Anda di halaman 1dari 146

NO.

KOEF SATUAN URAIAN PEKERJAAN

A PEKERJAAN PERSIAPAN
1 1 m² Pembersihan & Stripping Lahan
A Tenaga
0.1 OH Pekerja
0.05 OH Mandor
B Bahan
C Peralatan
D A+B+C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
2 1 m1 Pemasangan Bouwplank
A Tenaga
0.1 OH Pekerja
0.1 OH Tukang Kayu
0.01 OH Kepala Tukang
0.005 OH Mandor
B Bahan
0.012 m3 Kayu 5/7x 4m Kayu Kruing
0.02 Kg Paku Biasa 1"s/d 4"
0.007 m3 Kayu Papan 3/20 Kruing
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
3 1 Unit Papan Nama Proyek
A Tenaga
0.4 OH Pekerja
0.2 OH Tukang Kayu
0.02 OH Kepala Tukang
0.02 OH Mandor
B Bahan
0.025 m3 Kayu 5/7x 4m Kayu Kruing
1 m2 Print Outdoor Flexi
0.1 kg Paku Biasa 1"s/d 4"
16.8 kg Portland Semen
0.027 m3 Pasir Pasang
0.04 m3 Kerikil
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
4 1 Bln Administrasi, Dokumentasi Proyek & As Built Drawing
1 Bln
Jumlah
5 1 Bln Listrik & Air Kerja
1 Bln
Jumlah
6 1 m1 Pagar Sementara Proyek & Keamanan
A Tenaga
0.2 OH Pekerja
0.4 OH Tukang Kayu
0.02 OH Kepala Tukang
0.02 OH Mandor
B Bahan
1.25 Btg Kayu Dolken diameter 8-10/400 cm
2.5 kg Portland Semen
1.2 Lbr Seng Gelombang BJLS 0,2 panjang 180 cm
0.005 m3 Pasir Beton
0.009 m3 Batu Pecah 3/5
0.072 m3 Kayu 5/7x 4m Kayu Kruing
0.06 kg Paku Biasa 1"s/d 4"
0.45 kg Meni Besi
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
7 1 Ls Mobilisiasi & Demobilisasi
1 Ls
Jumlah
B Pekerjaan Struktur Beton Gudang
1 Pondasi Tiang Tipe P1
1 1 m³ Galian & Urugan Kembali dipadatkan
1 1 m³ Galian Tanah Biasa Sedalam 1m
A Tenaga
0.75 OH Pekerja
0.025 OH Mandor
B Bahan
C Peralatan
D A+B+C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
2 1 m³ Pekerjaan Urugan Tanah
A Tenaga
0.5 OH Pekerja
0.05 OH Mandor
B Bahan
C Peralatan
D A+B+C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
3 1 m³ Pemadatan Tanah (Per 20 cm)
A Tenaga
0.5 OH Pekerja
0.05 OH Mandor
B Bahan
C Peralatan
D A+B+C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
4 1 m3 Lantai Kerja t = 10 cm (Beton K-150)
A Tenaga
1.2 OH Pekerja
0.2 OH Tukang Batu
0.02 OH Kepala Tukang
0.006 OH Mandor
B Bahan
299 kg Portland Semen
0.57 m3 Pasir Beton
0.7 kg Kerikil
215 ltr Air
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
5 1 m3 Sirtu Padat t = 20 cm
A Tenaga
0.25 OH Pekerja
0.025 OH Mandor
B Bahan
1.2 m3 Sirtu
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
6 1 m3 Beton Mutu K-300 (Pilecap)
A Tenaga
1.65 OH Pekerja
0.275 OH Tukang Batu
0.028 OH Kepala Tukang
0.083 OH Mandor
B Bahan
413 kg Portland Semen
0.486 m3 Pasir Beton
0.704 m3 Kerikil
215 ltr Air
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
7 10 kg Besi Tulangan
A Tenaga
0.07 OH Pekerja
0.07 OH Tukang Besi
0.007 OH Kepala Tukang
0.004 OH Mandor
B Bahan
10.5 kg Besi Beton ( Ulir)
0.15 kg Kawat Beton
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
8 1 m3 Bekisting
A Tenaga
0.52 OH Pekerja
0.26 OH Tukang Kayu
0.026 OH Kepala Tukang
0.026 OH Mandor
B Bahan
0.04 m3 Kayu Meranti
0.3 kg Paku Biasa 1"s/d 4"
0.1 ltr Minyak Bekisting
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
9 1 m1 Minipile 25 x 25
A Tenaga
1.65 OH Pekerja
0.275 OH Tukang Batu
0.028 OH Kepala Tukang
0.083 OH Mandor
B Bahan
1 m Minipile 25 x 25 (3 meter)
C Peralatan
1 m Pile Driver / Hammer
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
10 1 Buah Cut Off Tiang Minipile
A Tenaga
1.2 OH Pekerja
0.5 OH Tukang Batu
0.04 OH Kepala Tukang
0.04 OH Mandor
B Bahan
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
III PEKERJAAN PONDASI
1 Pondasi Tiang Tipe P2
1 1 m³ Galian & Urugan Kembali dipadatkan
1 1 m³ Galian Tanah Biasa Sedalam 1m
A Tenaga
0.75 OH Pekerja
0.025 OH Mandor
B Bahan
C Peralatan
D A+B+C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
2 1 m³ Pekerjaan Urugan Tanah
A Tenaga
0.5 OH Pekerja
0.05 OH Mandor
B Bahan
C Peralatan
D A+B+C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
3 1 m³ Pemadatan Tanah (Per 20 cm)
A Tenaga
0.5 OH Pekerja
0.05 OH Mandor
B Bahan
C Peralatan
D A+B+C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
4 1 m3 Lantai Kerja t = 10 cm (Beton K-150)
A Tenaga
1.2 OH Pekerja
0.2 OH Tukang Batu
0.02 OH Kepala Tukang
0.006 OH Mandor
B Bahan
299 kg Portland Semen
0.57 m3 Pasir Beton
0.7 kg Kerikil
215 ltr Air
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
5 1 m3 Sirtu Padat t = 20 cm
A Tenaga
0.25 OH Pekerja
0.025 OH Mandor
B Bahan
1.2 m3 Sirtu
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
6 1 m3 Beton Mutu K-300 (Pilecap)
A Tenaga
1.65 OH Pekerja
0.275 OH Tukang Batu
0.028 OH Kepala Tukang
0.083 OH Mandor
B Bahan
413 kg Portland Semen
0.486 m3 Pasir Beton
0.704 m3 Kerikil
215 ltr Air
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
7 10 kg Besi Tulangan
A Tenaga
0.07 OH Pekerja
0.07 OH Tukang Besi
0.007 OH Kepala Tukang
0.004 OH Mandor
B Bahan
10.5 kg Besi Beton ( Ulir)
0.15 kg Kawat Beton
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
8 1 m3 Bekisting
A Tenaga
0.52 OH Pekerja
0.26 OH Tukang Kayu
0.026 OH Kepala Tukang
0.026 OH Mandor
B Bahan
0.04 m3 Kayu Meranti
0.3 kg Paku Biasa 1"s/d 4"
0.1 ltr Minyak Bekisting
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
9 1 m1 Minipile 25 x 25
A Tenaga
1.65 OH Pekerja
0.275 OH Tukang Batu
0.028 OH Kepala Tukang
0.083 OH Mandor
B Bahan
1 m Minipile 25 x 25 (3 meter)
C Peralatan
1 m Pile Driver / Hammer
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
10 1 Buah Cut Off Tiang Minipile
A Tenaga
1.2 OH Pekerja
0.5 OH Tukang Batu
0.04 OH Kepala Tukang
0.04 OH Mandor
B Bahan
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
3 Kolom Pedestal Tipe K1 (40x60 cm)
1 1 m3 Beton Mutu K-300
A Tenaga
1.65 OH Pekerja
0.275 OH Tukang Batu
0.028 OH Kepala Tukang
0.083 OH Mandor
B Bahan
413 kg Portland Semen
0.486 m3 Pasir Beton
0.704 m3 Kerikil
215 ltr Air
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
2 10 kg Besi Tulangan
A Tenaga
0.07 OH Pekerja
0.07 OH Tukang Besi
0.007 OH Kepala Tukang
0.004 OH Mandor
B Bahan
10.5 kg Besi Beton ( Ulir)
0.15 kg Kawat Beton
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
3 1 m3 Bekisting
A Tenaga
0.66 OH Pekerja
0.33 OH Tukang Kayu
0.033 OH Kepala Tukang
0.033 OH Mandor
B Bahan
0.06 m3 Kayu Meranti
0.4 kg Paku Biasa 1"s/d 4"
0.2 ltr Minyak Bekisting
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
4 Kolom Pedestal Tipe K2 (25x40 cm)
1 1 m3 Beton Mutu K-300
A Tenaga
1.65 OH Pekerja
0.275 OH Tukang Batu
0.028 OH Kepala Tukang
0.083 OH Mandor
B Bahan
413 kg Portland Semen
0.486 m3 Pasir Beton
0.704 m3 Kerikil
215 ltr Air
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
2 10 kg Besi Tulangan
A Tenaga
0.07 OH Pekerja
0.07 OH Tukang Besi
0.007 OH Kepala Tukang
0.004 OH Mandor
B Bahan
10.5 kg Besi Beton ( Ulir)
0.15 kg Kawat Beton
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
3 1 m3 Bekisting
A Tenaga
0.66 OH Pekerja
0.33 OH Tukang Kayu
0.033 OH Kepala Tukang
0.033 OH Mandor
B Bahan
0.06 m3 Kayu Meranti
0.4 kg Paku Biasa 1"s/d 4"
0.2 ltr Minyak Bekisting
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
5 Tie Beam Tipe S1 (25 x 40 cm)
1 1 m3 Beton Mutu K-300
A Tenaga
1.65 OH Pekerja
0.275 OH Tukang Batu
0.028 OH Kepala Tukang
0.083 OH Mandor
B Bahan
413 kg Portland Semen
0.486 m3 Pasir Beton
0.704 m3 Kerikil
215 ltr Air
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
2 10 kg Besi Tulangan
A Tenaga
0.07 OH Pekerja
0.07 OH Tukang Besi
0.007 OH Kepala Tukang
0.004 OH Mandor
B Bahan
10.5 kg Besi Beton ( Ulir)
0.15 kg Kawat Beton
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
3 1 m3 Bekisting
A Tenaga
0.66 OH Pekerja
0.33 OH Tukang Kayu
0.033 OH Kepala Tukang
0.033 OH Mandor
B Bahan
0.06 m3 Kayu Meranti
0.4 kg Paku Biasa 1"s/d 4"
0.2 ltr Minyak Bekisting
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan

KOEF SAT. URAIAN PEKERJAAN

Pelat Lantai t=15 cm


1 m3 Beton Mutu K-300
A Tenaga
1.65 OH Pekerja
0.275 OH Tukang Batu
0.028 OH Kepala Tukang
0.083 OH Mandor
B Bahan
413 kg Portland Semen
0.486 m3 Pasir Beton
0.704 m3 Kerikil
215 ltr Air
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
10 kg Jaring Kawat Baja/Wire Mesh
A Tenaga
1.65 OH Pekerja
0.275 OH Tukang Batu
0.028 OH Kepala Tukang
0.083 OH Mandor
B Bahan
10.2 kg Jaring Kawat Baja/Wire Mesh
0.05 m3 Kawat Beton
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
1 m3 Lantai Kerja t=8cm (Beton K-150)
A Tenaga
1.2 OH Pekerja
0.2 OH Tukang Batu
0.02 OH Kepala Tukang
0.006 OH Mandor
B Bahan
299 kg Portland Semen
0.57 m3 Pasir Beton
0.7 m3 Kerikil
215 ltr Air
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
1 m3 Sirtu Padat t = 20 cm
A Tenaga
0.25 OH Pekerja
0.025 OH Mandor
B Bahan
1.2 m3 Sirtu
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
Pondasi Lajur Batu Belah Bawah Sloof
1 m3 Galian Tanah Biasa Sedalam 1 m
A Tenaga
0.75 OH Pekerja
0.025 OH Mandor
B Bahan
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
1 m3 Pemasangan Pondasi Batu Belah 1SP:8PP
A Tenaga
1.5 OH Pekerja
0.75 OH Tukang Batu
0.075 OH Kepala Tukang
0.075 OH Mandor
B Bahan
1.2 m3 Batu Belah
91 m3 Portland Semen
0.584 m3 Pasir Pasang
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
1 m3 Sirtu Padat t = 10 cm
A Tenaga
0.25 OH Pekerja
0.025 OH Mandor
B Bahan
1.2 m3 Sirtu
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
Pondasi Lajur Batu Belah Tepi Luar
1 m3 Galian Tanah Biasa Sedalam 1 m
A Tenaga
0.75 OH Pekerja
0.025 OH Mandor
B Bahan
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
1 m3 Pemasangan Pondasi Batu Belah 1SP:8PP
A Tenaga
1.5 OH Pekerja
0.75 OH Tukang Batu
0.075 OH Kepala Tukang
0.075 OH Mandor
B Bahan
1.2 m3 Batu Belah
91 m3 Portland Semen
0.584 m3 Pasir Pasang
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
1 m3 Sirtu Padat t = 10 cm
A Tenaga
0.25 OH Pekerja
0.025 OH Mandor
B Bahan
1.2 m3 Sirtu
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D + E)
Beton Praktis
1 m3 Beton Praktis beton Mutu K150
A Tenaga
0.18 OH Pekerja
0.02 OH Tukang Batu
0.02 OH Tukang Kayu
0.006 OH Kepala Tukang
0.009 OH Mandor
0.02 OH Tukang Besi
B Bahan
0.002 m3 Kayu Klas III
0.01 kg Paku Biasa 2"-5"
3 kg Besi Beton Polos
0.45 kg Kawat Beton
4 kg Portland Semen
0.006 m3 Pasir Beton
0.009 m3 Kerikil
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
1 m3 Sloof Praktis Beton Mutu K-150
A Tenaga
0.18 OH Pekerja
0.02 OH Tukang Batu
0.02 OH Tukang Kayu
0.006 OH Kepala Tukang
0.009 OH Mandor
0.02 OH Tukang Besi
B Bahan
0.002 m3 Kayu Klas III
0.01 kg Paku Biasa 2"-5"
3 kg Besi Beton Polos
0.45 kg Kawat Beton
4 kg Portland Semen
0.006 m3 Pasir Beton
0.009 m3 Kerikil
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
1 m3 Ring Praktis Beton Mutu K-150
A Tenaga
0.18 OH Pekerja
0.02 OH Tukang Batu
0.02 OH Tukang Kayu
0.006 OH Kepala Tukang
0.009 OH Mandor
0.02 OH Tukang Besi
B Bahan
0.002 m3 Kayu Klas III
0.01 kg Paku Biasa 2"-5"
3 kg Besi Beton Polos
0.45 kg Kawat Beton
4 kg Portland Semen
0.006 m3 Pasir Beton
0.009 m3 Kerikil
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
PEKERJAAN STRUKTUR BAJA GUDANG
Kolom Portal Utama IWF 500.200
1 kg Berat Termasuk Pengecatan Zyncromate
A Tenaga
0.06 OH Pekerja
0.06 OH Tukang Besi
0.006 OH Kepala Tukang
0.003 OH Mandor
B Bahan
1.15 kg Besi Profil
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
1 kg Base Plate + Angkur
A Tenaga
B Bahan
1 m2 Base Plate
1 kg Angkur
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
1 m3 Murbaut/pelat pengaku,dll
A Tenaga
B Bahan
1 kg Murbaut
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
Kolom Tepi IWF 500.200
1 m3 Berat Termasuk Pengecatan Zyncromate
A Tenaga
0.06 OH Pekerja
0.06 OH Tukang Besi
0.006 OH Kepala Tukang
0.003 OH Mandor
B Bahan
1.15 kg Besi Profil
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
1 m3 Murbaut/pelat pengaku,dll
A Tenaga
B Bahan
1 kg Murbaut
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
Balok Portal Utama IWF 350.175
1 m3 Berat Termasuk Pengecatan Zyncromate
A Tenaga
0.06 OH Pekerja
0.06 OH Tukang Besi
0.006 OH Kepala Tukang
0.003 OH Mandor
B Bahan
1.15 m3 Besi Profil
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
1 m3 Murbaut/pelat pengaku,dll
A Tenaga
B Bahan
1 kg Murbaut
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan

NO. KOEF SATUAN URAIAN PEKERJAAN

1 1 kg Balok konsol IWF 200.100.5,5.8


A Tenaga
0.06 OH Pekerja
0.06 OH Tukang Besi
0.006 OH Kepala Tukang
0.003 OH Mandor
B Bahan
1.15 kg Besi Baja IWF
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan

2 1 kg Balok Regel/Ikat IWF 350.175.6.9


A Tenaga
0.06 OH Pekerja
0.06 OH Tukang Besi
0.006 OH Kepala Tukang
0.003 OH Mandor
B Bahan
1.15 kg Besi Baja IWF
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan

3 1 kg Balok Kanopi IWF 200.100.5,5.8


A Tenaga
0.06 OH Pekerja
0.06 OH Tukang Besi
0.006 OH Kepala Tukang
0.003 OH Mandor
B Bahan
1.15 kg Besi Baja IWF
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan

4 1 kg Gording Utama 2C.150.50.20.2,3


A Tenaga
0.06 OH Pekerja
0.06 OH Tukang Besi
0.006 OH Kepala Tukang
0.003 OH Mandor
B Bahan
1.15 kg Besi Profil
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan

5 1 kg Gording Kanopi C.150.50.20.2,3


A Tenaga
0.06 OH Pekerja
0.06 OH Tukang Besi
0.006 OH Kepala Tukang
0.003 OH Mandor
B Bahan
1.15 kg Besi Profil
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan

