery knk 1 2 3 4 5 6 6 100.000 600.000
TOTAL 2.280.000

ABSENSI HARIAN UPAHAN Tanggal 27/04/2022


PROYEK : RENOVASI CIJAWURA
HARI
No. NAMA PEKERJA HARGA SAT JUMLAH
M S S R K J S
1 CIJAWURA
Pak momo TK 1 2 3 4 4 140.000 560.000
Hendra TK 1 2 3 4 4 140.000 560.000
Tery knk 1 2 3 4 4 100.000 400.000
TOTAL 1.520.000

ABSENSI HARIAN UPAHAN Tanggal 14/05/2022


PROYEK : RENOVASI CIJAWURA
HARI
No. NAMA PEKERJA HARGA SAT JUMLAH
M S S R K J S
1 CIJAWURA
Pak momo TK 1 2 3 4 5 5 140.000 700.000
Hendra TK 1 2 3 4 5 5 140.000 700.000
Tery knk 1 2 3 4 5 5 100.000 500.000
TOTAL 1.900.000