6 1 m2 Penutup Atap Utama


A Tenaga
0.06 OH Pekerja
0.06 OH Tukang Besi
0.006 OH Kepala Tukang
0.003 OH Mandor
B Bahan
0.5 m2 Galvalum
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan

7 1 m2 Penutup Atap Kanopi


A Tenaga
0.06 OH Pekerja
0.06 OH Tukang Besi
0.006 OH Kepala Tukang
0.003 OH Mandor
B Bahan
0.5 m2 Galvalum
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan

8 1 m2 Pemasangan Talang
A Tenaga
0.06 OH Pekerja
0.06 OH Tukang Besi
0.006 OH Kepala Tukang
0.003 OH Mandor
B Bahan
0.5 m2 Galvalum
0.015 kg Paku Biasa 1-2,5 cm
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan

KOEF. SAT. URAIAN PEKERJAAN

1 m3 Urugan Tanah Peninggian Peil


A TENAGA
0.5 OH Pekerja
0.05 OH Mandor
B BAHAN
1 m3 Tanah padas
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D + E)

1 m3 Beton Sloof Praktis mutu f'c=12,2 Mpa (K150), slum (12±2)cm, w/c = 0,72
A TENAGA
0.3 OH Pekerja
0.03 OH Tukang kayu
0.03 OH Tukang batu
0.03 OH Tukang besi
0.01 OH Kepala tukang
0.015 OH Mandor
B BAHAN
5.8 Kg Portland Semen
0.095 m3 Pasir Beton
0.016 m3 Kerikil (maks 30 mm)
3.8 Kg Besi Beton Polos
0.0528 Kg Kawat Beton
0.003 m3 Kayu Lanan
0.021 kg Paku Biasa 2"-5"
0.2 ltr Minyak Bekisting
C PERALATAN
D JUMLAH A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

1 m3 Beton Ring Praktis mutu f'c=12,2 Mpa (K150), slum (12±2)cm, w/c = 0,72
A TENAGA
0.3 OH Pekerja
0.03 OH Tukang kayu
0.03 OH Tukang batu
0.03 OH Tukang besi
0.01 OH Kepala tukang
0.015 OH Mandor
B BAHAN
5.8 Kg Portland Semen
0.095 m3 Pasir Beton
0.016 m3 Kerikil (maks 30 mm)
3.8 Kg Besi Beton Polos
0.0528 Kg Kawat Beton
0.003 m3 Kayu Lanan
0.021 kg Paku Biasa 2"-5"
0.2 ltr Minyak Bekisting
C PERALATAN
D JUMLAH A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

1 m3 Beton Kolom Praktis mutu f'c=12,2 Mpa (K150), slum (12±2)cm, w/c = 0,72
A TENAGA
0.2 OH Pekerja
0.02 OH Tukang kayu
0.02 OH Tukang batu
0.02 OH Tukang besi
0.009 OH Kepala tukang
0.006 OH Mandor
B BAHAN
7.27 Kg Portland Semen
0.011 m3 Pasir Beton
0.002 m3 Kerikil (maks 30 mm)
5.45 Kg Besi Beton Polos
0.82 Kg Kawat Beton
0.005 m3 Kayu Lanan
0.021 kg Paku Biasa 2"-5"
0.2 ltr Minyak Bekisting
C PERALATAN
D JUMLAH A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

Beton Pelat Leufel T=10 cm


1 m3 Membuat Beton mutu f'c=12,2 Mpa (K150), slum (12±2)cm, w/c = 0,72
A TENAGA
1.65 OH Pekerja
0.275 OH Tukang batu
0.028 OH Kepala tukang batu
0.083 OH Mandor
B BAHAN
413 Kg Portland Semen
681 Kg Pasir Beton
1021 Kg Kerikil (maks 30 mm)
215 ltr Air
C PERALATAN
D Jumlah A+B+C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D+E)

1 m2 Jaring Kawat baja/Wire Mesh


A TENAGA
0.025 OH Pekerja
0.025 OH Tukang besi
0.002 OH Kepala tukang besi
0.001 OH Mandor
B BAHAN
10.2 Kg Jaring Kawat Baja dilas
0.09 Kg Kawat Beton
C PERALATAN
D Jumlah A+B+C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D+E)

1 m2 Memasang Bekisting untuk Lantai


A TENAGA
0.66 OH Pekerja
0.33 OH Tukang kayu
0.033 OH Kepala tukang kayu
0.033 OH Mandor
B BAHAN
0.04 m3 Kayu Lanan
0.4 Kg Paku Biasa 2" - 5"
0.2 Ltr Minyak Bekisting
0.015 m3 Balok Kayu Kruing
0.35 Lbr Plywood tebal 9mm
6 Btg Dolken Kayu Galam diameter 8 - 10 cm / 4 m
C PERALATAN
D Jumlah A+B+C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D+E)

1 m2 Dinding Bata Merah (5x11x22) cm Tebal 1/2 Bata Camp. 1 SP : 2 PP


A TENAGA
0.3 OH Pekerja
0.1 OH Tukang batu
0.01 OH Kepala tukang batu
0.015 OH Mandor
B BAHAN
70 buah Bata Merah 5 x 11 x 22
18.95 kg Portland Semen
0.038 m3 Pasir Pasang
C PERALATAN
D Jumlah A + B + C
E Overhead + Profit
F Harga Satuan Pekerjaan (D+E)

1 m2 Plester Aci 1PC : 2PP Tebal 15 mm


A TENAGA
0.3 OH Pekerja
0.15 OH Tukang batu
0.015 OH Kepala tukang batu
0.015 OH Mandor
B BAHAN
10.224 kg Portland Semen
0.02 m3 Pasir Pasang
C PERALATAN
D Jumlah A + B + C
E Overhead + Profit
F Harga Satuan Pekerjaan (D+E)

1 m2 Cat Tembok Eksterior


A TENAGA
0.02 OH Pekerja
0.063 OH Tukang cat
0.0063 OH Kepala tukang cat
0.003 OH Mandor
B BAHAN
0.1 kg Plamir
0.1 kg Cat Dasar
0.26 klg Cat Penutup 2x
C PERALATAN
D Jumlah A + B + C
E Overhead + Profit
F Harga Satuan Pekerjaan (D+E)

1 m2 Cat Tembok Interior


A TENAGA
0.02 OH Pekerja
0.063 OH Tukang cat
0.0063 OH Kepala tukang cat
0.003 OH Mandor
B BAHAN
0.1 kg Plamir
0.1 kg Cat Dasar
0.26 klg Cat Penutup 2x
C PERALATAN
D Jumlah A + B + C
E Overhead + Profit
F Harga Satuan Pekerjaan (D+E)

1 m2 Pemasangan Lantai Keramik 30 x 30 cm


A TENAGA
0.7 OH Pekerja
0.35 OH Tukang batu
0.035 OH Kepala tukang batu
0.035 OH Mandor
B BAHAN
11.87 Buah Ubin Keramik 30 x 30 cm
10 Kg Portland Semen
0.045 m3 Pasir Pasang
1.5 Kg Semen Warna
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

1 m2 Floor Hardener
A TENAGA
0.12 OH Pekerja
0.12 OH Tukang batu
0.012 OH Kepala tukang batu
0.006 OH Mandor
B BAHAN
5 kg Floor Hardener
1 ls Alat Bantu
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

1 m2 Plafond gypsumboard
A TENAGA
0.1 OH Pekerja
0.05 OH Tukang kayu
0.005 OH Kepala tukang kayu
0.005 OH Mandor
B BAHAN
0.364 lbr Gypsumboard gyproc uk. 120cmx240cmx9mm
0.11 bh Paku Sekrup
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

1 bh Tipe Pintu Gerbang PG1


A TENAGA
0.525 OH Pekerja
0.525 OH Tukang besi
0.525 OH Tukang cat
0.052 OH Kepala tukang besi
0.026 OH Mandor
B Bahan
289 kg Besi Plat t=2mm
6 btg Besi Siku L 50.50.5
1 kg Cat Duco Propan Acrylux
4 bh Roda
1 m1 Rel Heavy Duty
1 m1 Rel Baja CNP + penggantung
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

1 bh Tipe Pintu Gerbang PG2


A TENAGA
0.525 OH Pekerja
0.525 OH Tukang besi
0.525 OH Tukang cat
0.052 OH Kepala tukang besi
0.026 OH Mandor
B Bahan
289 kg Besi Plat t=2mm
6 btg Besi Siku L 50.50.5
1 kg Cat Duco Propan Acrylux
3 bh Roda
1 m1 Rel Heavy Duty
1 m1 Rel Baja CNP + penggantung
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

1 bh Tipe Pintu Besi P1


A TENAGA
0.525 OH Pekerja
0.525 OH Tukang besi
0.525 OH Tukang cat
0.052 OH Kepala tukang besi
0.026 OH Mandor
B Bahan
289 kg Besi Plat t=2mm
6 btg Besi Siku L 50.50.5
1 kg Cat Duco Propan Acrylux
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

1 bh Tipe Boven BV1


A TENAGA
0.525 OH Pekerja
0.026 OH Mandor
B Bahan
2 bh Boven Alumunium 40.60
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

1 bh Tipe Boven BV2


A TENAGA
0.525 OH Pekerja
0.026 OH Mandor
B Bahan
3 bh Boven Alumunium 40.60
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

1 bh Pemasangan 1 bh Bak Kontrol Pas. Batu Bata 45 x 45 x 50 cm


A TENAGA
3.2 OH Pekerja
1.15 OH Tukang Batu
0.011 OH Kepala Tukang
0.016 OH Mandor
JUMLAH TENAGA
B BAHAN
70 bh Bata Merah
77 kg Semen Portland
0.13 m3 Pasir Pasang
0.09 m3 Pasir Beton
0.02 m3 Kerikil
2.6 kg Baja Tulangan
JUMLAH BAHAN
C PERALATAN
JUMLAH PERALATAN
D JUMLAH A + B + C
E Overhead & Profit (10 %)
F Harga Satuan Pekerjaan (D + E)

1 m Pemasangan 1 m' pipa PVC Tipe AV Dia 4"


A TENAGA
0.081 OH Pekerja
0.135 OH Tukang Batu
0.0135 OH Kepala Tukang
0.004 OH Mandor
JUMLAH TENAGA
B BAHAN
1.2 m Pipa PVC 4"
35 % Perlengkapan
JUMLAH BAHAN
C PERALATAN
JUMLAH PERALATAN
D JUMLAH A + B + C
E Overhead & Profit (10 %)
F Harga Satuan Pekerjaan (D + E)

1 bh Pemasangan 1 bh Titik Lampu


A TENAGA
100 % Upah
JUMLAH TENAGA
B BAHAN
3 btg Pipa Listrik 5/8"
24 m Kabel
3 bh T Dus
4 bh L Bow
3 bh Las Dop
24 bh Klem
1 bh Mongkok
1 bh Saklar
1 bh Fitting
JUMLAH BAHAN
C PERALATAN
JUMLAH PERALATAN
D JUMLAH A + B + C
E Overhead & Profit (10 %)
F Harga Satuan Pekerjaan (D + E)

1 m Pemasangan 1 buah MCB


A TENAGA
100 % Upah
JUMLAH TENAGA
B BAHAN
3 btg Pipa Listrik 5/8"
15 m Kabel
1 bh T Dus
2 bh L Bow
24 bh Klem Biasa
1 bh MCB
JUMLAH BAHAN
C PERALATAN
JUMLAH PERALATAN
D JUMLAH A + B + C
E Overhead & Profit (10 %)
F Harga Satuan Pekerjaan (D + E)

NO. KOEF SATUAN URAIAN PEKERJAAN


NO. KOEF SATUAN URAIAN PEKERJAAN

PEKERJAAN TANAH
1 m3 Pengurugan kembali galian tanah
A TENAGA
0.5 OH Pekerja
0.05 OH Mandor
B BAHAN
1 m3 Tanah padas
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D + E)
PEKERJAAN JALAN
1 m2 Pemasangan Paving Block Natural Tebal 8 cm
A TENAGA
0.5 OH Pekerja
0.5 OH Tukang batu
0.05 OH Kepala tukang batu
0.0013 OH Mandor
B BAHAN
1 m2 Paving block square
0.07 m3 Pasir beton
C PERALATAN
10 % Peralatan
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D + E)
1 m3 Mengurug Sirtu Padat
A TENAGA
0.25 OH Pekerja
0.025 OH Mandor
B BAHAN
1.2 m3 Sirtu
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D + E)
1 m1 Kansteen Beton
A Tenaga
0.1 OH Tukang batu
0.05 OH Kepala tukang batu
B Bahan
1 m1 Kansteen
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D + E)
SALURAN DRAINASE U.40
1 pcs Saluran uditch 40 cm
A Tenaga
0.5 OH Pekerja
0.05 OH Mandor
B Bahan
1 m1 Buis Beton U 40 cm
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D + E)

1 m3 Galian Tanah Biasa Sedalam 1 m


A TENAGA
0.75 OH Pekerja
0.025 OH Mandor
B BAHAN
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D + E)

Membuat Lantai Kerja Beton mutu f'c=7,4 Mpa (K100), slum


1 m3
(3-6) cm, w/c = 0,87
A TENAGA
1.2 OH Pekerja
0.2 OH Tukang batu
0.02 OH Kepala tukang batu
0.006 OH Mandor
B BAHAN
230 Kg Portland Semen
893 kg Pasir Beton
1027 kg Kerikil (maksimum 30 mm)
200 ltr Air
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D + E)

1 m3 Mengurug Sirtu Padat


A TENAGA
0.25 OH Pekerja
0.025 OH Mandor
B BAHAN
1.2 m3 Sirtu
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D + E)
1 pcs Tutup Pelat Beton
A Harga Satuan Pekerjaan
ls Tutup uditch 40 cm Light Duty
SALURAN DRAINASE U.80
1 pcs Saluran uditch 80 cm
A Tenaga
0.5 OH Pekerja
0.05 OH Mandor
B Bahan
1 m1 Buis Beton U 80 cm
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D + E)

1 m3 Galian Tanah Biasa Sedalam 1 m


A TENAGA
0.75 OH Pekerja
0.025 OH Mandor
B BAHAN
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D + E)

Membuat Lantai Kerja Beton mutu f'c=7,4 Mpa (K100), slum


1 m3
(3-6) cm, w/c = 0,87
A TENAGA
1.2 OH Pekerja
0.2 OH Tukang batu
0.02 OH Kepala tukang batu
0.006 OH Mandor
B BAHAN
230 Kg Portland Semen
893 kg Pasir Beton
1027 kg Kerikil (maksimum 30 mm)
200 ltr Air
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D + E)

1 m3 Mengurug Sirtu Padat


A TENAGA
0.25 OH Pekerja
0.025 OH Mandor
B BAHAN
1.2 m3 Sirtu
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D + E)
PENERANGAN JALAN
1 bh Lampu PJU tiang heksagonal
A Tenaga
0.5 OH Pekerja
0.25 OH Tukang listrik
0.05 OH Mandor
B Bahan
1 bh Tiang Lampu Heksagonal 6m
1 bh Lampu LED 40W + Akesoris lainnya
C Peralatan
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D + E)

0.16 m3 Pondasi Beton Bertulang (K250)


A Tenaga
1.65 OH Pekerja
0.275 OH Tukang batu
0.028 OH Kepala tukang batu
0.083 OH Mandor
B Bahan
61.44 Kg Portland Semen
110.72 Kg Pasir Beton
166.24 Kg Kerikil
34.4 ltr Air
12.56 Kg Besi Beton
10.688 Kg Kawat Beton
C Peralatan
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D + E)
TAMAN & PENGHIJAUAN
1 m2 Penanaman rumput hias
A Tenaga
0.04 OH Pekerja
0.004 OH Mandor
B Bahan
0.5 m2 Rumput Gajah
0.04 krg Pupuk Kandang
C Peralatan
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D + E)

1 bh Penanaman Pohon Peneduh (T=2 meter)


A Tenaga
0.025 OH Pekerja
0.0025 OH Mandor
B Bahan
1 bh Pohon Peneduh
0.08 krg Pupuk Kandang
0.001 kg Furadan
C Peralatan
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D + E)
PAGAR BRC
1 m1 Bongkar Pagar Panel Eksisting
A Tenaga
0.2 OH Pekerja
0.01 OH Mandor
B Bahan
C Peralatan
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D + E)

1 m1 Pagar BRC
A Tenaga
0.375 OH Pekerja
0.125 OH Tukang batu
0.12 OH Kepala tukang batu
0.019 OH Mandor
B Bahan
0.434 /lb Pagar BRC 120 A2
2 kg Semen Portland
0.005 m3 Pasir beton
0.009 m3 Kerikil beton 2/3
C Peralatan
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D + E)
1 m3 Beton Mutu K-300
A Tenaga
1.65 OH Pekerja
0.275 OH Tukang Batu
0.028 OH Kepala Tukang
0.083 OH Mandor
B Bahan
413 kg Portland Semen
0.486 m3 Pasir Beton
0.704 m3 Kerikil
215 ltr Air
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
10 kg Jaring Kawat Baja/Wire Mesh
A Tenaga
1.65 OH Pekerja
0.275 OH Tukang Batu
0.028 OH Kepala Tukang
0.083 OH Mandor
B Bahan
10.2 kg Jaring Kawat Baja/Wire Mesh
0.05 m3 Kawat Beton
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
1 m3 Lantai Kerja t=8cm (Beton K-150)
A Tenaga
1.2 OH Pekerja
0.2 OH Tukang Batu
0.02 OH Kepala Tukang
0.006 OH Mandor
B Bahan
299 kg Portland Semen
0.57 m3 Pasir Beton
0.7 m3 Kerikil
215 ltr Air
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
1 m3 Sirtu Padat t = 20 cm
A Tenaga
0.25 OH Pekerja
0.025 OH Mandor
B Bahan
1.2 m3 Sirtu
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
Pondasi Lajur Batu Belah Bawah Sloof
1 m3 Galian Tanah Biasa Sedalam 1 m
A Tenaga
0.75 OH Pekerja
0.025 OH Mandor
B Bahan
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
1 m3 Pemasangan Pondasi Batu Belah 1SP:8PP
A Tenaga
1.5 OH Pekerja
0.75 OH Tukang Batu
0.075 OH Kepala Tukang
0.075 OH Mandor
B Bahan
1.2 m3 Batu Belah
91 m3 Portland Semen
0.584 m3 Pasir Pasang
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
1 m3 Sirtu Padat t = 10 cm
A Tenaga
0.25 OH Pekerja
0.025 OH Mandor
B Bahan
1.2 m3 Sirtu
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
Pondasi Lajur Batu Belah Tepi Luar
1 m3 Galian Tanah Biasa Sedalam 1 m
A Tenaga
0.75 OH Pekerja
0.025 OH Mandor
B Bahan
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
1 m3 Pemasangan Pondasi Batu Belah 1SP:8PP
A Tenaga
1.5 OH Pekerja
0.75 OH Tukang Batu
0.075 OH Kepala Tukang
0.075 OH Mandor
B Bahan
1.2 m3 Batu Belah
91 m3 Portland Semen
0.584 m3 Pasir Pasang
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
1 m3 Sirtu Padat t = 10 cm
A Tenaga
0.25 OH Pekerja
0.025 OH Mandor
B Bahan
1.2 m3 Sirtu
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D + E)
Beton Praktis
1 m3 Beton Praktis beton Mutu K150
A Tenaga
0.18 OH Pekerja
0.02 OH Tukang Batu
0.02 OH Tukang Kayu
0.006 OH Kepala Tukang
0.009 OH Mandor
0.02 OH Tukang Besi
B Bahan
0.002 m3 Kayu Klas III
0.01 kg Paku Biasa 2"-5"
3 kg Besi Beton Polos
0.45 kg Kawat Beton
4 kg Portland Semen
0.006 m3 Pasir Beton
0.009 m3 Kerikil
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
1 m3 Sloof Praktis Beton Mutu K-150
A Tenaga
0.18 OH Pekerja
0.02 OH Tukang Batu
0.02 OH Tukang Kayu
0.006 OH Kepala Tukang
0.009 OH Mandor
0.02 OH Tukang Besi
B Bahan
0.002 m3 Kayu Klas III
0.01 kg Paku Biasa 2"-5"
3 kg Besi Beton Polos
0.45 kg Kawat Beton
4 kg Portland Semen
0.006 m3 Pasir Beton
0.009 m3 Kerikil
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
1 m3 Ring Praktis Beton Mutu K-150
A Tenaga
0.18 OH Pekerja
0.02 OH Tukang Batu
0.02 OH Tukang Kayu
0.006 OH Kepala Tukang
0.009 OH Mandor
0.02 OH Tukang Besi
B Bahan
0.002 m3 Kayu Klas III
0.01 kg Paku Biasa 2"-5"
3 kg Besi Beton Polos
0.45 kg Kawat Beton
4 kg Portland Semen
0.006 m3 Pasir Beton
0.009 m3 Kerikil
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
PEKERJAAN STRUKTUR BAJA GUDANG
Kolom Portal Utama IWF 500.200
1 kg Berat Termasuk Pengecatan Zyncromate
A Tenaga
0.06 OH Pekerja
0.06 OH Tukang Besi
0.006 OH Kepala Tukang
0.003 OH Mandor
B Bahan
1.15 kg Besi Profil
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
1 kg Base Plate + Angkur
A Tenaga
B Bahan
1 m2 Base Plate
1 kg Angkur
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
1 m3 Murbaut/pelat pengaku,dll
A Tenaga
B Bahan
1 kg Murbaut
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
Kolom Tepi IWF 500.200
1 m3 Berat Termasuk Pengecatan Zyncromate
A Tenaga
0.06 OH Pekerja
0.06 OH Tukang Besi
0.006 OH Kepala Tukang
0.003 OH Mandor
B Bahan
1.15 kg Besi Profil
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
1 m3 Murbaut/pelat pengaku,dll
A Tenaga
B Bahan
1 kg Murbaut
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
Balok Portal Utama IWF 350.175
1 m3 Berat Termasuk Pengecatan Zyncromate
A Tenaga
0.06 OH Pekerja
0.06 OH Tukang Besi
0.006 OH Kepala Tukang
0.003 OH Mandor
B Bahan
1.15 m3 Besi Profil
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
1 m3 Murbaut/pelat pengaku,dll
A Tenaga
B Bahan
1 kg Murbaut
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
Pekerjaan Tanah & Beton
Pengurugan kembali dihitung dari 1/3 kali koefisien pekerjaan
1 m3
galian
A Tenaga
0.5 OH Pekerja
0.05 OH Mandor
B Bahan
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
1 m2 Plat beton leuvel tebal 10cm
A Tenaga
0.007 OH Pekerja
0.076 OH Tukang batu
0.008 OH Kepala tukang
0.001 OH Mandor
B Bahan
0.008 m3 Lantai kerja tebal 10cm
9.394 Kg Besi hollow (50x50x3) m
0.005 m3 kayu kaso 5/7
0.080 lbr Phenol film 12 mm
0.200 ltr Minyak bekisting
3.882 bh Dinabolt dia 12 mm (10 s/d 15 cm)
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
Pekerjaan Finishing

1 m2 Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1


bata Camp. 1SP:2PP
A Tenaga
0.600 OH Pekerja
0.200 OH Tukang batu
0.020 OH Kepala tukang batu
0.030 OH Mandor
B Bahan
140.000 Buah Bata merah
43.500 kg Porland semen (PC)
0.080 m3 Pasir pasang (PP)
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
1 m2 Pemasangan Plesteran 1PC:1PP Tebal 15mm
A Tenaga
0.300 OH Pekerja
0.150 OH Tukang batu
0.015 OH Kepala tukang batu
0.015 OH Mandor
B Bahan
15.504 Kg Portland Semen
0.016 m3 Pasir pasang
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
1 m2 Pengecatan Tembok Baru (1lap. Plamir, 1 lap Cat Dasar, 2 Lap Cat
Penutup)
A Tenaga
0.020 OH Pekerja
0.063 OH Tukang cat
0.006 OH Kepala tukang
0.003 OH Mandor
B Bahan
0.100 Kg Plamir
0.100 Kg Cat dasar
0.260 Kg Cat penutup 2 kali
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
1 m2 Pemasangan Lantai Keramik 30 x 30 cm
A Tenaga
0.700 OH Pekerja
0.350 OH Tukang batu
0.035 OH Kepala tukang
0.035 OH Mandor
B Bahan
11.870 Buah Ubin keramik 30x30 cm
10.000 Kg Portland Semen
0.045 m3 Pasir pasang
1.500 Kg Semen warna
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
1 m2 Memasang Plafond Gypsumboard
A Tenaga
0.100 OH Pekerja
0.050 OH Tukang kayu
0.005 OH Kepala tukang
0.005 OH Mandor
B Bahan
0.364 Lbr Gypsum board
0.110 Kg Paku sekrup
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
1 m2 Pintu Besi P1
A Tenaga
1.050 OH Pekerja
1.050 OH Tukang besi
0.105 OH Kepala tukang
0.052 OH Mandor
B Bahan
15.000 Kg Besi siku L.30.30.3
32.800 Kg Besi plat baja
0.050 Kg Kawat las
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
1 m2 Pintu Tipe P2 (pintu kaca)
A Tenaga
0.085 OH Pekerja
0.085 OH Tukang besi
0.009 OH Kepala tukang
0.005 OH Mandor
B Bahan
4.400 m Pintu aluminium
4.500 m profil kaca
0.270 tube sealant
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
1 m2 Pintu Tipe P3 (pintu pvc)
A Tenaga
0.085 OH Pekerja
0.085 OH Tukang batu
0.009 OH Kepala tukang
0.005 OH Mandor
B Bahan
1.400 m2 Pintu pvc
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
1 m2 Tipe Jendela J1
A Tenaga
0.650 OH Pekerja
0.650 OH Tukang las biasa
0.065 OH Kepala tukang
0.032 OH Mandor
B Bahan
4.760 m besi square tube
4.522 m besi list kaca 1 x 1 cm
20.000 cm pengelasan
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
1 m2 Tipe Jendela J2 (kupu-kupu)
A Tenaga
0.650 OH Pekerja
0.650 OH Tukang las biasa
0.065 OH Kepala tukang
0.032 OH Mandor
B Bahan
4.760 m besi square tube
4.522 m besi list kaca 1 x 1 cm
20.000 cm pengelasan
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
1 m2 Tipe roster
A Tenaga
0.650 OH Pekerja
0.650 OH Tukang kayu
0.065 OH Kepala tukang
0.032 OH Mandor
B Bahan
0.045 m roster
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
1 m2 Rangka Atap Baja Ringan
A Tenaga
0.734 OH Pekerja
0.734 OH Tukang besi
0.073 OH Kepala tukang
0.037 OH Mandor
B Bahan
3.065 m Baja ringan
C Peralatan
10.000 % Peralatan*) harga bahan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
1 m2 Atap Genteng Beton
A Tenaga
0.200 OH Pekerja
0.100 OH Tukang kayu
0.010 OH Kepala tukang
0.010 OH Mandor
B Bahan
11.000 Lbr Genteng beton
0.030 Kg Paku biasa 2" - 5"
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
1 m2 Atap Zincalum
A Tenaga
0.120 OH Pekerja
0.060 OH Tukang kayu
0.006 OH Kepala tukang
0.006 OH Mandor
B Bahan
1.000 m2 zincalume
0.020 Kg Paku biasa 1/2" - 1"
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
1 m2 Insulasi Aluminium Bubble
A Tenaga
0.120 OH Pekerja
0.060 OH Tukang kayu
0.006 OH Kepala tukang
0.006 OH Mandor
B Bahan
1.000 m2 Aluminium bubble
0.020 Kg Paku biasa 1/2" - 1"
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
1 m2 Bubungan Genteng Jurai Beton
A Tenaga
0.400 OH Pekerja
0.200 OH Tukang kayu
0.020 OH Kepala tukang
0.002 OH Mandor
B Bahan
5.000 buah Genteng bubung plentong
8.000 Kg Portland Semen
0.032 m3 Pasir pasang
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
1 m2 Lisplank Kalsiplank fin. Cat
A Tenaga
0.100 OH Pekerja
0.200 OH Tukang kayu
0.020 OH Kepala tukang
0.005 OH Mandor
B Bahan
0.011 m3 Kayu kelas I (jati), papan
0.100 Kg Paku biasa 2" - 5"
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
1 unit Kubah Masjid
A Tenaga
0.100 OH Pekerja
0.200 OH Tukang besi
0.020 OH Kepala tukang
0.005 OH Mandor
B Bahan
1.000 buah Kubah masjid
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
1 Ls Septictank & Resapan
A Tenaga
0.750 OH Pekerja
0.025 OH Mandor
B Bahan
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
1 m Pipa Drainase PVC dia. 3"
A Tenaga
0.081 OH Pekerja
0.135 OH Tukang batu
0.014 OH Kepala tukang
0.004 OH Mandor
B Bahan
1.200 m Pipa PVC dia. 3"
0.350 Ls Perlengkapan 35% x pipa
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
1 m Pipa Drainase PVC dia. 4"
A Tenaga
0.036 OH Pekerja
0.060 OH Tukang batu
0.006 OH Kepala tukang
0.002 OH Mandor
B Bahan
1.200 m Pipa PVC dia. 4"
0.350 Ls Perlengkapan 35% x pipa
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
1 m Roof Drain
A Tenaga
0.010 OH Pekerja
0.100 OH Tukang batu
0.010 OH Kepala tukang
0.005 OH Mandor
B Bahan
1.000 bh Roof drain
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
1 bh Bak Kontrol (30x30x35) cm
A Tenaga
2.160 OH Pekerja
0.720 OH Tukang batu
0.072 OH Kepala tukang
0.011 OH Mandor
B Bahan
40.000 bh Batu bata
44.000 Kg Semen portland
0.070 m3 Pasir pasang
0.060 m3 Pasir beton
0.070 m3 Kerikil
1.600 Kg Baja tulangan
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
1 bh Closet Duduk Monoblok
A Tenaga
3.300 OH Pekerja
1.100 OH Tukang batu
0.001 OH Kepala tukang
0.160 OH Mandor
B Bahan
1.000 bh Closet duduk monoblok
0.060 Kg Kelengkapan 6% dari harga kloset
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
1 bh Floor Drain
A Tenaga
0.010 OH Pekerja
0.100 OH Tukang batu
0.010 OH Kepala tukang
0.005 OH Mandor
B Bahan
1.000 bh Floor drain
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
1 bh Kran Air
A Tenaga
0.010 OH Pekerja
0.400 OH Tukang batu
0.040 OH Kepala tukang
0.005 OH Mandor
B Bahan
1.000 bh Kran air
0.003 bh Sealtape
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
Elektrikal
1 bh Lampu SL 14 watt
A Tenaga
0.100 OH Pekerja
0.100 OH Tukang Listrik
0.010 OH Mandor
B Bahan
1.000 bh Lampu SL 14 watt (Phillips)
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%)
F Harga Satuan Pekerjaan (D+E)
1 bh Sakelar tunggal
A Tenaga
0.100 OH Pekerja
0.100 OH Tukang Listrik
0.010 OH Mandor
B Bahan
1.000 bh sakelar tunggal
1.000 bh inbowdoos
1.000 Ls Material bantu
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%)
F Harga Satuan Pekerjaan (D+E)
1 bh Sakelar ganda
A Tenaga
0.100 OH Pekerja
0.100 OH Tukang Listrik
0.010 OH Mandor
B Bahan
1.000 bh sakelar ganda
1.000 bh inbowdoos
1.000 Ls Material bantu
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%)
F Harga Satuan Pekerjaan (D+E)
1 bh Stop kontak
A Tenaga
0.100 OH Pekerja
0.100 OH Tukang Listrik
0.010 OH Mandor
B Bahan
1.000 bh Stop kontak
1.000 bh inbowdoos
1.000 Ls Material bantu
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%)
F Harga Satuan Pekerjaan (D+E)
1 titik Instalasi kabel & titik lampu
A Tenaga
0.100 OH Pekerja
0.100 OH Tukang Listrik
0.010 OH Mandor
B Bahan
1.000 m Kabel
1.000 bh Pitting
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan
1 unit Panel listrik + MCB
A Tenaga
0.100 OH Pekerja
0.050 OH Tukang Listrik
0.005 OH Mandor
B Bahan
1.000 m Kabel
1.000 bh MCB
C Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan

KOEF SAT. URAIAN PEKERJAAN

1 m3 Menggali Tanah Biasa Sedalam 1 m


A TENAGA
0.75 OH Pekerja
0.025 OH Mandor
B BAHAN
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D + E)

1 m3 Menggali Tanah Biasa Sedalam 2 m


A TENAGA
0.90 OH Pekerja
0.045 OH Mandor
B BAHAN
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D + E)

Pengurugan Kembali dihitung dari 1/3 kali koef Pekerjaan


1 m3
Galian
A TENAGA
0.50 OH Pekerja
0.050 OH Mandor
B BAHAN
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D + E)

1 m3 Pemadatan Tanah (per 20 cm)


A TENAGA
0.50 OH Pekerja
0.050 OH Mandor
B BAHAN
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D + E)

1 m3 Mengurug Sirtu Padat


A TENAGA
0.25 OH Pekerja
0.025 OH Mandor
B BAHAN
1.2 m3 Sirtu
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D + E)

1 m3 Pemasangan Pondasi Batu Belah 1SP : 3 PP


A TENAGA
1.50 OH Pekerja
0.75 OH Tukang Batu
0.075 OH Kepala Tukang
0.075 OH Mandor
B BAHAN
1.2 m3 Batu Belah 15/20
202 kg Portland Cement
0.485 m3 Pasir Pasang
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D + E)

Membuat Beton mutu f'c = 7,4 Mpa (K100), slump (12±2)


1 m3
cm, w/c = 0,87 (lantai kerja)
A TENAGA
1.65 OH Pekerja
0.275 OH Tukang Batu
0.028 OH Kepala Tukang
0.083 OH Mandor
B BAHAN
247 kg Portland Cement
869 kg Pasir Beton
999 kg Kerikil (maksimum 30 mm)
215 ltr Air
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D + E)

1 m2 Pemasangan Paving Block Natural Tebal 8 cm


A TENAGA
0.50 OH Pekerja
0.5 OH Tukang Batu
0.05 OH Kepala Tukang
0.0013 OH Mandor
B BAHAN
1.01 m2 Paving Block Tebal 8 cm
0.07 m3 Pasir Beton
C PERALATAN
10 % Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D + E)

1 bh Pemasangan Bak Kontrol Pas. Batu Bata 60x60 tinggi 60 cm

A TENAGA
3.20 OH Pekerja
1.15 OH Tukang Batu
0.011 OH Kepala Tukang
0.016 OH Mandor
B BAHAN
123 bh Batu Bata
114 kg Portland Cement
0.184 m3 Pasir Pasang
0.12 m3 Pasir Beton
4.85 kg Baja Tulangan
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D + E)

1 m' Pemasangan Pipa PVC Tipe AW Ø 3"


A TENAGA
0.08 OH Pekerja
0.135 OH Tukang Batu
0.0135 OH Kepala Tukang
0.0040 OH Mandor
B BAHAN
1.2 m' Pipa PVC Ø 3"
0.35 Ls Perlengkapan 35% x pipa
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D + E)

1 Titik Pemasangan Lampu


A TENAGA
100.00 % Pekerja
B BAHAN
3.00 btg Pipa Listrik 5/8"
24.00 m Kabel
3.00 buah T.Dus
4.00 buah L.Bow
3.00 buah Las Dop
24.00 buah Klem
1.00 buah Mongkok
1.00 buah Saklar
1.00 buah Pitting
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D + E)

1 m' Pemasangan Kansteen Beton


A TENAGA
0.50 OH Pekerja
0.5 OH Tukang Batu
0.05 OH Kepala Tukang
0.0013 OH Mandor
B BAHAN
1.01 m2 Kansteen
0.07 m3 Pasir Beton
C PERALATAN
10 % Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D + E)

1 m' Pemasangan Saluran Uditch 60 cm


A TENAGA
0.50 OH Pekerja
0.5 OH Tukang Batu
0.05 OH Kepala Tukang
0.0013 OH Mandor
B BAHAN
1.01 m2 Buis Beton 50 cm - 100 cm
0.07 m3 Pasir Beton
C PERALATAN
10 % Peralatan
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D + E)

Pembuatan Pintu Besi Plat Baja Tebal 2 mm Rangkap,


1 m2
Rangka Baja Siku
A TENAGA
1.05 OH Pekerja
1.05 OH Tukang Besi
0.105 OH Kepala Tukang
0.0520 OH Mandor
B BAHAN
15 kg Besi Siku L.50.50.5
32.8 kg Besi Plat Baja
0.05 kg Kawat Las
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D + E)

1 m2 Penanaman Rumput Hias


A TENAGA
0.50 OH Pekerja
0.05 OH Mandor
B BAHAN
1 m2 Rumput Gajah Biasa
0.25 kg Tanah Humus
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D + E)

1 bh Penanaman Pohon Peneduh


A TENAGA
0.50 OH Pekerja
0.05 OH Mandor
B BAHAN
1 bh Ketapang Kencana
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D + E)
HARGA BAHAN/UPAH JUMLAH
Rp Rp

Rp20,625
Rp18,750
Rp115,000 Rp11,500
Rp145,000 Rp7,250

Rp18,750
Rp1,875
Rp20,625
Rp188,964
Rp28,225
Rp115,000 Rp11,500
Rp145,000 Rp14,500
Rp150,000 Rp1,500
Rp145,000 Rp725
Rp143,560
Rp6,800,000 Rp81,600
Rp18,000 Rp360
Rp8,800,000 Rp61,600

Rp171,785
Rp17,179
Rp188,964
Rp365,408
Rp80,900
Rp115,000 Rp46,000
Rp145,000 Rp29,000
Rp150,000 Rp3,000
Rp145,000 Rp2,900
Rp251,289
Rp6,800,000 Rp170,000
Rp50,000 Rp50,000
Rp18,000 Rp1,800
Rp1,160 Rp19,488
Rp370,000 Rp9,990
Rp281 Rp11

Rp332,189
Rp33,219
Rp365,408
Rp3,500,000
Rp3,500,000 Rp3,500,000
Rp3,500,000
Rp8,500,000
Rp2,500,000 Rp8,500,000
Rp8,500,000
Rp758,445
Rp86,900
Rp115,000 Rp23,000
Rp145,000 Rp58,000
Rp150,000 Rp3,000
Rp145,000 Rp2,900
Rp602,595
Rp24,000 Rp30,000
Rp1,160 Rp2,900
Rp55,000 Rp66,000
Rp380,000 Rp1,900
Rp360,000 Rp3,240
Rp6,800,000 Rp489,600
Rp18,000 Rp1,080
Rp17,500 Rp7,875

Rp689,495
Rp68,950
Rp758,445
Rp3,500,000
Rp3,500,000 Rp3,500,000
Rp3,500,000

Rp241,313
Rp98,863
Rp89,875
Rp115,000 Rp86,250
Rp145,000 Rp3,625

Rp89,875
Rp8,988
Rp98,863
Rp71,225
Rp64,750
Rp115,000 Rp57,500
Rp145,000 Rp7,250

Rp64,750
Rp6,475
Rp71,225
Rp71,225
Rp64,750
Rp115,000 Rp57,500
Rp145,000 Rp7,250
Rp64,750
Rp6,475
Rp71,225
Rp813,870
Rp170,870
Rp115,000 Rp138,000
Rp145,000 Rp29,000
Rp150,000 Rp3,000
Rp145,000 Rp870
Rp569,012
Rp1,160 Rp346,840
Rp380,000 Rp216,600
Rp281 Rp197
Rp25 Rp5,375

Rp739,882
Rp73,988
Rp813,870
Rp326,013
Rp32,375
Rp115,000 Rp28,750
Rp145,000 Rp3,625
Rp264,000
Rp220,000 Rp264,000

Rp296,375
Rp29,638
Rp326,013
Rp1,000,800
Rp245,860
Rp115,000 Rp189,750
Rp145,000 Rp39,875
Rp150,000 Rp4,200
Rp145,000 Rp12,035
Rp663,958
Rp1,160 Rp479,080
Rp380,000 Rp184,680
Rp281 Rp198
Rp25 Rp5,375

Rp909,818
Rp90,982
Rp1,000,800
Rp180,268
Rp19,130
Rp115,000 Rp8,050
Rp135,000 Rp9,450
Rp150,000 Rp1,050
Rp145,000 Rp580
Rp144,750
Rp13,500 Rp141,750
Rp20,000 Rp3,000

Rp163,880
Rp16,388
Rp180,268
Rp360,327
Rp105,170
Rp115,000 Rp59,800
Rp145,000 Rp37,700
Rp150,000 Rp3,900
Rp145,000 Rp3,770
Rp222,400
Rp5,400,000 Rp216,000
Rp18,000 Rp5,400
Rp10,000 Rp1,000

Rp327,570
Rp32,757
Rp360,327
Rp583,946
Rp245,860
Rp115,000 Rp189,750
Rp145,000 Rp39,875
Rp150,000 Rp4,200
Rp145,000 Rp12,035
Rp125,000
Rp125,000 Rp125,000
Rp160,000
Rp160,000 Rp160,000
Rp530,860
Rp53,086
Rp583,946
Rp244,530
Rp222,300
Rp115,000 Rp138,000
Rp145,000 Rp72,500
Rp150,000 Rp6,000
Rp145,000 Rp5,800

Rp222,300
Rp22,230
Rp244,530
Rp436,352
Rp98,863
Rp89,875
Rp115,000 Rp86,250
Rp145,000 Rp3,625

Rp89,875
Rp8,988
Rp98,863
Rp71,225
Rp64,750
Rp115,000 Rp57,500
Rp145,000 Rp7,250

Rp64,750
Rp6,475
Rp71,225
Rp71,225
Rp64,750
Rp115,000 Rp57,500
Rp145,000 Rp7,250

Rp64,750
Rp6,475
Rp71,225
Rp813,870
Rp170,870
Rp115,000 Rp138,000
Rp145,000 Rp29,000
Rp150,000 Rp3,000
Rp145,000 Rp870
Rp569,012
Rp1,160 Rp346,840
Rp380,000 Rp216,600
Rp281 Rp197
Rp25 Rp5,375

Rp739,882
Rp73,988
Rp813,870
Rp326,013
Rp32,375
Rp115,000 Rp28,750
Rp145,000 Rp3,625
Rp264,000
Rp220,000 Rp264,000

Rp296,375
Rp29,638
Rp326,013
Rp1,000,800
Rp245,860
Rp115,000 Rp189,750
Rp145,000 Rp39,875
Rp150,000 Rp4,200
Rp145,000 Rp12,035
Rp663,958
Rp1,160 Rp479,080
Rp380,000 Rp184,680
Rp281 Rp198

Rp909,818
Rp90,982
Rp1,000,800
Rp180,268
Rp19,130
Rp115,000 Rp8,050
Rp135,000 Rp9,450
Rp150,000 Rp1,050
Rp145,000 Rp580
Rp144,750
Rp13,500 Rp141,750
Rp20,000 Rp3,000

Rp163,880
Rp16,388
Rp180,268
Rp360,327
Rp105,170
Rp115,000 Rp59,800
Rp145,000 Rp37,700
Rp150,000 Rp3,900
Rp145,000 Rp3,770
Rp222,400
Rp5,400,000 Rp216,000
Rp18,000 Rp5,400
Rp10,000 Rp1,000

Rp327,570
Rp32,757
Rp360,327
Rp583,946
Rp245,860
Rp115,000 Rp189,750
Rp145,000 Rp39,875
Rp150,000 Rp4,200
Rp145,000 Rp12,035
Rp125,000
Rp125,000 Rp125,000
Rp160,000
Rp160,000 Rp160,000
Rp530,860
Rp53,086
Rp583,946
Rp244,530
Rp222,300
Rp115,000 Rp138,000
Rp145,000 Rp72,500
Rp150,000 Rp6,000
Rp145,000 Rp5,800

Rp222,300
Rp22,230
Rp244,530

Rp1,006,712
Rp245,860
Rp115,000 Rp189,750
Rp145,000 Rp39,875
Rp150,000 Rp4,200
Rp145,000 Rp12,035
Rp669,333
Rp1,160 Rp479,080
Rp380,000 Rp184,680
Rp281 Rp198
Rp25 Rp5,375

Rp915,193
Rp91,519
Rp1,006,712
Rp180,268
Rp19,130
Rp115,000 Rp8,050
Rp135,000 Rp9,450
Rp150,000 Rp1,050
Rp145,000 Rp580
Rp144,750
Rp13,500 Rp141,750
Rp20,000 Rp3,000

Rp163,880
Rp16,388
Rp180,268
Rp513,354
Rp133,485
Rp115,000 Rp75,900
Rp145,000 Rp47,850
Rp150,000 Rp4,950
Rp145,000 Rp4,785
Rp333,200
Rp5,400,000 Rp324,000
Rp18,000 Rp7,200
Rp10,000 Rp2,000

Rp466,685
Rp46,669
Rp513,354

1006712.479259
245860
115000 189750
145000 39875
150000 4200
145000 12035
669333.162963
1160 479080
380000 184680
281.481481481481 198.162962963
25 5375

915193.162963
91519.3162963
1006712.479259
180268
19130
115000 8050
135000 9450
150000 1050
145000 580
144750
13500 141750
20000 3000

163880
16388
180268
513353.5
133485
115000 75900
145000 47850
150000 4950
145000 4785
333200
5400000 324000
18000 7200
10000 2000

466685
46668.5
513353.5

1000799.979259
245860
115000 189750
145000 39875
150000 4200
145000 12035
663958.162963
1160 479080
380000 184680
281.481481481481 198.162962963

909818.162963
90981.8162963
1000799.979259
180268
19130
115000 8050
135000 9450
150000 1050
145000 580
144750
13500 141750
20000 3000

163880
16388
180268
513353.5
133485
115000 75900
145000 47850
150000 4950
145000 4785
333200
5400000 324000
18000 7200
10000 2000

466685
46668.5
513353.5
HARGA BAHAN/UPAH JUMLAH
MAKSIMUM MAKSIMUM
Rp Rp

1000799.979259
245860
115000 189750
145000 39875
150000 4200
145000 12035
663958.162963
1160 479080
380000 184680
281.481481481481 198.162962963

909818.162963
90981.8162963
1000799.979259
580096
245860
115000 189750
145000 39875
150000 4200
145000 12035
281500
27500 280500
20000 1000

527360
52736
580096
813870.2407407
170870
115000 138000
145000 29000
150000 3000
145000 870
569012.037037
1160 346840
380000 216600
281.481481481481 197.037037037
25 5375

739882.037037
73988.2037037
813870.2407407
326012.5
32375
115000 28750
145000 3625
264000
220000 264000

296375
29637.5
326012.5

98862.5
89875
115000 86250
145000 3625

89875
8987.5
98862.5
1109916.5
303375
115000 172500
145000 108750
150000 11250
145000 10875
705640
320000 384000
1160 105560
370000 216080

1009015
100901.5
1109916.5
326012.5
32375
115000 28750
145000 3625
264000
220000 264000

296375
29637.5
326012.5

98862.5
89875
115000 86250
145000 3625

89875
8987.5
98862.5
357208.5
303375
115000 172500
145000 108750
150000 11250
145000 10875
21360
10500 12600
0 0
15000 8760

324735
32473.5
357208.5
326012.5
32375
115000 28750
145000 3625
264000
220000 264000

296375
29637.5
326012.5
32601.25
358613.75

115288.2866667
31405
115000 20700
145000 2900
145000 2900
150000 900
145000 1305
135000 2700
73402.53333333
10650000 21300
18000 180
12000 36000
20000 9000
1160 4640
380000 2280
281.481481481481 2.533333333333

104807.5333333
10480.75333333
115288.2866667
115288.2866667
31405
115000 20700
145000 2900
145000 2900
150000 900
145000 1305
135000 2700
73402.53333333
10650000 21300
18000 180
12000 36000
20000 9000
1160 4640
380000 2280
281.481481481481 2.533333333333

104807.5333333
10480.75333333
115288.2866667
115288.2866667
31405
115000 20700
145000 2900
145000 2900
150000 900
145000 1305
135000 2700
73402.53333333
10650000 21300
18000 180
12000 36000
20000 9000
1160 4640
380000 2280
281.481481481481 2.533333333333

104807.5333333
10480.75333333
115288.2866667

36627.25
16335
115000 6900
135000 8100
150000 900
145000 435
16962.5
14750 16962.5

33297.5
3329.75
36627.25
138916.6666667

126287.8787879
112787.878787879 112787.8787879
13500 13500

126287.8787879
12628.78787879
138916.6666667
15400

14000
14000 14000

14000
1400
15400

36627.25
16335
115000 6900
135000 8100
150000 900
145000 435
16962.5
14750 16962.5

33297.5
3329.75
36627.25
15400

14000
14000 14000

14000
1400
15400

36627.25
16335
115000 6900
135000 8100
150000 900
145000 435
16962.5
14750 16962.5

33297.5
3329.75
36627.25
15400

14000
14000 14000

14000
1400
15400
HARGA BAHAN/UPAH JUMLAH
Rp Rp
31025.5
16935
115000 6900
145000 8700
150000 900
145000 435
11270
9800 11270

28205
2820.5
31025.5

31025.5
16935
115000 6900
145000 8700
150000 900
145000 435
11270
9800 11270

28205
2820.5
31025.5

31025.5
16935
115000 6900
145000 8700
150000 900
145000 435
11270
9800 11270

28205
2820.5
31025.5

37287.25
16935
115000 6900
145000 8700
150000 900
145000 435
16962.5
14750 16962.5

33897.5
3389.75
37287.25

37287.25
16935
115000 6900
145000 8700
150000 900
145000 435
16962.5
14750 16962.5

33897.5
3389.75
37287.25

40628.5
16935
115000 6900
145000 8700
150000 900
145000 435
20000
40000 20000

36935
3693.5
40628.5

40628.5
16935
115000 6900
145000 8700
150000 900
145000 435
20000
40000 20000

36935
3693.5
40628.5

40925.5
16935
115000 6900
145000 8700
150000 900
145000 435
20270
40000 20000
18000 270

37205
3720.5
40925.5
HARGA BAHAN/UPAH JUMLAH
Rp Rp

236225
64750
115000 57500
145000 7250
150000
150000 150000

214750
21475
236225

m (12±2)cm, w/c = 0,72 128534.2183598


50925
115000 34500
145000 4350
145000 4350
135000 4050
150000 1500
145000 2175
65924.28941799
1200 6960
271.428571428571 25.78571428571
281.481481481481 4.5037037037037
12000 45600
20000 1056
3300000 9900
18000 378
10000 2000

116849.289418
11684.9289418
128534.2183598

m (12±2)cm, w/c = 0,72 128534.2183598


50925
115000 34500
145000 4350
145000 4350
135000 4050
150000 1500
145000 2175
65924.28941799
1200 6960
271.428571428571 25.78571428571
281.481481481481 4.5037037037037
12000 45600
20000 1056
3300000 9900
18000 378
10000 2000
116849.289418
11684.9289418
128534.2183598

um (12±2)cm, w/c = 0,72 157438.103545


33720
115000 23000
145000 2900
145000 2900
135000 2700
150000 1350
145000 870
109405.5486772
1200 8724
271.428571428571 2.985714285714
281.481481481481 0.562962962963
12000 65400
20000 16400
3300000 16500
18000 378
10000 2000

143125.5486772
14312.55486772
157438.103545

(12±2)cm, w/c = 0,72 1340977.494709


245860
115000 189750
145000 39875
150000 4200
145000 12035
973210.44973545
1200 495600
271.428571428571 184842.8571429
281.481481481481 287392.5925926
25 5375

1219070.449735
121907.0449735
1340977.494709

177644.5
6695
115000 2875
135000 3375
150000 300
145000 145
154800
15000 153000
20000 1800

161495
16149.5
177644.5

620878.5
133485
115000 75900
145000 47850
150000 4950
145000 4785
430950
3300000 132000
18000 7200
10000 2000
6800000 102000
125000 43750
24000 144000

564435
56443.5
620878.5

Camp. 1 SP : 2 PP 131092.5471429
52675
115000 34500
145000 14500
150000 1500
145000 2175
66500.04285714
625 43750
1200 22740
264.285714285714 10.04285714286

119175.0428571
11917.50428571
131092.5471429

80243.99428571
60675
115000 34500
145000 21750
150000 2250
145000 2175
12274.08571429
1200 12268.8
264.285714285714 5.285714285714

72949.08571429
7294.908571429
80243.99428571

27912.5
12815
115000 2300
145000 9135
150000 945
145000 435
12560
32000 3200
26000 2600
26000 6760

25375
2537.5
27912.5

59086.5
12815
115000 2300
145000 9135
150000 945
145000 435
40900
32000 3200
26000 2600
135000 35100

53715
5371.5
59086.5

1188010.332143
141575
115000 80500
145000 50750
150000 5250
145000 5075
938434.3928571
78000 925860
1200 12000
264.285714285714 11.89285714286
375 562.5

1080009.392857
108000.9392857
1188010.332143

810557
33870
115000 13800
145000 17400
150000 1800
145000 870
703000
140000 700000
3000 3000

736870
73687
810557

50442.7
20225
115000 11500
145000 7250
150000 750
145000 725
25632
68000 24752
8000 880

45857
4585.7
50442.7

7427414.5
218945
115000 60375
135000 70875
145000 76125
150000 7800
145000 3770
6533250
14250 4118250
220500 1323000
87000 87000
120000 480000
215000 215000
310000 310000

6752195
675219.5
7427414.5

7295414.5
218945
115000 60375
135000 70875
145000 76125
150000 7800
145000 3770
6413250
14250 4118250
220500 1323000
87000 87000
120000 360000
215000 215000
310000 310000

6632195
663219.5
7295414.5

6321914.5
218945
115000 60375
135000 70875
145000 76125
150000 7800
145000 3770
5528250
14250 4118250
220500 1323000
87000 87000

5747195
574719.5
6321914.5

400559.5
64145
115000 60375
145000 3770
300000
150000 300000
364145
36414.5
400559.5

565559.5
64145
115000 60375
145000 3770
450000
150000 450000

514145
51414.5
565559.5

115000 368000
145000 166750
150000 1650
145000 2320
538720

320000 22400000
1200 92400
264.285714285714 34.35714285714
271.428571428571 24.42857142857
281.481481481481 5.62962962963
12000 31200
22523664.41534

0
23062384.41534
2306238.441534
25368622.85688

115000 9315
145000 19575
150000 2025
145000 580
31495

280000 336000
10000 3500
339500

0
370995
37099.5
408094.5

115000 115000
115000

1000 3000
5500 132000
1500 4500
1500 6000
800 2400
1500 36000
2500 2500
25000 25000
38000 38000
249400

0
364400
36440
400840

Rp115,000 Rp115,000
Rp115,000

Rp1,000 Rp3,000
Rp5,500 Rp82,500
Rp1,500 Rp1,500
Rp1,500 Rp3,000
Rp1,500 Rp36,000
Rp50,000 Rp50,000
Rp176,000

Rp0
Rp291,000
Rp29,100
Rp320,100
HARGA BAHAN/UPAH JUMLAH
Rp Rp

Rp 236,225
Rp 64,750
Rp 115,000 Rp 57,500
Rp 145,000 Rp 7,250
Rp 150,000
Rp 150,000 Rp 150,000

Rp 214,750
Rp 21,475
Rp 236,225

Rp 310,693
Rp 137,689
Rp 115,000 Rp 57,500
Rp 145,000 Rp 72,500
Rp 150,000 Rp 7,500
Rp 145,000 Rp 189
Rp 131,600
Rp 105,000 Rp 105,000
Rp 380,000 Rp 26,600
Rp 13,160
Rp 131,600 Rp 13,160
Rp 282,449
Rp 28,245
Rp 310,693
Rp 299,613
Rp 32,375
Rp 115,000 Rp 28,750
Rp 145,000 Rp 3,625
Rp 240,000
Rp 200,000 Rp 240,000

Rp 272,375
Rp 27,238
Rp 299,613
Rp 57,200
Rp 22,000
Rp 145,000 Rp 14,500
Rp 150,000 Rp 7,500
Rp 30,000
Rp 30,000 Rp 30,000

Rp 52,000
Rp 5,200
Rp 57,200
Rp 120,725
Rp 64,750
Rp 115,000 Rp 57,500
Rp 145,000 Rp 7,250
Rp 45,000
Rp 45,000 Rp 45,000

Rp 109,750
Rp 10,975
Rp 120,725

Rp 98,863
Rp 89,875
Rp 115,000 Rp 86,250
Rp 145,000 Rp 3,625

Rp 89,875
Rp 8,988
Rp 98,863

Rp 1,081,671

Rp 170,870
Rp 115,000 Rp 138,000
Rp 145,000 Rp 29,000
Rp 150,000 Rp 3,000
Rp 145,000 Rp 870
Rp 812,467
Rp 1,200 Rp 276,000
Rp 271 Rp 242,387
Rp 281 Rp 289,080
Rp 25 Rp 5,000

Rp 983,337
Rp 98,334
Rp 1,081,671

Rp 273,213
Rp 32,375
Rp 115,000 Rp 28,750
Rp 145,000 Rp 3,625
Rp 216,000
Rp 180,000 Rp 216,000

Rp 248,375
Rp 24,838
Rp 273,213
Rp 101,000
Rp 101,000

Rp 131,725
Rp 64,750
Rp 115,000 Rp 57,500
Rp 145,000 Rp 7,250
Rp 55,000
Rp 55,000 Rp 55,000

Rp 119,750
Rp 11,975
Rp 131,725

Rp 98,863
Rp 89,875
Rp 115,000 Rp 86,250
Rp 145,000 Rp 3,625

Rp 89,875
Rp 8,988
Rp 98,863

Rp 1,081,671

Rp 170,870
Rp 115,000 Rp 138,000
Rp 145,000 Rp 29,000
Rp 150,000 Rp 3,000
Rp 145,000 Rp 870
Rp 812,467
Rp 1,200 Rp 276,000
Rp 271 Rp 242,387
Rp 281 Rp 289,080
Rp 25 Rp 5,000

Rp 983,337
Rp 98,334
Rp 1,081,671

Rp 273,213
Rp 32,375
Rp 115,000 Rp 28,750
Rp 145,000 Rp 3,625
Rp 216,000
Rp 180,000 Rp 216,000
Rp 248,375
Rp 24,838
Rp 273,213

Rp 11,111,100
Rp 101,000
Rp 115,000 Rp 57,500
Rp 145,000 Rp 36,250
Rp 145,000 Rp 7,250
Rp 10,000,000
Rp 2,500,000 Rp 2,500,000
Rp 7,500,000 Rp 7,500,000

Rp 10,101,000
Rp 1,010,100
Rp 11,111,100

Rp 858,675
Rp 245,860
Rp 115,000 Rp 189,750
Rp 145,000 Rp 39,875
Rp 150,000 Rp 4,200
Rp 145,000 Rp 12,035
Rp 534,754
Rp 1,200 Rp 73,728
Rp 271 Rp 30,053
Rp 281 Rp 46,793
Rp 25 Rp 860
Rp 13,500 Rp 169,560
Rp 20,000 Rp 213,760

Rp 780,614
Rp 78,061
Rp 858,675

Rp 15,048
Rp 5,180
Rp 115,000 Rp 4,600
Rp 145,000 Rp 580
Rp 8,500
Rp 15,000 Rp 7,500
Rp 25,000 Rp 1,000

Rp 13,680
Rp 1,368
Rp 15,048

Rp 33,288
Rp 3,238
Rp 115,000 Rp 2,875
Rp 145,000 Rp 363
Rp 27,024
Rp 25,000 Rp 25,000
Rp 25,000 Rp 2,000
Rp 24,000 Rp 24

Rp 30,262
Rp 3,026
Rp 33,288

Rp 26,895
Rp 24,450
Rp 115,000 Rp 23,000
Rp 145,000 Rp 1,450

Rp 24,450
Rp 2,445
Rp 26,895

Rp 264,594
Rp 82,005
Rp 115,000 Rp 43,125
Rp 145,000 Rp 18,125
Rp 150,000 Rp 18,000
Rp 145,000 Rp 2,755
Rp 158,535
Rp 347,500 Rp 150,815
Rp 1,200 Rp 2,400
Rp 380,000 Rp 1,900
Rp 380,000 Rp 3,420

Rp 240,540
Rp 24,054
Rp 264,594
Rp1,000,799.98
Rp245,860.00
Rp115,000.00 Rp189,750.00
Rp145,000.00 Rp39,875.00
Rp150,000.00 Rp4,200.00
Rp145,000.00 Rp12,035.00
Rp663,958.16
Rp1,160.00 Rp479,080.00
Rp380,000.00 Rp184,680.00
Rp281.48 Rp198.16
Rp909,818.16
Rp90,981.82
Rp1,000,799.98
Rp580,096.00
Rp245,860.00
Rp115,000.00 Rp189,750.00
Rp145,000.00 Rp39,875.00
Rp150,000.00 Rp4,200.00
Rp145,000.00 Rp12,035.00
Rp281,500.00
Rp27,500.00 Rp280,500.00
Rp20,000.00 Rp1,000.00

Rp527,360.00
Rp52,736.00
Rp580,096.00
Rp813,870.24
Rp170,870.00
Rp115,000.00 Rp138,000.00
Rp145,000.00 Rp29,000.00
Rp150,000.00 Rp3,000.00
Rp145,000.00 Rp870.00
Rp569,012.04
Rp1,160.00 Rp346,840.00
Rp380,000.00 Rp216,600.00
Rp281.48 Rp197.04
Rp25.00 Rp5,375.00

Rp739,882.04
Rp73,988.20
Rp813,870.24
Rp326,012.50
Rp32,375.00
Rp115,000.00 Rp28,750.00
Rp145,000.00 Rp3,625.00
Rp264,000.00
Rp220,000.00 Rp264,000.00

Rp296,375.00
Rp29,637.50
Rp326,012.50
wah Sloof
Rp98,862.50
Rp89,875.00
Rp115,000.00 Rp86,250.00
Rp145,000.00 Rp3,625.00
Rp89,875.00
Rp8,987.50
Rp98,862.50
Rp1,109,916.50
Rp303,375.00
Rp115,000.00 Rp172,500.00
Rp145,000.00 Rp108,750.00
Rp150,000.00 Rp11,250.00
Rp145,000.00 Rp10,875.00
Rp705,640.00
Rp320,000.00 Rp384,000.00
Rp1,160.00 Rp105,560.00
Rp370,000.00 Rp216,080.00

Rp1,009,015.00
Rp100,901.50
Rp1,109,916.50
Rp326,012.50
Rp32,375.00
Rp115,000.00 Rp28,750.00
Rp145,000.00 Rp3,625.00
Rp264,000.00
Rp220,000.00 Rp264,000.00

Rp296,375.00
Rp29,637.50
Rp326,012.50
pi Luar
Rp98,862.50
Rp89,875.00
Rp115,000.00 Rp86,250.00
Rp145,000.00 Rp3,625.00

Rp89,875.00
Rp8,987.50
Rp98,862.50
Rp357,208.50
Rp303,375.00
Rp115,000.00 Rp172,500.00
Rp145,000.00 Rp108,750.00
Rp150,000.00 Rp11,250.00
Rp145,000.00 Rp10,875.00
Rp21,360.00
Rp10,500.00 Rp12,600.00
Rp0.00 Rp0.00
Rp15,000.00 Rp8,760.00
Rp324,735.00
Rp32,473.50
Rp357,208.50
Rp326,012.50
Rp32,375.00
Rp115,000.00 Rp28,750.00
Rp145,000.00 Rp3,625.00
Rp264,000.00
Rp220,000.00 Rp264,000.00

Rp296,375.00
Rp29,637.50
Rp326,012.50
32,601.25
358,613.75

Rp115,288.29
Rp31,405.00
Rp115,000.00 Rp20,700.00
Rp145,000.00 Rp2,900.00
Rp145,000.00 Rp2,900.00
Rp150,000.00 Rp900.00
Rp145,000.00 Rp1,305.00
Rp135,000.00 Rp2,700.00
Rp73,402.53
Rp10,650,000.00 Rp21,300.00
Rp18,000.00 Rp180.00
Rp12,000.00 Rp36,000.00
Rp20,000.00 Rp9,000.00
Rp1,160.00 Rp4,640.00
Rp380,000.00 Rp2,280.00
Rp281.48 Rp2.53

Rp104,807.53
Rp10,480.75
Rp115,288.29
Rp115,288.29
Rp31,405.00
Rp115,000.00 Rp20,700.00
Rp145,000.00 Rp2,900.00
Rp145,000.00 Rp2,900.00
Rp150,000.00 Rp900.00
Rp145,000.00 Rp1,305.00
Rp135,000.00 Rp2,700.00
Rp73,402.53
Rp10,650,000.00 Rp21,300.00
Rp18,000.00 Rp180.00
Rp12,000.00 Rp36,000.00
Rp20,000.00 Rp9,000.00
Rp1,160.00 Rp4,640.00
Rp380,000.00 Rp2,280.00
Rp281.48 Rp2.53

Rp104,807.53
Rp10,480.75
Rp115,288.29
Rp115,288.29
Rp31,405.00
Rp115,000.00 Rp20,700.00
Rp145,000.00 Rp2,900.00
Rp145,000.00 Rp2,900.00
Rp150,000.00 Rp900.00
Rp145,000.00 Rp1,305.00
Rp135,000.00 Rp2,700.00
Rp73,402.53
Rp10,650,000.00 Rp21,300.00
Rp18,000.00 Rp180.00
Rp12,000.00 Rp36,000.00
Rp20,000.00 Rp9,000.00
Rp1,160.00 Rp4,640.00
Rp380,000.00 Rp2,280.00
Rp281.48 Rp2.53

Rp104,807.53
Rp10,480.75
Rp115,288.29
A GUDANG
00.200
Rp36,627.25
Rp16,335.00
Rp115,000.00 Rp6,900.00
Rp135,000.00 Rp8,100.00
Rp150,000.00 Rp900.00
Rp145,000.00 Rp435.00
Rp16,962.50
Rp14,750.00 Rp16,962.50

Rp33,297.50
Rp3,329.75
Rp36,627.25
Rp138,916.67

Rp126,287.88
Rp112,787.88 Rp112,787.88
Rp13,500.00 Rp13,500.00
Rp126,287.88
Rp12,628.79
Rp138,916.67
Rp15,400.00

Rp14,000.00
Rp14,000.00 Rp14,000.00

Rp14,000.00
Rp1,400.00
Rp15,400.00
00
Rp36,627.25
Rp16,335.00
Rp115,000.00 Rp6,900.00
Rp135,000.00 Rp8,100.00
Rp150,000.00 Rp900.00
Rp145,000.00 Rp435.00
Rp16,962.50
Rp14,750.00 Rp16,962.50

Rp33,297.50
Rp3,329.75
Rp36,627.25
Rp15,400.00

Rp14,000.00
Rp14,000.00 Rp14,000.00

Rp14,000.00
Rp1,400.00
Rp15,400.00
50.175
Rp36,627.25
Rp16,335.00
Rp115,000.00 Rp6,900.00
Rp135,000.00 Rp8,100.00
Rp150,000.00 Rp900.00
Rp145,000.00 Rp435.00
Rp16,962.50
Rp14,750.00 Rp16,962.50

Rp33,297.50
Rp3,329.75
Rp36,627.25
Rp15,400.00
Rp14,000.00
Rp14,000.00 Rp14,000.00

Rp14,000.00
Rp1,400.00
Rp15,400.00
on

Rp 71,225.00
Rp 64,750.00
Rp 115,000.00 Rp 57,500.00
Rp 145,000.00 Rp 7,250.00

Rp 64,750.00
Rp 6,475.00
Rp 71,225.00
Rp 137,873.71
Rp 13,170.00
Rp 115,000.00 Rp 805.00
Rp 145,000.00 Rp 11,020.00
Rp 150,000.00 Rp 1,200.00
Rp 145,000.00 Rp 145.00
Rp 112,169.74
Rp 108,167.09 Rp 865.34
Rp 6,000.00 Rp 56,364.00
Rp 6,800,000.00 Rp 34,000.00
Rp 130,000.00 Rp 10,400.00
Rp 10,000.00 Rp 2,000.00
Rp 2,200.00 Rp 8,540.40

Rp 125,339.74
Rp 12,533.97
Rp 137,873.71

Rp 302,115.00
Rp 105,350.00
Rp 115,000.00 Rp 69,000.00
Rp 145,000.00 Rp 29,000.00
Rp 150,000.00 Rp 3,000.00
Rp 145,000.00 Rp 4,350.00
Rp 169,300.00
Rp 625.00 Rp 87,500.00
Rp 1,200.00 Rp 52,200.00
Rp 370,000.00 Rp 29,600.00

Rp 274,650.00
Rp 27,465.00
Rp 302,115.00
Rp 93,719.78
Rp 60,675.00
Rp 115,000.00 Rp 34,500.00
Rp 145,000.00 Rp 21,750.00
Rp 150,000.00 Rp 2,250.00
Rp 145,000.00 Rp 2,175.00
Rp 24,524.80
Rp 1,200.00 Rp 18,604.80
Rp 370,000.00 Rp 5,920.00

Rp 85,199.80
Rp 8,519.98
Rp 93,719.78

Rp 26,702.50
Rp 12,815.00
Rp 115,000.00 Rp 2,300.00
Rp 145,000.00 Rp 9,135.00
Rp 150,000.00 Rp 945.00
Rp 145,000.00 Rp 435.00
Rp 11,460.00
Rp 32,000.00 Rp 3,200.00
Rp 15,000.00 Rp 1,500.00
Rp 26,000.00 Rp 6,760.00

Rp 24,275.00
Rp 2,427.50
Rp 26,702.50
Rp 304,583.51
Rp 141,575.00
Rp 115,000.00 Rp 80,500.00
Rp 145,000.00 Rp 50,750.00
Rp 150,000.00 Rp 5,250.00
Rp 145,000.00 Rp 5,075.00
Rp 135,319.10
Rp 7,090.91 Rp 84,169.10
Rp 1,200.00 Rp 12,000.00
Rp 370,000.00 Rp 16,650.00
Rp 15,000.00 Rp 22,500.00

Rp 276,894.10
Rp 27,689.41
Rp 304,583.51
Rp 51,350.20
Rp 20,225.00
Rp 115,000.00 Rp 11,500.00
Rp 145,000.00 Rp 7,250.00
Rp 150,000.00 Rp 750.00
Rp 145,000.00 Rp 725.00
Rp 26,457.00
Rp 68,000.00 Rp 24,752.00
Rp 15,500.00 Rp 1,705.00

Rp 46,682.00
Rp 4,668.20
Rp 51,350.20
Rp 1,005,884.00
Rp 296,290.00
Rp 115,000.00 Rp 120,750.00
Rp 145,000.00 Rp 152,250.00
Rp 150,000.00 Rp 15,750.00
Rp 145,000.00 Rp 7,540.00
Rp 618,150.00
Rp 9,800.00 Rp 147,000.00
Rp 14,250.00 Rp 467,400.00
Rp 75,000.00 Rp 3,750.00

Rp 914,440.00
Rp 91,444.00
Rp 1,005,884.00
Rp 558,112.50
Rp 24,175.00
Rp 115,000.00 Rp 9,775.00
Rp 145,000.00 Rp 12,325.00
Rp 150,000.00 Rp 1,350.00
Rp 145,000.00 Rp 725.00
Rp 483,200.00
Rp 100,000.00 Rp 440,000.00
Rp 6,000.00 Rp 27,000.00
Rp 60,000.00 Rp 16,200.00

Rp 507,375.00
Rp 50,737.50
Rp 558,112.50
Rp 296,092.50
Rp 24,175.00
Rp 115,000.00 Rp 9,775.00
Rp 145,000.00 Rp 12,325.00
Rp 150,000.00 Rp 1,350.00
Rp 145,000.00 Rp 725.00
Rp 245,000.00
Rp 175,000.00 Rp 245,000.00

Rp 269,175.00
Rp 26,917.50
Rp 296,092.50
Rp 315,478.46
Rp 183,390.00
Rp 115,000.00 Rp 74,750.00
Rp 145,000.00 Rp 94,250.00
Rp 150,000.00 Rp 9,750.00
Rp 145,000.00 Rp 4,640.00
Rp 103,408.60
Rp 6,000.00 Rp 28,560.00
Rp 3,500.00 Rp 15,827.00
Rp 2,951.08 Rp 59,021.60

Rp 286,798.60
Rp 28,679.86
Rp 315,478.46
Rp 315,478.46
Rp 183,390.00
Rp 115,000.00 Rp 74,750.00
Rp 145,000.00 Rp 94,250.00
Rp 150,000.00 Rp 9,750.00
Rp 145,000.00 Rp 4,640.00
Rp 103,408.60
Rp 6,000.00 Rp 28,560.00
Rp 3,500.00 Rp 15,827.00
Rp 2,951.08 Rp 59,021.60

Rp 286,798.60
Rp 28,679.86
Rp 315,478.46
Rp 203,214.00
Rp 183,390.00
Rp 115,000.00 Rp 74,750.00
Rp 145,000.00 Rp 94,250.00
Rp 150,000.00 Rp 9,750.00
Rp 145,000.00 Rp 4,640.00
Rp 1,350.00
Rp 30,000.00 Rp 1,350.00

Rp 184,740.00
Rp 18,474.00
Rp 203,214.00
Rp 282,573.09
Rp 207,155.00
Rp 115,000.00 Rp 84,410.00
Rp 145,000.00 Rp 106,430.00
Rp 150,000.00 Rp 10,950.00
Rp 145,000.00 Rp 5,365.00
Rp 45,208.75
Rp 14,750.00 Rp 45,208.75
Rp 4,520.88
Rp 45,208.75 Rp 4,520.88
Rp 256,884.63
Rp 25,688.46
Rp 282,573.09
Rp 132,209.00
Rp 40,450.00
Rp 115,000.00 Rp 23,000.00
Rp 145,000.00 Rp 14,500.00
Rp 150,000.00 Rp 1,500.00
Rp 145,000.00 Rp 1,450.00
Rp 79,740.00
Rp 7,200.00 Rp 79,200.00
Rp 18,000.00 Rp 540.00

Rp 120,190.00
Rp 12,019.00
Rp 132,209.00
Rp 126,093.00
Rp 24,270.00
Rp 115,000.00 Rp 13,800.00
Rp 145,000.00 Rp 8,700.00
Rp 150,000.00 Rp 900.00
Rp 145,000.00 Rp 870.00
Rp 90,360.00
Rp 90,000.00 Rp 90,000.00
Rp 18,000.00 Rp 360.00

Rp 114,630.00
Rp 11,463.00
Rp 126,093.00
Rp 412,093.00
Rp 24,270.00
Rp 115,000.00 Rp 13,800.00
Rp 145,000.00 Rp 8,700.00
Rp 150,000.00 Rp 900.00
Rp 145,000.00 Rp 870.00
Rp 350,360.00
Rp 350,000.00 Rp 350,000.00
Rp 18,000.00 Rp 360.00

Rp 374,630.00
Rp 37,463.00
Rp 412,093.00
Rp 133,628.00
Rp 78,290.00
Rp 115,000.00 Rp 46,000.00
Rp 145,000.00 Rp 29,000.00
Rp 150,000.00 Rp 3,000.00
Rp 145,000.00 Rp 290.00
Rp 43,190.00
Rp 4,350.00 Rp 21,750.00
Rp 1,200.00 Rp 9,600.00
Rp 370,000.00 Rp 11,840.00

Rp 121,480.00
Rp 12,148.00
Rp 133,628.00
Rp 395,147.50
Rp 44,225.00
Rp 115,000.00 Rp 11,500.00
Rp 145,000.00 Rp 29,000.00
Rp 150,000.00 Rp 3,000.00
Rp 145,000.00 Rp 725.00
Rp 315,000.00
Rp 29,000,000.00 Rp 313,200.00
Rp 18,000.00 Rp 1,800.00

Rp 359,225.00
Rp 35,922.50
Rp 395,147.50
Rp 873,647.50
Rp 44,225.00
Rp 115,000.00 Rp 11,500.00
Rp 145,000.00 Rp 29,000.00
Rp 150,000.00 Rp 3,000.00
Rp 145,000.00 Rp 725.00
Rp 750,000.00
Rp 750,000.00 Rp 750,000.00

Rp 794,225.00
Rp 79,422.50
Rp 873,647.50
Rp 98,862.50
Rp 89,875.00
Rp 115,000.00 Rp 86,250.00
Rp 145,000.00 Rp 3,625.00

Rp 89,875.00
Rp 8,987.50
Rp 98,862.50
Rp 87,215.33
Rp 31,495.00
Rp 115,000.00 Rp 9,315.00
Rp 145,000.00 Rp 19,575.00
Rp 150,000.00 Rp 2,025.00
Rp 145,000.00 Rp 580.00
Rp 47,791.66
Rp 30,833.33 Rp 37,000.00
Rp 30,833.33 Rp 10,791.67

Rp 79,286.66
Rp 7,928.67
Rp 87,215.33
Rp 94,999.67
Rp 14,030.00
Rp 115,000.00 Rp 4,140.00
Rp 145,000.00 Rp 8,700.00
Rp 150,000.00 Rp 900.00
Rp 145,000.00 Rp 290.00
Rp 72,333.34
Rp 46,666.67 Rp 56,000.00
Rp 46,666.67 Rp 16,333.33

Rp 86,363.34
Rp 8,636.33
Rp 94,999.67
Rp 41,662.50
Rp 17,875.00
Rp 115,000.00 Rp 1,150.00
Rp 145,000.00 Rp 14,500.00
Rp 150,000.00 Rp 1,500.00
Rp 145,000.00 Rp 725.00
Rp 20,000.00
Rp 20,000.00 Rp 20,000.00

Rp 37,875.00
Rp 3,787.50
Rp 41,662.50
Rp 575,404.50
Rp 365,195.00
Rp 115,000.00 Rp 248,400.00
Rp 145,000.00 Rp 104,400.00
Rp 150,000.00 Rp 10,800.00
Rp 145,000.00 Rp 1,595.00
Rp 157,900.00
Rp 625.00 Rp 25,000.00
Rp 1,200.00 Rp 52,800.00
Rp 370,000.00 Rp 25,900.00
Rp 280,000.00 Rp 16,800.00
Rp 260,000.00 Rp 18,200.00
Rp 12,000.00 Rp 19,200.00
Rp 523,095.00
Rp 52,309.50
Rp 575,404.50
Rp 2,775,685.00
Rp 562,350.00
Rp 115,000.00 Rp 379,500.00
Rp 145,000.00 Rp 159,500.00
Rp 150,000.00 Rp 150.00
Rp 145,000.00 Rp 23,200.00
Rp 1,961,000.00
Rp 1,850,000.00 Rp 1,850,000.00
Rp 1,850,000.00 Rp 111,000.00

Rp 2,523,350.00
Rp 252,335.00
Rp 2,775,685.00
Rp 66,412.50
Rp 17,875.00
Rp 115,000.00 Rp 1,150.00
Rp 145,000.00 Rp 14,500.00
Rp 150,000.00 Rp 1,500.00
Rp 145,000.00 Rp 725.00
Rp 42,500.00
Rp 42,500.00 Rp 42,500.00

Rp 60,375.00
Rp 6,037.50
Rp 66,412.50
Rp 121,974.88
Rp 65,875.00
Rp 115,000.00 Rp 1,150.00
Rp 145,000.00 Rp 58,000.00
Rp 150,000.00 Rp 6,000.00
Rp 145,000.00 Rp 725.00
Rp 45,011.25
Rp 45,000.00 Rp 45,000.00
Rp 4,500.00 Rp 11.25

Rp 110,886.25
Rp 11,088.63
Rp 121,974.88

Rp 140,195.00
Rp 27,450.00
Rp 115,000.00 Rp 11,500.00
Rp 145,000.00 Rp 14,500.00
Rp 145,000.00 Rp 1,450.00
Rp 100,000.00
Rp 100,000.00 Rp 100,000.00

Rp 127,450.00
Rp 0.10 Rp 12,745.00
Rp 140,195.00
Rp 44,495.00
Rp 27,450.00
Rp 115,000.00 Rp 11,500.00
Rp 145,000.00 Rp 14,500.00
Rp 145,000.00 Rp 1,450.00
Rp 28,000.00
Rp 13,000.00 Rp 13,000.00
Rp 5,000.00 Rp 5,000.00
Rp 10,000.00 Rp 10,000.00

Rp 40,450.00
Rp 4,045.00
Rp 44,495.00
Rp 46,695.00
Rp 27,450.00
Rp 115,000.00 Rp 11,500.00
Rp 145,000.00 Rp 14,500.00
Rp 145,000.00 Rp 1,450.00
Rp 30,000.00
Rp 15,000.00 Rp 15,000.00
Rp 5,000.00 Rp 5,000.00
Rp 10,000.00 Rp 10,000.00

Rp 42,450.00
Rp 4,245.00
Rp 46,695.00
Rp 52,195.00
Rp 27,450.00
Rp 115,000.00 Rp 11,500.00
Rp 145,000.00 Rp 14,500.00
Rp 145,000.00 Rp 1,450.00
Rp 35,000.00
Rp 20,000.00 Rp 20,000.00
Rp 5,000.00 Rp 5,000.00
Rp 10,000.00 Rp 10,000.00

Rp 47,450.00
Rp 4,745.00
Rp 52,195.00
Rp 51,370.00
Rp 27,500.00
Rp 115,000.00 Rp 11,500.00
Rp 145,000.00 Rp 14,500.00
Rp 150,000.00 Rp 1,500.00
Rp 19,200.00
Rp 6,200.00 Rp 6,200.00
Rp 13,000.00 Rp 13,000.00

Rp 46,700.00
Rp 4,670.00
Rp 51,370.00
Rp 176,770.00
Rp 19,500.00
Rp 115,000.00 Rp 11,500.00
Rp 145,000.00 Rp 7,250.00
Rp 150,000.00 Rp 750.00
Rp 141,200.00
Rp 6,200.00 Rp 6,200.00
Rp 135,000.00 Rp 135,000.00

Rp 160,700.00
Rp 16,070.00
Rp 176,770.00
HARGA BAHAN/UPAH JUMLAH
MAKSIMUM MAKSIMUM
Rp Rp
98,862.50

115,000.00 86,250.00
145,000.00 3,625.00

89,875.00
8,987.50
98,862.50

121,027.50

115,000.00 103,500.00
145,000.00 6,525.00

110,025.00
11,002.50
121,027.50

23,741.67

115,000.00 57,500.00
145,000.00 7,250.00
64,750.00
6,475.00
23,741.67

71,225.00

115,000.00 57,500.00
145,000.00 7,250.00

64,750.00
6,475.00
71,225.00

299,612.50

115,000.00 28,750.00
145,000.00 3,625.00

200,000.00 240,000.00

272,375.00
27,237.50
299,612.50

3,646,307.50

115,000.00 172,500.00
145,000.00 108,750.00
150,000.00 11,250.00
145,000.00 10,875.00

340,000.00 408,000.00
12,000.00 2,424,000.00
370,000.00 179,450.00

3,314,825.00
331,482.50
3,646,307.50

4,105,536.81

115,000.00 189,750.00
145,000.00 39,875.00
150,000.00 4,200.00
145,000.00 12,035.00

12,000.00 2,964,000.00
271.43 235,872.67
281.48 281,198.52
25.00 5,375.00

3,732,306.19
373,230.62
4,105,536.81

291,938.35

115,000.00 57,500.00
145,000.00 72,500.00
150,000.00 7,500.00
145,000.00 188.50

90,000.00 90,900.00
360,000.00 25,200.00

116,100.00 11,610.00
265,398.50
26,539.85
291,938.35

1,000,862.50

115,000.00 368,000.00
145,000.00 166,750.00
150,000.00 1,650.00
145,000.00 2,320.00

625.00 76,875.00
1,200.00 136,800.00
370,000.00 68,080.00
260,000.00 31,200.00
12,000.00 58,200.00

909,875.00
90,987.50
1,000,862.50

87,215.33

115,000.00 9,315.00
145,000.00 19,575.00
150,000.00 2,025.00
145,000.00 580.00

30,833.33 37,000.00
30,833.33 10,791.67

79,286.66
7,928.67
87,215.33

21,791,154.00

196,140.00 19,614,000.00

4,200.00 12,600.00
6,200.00 148,800.00
600.00 1,800.00
600.00 2,400.00
600.00 1,800.00
60.00 1,440.00
1,300.00 1,300.00
13,000.00 13,000.00
13,000.00 13,000.00

19,810,140.00
1,981,014.00
21,791,154.00

220,306.35

115,000.00 57,500.00
145,000.00 72,500.00
150,000.00 7,500.00
145,000.00 188.50

30,000.00 30,300.00
380,000.00 26,600.00

56,900.00 5,690.00
200,278.50
20,027.85
220,306.35

379,179.35

115,000.00 57,500.00
145,000.00 72,500.00
150,000.00 7,500.00
145,000.00 188.50

160,000.00 161,600.00
380,000.00 26,600.00

188,200.00 18,820.00
344,708.50
34,470.85
379,179.35

4,469,014.00

115,000.00 120,750.00
135,000.00 141,750.00
150,000.00 15,750.00
145,000.00 7,540.00

220,500.00 3,307,500.00
14,250.00 467,400.00
41,000.00 2,050.00

4,062,740.00
406,274.00
4,469,014.00

94,050.00

115,000.00 57,500.00
145,000.00 7,250.00

18,500.00 18,500.00
9,000.00 2,250.00

85,500.00
8,550.00
94,050.00

401,225.00

115,000.00 57,500.00
145,000.00 7,250.00

300,000.00 300,000.00

364,750.00
36,475.00
401,225.00
efektivitas 7

No Item Pekerjaan Vol Satuan


Pekerja T. Kayu
A Pekerjaan Persiapan
1 Pembersihan dan striping lahan 24220.21 m² 0.1
2 Pengukuran dan pemasangan bowplank 280 m' 0.1 0.1
3 Papan nama proyek 1 Unit 0.4 0.2
4 Administrasi,dokumentasi proyek & asbuilt drawing 5 bln
5 Listrik dan air kerja 5 bln
6 Pagar sementara proyek dan keamanan 112 m' 0.2 0.4
7 Mobilisasi & Demobilisasi 1 Ls
B Pekerjaan Struktur Beton Gudang
1 Pondasi tiang tipe P1
Galian 6.48 m3 0.75
Urugan kembali dipadatkan 2.16 m3 0.5
Lantai kerja t=10cm beton K-150 0.72 m3 1.2
Sirtu padat t=20cm 1.44 m3 0.25
Beton mutu K-300 Pile cap 2.69 m3 1.65
Besi tulangan 448.403 kg 0.07
Bekesting 24 m2 0.52 0.26
Minipile 25x25 96 m1
Cut off tiang minipile 8 titik 1.2
2 Pondasi tiang tipa P2
Galian 42.768 m3 0.75
Urugan kembali dipadatkan 14.256 m3 0.5
Lantai kerja t=10cm beton K-150 4.752 m3 1.2
Sirtu padat t=20cm 9.5 m3 0.25
Beton mutu K-300 Pile cap 19.4 m3 1.65
Besi tulangan 3035.9 kg 0.07
Bekesting 138.6 m2 0.52 0.26
Minipile 25x25 792 m1
Cut off tiang minipile 66 titik 1.2
3 Kolom pedestal tipe K1 (40x60cm)
Beton mutu K-300 11.32 m3 1.65
Berat tulangan 2932.083 kg 0.07
Bekesting 94.3 m2 0.66 0.33
4 Kolom tipe K2 (25x40cm)
Beton mutu K-300 9 m3 1.65
Berat tulangan 1556.871 kg 0.07
Bekesting 117 m2 0.66 0.33
5 Tie beam tipe S1 (25x40cm)
Beton mutu K-300 27.79 m3 1.65
Berat tulangan 8141.785 kg 0.07
Bekesting 222.3 m2 0.66 0.33
6 Tie beam tipe S2 (20x30 cm)
Beton mutu K-300 0.41 m3 1.65
Berat tulangan 235.1 kg 0.07
Bekesting 4.08 m2 0.66 0.33
7 Pelat lantai t=15cm
Beton mutu K-300 450 m3 1.65
Berat tulangan rangkap Wiremesh 62075.26 kg 0.025
Lantai kerja t=8cm K-150 600 m3 1.2
Sirtu padat t=20cm 60 m3 0.25
8 Pondasi lajur batu belah ( bawah sloof )
Galian 363.039 m3 0.75
Pas. Pondasi batu belah 68.019 m3 1.5
Sirtu padat t=10cm 23.432 m3 0.25
9 Pondasi lajur batu belah ( tepi luar )
Galian 483.368 m3 0.75
Pas. Pondasi batu belah 59.356 m3 1.5
Sirtu padat t=10cm 20.448 m3 0.25
10 Beton praktis
Kolom Praktis beton mutu K-150 80 m 0.18 0.02
Sloof Praktis beton mutu K-150 227.2 m 0.18 0.02
Ring Praktis beton mutu K-150 279.1 m 0.18 0.02
C Pekerjaan Struktur Baja Gudang
1 Kolom portal utama IWF 500.200.10.16
Berat profil, baut, plat + cat 15848.94 kg 0.06
2 Kolom tepi IWF 500.200.10.16
Berat profil, baut, plat + cat 5367.834 kg 0.06
3 Balok portal utama IWF 350.175.6.9
Berat profil, baut, plat + cat 28293.75 kg 0.06
4 Balok konsol IWF 200.100.5,5.8
Berat profil, baut, plat + cat 537.8 kg 0.06
5 Balok regel/Ikat IWF 350.175.6.9
Berat profil, baut, plat + cat 7903.36 kg 0.06
6 Balok kanopi IWF 200.100.5,5.8
Berat profil, baut, plat + cat 495 kg 0.06
7 Gording utama 2C.150.50.20.2,3
Berat profil, baut, plat + cat 29340.75 kg 0.06
8 Gording kanopi C.150.50.20.2,3
Berat profil, baut, plat + cat 721.78 kg 0.06
9 Penutup atap utama
Atap galvalum 3244.2 m2 0.1
Insulasi alumunium bubble + kasa ayam 3244.2 m2 0.15 0.05
Atap bubungan galvalum 124 m1 0.4
Listplank galvalum rangka siku 270 m1 0.1
Talang galvalum rangka siku 124 m1 0.04
10 Penutup atap kanopi
Atap galvalum 51 m2 0.1
Listplank galvalum rangka siku 29 m1 0.1
Talang galvalum rangka siku 17 m1 0.04
D Pekerjaan Arsitektur Gudang
1 Pekerjaan tanah & beton
Urugan Tanah & Peninggian Peiil 8556 m3 0.5
Beton Sloof Praktis Sp-15x25Mutu K-150 235.5 m 0.3 0.03
Beton Ring Praktis Rp-15x20 Mutu K-150 795.5 m 0.3 0.03
Beton Kolom Praktis Kp-15x15 K-150 105 m 0.2 0.02
Beton Pelat Leuevel T=10cm K-150 50.4 m2 1.65
2 Pekerjaan finishing
dinding bata 1238 m2 0.3
pelster & aci 2476 m2 0.3
cat eksterior 1238 m2 0.02
cat interior 1238 m2 0.02
keramik lantai 30x30 12 m2 0.7
floor hardener 3000 m2 0.12
plafond gypsumboard 12 m2 0.1 0.05
3 Pekerjaan tipe kusen
tipe pintu gerbang PG1 2 bh 0.525
tipe pintu gerbang PG2 2 bh 0.525
tipe pintu besi P1 1 bh 0.525
tipe boven BV1 16 bh 0.525
tipe boven BV2 12 bh 0.525
Koefisien Durasi Pekerjaan
T. Batu T. Besi T. Cat T. Las Kepala Tukang Mandor (Hari) Pekerja T. Kayu

0.05 14 24.7145
0.01 0.005 2 2 2
0.02 0.02 1 0.057143 0.028571

0.02 0.02 2 1.6 3.2

0.025 1 0.694286
0.05 1 0.154286
0.2 0.02 0.006 1 0.123429
0.025 1 0.051429
0.275 0.028 0.083 1 0.634071
0.07 0.007 0.004 3 1.494677
0.026 0.026 1 1.782857 0.891429

0.5 0.04 0.04 1 1.371429

0.025 2 2.291143
0.05 1 1.018286
0.2 0.02 0.006 1 0.814629
0.025 1 0.339286
0.275 0.028 0.083 3 1.524286
0.07 0.007 0.004 2 15.1795
0.026 0.026 2 5.148 2.574

0.5 0.04 0.04 5 2.262857

0.275 0.028 0.083 1 2.668286


0.07 0.007 0.004 2 14.66042
0.033 0.033 1 8.891143 4.445571

0.275 0.028 0.083 1 2.121429


0.07 0.007 0.004 2 7.784355
0.033 0.033 1 11.03143 5.515714

0.275 0.028 0.083 2 3.27525


0.07 0.007 0.004 4 20.35446
0.033 0.033 2 10.47986 5.239929

0.275 0.028 0.083 1 0.096643


0.07 0.007 0.004 1 2.351
0.033 0.033 1 0.384686 0.192343
0.275 0.028 0.083 7 15.15306
0.025 0.025 0.001 10 22.16974
0.2 0.02 0.006 5 20.57143
0.025 1 2.142857

0.025 3 12.96568
0.75 0.075 0.075 1 14.5755
0.025 1 0.836857

0.025 3 17.26314
0.75 0.075 0.075 1 12.71914
0.025 1 0.730286

0.02 0.02 0.006 0.009 1 2.057143 0.228571


0.02 0.02 0.006 0.009 1 5.842286 0.649143
0.02 0.02 0.006 0.009 1 7.176857 0.797429

0.06 0.006 0.003 10 13.5848

0.06 0.006 0.003 5 9.202001

0.06 0.006 0.003 14 17.3227

0.06 0.006 0.003 3 1.536571

0.06 0.006 0.003 5 13.54862

0.06 0.006 0.003 1 4.242857

0.06 0.006 0.003 14 17.96372

0.06 0.006 0.003 1 6.186686

0.05 0.005 0.008 5 9.269143


0.005 0.008 5 13.90371
0.2 0.02 0.002 1 7.085714
0.2 0.02 0.005 1 3.857143
0.06 0.01 0.001 1 0.708571

0.05 0.005 0.008 1 0.728571


0.2 0.02 0.005 1 0.414286
0.06 0.01 0.001 1 0.097143

0.05 28 21.82653
0.03 0.03 0.01 0.015 1 10.09286 1.009286
0.03 0.03 0.01 0.015 2 17.04643 1.704643
0.02 0.02 0.009 0.006 1 3 0.3
0.275 0.028 0.083 1 11.88

0.1 0.01 0.015 5 10.61143


0.15 0.015 0.015 7 15.15918
0.063 0.0063 0.003 1 3.537143
0.063 0.0063 0.003 1 3.537143
0.35 0.035 0.035 1 1.2
0.12 0.012 0.006 5 10.28571
0.005 0.005 1 0.171429 0.085714

0.525 0.525 0.052 0.026 1 0.15


0.525 0.525 0.052 0.026 1 0.15
0.525 0.525 0.052 0.026 1 0.075
0.026 1 1.2
0.026 1 0.9
Jumlah Pekerja Jumlah Peke
T. Batu T. Besi T. Cat T. Las Kepala Tukang Mandor Pekerja T. Kayu T. Batu

12.35725 25
0.2 0.1 2 2
0.00285714286 0.002857 1 1

0.16 0.16 2 4

0.023143 1
0.015429 1
0.020571 0.00205714286 0.000617 1 1
0.005143 1
0.105679 0.01076 0.031896 1 1
1.494677 0.14946766667 0.08541 2
0.08914285714 0.089143 2 1

0.571429 0.04571428571 0.045714 2 1

0.076371 3
0.101829 2
0.135771 0.01357714286 0.004073 1 1
0.033929 1
0.254048 0.02586666667 0.076676 2 1
15.1795 1.51795 0.8674 16
0.2574 0.2574 6

0.942857 0.07542857143 0.075429 3 1

0.444714 0.04528 0.134223 3 1


14.66042 1.4660415 0.837738 15
0.44455714286 0.444557 9 5

0.353571 0.036 0.106714 3 1


7.784355 0.7784355 0.44482 8
0.55157142857 0.551571 12 6

0.545875 0.05558 0.164755 4 1


20.35446 2.03544625 1.163112 21
0.52399285714 0.523993 11 6

0.016107 0.00164 0.004861 1 1


2.351 0.2351 0.134343 3
0.01923428571 0.019234 1 1
2.52551 0.25714285714 0.762245 16 3
22.16974 22.1697353571 0.886789 23
3.428571 0.34285714286 0.102857 21 4
0.214286 3

0.432189 13
7.28775 0.728775 0.728775 15 8
0.083686 1

0.575438 18
6.359571 0.63595714286 0.635957 13 7
0.073029 1

0.228571 0.228571 0.06857142857 0.102857 3 1 1


0.649143 0.649143 0.19474285714 0.292114 6 1 1
0.797429 0.797429 0.23922857143 0.358843 8 1 1

13.5848 1.35848035714 0.67924 14

9.202001 0.92020011429 0.4601 10

17.3227 1.73227010204 0.866135 18

1.536571 0.15365714286 0.076829 2

13.54862 1.35486171429 0.677431 14

4.242857 0.42428571429 0.212143 5

17.96372 1.79637244898 0.898186 18

6.186686 0.61866857143 0.309334 7

4.634571 0.46345714286 0.741531 10


0 0.46345714286 0.741531 14
3.542857 0.35428571429 0.035429 8
7.714286 0.77142857143 0.192857 4
1.062857 0.17714285714 0.017714 1

0.364286 0.03642857143 0.058286 1


0.828571 0.08285714286 0.020714 1
0.145714 0.02428571429 0.002429 1

2.182653 22
1.009286 1.009286 0.33642857143 0.504643 11 2 2
1.704643 1.704643 0.56821428571 0.852321 18 2 2
0.3 0.3 0.135 0.09 3 1 1
1.98 0.2016 0.5976 12 2

3.537143 0.35371428571 0.530571 11 4


7.579592 0.75795918367 0.757959 16 8
11.142 1.1142 0.530571 4
11.142 1.1142 0.530571 4
0.6 0.06 0.06 2 1
10.28571 1.02857142857 0.514286 11 11
0.00857142857 0.008571 1 1

0.15 0.15 0.01485714286 0.007429 1


0.15 0.15 0.01485714286 0.007429 1
0.075 0.075 0.00742857143 0.003714 1
0.059429 2
0.044571 1
Jumlah Pekerja
Total Pekerja
T. Besi T. Cat T. Las Kepala Tukang Mandor

13 38
1 1 6
1 1 4

1 1 8

1 2
1 2
1 1 4
1 2
1 1 4
2 1 1 6
1 1 5

1 1 5

1 4
1 3
1 1 4
1 2
1 1 5
16 2 1 35
1 7

1 1 6

1 1 6
15 2 1 33
1 1 16

1 1 6
8 1 1 18
1 1 20

1 1 7
21 3 2 47
1 1 19

1 1 4
3 1 1 8
1 1 4
1 1 21
23 23 1 70
1 1 27
1 4

1 14
1 1 25
1 2

1 19
1 1 22
1 2

1 1 1 8
1 1 1 11
1 1 1 13

14 2 1 31

10 1 1 22

18 2 1 39

2 1 1 6

14 2 1 31

5 1 1 12

18 2 1 39

7 1 1 16

5 1 1 17
0 1 1 16
4 1 1 14
8 1 1 14
2 1 1 5

1 1 1 4
1 1 1 4
1 1 1 4

3 25
2 1 1 19
2 1 1 26
1 1 1 8
1 1 16

1 1 17
1 1 26
12 2 1 19
12 2 1 19
1 1 5
2 1 25
1 1 4

1 1 1 1 5
1 1 1 1 5
1 1 1 1 5
1 3
1 2

1081
efektivitas 7
Koe
No Item Pekerjaan Vol Satuan
Pekerja T. Kayu T. Batu
E Pekerjaan M/E Gudang
1 Mekanikal
Pipa Drainase PVC dia 4' 189 m 0.135
Alat sambung pipa 1 Ls
Roof Drain 33 bh 0.01 0.1
Bak Kontrol 15 bh 3.2 1.15
2 Elektrikal
Lampu Gudang LED 100 watt 16 bh 0.1
Lampus SL 14 watt 25 bh 0.1
Sakelar Tunggal 1 bh 0.1
Sakelar Ganda 2 bh 0.1
Stopkontak biasa 3 bh 0.1
Stopkontak Genset 2 bh 0.1
Instalasi kabel 8 titik lampu 49 titik 0.5
Genset slient 7KVA 1 Ls 0.01 0.01
Panel listrik + MCB 1 unit 1
Penangkal Petir (Splitzen, Arde, Kabel, Pentanahan) 22 bh 1
Durasi
Koefisien Pekerjaan Jumlah Pekerja
T. Listrik T. Cat T. Las Kepala Tukang Mandor (Hari) Pekerja T. Kayu T. Batu T. Listrik

0.0135 0.004 1 0 3.645

0.01 0.005 1 0.047143 0.471429


0.011 0.016 1 6.857143 2.464286

0.1 0.01 1 0.228571 0.228571


0.1 0.01 1 0.357143 0.357143
0.01 1 0.014286 0.001429
0.01 1 0.028571 0.002857
0.01 1 0.042857 0.004286
0.01 1 0.028571 0.002857
0.2 1 3.5 1.4
1 0.001429 0.001429
1 0.142857
1 3.142857
Jumlah Pekerja Jumlah Pekerja
T. Cat T. Las Kepala Tukang Mandor Pekerja T. Kayu T. Batu T. Listrik T. Cat T. Las

0.3645 0.108 0 4

0.04714285714 0.023571 1 1
0.02357142857 0.034286 7 3

0.022857 1 1
0.035714 1 1
1 1
1 1
1 1
1 1
4 2
1 1
1
4
a Total
Kepala Tukang Mandor Pekerja

1 1 6

1 1 4
1 1 12

1 3
1 3
2
2
2
2
6
2
1
4

49
efektivitas 7
No Item Pekerjaan Vol Satuan
Pekerja T. Kayu
F Pekerjaan Halaman
1 Pekerjaan Halaman
Urugan dan pemadatan tanah 11.75 m3 0.5
2 Perkerasan Jalan
Paving block mutu K - 300 2,000.00 m2 0.5
Sirtu padat t = 20 cm 400.00 m2 0.25
kansteen beton 580.00 m
3 Saluran Drainase U.40
Saluran Uditch 40 cm 308.00 m 0.5
Galian 61.60 m3 0.75
Lantai kerja t = 5 cm 6.16 m3 1.2
Sirtu padat t = 10 cm 12.32 m3 0.25
Tutup pelat beton 308.00 m
4 Saluran Drainase U.80
Saluran Uditch 80 cm 128.00 m 0.5
Galian 81.92 m3 0.75
Lantai kerja t = 5 cm 5.12 m3 1.2
Sirtu padat t = 10 cm 10.24 m2 0.25
5 Penerangan Jalan
Lampu PJU Tiang Heksagonal 4.00 unit 0.5
Termasuk Lampu LED 40 watt + Aksesoris
Pondasi beton bertulang 4.00 m3 1.65
6 Taman dan Penghijauan
Penanaman rumput hias termasuk tanah humus 1,470.00 m2 0.04
Penanaman pohon peneduh T = 2 meter 50.00 bh 0.025
7 Pagar BRC
Bongkar pagar panel eksisting 135.00 m 0.2
Pagar BRC 135 m 0.375
Durasi
Koefisien Pekerjaan J
T. Batu T. Listrik T. Cat T. Las Kepala Tukang Mandor (Hari) Pekerja T. Kayu

0.05 1 0.839286

0.5 0.05 0.0013 14 10.20408


0.025 2 7.142857
0.1 0.05 2

0.05 3 7.333333
0.025 1 6.6
0.2 0.02 0.006 1 1.056
0.025 1 0.44

0.05 2 4.571429
0.025 2 4.388571
0.02 0.02 0.006 1 0.877714
0.025 1 0.365714

0.25 0.05 1 0.285714

0.275 0.028 0.083 1 0.942857

0.004 2 4.2
0.0025 1 0.178571

0.01 1 3.857143
0.125 0.12 0.019 2 3.616071
Jumlah Pekerja Jumlah Peke
T. Batu T. Listrik T. Cat T. Las Kepala Tukang Mandor Pekerja T. Kayu T. Batu

0.083929 1

10.20408 1.020408163265 0.026531 11 11


0.714286 8
4.142857 2.071428571429 5

0.733333 8
0.22 7
0.176 0.0176 0.00528 2 1
0.044 1

0.457143 5
0.146286 5
0.014629 0.014628571429 0.004389 1 1
0.036571 1

0.142857 0.028571 1

0.157143 0.016 0.047429 1 1

0.42 5
0.017857 1

0.192857 4
1.205357 1.157142857143 0.183214 4 2
Jumlah Pekerja Total
T. Listrik T. Cat T. Las Kepala Tukang Mandor Pekerja

1 2

2 1 25
1 9
3 8

1 9
1 8
1 1 5
1 2

1 6
1 6
1 1 4
1 2

1 1 3

1 1 4

1 6
1 2

1 5
2 1 9

115
efektivitas 7
Koefisie
No Item Pekerjaan Vol Satuan
Pekerja T. Kayu T. Batu
G Pekerjaan Struktur Mushola & Ruang Rapat
1 Pondasi Footplat
Galian 21.60 m³ 0.75
Lantai Kerja t=5 cm 1.08 m³ 1.2 0.2
Sirtu padat t=15 cm 4.67 m³ 0.25
Beton mutu K-300 3.75 m³ 1.65 0.275
Berat tulangan 671.05 kg 0.07
Bekesting 15.00 m2 0.66 0.33
2 Kolom tipe K3 (15x30cm)
Beton mutu K-300 3.38 m³ 1.65 0.275
Berat tulangan 703.16 kg 0.07
Bekesting 62.10 m2 0.66 0.33
3 Tie Beam Tipe Sp (15x25cm)
Beton mutu K-300 2.19 m3 1.65 0.275
Berat tulangan 249.52 kg 0.07
Bekesting 29.25 m2 0.66 0.33
4 Balok Tipe B1 (15x30cm)
Beton mutu K-300 2.23 m3 1.65 0.275
Berat tulangan 464.09 kg 0.07
Bekesting 37.13 m2 0.66 0.33
5 Pondasi Lajur Batu Belah (bawah sloof)
Galian 28.08 m³ 0.75
Pas. Pondasi batu belah 24.57 m³ 1.5 0.75
Sirtu padat t=10 cm 4.10 m³ 0.25
6 Pondasi Lajur Batu Belah (tepi luar)
Galian 9.94 m³ 0.75
Pas. Pondasi batu belah 9.94 m³ 1.5 0.75
Sirtu padat t=10 cm 4.1 m³ 0.25
7 Pelat DAK T=10 cm
Beton mutu K-300 4.58 m3 1.65 0.275
Berat tulangan rangkap wiremesh 499.11 m3 0.07
Bekesting 45.80 m3 0.66 0.33
8 Beton Praktis
Kolom praktis (beton mutu K-150) 16.00 m 0.18 0.02 0.02
Sloof praktis (beton mutu K-150) 38.50 m 0.18 0.02 0.02
Ring praktis (beton mutu K150) 16.00 m 0.18 0.02 0.02
H Pekerjaan Arsitektur Mushola & Ruang Rapat
1 Pekerjaan Tanah & Beton
Urugan tanah peninggian peil 470.80 m³ 0.5
Beton plat Leufel T=10cm 3.20 m2 0.007 0.076
2 Pekerjaan Finishing
Dinding bata 256.50 m2 0.6 0.2
Plester & aci 513.00 m2 0.3 0.15
Cat eksterior 210.00 m2 0.02
Cat interior 210.00 m2 0.02
Keramik lantai 30x30 103.80 m2 0.7 0.35
Keramik dinding 30x30 46.50 m2 0.7 0.35
Plafond Gypsumboard 74.00 m2 0.1 0.05
3 Pekerjaan Tipe Kusen
Tipe pintu besi P1 1.00 unit 1.05
Tipe pintu P2 2.00 unit 0.085
Tipe pintu Km/wc P3 2.00 unit 0.085 0.085
Tipe jendela J1 4.00 unit 0.65
Tipe jendela J2 2.00 unit 0.65
Tipe roster 40.00 bh 0.65 0.65
4 Pekerjaan Atap
Rangka atap baja ringan 68.60 m2 0.734
Atap genteng beton 41.60 m2 0.2 0.1
Atap zincalume 27.00 m2 0.12 0.06
Insulasi aluminium bubble 27.00 m2 0.12 0.06
Bubungan genteng jurai beton 14.00 m2 0.4 0.2
lLisplank kalsiplank fin. Cat 24.00 m2 0.1 0.2
Kubah masjid 1.00 unit 0.1 0.2
Durasi
Koefisien Pekerjaan Jumlah Pekerja
T. Besi T. Cat T. Las Kepala Tukang Mandor (Hari) Pekerja T. Kayu T. Batu T. Besi

0.025 1 2.314286
0.02 0.006 1 0.185143 0.030857
0.025 1 0.166786
0.028 0.083 1 0.883929 0.147321
0.07 0.007 0.004 5 1.3421 1.3421
0.033 0.033 1 1.414286 0.707143

0.028 0.083 1 0.796714 0.132786


0.07 0.007 0.004 5 1.40632 1.40632
0.033 0.033 1 5.855143 2.927571

0.028 0.083 1 0.516214 0.086036


0.07 0.007 0.004 1 2.4952 2.4952
0.033 0.033 1 2.757857 1.378929

0.028 0.083 1 0.525643 0.087607


0.07 0.007 0.004 1 4.6409 4.6409
0.033 0.033 1 3.500829 1.750414

0.025 1 3.008571
0.075 0.075 2 2.6325 1.31625
0.025 1 0.146429

0.025 1 1.065
0.075 0.075 2 1.065 0.5325
0.025 1 0.146429

0.028 0.083 1 1.079571 0.179929


0.07 0.007 0.004 1 4.9911 4.9911
0.033 0.033 1 4.318286 2.159143

0.02 0.006 0.009 1 0.411429 0.045714 0.045714 0.045714


0.02 0.006 0.009 1 0.99 0.11 0.11 0.11
0.02 0.006 0.009 1 0.411429 0.045714 0.045714 0.045714

0.05 4 8.407143
0.008 0.001 1 0.0032 0.034743
0.02 0.03 5 4.397143 1.465714
0.015 0.015 5 4.397143 2.198571
0.063 0.0063 0.003 1 0.6
0.063 0.0063 0.003 1 0.6
0.035 0.035 3 3.46 1.73
0.035 0.035 2 2.325 1.1625
0.005 0.005 1 1.057143 0.528571

1.05 0.105 0.052 1 0.15 0.15


0.085 0.009 0.005 1 0.024286 0.024286
0.009 0.005 1 0.024286 0.024286
0.65 0.065 0.032 1 0.371429
0.65 0.065 0.032 1 0.185714
0.065 0.032 3 1.238095 1.238095

0.734 0.073 0.037 2 3.5966 3.5966


0.01 0.01 1 1.188571 0.594286
0.006 0.006 1 0.462857 0.231429
0.006 0.006 1 0.462857 0.231429
0.02 0.002 1 0.8 0.4
0.02 0.005 1 0.342857 0.685714
0.02 0.005 1 0.014286 0.028571
Jumlah Pekerja Jumlah Pekerja
T. Cat T. Las Kepala Tukang Mandor Pekerja T. Kayu T. Batu T. Besi T. Cat T. Las

0.077143 3
0.003085714286 0.000926 1 1
0.016679 1
0.015 0.044464 1 1
0.13421 0.076691 2 2
0.070714285714 0.070714 2 1

0.01352 0.040077 1 1
0.140632 0.080361 2 2
0.292757142857 0.292757 6 3

0.00876 0.025967 1 1
0.24952 0.142583 3 3
0.137892857143 0.137893 3 2

0.00892 0.026441 1 1
0.46409 0.265194 5 5
0.175041428571 0.175041 4 2

0.100286 4
0.131625 0.131625 3 2
0.014643 1

0.0355 2
0.05325 0.05325 2 1
0.014643 1

0.01832 0.054306 2 1
0.49911 0.285206 5 5
0.215914285714 0.215914 5 3

0.013714285714 0.020571 1 1 1 1
0.033 0.0495 1 1 1 1
0.013714285714 0.020571 1 1 1 1

0.840714 9
0.003657142857 0.000457 1 1
0.146571428571 0.219857 5 2
0.219857142857 0.219857 5 3
1.89 0.189 0.09 1 2
1.89 0.189 0.09 1 2
0.173 0.173 4 2
0.11625 0.11625 3 2
0.052857142857 0.052857 2 1

0.015 0.007429 1 1
0.002571428571 0.001429 1 1
0.002571428571 0.001429 1 1
0.371429 0.037142857143 0.018286 1 1
0.185714 0.018571428571 0.009143 1 1
0.12380952381 0.060952 2 2

0.3577 0.1813 4 4
0.059428571429 0.059429 2 1
0.023142857143 0.023143 1 1
0.023142857143 0.023143 1 1
0.04 0.004 1 1
0.068571428571 0.017143 1 1
0.002857142857 0.000714 1 1
a Total
Kepala Tukang Mandor Pekerja

1 4
1 1 4
1 2
1 1 4
1 1 6
1 1 5

1 1 4
1 1 6
1 1 11

1 1 4
1 1 8
1 1 7

1 1 4
1 1 65
1 1 8

1 5
1 1 7
1 2

1 3
1 1 5
1 2

1 1 5
1 1 12
1 1 10

1 1 6
1 1 6
1 1 6

1 10
1 1 4
1 1 9
1 1 10
1 1 5
1 1 5
1 1 8
1 1 7
1 1 5

1 1 4
1 1 4
1 1 4
1 1 4
1 1 4
1 1 6

1 1 10
1 1 5
1 1 4
1 1 4
1 1 4
1 1 4
1 1 4

335
efektivitas 7
Koefisien
No Item Pekerjaan Vol Satuan
Pekerja T. Kayu T. Batu T. Listrik
I Pekerjaan M/E Mushola & Ruang Rapat
1 Mekanikal
Septictank & resapan 1.00 Ls 0.75
Pipa drainase PVC dia. 3" 20.00 m 0.081 0.135
Pipa drainase PVC dia. 4" 6.00 m 0.036 0.06
Roof drain 8.00 bh 0.01 0.1
Bak kontrol 4.00 bh 2.16 0.72
Closet duduk monoblok 2.00 bh 3.3 1.1
Floor drain 4.00 bh 0.01 0.1
Kran air 6.00 bh 0.01 0.4
2 Elektrikal
Lampu SL 14 watt 21.00 bh 0.1 0.1
Sakelar tunggal 6.00 bh 0.1 0.1
Sakelar ganda 4.00 bh 0.1 0.1
Stop kontak 5.00 bh 0.1 0.1
Instalasi kabel & titik lampu 36.00 titik 0.1 0.1
Panel listrik + MCB 1.00 unit 0.1 0.05
Durasi
Koefisien Pekerjaan Jumlah Pekerja
T. Cat T. Las Kepala Tukang Mandor (Hari) Pekerja T. Kayu T. Batu T. Listrik

0.025 1 0.107143
0.0135 0.004 1 0.231429 0.385714
0.006 0.002 1 0.030857 0.051429
0.01 0.005 1 0.011429 0.114286
0.072 0.011 1 1.234286 0.411429
0.001 0.16 1 0.942857 0.314286
0.01 0.005 1 0.005714 0.057143
0.04 0.005 1 0.008571 0.342857

0.01 1 0.3 0.3


0.01 1 0.085714 0.085714
0.01 1 0.057143 0.057143
0.01 1 0.071429 0.071429
0.01 1 0.514286 0.514286
0.005 1 0.014286 0.007143
Jumlah Pekerja Jumlah Pekerja
T. Cat T. Las Kepala Tukang Mandor Pekerja T. Kayu T. Batu T. Listrik T. Cat

0.003571 1
0.038571428571 0.011429 1 1
0.005142857143 0.001714 1 1
0.011428571429 0.005714 1 1
0.041142857143 0.006286 2 1
0.000285714286 0.045714 1 1
0.005714285714 0.002857 1 1
0.034285714286 0.004286 1 1

0.03 1 1
0.008571 1 1
0.005714 1 1
0.007143 1 1
0.051429 1 1
0.000714 1 1
mlah Pekerja Total
T. Las Kepala Tukang Mandor Pekerja

1 2
1 1 4
1 1 4
1 1 4
1 1 5
1 1 4
1 1 4
1 1 4

1 3
1 3
1 3
1 3
1 3
1 3

49
efektivitas 7
Koefi
No Item Pekerjaan Vol Satuan
Pekerja T. Kayu T. Batu
J Pekerjaan Stock Area LPG
1 Pekerjaan tanah
Urugan dan pemadatan tanah 11,882.62 m3 0.5
2 Perkerasan jalan
Paving block mutu K - 300 22,746.71 m2 0.5 0.5
Sirtu padat t = 20 cm 3,950.61 m2 0.25
Kansteen beton 638.25 m1 0.50 0.5
3 Saluran drainase U.60
Saluran Uditch 80 cm 540.43 m1 0.5
Galian 345.88 m3 0.75
Lantai kerja t = 5 cm 21.62 m3 1.20 0.02
Sirtu padat t = 10 cm 43.23 m3 0.25
Pipa drainase PVC diameter 3" 180.14 m1 0.08 0.14
Bak kontrol 80 x 80 4.00 unit 3.20 1.15
4 Penerangan jalan
Lampu PJU Tiang Heksagonal 17.00 unit 0.50
Termasuk lampu LED 40 watt + aksesoris
Pondasi beton bertulang
J Pekerjaan Stock Area LPG
1 Pekerjaan tanah
Galian 33.37 m3 0.75
Pasangan Talud Batu Belah 92.70 m3 1.50 0.75
Sirtu padat t = 20 cm 7.42 m3 0.25
Urugan dan pemadatan tanah 379.19 m3 0.5
2 Perkerasan jalan
Paving blok mutu K-300 (sirtu dipadatkan t = 20 cm) 120.06 m3 0.5 0.5
Kansteen beton 34.31 m1 0.50 0.5
Pipa drainase PVC diameter 3" 0.60 m3 0.08 0.14
Bak kontrol 80 x 80 4.00 unit 3.20 1.15
3 Penerangan jalan
Lampu PJU Tiang heksagonal 1.00 unit 0.50
Termasuk Lampu LED 40 watt + Aksesoris Pondasi
Beton Bertulang
4 Pintu gerbang baru
Pintu Gerbang Pelat Besi 1.00 Ls 1.05
Kolom dan Pondasi beton bertulang 1.00 Ls 1.65 0.275
5 Taman dan penghijauan
Penanaman rumput hias termasuk tanah humus 2479.54 m2 0.50
Penanaman pohon peneduh T = 2 meter 50.00 bh 0.50
L Pekerjaan Jalan Ramp
1 Pekerjaan tanah
Galian 156.60 m3 0.5
Pasangan Talud Batu Belah 117.60 m3 1.50 0.75
Sirtu padat t = 20 cm 12.80 m3 0.25
Urugan dan pemadatan tanah 230.40 m3 0.5
2 Perkerasan jalan
Paving block mutu K - 300 390.12 m3 0.5 0.5
Sirtu padat t = 20 cm 78.02 m3 0.25
Kansteen beton 80.00 m1 0.50 0.5
Durasi
Koefisien Pekerjaan Jumlah Pekerja
T. Listrik T. Cat T. Besi Kepala Tukang Mandor (Hari) Pekerja T. Kayu T. Batu T. Listrik

0.05 30 28.29195

0.05 0.0013 60 27.07942 27.07942


0.025 14 10.07809
0.05 0.0013 14 3.256378 3.256378

0.05 3 12.86738
0.03 3 12.35286
0.02 0.01 1 3.706286 0.061771
0.03 1 1.543929
0.01 0.004 1 2.084477 3.474129
0.01 0.02 1 1.828571 0.657143

0.25 0.05 1 1.214286 0.607143

0.03 1 3.575357
0.075 0.075 2 9.932143 4.966071
0.025 1 0.265
0.05 3 9.028333

0.05 0.0013 1 8.575714 8.575714


0.05 0.0013 1 2.450714 2.450714
0.01 0.004 1 0.006943 0.011571
0.01 0.02 1 1.828571 0.657143

0.25 0.05 1 0.071429 0.035714

1.05 0.105 0.052 1 0.15


0.028 0.083 1 0.235714 0.039286

0.05 5 35.422
0.05 1 3.571429

0.05 1 11.18571
0.075 0.075 5 5.04 2.52
0.025 1 0.457143
0.05 1 16.45714

0.05 0.0013 7 3.980816 3.980816


0.025 1 2.786429
0.05 0.0013 1 5.714286 5.714286
Jumlah Pekerja Jumlah Pekerja
T. Cat T. Besi Kepala Tukang Mandor Pekerja T. Kayu T. Batu T. Listrik T. Cat T. Besi

2.829195 29

2.70794166667 0.070406 28 28
1.007809 11
0.3256377551 0.008467 4 4

1.286738 13
0.411762 13
0.06177142857 0.018531 4 1
0.154393 2
0.34741285714 0.102937 3 4
0.00628571429 0.009143 2 1

0.121429 2 1

0.119179 4
0.49660714286 0.496607 10 5
0.0265 1
0.902833 10

0.85757142857 0.022297 9 9
0.24507142857 0.006372 3 3
0.00115714286 0.000343 1 1
0.00628571429 0.009143 2 1

0.007143 1 1

0.15 0.015 0.007429 1 1


0.004 0.011857 1 1

3.5422 36
0.357143 4

1.118571 12
0.252 0.252 6 3
0.045714 1
1.645714 17

0.39808163265 0.01035 4 4
0.278643 3
0.57142857143 0.014857 6 6
a Total
Kepala Tukang Mandor Pekerja

3 32

3 1 60
2 13
1 1 10

2 15
1 14
1 1 7
1 3
1 1 9
1 1 5

1 4

1 5
1 1 17
1 2
1 11

1 1 20
1 1 8
1 1 4
1 1 5

1 3

1 1 4
1 1 4

4 40
1 5

2 14
1 1 11
1 2
2 19

1 1 10
1 4
1 1 14

374

Anda mungkin juga menyukai